Loading...
HomeMy WebLinkAboutReport 1'.Denis -Law Mayor •· March 4, 2016 ·. · · James Jaeger; P.E .. Jaeger Engin.eering : 9419 S 204th Place - · ·Kent, WA 98~31 SUBJECT: . Chau Sh~rt Plat S~~rt Plat LUA09"123,' SH PL-A (King Co. :Fil~ #L03S0016) . De~r Mr. Jaeger: . This.offke)1as reviev.,ecl y~ur request(dated February,27, 2010j ti> extend an approved. · short plat (File No. LUA09~123/KC File #L0,3S00i6) that expired ori March 12, 2009 .. · . . .· . ' ·. . . . . -. . . . .. P~rsuant fo RMC 4-l~OSOF, the. mu~icipal code grants authorization to the Pl~nning . Director to approve a'n extension fo~ any land use. or subdivision project. therefore, . your short plat extension request is approved; The short plat wiH expire on Mai"ch iz, 2011.· I hop_e this extensiop meets your needs arid tb~t your project can be completed. You. -. may call Laureen Nicolay at (425) 430-7294 if you have any further questions; · . . : ··,_,.; ··: . ·• . ,:" '".,;: '.: ,. ' .. : .· _., .• . ··. . ' . . '. .. ·. '_'. . ·_' C.E;,,Chip'' Vincent ' · ·Plaririing Dire~torc. · cc: Jennifer·Henning, Cufrent Planning Ma~nager · Cit\iofRenton FileLUA09-123 -·• : · Jari -~llian, Pl~n .. ReView .. · Renton City Hall • 1055 South Grady Way • Renton, Washington 98057. • rentonwa.go~ J~GER ENGilN~Ril!NI@i 9419 S. 204 PLACE -KENT, WASHINGTON 98031 PHONE (253) 850-0934 FAX (253) 850-0155 February 27, 2010 Rocale Timmons City of Renton -Current Planning 1055 S. Grady Way Renton, WA. 98057 RE: Request for Extension,oJ Short Plat Chau 3 Lot Short Plat 17034 106th Ave. SE Dear Ms. Timmons. City of Renton Planning Division MAR -2 2010 I had been working with King County on the final short plat approval of the Chau Short Plat. Since the application to the County, the property has been annexed to the City of Renton. The preliminary short plat approval from the County expired last year. I am writing to request an extension that will allow the short plat to get recorded. Last year, before the expiration. I met with Ken Glasby, a planner for the City. He gave me the forms and· mentioned several items that should be provided to the City to complete the project. Mr. Glasby has since left the City and I would like to finish the project with you. The main item that he mentioned was the paperwork for the dedication of a small portion of ROW at the intersection. This information was given to the surveyor for the legal description and exhibit of the area to be dedicated. The surveyor in turn was working with the owner to get this signed and submitted. I do not know if the . owner-/applicant,Ms,-Ha Chau, has submitted-this to the City yeL I did confirm with the County that the engineering plans for the roadway improvements (curb, gutter, sidewalk, some drainage, etc.)were approved in December of 2008. The review engineer at the County was Mazen Haidar (206-296-7133). The County file number was L03S0016. The project is very near completion and I am hoping that the City will grant an extension. Please feel free to contact me with any questions. Thank you for your attention. F9-~ James Jaeger. P.E. . . JAEGER . ENGINEERI~G· 9~19 s. 204 PLA<;:E. ~·KENT; WASHINGTON ~8031. . 'PHONE (253) 850-0934 fAX (253) 850-0155. · March.22, 2007 . August 28, 200? · . ~ (/') . [iiiiJ ·p . t:a·.@ . p C . [iiiiJ ··. 0 CX) • .• ·. N -c::::i, . . fll . 8 9) ex, . ' . .• ~ .. · . . .. . . Sl\IALL SITE DRAI~AGE · .. _ . . TECHNICAL INFORMATION REPORT . · CHAU3LOTSHORTPLAT . . 170341061 b AVEiSE ·.· . · CO~TY FILE NO. L03S0016 · .· L07SR022 . · PREPARED FOR:·: . . Ha Minh Chau 4i01 150th Ave. SE . . B~H~vue, WA._ 98006 ' .. (425) 643-3993 · PREP ARE~_BY: ' ' . ' . . Jame:s J:Jaeger, p'£.· . . .• • 1' . ' .. ' I . ! JAEGER ENGINEERING 9419 s. 204 PLACE • KENT~ WASHINGTON 98031 PHONE (253) 850-0934 FAX (253) 850-0155 March 22; 2007 August 28, 2008 · SMALL SITE DRAINAGE . TECHNICAL INFORMATION REPORT PREPARED FOR: Ha Minh Chau CHAU3LOTSHORTPLAT i 7034 1061b A VE. SE COUNTY FILE NO. L03S0016 L07SR022 4101 150th Ave. SE Bellevue, WA. 98006 (425) 6.43-3993 PREPARED BY: James J. Jaeger, P.E. I i I I I ! I i I I I. OVERVIEW The proposed project is a 3 lot short plat located at the southeast corner of the intersection of SE 172nd St. and 106th Ave. SE. The property is 0.34 acres and is proposed to divide into 3 new single family lots. two lots of approx. 4500 SF and a larger lot of approx. 5500 SF. The property is zoned R-8. There is and existing house and carport that will be demolished and removed. Also on the site is an gravel driveway that is connected to 106th Ave. SE. This driveway will also be removed. Access to the new houses will be a joint driveway (lots 2 and 3) from 1061h Ave. SE. and single driveway (Lot l) from SE 172nd St. Both of the frontage streets are currently unimproved. Both will be improved with curb, gutter. sidewalk and pavement widening to meet the urban sub-access road standard. The pavement widening will be measured from the centerline of the existing pavement. rather than the ROW centerline, per discussion with County staff. This was agreed to by the County so that additional ROW would not be needed to construct the necessary road width. The existing lot and future lots will be fully served by the existing public utilities. The site is nearly flat in the northeast corner and then begins an increasing slope down to the southwest corner. The maximum slope near this corner is approx. 12%. The site slopes down to both frontage streets. The site vegetation is primarily tall grass, brush with sporadic trees and shrubs. There is a row of fir trees along the 106th Ave. SE frontage. There are no sensitive areas or hazard designations within this site. This property is basically a large existing lot on a corner of an older plat. There are no drainage improvements on the site itself. However, there are several culverts and ditches along the edges of both street frontages. All of the ditches drain to an existing culvert located near the southwest property corner. Along with the proposed new curb, gutter and sidewalks, the applicant will install a gutter drainage system consisting of catch basins and piping that will connect to the existing catch basin. This new gutter system will collect all of the runoff from the half streets along the frontage as well as the existing ditches upstream from the property. The new lots will include a roof downspout drainage piping system that will be connected lo individual dispersal trenches. Each lot will also have a connection stub pipe to the public drainage system for footing drains .. The project is exempt from drainage detention and water quality enhancement as will be shown on the developed drainage section. l ' . ® King County Department of Development and Environmental Services 900 Oakesdale Avenue SW Renton, WA 98055-1219 File No. File Name: CONDITIONS OF APPROVAL L03S0016 Chau Short Plat · Application Date: May 2, 2003 Revision Date: January 30, 2004 This short subdivision is granted preliminary approval subject to the following Conditions of Approval. These conditions are based on a field visit and current information the applicant has provided about the short subdivision property. Occasionally, in satisfying the Conditions of Approval, a more definitive land use limitation of the property may be revealed. New information (such as final Health approval or sensitive areas review) may require additional conditions and may reduce the number oflots. Final approval will be granted after compliance with the Conditions of Approval. Key codes and guidelines have been noted to provide guidance in preparing the required plans and other documents. Compliance with some of the following conditions will require that engineering plans be prepared by a professional civil engineer licensed in the State of Washington. 1. Title 19A A. The short subdivision shall comply with all provisions of Title 19A. B. The final review process must be completed prior to recording of the short subdivision. The Department of Development and Environmental Services (DDES) strongly recommends the Final Short Plat be submitted at least one year prior to the expiration date of the project. The Final Short Plat submittal package includes: I. A surveyed map page (four sets) including lot area closure calculations; 2. Final health approval from the King County Health Department (different . from preliminary health approval); 3. A current short plat certificate and supporting documents (easements, etc.); 4. Payment of the Final Short Plat submittal fee; 5. A copy of this letter (preliminary approval letter). A licensed land surveyor shall be hired to prepare the final short subdivision documents. These documents shall comply with all of the following conditions for final approval: . •. C. All persons having an ownership interest in the subject property are required to sign the final short subdivision. D. If modifications to the approved preliminary site plan (Attachment I) are needed to accomplish engineering design or final short plat, then a revised preliminary site plan shall be submitted to DDES for review and approval. The revised site plans shall be submitted with the engineering plans or the final short plat submittal. 2. Surface \Valer Management (KCC 9) 1998 King County Surface \Vater Design Manual (S\VDM) A. This short subdivision proposal is subject to Full Drainage Review per section 1.1.2.3. Final short subdivision approval shall require full compliance with drainage provisions and storm drainage requirements of this section. Compliance may result in reducing the number and/or location of lots shown on the approved preliminary short subdivision. The conditions outlined below are site-specific drainage conditions: (1) Core Requirement #1 -Discharge at the Natural Location (2) Core Requirement #2 -Off-Site Analysis (3) Core Requirement #3 -Flow Control (4) Core Requirement #4 -Conveyance System (5) Core Requirement #5 -Erosion & Sedimentation Control (6) Core Requirement #6 -Maintenance and Operation (7) Core Requirement #7 -Financial Guarantees & Liability (8) Core Requirement #8 -Water Quality (SI) Special Requirement #1 -Other Adopted Requirements B. A professional civil engineer licensed in the State of Washington shall prepare a Technical Information Report and/or engineering plans per Chapter 2, of the 1998 King County Surface Water Design Manual. 3. Health (KCC 13) This project is exempt from further King County Heath Department review. However, if improvements are required from the Sewer and/or the Water District, then verification shall be required from said District(s) that the improvements have been bonded and/or installed, prior to final recording of the short plat. ' 4. Road Standards (KCC 14) 1993 King County Road Standards, Ordinance 11187 Final short subdivision approval shall require full compliance with the provisions set forth in the King County Road Standards including engineering plans for all road improvements. The engineering plans shall be prepared by a professional civil engineer licensed in the State of Washington. DOES strongly recommends the · Engineering Plans be submitted at least two years prior to the expiration date of the project. A. That portion of the North half of SE J 72"d Street adjoining the subject property shall be improved to an urban Sub-access standard per KCRS Section 1.03. B. That portion of the East half of 106th Avenue SE adjoining the subject property · shall be improved to an urban Sub-access standard per KCRS Section 1.03. C. Provide 35' paved radii at the intersection of I 061h Avenue SE and SE 172 Street per KCRS Section 2.10. Dedicate a 25-foot property line radius at the intersection of I 06'h A venue SE and SE I 72"d Street per KCRS Section 2.10. D. Existing roadside obstacle(s) shall be relocated to provide a minimum clearance of 10 feet from the edge of the travel lane to the obstacle(s) per KCRS Section 5.11. E. Private access to Lots 2 and 3 shall be shown as a joint-use driveway tract per KCRS Section 3.01. The tract shall be an undivided ownership to the lots it serves, and the lot owners shall be responsible for its maintenance. The tract shall be 20-feet wide with a 18-foot-wide paved surface. The tract shall be a minimum of 20 feet in length. · F. The following notes shall be shown on the final recorded short subdivision: I) \Varning: King County has no responsibility to build, improve, maintain or otherwise service the private roads contained within or providing service to the property described in this short subdivision. 2) All private easements and/or tracts to be maintained, repaired, and/or rebuilt by the owners of the parcels having legal access therefrom and their heirs, assigns or successors, unless and until such roads are improved to King County standards and are dedicated and accepted by King County for maintenance. G. All utilities within proposed rights-of-way shall be included within a franchise approved by the King County Council prior to final short subdivision recording. • H. All restrictions, easements, tracts, and their purpose shall be shown on the final recorded short subdivision. 5. Building and _Construction Standards (Title 16) Grading. The applicant shall comply with all applicable provisions of KCC 16.82. 6. Fire Code (KCC 17) Section 902 of the 1997 Edition of Uniform Fire Code The applicant shall obtain the approval of the King County Fire Protection Engineer for the adequacy of the fire hydrant, water main, and fire flow standards ofKCC 17.08 prior to recoding of the lots. 7. Zoning Code (KCC 21A) A. Density and Dimensions (KCC 21 A.12) All lots shall meet the density and dimensions requirements of the R-8-SO zone classification or shall be as shown on the face of the approved prelimi- nary short subdivision, whichever is larger. Minor revisions to the short subdivision, which do not result in substantial changes and/or do not create additional lots may be approved at the discretion of LUSD. B. Street Trees (KCC 21 A.16) Street trees shall be provided along that portion of the right-of-way for l 061h Avenue Southeast and Southeast l 72"d Street abutting the subject property, pursuant to the provisions of KCC 2 IA.16.050(E) and KCC 21 A.16.190, unless existing trees are shown to be equivalent to the requirement of Code. See note below. The required street trees shall be designed as to location and spacing on the final plan submittal. The street trees must be installed and inspected, or a performance bond posted, prior to recording of the plat. If a performance bond is posted, the street trees must be · installed and inspected within one year of recording of the plat. At the time of inspection, if the trees are found to be installed per the approved plan, a maintenance bond must be submitted, or the performance bond replaced with a maintenance bond, and held for one year. After one year, the maintenance bond may be released after DDES has completed a second inspection and determined that the trees have been kept healthy and thriving. NOTE: I. KCC 21A.16.0SO Landscaping -street frontages. The average width of perimeter landscaping along street frontages shall be provided as follows: i' i•' • C , • For single-family subdivisions: a. Trees shall be planted at the rate of one tree for every 40 feet of frontage along a neighborhood collector street or arterial street. b. The trees shall be: · · I. Located within the street right-of-way if permitted by the custodial state or local agency; 2. No more than 20 feet from the street right-of-way line when located within a lot; 3. Maintained by the adjacent landowner unless part of a County maintenance program; and 4. A species approved by the County if located within the street right-of-way and compatible with overhead utility lines. c. The.trees may be spread at irregular intervals in order to accommodate sight distance requirements for driveways and intersections. 2. KCC 21A.16.190 Financial guarantees. Financial guarantees shall be.required consistent with the provisions of Title 27A. C. Significant Tree Retention-KCC 21 A.38.230 which applies to the site, a detailed tree retention plan shall be submitted with the engineering plans for the subject plat. The tree retention plan (and engineering plans) shall be consistent with the requirements ofKCC 21A.38.230, as well as the conceptual tree retention plan which is part of the hearing record for this project. No clearing of the subject property is permitted until the final tree retention plan is approved by LUSD. Flagging and temporary fencing of trees to be retained shall be provided, consistent with KCC 21A.38.230B4. The placement of impervious surfaces, fill material, excavation work, or the storage of construction materials is prohibited within the fenced areas around preserved trees, except for grading work permitted pursuant to KCC 21A.38.230B4d(2). A note shall be placed on the final plat indicating that the trees shown to be retained on the tree retention plan shall be maintained by the future owners of the proposed lots, consistent with KCC 21A.38.230B6. (Note that the tree retention plan shall be included as part of the final engineering plans for the subject plat.) If there are no significant trees as defined by the Special Overlay District on the site then, this requirement does not apply. D. The existing house shall be removed or demolished prior to the final approval and recording. A demolition pennit shall be obtained prior to demolition. 8. Road Mitigation Payment System ..... i~: ... r . , ' The applicant shall comply with Road Mitigation Payment System (MPS), by paying the required MPS fee as determined by King County Department of Transportation, plus an administrative fee. The applicant has an option to either: A. Pay the. MPS fee at final short subdivision recording and the MPS administrative fee at final short subdivision application, or B. Pay the MPS fee at building permit issuance and the MPS administrative fee at the time of building permit application. If option A is chosen, then the following note shall be shown on the final short plat: MPS FEE NOTICE: All fees required by King County code 14. 75, Mitigation Payment System (MPS) have been paid. If option B is chosen, then the following note shall be shown on the final short plat: MPS FEE NOTICE: This short plat is subject to King County Code No. 14.75, King County Road Mitigation Payment System (MPS). The MPS fees plus the MPS administrative fee shall be paid at the time of building permit application at the rate in effect at that time. 9. State Environmental Policy Act (SEPA) This short subdivision was exempt from the provision of the State Environmental Policy Act (SEP A). 10. Other Considerations Preliminary approval of this application does not limit the applicant's responsibility to obtain any required permit or license from the State or other regulatory body. This may include obtaining a forest practice permit from the Washington State Department of Natural Resources for tree removal. KING COUNTY LAND USE SERVICES 130.01' ~r (") 3'o 12' RCP I I iu ..,. . lo V) LDT 13 ,-- 1 I EX HOUSE I I L--- 12' RCP JNV=386.7 -- DITCH ----+\e~~,m~-\EDGE ~ \ INV=3']5.~ 1., 1 i , Ii ' I '\Ji ' '•• I Transmitted to the following Parties of Record for short plat L03S0016: Cramer Northwest Inc. 945 N. Central Ave., Suite #104 Kent, WA 98032 Mr. & Mrs. G.A. Headland 17030 106 1h Ave SE Renton, WA 98055 Jay Newton 17006 106th Ave SE Renton, WA 98055 Trishah Bull, Project Manager II, DDES Land Use Services Division Curt Foster, Sr. Engineer, DDES Land Use Services Division Mazen Haidar, Engineer, DDES Land Use Services Division Rich Hudson, Program Manager III, DDES Land Use Services Division i '. ATTACHMENT A RIGHT TO APPEAL This action may be appealed in writing to the King County Hearing Examiner, with a fee of$250.00 (check payable to King County Office of Finance). As required by KCC 20.20.090 and 20.24.090, the appeal period shall be fourteen (14) calendar days and shall commence on the third day after the notice of decision is mailed. Filing an appeal requires actual delivery to the King County Land Use Services Division prior to the close of business (4:30 p.m.) on the date due. Prior mailing is not sufficient if actual receipt by the Division does not occur within the applicable time period. The Examiner does not have authority to extend the time period unless the Division is not open on the specified closing date, in which event delivery prior to the close of business on the next business day is sufficient to meet the filing requirement. If a timely Notice of Appeal has been filed, the appellant shall file a statement of appeal within a 21-day calendar period commencing three days after the notice of decision is mailed. The statement of appeal shall identify the decision being appealed (including file number) and the alleged errors in that decision. The statement of appeal shall state: 1) specific reasons why the decision should be reversed or modified; and 2) the harm suffered or anticipated by the appellant, and the relief sought. The scope of an appeal shall be based on matters or issues raised in the statement of appeal. Failure to timely file a notice of appeal, appeal fee, or statement of appeal deprives the Examiner of jurisdiction to consider the appeal. Appeals must be submitted to the Department of Development and Environmental Services, addressed as follows: LAND USE APPEAL Land Use Services Division Department of Development and Environmental Services BlackR.iver Corporate Park 900 Oakesdale Avenue Southwest Renton, WA 98055-1219 A request for a pre-hearing conference may be made by any party. For more infomiation regarding appeal proceedings and pre-hearing conferences, please contact the Office of the Examiner for a Citizens' Guide to the Examiner hearings and/or read KCC 20.20 and 20.24. PROJECT INFORMATION Proposal: Short Plat Location: 17034 106th Avenue SE Renton, Washington 98055 Owner: Ha Chau Area: Approximately .33 acre Soils: AgC (Alderwood gravelly sandy loam) Legal Description: Lot 13, Block 4, Aker's Farms No. 5 Volume 40, Page 27 Tax Parcel No: 008700-0280-07 PROJECT DESCRIPTION This project proposes to subdivide approximately 1/3 acre of land into 3 (three) lots. Presently there is a single family residence with carport located at the north side of the parcel. As a result of the subdivision, the existing house will be partially or entirely demolished. The ground consists of lawn, three pine trees in the front yard, a row of small fu trees along the west property line, and a gravel driveway. The parcel is bordered by S.E. 172°d Street along the south side, and by I 06th A venue S .E. along the west side. Attached are site pictures, a vicinity map, a soils map, U.S.G.S. aerial topography map, and a schematic storm drainage plan. These enclosures were used in this analysis as resources. DOWNSTREAM ANALYSIS The ground of the parcel slopes from northeast corner down to southeast corner at a moderate slope of ten ( I 0) percent. The sheet flow from the parcel is collected by the ditches along the south and west property lines. Both of these ditches are located in the public right-of-way and meet outside of the southwest corner of the property. The west side and south side ditches are connected via eighteen (18) inch and twelve (12) inch diameter short culverts, respectively, into a catch basin located in the northeast corner of the intersection. There is a twelve (12) inch diameter outgoing reinforced concrete pipe culvert from the catch basin running diagonally across the intersection at an approximate slope of7.7%. Page I of2 ct:s This culvert daylights into a wooded ravine that continues to slope down in a southwesterly direction until it becomes a roadside ditch for the State Route 515 (Talbot Road), at a point at least a •;. mile from the proposed subdivision. There are no evident signs of erosion or capacity problems within this existing downstream storm drainage conveyance system. Eventually the runoff from the property is part of the Panther Creek Wetland that is drained into Lake Washington via Green River. A site visit to verify these conditions was made on March 6, 2003, by CTS Engineers, Inc. PROPOSED SITE DRAINAGE IMPROVEMENTS Each ditch on the south and west of the subject property currently outlets via a short culvert which connects to an existing catch basin at the NE comer of the intersection of I 06th Ave SE and SE 172nd St. As part of the access improvements to the subdivided property, it is proposed to replace both existing ditches with culverts, filling each ditch to the level of street pavement. In addition, the existing catch basin is proposed to be replaced with a larger catch basin or storm drain manhole. Site drainage and storm runoff will be directed into below-grade pipes which will connect to the proposed culverts upstream of the replaced catch basin. Refer to the attached preliminary storm drainage plan for a graphical representation of the proposed improvements. Page 2 of2 ct:s SO l \.-<5:i. , F16.. Z. ~ s, 19TH ST HS 5 SW 23RD ST ·,. . .;;;:., ·~; " .5 miles in. _ 1900 ft. """"'C-.C~ ' 1W' m 626 SH 686 MAP -~ :;;i's :: ST 11100 1 St IESTH I69lll :·., ST ' -. .. -·· .. • FJ?..oM; t ···.!. ~ G 1'12-0-re:c:.:1 Loe-A1loN II. PEAK RUNOFF FLOWS A. PREDEVELOPED DRAINAGE The pre-developed drainage basin includes the entire subject property plus a portion of the two frontage roads. T.he frontage road areas were included because the proposed curb. gutter and sidewalk will add new impervious surface that must be accounted for in the drainage calculations. The on-site area was calculated to be 0.34 acres. The area of the frontage road improvements was determined using only the area from the edge of the existing pavement to the ROW line. The existing road pavement was not included in the calculations because this area will not be changed. The frontage area was calculated to be 3982 SF, or 0.09 acres. This provided a total project area of 0.43 acres. The existing house and gravel driveway also presented existing impervious surface. This existing impervious surface was calculated to be 0.07 acres. Note that only 50% of the gravel driveway was counted as impervious surface, per code. The remaining pre-developed area was considered till pasture. The pre-developed drainage analysis was performed using the "KCRTS" hydrology software and its summary tables and charts are attached for reference. The methods outlined in the 1998 King County Surface Water Design Manual were used as guidelines. Following this page are the data sheets used for the computer input data. The computer summary sheets for peak flows are also attached. Below is a brief description of the existing drainage characteristics: 2 year peak flow: l O year peak flow: l 00 year peak flow: project area: till pasture: impervious area: 0.024 CFS 0.040 CFS 0.076 CFS 0.43 acres 0.36 acres 0.07 acres CHAU SHORT PLAT KCRTS PEAK FLOW SUMMARY PRE-DEVELOPED DRAINAGE Flow Frequency Analysis Time Series File:chaupre.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--------Flow Frequency Analysis------- Flow Rate Rank Time of Peak --Peaks Rank Return Prob (CFS) (CFS) Period 0.037 4 2/09/01 15:00 0.076 1 100.00 0.990 0.024 6 1/05/02 16:00 0.042 2 25.00 0.960 0.042 2 2/27/03 7:00 0.040 3 10.00 0.900 0.019 8 8/26/04 2:00 0.037 4 5.00 0.800 0.024 7 1/05/05 8:00 0.037 5 3.00 0.667 0.040 3 1/18/06 16:00 0.024 6 2.00 0.500 0.037 5 11/24/06 3:00 0.024 7 1. 30 0.231 0.076 1 1/09/08 6:00 0.019 8 1.10 0.091 Computed Peaks 0.065 50.00 0.980 ---':"'·- ....... , .... ~. . ·• .. -·--. -. CH.1>.-u :SHDRT PLp.,_r ... PRE-i)E.. \.iS,.L,,pi:=r. ('\ I< i;l, I ...J P>r-6£ I. .... ,,_,_ ' " ~ /') " -,SJ +-e ~~·. 130.11..o ( \\3,45) ::-(4,IDCa sF co ,:,4 Pre.) ~'\ ,.... .I ' ,"t" I ' -,, ........ -"""""""\ 1-Ti\{)_,.. -,..._ • .., l(e, ~...i. . .;: . 1-::z--~ .., A:.. .t -I i /"2j) 3 qQ,i "SF - C ' -' ' 7.-/ Ccl To '\'t.-,\ ? yD I e.c.:t-~·. I e:, 1 4'o :sF --0,43 A<:-. = ? . i::=.~ sn ~ , G-LJ'C\~~-R."1 J"uS' : II I ~~$ b~ . 2497 ;se II ~st. ~\~ c:h:::1~'. 6 <c," -s;-F II 0--Jfo )'MF£ -4±.3 Sr ' I ~ -h>hl Q,kj'ST, I~, :z_q~ }P :: 0,0t Ac_ II 311 S'><I s'I, N Gee P~~J_QUS" II ~ Ll.:s:e... -h\\ I f43 h..,ce... Ill B';) a,r e.c.._ ;:-O 4"3. -(!),01 -0. 3l,, (\c.., Ill 4.111 :R f"l \ NA:'r\.-L,,, ~jSA:.fo ..._1 •• 111 ~To...c.. i=n _J -. ..--I ,o II .c,. II lecf<J.'; PPE-uc;~:·J. Pr=-A-K-~s- II l 0-'--. 2-'<r· -D.b24- J I ~ IO ':fY :,. 0' (? 4-0 II /OD TC.· ~ o.011~ I II . ' I i ! II ; I I I I ~-~-·-· 11 B. DEVELOPED DRAINAGE The developed drainage calculations used the same project area as the pre-developed calculations. The impervious surfaces included the 3 new houses. 3 new driveways, the joint use driveway and the frontage improvements for 106th Ave SE and Se 172nd St. The applicant provided specific house plans for the three new lots. The footprint for these specific houses was uses as the impervious surface area for the new houses at each lot. These areas are shown on the attached worksheet. A driveway for each lot was also calculated using the site plan that was provided by the applicant. The areas for the driveways were taken directly from the plan for each new lot. The joint use driveway was calculated to cover the "worse" condition of extending the full length of the common lot line between Lots 2 and 3. The required pavement with of 18 ft. was used. The frontage improvement impervious surface includes the new sidewalk. curb and pavement widening. The pavement widening width was calculated using an average width of the additional pavement for both streets. The developed pervious surface was considered as till lawn. Similar to the existing condition. the KCRTS method was used to determine the peak flows for the various storm events. The computer data sheets for the developed flows follow this page. A brief summary of the developed drainage characteristics are: 2 year peak flow: 10 year peak flow: 100 year peak flow: total area: till lawn: impervious area: 0.075 CFS 0.091 CFS 0.153 CFS 0.43 acres 0.19 acres 0.24 acres Time CHAU SHORT PLAT KCRTS PEAK FLOW SUMMARY DEVELOPED DRAINAGE Flow Frequency Analysis Series File:chaudev.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--------Flow Frequency Analysis------- Flow Rate Rank Time of Peak -Peaks Rank Return Prob (CFS) (CFS) Period 0.075 6 2/09/01 2:00 0.153 1 100.00 0.990 0.060 8 1/05/02 16:00 0.092 2 25.00 0.960 0.091 3 2/27/03 7:00 0.091 3 10.00 0.900 0.063 7 8/26/04 2:00 0.079 4 5.00 0.800 0.076 5 10/28/04 16:00 0.076 5 3.00 0.667 0.079 4 1/18/06 16:00 0.075 6 2.00 0.500 0.092 2 10/26/06 0:00 0.063 7 1. 30 0.231 0.153 1 1/09/08 6:00 0.060 8 1.10 0.091 Computed Peaks 0.133 50.00 0.980 ----++t-------,-1..,_,,-t=~'----.~-.q:OBI:..i..._---1:p_'-":u---------- ----+++----~~E:>-lE.LD ~ D-~._.f'r:~(N~~~~------- II ___ "2-_,----;;-,-f ff _~~~"--'-"''-""-----'Lro'"""-'--'-'--'p~~=D~-'------------- 1 ff I ; /'o • Zi:; 2. ::: IQ( l I to)+ QI. D(/ 4-o) : .64-13 ---~~---~e=>':..1-----"b?=-'-b--_\~, ""'=_._r::_,,vw.,10='-'"-":s:.__._· ____ _.,_,,/ D,._7_,_,__,I o=-~:sF"-'-r __ 1111 s) -,- ----,---------------------==---, 0~ -z..4-Ac..-. jl'i !,l If' , I 111 Ill II II iii If 2.. "r )0 ~~· )Ou "l.r How5 :: ::: 0. OCf( ::: O,r53 C. HYDROLOGIC ANALYSIS The site qualifies for an exemption from Core Requirement #3. Flow Control. Exemption #3 (page 1-27. attached) is met. This is the peak flow exemption using flow control BMP's. The 100 year peak developed flow is 0.153 CFS. The 100 year peak pre-developed flow is 0.07 6 CFS. The difference is 0.077 CFS. which is less than 0.1 CFS limit to qualify for this exemption. In addition, the site is a re-development project and is not located within a critical drainage area or a landslide hazard drainage area. The project is a single family residential project; also needed to qualify for this exemption. The flow control BMP used for this project is individual lot dispersal trenches. Individual lot infiltration is not an alternative because the soils are of the Alderwood series (hydrologic group CJ. These soils have slow permeability rates and high ground water. The site qualifies for small site drainage review since the net new impervious surface is less than 10.000 SF. The new impervious from the development of the site and the 3 lots is 10.710 SF. The existing impervious surface to be removed is 2,940 SF. The net new impervious surface is 7.770 SF. D. WATER QUALITY CONTROL The site also qualifies for an exemption from Core Requirement #8, Water Quality. Exemption # 1, surface area exemption (page 1-50. attached) is met. The developed site will be adding less than 5000 SF of new impervious surface subject to vehicular traffic (PGIS). The new PGIS area includes the 3 new driveways for each lot. the joint use driveway and the pavement widening along both frontage roads. The totals for these areas are: • 3 driveways: 546 SF • joint driveway: 1080 SF • 106 Ave. widening: 708 SF • 172 St. widening: 140 SF TOTAL: 247 4 SF This does not count the existing gravel driveway that is being removed (credit for 50% of the area). This does show that the project meets the requirements for the surface area exemption. ... ---- I .:!.3 CORE REQUIREME.'T #3: FLOW CO:-.TIOL CJ EXEMPTIONS FROM CORE REQUIREMENT #3 There are eight possible exemptions from the requirement 10 provide a formal flow control facility per Core Requirement #3. The intent of these exemptions is to provide for situations where a facility may not be practical or needed, where other alternatives to a facility can be just as effective, or where it makes sense to provide incentives for retaining native vegetation or for maximizing use of existing developed areas. 1. Impervious Suriace Exemption A proposed project or any threshold discharge area within a project is exempt if less than 5,000 square feet of new impervious surface will be added and the project or threshold discharge area is not within a Landslide Hazard Drainage Area." If the project or threshold discharge area is located within a Landslide Hazard Drainage Area, this exemption only applies to new impervious surface less than 2,000 square feet. 2. Impervious Surface Exemption Using Flow Control BMPs Any threshold discharge area within a proposed project is exempt if less than 10,000 square feet of new impervious surface will be added, AND all of the following criteria are met: a) The area cleared to accommodate the proposed project must be less than 35% or less than 2 acres of the threshold discharge area (whichever is greater), AND b) If the project is a single family residential project, flow control BMPs must be applied within the threshold discharge area as specified in Small Site Drainage Requirements (detached Appendix C), AND c) · For projects other than single family residential projects, the new impervious surface within · the threshold discharge area must be comprised of either non-pollution-generating roofs that comply with the roof downspout controls in Section 5.1, OR roads, trails, or drivewavs that · comply with the rural roadway dispersion requirements in Section 5.2.1, Al\TI ' · d) The manner in which runoff is discharged from the project site must not create a significant adverse impact per Core Requirement #1. 3. Peak Flow Exemption Using Flow Control BMPs Any threshold discharge area within a proposed project is exempt if the project improvements within the threshold discharge area generate less than a 0.1 cfs increase in the existing site conditions"' 100- year peak flow rate, AND all of the following criteria are met: a) If the project is a rede,·elopment project, flow control BMPs must be applied as specified in Section 5.2, and the project improvements must not significantly impact a "severe erosion problem" or "severe flooding problem" (see page 1-21), and must not be located within a Landslide Hazard Drainage Area, AND b) If the project is a single family residential project, the runoff from impervious surfaces must be infiltrated or dispersed using flow control BMPs specified in Appendix C, and any areas of native 31 Landslide Hazard Drainage Areas are delineated on a map adopted with this manual (see map pocket on inside of back cover). 32 Existing site conditions depend on what, if any, land conversion activity has occurred on the si1e since May 1979 when King County first required flow control on developments adding more than 5,000 square feet of new impervious surface. IF a drainage plan has been approved by the County since May , 979 for any land conversion activity which includes the addition of more than 5,000 square feet of new impervious surface, THEN existing site conditions are those created by the site improvements and drainage facilities·constructed per 1he approved engineering plans. OTHERWISE, existing site conditions are those that existed prior to May 1979 as determined from aerial photographs and, if necessary, on knowledge of individuals familiar with the area. The intent is to mitiga1e unaddressed impacts created by site alterations or improvements, such as clearing, which have occurred since May 1979. "· 1998 Surface \Vater Design Manual 9/1/98 1-27 SECTION 1.2 CORE REQL'IREME.'-'TS 9/1/98 vegetation assumed not to be cleared for the purposes of computing the increase in 100-year peak flow must be preserved within a tract or by covenant as described in Appendix C, AND c) For projects other than rede>·elopment projects and single family residential projects, the new impervious surface within the threshold discharge area must be comprised of either non- pollution-generating roofs that comply with the roof downspout controls in Section 5.1, OR roads, trails, or driveways that comply with the rural roadway dispersion reguirements in Section 5.2.1, AND d) The manner in which runoff is discharged from the project site must not create a significant adverse impact per Core Reguirement #I. 4. Peak Flow Exemption for Urban Redevelopment Projects Any natural discharge area of a redevelopment project located within the Urban Growth Area is exempt if the project improvements within the natural discharge area generate Jess than a 0.1 cfs increase in the existing site conditions JOO-year peak flow, A.1\'D all of the following criteria are met: a) The application of this exemption to narural discharge areas within a proposed project must not result in more than a 0.4 cfs increase in the existing site conditions I 00-year peak flow rate for any threshold discharge area of the project, AND b) Flow control B~{Ps must be applied to the runoff from new impervious surfaces as specified in Section 5.2.J, AND c) The project impro,·ements within the natural discharge area must not be located within a Landslide Hazard Drainage Area and must not significantly impact a "severe erosion problem" or "severe flooding problem" (see page 1-21), AND d) · .. The manner in which runoff is discharged from the project site must not create a significant adverse impact per Core Requirement #I. 5., Forested Open Space Exemption for Rural Residential Projects Any natural discharge area within a proposed rural residential project (zoned RA-2.5, RA-5, RA-I 0, or RA-20) is exempt if all of the following criteria are met: a) At least 65% of the unsubmerged portion" of the natural discharge area will be set aside as forested open space as specified in Section 5.2.1. Al\'D b) The runoff from new impervious surfaces within the natural discharge area will be dispersed over native vegetation using the flow control Bl\1Ps detailed in Section 5.2.1, A.1\"D c) The manner in which runoff is discharged from the project site will not create a significant adverse impact per Core Requirement #l. 6. Direct Discharge Exemption Any natural discharge area within a proposed project is exempt if it drains to one of the "major receiving waters" listed in Table 1.2.3.B, AND meets all of the following criteria for direct discharge•• to that receiving water: a) The flowpath from the project site discharge point to the edge of the JOO-year floodplain of the major receiving water shall be no longer than a quarter mile, except for discharges to Lake Sammamish, Lake Washington, and Puget Sound, AND b) The conveyance system between the project site and the ordinary high water line of the major receiving water shall be comprised of manmade com·eyance elements (pipes, ditches, outfall 33 Unsubmerged portion means any portion outside lhe ordinary high water line of streams, lakes, and wetlands . .s.: Direct discharge means unde!ained discharge from a proposed project to a "major receiving wa1er." 1998 Surface W:Her Design M.mua1 1-28 SECTION 1.2 CORE REQUJREME:-.'TS • Special Requirement #5: Oil Control, Section 1.3.5 (p. 1-62)-This requirement applies special oil controls to those projects proposing to develop or redevelop a high-use site. Key Definitions • Pollution-generating impervious surface (PGIS) Definition: Those impervious surfaces considered to be a significant source of pollutants in stormwater runoff. Such surfaces include those which are subject to vehicular use" or storage of erodable or teachable materials, wastes, or chemicals," and which receive direct rainfall or the run-on or blow-in of rainfall. 48 Metal roofs are also considered to be PGIS unless they are treated to prevent leaching. • Pollution-generating pervious surface (PGPS) Definition: Any non-impervious surface with vegetative ground cover subject to use of pesticides and fertilizers. Such surfaces include. but are not limited to, the lawn and landscaped areas of residential or commercial sites, golf courses, parks and sports fields . ....---;j>;... D EXEMPTIONS FROM CORE REQUIREMENT #8 9/1/98 There are five possible exemptions from the requirement to provide a formal water quality facility per Core Requirement #8: 1. Surface Area Exemption A proposed project or any threshold discharge area within a project is exempt if it meets all of the following criteria: a) Less than 5,000 square feet of new PGJS'' will be added. AND b) Less than 5,000 square feet of contiguous PGIS'' will be created through any combination of new and/or replaced impen·ious surface as part of a redevelopment project, AND c) Less than 1 acre of contiguous PGPS'' will be added and/or modified," OR there is a formal agreement with King County to implement a landscape management plan" for the PGPS areas on the site (or a farm management plan in the case of an agricultural land use). 46 A surface. whether paved or not, shall be considered subject to vehicular use if it is regularly used by motor vehicles. The following are considered regularly-used surfaces: roads, unvegetated road shoulders, bike lanes within the traveled lane of a roadway, driveways, parking lots, unfenced fire!anes, diesel equipment storage yards, and airport runways. The following are not considered regularly-used surfaces: road shoulders primarily used for emergency parking, paved bicycle pathways, bicycle lanes adjacent to unpaved or paved road shoulders primarily used for emergency parking, fenced firelanes, and infrequently used maintenance access roads. 47 Erodable or leachabfe materials, \IYastes, or chemicals are those substances which, when exposed to rainfall, measurably alter the physical or chemical characteristics of the rainfall runoff {examples include erodable soil, uncovered process wastes, manure, fertilizers, oily substances, ashes, kiln dust. garbage dumpster leakage, etc.). 48 A covered parking area would be considered pollution-generating if runoff from uphill could regularly run through it, or if rainfall could regularly blow in and wet the pavement surface. The same par1<ing area would not be included if it were enclosed by walls or if a low wall and berm prevented stormwater from being blown in or from running onto the covered area. 49 New PGIS means new impervious surface (as defined on page 1-4) that is pollution-generating. so Contiguous PGIS means a discrete patch of PGJS that is all together as opposed to being separated in different locations on the project site. As used in this and other exemptions, the intent is to apply Core Requirement #8 to those redevelopment projects that are replacing and/or adding enough impervious surface in one location to allow for opporiune installation of a water quality facility. 51 Contiguous PGPS means a patch of PGPS that is au together as opposed to being separated in different locations on the project site. 52 Modified PGPS means any existing PGPS that is re-graded or re-contoured by the proposed project. 53 Landscape management plan means a King County approved plan for defining the layout and long-term maintenance of landscaping features to minimize the use of pesticides and fertilizers. and to reduce the discharge cl suspended solids and other pollutants. Guidelines for preparing landscape management plans can be found in Reference Section 4-A. Submittal requirements are detailed in Section 2.3.1.4. 1998 Surface Water Dc:sign ~b.nuJ.l 1-50 Site Improvement Bond Quantity Worksheet King County Department of Development & Environmental Services 900 Oakesdale Avenue Southwest Renton, Washington 98055-1219 Project Name: Chau 3 Lot Short Plat Location: 17034 106th Ave. SE Clearing greater than or equal to 5,000 board feet of timber? -~~~~~~-yes XXXXXXXXX no If yes, Forest Practice Permit Number: --------- (RCW 76.09) Page 1 of 9 /'' A~c:.r:;,iSPRond Date: 28-Au.9.-08 Project No.: L03S0016 Activity No.: L07SR022 Note: All prices include labor, equipment, materials, overhead and profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database. Unit prices updated: 02/12/02 Version: 04/22/02 Report Date: 9/8/2008 Site Improvement Bond Quantity Worksheet Reference# EROSION/SEDIMENT CONTROL Backfill & compaction-embankment Check dams, 4" minus rock SWDM 5.4.6.3 Crushed surfacino 1 1/4" minus WSDOT 9-03.913\ Ditchinq Excavation-bulk Fence, silt SWDM 5.4.3.1 Fence, Temporary (NGPE) Hvdroseedinq SWDM 5.4.2.4 Jute Mesh SWDM 5.4.2.2 Mulch, by hand, straw, 3" deep SWDM 5.4.2.1 Mulch, by machine, straw, 2" deep SWDM 5.4.2.1 Pioina, temoorarv, CPP, 6" Pioinci, temporary, CPP, 8" Piping, temPorarv, CPP, 12" Plastic coverina, 6mm thick, sandbaaned SWDM 5.4.2.3 Rip Rap, machine ~laced: slooes WSDOT 9-13.1(2) Rock Construction Entrance, 50'x15'x1' SWDM 5.4.4.1 Rock Construction Entrance, 100'x15'x1' SWDM 5.4.4.1 Sediment pond riser assemblv I SWDM 5.4.5.2 Sediment trao, 5' hlah berm I SWDM 5.4.5. 1 Sed. trap, 5' l'igh, rlprapoed spillway berm section SWDM 5.4.5.1 Seeding, by hand SWDM 5.4.2.4 Soddina, 1" deep, level around I SWDM 5.4.2.5 Sodding, 1" deep, sloped ground I SWDM 5.4.2.5 TESC Suoervisor Water truck, dust control SWDM 5.4.7 WRITE-IN-ITEMS •••• /see nane 91 CB Protection Filter Page 2 of 9 R.::i~.r;:iSPAond Unit Price Unit Quantitv $ 5.62 CY 20 $ 67.51 Each $ 85.45 CY $ 8.08 CY $ 1.50 CY 20 $ 1.38 LF $ 1.38 LF $ 0.59 SY $ 1.45 SY $ 2.01 SY 100 $ 0.53 SY $ 10.70 LF $ 16.10 LF $ 20.70 LF $ 2.30 SY $ 39.08 CY $ 1,464.34 Each $ 2,928.68 Each $ 1,949.38 Each $ 17.91 LF $ 68.54 LF $ 0.51 SY $ 6.03 SY $ 7.45 SY $ 74.75 HR 4 $ 97.75 HR 4 $ 100.00 Each 1 ESC SUBTOTAL: 30% CONTINGENCY & MOBILIZATION: ESCTOTAL: COLUMN: #of Aoolications Cost 1 112 1 30 1 201 1 299 1 391 1 100 $ 1,133.40 $ 340.02 $ 1,473.42 A Unit prices updated: 02/12/02 Version: 04/22/02 Report Date: 9/8/2008 -· GENEH/\L ITEMS Backfil & Compaction-embankment Backfil & Compaction-trench Clear/Remove Brush, bv hand Clearlna/Gruti:>lnarTree Removal Excavation -b.Jlk Excavation -Trench Fenclrg, cedar 6' high Fenclrq, chain link. vlnvl coated 5 hloh FencilYl, chain link. aate. vlnVf coated 20' Fenclra, solit rail, 3' hich FIii & compact • common barrow Fm & comoact -arave\ base Fill & compac1 -screened toosoll Gablon. 12" deep, stone filled mesh Gablon. 18" deep, stone filled mesh Gablon 36" deeo, stone filled mesh Gradira, fine, bv hand Gradirn, fine, with orader Monuments, 3' lon!l Sensit'we Areas S1an Soddlnn, 1" deeo, slooed around SuNeving, line & arade Survel.Anq, lot location/lines Traffic control crew ( 2 flanners) Trail, 4'' chinn,:,,d wood Trail, 4'' crushed cinder Trail, 4'' top course Wall, retainlna, concrete Wall, rockery Page 3 of 9 *KCC 27 A authoriZes only one bond reduction. ~----l'."nn.~ ... .-1 Site Improvement Bond Quantity Worksheet Existing Future Public Private Righi-of-Way Road Improvements lmprovements & Drainaoe Facilities Unit Price Unit Quant. Cost Quant. Cost Quant. Cost $ 5.62 CY $ 8.53 CY 45 363.85 $ 0.36 SY 100 36.00 $ 8,876.16 Acre $ 1.50 CY $ 4.06 CY 45 182.70 $ 18.55 LF $ 13.44 LF $1,271.81 Each $ 12.12 LF $ 22.57 CY $ 25.48 CY $ 37.85 CY $ 54.31 SY $ 74.85 SY $ 132.48 SY $ 2.02 SY $ 0.95 SY 250 237.50 $ 135.13 Each $ 2.88 Each $ 7.46 SY $ 788.26 Day 1 788.26 $ 1 556.64 Acre 0.1 155.66 $ 85.18 HR 8 681.44 $ 7.59 SY $ 8.33 SY $ 8.19 SY $ 44.16 SF $ 9.49 SF SUBTOTAL 2,465.41 Quantity Completed (Bond Reduction)" Quant. Complete Cost Unit prices updated: 02/12/02 Version: 4n.2102 Report Date: 9/8/2008 Site Improvement Bond Quantity Worksheet ' . Existing Future Public Private Right-of-way Road Improvements Improvements & Drainaae Facilities Unit Price Unit Quant. Cost Quant. I Cost Quant. I Cost ROAD [MP.R.9:J_F,MEt,J_T AC Grhdina, 4' wide machine< 1000sv $ 23.00 SY 115 2,645.00 AC Grnding. 4' wide machine 1000-2000sy $ 5.75 SY AC Grhdin!:1, 4' wide machine > 2000sv $ 1.38 SY AC Ranoval/Disnnsal/Reoair $ 41.14 SY Barricade, tvne I $ 30.03 LF Barricade tvne Ill < Permanent ) $ 45.05 LF Curb a Gutter, rolled $ 13.27 LF Curb a Gutter, vertlcal $ 9.69 LF 259 2,509.71 Curb iYld Gutler, demolltlon and disnosal $ 13.58 LF Curb, extruded asphalt $ 2.44 LF Curb, extruded concrete $ 2.56 LF SawcU asoh!lt, 3" death $ 1.85 LF 260 481.00 SawcU, concrete, per 1" det>th $ 1.69 LF Sea\art, asphalt $ 0.99 LF 260 257.40 Shoulder, AC, ( see AC road unit orlce) $ -SY Shoulder, oravel, 4" thick $ 7.53 SY Sidewalk, 4" thick $ 30.52 SY 144 4,394.88 Sidewalk, 4" thick, demolition and dlsoosal $ 27.73 SY Sidewalk, 5" thick $ 34.94 SY Sidewalk, 5" thick, demolition and disoosat $ 34.65 SY Slan, handicao $ 85.28 Each Strlcina, cer stall $ 5.82 Each Stripln1t thermoplastic, < for crosswalk ) $ 2.38 SF Striping, 4" reflectorlzed line $ 0.25 LF Page 4 or 9 SUBTOTAL 10,287.99 : I *KCC 27A authorizes only one bond reduction. .... __ ,-("f:,t"}.~ ... ~ Bond Reduction• ,'.' ·\: --· .. ' , .. , .. •>~;·"' ... :'.'!'"'.,'. Quant. ... Complete Cost Untt prices updated: 02/12/02 Version: 4122/02 Report Date: 9/812008 . Site Improvement Bond Quantity Worksheet Unit Price Unit t<OAD_ SUl3_F.I\CING /,i'' r~(y:;,f,; ~ ~ r; [1,'}SI'. :-: \ ', .. lr:p, ''lll ~<:i For KCRS '93, (additional 2.5" base) add: $ 3.60 SY AC Overlav. 1.5" AC $ 7.39 SY AC Overlay, 2" AC $ 8.75 SY AC Road, 2'', 4" rock, First 2500 SY $ 17.24 SY AC Road, 2". 4" rock. Qtv. over 2500SY $ 13.36 SY AC Road, 3", 4" rock, First 2500 SY $ 19.69 SY AC Road, 3", 4" rock, Qtv. over 2500 SY $ 15.81 SY AC Road, 5", First 2500 SY $ 14.57 SY AC Road, 5", atv. Over 2500 SY $ 13.94 SY AC Road, 6". Flrs1 2500 SY $ 16.76 SY AC Road, 6". Qty. Over 2500 SY $ 16.12 SY Asphalt Treated Base 4" thick $ 9.21 SY Gravel Road. 4" rock, First 2500 SY $ 11.41 SY Gravel Road, 4" rock, Otv. over 2500 SY $ 7.53 SY PCC Road, 5", no base, over 2500 SY $ 21.51 SY PCC Road, 6', no base, over 2500 SY $ 21.87 SY Thickened Edge $ 6.89 LF Page5of9 SUBTOTAL ·KCC 27A authorizes only one bond reduction. o.,,,r,,.~Pi:l.rinrl Existing Future Public Right-of-way Road Improvements & Drainage Facilities Quant. Cost Quant. I Cost FtJ; ·n 11,:r:n;: f I. r:· h!,,._;.., , .... !,;rs•~,,~ I 5" lqprr,tll",('\ 181 651.60 894 6,606.66 181 2,418.16 9,676.42 Priyate,, .. ., ~~~:;~~r~ti.r~t-:t: .. I Improvements Quant. Quant. I Cost Comolete Cost 64 230.40 64 855.04 20 137.80 1,223.24 Un~ prices updated: 02/12/02 Version: 4'22/02 Report Date: 9/8(2008 Site Improvement Bond Quantity Worksheet Unit Price Unit DR/\IN/\GE (C f)p :: (;.-.1 nm,1!.<!d f'l<i",li<: Pu;r•. t·J 1;; ,,i 1· ti111v;,lr,!;'. 1 Access Road, RID Bollards -fixed Bollards -removable • (CBs include frame and lid) CB T"ne I CB Tvne IL CB Tvoe 11, 48" diameter for additional deoth over 4' CB Tvne 11, 54" diameter for additional depth over 4' CB Tvne II, 60" diameter for additional deoth over 4' CB T"= 11, 7'Z' diameter for additional depth over 4' Throuah~curb Inlet Framework (Add) Cleanout, PVC, 4" Cleanout, PVC, 6" CleanOut, PVC, 8" Culvert, PVC, 4" Culvert, PVC, 6" Culvert, PVC, B" Culvert, PVC, 12" Culvert, CMP, B" Culvert, CMP, 12" Culvert, CMP, 15" Culvert, CMP, 18" Culvert, CMP, 24" Culvert, CMP, 30" Culvert, CMP, 36" Culvert, CMP, 48" Culvert, CMP, 60" Culvert, CMP, 72" Page 6 of 9 *KCC 27 A authorizes only one bond reduction. BasraSPBond $ 16.74 SY $ 240.74 Each $ 452.34 Each $ 1 257.64 Each $ 1 433.59 Each $ 2 033.57 Each $ 436.52 FT $ 2 192.54 Each $ 486.53 FT $ 2 351.52 Each $ 536.54 FT $ 3 212.64 Each $ 692.21 FT $ 366.09 Each $ 130.55 Each $ 174.90 Each $ 224.19 Each $ 8.64 LF $ 12.60 LF $ 13.33 LF $ 21.77 LF $ 17.25 LF $ 26.45 LF $ 32.73 LF $ 37.74 LF $ 53.33 LF $ 71.45 LF $ 112.11 LF $ 140.63 LF $ 235.45 LF $ 302.58 LF SUBTOTAL Existing Right-of-way Quant. Cost ;·.,,' ... ,-,,:::•··. 3 3,IT2.92 3,772.92 Future Public Private ·, . . Bond Reduction'. .. · .. . . ... '., .. Road Improvements Improvements & Drainage Facilities Quanl. Quant. Cost Quant. I Cost Complete Cost . ,·: .·· ' . :•. •,, . ·,.; ,; '·,·••:··:• , .. ,.1 .,,,,,,,! ; ·.::' ,,, ·',.•,':I·: .,-,,_<· . • •·! ·' ,,., .. , Unit prices updated: 02/12/02 Version: 4/22/02 Report Date: 9/8/2008 .. DRAINAGE CONTINUED Culvert, Concrete, 8" Culvert. Concrete, 12" Culvert, Concrete, 15" Culvert, Concrete, 18" Culvert, Concrete, 24" Culvert, Concrete, 30" Culvert. Concrete, 36" Culvert, Concrete 42'' Culvert, Concrete 48" Culvert, CPP, 6" Culvert, CPP, 8" Culvert, CPP, 12'' Culvert, CPP, 15" Culvert, CPP, 18" Culvert, CPP, 24" Culvert, CPP, 30" Culvert, CPP, 36" Oltchina Flow Disoersal Trench (1,436 base+} French Drain /3' deothl Geotextlte, laid In trench, oolVDroovlene Infiltration oond testino Mid-tank Access Riser, 48" dla, 6' deep Pond OvertloW Solllwav Restrlctor/Oil Separator, 12" Restrictor/Oil Separator, 15" Restrictor/Oil Separator 18" Riorao, olaced Tank End Reducer (36" diameter) Trash Rack, 12" Trash Rack, 15" Trash Rack. 18" Trash Rack, 21" Page 7 of 9 ·Kee 27A authorizes only one bond reduction. R;:i~raSPBond Site Improvement Bond Quantity Worksheet Existing Future Public Private Right-of-way Road Improvements Improvements & Drainage Facilities Unit Price Unit Quant. Cost Quant. Cost Quant. Cost $ 21.02 LF $ 30.05 LF 14 420.7 $ 37.34 LF $ 44.51 LF $ 61.07 LF $ 104.18 LF $ 137.63 LF $ 158.42 LF $ 175.94 LF $ 10.70 LF $ 16.10 LF $ 20.70 LF 129 2670.3 $ 23.00 LF $ 27.60 LF $ 36.80 LF $ 48.30 LF $ 55.20 LF $ 8.08 CY 10 80.8 $ 25.99 LF $ 22.60 LF $ 2.40 SY $ 74.75 HR $ 1,605.40 Each $ 14.01 SY $ 1,045.19 Each $ 1,095.56 Each $ 1,146.16 Each $ 39.08 CY 10 390.8 $ 1,000.50 Each $ 211.97 Each $ 237.27 Each $ 268.89 Each $ 306.84 Each SUBTOTAL 3562.6 Bond Reduction• Quant. Complete Cost Unit prices updated: 02/12/02 Version: 4/22/02 Report Date: 9/8/2008 .. ' ~ .. Site Improvement Bond Quantity Worksheet Unit Price Unit P/\1,.KING.L,.OLSURF/\C:1.N_G 2'' AC. 2" top course rock & 4" borrow $ 15.84 SY 2'' AC. 1.5" top course & 2.5" base course $ 17.24 SY 4" select borrow $ 4.55 SY 1.5" too course rock & 2.5" base course $ 11.41 SY W.RLTE,IN-.1.J:.El\'I_S Mailboxes $ 800.00 EA. EA. LF EA. EA. EA. LF SF LF LF SUBTOTAL SUBTOTAL (SUM ALL PAGES): 30% CONTINGENCY & MOBILIZATION: Page 8 of 9 *KCC 27 A authorizes only one bond reduction. B;i~raSPBnnd GRANDTOTAL: COLUMN: Existing Future Public Right-of-way Road Improvements & Drainaoe Facilities Quant. I Price Quant. I Cost 1 800 800.00 30,565.34 9,169.80 39,734.95 B C Quant. Private Bond Reduction• lmprov:ements Cost D Quant. Comrlete Cost 1,223.24 366.97 1,590.21 E Unit prices updated: 02/12/02 Version: 4/22/02 Report Date: 9/812008 "•.-' • Site Improvement Bond Quantity Worksheet Original bond computations prepared by: Name: Chau 3 Lot Short Plat Date: 28-Aug-08 PE Registration Number: 20734 Tel. #: 253-850-0934 Firm Name: Jaeger Engineering Address: 9419 S. 204 Place, Kent, WA. 98031 Project No: L03S0016 ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS Stabilization/Erosion Sediment Control (ESC) Existing Right-of-Way Improvements Future Public Road Improvements & Drainage Facilities Private Improvements Calculated Quantity Completed Total Right-of Way and/or Site Restoration Bond·/ .. (First $7,500 of bond• shall be cash.) Performance Bond• Amount (A+B+C+D) = TOTAL Redu~ed Performance Bond· Total••• Maintenance/Defect Bond• Total NAME OF PERSON PREPARING BOND· REDUCTION: PERFORMANCE BOND· AMOUNT (A) $ 1.473.4 (B) $ :3_9,734.9 (C) $ ---- (D) $ 1,590.2 (A+B) $ 41,208.4 (T) $ 42,798.6 Minimum bondJ amount is $1000. BOND• AMOUNT REQUIRED AT RECORDING OR TEMPORARY OCCUPANCY••• (E) $ TX 0.30 $ 12,839.6 (T-E) $ 42,798.6 Use larger of Tx30% or (T-E) "NOTE: The word "bond" as used in this document means any financial guarantee acceptable to King County. •• NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. OR Date: PUBLIC ROAD & DRAINAGE MAINTENANCE/DEFECT BOND• (B+C) x 0.25 = $ 9,933.7 The restoration requirement shall include the total cost for all TESC as a minimum, not a maXimum. In addition, corrective work, both on-and off-site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity. **• NOTE: Per KCC 27 A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes. SURETY BOND RIDER NOTE: If a bond rider is used. minimum additional performance bond shall be ! $ 1,590.2 !(C+D)-E REQUIRED BOND· AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY ODES Page 9 of 9 BasraSPBond Unit prices updated: 02/12/02 Version: 4/22/02 Report Date: 9/8/2008 • • I I·: •f .. ·' . i ·. I·' ' . ',, . . . J.AEGER ENGINEER.IN'G 9419.S. 204PLACE ~ KENT,.WASHINGTON 98031' PHONE '(253} 850--0934 FAX (253). 850-0155 . . . ' -·. . ' ' .' . , . March 22,2007· . August 28, 2008 . . . ' ' " ' . ' . SMAi..LSiTE DRAINAGE .. ,·~ ·tECHNICAL INFQRMATION REPORT • J .. CHAU3LO'f.SB0RTPLAT'. . . ·170341061bAVE. SE . COUNTY FILE NO; L0380016 . . L07~R022· '·· . '. , . . '.,.. . 'PREPAIIBD FOR: .... . ·; . · Ha Minh Chau.· ' · .· 41'<>1.'l~Oth Ave; SE. · • Bellevue, WA. 98Qci6 .· .· ( 425) 6;43,3993 . ' . . PREPARED BY:. James J., Jaeger, P.E. · . . ~ . . . --- . . ; . ' .22J . i's . [iiiiI : 0 :_r~. @ .· 0 · C . · (iiiil. . , . ·o· : co· . . . = in ,-.., .. en ,g ~ . ·' = .. = .• uuu ·~{6J ... ·.,'I".' .. ,,·, ~ .~ ·:.' . ·._,.., .... JAEGER· ENGINEERING 9419 S. 204 PLACE -KENT; WASHINGTON 98031 PHONE (253) 850-0934 FAX (253) 850-0155 March 22, 2007 August 28, 2008 · SMALL SITE DRAINAGE TECHNICAL INFORMATION REPORT PREPARED FOR: Ha Minh Chau CHAU3LOTSB0RTPLAT 17034 1061b A VE. SE COUNTY FILE NO. L03S0016 L07SR022 4101 150th Ave. SE Bellevue, WA. 98006 (425) 643-3993 PREPARED BY: James J. Jaeger, P.E. ' I. OVERVIEW The proposed project is a 3 lot short plat located at the southeast corner of the intersection of SE 172nd St. and 1061h Ave. SE. The property is 0.34 acres and is proposed to divide into 3 new single family lots, two lots of approx. 4500 SF and a larger lot of approx. 5500 SF. The property is zoned R-8. There is and existing house and carport that will be demolished and removed. Also on the site is an gravel driveway that is connected to 1061h Ave. SE. This driveway will also be removed. Access to the new houses will be a joint driveway (lots 2 and 3) from 1061h Ave. SE. and single driveway (Lot 1) from SE 172nd St. Both of the frontage streets are currently unimproved. Both will be improved with curb, gutter, sidewalk and pavement widening to meet the urban sub-access road standard. The pavement widening will be measured from the centerline of the existing pavement, rather than the ROW centerline, per discussion with County staff. This was agreed to by the County so that additional ROW would not be needed to construct the necessary road width. The existing lot and future lots will be fully served by the existing public utilities. The site is nearly flat in the northeast corner and then begins an increasing slope down to the southwest corner. The maximum slope near this corner is approx. 12%. The site slopes down to both frontage streets. The site vegetation is primarily tall grass, brush with sporadic trees and shrubs. There is a row of fir trees along the 1061h Ave. SE frontage. There are no sensitive areas or hazard designations within this site. This property is basically a large existing lot on a corner of an older plat. There are no drainage improvements on the site itself. However, there are several culverts and ditches along the edges of both street frontages. All of the ditches drain to an existing culvert located near the southwest property corner. Along with the proposed new curb, gutter and sidewalks, the applicant will install a gutter drainage system consisting of catch basins and piping that will connect to the existing catch basin. This new gutter system will collect all of the runoff from the half streets along the frontage as well as the existing ditches upstream from the property. The new lots will include a roof downspout drainage piping system that will be connected to individual dispersal trenches. Each lot will also have a connection stub pipe to the public drainage system for footing drains .. The project is exempt from drainage detention and water quality enhancement as will be shown on the developed drainage section. .. , . !' ' ® King County Department of Development and Environmental Services 900 Oakesdale Avenue SW Renton, WA 98055-1219 File No. File Name: CONDITIONS OF APPROVAL L03S00l6 Chau Short Plat · Application Date: May 2, 2003 Revision Date: January 30, 2004 This short subdivision is granted preliminary approval subject to the following Conditions of Approval. These conditions are based on a field visit and current information the applicant has provided about the short subdivision property. Occasionally, in satisfying the Conditions of Approval, a more definitive land use limitation of the property may be revealed. New information (such as final Health approval or sensitive areas review) may require additional conditions and may reduce the number of lots. Final approval will be granted after compliance with the Conditions of Approval. Key codes and guidelines have been noted to provide guidance in preparing the required plans and other documents. Compliance with some of the following conditions will require that engineering plans be prepared by a professional civil engineer licensed in the State of Washington. I. Title 19A A. The short subdivision shall comply with all provisions of Title 19A. B. The final review process must be completed prior to recording of the short subdivision. The Department of Development and Environmental Services (DDES) strongly recommends the Final Short Plat be submitted at least one year prior to the expiration date of the project. The Final Short Plat submittal package includes: 1. A surveyed map page (four sets) including lot area closure calculations; 2. Final health approval from the King County Health Department ( different from preliminary health approval); 3. A current short plat certificate and supporting documents (easements, etc.); 4. Payment of the Final Short Plat submittal fee; 5. A copy of this letter (preliminary approval letter). A licensed land surveyor shall be hired to prepare the final short subdivision documents. These documents shall comply with all of the following conditions for final approval: .• ', C. All persons having an ownership interest in the subject property are required to sign the final short subdivision. D. If modifications to the approved preliminary site plan (Attachment 1) are needed to accomplish engineering design or final short plat, then a revised preliminary site plan shall be submitted to DDES for review and approval. The revised site plans shall be submitted with the engineering plans or the final short plat submittal. 2. Surface \Yater Management (KCC 9) 1998 King County Surface \Yater Design Manual (SWDM) A. This short subdivision proposal is subject to Full Drainage Review per section 1.1.2.3. Final short subdivision approval shall require full compliance with drainage provisions and storm drainage requirements of this section. Compliance may result in reducing the number and/or location of lots shown on the approved preliminary short subdivision. The conditions outlined below are site-specific drainage conditions: ( 1) Core Requirement #1 -Discharge at the Natural Location (2) Core Requirement #2 -Off-Site Analysis (3) Core Requirement #3 -Flow Control (4) Core Requirement #4 -Conveyance System (5) Core Requiremenf#S -Erosion & Sedimentation Control (6) Core Requirement #6 -Maintenance and Operation (7) Core Requirement #7 -Financial Guarantees & Liability (8) Core Requirement #8 -Water Quality (SI) Special Requirement #1-Other Adopted Requirements B. A professional civil engineer licensed in the State of Washington shall prepare a Technical Information Report and/or engineering plans per Chapter 2, of the 1998 King County Surface Water Design Manual. 3. Health (KCC 13) This project is exempt from further King County Heath Department review. However, if improvements are required from the Sewer and/or the Water District, then verification shall be required from said District(s) that the improvements have been bonded and/or installed, prior to final recording of the short plat. ,· ,· 4. Road Standards (KCC 14) 1993 King County Road Standards, Ordinance 11187 Final short subdivision approval shall require full compliance with the provisions set forth in the King County Road Standards including engineering plans for all road improvements. The engineering plans shall be prepared by a professional civil engineer licensed in the State of Washington. DDES strongly recommends the Engineering Plans be submitted at least two years prior to the expiration date of the project. A. That portion of the North half of SE 172nd Street adjoining the subject property shall be improved to an urban Sub-access standard per KCRS Section 1.03. B. That portion of the East half of I 06th Avenue SE adjoining the subject property · shall be improved to an urban Sub-access standard per KCRS Section 1.03. C. Provide 35' paved radii at the intersection of 1061h Avenue SE and SE 172 Street per KCRS Section 2.10. Dedicate a 25-foot property line radius at the intersection of I 06 1h A venue SE and SE 172°d Street per KCRS Section 2.10. D. Existing roadside obstacle(s) shall be relocated to provide a minimum clearance of JO feet from the edge of the travel lane to the obstacle(s) per KCRS Section 5.11. E. Private access to Lots 2 and 3 shall be shown as a joint-use driveway tract per KCRS Section 3.0 I. The tract shall be an undivided ownership to the lots it serves, and the lot owners shall be responsible for its maintenance. The tract shall be 20-feet wide with a 18-foot-wide paved surface. The tract shall be a minimum of 20 feet in length. · F. The following notes shall be shown on the final recorded short subdivision: I) \Varning: King County has no responsibility to build, improve, maintain or otherwise service the private roads contained within or providing service to the property described in this short subdivision. 2) All private easements and/or tracts to be maintained, repaired, and/or rebuilt by the owners of the parcels having legal access therefrom and their heirs, assigns or successors, unless and until such roads are improved to King County standards and are dedicated and accepted by King County for maintenance. G. All utilities within proposed rights-of-way shall be included within a franchise approved by the King County Council prior to final short subdivision recording. ,. " I H. All restrictions, easements, tracts, and their purpose shall be shown on the final recorded short subdivision. 5. Building and Construction Standards (Title 16) Grading. The applicant shall comply with all applicable provisions of KCC 16.82. 6. Fire Code (KCC 17) Section 902 of the 1997 Edition of Uniform Fire Code The applicant shall obtain the approval of the King County Fire Protection Engineer for the adequacy of the fire hydrant, water main, and fire flow standards ofKCC 17.08 prior to recoding of the lots. 7. Zoning Code (KCC 21A) A. Density and Dimensions (KCC 21A.12) All lots shall meet the density and dimensions requirements of the R-8-SO zone classification or shall be as shown on the face of the approved prelimi- nary short subdivision, whichever is larger. Minor revisions to the short subdivision, which do not result in substantial changes and/or do not create additional lots may be approved at the discretion of LUSD. B. Street Trees (KCC 21 A.16) Street trees shall be provided along that p011ion of the right-of-way for 106 1h Avenue Southeast and Southeast 172nd Street abutting the subject property, pursuant to the provisions of KCC 2 IA.l 6.050(E) and KCC 21 A.16.190, unless existing trees are shown to be equivalent to the requirement of Code. See note below. The required street trees shall be designed as to location and spacing on the final plan submittal. The street trees must be installed and inspected, or a performance bond posted, prior to recording of the plat. If a performance bond is posted, the street trees must be installed and inspected within one year of recording of the plat At the time of inspection, if the trees are found to be installed per the approved plan, a maintenance bond must be submitted, or the performance bond replaced with a maintenance bond, and held for one year. After one year, the maintenance bond may be released after DDES has completed a second inspection and determined that the trees have been kept healthy and thriving. NOTE: I. KCC 21A.16.050 Landscaping -street frontages. The average width of perimeter landscaping along street frontages shall be provided as follows: '·, ( ... -... ~. f • For single-family subdivisions: a. Trees shall be planted at the rate of one tree for every 40 feet of frontage along a neighborhood collector street or arterial street. b. The trees shall be: · I. Located within the street right-of-way if permitted by the custodial state or local agency; 2. No more than 20 feet from the street right-of-way line when located within a lot; 3. Maintained by the adjacent landowner unless part of a County maintenance program; and 4. A species approved by the County if located within the street right-of-way and compatible with overhead utility lines. c. The trees may be spread at irregular intervals in order to accommodate sight distance requirements for driveways and intersections. 2. KCC 21A.l 6.190 Financial guarantees. Financial guarantees shall be.required consistent with the provisions of Title 27A. C. Significant Tree Retention-KCC 21A.38.230 which applies to the site, a detailed tree retention plan shall be submitted with the engineering plans for the subject plat. The tree retention plan (and engineering plans) shall be consistent with the requirements ofKCC 21A.38.230, as well as the conceptual tree retention plan which is part of the hearing record for this project. No clearing of the subject property is permitted until the final tree retention plan is approved by LUSD. Flagging and temporary fencing of trees to be retained shall be provided, consistent with KCC 21A.38.230B4. The placement of impervious surfaces, fill material, excavation work, or the storage of construction materials is prohibited within the fenced areas around preserved trees, except for grading work permitted pursuant to KCC 21 A.38.230B4d(2). A note shall be placed on the final plat indicating that the trees shown to be retained on the tree retention plan shall be maintained by the future owners of the proposed lots, consistent with KCC 2 IA.38.230B6. (Note that the tree retention plan shall be included as part of the final engineering plans for the subject plat.) If there are no significant trees as defined by the Special Overlay District on the site then, this requirement does not apply. D. The existing house shall be removed or demolished prior to the final approval and recording. A demolition permit shall be obtained prior to demolition. 8. Road Mitigation Payment System ; .... l,t ·. ,, ' ', /' The applicant shall comply with Road Mitigation Payment System (MPS), by paying the required MPS fee as determined by King County Department of Transportation, plus an administrative fee, The applicant has an option to either: A, Pay the. MPS fee at final short subdivision recording and the MPS administrative fee at final short subdivision application, or B. Pay the MPS fee at building permit issuance and the MPS administrative fee at the time of building permit application. If option A is chosen, then the following note shall be shown on the final short plat: MPS FEE NOTICE: All fees required by King County code 14. 75, Mitigation Payment System (MPS) have been paid. If option B is chosen, then the following note shall be shown on the final short plat: MPS FEE NOTICE: This short plat is subject to King County Code No. 14.75, King County Road Mitigation Payment System (MPS). The MPS fees plus the MPS administrative fee shall be paid at the time of building permit application at the rate in effect at that time. 9. State Environmental Policy Act (SEPA) This short subdivision was exempt from the provision of the State Environmental Policy Act (SEPA). I 0. Other Considerations Preliminary approval of this application does not limit the applicant's responsibility to obtain any required permit or license from the State or other regulatory body. This may include obtaining a forest practice permit from the Washington State Department of Natural Resources for tree removal, . 1~ LINV=381.S 1----- ,5 ' ci) ::~'"! 11 l 11 c,l BEGIN NEIi CURB, GUTTER & SIDEIIALK 11 · '---l----lL-0', _ _J 130.01' 12• CONC, RET, \/ALL 111TH \IOOD FENCE (\IALL ON PROP. LN.> 1-,-II \ 1 i3 i3:\ASPHAL T. .1 ~ u D/V AP N EX CONC.1 EX HOUSE 'u " ~~ . II · \ \ I : ? i$ l~ ~ \~, t ----'-~y--;aa-~:,, J3o) .··: \ -/ ----rE;~:~i6_---~-~""'s'="o.~---.io rl ---/ DRIVE I 1\ CA;\ I : \ 7-,, ff] ,--JI PORT I I \ \ LDT 13 1-..J..t-41'11!..,\-~I?\~ \[) Lori'!./"' , i1---_J ' 1 1 co .~ 1 /Ji_';>:, ~ I ~ LOTI # 1-:'ll ~ q \ *·/ (") I ..;: I c) v• ~ts:l/)rn\ \ o 4 190± SQ F i l/) ..s.,9e6+LSQ. FT. '.,, I e r--""--I , (3) 10' ' . I tJ..(>pfo~-S"'( <J50 , ___ ....J M-4-.\--.. \ \a I Ex 1 HOUSE 1 _!!f ,~PINES I <REMOVE> I . I ~-. A \ \ I I I co \ EX HOUSE c!~+.::H++-Wr+~t.:' ~-7-'-9.18~' \ ~ -\ -t; \f ~ ? ~ --- , 0 I -I\ - llOT # -1 L---:-~-----J I; 4.594± SQ. F~~ ~r 5e:i , 0:... \ 2s " ::> / SM~L \ 5'._ m ""~ v, FIR ·TREES ' I . N~~Lfl~r°~\,'~R "'\., ~D NEIi c11 B, GUTTER ' ...,.-25' ROIi R & SJIJ8,/ALK v-"'& R!=LDCA TED F.fl. 6 '-~- 12' RCP JNV=386.7 -~ 5..00'--_-:::: -.30 " EX ilJTC+i' EDGE OF PAVEMEt ! // 3'o 12' RCP 1."j !) ' !NV=3r,3 1 .·. -1J \U,' Transmitted to the following Parties of Record for short plat L03S0016: Cramer Northwest Inc. 945 N. Central Ave., Suite #104 Kent, WA 98032 Mr. & Mrs. G.A. Headland 17030 106'h Ave SE Renton, WA 98055 Jay Newton 17006 106u, Ave SE Renton, WA 9805 5 Trishah Bull, Project Manager II, DDES Land Use Services Division Curt Foster, Sr. Engineer, DDES Land Use Services Division Mazen Haidar, Engineer, DDES Land Use Services Division Rich Hudson, Program Manager III, DDES Land Use Services Division ... • ATTACHMENT A RIGHT TO APPEAL This action may be appealed in writing to the King County Hearing Examiner, with a fee of$250.00 (check payable to King County Office of Finance). As required by KCC 20.20.090 and 20.24.090, the appeal period shall be fourteen (14) calendar days and shall commence on the third day after the notice of decision is mailed. Filing an appeal requires actual delivery to the King County Land Use Services Division prior to the close of business (4:30 p.m.) on the date due. Prior mailing is not sufficient if actual receipt by the Division does not occur within the applicable time period. The Examiner does not have authority to extend the time period unless the Division is not open on the specified closing date, in which event delivery prior to the close of business on the next business day is sufficient to meet the filing requirement. If a timely Notice of Appeal has been filed, the appellant shall file a statement of appeal within a 21-day calendar period commencing three days after the notice of decision is mailed. The statement of appeal shall identify the decision being appealed (including file number) and the alleged errors in that decision. The statement of appeal shall state: 1) specific reasons why the decision should be reversed or modified; and 2) the harm suffered or anticipated by the appellant, and the relief sought. The scope of an appeal shall be based on matters or issues raised in the statement of appeal. Failure to timely file a notice of appeal, appeal fee, or statement of appeal deprives the Exan1iner of jurisdiction to consider the appeal. Appeals must be submitted to the Department of Development and Environmental Services, addressed as follows: LAND USE APPEAL Land Use Services Division Department of Development and Environmental Services BlackRiver Corporate Park 900 Oakesdale Avenue Southwest Renton, WA 98055-1219 A request for a pre-hearing conference may be made by any party. For more infomrntion regarding appeal proceedings and pre-hearing conferences, please contact the Office of the Examiner for a Citizens' Guide to the Examiner hearings and/or read KCC 20.20 and 20.24. . -• ' PROJECT INFORMATION Proposal: Short Plat Location: 17034 106th Avenue SE Renton, Washington 98055 Owner: Ha Chau Area: Approximately .33 acre 1)0LUN~f\l\.. DF-.~,l'-l.~ Soils: AgC (Alderwood gravelly sandy loam) Legal Description: Lot 13, Block 4, Aker's Farms No. 5 Volume 40, Page 27 Tax Parcel No: 008700-0280-07 PROJECT DESCRIPTION This project proposes to subdivide approximately 1/3 acre ofland into 3 (three) lots. Presently there is a single family residence with carport located at the north side of the parcel. As a result of the subdivision, the existing house will be partially or entirely demolished. The ground consists of la-wn, three pine trees in the front yard, a row of small fir trees along the west property line, and a gravel driveway. The parcel is bordered by S.E. l 72"d Street along the south side, and by I 06th Avenue S.E. along the west side. Attached are site pictures, a vicinity map, a soils map, U.S.G.S. aerial topography map, and a schematic storm drainage plan. These enclosures were used in this analysis as resources. DOWNSTREAM ANALYSIS The ground of the parcel slopes from northeast comer down to southeast comer at a moderate slope of ten ( l 0) percent. The sheet flow from the parcel is collected by the ditches along the south and west property lines. Both of these ditches are located in the public right-of-way and meet outside of the southwest comer of the property. The west side and south side ditches are connected via eighteen (18) inch and twelve (12) inch diameter short culverts, respectively, into a catch basin located in the northeast comer of the intersection. There is a twelve (12) inch diameter outgoing reinforced concrete pipe culvert from the catch basin running diagonally across the intersection at an approximate slope of7.7%. Page I of2 ct:s This culvert daylights into a wooded ravine that continues to slope down in a southwesterly direction until it becomes a roadside ditch for the State Route 515 (Talbot Road), at a point at least a Y. mile from the proposed subdivision. There are no evident signs of erosion or capacity problems within this existing downstream storm drainage conveyance system. Eventually the runoff from the property is part of the Panther Creek Wetland that is drained into Lake Washington via Green River. A site visit to verify these conditions was made on March 6, 2003, by CTS Engineers, Inc. PROPOSED SITE DRAINAGE IMPROVEMENTS Each ditch on the south and west of the subject property currently outlets via a short culvert which connects to an existing catch basin at the NE comer of the intersection of I 06th Ave SE and SE 172nd St. As part of the access improvements to the subdivided property, it is proposed to replace both existing ditches with culverts, filling each ditch to the level of street pavement. In addition, the existing catch basin is proposed to be replaced with a larger catch basin or storm drain manhole. Site drainage and storm runoff will be directed into below-grade pipes which will connect to the proposed culverts upstream of the replaced catch basin. Refer to the attached preliminary storm drainage plan for a graphical representation of the proposed improvements. Page 2 of2 ct:s ,. .. Sol\..-~ 'F~. z ST 2 ~ SW 19Tii ST .,s 5 ~ .,s.w 23RD ST .n.t.r 0 l in. -1900 f~. ,-:-:_;. ' "" S[[ 626 6TH z z > > < < S[[ ST z ST llOO 11100 1 69Jll :-... ST ;5 --· C fi'-oM: - f,g.01"£ c.:r -__..J Loc..A110N ' . v ~{.,\~ '. ~~r.i-rot-1 aur<v~e,..(...e; 1 ,.c, !"11>-lV"f~ -sE4-1~$ , U'/l?eD 1qq4-1 '-"1-l, '"' e. , r-rre:.µt tt-L '2-':> r eii.--r. II. PEAK RUNOFF FLOWS A. PREDEVELOPED DRAINAGE The pre-developed drainage basin includes the entire subject property plus a portion of the two frontage roads. T,he frontage road areas were included because the proposed curb. gutter and sidewalk will add new impervious surface that must be accounted for in the drainage calculations. The on-site area was calculated to be 0.34 acres. The area of the frontage road improvements was determined using only the area from the edge of the existing pavement to the ROW line. The existing road pavement was not included in the calculations because this area will not be changed. The frontage area was calculated to be 3982 SF. or 0.09 acres. This provided a total project area of 0.43 acres. The existing house and gravel driveway also presented existing impervious surface. This existing impervious surface was calculated to be 0.07 acres. Note that only 50% of the gravel driveway was counted as impervious surface. per code. The remaining pre-developed area was considered till pasture. The pre-developed drainage analysis was performed using the "KCRTS" < ' hydrology software and its summary tables and charts are attached for reference. The methods outlined in the 1998 King County Surface Water Design Manual were used as guidelines. Following this page are the data sheets used for the computer input data. The computer summary sheets for peak flows are also attached. Below is a brief description of the existing drainage characteristics: 2 year peak flow: 10 year peak flow: 100 year peak flow: project area: till pasture: impervious area: 0.024 CFS 0.040 CFS 0.076 CFS 0.43 acres 0.36 acres 0.07 acres CHAU SHORT PLAT KCRTS PEAK FLOW SUMMARY PRE-DEVELOPED DRAINAGE Flow Frequency Analysis Time Series File:chaupre.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--------Flow Frequency Analysis------- Flow Rate Rank Time of Peak -Peaks Rank Return Prob (CFS) (CFS) Period 0.037 4 2/09/01 15:00 0.076 1 100.00 0.990 0.024 6 1/05/02 16:00 0.042 2 25.00 0.960 0.042 2 2/27/03 7:00 0.040 3 10.00 0.900 0.019 8 8/26/04 2:00 0.037 4 5.00 0.800 0.024 7 1/05/05 8:00 0.037 5 3.00 0.667 0.040 3 1/18/06 16:00 0.024 6 2.00 0.500 0.037 5 11/24/06 3:00 0.024 7 1. 30 0.231 0.076 1 1/09/08 6:00 0.019 8 1.10 0.091 Computed Peaks 0.065 50.00 0.980 1-.. ' :: 0,43 Ac-. 2..497 SE 3 Sr = o.o s'><,s"'i N. c.,. e~J.i.-..c=US""'----------------- a..) ( )s:e.. TIii I f93±uce.. () . 31.s. b:c... ,0 = 11 B. DEVELOPED DRAINAGE The developed drainage calculations used the same project area as the pre-developed calculations. The impervious surfaces included the 3 new houses. 3 new driveways, the joint use driveway and the frontage improvements for 1061h Ave SE and Se 172nd St. The applicant provided specific house plans for the three new lots. The footprint for these specific houses was uses as the impervious surface area for the new houses at each Jot. These areas are shown on the attached worksheet. A driveway for each Jot was also calculated using the site plan that was provided by the applicant. The areas for the driveways were taken directly from the plan for each new lot. The joint use driveway was calculated to cover the "worse" condition of extending the full length of the common lot line between Lots 2 and 3. The required pavement with of 18 ft. was used. The frontage improvement impervious surface includes the new sidewalk. curb and pavement widening. The pavement widening width was calculated using an average width of the additional pavement for both streets. The developed pervious surface was considered as till lawn. Similar to the existing condition. the KCRTS method was used to determine the peak flows for the various storm events. The computer data sheets for the developed flows follow this page. A brief summary of the developed drainage characteristics are: 2 year peak flow: 10 year peak flow: 100 year peak flow: total area: till lawn: impervious area: 0.075 CFS 0.091 CFS 0.153 CFS 0.43 acres 0.19 acres 0.24 acres .. Time CHAU SHORT PLAT KCRTS PEAK FLOW SUMMARY DEVELOPED DRAINAGE Flow Frequency Analysis Series File:chaudev.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--------Flow Frequency Analysis------- Flow Rate Rank Time of Peak -Peaks Rank Return Prob (CFS) (CFS) Period 0.075 6 2/09/01 2:00 0.153 1 100.00 0.990 0.060 8 1/05/02 16:00 0.092 2 25.00 0.960 0.091 3 2/27/03 7:00 0. 091 3 10.00 0.900 0.063 7 8/26/04 2:00 0. 079 4 5.00 0.800 0.076 5 10/28/04 16:00 0.076 5 3.00 0.667 0.079 4 1/18/06 16:00 0.075 6 2.00 0.500 0:092 2 10/26/06 0:00 0.063 7 1. 30 0.231 0.153 1 1/09/08 6:00 0.060 8 1.10 0.091 Computed Peaks 0.133 50.00 0.980 ----+11c---------\.=--=tW~oBr ~L~~--------- ------+!4------~b~SN=-.,__,E.l_D= E~~~IN~P>:rG~E _______ _ II II 2-, 111 ~·. Ill &(\I :0)-1-v,. D(j_±o)-t----'-· -------__.iall:.6a....a4-t3'-"'-__ _ II! ~ LI\ ""7 ---~"----~e-v,,___.w~~-~'~:ro~.~10='-'~:s:~·, ____ _,_/ ~'-' o ::s:F -------;-;,lfl, _________________ --=-=-·o_, "-+ Ac..-. Ill ,,I '[' 3. iii I ii .I, 1;; l 'I I, Ill r~\Ou:5 '. ()re_c.._ ::: 0, t 3. -o_._Z..~4:_-__ 0-,~ l_°t~~f±~c_~,~- --~4--l-:t~R~a..."'-'-'-'"'-'--'~~'__,_,_;:Jr-~~-·· __________ _ Iii fo-d:oc ·, I . o Ill sill Ill Ill 2... r = . 0-15' CFS"' ---~11-,-1 -----"'.::1--)_0_~-'1'--· _» ___ o_._o'i_1_~C-F=~S ______ _ 111 c lou ::-JV-· :: 0, r 53 u=-s 111 • , ---~1,-1 -------------------------- Iii ----+II _______ _ C. HYDROLOGIC ANALYSIS The site qualifies for an exemption from Core Requirement #3. Flow Control. Exemption #3 (page 1-27. attached) is met. This is the peak flow exemption using flow control BMP's. The 100 year peak developed flow is 0.153 CFS. The 100 year peak pre-developed flow is 0.07 6 CFS. The difference is 0.077 CFS. which is less than 0.1 CFS limit to qualify for this exemption. In addition. the site is a re-development project and is not located within a critical drainage area or a landslide hazard drainage area. The project is a single family residential project; also needed to qualify for this exemption. The flow control BMP used for this project is individual lot dispersal trenches. Individual lot infiltration is not an alternative because the soils are of the Alderwood series (hydrologic group CJ. These soils have slow permeability rates and high ground water. The site qualifies for small site drainage review since the net new impervious surface is less than 10.000 SF. The new impervious from the development of the site and the 3 lots is 10.710 SF. The existing impervious surface to be removed is 2,940 SF. The net new impervious surface is 7.770 SF. D. WATER QUALITY CONTROL The site also qualifies for an exemption from Core Requirement #8, Water Quality. Exemption# 1. surface area exemption (page 1-50, attached) is met. The developed site will be adding less than 5000 SF of new impervious surface subject to vehicular traffic (PGISJ. The new PGIS area includes the 3 new driveways for each lot. the joint use driveway and the pavement widening along both frontage roads. The totals for these areas are: • 3 driveways: 546 SF • joint driveway: 1080 SF • 106 Ave. widening: 708 SF • 172 St. widening: 140 SF TOTAL: 2474 SF This does not count the existing gravel driveway that is being removed (credit for 50% of the area). This does show that the project meets the requirements for the surface area exemption. l.:!.3 CORE REQUIREME.'-7 #3: FLOW CO:\"ffiOL 0 EXEMPTIONS FROM CORE REQUIREMENT #3 There are eight possible exemptions from the requirement to provide a formal now control facility per Core Requirement #3. The intent of these exemptions is to provide for situations where a facility may not be practical or needed, where other alternatives to a facility can be just as effective, or where it makes sense to provide incentives for retaining native vegetation or for maximizing use of existing developed areas. 1. Impervious Surlace Exemption A proposed project or any threshold discharge area within a project is exempt if less than 5,000 square feet of new impervious surface will be added and the project or threshold discharge area is not within a Landslide Hazard Drainage Area." If the project or threshold discharge area is located within a Landslide Hazard Drainage Area, this exemption only applies to new impervious surface Jess than 2,000 square feet. 2. Impervious Surface Exemption Using Flow Control BMPs Any threshold discharge area within a proposed project is exempt if less than 10,000 square feet of new impervious surface will be added, AND all of the following criteria are met: a) The area cleared to accommodate the proposed project must be less than 35% or less than 2 acres of the threshold discharge area (whichever is greater), AND b) If the project is a single family residential project, flow control BMPs must be applied within the threshold discharge area as specified in Small Site Drainage Requiremenrs (detached Appendix C), AND c) · For projects other than single family residential projects, the new impervious surface within · the threshold discharge area must be comprised of either non-pollution-generating roofs that comply with the roof downspout controls in Section 5.1. OR roads, trails, or driveways that comply with the rural roadway dispersion requirements in Section 5.2. l, AND d) The manner in which runoff is discharged from the project site must not create a significant adverse impact per Core Requirement# I. 3. Peak Flow Exemption Using Flow Control BMPs An)' threshold discharge area within a proposed project is exempt if the project improvements within the threshold discharge area generate less than a 0.1 cfs increase in the existing site conditions"' l 00- year peak flow rate, M'D all of the following criteria are met: a) If the project is a redevelopment project, flow control BMPs must be applied as specified in Section 5.2, and the project improvements must not significantly impact a "severe erosion problem" or "severe flooding problem" (see page 1-21), and must not be located within a Landslide Hazard Drainage Area, AND b) If the project is a single family residential project, the runoff from impervious surfaces must be infiltrated or dispersed using flow control BMPs specified in Appendix C, and any areas of native 31 landslide Hazard Drainage Areas are delineated on a map adopted with this manual (see map pocket on inside of back cover). 32 Existing site conditions depend on what. if any, land conversion activity has occurred on the site since May 1979 when King County first required flow control on developments adding more than 5,000 square feet of new impervious surface. IF a drainage plan has been approved by the County since tv',ay , 979 for any land conversion activity which includes the addition of more than 5,000 square feet of new impervious surtace, THEN existing site conditions are those created by the site improvements and drainage facilities ·constructed per >he approved engineering plans. OTHERWISE, existing site conditions are those that existed prior to May 1979 as determined from aerial photographs and, if necessary, on knowledge of individuals familiar with the area. The intent is to mitiga1e unaC:dressed impacts created by site alterations or improvements, such as clearing, which have occurred since May 1979. ' 1998 Surface Water Design Manual 9/J/98 1-li ii. SECTION 1.2 CORE REQL'IREME.',TS 9/1 /98 vegetation assumed not to be cleared for the purposes of computing the increase in 100.year peak flow must be preserved within a tract or by covenant as described in Appendix C, AND c) For projects other than rede,·elopment projects and single family residential projects, the new impervious surface within the threshold discharge area must be comprised of either non- pollution-generating roofs that comply with the roof downspout controls in Section 5.1, OR roads, trails, or driveways that comply with the rural roadway dispersion requirements in Section 5.2.1, AND d) The manner in which runoff is discharged from the project site must not create a significant adverse impact per Core Requirement #1. 4. Peak Flow Exemption for Urban Redevelopment Projects Any natural discharge area of a redevelopment project located within the Urban Growth Area is exempt if the project improvements within the natural discharge area generate less than a 0.1 cfs increase in the existing site conditions I 00-year peak flow, M"D all of the following criteria are met: a) The application of this exemption to narural discharge areas within a proposed project must not result in more than a 0.4 cfs increase in the existing site conditions I 00-year peak flow rate for any threshold discharge area of the project, AND b) Flow control BMPs must be applied to the runoff from new impervious surfaces as specified in Section 5.2.1, AND c) The project improvements within the natural discharge area must not be located within a Landslide Hazard Drainage Area and must not significantly impact a "severe erosion problem" or "senre flooding problem" (see page 1-21 ), AND d) . The manner in which runoff is discharged from the project site must not create a significant adverse impact per Core Requirement #1. 5. -Forested Open Space Exemption for Rural Residential Projects Any natural discharge area within a proposed rural residential project (zoned RA-2.5, RA-5, RA-I 0, or RA-20) is exempt if all of the following criteria are met: a) At least 659' of the unsubmerged porrion" of the natural discharge area will be set aside as forested.open space as specified in Section 5.2.1, AND b) The runoff from new impervious surfaces within the natural discharge area will be dispersed over native vegetation using the flow control BMPs detailed in Section 5.2.1, A.1\"D c) The manner in which runoff is discharged from the project site will not create a significant adverse impact per Core Requirement #1. 6. Direct Discharge Exemption Any natural discharge area within a proposed project is exempt if it drains to one of the "major receiving waters" listed in Table 1.2.3.B, AND meets all of the following criteria for direct dischargeJ.C to thit receiving water: a) The flowpath from the project site discharge point to the edge of the l 00-year floodplain of the major receiving water shall be no longer than a quarter mile, except for discharges to Lake Sammamish, Lake Washington, and Puget Sound, AND b) The conveyance system between the project site and the ordinary high water line of the major receiving water shall be comprised of manmade conveyance elements (pipes, ditches, outfall 33 Unsubmerged portion means any portion outside the ordinary high water line of str_eams, lakes, and wetlands. 34 Direct discharge means undetained discharge from a proposed project to a •major receiving water." 1998 Surface Water Design Manual 1-28 SECTION 1.2 CORE REQUIREMENTS > 9/1/98 • Special Requirement #5: Oil Control, Section 1.3.5 (p. 1-62)--This requirement applies special oil controls to those projects proposing to develop or redevelop a high-use site. Key Definitions • Pollution-generating impenious surface (PGIS) Definition: Those impervious surfaces considered to be a significant source of pollutants in stormwater runoff. Such surfaces include those which are subject to vehicular use" or storage of erodable or leachable materials, wastes, or chemicals," and which receive direct rainfall or the run-on or blow-in of rainfall.'' Metal roofs are also considered to be PGIS unless they are treated to prevent leaching. • Pollution-generating penious surface (PGPS) Definition: Any non-impervious surface with vegetative ground cover subject to use of pesticides and fenilizers. Such surfaces include. but are not limited to, the lawn and landscaped areas of residential or commercial sites, golf courses, parks and spons fields. D EXEMPTIONS FROM CORE REQUIREMENT #8 There are five possible exemptions from the requirement to provide a formal water quality facility per Core Requirement #8: 1. Surface Area Exemption A proposed project or any threshold discharge area within a project is exempt if it meets all of the following criteria: ·· · a) Less than 5,000 square feet of new PGIS'' will be added. AND b) Less than 5,000 square feet of contiguous PGIS"' will be created through any combination of new and/or replaced impervious surface as pan of a redevelopment project, MTI c) Less than I acre of contiguous PGPS"' will be added and/or modified," OR there is a formal · agreement with King County to implement a landscape management plan53 for the PGPS areas on the site (or a farm management plan in the case of an agricultural land use). 46 A surlace, whether paved or not, shall be considered subject to vehicular use if it is regularly used by motor vehicles. The follo'Ning are considered regularly-used surfaces. roads, unvegetated road shoulders, bike lanes within the traveled lane of a roadway, driveways, parking lots, unfenced firetanes, diesel equipment storage yards, and airport runways. The following are not considered regularly-used surtaces: road shoulders primarily used for emergency parking, paved bicycle pathways, bicycle lanes adjacent to unpaved or paved road shoulders primarily used for emergency parking, fenced firelanes, and infrequently used maintenance access roads. 47 Erodable or Jeachable materials, wastes, or chemicals are those substances which, when exposed to rainfall. measurably alter the physical or chemical characteristics of the rainfall runoff (examples include erodable soil, uncovered process wastes, manure, fertilizers, oily substances, ashes, kiln dust, garbage dumpster leakage, etc.). 48 A covered parking area would be considered pollution-generating if runoff from uphill could regularty run through it, or if rainfall could regularty blow in and wet the paverr.ent surface. The same par1<ing area would not be included if it were enclosed by walls or if a low wall and berm prevented stormwater from being blown in or from running onto the covered area. 49 New PG!S means new impervious surface (as defined on page i--4) that is pollution-generating. 5° Contiguous PGIS means a discrete patch of PGIS that is all together as opposed to being separated in ditterent locations on the project site. As used in this and other exemptions, the intent is to apply Core Requirement #8 to those redevelopment projects that are replacing and/or adding enough impervious surface in one location to allow for opportune installation of a water quality facility. 51 Contiguous PGPS means a patch of PGPS that is all together as opposed to being separated in different locations on the project site. 52 Modified PGPS means any existing PGPS that is re-graded or re-contoured by the proposed project. 53 Landscape management plan means a King County approved plan for defining the layout and long-term maintenance of landscaping features to minimize the use of pesticides and fertilizers, and to reduce the discharge of suspended solids and other pollutants. Guidelines for preparing landscape management plans can be found in Reference Section 4-A. Submittal requirements are detailed in Section 2.3. 1.4. 1998 Si.:rface Water Design ~1::i.nua.l 1·50 Site Improvement Bond Quantity Worksheet King County Department of Development & Environmental Services 900 Oakesdale Avenue Southwest Renton, Washington 98055-1219 Project Name: Chau 3 Lot Short Plat Location: 17034106th Ave. SE Clearing greater than or equal to 5,000 board feet of timber? ------~ yes XXXXXXXXX no If yes, Forest Practice Permit Number: --------- (RCW 76.09) Page 1 of 9 l .. , R~c:r~SPRond Date: 28-Au.9.-08 Project No.: L03S0016 Activity No.: L07SR022 Note: All prices include labor, equipment, materials, overhead and profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database. ./ Unit prices updated; 02/12/02 Version: 04/22/02 Report Date: 9/8/2008 Site Improvement Bond Quantity Worksheet Reference# EROSION/SEDIMENT CONTROL Backfill & compaction-embankment Check dams, 4" minus rock SWDM 54.6.3 Crushed surfacing 1 1/4" minus WSDOT 9-03.9(3) Ditching Excavation-bulk Fence, silt SWDM 5.4. 3.1 Fence, Temporary (NGPE) Hydroseedina SWDM 5.4.2.4 Jute Mesh SWDM 5.4.2.2 Mulch, bv hand, straw, 3" deep SWDM 5.4. 2.1 Mulch, by machine, straw, 2" deep SWDM 5.4. 2.1 Piping, temoorarv, CPP, 6" Pipino, temoorarv, CPP, 8" Pipina, temporary, CPP, 12" Plastic coverina, 6mm thick, sandbaoaed SWDM 5.4.2.3 Rip Rap, machine placed; slopes WSDOT 9-13.1(2) Rock Construction Entrance, 50'x15'x1' SWDM 5.4.4.1 Rock Construction Entrance, 100'x15'x1' SWDM 5.4.4.1 Sediment oond riser assembly I SWDM 5.4. 5. 2 Sediment trap, 5' high berm I SWDM 54.5.1 Sed. trap, 5' high, rlprapnM spillway berm section SWDM 54.5.1 Seeding, by hand SWDM 5.4.2.4 Soddino, 1" deep, level around I SWDM 54.2.5 Sodding, 1" deeo, slooed around I SWDM 5.4. 2. 5 TESC Supervisor Water truck, dust control SWDM 5.4.7 WRITE-IN-ITEMS •**• !see oaae 91 CB Protection Filter Page 2 of 9 Ai:t~rnSPAond Unit Price Unit Quantltv $ 5.62 CY 20 $ 67.51 Each $ 85.45 CY $ 8.08 CY $ 1.50 CY 20 $ 1.38 LF $ 1.38 LF $ 0.59 SY $ 1.45 SY $ 2.01 SY 100 $ 0.53 SY $ 10.70 LF $ 16.10 LF $ 20.70 LF $ 2.30 SY $ 39.08 CY $ 1,464.34 Each $ 2,928.68 Each $ 1,949.38 Each $ 17.91 LF $ 68.54 LF $ 0.51 SY $ 603 SY $ 7.45 SY $ 74.75 HR 4 $ 97.75 HR 4 $ 100.00 Each 1 ESC SUBTOTAL: 30% CONTINGENCY & MOBILIZATION: ESCTOTAL: COLUMN: #of Annlications Cost 1 112 1 30 1 201 1 299 1 391 1 100 $ 1,133.40 $ 340.02 $ 1,473.42 A Unit prices updated: 02/12/02 Version: 04/22/02 Report Date: 9/8/2008 -I Site Improvement Bond Quantity VVorksheet Existing Future Public Private Right-of-Way Road Improvements Improvements & Drainaae Facilities Unit Price Unit Quant. Cost Quant. Cost Quant. Cost (.;ff.Jl:.IU\1_ 1 rFMS Backfil & Compaction-embankment $ 5.62 CY Backfil & Compactlai-trench $ 8.53 CY 45 383.85 Clear/Remove Brush, b\l hand $ 0.36 SY 100 36.00 Clearl,,..,/Grubblru:i/Tree Removal $ 8,876.16 Acre Excavation -b.Jlk $ 1.50 CY Excavation -Trench $ 4.06 CY 45 182.70 Fenclrn, cedar, 6' hlah $ 18.55 LF Fenctrn, chain link vinyl coated, 6 high $ 13.44 LF Fenclf"Q, chain link, gate. vlnv1 coated 2fJ $ 1,271.81 Each Fencl!'(], sclit rall, 3' hlah $ 12.12 LF FIU & compact -common barrow $ 22.57 CY Flll & compact -aravel base $ 25.48 CY Ftll & comoacl -screened tnnsoll $ 37.85 CY Gablon. 12 .. deeo. stone filled mesh $ 54.31 SY Gablon, 18" deeo. stone filled mesh $ 74.85 SY Gablon 36"' deeo, stone filled mesh $ 132.48 SY Gradln:::i, fine, by hand $ 2.02 SY Gradin:J. nne, with grader $ 0.95 SY 250 237.50 Monuments, 3' lono $ 135.13 Each SensilNe Areas Slan $ 2.88 Each Soddinn, 1" deeo, stooed around $ 7.46 SY Surve\o'lno, line & grade $ 788.26 Dav 1 788.26 Survey'lnQ, lot locatlon/llnes $ 1,556.64 Acre 0.1 155.66 Traffic control crew ( 2 nanners ) $ 85.18 HR 8 681.44 Trail, 4" ch\nnPd wood $ 7.59 SY Trail, 4" crushed cinder $ 8.33 SY Trall, 4' top course $ 6.19 SY Wall retalnlna. concrete $ 44.16 SF Wall, rockery $ 9.49 SF Page 3 of 9 SUBTOTAL 2,465.41 ·KcC 27 A authoriZes only one bond reduction. . --'"'nn ..... .-1 Quantity Completed (Bond Reduction)* Quant. Comclete Cost Unit prices updated: 02/12102 Version: 4f22102 Report Date: 9/8/2008 Site Improvement Bond Quantity Worksheet Existing Future Public Private Rlght-01-way Road Improvements Improvements & Oralnaoe Facllltles Unit Price Unit Quant. Cost Quant. Cost Quant. I Cost IWf\ll lf,1PIWVEMU•Jl AC GrhdinA, 4' wide machine< 1ooosv $ 23.00 SY 115 2,645.00 AC Grhdino, 4' wide machine 1000·2000sv $ 5.75 SY AC Grhdina, 4· wide machine > 200Qsv $ 1.38 SY AC RenovaVOisnosal/Repalr $ 41.14 SY Barricade, t\([')p I $ 30.03 LF Barricade tvnP Ill ( Permanent ) $ 45.05 LF Curb a Gutter, rolled $ 13.27 LF Curb a Gutter, vertical $ 9.69 LF 259 2,509.71 Curb aid Gutler, demolltlon and dlsnnsal $ 13.58 LF Curb, extruded asphalt $ 2.44 LF Curb, extruded concrete $ 2.56 LF Sawci..t asphalt, 3" depth $ 1.85 LF 260 481 .00 Sawcl.i concrete, ruir 1" deDth $ 1.69 LF Sealart. asohalt $ 0.99 Lf 260 257.40 Shoulder, AC, < see AC road unit orlce l $ . SY Shoulder, gra"lel, 4" thick $ 7.53 SY Sidewalk, 4" thick $ 30.52 SY 144 4,394.88 Sldewalk, 4" thick, demolition and dlsoosal $ 27.73 SY Sidewalk, 5" thick $ 34.94 SY Sidewalk, 5" th1ck, demolltlon and dlsoosal $ 34.65 SY Slon. handicap $ 85.28 Each Strlolna, n11or stall $ 5.82 Each Strlolng, thermoolastlc, l for crosswalk) $ 2.38 SF Striping, 4" ref\ectortzed line $ 0.25 LF Page 4of 9 SUBTOTAL 10,287.99 : I *KCC 27A authoriZes only one bond reduction. "'--·-t"r,n,~ ... r1 Bond Reduction* Quant. Complete Cost ; Unit prices updated: 02/12/02 Version: 4/22/02 Report Date: 9/8/2008 Site Improvement Bond Quantity Worksheet Existing Future Public Private Right-of-way Road Improvements Improvements & Dralnaqe Facilities Unit Price Unit Quant. I Cost Quant. Cost Quant. I Cost 1~0/\0 ~-;ur-:F/\r.lMC. I ,J'" !-'.n• ,I,, · :• ! , I,.:'.,'. :: 1 ', .. 11 •I , < ,·,1 !I"··•• 1 ! ,,f ··,•.\·:;. I• ·:·, •• i ' " I· , ; .. :; 1 ,·;· 1 .... , ""'' .. , For KCRS '93. (additional 2.5"' base} add: $ 3.60 SY 181 651.60 64 AC Overlay, 1.5" AC $ 7.39 SY 894 6,606.66 AC Overlav, TAC $ 8.75 SY AC Road, 2", 4" rock, First 2500 SY $ 17.24 SY AC Road, 2", 4" rock Qty. a.er 2500SY $ 13.36 SY 181 2,418.16 64 AC Road, 3M, 4" rock, First 2500 SY $ 19.69 SY AC Road, 3", 4" rock. Otv. over 2500 SY $ 15.81 SY AC Road, 5", First 2500 SY $ 14.57 SY AC Road, 5", Qty. Over 2500 SY $ 13.94 SY \., AC Road, 6", First 2500 SY $ 16.76 SY AC Road, 6", Qtv. Over 2500 SY $ 16.12 SY Asphalt Treated Base 4" thick $ 9.21 SY Gravel Road, 4" rock, First 2500 SY $ 11 .41 SY Gravel Road, 4" rock. Qtv. over 2500 SY $ 7.53 SY PCC Road, 5", no base, over 2500 SY $ 21.51 SY PCC Road, D, no base over 2500 SY $ 21.87 SY Thickened Edge $ 6,89 LF 20 Page 5 of 9 SUBTOTAL 9,676.42 ·KCC 27A authorizes only one bond reduction. """r:::oC::PAr,nri . Bond Reduction~ Quant. Comolete Cost 230.40 855.04 ! 137.80 1,223.24 Unit prices updated: 02/12/02 Version: 4/22/02 Report Date: 9/B/2008 • " Site Improvement Bond Quantity Worksheet • Unit Price Unit IJl~/\1N/\CF 1 (,I >1' -i':, •1111' 1.1\,,,! j 'I, ,•Ji, ! ·:; 1' • t ! l ', •I I • t• II , ·.I···,!, Access Road, RID $ 16.74 Bollards -fixed $ 240.74 Bollards -removable $ 452.34 • {CBs include frame and lid\ CB Tv= I $ 1 257.64 CB Tvoe IL $ 1 433.59 CB Tvoe II, 48N diameter $ 2,033.57 for additional deoth over 4' $ 436.52 CB Tvne II, 54N diameter $ 2 192.54 for additional depth over 4' $ 466.53 CB Tvne II. 60" diameter $ 2351.52 for additional decth over 4' $ 536.54 CB Tvoe II 7'l' diameter $ 3 212.64 for addltlonal depth over 4' $ 692.21 Throuah-curb Inlet Framework {Add) $ 366.09 Cleanout, PVC, 4N $ 130.55 Cleanout, PVC, 6" $ 174.90 Cleanout, PVC, 6" $ 224.19 Culvert PVC, 4" $ 8.64 Culvert, PVC, 6" $ 12.60 Culvert, PVC, 6" $ 13.33 Culvert, PVC, 1 Z' $ 21.77 Culvert, CMP, 8" $ 17.25 Culvert, CMP, 12'' $ 26.45 Culvert, CMP, 15" $ 32.73 Culvert, CMP, 18" $ 37.74 Culvert, CMP, 24" $ 53.33 Culvert, CMP, 30" $ 71.45 Culvert, CMP, 36" $ 112.11 Culvert, CMP, 46" $ 140.83 Culvert, CMP, 60'' $ 235.45 Culvert, CMP, 72" $ 302.58 Page 6 of 9 SUBTOTAL "KCC 27 A authorizes only one bond reduction. BasraSPBond SY Each Each Each Each Each FT Each FT Each FT Each FT Each Each Each Each LF LF LF LF LF LF LF LF LF LF LF LF LF LF Existing Rlght-01-way Quant. I Cost • ·, 3 3,772.92 3,772.92 Future Public Private Road Improvements Improvements & Orainaqe Facllltles Quant. Cost Quant. I Cost '' .. •' . ' ",-,; ····:'· ,-·, -..•.. ,_.,1· Bond Reduction• Quant. Complete Cost . .. · .. ,. Unit prices updated: 02/12/02 Version: 4/22/02 Report Date: 9/8/2008 "-------"-~------------ .. Site Improvement Bond Quantity Worksheet DRAINAGE CONTINUED Unit Price Culvert, Concrete, 8" $ 21.02 Culvert. Concrete, 1 'l' $ 30.05 Culvert, Concrete, 15" $ 37.34 Culvert, Concrete, 18" $ 44.51 Culvert Concrete, 24" $ 61.07 Culvert. Concrete, 30" $ 104.18 Culver1, Concrete, 36" $ 137.63 Culvert, Concrete 42" $ 158.42 Culvert, Concrete. 48" $ 175.94 Culvert, CPP. 6" $ 10.70 Culvert, CPP, 8" $ 16.10 Culvert, CPP, 12" $ 20.70 Culvert, CPP, 15" $ 23.00 Culvert, CPP, 18" $ 27.60 Culvert, CPP, 24" $ 36.80 Culvert, CPP, 30'" $ 48.30 Culvert, CPP, 36" $ 55.20 Oltchlna $ 8.08 FloW Dlsoersal Trench (1,436 base+I $ 25.99 French Drain (3' depth) $ 22.60 Geotextlle, laid In trench, nnlvnronvfene $ 2.40 Infiltration oond testlno $ 74.75 Mid-tank Access Riser, 48" dla, 6' deep $ 1,605.40 Pond Overflow Srl\tway $ 14.01 Restrlctor/011 Separator 1 Z' $ 1 045.19 Restrlctor/011 Senarator 15" $ 1,095.56 Restrictor/011 Separator 18" $ 1,146.16 Rlprap, placed $ 39.08 Tank End Reducer (36" diameter) $ 1,000.50 Trash Rack, 12" $ 211.97 Trash Rack, 15" $ 237.27 Trash Rack, 15• $ 268.89 Trash Rack, 21" $ 306.84 Page7of9 SUBTOTAL *KCC 27 A authorizes only one bond reduction. A~~raSPBond Existing Future Public Private Right-of-way Road Improvements Improvements & Drainage Facilities Unit Quant. Cost Quant. Cost Quant. Cost LF LF 14 420.7 LF LF LF LF LF LF LF LF LF LF 129 2670.3 LF LF LF LF LF CY 10 80.8 LF LF SY HR Each SY Each Each Each CY 10 390.8 Each Each Each Each Each 35626 Bond Reduction* Quant. Comolete Cost Unit prices updated: 02112102 Version: 4/22102 Report Date: 9/8/2008 , . _, Site Improvement Bond Quantity Worksheet Unit Price Unll l'/\10\lr•JG LO r SllHFIIClf•H, T AC, 7 too course rock & 4" borrow $ 15.84 SY 2" AC, 1.5" lop course & 2.5" base course $ 17.24 SY 4N select borrow $ 4.55 SY 1 .5" too course rock & 2.5" base course $ 11.41 SY wrmE-IN-ITEMS Mailboxes $ 800.00 EA. EA. LF EA. EA. EA. LF SF LF LF SUBTOTAL SUBTOTAL (SUM ALL PAGES): 30'k CONTINGENCY & MOBILIZATION: Page 8 of 9 • KCC 27 A authorizes only one bond reduction. R.!sraSPBond GRANDTOTAL: COLUMN: Existing Future Public Private Right-of-way Road Improvements Improvements & Drainaqe Facitltles Quant. I Price Quant. Cost Quant. Cost 1 800 800.00 30,565.34 9,169.80 39,734.95 B C D Bond Reduction• Quant. Comolete Cost 1,223.24 366.97 1,590.21 E Unit prices updated: 02/12/02 Version: 4/22/02 Report Date: 9/8/2008 " . ' . . Site Improvement Bond Quantity Worksheet Original bond computations prepared by: Name: Chau 3 Lot Short Plat Dato: 28-Aug-08 PE Registration Number: 20734 T ol. #: 253-850-0934 Firm Name: Jaeger Engineering Address: 9419 S. 204 Place, Kent, WA. 98031 Project No: L03S0016 ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS PERFORMANCE BOND· PUBLIC ROAD & DRAINAGE AMOUNT BOND· AMOUNT MAINTENANCE/DEFECT BOND· Stabilization/Erosion Sediment Control (ESC) Existing Right-of-Way Improvements Future Public Road Improvements & Drainage Facilities Private Improvements Calculated Quantity Completed Total Right-of Way and/or Site Restoration Bond•1•• {First $7,500 of bond· shall be cash.) Performance Bond• Amount (A+B+C+D) = TOTAL Redufed Performance Bond• Total ••• (A) (B) (C) (D) (A+B) (T) $ 1,473.4 $ 39,734.9 $ $ 1,590.2 $ 41,208.4 $ 42,798.6 Minimum bond' amount 1s $1000. REQUIRED AT RECORDING OR TEMPORARY OCCUPANCY ••• I I (E) $ J I TX 0.30 $ 12,839.6 OR (T-E) $ 42,798.6 Use larger of Tx30% or (T-E) (B+C) x Maintenance/Defect Bond• Total 0.25 = $ 9,933.7 NAME OF PERSON PREPARING BOND· REDUCTION: • NOTE: The word ''bond" as used in this document means any financial guarantee acceptable to King County . .. NOTE: KCC 27 A authorizes right of way and site restoration bonds to be combined when both are required. Date: The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on-and off-site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity. ••• NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes. SURETY BONO RIDER NOTE: If a bond rider is used, minimum additional performance bond shall be { $ 1,590.2 j(C+D)-E REQUIRED BOND· AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY ODES Page 9 of9 BasraSPBond Unit prices updated: 02/12/02 Version: 4/22/02 Report Date: 9/8/2008 ·~ Chau Short Plat -Engineering File ·~ f Status -On Hold ...... Coordination with applicant has not occurred since November 2008. Engineering plans need final review. Tree retention plans must be submitted by applicant for final review. ft ·l, • • King County Department of Development and Environmental Services 900 Oakesdale Avenue Southwest Renton, WA 98055-1219 . March 12, 2004 Ha Minh Chau 4101 1501h Avenue SE Bellevue, WA 98006 • RE: Preliminary Approval for Short Subdivision No.L03S0016 Dear Ms Chau: The Land Use Services Division (LUSD) has completed review of the short subdivision application captioned above. The LUSD finds that the proposed short subdivision complies with the King County Land Segregation Code (Title 19A), Zoning Code (Title 21A), and other applicable codes as specified in King County Code (KCC) 19A.08.060. The short subdivision is granted preliminary approval subject to the Conditions of Preliminary Approval attached hereto and incorporated herein by reference. Any aggrieved party may appeal this decision by the appeal deadline, which is March 29, 2004. The appeal procedure is enclosed for your information. The preliminary approval is valid for a period of 60 months from the date of this letter, unless an appeal is filed. In the event that an appeal is filed, the preliminary approval is valid for a period of 60 months from the date of the appeal decision. Enclosed are the following: • Notice of Decision • Conditions of Preliminary Approval • Appeal Procedure If you have any questions regarding this letter, please contact Fereshteh Dehkordi, Program Manager, at (206) 296-7173 and Curt Foster, Engineer, at (206) 296-7106. Curt Foster, P.K, Senior Engineer Engineering Review Section, LUSD Enclosures cc: Jim Jaeger, Jaeger Engineering Applicant File Letter.frm/CoverLtr2000.SP.doc 3/9/00 ·~ enior Planner Current Planning Section, LUSD <® • King County Department of Development and Environmental Services 900 Oakesdale Avenue SW Renton, WA 98055-1219 File No. File Name: Application Date: Revision Date: CONDITIONS OF APPROVAL L03S0016 Chau Short Plat May 2, 2003 January 30, 2004 • This short subdivision is granted preliminary approval subject to the following Conditions of Approval. These conditions are based on a field visit and current information the applicant has provided about the short subdivision property. Occasionally, in satisfying the Conditions of Approval, a more definitive land use limitation of the property may be revealed. New information (such as. final Health approval or sensitive areas review) may require additional conditions arid may reduce the numqer of lots. Final approval will be granted after compliance with the Conditions of Approval. Key codes and guidelines have been noted to provide guidance in preparing the required plans and other documents. Compliance with some of the following conditions will require that engineering plans be.prepared by a professional civil engineer licensed in the State of Washington. 1. Title 19A A. The short subdivision shall comply with all provisions of Title 19A. B. The final review process must be completed prior to recording of the short subdivision. The Department of Development and Environmental Services (DOES) strongly recommends the Final Short Plat be submitted at least one year prior to the expiration date of the project. The Final Short Plat submittal package includes: I. A surveyed map page (four sets) including lot area closure calculations; 2. Final health approval from the King County Health Department ( different from preliminary health approval); 3. A current short plat certificate and supporting documents (easements, etc.); 4. Payment of the Final Short Plat submittal fee; 5. A copy of this letter (preliminary approval letter). A licensed land surveyor shall be hired to prepare the final short subdivision documents. These documents shall comply with all of the following conditions for final approval: • • C. All persons having an ownership interest in the subject property are required to sign the final short subdivision. D. If modifications to the approved preliminary site plan (Attachment I) are . needed to accomplish engineering design or final short plat, then a revised preliminary site plan shall be submitted to DOES for review and approval. The revised site plans shall be submitted with the engineering plans or the final short plat submittal. 2. Surface Water Management (KCC 9) 1998 King County Surface Water Design Manual (SWDM) A. This short subdivision proposal is subject to Full Drainage Review per section 1.1.2.3. Final short subdivision approval shall require full compliancewith drainage provisions and storm drainage requirements of this section. Compliance may result in reducing the number and/or location oflots shown on the approved preliminary short subdivision. The conditions outlined below are site-specific drainage conditions: (1) Core Requirement #1 -Discharge at the Natural Location (2) Core Requirement #2 -Off-Site Analysis (3) Core Requirement #3 -Flow Control (4) Core Requirement #4 -Conveyance System (5) Core Requirement #5 -Erosion & Sedimentation Control (6) Core Requirement #6 -Maintenance and Operation (7) Core Requirement #7 -Financial Guarantees & Liability (8) Core Requirement #8 -Water Quality · (S 1) Special Requirement #1 -Other Adopted Requirements B. A professional civil engineer licensed in the State of Washington shall prepare a Technical Information Report and/or engineering plans per Chapter 2, of the 1998 King County Surface Water Design Manual. 3. Health (KCC 13) This project is exempt from further King County Heath Department review. However, if improvements are required from the Sewer and/or the Water District, then verification shall be required from said District(s) that the improvements have been bonded and/or installed, prior to final recording of the short plat. • • 4. Road Standards (KCC 14) 1993 King County Road Standards, Ordinance 11187 Final short subdivision approval shall require full compli~nce with the provisions set forth in the King County Road Standards including engineering. plans for all road improvements. The engineering plans shall be prepared by a professional civil engineer licensed in the State of Washington. DDES strongly recommends the Engineering Plans be submitted at least two years prior to the expiration date of the project. · A. That portion of the North half of SE 172nd Street adjoining the subject property shall be improved to an urban Sub-access standard per KCRS Section 1.03. B. That portion of the East half of 1061h Avenue SE adjoining the subject property · shall be improved to an urban Sub-access standard per KCRS Section 1.03. C. Provide 35' paved.radii at the intersection of 1061h Avenue SE and SE 172 Street per KCRS Section 2.10. Dedicate a 25-foot property line radius at the intersection of I 06'h A venue SE and SE 172nd Street per KCRS Section 2.10. D. Existing roadside obstacle(s) shall be relocated to provide a minimum clearance of 10 feet from the edge of the travel lane to the obstacle(s) per KCRS Section 5.11. E. Private access to Lots 2 and 3 shall be shown as a joint-use driveway tract per KCRS Section 3.0 l. The tract shall be an undivided ownership to the lots it serves, and the lot owners shall be responsible for its maintenance. The tract shall be 20-feet wide with a 18-foot-wide paved surface. The tract shall be a minimum of 20 feet in length. · F. The following notes shall be shown on the final recorded short subdivision: 1) Warning: King County has no responsibility to build, improve, maintain or otherwise service the private roads contained within or providing service to the property described in this short subdivision. 2) All private easements and/or tracts to be maintained, repaired, and/or rebuilt by the owners of the parcels having legal access therefrom and their heirs, assigns or successors, unless and until such roads are improved to King County standards and are dedicated and accepted by King County for maintenance. G. All utilities within proposed rights-of-way shall be included within a franchise approved by the King County Council prior to final short subdivision recording. • • H. All restrictions, easements, tracts, and their purpose shall be shown on the final recorded short subdivision. 5. Building and Construction Standards (Title 16) Grading. The applicant shall comply with all applicable provisions ofKCC 16.82. 6. Fire Code (KCC 17) Section 902 of the 1997 Edition of Uniform Fire Code The applicant shall obtain the approval of the King County Fire Protection Engineer for the adequacy of the fire hydrant, water main, and fire flow standards ofKCC 17.08 . prior to recoding of the lots. 7. Zoning Code (KCC 21A) A. Density and Dimensions (KCC 21A.12) All lots shall meet the density and dimensions requirements of the R-8-SO zone classification or shall be as shown on the face of the approved prelimi- nary short subdivision, whichever is larger. Minor revisions to the short subdivision, which do not result in substantial changes and/cir do not create additional lots may be approved at the discretion ofLUSD. B. Street Trees (KCC 21A.16) Street trees shall be provided along that portion of the right-of-way for I 061h Avenue Southeast and Southeast 172nd Street abutting the subject property, pursuant to the provisions of KCC 21A. I 6.050(E) and KCC 21 A.16.190, unless existing trees are shown to be equivalent to the requirement of Code. See note below. The required street trees shall be designed as to location and spacing on the final plan submittal. The street trees must be installed and inspected, or a performance bond posted, prior to recording of the plat. If a performance bond is posted, the street trees must be installed and inspected within one year of recording of the plat. At the time of inspection, if the trees are found to be installed per the approved plan, a maintenance bond must be submitted, or the performance bond replaced with a maintenance bond, and held for one year. After one year, the maintenance bond may be released after ODES has completed a second inspection and determined that the trees have been kept healthy and thriving. NOTE:· I. KCC 21A.16.0SO Landscaping -street frontages. The average width of perimeter landscaping along street frontages shall be provided as follows: • • For single-family subdivisions: a, Trees shall be planted at the rate of one tree for every 40 feet of frontage along a neighborhood collector street or arterial street. b. The trees shall be: ·I. Located within the street right-of-way if permitted by the custodial state or local agency; 2. No more than 20 feet from the street right-of-way line when located within a lot; 3. Maintained by the adjacent landowner unless part of a County maintenance program; and 4. A species approved by the County if located within the street right-of-way and compatible with overhead utility lines. c. The.trees may be spread at irregular interva.ls in order to accommodate sight distance requirements for driveways and intersections. 2. KCC 21A.16.190 Financial guarantees. Financial guarantees shall be.required consistent with the provisions of Title 27 A. C. Significant Tree Retention-KCC 2 IA.38.230 Which applies to the site, a detailed tree retention plan shall be submitted with the engineering plans for the subject plat. The tree retention plan (and engineering plans) shall be consistent with the requirements of KCC 21 A.38.230, as well as the conceptual tree retention plan which is part of the hearing record for this project. No clearing of the subject property is permitted until the final tree retention plan is approved by LUSD. Flagging and temporary fencing of trees to be retained shall be provided, consistent with KCC 21A.38.230B4. The placement of impervious surfaces, fill material, excavation work, or the storage of construction materials is prohibited within the fenced areas around preserved trees, except for grading work permitted pursuant to KCC 21 A.38.230B4d(2). A note shall be placed on the final plat indicating that the trees shown to be retained on the tree retention plan shall be maintained by the future owners of the proposed lots, consistent with KCC 21A.38.230B6. (Note that the tree retention plan shall be included as part of the final engineering plans for the subject plat.) If there are no significant trees as defined by the Special Overlay District on the site then. this requirement does not apply. D. The existing house shall be removed or demolished prior to the final approval and recording. A demolition permit shall be obtained prior to demolition. 8. Road Mitigation Payment System • • The applicant shall comply with Road Mitigation Payment System (MPS), by paying the required MPS fee as determined by King County Department of Transportation, plus an administrative fee. The applicant has an option to either: A. Pay the MPS fee at final short subdivision recording and the MPS administrative fee at final short subdivision application, or B. Pay the MPS fee at building permit issuance and the MPS administrative fee at the time of building permit application. If option A is chosen, then the following note shall be shown on the final short plat: MPS FEE NOTICE: All fees required by King County code 14.75, Mitigation Payment System (MPS) have been paid. If option B is chosen, then the following note shall be shown on the final short plat: MPS FEE NOTICE: This short plat is subject to King County Code No. 14.75, King County Road Mitigation Payment System (MPS). The MPS fees plus the MPS administrative fee shall be paid at the time of building permit application at the rate in effect at that time. 9. State Environmental Policy Act (SEPA) This short subdivision was exempt from the provision of the State Environmental Policy Act (SEPA). . 10. Other Considerations Preliminary approval of this application does not limit the applicant's responsibility to obtain any required permit or license from the State or other regulatory body. This may include obtaining a forest practice permit from the Washington State Department of Natural Resources for tree removal. I . 1:;: LI~V,=38~.5 t--~-- 1 . . 15 ~ <t ~ • 11,k ;';, l1 .~ ~ ::~1 I f-1~ . 11 l . "' BEGIN NEl,I CURB, ;d II . '--1~-IL_: GUTTER t SIDEl,IALK ~ Cl'_ I 1-1-II \ -I Q t.:j;\ASPHAL T. I ~ u D/IJ AP N EX CONC: I EX HOUSE OJ 130.01' 12' CDNC. RET. \,/All l,IITH l,IOQD FENCE (\,/ALL ON PROP. LN.> "' CA (') ~ '.:l , . II · \ I I r?; <tCJ ~ __i_. I I a. °' . I \)I \ -, ------__J I I I I .•. 1 \:_ --__ -:: 79.:~· S88 16'3iE 130.0 ~1 r ~~5~o~~~ ., I\ / E;GRA EL--- 1 ~- 1 ----1 . --_ / DRIVE 11 CAR-I : \ 7-,, I# ,--J1PORT I I I \ 'D ti 't---_JI I \ , LOT 13 ,?:/ LO ;'I.JI_~.:,. 0 I ~ LOTI #. 1"' ~ \ :s/J:;.,; "' I · I si. "' \W i 90± SQ F"' i J.i ~,9eE,:1,-.L,SQ. FT.'\ . I ::: r --\\. *' (3) 10· ' ' I EX ~Cf~'}(, ~ ( <J50 ·-----.J - . PINES I I <REMOVE> I f · I I I I · I EX HOUSE . 'A 79.83' . -~ -t~ . \ ~ ? \ llrt •. rn~,a;...~_J Jot) ~~I -"~~-_ Jj -, : , __ \ '.1 " • :. I s 4,594± SQ, FT~ . ~r-5w"' ~ / SMAI-L \ 6'&.,, lf) ..,.bi v, FIR 'TREES I N~tLf;~'P~R . \,'.__ • ~~D NEl,I C!I B, GUTTER \.-°'25' ROI,/ R"l( J,9 ~ S!IJE\oiALK 1'11;.LDCATED FH. G'-~3 KING COUNTY · LAND USE SERVICES .,,.,~,., .... , ... _,,., -'0 . 12' RCP INV=386.7 · DITCH -- EDGE OF PAVEMEN1 -- • • Transmitted to the following Parties of Record for short plat L03S0016: Cramer Northwest Inc. 945 N. Central Ave., Suite # I 04 Kent, WA 98032 Mr. & Mrs. G.A. Headland 17030 106 1h Ave SE Renton, WA 98055 Jay Newton 17006 1061 h Ave SE Renton, WA 98055 Trishah Bull, Project Manager II, DDES Land Use Services Division Curt Foster, Sr. Engineer, ODES Land Use Services Division Mazen Haidar, Engineer, DDES Land Use Services Division Rich Hudson, Program Manager III, ODES Land Use Services Division s • ATTACHMENT A RIGHT TO APPEAL • This action may be appealed in writing to the King County Hearing Examiner, with a fee of$250.00 (check payable to King County Office of Finance). As required by KCC 20.20.090 and 20.24.090, the appeal period shall be fourteen (14) calendar days and shall commen~e on the third day after the notice of decision is mailed. Filing an appeal requires actual delivery to the King County Land Use Services Division · prior to the close of business (4:30 p.m.) on the date due. Prior mailing is not sufficient if actual receipt by the Division does not occur within the applicable time period. The Examiner does not have authority to extend the time period unless the Division is not open on the specified closing date, in which event delivery prior to the close of business· on the next business day is sufficient to meet the filing requirement. If a timely Notice of Appeal has been filed, the appellant shall file a statement of appeal within a 21-day calendar period commencing three days after the notice of decision is mailed. The statement of appeal shall identify the decision being appealed (including file number) and the alleged errors in that decision. The statement of appeal shall state: I) specific reasons why the decision should be reversed or modified; and 2) the harm suffered or anticipated by the appellant, and the relief sought. The scope of an appeal shall be based on matters or issues raised in the statement of appeal. Failure to timely file a notice of appeal, appeal fee, or statement of appeal deprives the Examiner ofjurisdictiori to consider the appeal. Appeals must be submitted to the Department of Development and Environmental Services, addressed as follows: LAND USE APPEAL Land Use Services Division Department of Development and Environmental Services BlackRiver Corporate Park 900 Oakesdale Avenue Southwest Renton, WA98055-1219 A request for a pre-hearing conference may be made by any party. For more information regarding appeal proceedings and pre-hearing conferences, please contact the Office of the Examiner for a Citizens' Guide to the Examiner hearings and/or read KCC 20.20 and 20.24. ' ti KingCounty Department of Development And Envlronmarital Services 900 Oaliesdale Avenue SW Renton, WA 98055-5212 206-296-6600 TIY 206-296-7217 www.metrokc.gov Engineering Plans Review Comments Project Type : 3 Lots Short Plat Review Date : 10-02-2008 Reviewer Name : Mazen Haidar, P.E. Project Name : Chau Short Plat Review No.: 2 na Email : mazen.haidarca>metrokc.gov Project Number : L03S0016 Phone: (206) 296 -7133 Activity Number : L07SR022 Fax: (206) 206 -6613 Sub Back. Reference Item Review Comments Consultant Response Check Item Sheat-1 1 Please provide the United States Postal Services (USPS) approval stamp and signature for mailboxes location. Sheat-2 1 Please revise the proposed dispersal trenches location to maintain 25' of vegetated flow path between trench location and orooertv lines. General 1 Please provide 5 copies of separate significant trees plan with standard details and notes for County review 2 Please be informed that constructability review is pending for the subject project and full compliance with the review comments and conditions (if any) is necessarv for the enaineerina review aonroval. 3 Please be informed that significant trees plan review will be needed for the subject project-and full compliance with the review comments and conditions (if any) is necessarv for the enaineerina review annroval. 4 Please submit three sets of revised plans for further review by the County Sheet 1 of 1 .. :., ti King County Department of Development And Environmental Services 900 Oakesdale Avenue SW Renton, WA 98055-5212 206-296-6600 TTY 206-296-7217 www.metrokc.gov Engineering Plans Review Comments Project Type : 3 Lots Short Plat Review Date : 10-01-2007 Reviewer Name : Mazen Haidar, p.E::. . Project Name : Chau Short Plat· Review No.: 1•' Email: mazen.haidar@metrokc.gov Project Number : L03S0016 Phone: (206) 296 -7133 Activity Number : L07SR022 ·· Fax: (206) 206 -6613 .. ' Sub Back Reference Item Review Comments Consultant Response Check Item Sheet-1 1 Please show the United States Postal Services (USPS) approval stamp and signature for mailboxes location and show box standard detail oer the 1993 KCRS Sheet-2 1 Please show property lines stations in profiles 2 Show standard detail for thicken-edge 3 Indicate name of party responsible for relocating existing power poles and reference 93 KCRS for relocation of poles. 4 Please extend urban frontage improvements along the entire southern property line Sheet-3 1 Please replace ADA ramps details with those referenced in red on plans. TIR 1 Please check impervious areas calculations for the developed conditions, the calculations shown more than 10,000 square-feet of new impervious surfaces will be created which makes the subject short plat is subject to Larqe Site Drainaqe Manual Sheet 1 of 2 I __ , • ~ King County Department of Development And Environmental Services 900 Oakesdale Avenue SW Renton, WA 98055-5212 206-296-6600 TIY 206-296-7217 www.nietrokc.gov Sub Reference Item Item 2 3 4 . General 1 2 3 4 Back Review Comments Consultant Response Check Please note the use of perforated stub-outs alone is not an acceptable BMP, per the 1998 King County Surface Water Design Manual (KSWDM) the plans shall show an acceptable BMP's such as dispersal or infiltration trenches. Please make sure the plans show proposed BM P's with standard details as needed. Please include bond quantities calculations in Tl R Please provide a separate TESC plans with standard notes and details Please provide significant trees plans for review and approval by the County Show standard detail for street trees. Please add the following note on plans: Per KCRS Section 4.01F, a 1 inch full width overlay shall be required. Appropriate repairs to the existing subgrade, base material, surfacing and pre-level may be required prior to placing the overlay. The overlay may be waived only upon written request and after an evaluation of pavement conditions and/or channelization requirements has been completed and approved by the County Road Engineer or Development Engineer. Sheet 2 of 2 ' ti King County Departme·nt of Development And Environmental Services 900 Oakesdale Avenue SW Renton, WA 98055-5212 206-296-6600 TIY 206-296-7217 www.metrokc.gov Engineering Plans Review Comments ProjectType: 3 Lots Short Plat Review Date : 10-01-2007 Reviewer Name : Mazen Haidar, P_,E. . • • Project Name : Chau Short Plat · Review No.: 1st Email: mazen.haidar@metrokc.gov Project Number : L03S0016 Phone: (206) 296 -7133 Activity Number : L07SR022 . Fax: (206) 206 -6613 . Sub · Back Reference Item Review Comments Consultant Response Check Item Sheet-1 1 Please show the United States Postal Services (USPS) approval stamp and signature for mailboxes location and show box standard detail oer the 1993 KCRS Sheet-2 1 Please show property lines stations in profiles 2 Show standard detail for thicken-edge 3 Indicate name of party responsible for relocating existing power poles and reference 93 KCRS for relocation of poles. 4 Please extend urban frontage improvements along the entire southern property line Sheet-3 1 Please replace ADA ramps details with those referenced in red on plans. TIR 1 Please check impervious areas calculations for the developed conditions, the calculations shown more than 10,000 square-feet of new impervious surfaces will be created which makes the subject short plat is subject to Larae Site Drainaae Manual Sheet 1 of 2 tQ King County Department of Development And Environmental Services 900 Oakesdale Avenue SW Renton, WA 98055-5212 206-296~600 TTY 206-296-7217 www.metrokc.gov Sub Reference Item Item 2 3 4 General 1 2 3 4 Back Review Comments Consultant Response Check -•-,- Please note the use of perforated stub-outs alone is not an acceptable BMP, per the 1998 King County Surface Water Design Manual (KSWDM) the plans shall show an acceptable BMP's such as dispersal or infiltration trenches. Please make sure the plans show proposed BM P's with standard details as needed. Please include bond quantities calculations in TIR Please provide a separate TESC plans with standard notes and details Please provide significant trees plans for review and approval by the County Show standard detail for street trees. Please add the following note on plans: Per KCRS Section 4.01F, a 1 inch full width overlay shall be required. Appropriate repairs to the existing subgrade, base material, surfacing and pre-level may be required prior to placing the overlay. The overlay may be waived only upon written request and after an evaluation of pavement conditions and/or channelization requirements has been completed and approved by the County Road Engineer or Development Enaineer. Sheet 2 of 2 ' ~ ti King County · Department of Development And Environmental Services 900 Oakesdale Avenue SW Renton, WA 98055-5212 206-296-6600 TTY 206-296-7217 www.metrokc.gov . Engineering Plans Review Comments · Project Type : 3 lots Short Plat Review Date : 10-01-2007 Reviewer Nanle: Mazen Haidar, P,E. ProjectName: Chau ShortPlat · Review No.: 1Sl Email: mazen.haidar@metrokc,gov Prc:>ject Number : L0.3S0016 Phone: (206) 296 -7133 . -. Activity Number: L07SR022 . Fax: (206) 206 -6613 ·-•.. -. . .. Sub Back Reference Item Review Comments Consultant Response Check Item . Sheet-1 1 Please show the United States Postal Services (USPS) approval stamp and signature for mailboxes location and show box standard detail per the 1993 KCRS Sheet-2 1 Please show property lines stations in profiles . 2 Show standard detail for thicken-edge 3 Indicate name of party responsible for relocating existing power poles and reference 93 KCRS for relocation of ooles. 4 Please extend urban frontage improvements along the entire southern property line Sheet -3 1 Please replace ADA ramps details with those referenced in red on plans. TIR 1 Please check impervious areas calculations for the .developed conditions, the calculations shown more than 10,000 square-feet of new impervious surfaces will be_ created which makes the subject short plat is subject to Larqe Site Drainaqe Manual Sheet 1 of 2 -· ~ KingCounty Department of Development And Environmental Services 900 Oakesdale Avenue SW Renton, WA 98055-5212 206-296-6600 TIY 206-296-7217 www.metrokc.gov Sub Reference Item Item .. 2 3 4 General 1. 2 3 4 . Back Review Comments Consultant Response Check Please note the use of perforated stub-outs alone is not an acceptable BMP, per the 1998 King County Surface Water Design Manual (KSWDM) the plans shall show an acceptable BM P's such as dispersal or infiltration trenches. Please make sure the plans show proposed BM P's with standard details as needed. Please include bond quantities calculations in TIR Please provide a separate TESC plans with standard notes and details Please provide significant trees plans for review and approval by the County Show standard detail for street trees. Please add the following note on plans: Per KCRS Section 4.01F, a 1 inch full width overlay shall be required. Appropriate repairs to the existing subgrade, base material, surfacing and pre-level may be required prior to placing the overlay. The overlay may be waived only upon written request and after an evaluation of pavement conditions and/or channelization requirements has been completed and approved by the County Road Engineer or Development Engineer. Sheet 2 of 2 r • • ® Web date· 10/10/2005 King County Department of Development and Environmental Services Land Use Services Division ENGINEERING REVIEW CHECKLIST 1998 Surface Water Design Manual 1993 King County Road Standards 900 Oakesdale Avenue Southwest Renton, WA 98055-1219 206-296-6600 TTY 206-296-7217 For alternate formats, call 206-296-6600. PROJECT INFORMATION Project Name C~r-\ Activity Number ::5RTm ProJect Number -=-=-""-,.._.,,_~"'-"'~""'"-)\1«-_-'-~-"~°F----------------------- Development Number DOES Review Engineer Notes OK Date D Hearing Examiner's Report ........ Date Revised Report ...... Date ------- 0 Plat Ordinance Number Date D Preliminary Plat Map .......... Date Approved by Hearing Examiner D Revised Preliminary Plat Map ....... Date Approved by ODES ----------------- D 5-year Expiration ...... Date __________ (Show on engineering cover sheet) ROUTING TO OTHER KING COUNTY SECTIONS OK D Wetland Report / Plans Route Date ___________ _ Response Date ___________ _ D Geotechnical Report/ Plans Route Date ___________ _ Response Date ___________ _ -~ D Grading Report / Plans Route Date ___________ _ Response Date ___________ _ D Structural Designs / Calculations / Civil Plans / Soils Report (Vaults, Retaining Walls, Bridges) Route Date Response Date ___________ _ D Landscape / Recreation I Street Tree I Plan Route Date ------------Response Date ------------ EngineeringReviewChecklistFORM.doc le-ckl-ercheck.pdf 10/10/2005 1 of 16 • • Activity Number: ------------- (Continued) D Traffic Improvement Plan/ Report Route Date ___________ _ Response Date ____________ _ D Tree Retention/ Forestry/ Plan Route Date ___________ _ Response Date ____________ _ D Other Report / Plan Route Date ___________ _ Response date ------------- D All required routing stations shown and updated on PRMS Notes GENERAL SUBDIVISION REQUIREMENTS D Site plan layout matches preliminary plat approved by Hearing Examiner (Check for same lot count, tract configuration, road alignments, etc.) D Compliance with conditions of preliminary approval D Compliance with Mitigated Determination of Non-Significance D Tract Table if three or more tracts. Identify name, size and purpose. D Show and label all SAO tracts, buffers, and 15' BSBL. D Review maximum height of 6-feet for rockeries and retaining walls per KCC 21A.12.030, 110-170, 220) Also show standard note per policy on Web site. D D D Use updated cover sheet showing designation for highly critical sites per Appendix, D44. Determine if HPA fisheries permit required -contact CAO staff. Tree Retention Plans -Show standard plan note (see section policies). SURFACE WATER DESIGN MANUAL (1998) CORE AND SPECIAL REQUIREMENTS OK SWDM D 1.2.1 D 1.2.2 D 1.2.3 D 1.2.6 D 1.2.8 D 1.3.1 D 1.3.2 Core #1 -Evaluate diversion of drainage within subbasins and/or tightline requirements for landslide hazard drainage areas. Core #2 -Off-site analysis. Evaluate adequacy and conclusions. Core #3 -Flow control. Determine design standard based upon mapping and/or off-site analysis. Evaluate exemptions from flow control if applicable. Core #6 -All drainage facilities and road access shall be located in public tracts, right-of-way and/or drainage easements dedicated to King County. For private facilities, specify the required Declaration of Covenant and drainage easements for final recording. Core #8 -Water Quality. Determine design standard based upon mapping and/or off-site analysis. Evaluate exemptions if applicable and untreated areas per page 1-57. Special #1 -Area specific requirements. Perform P-suffix search on computer, evaluate grading code restrictions, and review for shared facility drainage plan. Special #2 -Floodplain boundaries shown on plans. EngineeringReviewChecklistFORM.doc le·ckl-ercheck.pdf 10/10/2005 2 of 16 • • Activity Number: ------------- DRAINAGE VARIANCES OK SWDM D 1.4 Activity No. _________ Approval Date ______________ _ Design lssue.,=s-----------------------------~ TECHNICAL INFORMATION REPORT OK SWDM D 2.3.1.1 D D D D D D D D D D D D D D D D D D D D D D D D D D D D Section 1 -Project Overview Figure 1: TIR Worksheet Figure 2: Site Location Figure 3: Drainage Basins a. Acreage of subbasins b. Identify all site characteristics c. Show existing discharge points to and from the site d. Show routes of existing, construction, and future flows at all discharge points and downstream hydraulic structures. e. Use a minimum USGS 1 :2400 topographic map as a base f. Show and cite the length of travel from the farthest upstream end of a proposed storm system in the development to any proposed flow control facility. Figure 4: Soils a. Show the project site b. The area draining to the site c. The drainage system downstream for the distance of the downstream analysis Section 2 -Preliminary Conditions Summary with responses Section 3 -Off-Site Analysis Section 4 -Flow Control and Water Quality Facility Analysis and Design Existing Site Hydrology (Part A) Developed Site Hydrology (Part B) Performance Standards (Part C) Flow Control System (Part D) Water Quality System (Part E) Section 5 -Conveyance System Design and Analysis Section 6 -Special Reports and Studies -Geo, Wetlands, Floodplain analysis (4.4.2) Section 7 -Other Permits (HPA, Special Use, WSDOT, etc.) Section B -Erosion / Sedimentation Control Design Section 9 -Bond Quantities Worksheet and RID Facility Summary Section 10 -Maintenance and Operations Manual (Section 10 for privately maintained or special non-standard features EngineeringReviewChecklistFORM.doc le-ck.1-ercheck.pdf 10/10/2005 3 of 16 ' • • Activity Number: ------------- SITE IMPROVEMENT PLANS OK SWDM D 2.3.1.2 D Vertical Datum NAVO 1988 -show benchmark D Horizontal Control NAO 1983/91 D 2.3.1.2 General Plan Format D (1) Sheet size 24" x 36"; quality reproducibles D (2) King Co. Standard Map Symbols; existing / proposed (Reference 7 A) D (3) Project Information/ Cover Sheet D a. Title: Project name and ODES file number D b. Table of Contents if more than 3 plan sheets D c. Vicinity Map D d. Name & Phone of Utility field contacts and One Call Number: 1-800-424-5555 (water, sewer, D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D gas, power) e. Preconstruction / Inspection notification requirements f. Name & Phone of erosion control supervisor g. Name & Phone of Surveyor h. Name & Phone of Owner I Agent i. Name & Phone of Applicant j. Legal description k. Plan approval block for DOES I. Name & Phone of engineering firm preparing plans m. Fire Marshal's approval stamp (if required) n. Mailbox location approval by U.S. Postal Service o. List of conditions of preliminary approval on all site improvements (4) An overall site plan if more than three plan sheets are used a. The complete property area development b. Right-of-way information c. Street names and road classification d. All project phasing and proposed division boundaries e. All natural and proposed drainage collection and conveyance systems with catch basin numbers shown (5) Each sheet and TIR is stamped, signed, and dated by a Professional Engineer licensed in Washington State (6) Detail Sheets Provided (7) Title block on each sheet a. Development title b. Name, address and phone number of engineering firm c. Revision block d. Page numbering e. Sheet title (e.g., road and drainage, grading, etc.) (8) King County approval block on each plan sheet (9) The location and label for each section or other detail shall be provided (10) Critical Area Setbacks per K.C.C. 21A.24 (11) All match lines correspond to the sheet reference (12) Division phase lines with limits of construction (13) Standard Plan Notes -General, Drainage & Structural notes (Reference 78) (14) Survey control plan sheet stamped by licensed PLS in Washington State EngineeringReviewChecklistFORM.doc Je-ckl-ercheck.pdf 10/10/2005 4 of 16 • • Activity Number: ------------- SITE IMPROVEMENT PLANS lcontinuodl OK SWDM 0 2.3.1.2 Plan View: Site Plan and Roadway Elements (1) Property Lines, R/W lines, roadway widths shown D D (2) Existing / Proposed road features; CL, edge pavement, edge shoulder, ditches, curb, sidewalk & D D D D D D access pts (3) Existing/ Proposed topographic contours@2', 5'>15% slope, 10-'>40% slope (4) All affected utilities are shown; utility poles marked (5) All roads and adjoining subdivisions identified (6) Existing / Proposed R/W dimensioned and shown (7) Existing / Proposed surfacing shown (8) Scale generally 1"=50' (1"=100' for lots >1 Acre) 0 2.3.1.2 Plan View: Drainage Conveyance 0 Sequentially number all catch basins and curb inlets 0 Show length, diameter, and material for all pipes, culverts, and stubouts 0 Label catch basin size and type 0 Show stubout locations for roof drains 0 Label all drainage easements, access easements, tracts, and building setbacks 0 Provide flow arrows for drainage direction 0 2.3.1.2 Plan View: Other 0 Show all buildings, property lines, streets, alleys, and easements 0 Verify condition of public right-of-way 0 Show structures on abutting properties within 50 feet 0 Identify fencing for drainage facilities 0 Provide section details of all retaining walls and rockeries O Show all wells on-site and within 100-feet of site. For well abandonment, include notes referencing DOE procedures. 0 2.3.1.2 Profiles: Roadway and Drainage D D D D D D D D D D D Existing / proposed roadway centerline (CL) at 50' stations increasing, reading from left to right. Show stationing of points of smooth vertical curve, with elevations Show vertical curve data including stopping sight distance Show all pipes and detention tanks with slope, length, size and type Show all pipe inverts and elevations of catch basins or lids Minimum cover dimensions if less than 2.0' Indicate roadway stationing and offset for all catchbasins Show vertical and horizontal scales (vertical 1 "=5') Label all profiles with street names and reference numbers to plan sheet Show all property boundaries and match line locations Provide profiles for conveyance systems of 12" and larger pipes or channels other than roadway ditches Catch basin lids are flush with ground line EngineeringReviewChecklistFORM.doc le·ckl·ercheck.pdf 10/10/2005 5 of 16 • • Activity Number: ------------- SITE IMPROVEMENT PLANS fconunued) OK SWDM D 2.3.1.2 Plan Details D Provide scale drawing of each pond. vault, or water quality facility. Include all pipe details for size, type, slope, length, etc. D D Show existing and final grade contours at 2-foot intervals. Show maximum design water elevation. Dimension all berm widths D D D D D D D D D D 2.3.1.2 D Notes: Provide two cross sections through pond, including one section through restrictor Specify soils and compaction requirements Show location and detail of emergency overflows, spillways, and bypasses Specify rock protection I energy dissipation details Provide inverts for all pipes, grates, etc., and spot elevations on pond bottom Show location of access roads to control manholes and pond / forebay bottoms Provide plan an·d section views of all energy dissipaters. Specify size and thickness of rock. Show bollard locations (Typically at entrance to drainage facility and walking trails) Restrictor and control structures must have section and plan view drawn to scale Structural Plan Details Verify that designer is a licensed structural P.E. for vaults or bridges EROSION AND SEDIMENT CONTROL (SWDM Appendix D) OK D D D D D D D D D D D D D D D D SWDM 2.3.1.3 D.4.1 General Specifications Separate plan sheet showing entire site w/features Show critical areas and buffers in separate tracts Show existing contours and final grades if scope or work includes grading Pertinent information from soils report is added to plans Drainage features identified (streams, wetlands, bogs, springs, seeps, swales, ditches, pipes & depressions) Utility corridors other than roads shown Show drainage divides and flow directions Specify best management practices Show cut and fill slopes with catch lines indicated Sufficient conceptual details to convey design intent Standard ESC plan notes shown on plans (Page D-69) For grading and structural fill within lot areas -show standard notes for geo hazards (see section policies for geo notes) Clearing Limits (1) Delineate clearing limits -colored survey tape may be used. Critical areas require plastic/ metal safety fence or stake and wire fences. (2) Provide detail of fencing EngineeringReviewChecklistFORM.doc le-ckl-ercheck.pdf 1011012005 6 of 16 • • Activity Number: ------------- 2.3.1.3 EROSION AND SEDIMENT CONTROL ISWDM Appendix D) lconllnuedl OK SWDM D D D D D D D D D D D D D D D D D D D D D D D D D D D D D.4.2 D.4.3 D.4.4 D.4.5 D.4.6 Cover Measures (1) Specify the type and location of temporary and permanent cover measures. (Mulch, erosion control nets, blankets, plastic, seeding and sodding) (2) Specify the seed mixes, fertilizers and soil amendments to be used and application rates (3) Areas receiving special treatment are specified (jute netting, rock lining or sod) (4) Soil cover practices and locations of disturbed areas Perimeter Protection (1) Specify the location and type of perimeter protection to be used -silt fence, brush barriers, and/or vegetated strips (2) Provide details and specify type of fabric for silt fence Traffic Area Stabilization (1) Show construction entrance with detail (Figure D.4.G) (2) Show proposed construction roads and parking areas. Specify details for stabilization. Sediment Retention (1) Show location of sediment pond or sediment trap. Very small areas can be treated with only perimeter protection (see D.4.3). · (2) Sediment Trap -Can be used for drainage areas of 3 acres or less. Calculate surface area using 2-year design storm. Show detail per Figure D.4.H. (3) Sediment Pond -Determine pond geometry and show details on plan for required storage, depth, length and width (4) Show sediment pond cross section and detail (Figures 0.4.J and K) (5) Provide details of cell dividers and stabilization techniques for inlet I outlet (6) Specify mulch or recommended cover of berms & slopes (7) Specify the 1-foot marker for sediment.removal (8) Indicate catch basins for protection and show design details (Figures 0.4.L and M) Surface Water Control (1) Show conveyance of all surface water to a sediment pond or trap (2) Discharge location shall be downslope from disturbed areas (3) Show details for conveyance with interceptor dike, swales (Figures 0.4.0, P). (4) For ditches, determine capacity for 10-year storm with 0.5 feet freeboard. Show details for check dams (Figure 0.4.R). Determine check dam spacing and as needed, show inverts and minimum slopes of open channels. Also show direction of open channel ftow. (5) For pipe slope drains, determine capacity for 10-year storm. Show details per Figure 0.4.Q. (6) Determine level of protection for outlet (rock pad, outfall design, or level spreader). See requirements in D-38 through D-40. (7) Evaluate off-site flows entering the site and assure bypass of disturbed areas EngineeringReviewChecklistFORM.doc le-ckl-ercheck.pdf 1011012005 7 of 16 • • Activity Number: -------------2. 3. 1. 3 EROSION AND SEDIMENT CONTROL (SWDM Appendix DI (contlnuodl OK SWDM D D D D D D D D D D D D D D D D D D D D D D D D D D.5.1 D.5.2 D.5.3 D.5.4 D.5.7 D.5.8 ESC Report (1) Show detailed construction sequence (page D-70) (2) All required calculations and soils reports contained in TIR Wet Season Requirements (1) Provide a list of all applicable wet season requirements (details on page D-42) Critical Area Restrictions (1) Consider phased construction during the dry season. See special recommendations on page D- 43. Maintenance (1) Plans shall list the name, address and phone number of the ESC Supervisor. A sign shall also be posted on the construction site with information for contacting the ESC supervisor. (2) Determine if site is Highly Critical (Soil Types C or D, 5 acres of disturbance, large areas with slopes >10%, proximity to streams, wetlands, or lakes) (3) On cover sheet of engineering plans, designate if highly critical site NPDES Requirements (1) Determine if project will disturb more than 5 acres (2) If disturbed area is greater the 5 acres, show the following note on the plans: "No construction or site disturbance for this project may begin before the applicant first obtains a General Permit to Discharge Stormwater Associated with Construction Activity permit from the Washington State Department of Ecology (DOE). For more information or application form, please visit DOE's website at http://www.ecy.wa.gov/biblio/ecy02085.html" Forest Practices Permit (1) Determine if project needs FPA permit. Contact DOES grading section. (2) Provide a reference note on the cover sheet indicating whether or not an FPA permit has been obtained. · Early Start Plan Review (1) Standard cover sheet included with Title for Phased Early Start (2) List the scope of work for early start (scope of work will vary for each project -evaluate clearing, grading for roads, lot grading, utility installation, vault construction, off-site work) (3) Update the sheet index to identify all plans with updated page numbers (4) Include standard ESC plan prepared in accordance with all requirements listed above for erosion and sediment control (5) Include detailed construction sequence and identify ESC supervisor (6) Show standard erosion control notes (7) Show early start activity number on all plain sheets EngineeringReviewChecklistFORM.doc le-ckl-ercheck.pdf 10/10/2005 8 of 16 • • Activity Number: ------------- DESIGN REQUIREMENTS OK SWDM D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D 3.2 3.27 3.3.6 3.3.7 4.0 4.5 4.7 4.9 4.9 4.10 4.27 4.35 4.51 4.69 4.53 5.0 5.3 5.9 5.11 Runoff Computation Rational Method required for on-site conveyance (See Table 3.2) KCRTS used for flow control design Evaluate correct data: Rainfall region, scale factor, time step, record type, acreages, soil cover groups, and percent impervious For urban areas, unprotected forest modeled as pasture or grass For rural areas, unprotected forest assumes 50% grass, 50% pasture All pre-developed grassland modeled as pasture All post developed grassland modeled as grass Impervious coverage calculated based upon specific project -clearly summarize types and amounts of impervious For urban development, impervious for each lot, >= 4,000 sq ft or maximum allowed in zoning code For rural development, impervious for each lot, >= 8,000 sq ft or maximum allowed in zoning code Evaluate requirements for modeling with effective impervious area Point of compliance -evaluate for on-site bypass and off-site closed depression On-site closed depressions and ponding areas Conveyance System Analysis and Design Conveyance systems are in easements with BSBLs Off-site easements must be recorded using standard forms (Reference 8H) Determine which easements are public and private, label and dimension Pipes are parallel to and alongside property lines Minimum pipe size 12-inch, for private systems may allow 8 inch Easements for pipes outside of right of way For connecting pipes at structures, match crowns, 80% diameter, or inverts Minimum velocity at full flow 3.0 feet per second Minimum cover for pipes 2 feet Debris barrier for pipes 18-36 inch Outfall design criteria Surcharges (backwater analysis may be required) Maximum headwater allowed for culverts Bridge design Floodplain analysis Open channels Flow Control Design Mandatory requirements for roof downspouts in order of preference. Must evaluate feasibility of each. • Infiltration • Dispersion • Perforated stubouts Dispersion system criteria including vegetated flow path Perforated stub out, if used show detail per Fig. 5.1.3.A EngineeringReviewChecklistFORM.doc le-ckl-ercheck.pdf 10/10/2005 9 of 16 • • Activity Number: ------------- DESIGN REQUIREMENTS tcontlnuodl D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D 5.14 5. 15 5.17 5.3 5.3.1 5.3.2 Forested open space flow control BMPs • Show tracts or easements for FOS • Show required notes on plan for plat recording Roadway dispersion BMPs, check design criteria BMPs for reducing facility size. Note: Facility sizing credit allowed for dispersion only if flowpath from roofs ultimately drain to RID facility. Detention Facilities Emergency overflow -Evaluate flow path for safe and adequate conveyance Setbacks Flow-through system Detention Ponds Dam Safety Compliance Two cross-sections through pond (one x-section to include control structure} Review pond details in Figures 5.3. 1.A and B Designed as flow-through system Side slopes interior 3H:1V or fenced Vertical interior retaining walls Stamped by licensed structural civil engineer For pond walls, min. 25% of perimeter vegetated and no steeper than 3:1 Berms greater than 4 feet require key excavation Minimum berm width of 6 feet Primary overflow (control structure with riser}. Secondary Inlet to the control structure Emergency Overflow Spillway, 100 year developed peak flow Soil and compaction requirements described (95% modified proctor} Access road min. turning radius, maximum grade, min. width, fences or gates Pond sign (Figure 5.3. 1.D} Fencing and planting requirements Setbacks -5 feet from tow of exterior slope or 5 feet from water surface for cut slope Detention Tanks Flow-through system required 6" of dead storage in tank bottom Minimum pipe diameter of 36" Materials and structural stability Control structure per Section 5.3.4 Buoyancy Access risers and CBs are spaced properly with max. depth from finished grade to tank invert shall be 20 feet and accessible by maintenance vehicles EngineeringReviewChecklistFORM.doc le-ckl-ercheck.pdf 10/10/2005 10of16 • • Activity Number: ------------- DESIGN REQUIREMENTS rcontlnuedl OK SWDM D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D 5.3.3 5.3.4 5.4 6.0 6.1 6.2 6.2.2A 6.2.3 6.2.4 6.2.5 6.3 6.3.1 6.3.1.1 6.3.1 6.3.4 Detention Vaults Structural package submitted for approval Flow-through system required Review design details per Fig. 5.3.3.A. Note: Grate over sump with 2' x 2' hinged access door Access positioned a maximum of 50 feet from any location. (if over 3 foot cover use cone riser) Access required to inlet pipe and outlet Removable 5x1 O panel if vault greater than 1250 sq. ft. floor area Maximum depth from finished grade to vault invert to be 20 feet Minimum internal height shall be 7 feet, min. width shall be 4 feet min Ventilation pipes provided in all four corners Control Structures Section and plan view shown to scale Orifice size and elevation on plans match calculations. Minimum orifice 0.5". (Note: Information Plate details are no longer required -see policy on Web site.) Infiltration Facilities Appropriate soils logs and testing procedures in TIR Pond bottom at least 3 feet above seasonal high water Permeable soil extends minimum 3 feet below bottom of pond Geotechnical report states suitability and determines design infiltration rate Overflow route identified with 100-yr overflow conveyance Spill Control device upstream of facility Presettling Review setback requirements, page 5-60. Design water surface setback of 20 feet from external tract, easement or property lines Show the standard note regarding public rule for in operation facility (see section policies) Water Quality Design Water Quality Menus Water Quality facilities Water Quality Sequencing Setbacks, slopes and embankments Facility Liners Flow Splitter Designs Biofiltration Facility Biofiltration swales and soil amendments Methods of Analysis Swale geometry, plantings, flow conveyance, high flows, velocity Road access requirements, page 6-43 Filter strip geometry (slopes) EngineeringReviewChecklistFORM.doc 1011012005 11of16 • • Activity Number: ------------- DESIGN REQUIREMENTS fcontlnuodl OK SWDM D D D D D D D D D D D D D D D D D D D D D D D D D D D D D Notes: 6.4. 6.4.1.2 6.4.1.1 6.4.2 6.4.1.1 6.4.1.1 6.4.2.2 6.4.3 6.4.3.1 6.4.3.2 6.4.4 6.4.4.1 6.4.4.2 6.4.4.2 6.5 6.5.1 6.5.2 6.5.2.1 6.5.2.2 6.5.3 6.5.3.2 6.5.3.2 Wetpool Facility Designs Wetpool geometry, 2 cells, minimum depth of first cell 4 feet Flowpath length to width ratio 3: 1. Note: If flow path achieved with berms or walls, top of berm must be at 2-year water surface elevation. Berms, Baffles, Slopes lnleUOutlet Design Access, setbacks, and plantings Wetvaults Sizing basic or large Berms, Baffles, Slopes Two cells separated by wall or removable baffle Vault bottom forms a broad "V" with 5% sideslopes Inlet is submerged and outlet pipe designed for 100-year overflow Gravity drain provided if grade allows Minimum 50 square feet of grate over second cell Stormwater Wetlands Methods of Analysis Design Criteria -Wetland geometry, liners, access, plantings Combination Detention and Wetpool facilities Methods of Analysis Design Criteria -Detention and wetpool geometry, berms, baffles, slopes Access and plantings Media Filtration Facility Designs Presettling/pretreatment Sandfilters -Basic and Large Methods of analysis Design Criteria -Geometry, overflow/bypass, underdrain, and access Sandfilter Vaults Design Criteria -geometry, pretreatment, flow-spreading, energy dissipation Overflow/bypass, underdrain and access EngineeringReviewChecklistFORM.doc le-ckl-ercheck.pdf 10/10/2005 12of16 • • Activity Number: ------------- KING COUNTY ROAD STANDARDS (1993) GENERAL REQUIREMENTS 1.03A, B 1.03 D Off-site and frontage improvements determined by reviewing agency Note: For grading permits, the required extent of road improvements must be determined during engineering review. For subdivisions, the requirements are determined during preliminary review. Subdivisions must have recorded public access except for private roads DESIGN REQUIREMENTS 1.08 Road Variances Activity No. Approval Date ---------- Design Issues ROAD CLASSIFICATION TABLE Name of Roadwav KCRS Classification OK KCRS D 2.03C Maximum Superelevation (2.05) D 2.030 Horizontal curvature (2.05) D 2.03E Maximum grade (2.11) D 2.03F Stopping Sight Distance (2.05, 2.12) D 2.03G Entering Sight Distance (2.05, 2.13) EngineeringReviewChecklistFORM.doc le-ckl-ercheck.pdf 1011012005 13 of 16 • • Activity Number: ------------- KING COUNTY ROAD STANDARDS (1993) DESIGN REQUIREMENTS (conllnuedl OK KCRS D 2.03H D 2.031 D 2.03J D 2.03J D 2.03K D 2.03L D 2.06 D 2.0667 D 2.07 D 2.08A D 2.08B D 2.08E D 2.08F D 2.09 D 2.098 D 2.10A D 2.10A D 2.10A D 2.10B D 2.10C D 2.10E D 2.11A D 2.118 D 2.120 D 2.16 D 2.18 D 2.20 D 3.01 D 3.01 D 3.02A D 3.02B D 3.05 Minimum pavement width (Note: Footnote 9 -Neighborhood collectors require 36-feet at approach to intersections with arterials) Minimum roadway width Minimum R/Wwidth Min. R/W width (Footnote 12 and 2.198 -include 1 foot extra ROW behind curb or sidewalk) Curb or shoulder type road (2.01) Minimum Half-Street width Private Street Design Standards Verify maximum potential of 16 lots Half Streets Minimum Cul-de-Sac diameters Maximum Cul-de-Sac length Maximum Cross Slope 6% Bulb island shall be offset 2-feet Alleys Private Access Tracts (Note: Must meet all standards for minor access street, except curb cut driveway design is allowed with property line radii dedication) Angle of intersection between 85 and 95 degrees Intersection curb radius Intersection right-of-way radius Intersection spacing Intersection landing Lo~ Speed Curves Maximum Grade -Use AC for grades >12%, Use PCC for grades >20% Grade Brakes -maximum 1 % at intersections Intersection stopping sight distance (125' SSD allowed for local access streets) Bus zones -For arterials and neigh. collectors, the designer shall contact metro Intersections with State Highways Single access serving more than 100 lots Driveways Joint Use Driveways Sidewalks (both sides for subcollectors and higher classification) Location and width Handicapped access ramp (Use updated detail from KC Road Engineer, 3/26/04) EngineeringReviewChecklistFORM.doc le-ckl-ercheck.pdf 10/10/2005 14 of 16 • • Activity Number: ------------- KING COUNTY ROAD STANDARDS (1993) DESIGN REQUIREMENTS fcontlnuedl OK KCRS D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D 3.09 3.10 3.11 4.01 4.01F 4.01F 4.02 4.02 4.03 4.05 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.11 6.00 7.02A-D 7.03A 7.03L 7.04A 7.04E 7.05A 7.056 7.05E 8.02 8.03B School Access -asphalt walkway, sidewalk, or delineated shoulder Bikeways Equestrian Facilities Road Section and Surfacing (drawings 1-001 -1-006) Note: Neighborhood collectors require 3-inch asphalt concrete. Perform saw cut of pavement at fog line Pavement overlay for widening and channelization (show special note as approved by Development Engineer -see section policies) Residential street design Poor subgrade evaluation Arterial pavement design Pavement ma_rkings, channelization, and tapers (Requires DOT review) Rock facings (Dwg. Nos. 5-004 --5-007) Side slopes, generally 2H:1V Street trees and landscaping Mail boxes (Dwg. Nos. 5-010 -5-012) Street illumination Survey Monuments to be disturbed are shown Roadway Barricades Bollards for walkways or maintenance roads Roadside obstacles (Note: If variance required for utility pole, the utility company must apply for the variance.) Bridges (minimum width 28-feet) Grass-lined, pipe or rock lined, special designed ditch Minimum pipe size 12-inch diameter Beveled ends for culverts in ROW Maximum spacing between catch basins CBs taller than 5' (grate to invert) are Type H, Max. depth 12-feet per Dwg. 2-005 Vaned grates Through curb inlet frames for sag curves a.nd intersections> 4%. Notes: a) Through curb inlet not used on rolled curb b) See section policies for policy on three flanking inlets All covers and grates shall be locking Utility pole locations and other obstacles Open cuts on existing roadways, patch requirements EngineeringReviewChecklistFORM.doc le-ckl-<!rcheck.pdf 10/10/2005 15of16 • • Activity Number: ------------- KING COUNTY ROAD STANDARDS (1993) DESIGN REQUIREMENTS !continued) Notes: Check out the DOES Web site at www.metrokc.gov/ddes EngineeringReviewCheck.listFORM.doc le-ckl-ercheck.pdf 10/10/2005 16 of 16 JAEGER ENGINEERING. 9419 S. 204 PLACE -KENT, ,WASHINGTON· 98031 PHONE (253) 850-0934 FAX (253~ 850~0.155. March 22, 2007 . . SMALL SITE DRAINAGE . . TECHNICAL INFORMATION REPORT. CHAU 3 LOT SHORT PLAT .. · 17034 1061h A VE. SE . COUNTY.FILE NO: L03S0016 PREPARED FOR: . . Ha Minh Chau . 4101 1501hAve. SE Bellevue, WA. 98006 · .. : (425) 643-3993 . /B).tE~[E~IW[Efm . lJll : APR O 9 2o·oi J1 . K.C. D.D.E,S • . PREPAREDBY: ·James J. Jaeg~r, P.E._ · . . . · Le>""? o 1202-z. I. OVERVIEW The proposed project is a 3 lot short plat located at the southeast corner of the intersection of SE 172nd St. and 106th Ave. SE. The property is 0.34 acres and is proposed to divide into 3 new single family lots. two lots of approx. 4500 SF and a larger lot of approx. 5500 SF. The property is zoned R-8. There is and existing house and carport that will be demolished and removed. Also on the site is an gravel driveway that is connected to 106th Ave. SE. This driveway will also be removed. Access to the new houses will be a joint driveway (lots 2 and 3) from 106th Ave. SE. and single driveway (Lot 1) from SE 172nd St. The project has been submitted for preliminary short plat approval. The County screening committee has reviewed the initial submittal and requested additional information, some of which is addressed by this report. Both of the frontage streets are currently unimproved. Both will be improved with curb, gutter, sidewalk and pavement widening to meet the urban sub-access road standard. The pavement widening will be measured from the centerline of the existing pavement, rather than the ROW centerline, per discussion with County staff. Additionally, the frontage improvements along SE 172nd St. will end at the proposed Lot 1 lot line. This was agreed to by the County so that additional ROW would not be needed to construct the necessary road width. The existing lot and future lots will be fully served by the existing public utilities. The site is nearly flat in the northeast corner and then begins an increasing slope down to the southwest corner. The maximum slope near this corner is approx. 12%. The site slopes down to both frontage streets. The site vegetation is primarily tall grass, brush with sporadic trees and shrubs. There is a row of fir trees along the l 06th Ave. SE frontage. There are no sensitive areas or hazard designations within this site. This property is basically a large existing lot on a corner of an older plat. There are no drainage improvements on the site itself. However, there are several culverts and ditches along the edges of both street frontages. All of the ditches drain to an existing culvert located near the southwest property corner. Along with the proposed new curb, gutter and sidewalks, the applicant will install a gutter drainage system consisting of catch basins and piping that will connect to the existing catch basin. This new gutter system will collect all of the runoff from the half streets along the frontage as well as the existing ditches upstream from the property. The new lots will include a roof downspout drainage piping system that will be connected to the new catch basins. Each lot will also utilize a -· perforated stub-out connection as a BMP measure. The project is exempt from drainage detention and water quality enhancement as will be shown on the developed drainage section. Downstream drainage is not addressed in this report. A level l downstream drainage analysis by CTS Engineers, Inc. was submitted with the initial short plat application. "· PROJECT INFORMATION Proposal: Short Plat Location: 17034 I 06th Avenue SE Renton, Washington 98055 Owner: Ha Chau Area: Approximately .33 acre Soils: AgC (Alderwood gravelly sandy loam) Legal Description: Lot 13, Block 4, Aker's Farms No. 5 Volume 40, Page 27 Tax Parcel No: 008700-0280-07 PROJECT DESCRIPTION This project proposes to subdivide approximately 1/3 acre of land into 3 (three) lots. Presently there is a single family residence with carport located at the north side of the parcel. As a result of the subdivision, the existing house will be partially or entirely demolished. The ground consists of lawn, three pine trees in the front yard, a row of small fir trees along the west property line, and a gravel driveway. The parcel is bordered by S.E. 172"d Street along the south side, and by 106th A venue S.E. along the west side. Attached are site pictures, a vicinity map, a soils map, U.S.G.S. aerial topography map, and a schematic storm drainage plan. These enclosures were used in this analysis as resources. DOWNSTREAM ANALYSIS The ground of the parcel slopes from northeast corner dovm to southeast comer at a moderate slope of ten (I 0) percent. The sheet flow from the parcel is collected by the ditches along the south and west property lines. Both of these ditches are located in the public right-of-way and meet outside of the southwest corner of the property. The west side and south side ditches are connected via eighteen (18) inch and twelve (12) inch diameter short culverts, respectively, into a catch basin located in the northeast corner of the intersection. There is a twelve (12) inch diameter outgoing reinforced concrete pipe culvert from the catch basin running diagonally across the intersection at an approximate slope of7.7%. Page I of2 ct:s J This culvert daylights into a wooded ravine that continues to slope down in a southwesterly direction until it becomes a roadside ditch for the State Route 5 I 5 (Talbot Road), at a point at least a Y. mile from the proposed subdivision. There are no evident signs of erosion or capacity problems within this existing downstream storm drainage conveyance system. Eventually the runoff from the property is part of the Panther Creek Wetland that is drained into Lake Washington via Green River. A site visit to verify these conditions was made on March 6, 2003, by CTS Engineers, Inc. PROPOSED SITE DRAINAGE IMPROVEMENTS Each ditch on the south and west of the subject property currently outlets via a short culvert which connects to an existing catch basin at the NE corner of the intersection of 106th Ave SE and SE I 72nd St. As part of the access improvements to the subdivided property, it is proposed to replace both existing ditches with culverts, filling each ditch to the level of street pavement. In addition, the existing catch basin is proposed to be replaced with a larger catch basin or storm drain manhole. Site drainage and storm runoff will be directed into below-grade pipes which will connect to the proposed culverts upstream of the replaced catch basin. Refer to the attached preliminary storm drainage plan for a graphical representation of the proposed improvements. Page 2 of2 c-cs ·;i Sol\.-~ , Fl&. Z 65(. 5 m 626 "" • • ..... ¥ .... · . z 61" ST fz "' "' "' SE IESTII ' ~IST ~1 ., 'Y iS > J :: < ~~ i!": SE 1E9Tll SE§~ ST " ,·-: _,_;;;ii'. '1 ; ;;'.~ ·s ST § ~ 11 ";/''::::: f':,,,-:C-:,C,'j'c.,..C.'-'.,-IT-~--r -:: 11Bnl : '1. ·""'.'··· '--'--~~--- I iri. -1900 ft. SEE • :,i ~:,, ;! !>' ·:~:-.. ~· -~~,: ~ ... 686 ( ( ( ( f ' ( l. < -. ficoM: ~ ·. '1 ~ u ~----.J,_ _____ : :_;• f ,g.01" €: c.:r _ ___,, Loe-A-r10N ' . I L ' ® King County Department of Development and Environmental Services 900 Oakesdale Avenue Southwest Renton, WA 9805S-1219 March 12, 2004 Ha Minh Chau 4101 ISO'h Avenue SE Bellevue, WA 98006 RE: Preliminary Approval for Short Subdivision No.L03S0016 Dear Ms Chau: The Land Use Services Division (LUSD) has completed review of the short subdivision application captioned above. The LUSD finds that the proposed short subdivision complies with the King County Land Segregation Code (Title 19A), Zoning Code (Title 21A), and other applicable codes as specified in King County Code (KCC) l 9A.08.060. The short subdivision is granted preliminary approval subject to the Conditions of Preliminary Approval attached hereto and incorporated herein by reference. Any aggrieved party may appeal this decision by the appeal deadline, which is March 29, 2004. The appeal procedure is enclosed for your infom1ation. The preliminary approval is valid for a period of 60 months from the date of this letter, unless an appeal is filed. In the event that an appeal is filed, the preliminary approval is valid for a period of 60 month_s from tlie date of the appeal decision. Enclosed are the following: • Notice of Decision • Conditions of Preliminary Approval • Appeal Procedure If you have any questions regarding this letter, please contact Fereshteh Dehkordi, Program Manager, at (206) 296-7173 and Cm1 Foster, Engineer, at (206) 296-7106. Curt Foster, P.E:, Senior Engineer Engineering Review Section, LUSD Enclosures cc: Jim Jaeger, Jaeger Engineering Applicant File Letter. frm/CoverLtr2000. SP. doc 3/9/00 J <® King County Department of Development and Environmental Services 900 Oakesdale Avenue SW Renton, WA 98055-1219 File No. File Name: CONDITIONS OF APPROVAL L03S0016 Chau Short Plat · Application Date: May 2, 2003 Revision Date: January 30, 2004 This short subdivision is granted preliminary approval subject to the following Conditions of Approval. These conditions are based on a field visit and current information the applicant has provided about the short subdivision property. Occasionally, in satisfying the Conditions of Approval, a more definitive land use limitation of the property may be revealed. New infom1ation (such as final Health approval or sensitive areas review) may require additional conditions and may reduce the number of lots. Final approval will be granted after compliance with the Conditions of Approval. Key codes and guidelines have been noted to provide guidance in preparing the required plans and other documents. Compliance with some of the following conditions will require that engineering plans be.prepared by a professional civil engineer licensed in the State of Washington. 1. Title 19A A. B. The short subdivision shall comply with all provisions of Title 19A. The final review process must be completed prior to recording of the short subdivision. The Department of Development and Environmental Services (DDES) strongly recommends the Final Short Plat be submitted at least one year prior to the expiration date of the project. The Final Short Plat submittal package includes: I. A surveyed map page (four sets) including lot area closure calculations; 2. Final health approval from the King County Health Department (different from preliminary health approval); 3. A current short plat certificate and supporting documents (easements, etc.); 4. Payment of the Final Short Plat submittal fee; 5. A copy of this letter (preliminary approval letter). A licensed land surveyor shall be hired to prepare the final short subdivision documents. These documents shall comply with all of the following conditions for final approval: f C. All persons having an ownership interest in the subject property are required to sign the final short subdivision. D. If modifications to the approved preliminary site plan (Attachment 1) are needed to accomplish engineering design or final short plat, then a revised preliminary site plan shall be submitted to DDES for review and approval. The revised site plans shall be submitted with the engineering plans or the final short plat submittal. 2. Surface \Vater Management (KCC 9) 1998 King County Surface \Vater Design Manual (S\VDM) A. This short subdivision proposal is subject to Full Drainage Review per section 1.1.2.3. Final short subdivision approval shall require full compliancewith drainage provisions and storm drainage requirements of this section. Compliance may result in reducing the number and/or location oflots shown on the approved preliminary short subdivision. The conditions outlined below are site-specific drainage conditions: (!) Core Requirement #1 -Discharge at the Natural Location (2) Core Requirement #2 -Off-Site Analysis (3) Core Requirement #3 -Flow Control (4) Core Requirement #4 -Conveyance System (5) Core Requirement #5 -Erosion & Sedimentation Control (6) Core Requirement #6 -Maintenance and Operation (7) Core Requirement #7 -Financial Guarantees & Liability (8) Core Requirement #8 -Water Quality (S l) Special Requirement #1 -Other Adopted Requirements B. A professional civil engineer licensed in the State of Washington shall prepare a Technical lnfonnation Report and/or engineering plans per Chapter 2, of the 1998 King County Surface Water Design Manual. 3. Health (KCC 13) This project is exempt from further King County Heath Department review. However, if improvements are required from the Sewer and/or the Water District, then verification shall be required from said District(s) that the improvements have been bonded and/or installed, prior to final recording of the short plat. 4. Road Standards (KCC 14) 1993 King County Road Standards, Ordinance 11187 Final short subdivision approval shall require full compliance with the provisions set forth in the King County Road Standards including engineering plans for all road improvements. The engineering plans shall be prepared by a professional civil engineer licensed in the State of Washington. DDES strongly recommends the · Engineering Plans be submitted at least two years prior to the expiration date of the project. A. That portion of the North half of SE 172nd Street adjoining the subject property shall be improved to an urban Sub-access standard per KCRS Section 1.03. B. That portion of the East half of 106th Avenue SE adjoining the subject property· shall be improved to an urban Sub-access standard per KCRS Section 1.03. C. Provide 35' paved radii at the intersection of 106'h Avenue SE and SE 172 Street per KCRS Section 2.10. Dedicate a 25-foot property line radius at the intersection of 1061h Avenue SE and SE 172nd Street per KCRS Section 2.10. D. Existing roadside obstacle(s) shall be relocated to provide a minimum clearance of 10 feet from the edge of the travel lane to the obstacle(s) per KCRS Section 5.11. E. Private access to Lots 2 and 3 shall be shown as a joint-use driveway tract per KCRS Section 3.01. The tract shall be an undivided ownership to the lots it serves, and the lot owners shall be responsible for its maintenance. The tract shall be 20-feet wide with a 18-foot-wide paved surface. The tract shall be a minimum of 20 feet in length. · F. The following notes shall be shown on the final recorded short subdivision: 1) \Yarning: King County has no responsibility to build, improve, maintain or otherwise service the private roads contained within or providing service to the property described in this short subdivision. 2) All private easements and/or tracts to be maintained, repaired, and/or rebuilt by the owners of the parcels having legal access therefrom and their heirs, assigns or successors, unless and until such roads are improved to King County standards and are dedicated and accepted by King County for maintenance. G. All utilities within proposed rights-of-way shall be included within a franchise approved by the King County Council prior to final short subdivision recording. • H. All restrictions, easements, tracts, and their purpose shall be shown on the final recorded short subdivision. 5. Building and _Construction Standards (Title 16) Grading. The applicant shall comply with all applicable provisions of KCC 16.82. 6. Fire Code (KCC 17) Section 902 of the 1997 Edition of Uniform Fire Code The applicant shall obtain the approval of the King County Fire Protection Engineer for the adequacy of the fire hydrant, water main, and fire flow standards ofKCC 17.08 prior to recoding of the Jots. 7. Zoning Code (KCC 21A) A. Density and Dimensions (KCC 2JA.12) All lots shall meet the density and dimensions requirements of the R-8-SO zone classification or shall be as shown on the face of the approved prelimi- nary short subdivision, whichever is larger. Minor revisions to the short subdivision, which do not result in substantial ·changes and/or do not create additional lots may be approved at the discretion ofLUSD. B. Street Trees (KCC 21 A.16) Street trees shall be provided along that portion of the right-of-way for I 061h Avenue Southeast and Southeast l 72"d Street abutting the subject property, pursuant to the provisions ofKCC 2IA.16.050(E) and KCC 21 A.16.190, unless existing trees are shown to be equivalent to the requirement of Code. See note below. The required street trees shall be designed as to location and spacing on the final plan submittal. The street trees must be installed and inspected, or a performance bond posted, prior to recording of the plat. If a perfonnance bond is posted, the street trees must be installed and inspected within one year of recording of the plat. At the time of inspection, if the trees are found to be installed per the approved plan, a maintenance bond must be submitted, or the performance bond replaced with a maintenance 'bond, and held for one year. After one year, the maintenance · bond may be released after DDES has completed a second inspection and detennined that the trees have been kept healthy and thriving. NOTE: I. KCC 21A.16.050 Landscaping -street frontages. The average width of perimeter landscaping along street frontages shall be provided as follows: " For single-family subdivisions: a. Trees shall be planted at the rate of one tree for every 40 feet of frontage along a neighborhood collector street or arterial street. b. The trees shall be: · I. Located within the street right-of-way if permitted by the custodial state or local agency; 2. No more than 20 feet from the street right-of-way line when located within a lot; 3. Maintained by the adjacent landowner unless part of a County maintenance program; and 4. A species approved by the County if located within the street right-of-way and compatible with overhead utility lines. c. The.trees may be spread at irregular intervals in order to accommodate sight distance requirements for driveways and intersections. 2. KCC 2IA.16.190 Financial guarantees. Financial guarantees shall be.required consistent with the provisions of Title 27 A. C. Significant Tree Retention-KCC 21A.38.230 which applies to the site, a detailed tree retention plan shall be submitted with the engineering plans for the subject plat. The tree retention plan (and engineering plans) shall be consistent with the requirements ofKCC 21A.38.230, as well as the conceptual tree retention plan which is part of the hearing record for this project. No clearing of the subject property is pem1itted until the final tree retention plan is approved by LUSD. Flagging and temporary fencing of trees to be retained shall be provided, consistent with KCC 21A.38.230B4. The placement of impervious surfaces, fill material, excavation work, or the storage of construction materials is prohibited within the fenced areas around preserved trees, except for grading work pennitted pursuant to KCC 21A.38.230B4d(2). A note shall be placed on the final plat indicating that the trees shown to be retained on the tree retention plan shall be maintained by the future owners of the proposed Jots, consistent with KCC 21A.38.230B6. (Note that the tree retention plan shall be included as part of the final engineering plans for the subject plat.) If there are no significant trees as defined by the Special Overlay District on the site then, this requirement does not apply. D. The existing house shall be removed or demolished prior to the final approval and recording. A demolition pennit shall be obtained prior to demolition. 8. Road Mitigation Payment System The applicant shall comply with Road Mitigation Payment System (MPS), by paying the required MPS fee as detennined by King County Department of Transportation, plus an administrative fee. The applicant has an option to either: A. Pay the MPS fee at final short subdivision recording and the MPS administrative fee at final short subdivision application, or B. Pay the MPS fee at building pennit issuance and the MPS administrative fee at the time of building pennit application. If option A is chosen, then the following note shall be shown on the final short plat: MPS FEE NOTICE: All fees required by King County code 14.75, Mitigation Payment System (MPS) have been paid. If option B is chosen, then the following note shall be shown on the final short plat: l\fPS FEE NOTICE: This short plat is subject to King County Code No. 14.75, King County Road Mitigation Payment System (MPS). The MPS fees plus the MPS administrative fee shall be paid at the time of building pem1it application at the rate in effect at that time. 9. State Environmental Policy Act (SEPA) This short subdivision was exempt from the provision of the State Environmental Policy Act (SEPA). 10. Other Considerations Preliminary approval of this application does not limit the applicant's responsibility to obtain any required pennit or license from the State or other regulatory body. This may include obtaining a forest practice pennit from the Washington State Department of Natural Resources for tree removal. 1 · 1:; LINV,=3el.5 i------- 1 , ,E ~; ,l;i • IIJ..-s•..., l\\g w ~ ::~l- 1-11 "' BEGIN NEV CURB, GUTTER ~ SIDEVALK II -~~~O'-_I 1-1-II \ I 130.01' ~ ~I\ ASPHALT. I ~ u 1 \ DIV AP N EX CONC: I EX HOUSE '\J ~~ . II -\ I . : r, i~ ~ -L __ \ ______ _, / 12' CONC, RET. VALL \llTH VOOD FENCE (w'ALL ON PROP, LN,>" " •'.)\ ,..., ,. I I I · · ~ · . _ _ see 16'33\E 130 .0 ...: ___ ., 79.BF-~~~==~:;:;5n~--t _ rE;GRA a.---I '---I \ ---.J DRIVE 11 CAR-I \ LDT 13 /-', ~ ,--JI PORT I \ ,-r; ~-/ , -~ --....J I I \ ,'{/ LO 1; Ji_ '9::, a; I ~I LOTI # -1-:'.o \.:sl;y,_ "' I -<i I ~o \~~.190± SQ, F . I lfl ~,956-:t,,J.,SQ. FT. -._ '\• <3) 10' I EX ~~fE,i(, ( <J50 ~PINES : I <REMOVE) I ,,,;. -~ -i~ : I . ~ \ ~ :I JlOT # .} L--:-~-----J 4,594± SQ, F~~ i?lr-5e\ \ :Je " :> / SMA\--L \ ':I__ lfl w.l!l FIR ··T,REES ' I co (\J ()\ 0 1-,--_____ _, I f8 V') I I EX HOUSE I I L--- NE\I EL~Ow'ER \ :~ I ~ · POLE LOCAT~ON \,, -ND NE\I ClB, GUTT~ ~25' RO',/ R~ "'& ~ S!DE\o/ALK "l;,LOCATED F.fl. 6 '--. . -~ 12' RCP INV=386.7 . u--- ....... · -7 -::i:xlSTING n E HYDRANT ~ 1 EX ELEC. POw'E PO~~ BE RELO ATED C1 \ L--1','---t-'TO BE RELOCA -E 17RND ST_. . \ ! CENTE LINE ROV -\ s :__..' _...,., , f -, -or pAv,_1,1£.t-11 -----~ -- , J . £.DG£ ~ _,__-'\_ ---;EJEIVED R·-f 1/f ~f-' D-~ /- JAN 3 u 2004 ,,n r, ! I"~\" •.....-,.--._,.,, --~· r; tii3, r ~· ·--~· KING COUNTY LAND USE SERVICES , ............. . !NV=385,3 1 · Ji \\.)1 ' ! '. ' !• . ~ ~ ,,, DITCH EDGE OF PAVEMENT -- 390 '"-, \ -'" O' ....,,,... C Transmitted to the following Parties of Record for short plat L03SOO 16: Cramer Northwest Inc. 945 N. Central Ave., Suite # I 04 Kent, WA 98032 Mr. & Mrs. G.A. Headland 17030 1061h Ave SE Renton, WA 98055 Jay Newton 17006 I 06 1h Ave SE Renton, WA 98055 Trishah Bull, Project Manager II, DOES Land Use Services Division Curt Foster, Sr. Engineer, DOES Land Use Services Division Mazen Haidar, Engineer, ODES Land Use Services Division Rich Hudson, Program Manager III, DOES Land Use Services Division • . - C ATTACHMENT A RIGHT TO APPEAL This action may be appealed in writing to the King County Hearing Examiner, with a fee of$250.00 (check payable to King County Office of Finance). As required by KCC 20.20.090 and 20.24.090, the appeal period shall be fourteen (14) calendar days and shall commence on the third day after the notice of decision is mailed. Filing an appeal requires actual delivery to the King County Land Use Services Division prior to the close of business (4:30 p.m.) on the date due. Prior mailing is not sufficient if actual receipt by the Division does not occur within the applicable time period. The Examiner does not have authority to extend the time period unless the Division is not open on the specified closing date, in which event delivery prior to the close of business on the next business day is sufficient to meet the filing requirement. If a timely Notice of Appeal has been filed, the appellant shall file a statement of appeal within a 21-day calendar period commencing three days after the notice of decision is mailed. The statement of appeal shall identify the decision being appealed (including file number) and the alleged errors in that decision. The statement of appeal shall state: I) specific reasons why the decision should be reversed or modified; and 2) the harm suffered or anticipated by the appellant, and the relief sought. The scope of an appeal shall be based on matters or is.sues raised in the statement of appeal. Failure to timely file a notice of appeal, appeal fee, or statement of appeal deprives the Examiner of jurisdiction to consider the appeal. Appeals must be submitted to the Department of Development and Environmental Services, addressed as follows: LAND USE APPEAL Land Use Services Division Department of Development and Environmental Services BlackRiver Corporate Park 900 Oakesdale Avenue Southwest Renton, WA 98055-1219 A request for a pre-hearing conference may be made by any paiiy. For more infomiation regarding appeal proceedings and pre-hearing conferences, please contact the Office of the Examiner for a Citizens' Guide to the Examiner hearings and/or read KCC 20.20 and 20.24. ' .. II. PEAK RUNOFF FLOWS A. PREDEVELOPED DRAINAGE The pre-developed drainage basin includes the entire subject property plus a portion of the two frontage roads. T,he frontage road areas were included because the proposed curb. gutter and sidewalk will add new impervious surface that must be accounted for in the drainage calculations. The on-site area was calculated to be 0.34 acres. The area of the frontage road improvements was determined using only the area from the edge of the existing pavement to the ROW line. The existing road pavement was not included in the calculations because this area will not be changed. The frontage area was calculated to be 3982 SF, or 0.09 acres. This provided a total project area of 0.43 acres. The existing house and gravel driveway also presented existing impervious surface. This existing impervious surface was calculated to be 0.07 acres. Note that only 50% of the gravel driveway was counted as impervious surface, per code. The remaining pre-developed area was considered till pasture. The pre-developed drainage analysis was performed using the "KCRTS" hydrology software and its summary tables and charts are attached for reference. The methods outlined in the 1998 King County Surface Water Design Manual were used as guidelines. Following this page are the data sheets used for the computer input data. The computer summary sheets for peak flows are also attached. Below is a brief description of the existing drainage characteristics: ' 2 year peak flow: 10 year peak flow: 100 year peak flow: project area: till pasture: impervious area: 0.024 CFS 0.040 CFS 0.076 CFS 0.43 acres 0.36 acres 0.07 acres CHAU SHORT PLAT KCRTS PEAK FLOW SUMMARY PRE-DEVELOPED DRAINAGE Flow Frequency Analysis Time Series File:chaupre.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--------Flow Frequency Analysis------- Flow Rate Rank Time of Peak --Peaks Rank Return Prob (CFS) (CFS) Period 0.037 4 2/09/01 15:00 0.076 1 100.00 0.990 0.024 6 1/05/02 16:00 0.042 2 25.00 0.960 0.042 2 2/27/03 7:00 0.040 3 10.00 0.900 0.019 8 8/26/04 2:00 0.037 4 5.00 0. 800 0.024 7 1/05/05 8:00 0.037 5 3.00 0.667 0.040 3 1/18/06 16:00 0.024 6 2.00 0.500 0.037 5 11/24/06 3:00 0.024 7 1. 30 0.231 0.076 1 1/09/08 6:00 0.019 8 1.10 0.091 Computed Peaks 0.065 50.00 0.980 ' ' .. DD-si±~ 1).:£::E'o ', 130.' V, 13, 5) :: 14,lo(Q sF ( 0 ,!>4 ~'-3= ___ -!JJ1---c-L_t:n:~~._J~~\)~I'!'4Ml:: ~· ----Ht:-----rllJ~~~~.oo.:_.· -++· ·c_;··'--"-'24'+'-~ .(a_ ( ) @ ,= 3 '916i · 'SF = 0,43 Ac-. 2497 SF II 3 Sr ----m--~~---1-R-=-~a!l;L:Ll.L.-U~d__',1,, ____ __,:.Z..'f4<) SE = o.o f;'><IS"I N ~L.~US',.__ _____________ _ °0 ( )s:e.-TII\ I ~[e_, ----=---cy a:. e_9-~ Vc.-=4='3.,___---"0-L-.::.o_,1_-__ 0__,,,-=3'-"l,,=----.wft=c::..'-. __ ,0 II II = ~------'11.:------------------- , .. ., B. DEVELOPED DRAINAGE The developed drainage calculations used the same project area as the pre-developed calculations. The impervious surfaces included the 3 new houses. 3 new driveways, the joint use driveway and the frontage improvements for 106th Ave SE and Se 172nd St. The applicant provided specific house plans for the three new lots. The footprint for these specific houses was uses as the impervious surface area for the new houses at each lot. These areas are shown on the attached worksheet. A driveway for each lot was also calculated using the site plan that was provided by the applicant. The areas for the driveways were taken directly from the plan for each new lot. The joint use driveway was calculated to cover the "worse" condition of extending the full length of the common lot line between Lots 2 and 3. The required pavement with of 18 ft. was used. The frontage improvement impervious surface includes the new sidewalk. curb and pavement widening. The pavement widening width was calculated using an average width of the additional pavement for both streets. The developed pervious surface was considered as till lawn. Similar to the existing condition. the KCRTS method was used to determine the peak flows for the various storm events. The computer data sheets for the developed flows follow this page. A brief summary of the developed drainage characteristics are: 2 year peak flow: 10 year peak flow: l 00 year peak flow: total area: till lawn: impervious area: 0.075 CFS 0.091 CFS 0.153 CFS 0.43 acres 0.19 acres 0.24 acres .J CHAU SHORT PLAT KCRTS PEAK FLOW SUMMARY DEVELOPED DRAINAGE Flow Frequency Analysis Time Series File:chaudev.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--------Flow Frequency Analysis------- Flow Rate Rank Time of Peak --Peaks Rank Return Prob (CFS) (CFS) Period 0.075 6 2/09/01 2:00 0.153 1 100.00 0.990 0.060 8 1/05/02 16:00 0.092 2 25.00 0.960 0.091 3 2/27/03 7:00 0.091 3 10.00 0.900 0.063 7 8/26/04 2:00 0.079 4 5.00 0.800 0.076 5 10/28/04 16:00 0.076 5 3.00 0.667 0.079 4 1/18/06 16:00 0.075 6 2.00 0.500 0.092 2 10/26/06 0:00 0.063 7 1. 30 0.231 0.153 1 1/09/08 6:00 0.060 8 1.10 0.091 Computed Peaks 0.133 SO.OD 0.980 .• f -----ttt------,---"=--'=""--...._).C\coB.T-1----'-.P-I..-Xl-l----------- ----ttt----~~ cLD PSi> t)_t?,_ . .._.&:_,_,!N~&GE.~'---------- 2-, I " " 22. 4-2 Ill z.(, 1 to),. 0 ,. s_(g_~""-ci--:::----=-=,3..._J .... 1 ___ _ ---=Ill ____ =e')cr--<U?,=...,-~~\~,""'-=~-LQQS...:, _____ l.02.44-5f: ----'+fl~I _________________ :_o ,._4-Ac.... Ill ___ .,li.,-1 ---~,,__\.J~~-~h~ll__,~S" __________ _ '1 1 1 1 1· ':> o I o, I\ 111 .I! 4-i-11 Ill Ill Ill s 111 Ill 111 Ill Ill g:a__,-0, ~\ KCRTS" l Ore.c,_ == o , "' -o.._Z,~4--_~~· -·~~n_,_,c...~-'---- R~o:a. S. Fo.doc ·, 1.0 12e.v€dD~ A?oL Hews 2.. '1'("' = Q.01~ CFS- )0 'fC' ~ 0. O"t( (:FJ )Oil ::-{f""· ::: 0,(53 c.!=-S .. C. HYDRO LOGIC ANALYSIS The site qualifies for an exemption from Core Requirement #3, Flow Control. Exemption #3 (page 1-27, attached) is met. This is the peak flow exemption using flow control BMP's. The 100 year peak developed flow is 0.153 CFS. The 100 year peak pre-developed flow is 0.07 6 CFS. The difference is 0.077 CFS. which is less than 0.1 CFS limit to qualify for this exemption. In addition, the site is a re-development project and is not located within a critical drainage area or a landslide hazard drainage area. The project is a single family residential project; also needed to qualify for this exemption. The flow control BMP used for this project is the perforated stub-out. Individual lot infiltration is not an alternative because the soils ore of the Alderwood series (hydrologic group C). These soils have slow permeability rotes and high ground water. Also. the size of the lots would not allow the required setbacks for an infiltration system or for a splash block. The remaining BMP allowed by the code is the perforated stub-out. D. WATER QUALITY CONTROL The site also qualifies for an exemption from Core Requirement #8. Water Quality. Exemption # 1, surface area exemption (page 1-50. attached) is met. The developed site will be adding less than 5000 SF of new impervious surface subject to vehicular traffic (PGIS). The new PGIS area includes the 3 new driveways for each lot. the joint use driveway and the pavement widening along both frontage roads. The totals for these areas ore: • 3 driveways: 546 SF • joint driveway: 1350 SF • 106 Ave. widening: 236 SF • 172 St. widening: 135 SF TOT AL: 2267 SF This does not count the existing gravel driveway that is being removed (credit for 50% of the area). This does show that the project meets the requirements for the surface area exemption. ., 1.!.3 CORE REQUIREME."ff #3: FLOW CO:S'lllOL 0 EXEMPTIONS FROM CORE REQUIREMENT #3 There are eight possible exemptions from the requirement 10 provide a formal flow control facility per Core Requirement #3. The intent of these exemptions is 10 prol'ide for situations where a facility may not be practical or needed, where other alternatives to a facility can be just as effective, or where it makes sense to provide incentives for retaining native vegetation or for maximizing use of existing developed areas. 1. Impervious Surface Exemption A proposed project or any threshold discharge area within a project is exempt if less than 5,000 square feet of new impen·ious surface will be added and the project or threshold discharge area is not within a Landslide Hazard Drainage Area.31 If the project or threshold discharge area is located within a Landslide Hazard Drainage Area, this exemption only applies to new impervious surface less than 2,000 square feet. 2. Impervious Surface Exemption Using Flow Control BMPs Any threshold discharge area within a proposed project is exempt if less than 10,000 square feet of new impen·ious surface will be added, AND all of the following criteria are met: a) The area cleared to accommodate the proposed project must be less than 35% or less than 2 acres of the threshold discharge area (whichever is greater), .t,ND b) If the project is a single family residential project, flow control BMPs must be applied within the threshold discharge area as specified in Small Sire Drainage Requirements (detached Appendix C), AND c) For projects other than single family residential projects, the new impen·ious surface within · the threshold discharge area must be comprised of either non-pollution-generating roofs that comply with the roof downspout controls in Section 5.J. OR roads, trails, or driveways that · · comply with the rural roadway dispersion requirements in Section 5.2. l, AND d) The manner in which runoff is discharged from the.project site must not create a significant adverse impact per Core Requirement #l. 3. Peak Flow Exemption Using Flow Control BMPs Any threshold discharge area within a proposed project is exempt if the project improvements within the threshold discharge area generate less than a 0. l cfs increase in the exisring sire condirions" l 00- year peak flow rate, AND all of the following criteria are met: a) If the project is a redevelopment project, flow control BMPs must be applied as specified in Section 5.2, and the project improvements must not significantly impact a "severe erosion problem" or "severe flooding problem" (see page 1-21), and must not be located within a Landslide Hazard Drainage Area, AND b) If the project is a single family residential project, the runoff from impervious surfaces must be infiltrated or dispersed using flow control BMPs specified in Appendix C, and any areas of native 3, Landslide Hazard Drainage Areas are delineated on a map adopted with this manual (see map pocket on inside of back cover). 32 Existing site conditions depend on what, if any, land conversion activity has occurred on the si1e since May 1979 when King County first required flow control on developments adding more than 5,000 square feet of new impervious surface. IF a drainage plan has been approved by the County since May 1979 for any land conversion activity which in dudes the addition of more than 5,000 square feet of new impervious surface, THEN existing site conditions are those created by the site improvements and drainage facilities·constructed per the approved engineering plans. OTHERWISE, existing site conditions are those that existed prior to May 1979 as determined from aerial photographs and, if necessary, on knowledge of individuals familiar with the area. The intent is 10 mitigate unac'dressed impacts crealed by site alterations or improvements, such as clearing, which have occurred since May 1979. 1998 Surface \Vater Design Manual 9/l /98 1-27 .. SECTIO~ 1.2 CORE REQl:lREMENTS 9/1 /98 vegetation assumed not to be cleared for the purposes of computing the increase in I 00-year peak flow must be preserved within a tract or by covenant as described in Appendix C, AND c) For projects other than redeYelopment projects and single family residential projects, the new impervious surface within the threshold discharge area must be comprised of either non- pollution-generating roofs that comply with the roof downspout controls in Section 5.1, OR roads, trails, or driveways that comply with the rural roadway dispersion requirements in Section 5.2.1, AND d) The manner in which runoff is discharged from the project site must not create a significant adverse impact per Core Requirement #1. 4. Peak Flow Exemption for Urban Redevelopment Projects Any natural discharge area of a redevelopment project located within the Urban Growth Area is exempt if the project improvements within the natural discharge area generate Jess than a 0.1 cfs increase in the existing site conditions I 00-year peak flow, AND all of the following criteria are met: a) The application of this exemption to natural discharge areas within a proposed project must not result in more than a 0.4 cfs increase in the existing site conditions I 00-year peak flow rate for any threshold discharge area of the project, AND b) Flow control BM:Ps must be applied to the runoff from new impervious surfaces as specified in Section 5.2.l, AND c) The project improvements within the natural discharge area must not be located within a Landslide Hazard Drainage Area and must not significantly impact a "seYere erosion problem" or "senre flooding problem" (see page 1-21), AND d) . The manner in which runoff is discharged from the project site must not create a significant adYerse impact per Core Requirement #1. 5. · Forested Open Space Exemption for Rural Residential Projects Any natural discharge area within a proposed rural residential project (zoned RA-2.5, RA-5. RA-I 0, or RA-20) is exempt if all of the following criteria are met: a) At least 65% of the unsubmerged portion" of the natural discharge area will be set aside as forested open space as specified in Section 5.2. J, Al'ID b) The runoff from new impervious surfaces within the natural discharge area will be dispersed over native vegetation using the flow control Bll!Ps detailed in Section 5.2.l, AKD c) The manner in which runoff is discharged from the project site will not create a significant adverse impact per Core Requirement #1. 6. Direct Discharge Exemption Any natural disch.arge area within a proposed project is exempt if it drains to one of the "major receiYing waters" listed in Table J .2.3.B, AND meets all of the following criteria for direct discharge34 to that receiving water: a) The flowpath from the project site discharge point to the edge of the I 00-year floodplain of the major receiving water shall be no longer than a quarter mile, except for discharges to Lake Sammamish, Lake Washington, and Puget Sound, AND b) The conveyance system between the project site and the ordinary high water line of the major receiving water shall be comprised of manmade conveyance elements (pipes, ditches, outfall 33 Unsubmerged portion means any portion outside the ordinary high water line of streams, lakes, and wetlands. 34 Direct discharge means undetained discharge from a proposed project to a "major receiving water." 1998 Surface Water Design !-fanu2.l 1-28 .. •• SECTION 1.2 CORE REQUIREME1'TS • Special Requirement #5: Oil Control, Section 1.3.5 (p. 1-62}--This requirement applies special oil controls to those projects proposing to del'elop or redevelop a high-use site. Key Definitions • Pollution-generating impervious surface (PGIS) Definition: Those impervious surfaces considered to be a significant source of pollutants in storm water runoff. Such surfaces include those which are subject to vehicular use" or storage of erodab/e or teachable materials, wastes, or chemicals," and which receive direct rainfall or the run-on or blow-in of rainfall.'' Metal roofs are also considered to be PGIS unless they are treated to prevent leaching. • Pollution-generating pervious surface (PGPS) Definition: Any non-impervious surface with vegetative ground cover subject to use of pesticides and fenilizers. Such surfaces include. but are not limited to, the lawn and landscaped areas of residential or commercial sites, golf courses, parks and spons fields. __,,....-_>.,.._ D EXEMPTIONS FROM CORE REQUIREMENT #8 9/1/98 There are five possible exemptions from the requirement to provide a formal water quality facility per Core Requirement #8: 1. Surface Area Exemption A proposed project or any threshold discharge area within a project is exempt if it meets all of the following criteria: a) Less than 5,000 square feet of new PGIS'' will be added. AND b) Less than 5,000 square feet of contiguous PGJS''. will be created through any combination of new and/or replaced impervious surface as pan of a redevelopment project, AND c) Less than I acre of contiguous PGPS'' will be added and/or modified," OR there is a formal · agreement with King County to implement a landscape management plan53 for the PGPS areas on the site (or a farm management plan in the case of an agricultural land use). 46 A suriace, whether paved or not, shall be considered sutiject to vehicular use if it is regularly used by motor vehicles. The following are considered regularly·us'ed surfaces-. roaCs, unvegetated road shoulders, bike lanes within the traveled lane of a roadway, driveways, parking lots, unfenced firelanes, diesel equipment storage yards, and airport runways. The following are not considered regularly-used surfaces: road shoulders primarily used for emergency parking, pa\led bicycle pathways, bicycle lanes adjacent to unpaved or paved road shoulders primarily used for emergency parking, fenced firelanes, and infrequently used maintenance access roads. 47 Erodable or leachable materials, wastes, or chemicals are those substances which, when exposed to rainfall, measurably alter the physical or chemical characteristics of the rainfall runoff {examples include erodable soil, uncovered process wastes, manure, fertilizers, oily substances, ashes, kiln dust. garbage dumpster leakage, etc.). 48 A covered parking area WOl:Jld be considered pollution-generating if runoff from uphill could regularly run through it, or if rainfall could regularly blow in and wet the pavement surface. The same parking area wou!d not be included if it were enclosed by walls or if a low wall and benn prevented stormwater from being blown in or from running onto the covered area. 49 New PG/5 means new impervious surface {as defined on page 1--4) that is pollution-generating. 5° Contiguous PG!S means a discrete patch of PGIS that is all together as opposed to being separated in different locations on the project site. As used in this and other exemptions, the intent is to apply Core Requirement #8 to those redevelopment projects that are replacing and/or adding enough impervious surface in one location to allow for opportune installation of a water quality facility. 51 Contiguous PGPS means a patch of PGPS that is all together as opp~sed to being separated in different locations on the project site. 52 Modified PGPS means any existing PGPS that is re-graded or re-contoured by the proposed project. 53 Landscape management plan means a King County approved plan for defining the layout and long-term maintenance of landscaping features to minimize the use of pesticides and fertilizers, and to reduce the discharge of suspended solids and other pollutants. Guidelines for preparing landscape management plans can be found in Reference Section 4-A. Submir.al requirements are detailed in Section 2.3.1.4. l 99S Surface Water Design ~1:mull 1-50