Loading...
HomeMy WebLinkAboutChange Order - 1Docusign Envelope ID: F3A58071-79EC-4173-B481-7A2EAC544A00 Public Works Department Memorandum DATE: TO: FROM: STAFF CONTACT: SUBJECT: June 10, 2024 Martin Pastucha, Administrator Michael Stenhouse, Maintenance Services Director Jayson Grant, Pavement Management Tech Change Order 1 to CAG-24-088 with Coral Construction for the Guardrail Replacement Project Attached for your signature is Change Order 1 to CAG 24-088 with Coral Construction in the amount of $34,677.00 for Guardrail Replacement Project. Add item #7 Talbot Rd Attenuator Repair including the following Materials; yellow nose piece, 4- sliding panels, 1-type A cartridge, chevron sign and all hardware. Add item #8 Monster Rd Guardrail repair removes the existing 37.5' damaged terminal and install a new guardrail terminal per standard drawing C-22.45-06. The total amount of this Agreement is the sum of $116, 720.00 ... Total amount of agreement shall be $151,397.00. There is sufficient budget in the Project Account {003.000000.015.542.92.48.050) to cover the additional cost. CAG-24-088, CO #1-24 Approved by Cheryl Beyer via email 6/13/2024