Loading...
HomeMy WebLinkAboutPre-Comments_Tranport_Stormwater_09-151 QT - Ron StrakaPUBLIC WORKS DEPARTMENT City of M E M O R A N D U M DATE: September 14, 2009 [h 1 a Zoog TO: Arneta Henninger, Plan Reviewer FROM: Ronald J. Straka, Surface Water Utility Supervisor SUBJECT: QUENDALL TERMINALS STORMWATER REQUIREMENTS Please see my comments below regarding the drainage report and plans, dated August 271 2009, for Quendall Terminals. 1. The project shall be required to comply with the 2009 King County Surface Water Design Manual (KCSWDM) standards as a condition of SEPA. 2. A compete TIR for the project site will be required with submittal of the civil engineering plans for the site that includes all information required by the 2009 King County Surface Water Design Manual. This includes information related to satisfying all core requirements and applicable special requirements in the 2009 KCSWDM. 3. The proposed projects must submit an offsite analysis report that assesses potential offsite drainage and water quality impacts associated with development of the project site and proposes appropriate mitigation of those impacts. 4. The report must include a KCRTS printout of all land use input values for pre- and post -developed impervious and pervious areas. The report should also include a basin summary table for the existing condition and developed condition land use. The basin summary table should identify the wetlands. 5. The wetland area needs to be included in the pre- and post -developed time series analysis. 6. Since the project will result in more than 5,000 square feet of new impervious surfaceI the project must comply with section 1.2.3 of the 2009 KCSWDM Flow Control. The direct discharge exemption may apply to the project if it meets all of the following criteria: a. The flowpath from the project site discharge point to the edge of the 100 -year floodplain of the major receiving water will be no longer than a quarter mile. b. The conveyance system between the project site and the major receiving water will extend to the ordinary high water mark, and will be comprised Henninger/Quendall Terminal Stormwater Requirements Page 2 of 2 September 14, 2009 of manmade conveyance elements (pipes, ditches, etc.) and will be within public right-of-way or a public or private drainage easement c. The conveyance system will have adequate capacity per Core Requirement #4, Conveyance System, for the entire contributing drainage area, assuming build -out conditions to current zoning for the equivalent area portion and existing conditions for the remaining area d. The conveyance system will be adequately stabilized to prevent erosion, assuming the same basin conditions as assumed in Criteria (c) above. NOTE: The major receiving waters do not include wetlands. The engineer proposes to discharge runofffrom the north and west portions of the site into the wetlands located at the north and west corners of the site. The engineer needs to conduct an analysis of the wetland to determine the existing hydrology, including the hydroperiod, and base the recharge on that analysis. Typically, the wetland report would include a recommendation from the biologist as to the proper recharge rate. 8. The proposed roadway improvements shall betaken into consideration when calculating the post development site condition and sizing the water quality and flow control facilities, if required. 9. The project will be required to provide enhanced water quality treatment per section 1.2.8.1. Application of the Enhanced Basic Water Quality menu may be waived for treatment of any runoff that is discharged entirely by pipe all the way to the ordinary high water mark to the major receiving waters, listed on pages 1- 37 of the 2009 KCSWDM. Enhanced Basic Water Quality treatment is required for any discharges to the existing wetlands on site. 10. Does the project have an expected average daily traffic (ADT) count of 100 or more vehicles per square feet of gross building area, per section 1.2.8.1 of the 2009 KCSWDM? If yes, the project must provide oil control in addition to any other water quality facility required. If you have any questions contact Hebe Bernardo, Surface Water Utility Engineer (x7264). cc: Lys Hornsby, Utility Systems Director Kayren Kittrick, Development Engineering Supervisor Chip Vincent, Planning Director Neil Watts, Development Services Director h:\file sys\swp -surface water projects\swp 27 -surface water projects (plan review)\quendall terminals\first review.doc\HBaw 1. Introduction Quendall Terminals is a proposed mixed-use development in Renton, Washington. The development ncludes five stories of residential or office space above two levels of above -grade parking or retail and restaurant space. The development project anticipates entitlement of the following: Table 1-1: Proposed Development Use Residential Note: All areas shown are moss buil Quantity/Area 800 Units Office 245,000 Square Feet Retail 21,600 Square Feet Restaurant 9,000 Square Feet Parking 2,215 Spaces ding areas (GBA). The project site is located west of Interstate 405 near the northern city limits of Renton. The site is bounded by the Seahawks Training Facility to the north, BNSF railroad tracks to the east, and the Barbee Mill residential community to the south. Ripley Lane is located east of the BNSF railroad tracks and Lake Washington Boulevard is located southeast of the project site. See Figure 1 in the Appendix for the site location. This report is intended to support City of Renton entitlement processingfor Master Site Plan Approval. The scope of this report is to address the sanitary sewer system for the proposed development. Design criteria will be outlined and a sewerage approach will be evaluated. 2. Predeveloped Site Conditions The existing site is vacant and is the former location of a log sort ing and storage yard. The main site is approximately 20.30 acres in size, and the parcel east of the main project site across Ripley Lane North is approximately 1.15 acres in size. An existing 12 -inch sanitary sewer main runs from south to north along the east side of the site within a 60 -foot roadway and utility easement. The invert elevation of the existing sewer pipe is generally 10 to 13 feet below the existing ground surface. The existing Baxter Lift Station serves Quendall Terminals as well as the Seahawks Training Facility to the north and Barbee Mill to the South. There are no other sewers located on the project site. An 84 -inch Metro sewer main is located approximately 100 feet east of the site's east property line. See Figure 2 in the Appendix for existing site conditions. -� I'V, �/�tl ✓ � CenturyPacifiq LP /* `e-'3SK-� Quendall Terminals ,/�f( //� /� [ j�LcFd� I 3. Developed Site Conditions The proposed site improvements include amixed-use development consisting of residential, office, retail, and restaurant uses, as well as new public and private streets and parking. Sewer mains will be constructed within the proposed public streets Sewage from the buildings will discharge to the new sewer mains vla slde sewers. The new sewer mains will discharge to the existing 12 -inch sewer main at the east side of the project site at a new manhole constructed over the existing main. No improvements are planned for the 1.15 -acre parcel east of Ripley Lane. See Figures 3 and 4 in the Appendix for proposed site plan and proposed sewer plan, respectively. 4. Basis of Design An on-site sanitary sewer system will collect and convey flows from Quendall Terminals. Adjacent sites are already developed and served by separate sanitary sewer systems. This report has utilized programmed project areas and Department of Ecology (DOE) criteria to establish projected sewer flows without provisions for future growth or connections. See Figures 3 and 4 in the Appendix for proposed site plan and proposed sewer plan, respectively. Gross building areas have been used for this report. An allowance of 1,100 gallons/acre/day (gpad) has been made for infiltration and inflow since the proV osed sanitary sewer system is expected to be below seasonal high groundwater elevations. The 1.15 acre parcel east of Ripley Lane has not been included in the infiltration calculation. A peaking factor of 4.0 was included in the design flows. This factor should account for the daily and seasonal fluctuations in waste generation. Thisfactor should also mitigate the impact of the varying flow generations for the different uses proposed with this project. The sanitary sewer system was designed to convey the estimated peak flows by gravity to the project discharge location at a new manhole installed on an existing City of Renton sanitary sewer pipe. The sewer capacities were established using Manning's Equation, with an "n" factor of 0.013. Sewer lines have been designed using the minimum slope requirements of the Washington State DOE. The pipe slopes used in the final design and future construction documents may be greater than the minimum slope to accommodate potential settlement, depending on the recommendation of the geotechnical engineer. CenturyPacifiq LP Quendall Terminals 2 ixr b I 3. Developed Site Conditions The proposed site improvements include amixed-use development consisting of residential, office, retail, and restaurant uses, as well as new public and private streets and parking. Sewer mains will be constructed within the proposed public streets Sewage from the buildings will discharge to the new sewer mains vla slde sewers. The new sewer mains will discharge to the existing 12 -inch sewer main at the east side of the project site at a new manhole constructed over the existing main. No improvements are planned for the 1.15 -acre parcel east of Ripley Lane. See Figures 3 and 4 in the Appendix for proposed site plan and proposed sewer plan, respectively. 4. Basis of Design An on-site sanitary sewer system will collect and convey flows from Quendall Terminals. Adjacent sites are already developed and served by separate sanitary sewer systems. This report has utilized programmed project areas and Department of Ecology (DOE) criteria to establish projected sewer flows without provisions for future growth or connections. See Figures 3 and 4 in the Appendix for proposed site plan and proposed sewer plan, respectively. Gross building areas have been used for this report. An allowance of 1,100 gallons/acre/day (gpad) has been made for infiltration and inflow since the proV osed sanitary sewer system is expected to be below seasonal high groundwater elevations. The 1.15 acre parcel east of Ripley Lane has not been included in the infiltration calculation. A peaking factor of 4.0 was included in the design flows. This factor should account for the daily and seasonal fluctuations in waste generation. Thisfactor should also mitigate the impact of the varying flow generations for the different uses proposed with this project. The sanitary sewer system was designed to convey the estimated peak flows by gravity to the project discharge location at a new manhole installed on an existing City of Renton sanitary sewer pipe. The sewer capacities were established using Manning's Equation, with an "n" factor of 0.013. Sewer lines have been designed using the minimum slope requirements of the Washington State DOE. The pipe slopes used in the final design and future construction documents may be greater than the minimum slope to accommodate potential settlement, depending on the recommendation of the geotechnical engineer. CenturyPacifiq LP Quendall Terminals 2 I I EXISTING BAXTER LIFT STATION The Baxter Lift Station is an existing sewer lift station located at the northeast corner of the project site within a sanitary sewer easement. The lift station was designed in 2006 and was constructed in 2009. The lift station was designed for an overall peak flow of 594 gpm for the Seahawks Training Facility, Barbee Mill community, and the Quendall Terminals site. The lift station was designed and constructed with the following assumptions for future development of the Quendall Terminals site: Table 5.3: Lift Station Design Assumations for Quendall irrmi., .l"E. a, Developable Acres 5 Tributary Area 5.0 Acres Flow Rate 2,800 gpad Number of Units 75 Tributary Area 3.0 Acres Persons/Unit 2.4 Flow Rate 100 gpad Average Sewerage Flow 22.2 gpm Design 1/1 Rate 1,500 gpad Peaking Factor 4 Design Sewage Flow 88.9 gpm Design VI Flow 8.3 gpm Total Design Flow 97.2 gpm Total Design Flow Q peak hourly The sewer lift station was designed for a flow of 97.2 gpm from the Quendall project site. The anticipated flow from the Quendall project site is 614 gpm. The sewer lift station capacity will need to be increased by approximately 517 gpm to 1,111 gpm to accommodate development of the Quendall Terminals site. Per discussion with the City of Renton Public Works, the existing lift station has the ability to be modified to increase capacity by changing pump impellers and increasing the wet well capacity. See Figure 6 in the Appendix for Baxter Lift Station design details and Figure 7 for a record of discus0on with the City. f -" " �t� CTCeGaHL . LO CenturyPaclfic, LP Quendall %rminals (.e�Y�"'� • Other available options are installing larger pumps but Dave did not believe that would be necessary as the existing pumps were specifically chosen to allow impeller modifications as they anticipated the need for additional capacity in the future. Fees: Quendall has recently been assessed a capacity charge of $166k for their "fair share" of the Baxter Pump Station. This assessment was based on 111gpm of capacity. I asked Dave if future assessments would be required if the flows exceeded the 111 gpm. Dave indicated there would be NO additional capacity charge assessments for the Quendall site only mechanical pump station upgrades to increase the pump station pipacity to meet' o^qlr proposed site demand. o•5T�9 KPFF Consulting Engineers Page 2 Telephone Record November 77, 2009 Figure 7 \ � \ k ) k jr} \ 42 \ _ { {\\ \ k ) k jr} \ \ _ ; §§\\\\` \ k ) k jr} \ \ _ ci [ ) ) ) } k &