Loading...
HomeMy WebLinkAboutMFP24003362.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP24003362 IVR Number: 24003362 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:07/02/2024Application Date:2423049113Parcel Number: 920 SW GRADY WAY Permit Type:07/15/2024Issue Date:Franchise Permit Work Class:07/15/2025Expiration Date:Major Utility Job Number: 874044252-11985172Franchise Type:Natural Gas Description: PSE Gas 2 excavations to examine the existing 20in gas main located NE of the Powell and 10th intersection. Possible tree removal, street sign relocation, and pipe installation as necessary. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX INFRASOURCE SVCS B: (206) 949-5846Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering INFRASOURCE, INC 6905 S 228TH ST KENT, WA 98032 PLEASE SEE ATTACHED 874044252 - 11985172 1095 SW 10TH ST Jeff Kiesz 206-348-2347 MFP24003362 Monday Friday 8:00am 3:00pm Scott Warlick CED 7/15/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 1095 SW 10th St Renton WA 98057 USA SW 10TH STPOWELL AVE SW 100'11111111 11111111111111111111 SW GRADY WAYSW GRADY WAY10101010THOMAS AVE SW SW 10TH STKEEPR4-7BRIGHTW20-1ROAD WORK AHEADX'≥X'≥X'≥ RIGHT LANE CLOSED AHEAD W20-5RW1-4L1717W4-119maintain (2) 11' lanesX'≥X'≥RIGHT LANECLOSEDAHEADW20-5R W1-4LCONETOPPERKEEP R4-7BRIGHT W20-1 ROAD WORK AHEADX'≥ W20-1ROADWORKAHEADX'≥X'≥W1-4R BE PREPARED TO STOP W3-4X'≥X'≥W20-7ASTO P S/W CLOSED R9-9BE PREPARE D TO STOP W3-4X'≥X'≥W20-7AS/WCLOSEDR9-9BEPREPAREDTOSTOPW3-4X'≥X'≥W20-7ASTOPW20-1ROADWORKAHEADX'≥BEPREPAREDTOSTOPW3-4X'≥X'≥W20-7ABEPREPAREDTOSTOPW3-4X'≥X'≥W20-7ASTOP W20-1 ROADWORKAHEADX'≥THE FLAGGERS SHALL STOP THETRAFFIC ALL DIRECTIONS TOESCORT PEDESTRIANSAROUND/THRU WORK AREA0'60'30'NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVJaber Tofan206-406-8460Jaber.tofan@pse.com1 OF 11095 SW 10TH ST Renton WA 98057_recover0 11985172 06/26/2024Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless othe rwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flaggers shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPWORK PITMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Jaber TofanCard No. ES2 000434Card Exp. 02/18/2028Jaber.Tofan@pse.com(425)424-7316MFP24003362 Est. Start Date: & & & & &of CL of CL Tie-In Fitting Route #'s:Bollards:2.5" #4" #ADA Ramps #: Del Press:Traffic Signal:Bus Stop: No Parks #: Meter Loc:Trolley Lines:Mtr Hoods #: Meter:Speed Limit: EFV:Police #:TCP: Diameter:Flaggers #:Arterial: of CL Service Information Street Information Job Type of CL of CL of CL of CL of CL of CL of CL PLAT Map: Work Location Size of Cut Surface Type Job Description / Scope of Work New Construction: Construction Method PM / Inspector: Est. Duration: Jurisdiction:City / Zip: ROW Permit:Customer: Job #: Date:Address: Puget Sound Energy Gas Pre-Inspect Form N PPMP, Major Projects N GAS GAS GAS GAS GAS GAS GAS GAS GAS 20" STW HP 5' S O F N E S M T L I N E 67E208 Water Sewer Storm Drain Sewer P/LP/LExcavation approx. 20ftx8ftx12ft Excavation approx. 10ftx8ftx12ft Street sign may be relocated to the west of the intersection to accommodate excavations Tree may be removed to accommodate excavations MFP24003362 RESTORATION PER CITY OF RENTON STANDARDS 950 POWELL AVE SW ΟΝς∆ΚΚ ≅Υ∆ Ρς−Ρ−ς− 0/ΣΓ Ρ Σ Ρς ΦΘ≅ΧΞ ς ≅ Ξ 981 POWELL AVE SW W P W PIV C C PB PB P T C S S D D18" CONC.36" CONC. 36" CONC.108" CONC.CONC. SIDEWALKGRASSCONC. SIDEWALKGRASSGRASSCONC. SIDEWALK CONC. SIDEWALKCONC. SIDEWALKCONC. SIDEWALKGRASS GRASSASPHALT ROAD ASPHALT ROADASPHALT ROADASPHALT ROADD/W CUT\A1;ASPH. D/W D/W CUT\A1;ASPH. D/W CONC. SIDEWALK GRASS108" CONC. 108" CONC. 20" STW TRANSMISSION LINE W 36" CONC. ΡΒ≅Κ∆9 0! < 0 10 1/& 4020 µ LYNNWOOD FEDERAL WAY C O N S U L T I N G E N G I N E E R S, L L C 3500 188th St SW Lynnwood, WA 98037 Civil Engineering Project Management Land Surveying Landscape Architecture Land Planning www.esmcivil.com (253) 838-6113 (425) 297-9900 Suite 633 Public Works 84/ ΟΝς∆ΚΚ ≅Υ∆ Ρς+ Θ∆ΜΣΝΜ ∆ΡΛ ΙΝΑ ∀2//,0865,/12 ΟΡ∆ ς−Ν− ∀763/33141 Χ≅Σ∆9 3.00.1/13 ΡΓ∆∆Σ9 0.0 UTILITY LOCATIONS PROVIDED BY C-N-I LOCATES IN MARCH, 2024, WEREMARKED ON THE GROUND FOR PUGET SOUND ENERGY, AND WEREUTILIZED FOR THIS MAPPING. CITY OF RENTON GIS RECORDS WERE ALSO UTILIZED FOR THISMAPPING. ΜΝΣ∆ Κ∆Φ∆ΜΧ INFORMATION SIGN S SANITARY SEWER MANHOLE STORM DRAIN CATCH BASIN DSTORM DRAIN MANHOLE A.D.A. RAMP WITH DETECTABLE WARNING PLATE LEFT TURN ARROW PAINT MARK RIGHT TURN ARROW PAINT MARK G GAS P POWER, BURIED D STORM S SEWER STORM, >12" W WATER STRAIGHT ARROW PAINT MARK P POWER VAULT FIRE HYDRANT FIRE DEPARTMENT HOOK UP W WATER MANHOLE PIV WATER POST INDICATOR VALVE TELEPHONE RISER C TELECOMMUNICATIONS MANHOLE POWER TRANSFORMER T TELECOMMUNICATIONS VAULT SEWER, >12" TELECOMMUNICATION, BURIED LIGHT POLE PB WATER METER WATER VALVE ROAD CENTERLINE STOP BAR LANE STRIPE EDGE OF CONCRETE ROCK RIGHT OF WAY LINE CENTERLINE OF RIGHT OF WAY ELECTRICAL JUNCTION PULL/BOX FOUND MONUMENT IN CASE LANE INDICATOR DASHED LANE STRIPE GAS, >12" Excavation #1 approx. 20x8x12ft potholed top of main at 94in Excavation #2 approx. 10x8x12ft Contractor to protect existing city infrastructure during excavation. Coordinate with city inspector Tom Main in the field. Additional utility protection may be required. MFP24003362 This permit is for Major construction work in the ROW and will be billed at an additional $158/HR for inspections. After hours and weekend work will be billed at $175/HR WELD DETAIL PLAN VIEW REPAIR SLEEVE DETAIL VICINITY MAP SAP ORDER #XXXXXXXXXBILL OF MATERIAL ASSOCIATED SOLELY WITH THIS SHEET OF THE DRAWING FITTER'S CHECKLIST REVISIONS GAS MAIN PRESSURE AND TESTING STANDARD DRAWING ST3D3-194 CONSTRUCTION NOTES: BACKING STRIP DETAIL WELD PROCEDURE TABLE CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG JOINT FACILITIES ARRANGEMENTS STANDARD DRAWING REPAIR SLEEVE FOR DAMAGED PIPE . ST3D3-194 1/1 BILL OF MATERIALS 250 250 20 2024 48" length MFP24003362