Loading...
HomeMy WebLinkAboutQuendall Terminals LUA09-151 Renton Reporter Publication v 2NOTICE OF ENVIRONMENTAL DETERMINATION ENVIRONMENTAL REVIEW COMMITTEE RENTON, WASHINGTON Department of Community and Economic Development Notice is hereby given under WAC 197-11-510 and RMC 4-9-070 that the Environmental Impact Statement (EIS) Consistency Analysis (Environmental Consistency Analysis) for the proposal described below was issued by the City of Renton Environmental Review Committee on (ERC) Monday, March 20, 2017, and is available for public review. The ERC has determined that the proposed action is Consistent with the impacts analyzed under the EIS alternatives in the past State Environmental Policy Act (SEPA) review. No new mitigation measures are required beyond those identified in the 2015 Final Environmental Impact Statement (FEIS) and 2015 Mitigation Document, and there are no significant unavoidable impacts that cannot be mitigated. Copies are available for review at Renton City Hall, Customer Service Counter, 6th floor, 1055 South Grady Way, Renton WA 98057, and on the City of Renton web site (Rentonwa.gov). PROJECT NAME: Quendall Terminals PROPONENT: Campbell Mathewson, Century Pacific, L. P. PROJECT NUMBER: LUA09-151, EIS, ECF, BSP, SA-M, SM, DA LOCATION: 4350 Lake Washington Blvd. DESCRIPTION: The proposal is located adjacent to Lake Washington on 21.46 acres of Commercial/Office/Residential (COR) zoned property. The Consistency Analysis with the Draft Environmental Impact Statement (DEIS) issued December 10, 2010; evaluates potential impacts resulting from a new Enhanced Alternative established through a proposed Development Agreement. Similar to the Preferred Alternative, the Enhanced Alternative is intended to be a mixed-use development. The Enhanced Alternative would contain 692 residential units, 42,190 sq. ft. of commercial uses [retail and restaurant], 1,352 parking spaces and 12.9 acres of parks/open space. The following elements of the environment are addressed in this Consistency Analysis: Earth, Critical Areas, Environmental Health, Energy/Greenhouse Gases, Land & Shoreline Use, Aesthetics/Views, Parks & Recreation, Cultural Resources, Transportation, Height, and Bulk & Scale. DOCUMENT PURCHASE INFORMATION: The EIS Consistency Analysis is available for purchase from the Finance Department on the 1st Floor of Renton City Hall for $10 per hard copy, plus tax and postage (if mailed), or can be downloaded for free from the City of Renton website, Rentonwa.gov. PUBLIC REVIEW: No new mitigation measures are required beyond those identified in the 2015 FEIS and 2015 Mitigation Document, and there are no significant unavoidable impacts that cannot be mitigated. There is no comment period or appeal period for this Consistency Analysis and there are no new significant unavoidable impacts that cannot be mitigated by the existing environmental documents. Publication Date: March 24, 2017