HomeMy WebLinkAboutDOE agreed order amendment 2002 THIRD AMENDMENT TO AGREED ORDER NO. DE 92TC-N335 1 Error! AutoText entry not defined. STATE OF WASHINGTON DEPARTMENT OF ECOLOGY In the Matter of Remedial Action by: Quendall Terminals, a Joint Venture, composed of Altino Properties, Inc., a Washington Corporation, and J.H. Baxter & Co., a California Corporation, et al. THIRD AMENDMENT TO AGREED ORDER NO. DE 92TC-N335 TO: Quendall Terminals c/o Georgia B. Baxter Alex Cugini J.H. Baxter & Co. Altino Properties, Inc. P.O. Box 5902 P.O. Box 359 San Mateo, CA 94402-0902 Renton, WA 98055 Agreed Order No. DE92TC-N335 (as twice previously amended) is hereby amended to include the following: Findings of Fact 25. On December 26, 2001, Quendall Terminals received notice from the City of Renton that it does not intend to purchase the Quendall Terminals site. 26. In accord with Section (Work to be Performed), paragraph 8, Ecology and Quendall Terminals met to discuss the most appropriate manner in which to finish the work contemplated in the Agreed Order, as amended. This amendment memorializes those discussions. Work to be Performed 9. Quendall Terminals will complete the following tasks within the corresponding timeline: a) Submit to Ecology a Draft Risk Assessment and Feasibility Study Work Plan within 60 days after the close of the public comment period for this Agreed Order Amendment. THIRD AMENDMENT TO AGREED ORDER NO. DE 92TC-N335 2 Error! AutoText entry not defined. b) Submit to Ecology a Final Risk Assessment and Feasibility Study Work Plan within 30 days after resolution of any Ecology comments on the Draft Risk Assessment and Feasibility Study Work Plan or 15 days after the effective date of this Agreed Order Amendment, whichever is later. c) Initiate Wet Season Mudline Well Sampling as a complement to the Dry Season Mudline and Sediment Porewater Sampling conducted in September, 2002. The wet season sampling shall occur during the January to March 2003 wet season. d) Initiate Pilot Studies within 90 days from the receipt of final laboratory results from wet season mudline well sampling, or within 60 days of required permit approvals (as applicable), whichever is later. e) Submit Draft Baseline Risk Assessment and Feasibility Study within 150 days following receipt of final laboratory results from all completed Pilot Studies. f) Submit Final Baseline Risk Assessment and Feasibility Study within 60 days after resolution of any Ecology comments on the Draft Baseline Risk Assessment and Feasibility Study. Except as provided above, all other provisions of Agreed Order No. DE 92TC-N335 (as amended) remain unchanged and in effect. This Amendment is effective on the _______ day of ____________, 2002. QUENDALL TERMINALS, a joint venture By:_________________________________ Date: ______________________ ALEX CUGINI President, Altino Properties, Inc. AND By: __________________________________ Date: _______________________ GEORGIA B. BAXTER THIRD AMENDMENT TO AGREED ORDER NO. DE 92TC-N335 3 Error! AutoText entry not defined. Vice President, J.H. Baxter & Co. DEPARTMENT OF ECOLOGY By: _____________________________________ Date:_________________________ STEVEN M. ALEXANDER Regional Manager, Toxics Cleanup Program Northwest Regional Office, Dept. of Ecology