HomeMy WebLinkAboutW_Waiver_Form_20170425_v1DEPARTMENT OF COMMUNITY CITY OF
AND ECONOMIC DEVELOPMENTRenton'�._?
WAIVER OF SUBMITTAL REQUIREMENTS
FOR LAND USE APPLICATIONS
Planning Division
1055 South Grady Way -Renton, WA 98057
Phone: 425-430-7200 1 www.rentonwa.-,;ov
LAND USE PERMIT SUBMITTAL REQUIREMENTS:
WAIVED
BY:
MODIFIED COMMENTS:
BY:
Arborist Report 4
Biological Assessment 4
me S STri S�
Calculations 1
Colored Maps for Display 4
044,
Construction Mitigation Description 2AND4
Deed of Right -of -Way Dedication 1
Density Worksheet 4
Drainage Control Plan z
Drainage Report z
Elevations, Architectural 3 AND4
Environmental Checklist 4
Existing Covenants (Recorded Copy) 1AND 4
Existing Easements (Recorded Copy) 1AND4
Flood Hazard Data 4
Floor Plans 3 AND 4
Geotechnical Report? AND 3
Grading Elevations & Pian, Conceptual 2
Grading Elevations & Plan, Detailed 2
Sri
Habitat Data Report4
Improvement Deferral z
Irrigation Plan
PROJECT NAME: 1f/fi- y,957 /9P�nT%21G'�1ri�
DATE: 4l5-11I-
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Waiversubmittairegs.docx Rev: 08/2015
LAND USE PERMIT SUBMITTAL REQUIREMENTS:
WAIVED
BY:
MODIFIED COMMENTS:
BY:
King County Assessor's Map Indicating Site 4
Landscape Plan, Conceptual
Landscape Plan, Detailed4
Legal Description 4
Letter of Understanding of Geological Risk 4
Map of Existing Site Conditions 4
Master Application Form 4
Monument Cards (one per monument)1
Neighborhood Detail Map 4
Overall Plat Plan 4
r^r.
Parking, Lot Coverage & Landscaping Analysis 4
Plan Reductions (PMTS) 4
Post Office Approval 2
Plat Name Reservation 4
Plat Plan 4�,
Preapplication Meeting Summary 4
Public Works Approval Lettere
Rehabilitation Plan 4
Screening Detail 4
Shoreline Tracking Worksheet 4
Site Plan 2AND4
Stream or Lake Study, Standard
Stream or Lake Study, Supplemental
Stream or Lake Mitigation Plan 4
Street Profiles 2
Title Report or Plat Certificate IAND 4
Topography Map s
Traffic Study 2
Tree Cutting/Land Clearing Pian 4
Urban Design Regulations Analysis4
Utilities Plan, Generalized 2
Wetlands Mitigation Plan, Final 4
Wetlands Mitigation Plan, Preliminary 4
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Waiversubmittalregs.docx Rev: 08/2015
LAND USE PERMIT SUBMITTAL REQUIREMENTS: WAIVEDMODIFIED COMMENTS:
BY: BY:
Wetlands Report/Delineation 4
Wireless:
Applicant Agreement Statement ZAND 3
Inventory of Existing Sites ZAND 3
Lease Agreement, Draft 2 AND 3
Map of Existing Site Conditions 2AND3
Map of View Area 2 AND 3
Photosimulations
This Requirement may be waived by:
1. Property Services
2 Development Engineering Plan Review
3 Building
4 Planning
3
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Waiversubmittalregs.docx Rev: 08/2015