Loading...
HomeMy WebLinkAboutMiscl ~ King County Department of Development and Environmental Services 900 Oakesdale Avenue Southwest Renton, WA 98057-5212 206-296-6600 TrY 206-296-7217 August 27, 2008 Jennifer Reiner CamWest Development 9720 NE 120th Place, Suite 100 Kirkland, WA 98034 RE: Plat of East Renton & Rosemente (DOES File No. L02P0005 and L03P0018) Recreation Space Plan Activity No. L07M1072 Dear Ms. Reiner: This is in response to your August 17, 2007 submittal requesting approval of the landscape and recreation space plan for the Plat of East Renton & Rosemente, and the additional information received August 25, 2008. We have reviewed your submittal" and with the following conditions and additions, approve it as submitted: 1. The equipment (structures, benches, picnic table, etc.) shall meet at a minimum, Consumer Product Safety Standards and be appropriately anchored. 2, Walkways/Trails shall be installed from the sidewalk to the play areas. Walkways shall be constructed of a material and grade that is Americans with Disabilities Act (ADA) accessible. 3. Street trees, significant tree retention, if any, shall be reviewed with the engineering plans and are not part of this approval. A revised recreation/landscape plan may be required, in the event modifications associated with a significant tree plan and/or drainage facilities are required The landscaping and recreation space improvements (i.e. play structures) must be installed and inspected or a performance bond posted, prior to plat recording. The I I LANDSCAPE BOND QUANTITY FORM King Count)' PROJECT NAME: East Renton I Rosemonte -Recreation anti E,n'iro II 3 • ~. S L02P0005 I L03P0018 1)'''",.lm'''~'E~?\:' fE 900 Oakesd . e j _!~ Renton.Walm. jJlllR05S-)219 AUG 25 [1 ~1lE f[JDES PROJECT #: ?nnA I.LJt;:_A_D_D_R_E_S_S __ : ________ W __ e __ st __ o __ f __ 1 __ 4 __ 8t __ h __ A __ v __ e_S __ E __ ; __ K __ in;.;.:g::....:.C~. PREPARED BY: Margie Korve, Triad Assoc. K.G. OD.E.S. DATE PREPARED: 8/25/2008 DRAWING DATE: 8/25/2008 Bonds are based upon required landscaping only and will be posted for performance andlor maintenance. Required landscaping includes perimeter landscaping. surface parking area landscaping. (KeC 21A.16) and any landscaping required by SEPA environmental review The maintenance period is for the life of the project, however, after posting for maintenance, the performance bond will be reduced by 30% ($1,000.00 minimum) and be held for a two year period. Upon re-inspection 01 the site the bond will be released if the sile has been properly maintained (21A 16.180). If the project has not been maintained and there are dead trees, shrubs, ground cover, or other deficiencies noted in the required landscaping the bond wilt be held untit the deficiencies are corrected UNIT PRICE UNIT TYPE QUANTITY SOD LAWN AREAS $500.00 MSF (1000 SQ. FT) 0.00 HYDROSEEDING: LAWN $50.00 MSF (1000 SQ. FT) 9.46 HYDROSEEDING: HILLSIDE PLANTING $50.00 MSF (1000 SQ. FT) 2.70 SOIL PREPARATION A. TOPSOIL: TREES & SHRUBS (6 INCHES DEEP) $25.00 CY (CUBIC YARD) 177.00 TOPSOIL: LAWN AREA (4 INCHES DEEP) $25.00 CY (CUBIC YARD) 117.00 B. MULCH (2 IN), $24.00 CY (CUBIC YARD) 28.00 C. PEAT MOSS (TWO INCHES DEEP) $2.30 SY (SQUARE YARD) 0.00 D. COMPOST (3 INCHES DEEP & TILLING) $26.00 CY (CUBIC YARD) 88.00 E. FERTILIZER: included w/tree and shrub plant'g $6.67 CY (CUBIC YARD) 0.00 PLANT MATERIALS A. DECIDUOUS TREES (INTERIOR LANDSCAPING OR OTHER REQ'O LANDSCAPING) 2.0" CALIPER (minimum height 10') $250.00 COST & LABOR 0.00 1.75" CALIPER (minimum height 10') $200.00 COST & LABOR 5.00 MULTI TRUNK (minimum height 6') $80.00 COST & LABOR 4.00 B. EVERGREEN TREES FIVE (~)FEET OR ABOVE $150.00 COST & LABOR 14.00 C. SHRUBS (5 Gallon) $45.00 COST & LABOR 0.00 C. SHRUBS (2 Gallon) $30.00 COST & LABOR 543.00 SHRUBS (1 gallon) $10.00 COST & LABOR 188.00 PRICE $473.00 $135.00 $4,425,00 $2,925.00 $672.00 $2.288.00 $0.00 $1,000.00 $320.00 $2.100.00 $16,290.00 $1,880.00 SUB TOTAL BOND AMOUNT BOND AMOUNT SUBTOTAL: $32,508.00 PAGE 1 OF 2 I .' UNIT PRICE UNIT TYPE QUANTITY PRICE D. GROUND COVER (1 Gallon) $8.00 COST & LABOR 0.00 GROUND COVER (4 inch Pots) $4.00 COST & LABOR 0.00 MISCELLANEOUS TREE STAKES $2.65 PER 5T AKE & LABOR 46.00 $121.90 FENCING LINEAR FOOT 3.5 FT. WOOD SPLIT RAIL (tract C) $8.00 INCLUDES LABOR 180.00 $1,440.00 10 FT. VINYL CLAD CHAIN LINK $18.00 INCLUDES LABOR 0.00 IRRIGAnON IRRIGATION: Tracts C, H & L (Permanent) $0.50 SQUARE FOOT 17,987.00 $8,993.50 IRRIGATION: Tracts H & 1-Trail Area (Temporary) $0.25 SQUARE FOOT 3,740.00 $935.00 ADDITIONAL ITEMS SURFACES CONCRETE PAVING I WALK $15.00 SY (SQUARE YARD) 149.00 $2,235.00 4 FT. SOFT SURFACE TRAil $4.00 LF INCLUDES LABOR 1,443.00 $5,772.00 TIMBER STAIRS 12,00000 LUM SUM 1.00 $2.000.00 5 FT. GRAVEL SURFACE TRAIL $8.00 LF INCLUDES LABOR 129.00 $1.032.00 PLAYGROUND EQUIPMENT: All Unit Prices include delivory and installation PLAY STRUCTURE (Installation included) $15,000.00 lS (LUMP SUM) 1.00 $15,000.00 PLAY SURFACING ( 12 INCH DEPTH) -Delivered $2,500.00 LS (LUMP SUM) 1.00 $2,500.00 PLAY SURFACE TIMBER EDGING $7.00 LF (INCLUDES LABOR) 105.00 $735.00 BASKETBAlL SYSTEM: Pole, Backboard, Rim $1,650.00 LS (LUMP SUM) 1.00 $1,650.00 BASKETBAlL POLE SLEEVE: 4 inch surface sleeve $603.00 LS (LUMP SUM) 1.00 $603.00 BASKETBALL SYSTEM & SLEEVE INSTALLATION $450.00 LS (LUMP SUM) 1.00 $450.00 TETHER BALL (installation included) $300.00 LS (LUMP SUM) 1.00 $300.00 SITE FURNISHINGS: All Unit Prices include delivery and installation WOOD BENCHES (installation induded) $538.00 EACH 4.00 $2,152.00 RECYCLE PlASTIC BENCHES (installation included) $766.00 EACH 2.00 $1.532.00 PICNIC TABLES (instal!ation included) $1,075.00 EACH 0.00 TRAil SIGN $300.00 EACH 2.00 $600.00 THIRTY·PERCENT CONTINGENCY FEE $24,167.82 TOTAL BOND AMOUNT TOTAL BOND PRICE: IV $10~~ Note: ,'bC\ 1. Street trees are not calculated In thiS bond quantity worksheet, bul are included 10 a separate Street Tree Bond Quantity Form. PAGE 20F 2