Loading...
HomeMy WebLinkAboutAddendum - 6AMENDMENT NO. _6_ TO AGREEMENT FOR COULON MEMORIAL BEACH PARK NORTH WATER WALK IMPROVEMENTS THIS AMENDMENT, dated for reference purposes only as __________________, 202 , is by and between the City of Renton (the “City”), a Washington municipal corporation, and PND Engineers, Inc. (“Consultant”), a Washington corporation. The City and the Consultant are referred to collectively in this Amendment as the “Parties.” Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-20-010, dated January 13, 2020, to provide necessary services for the Coulon Memorial Beach North Water Walk Improvements (referred to herein as the “Agreement”); Whereas, the Parties wish to amend the Agreement to change the scope of work, change the time for performance, and change the compensation in order to provide professional services associated with design, permitting, bidding, and construction administration for the above referenced project. NOW THEREFORE, It is mutually agreed upon that CAG-20-010 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-6, which is attached and incorporated herein. 2.Time of Performance:Section 3, Time of Performance, is amendedto complete the scope of services per the agreement CAG-20-010. All Work shall be performed by no later than August 30, 2024. 3. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $_6,736.06_ from $549,195.96 to $_555,932.02, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actuallyperformed according to the rate(s) or amounts specified in Exhibit A-6 of the Agreement. 4.All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. CAG-20-010, Adden #6-24 July 11 PAGE 2 OF 2 IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date last signed by the Parties below. CITY OF RENTON By:_____________________________ CONSULTANT By:____________________________ Maryjane Van Cleave Jon B. Keiser Vice President _____________________________ Date _____________________________ Date Approved as to Legal Form By: __________________________ Shane Moloney Renton City Attorney Contract Template Updated 06/17/2021 Approved by Cheryl Beyer via email 7/3/2024 PND ENGINEERS, INC. SEATTLE STANDARD RATE SCHEDULE EFFECTIVE JANUARY 2024 Professional:Staff Engineer I $116.00 Staff Engineer II $134.00 Staff Engineer III $144.00 Staff Engineer IV $150.00 Staff Engineer V $155.00 Staff Engineer VI $173.00 Senior Engineer I $168.00 Senior Engineer II $179.00 Senior Engineer III $192.00 Senior Engineer IV $206.00 Senior Engineer V $225.00 Senior Engineer VI $246.00 Senior Engineer VII $265.00 Environmental Scientist I $121.00 Environmental Scientist II $144.00 Environmental Scientist III $163.00 Environmental Scientist IV $179.00 Environmental Scientist V $197.00 Environmental Scientist VI $207.00 Surveyors:Senior Land Surveyor I $134.00 Senior Land Surveyor II $144.00 Senior Land Surveyor III $155.00 Technicians:Technician I $68.00 Technician II $100.00 Technician III $110.00 Technician IV $121.00 Technician V $150.00 Technician VI $173.00 CAD Designer III $100.00 CAD Designer IV $116.00 CAD Designer V $139.00 CAD Designer VI $150.00 Expenses: Mileage: Current Federal IRS Rate Expenses and Subconsultants: Direct Cost, Plus 10%