Loading...
HomeMy WebLinkAboutMisc• • • City of Renton Planning Division APR 2 8 iUIU St. Thomas Orthodox Church 11651 SE 1881h St. PARCEL NO. 6198400020 Technical Information Report Conditional Use Permit 2 Submitted to: City of Renton Development Services 1055 South Grady Way Renton, WA 98057 Submitted by: Alta Cascade, Inc. 310 North Meridian, Suite 200 Puyallup, WA 98371 4/16/2010 I hereby state that these Drainage Calculations have been prepared by me or under my supervision and meet the standard of care and expertise which is usual and customary in the community for professional engineers. I understand that the City of Renton does not and will not assume liability or the sufficiency, suitability, or performance of drainage facilities prepared by me . St. Thomas Orthodox Church TIR TABLE OF CONTENTS Section Page 1.0 Project Overview ......................................................................................................... 1 2.0 Conditions and Requirements Summary ....................... : .............................................. 3 3.0 Off-site Analysis ........................................................................................................... 5 4.0 Flow Control and Water Quality Facility Analysis and Design ...................................... 6 5.0 Conveyance Systems Analysis and Design ................................................................. 7 6.0 Special Reports and Studies ........................................................................................ 7 7.0 Other Permits .............................................................................................................. 7 8.0 CSWPPP Analysis and Design .................................................................................... 8 9.0 Bond Quantities, Facility Summaries, and Declaration of Covenant. ............................ 9 10.0 Operations and Maintenance Manual .......................................................................... 9 Appendix A General Exhibits Soil Information ............................................................................ A-1 City of Renton Aquifer Protection Map ............................................... A-2 Downstream Analysis ..................................................................... A-3 Flow Control Application Map ........................................................... A-4 Appendix B Drainage Design Pre-developed Sub-basin Map ......................................................... B-1 Developed Sub-basin Map ............................................................... B-2 Appendix C TIR Documents Bond Quantities Worksheet. ............................................................... C-1 Appendix D Erosion and Sediment Control Erosion and Sediment Control Plan ..................................................... D-1 • • • • • • St. Thomas Orthodox Church TIR 1.0 Project Overview '!!"'-:,Alta C'a.:.;cadt ':-;y-------- This report accompanies the Drainage Control Plan for the proposed second Conditional Use Permit project for the St. Thomas Orthodox Church remodel at 11651 SE 188 1h St. The property is located at the southwest intersection of SE 1881h St. and 1181h Ave. SE as shown in Figure 1 below. c;j 'l' ' SE 186TH ST SE 182ND ST SE 186TH PL S£ 188TH ST 5£ 184-TH ST SE f82ND ST ~ ~ ~ ~ ~ BOULfYARD ~ LA!'£ f'A/tK' '--- $£ 187TH PL i:: 5£ ll!!/:!TH PL is PROJECT ,a § SITE ~ " SE 1 H ST ~ SE 192ND ST bi ~ bi ' \(' ~ /! l ' ::, ~ " -'1 ~ 5£ f96TH ST Figure 1 -Site Location ~ "' h V, :::; BOULEVARD LAN£ PARK k ~ Currently the site generally slopes at approximately 1.5% from the southwest to the northeast. The property is bordered on the north by SE 1881h St. and by 1181h Ave. SE on the east. An existing drainage ditch adjacent to each of these roads conveys storm water runoff from both the project site and roadway. The ditch prevents runoff from entering the site from the north or east. The property is bordered on the west and south by neighboring residential properties. The land surface along the property lines is generally flat prohibiting off-site drainage from entering the project site. The soils on the site have been identified as Alderwood gravelly sandy loam (AgB) according to the National Cooperative Soil Survey. The 2009 King County Surface Water Design Manual classifies Alderwood soils as Hydrologic Soil Group C. The soil map can be seen in Appendix A-1. The 1.11 acre (48, 853 ft2) project site consists of a single family residence, an abandoned house, and an existing mechanical shed. The site also includes an asphalt driveway, two gravel driveways, and a private gravel road. The site also contains several concrete surface areas and large gravel surface areas throughout the site. 1 St. Thomas Orthodox Church TIR Stormwater runoff from the pre-developed site flows into the ditch adjacent to the east and north property boundaries. A portion of the runoff is collected by an existing private ditch and conveyed east to the ditch on the west side of 118'" Ave. SE. The ditch flows north along 1181 " Ave. SE to the intersection of SE 188'" St. and 118'" Ave. SE. The storm water then flows west along SE 188'" St. through a series of ditches and culverts along the front of the north property boundary. Runoff from the north portion of the site flows into these ditches. The drainage then flows north through a culvert below SE 188'" St. to the downstream drainage facilities. The pre-developed sub-basin map can be seen in Appendix B-1 . For this property, under an approved Conditional Use Permit, LAU-08-102, a building permit application, B100038, has been submitted to the City. The Building Permit application is for remodeling an existing 2,016 sf shed into a 2,000 sf building to serve as a Church with 19 paved parking spaces. Two existing driveways will be abandoned and replaced with an asphalt driveway, access, and parking area. Additional improvements along the frontage of the property adjacent to SE 188th St are also included per the requirements of the City of Renton. The frontage improvements include additional widening of the asphalt pavement, concrete curb and gutter, an 8 ft planter strip, a 5 ft sidewalk, and one concrete access driveway. The newly paved access and parking areas will be sloped such that stormwater runoff flows northeast. The existing private drainage ditch will be replaced with a new bio-filtration swale, north of the paved turn-around location. This new swale wi_ll collect runoff from the southern half of the project site and convey it east, to the existing ditch adjacent to 118'" Ave. SE, as before. • A second bio-fillration swale will be constructed along the north property boundary to collect runoff • from the north half of the project site. The runoff will then be conveyed east, to the ditch adjacent to SE 188'" St. The developed sub-basin map can be seen in Appendix B-2. The specific areas under consideration for this report, and the second Conditional Use Permit, are the additional areas proposed as part of a second City of Renton Conditional Use Permit for the proposal. This project proposes to add 13 additional Asphalt parking areas, a concrete waiting area, and an additional roof area for the church building expansion (see Developed Sub-basin in Appendix B-2). The areas are detailed below in Table 1. Table 1 -Proposed Areas Area Area Total Total (ft') (acres) (ft') (acres) North Asphalt 558 0.013 Pollution Parking Generating South Asphalt 4,143 0.095 Impervious Parking 3,585 0.082 Surface Concrete Non Waiting Area 1,175 0.027 Pollution 2,543 0.058 Generating Building Roof 1,368 0.031 Total 6,686 0.153 2 • • • • St. Thomas Orthodox Church TIR 2.0 Conditions and Requirements Summary The City of Renton Municipal Code section 4-6-030 requires that permit applications include a drainage plan per 2009 King County Surface Water Design Manual (SWDM) as amended by the City of Renton. The Code also includes special requirements for Aquifer Recharge and Protection Areas. The proposed project site is not located on an Aquifer Protection Area as defined by the City of Renton Aquifer Protection Zones map (see Appendix A-2). As this project qualifies as requiring Full Drainage Review, the proposed project is required to comply with all eight Core Requirements of Section 1.2 and six Special Requirements of Section 1.3 of the SWDM. The eight Core Requirements from Section 1.2 of the SWDM are: • Core Requirement #1: Discharge at Natural Location • Core Requirement #2: Offsite Analysis • Core Requirement #3: Flow Control • Core Requirement #4: Conveyance System • Core Requirement #5: Erosion and Sediment Control • Core Requirement #6: Maintenance and Operations • Core Requirement #7: Financial Guarantees and Liability • Core Requirement #8: Water Quality The six Special Requirements from Section 1.3 of the SWDM are: • Special Requirement #1: Other Adopted Area-Specific Requirements • Special Requirement #2: Flood Hazard Area Delineation • Special Requirement #3: Flood Protection Facilities • Special Requirement #4: Source Control • Special Requirement #5: Oil Control • Special Requirement #6: Aquifer Protection Area The Core Requirements have been addressed with this drainage plan as follows. Core Requirement #1: Discharge at Natural Location Stormwater runoff from the project site currently flows into drainage ditch along the east and north edges of the property. The proposed drainage plan will discharge runoff to the same ditch at roughly the same locations. Drainage from the southern half of the project site will continue to be discharged to the east ditch while drainage from the northern half of the property will be conveyed to the north ditch. The natural discharge locations will be maintained by the proposed stormwater management plan. Core Requirement #2: Offsite Analysis A Level 1 Downstream Analysis was completed by Thomas Mudayankavil on August 20, 2008. The analysis was prepared in accordance with Core Requirement #2 of the 2005 King County Surface Water Design Manual. The analysis did not find any evidence of existing or potential problems 3 St. Thomas Orthodox Church TIR related to the existing or proposed site. A copy of the Downstream Analysis has been included for reference in Appendix C. Core Requirement #3: Flow Control The project site is located in the Forested Conditions Flow Control Duration Standard area per the City of Renton's adopted Flow Control Standards Map. Per section 1.2.3.1 of the SWDM, flow control duration standard areas are exempt from flow control for any threshold discharge area in which there is no more than a 0.1 cfs difference in the sum of developed 100-yr peak flow and the sum of forested site condition 100-yr peak flows for the same surface areas. The pre-developed, forested 100-yr peak flow is approximately 0.012 els. The developed 100-re peak flow for the target area is 0.072 cfs. The change in 100-yr peak flow for the proposed areas will not exceed the 0.1 cfs threshold. Therefore these areas are exempt from flow control. Core Requirement #4: Conveyance System This proposed project will include extension of paved surface and roof surface to the already proposed surfaces on-site. The paved surfaces will continue to flow to the proposed bio-swales and beyond to the existing adjacent ditches. There are no additional conveyance systems necessary for this proposed surface. The additional roof surface for the church building expansion will be collected and conveyed via traditional gutter and downspout connections to the existing ditch east of the building. Core Requirement #5: Erosion and Sediment Control Erosion and sediment control requirements will be met for this project as detailed below in Section 8. The plan includes the delineation of clearing limits via flagging. The plan also includes instruction regarding proper cover measures for the protection of disturbed areas. Perimeter protection will be maintained via silt fencing installed around the perimeter of the site. A stabilized construction entrance will be provided to prevent the transport of sediment to offsite roadway surfaces. The Erosion and Sediment Control Plan has been included as part of the original conditional use permit construction plans on sheet C-2. The plan can be seen in Appendix D. Core Requirement #6: Maintenance and Operations A Maintenance and Operations Manual is not required as there are no additional drainage facilities proposed in conjunction with this project. Core Requirement #7: Financial Guarantees and Liability A bond quantities worksheet has been provided for this project and can be seen in Appendix C-1. The applicant will provide construction bonds and obtain liability insurance as necessary prior to construction. Core Requirement #8: Water Quality Per section 1.2.8 of the SWDM, projects are exempt from water quality requirements if less than 5,000 sf of new pollution generating impervious surface is proposed. .4 • • • • • • St. Thomas Orthodox Church TIR The Special Requirements have been addressed with this drainage plan as follows. Special Requirement #1: Other Adopted Area-Specific Requirements No other area-specific adopted requirements have been identified at this time. Any additional area- specific requirements will be addressed when applicable. Special Requirement #2: Flood Hazard Area Delineation The project site does not contain, nor is it adjacent to a flood hazard area. This requirement is not applicable. Special Requirement #3: Flood Protection Facilities The proposed project does not propose to rely on flood protection facilities. This requirement does not apply. Special Requirement #4: Source Control The proposed business will be a place of worship and will not include storage or transfer of hazardous materials, manufacturing, washing, production, or vehicle repair. The only source control activity in the 2009 King County Stormwater Prevention Manual (SWPM) that is applicable to the site is activity A-1, Required BMPs for all Commercial Properties . These requirements include maintenance of storm drainage systems, the elimination of illicit storm drainage connections, and storm drains identification. The proposed project will implement these source control requirements. Special Requirement #5: Oil Control The proposed project will not be considered to be a high-use site. Oil control requirements are not applicable to this site. Special Requirement #6: Aquifer Protection Area The project site does not lie within the City of Renton identified aquifer protection area. This requirement does not apply. 3.0 Off-site Analysis A Level 1 Downstream Analysis was completed by Thomas Mudayankavil on August 20, 2008. The analysis was prepared in accordance with Core Requirement #2 of the 2005 King County Surface Water Design Manual. The analysis did not find any evidence of existing or potential problems related to the existing or proposed site. A copy of the Downstream Analysis has been included for reference in Appendix C . 5 St. Thomas Orthodox Church TIR ~~·Alta C'a.c; ca cl e; 4.0 Flow Control and Water Quality Facility Analysis and Design The peak flowrates for the pre-developed and proposed project were estimated using the King County Runoff Time Series Program (KCRTS) using the following assumptions: Pre-Developed The project site lies within the City of Renton area-specific flow control duration standard matching forested conditions. The site areas under consideration for this report can be seen on the Pre- Developed Sub-basin Map included in Appendix B-1. Project Location: Sea-Tac Scale Factor: 1 Land Use Type: Till Forest Area: 0.153 acres The peak flowrates from the KCRTS for the pre-developed site are shown below in Figure 2: Flow Frequency Analysis ------------------~------------------------------------ Time Series File:pre-dev c.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates-~ -----Flow Frequency Analysis------- Flow Rate Rank Time of Peak --Peaks --Rank Return (CFS) (CFS) Period 0.010 2 2/09/01 18:00 0.012 1 100.00 0.003 7 l/OS/02 16:00 0.010 2 0.007 4 2/28/03 3:00 0.007 3 0.000 8 12/23/03 2:00 0.007 4 0.004 6 l/05/05 8:00 0.006 5 0.007 3 l/18/06 20:00 0.004 6 0.006 5 11/24/06 6:00 0.003 7 0.012 1 l/09/08 9:00 0.000 8 Computed Peaks 0. 011 Figure 2 -Pre-Developed Peak Flowrates (KCRTS) The 100-yr peak flowrate for the pre-developed area is 0.012 els. Developed Project Location: Sea-Tac Scale Factor: 1 Land Use Type: Impervious Area: 0.153 acres 25.00 10. 00 5.00 3.00 2.00 1. 30 1.10 50.00 The peak flowrates from the KCRTS for the developed site are shown below in Figure 3: 6 Prob 0.990 0. 960 0.900 0.800 0.667 0.500 0.231 0. 091 0.980 • • • • • • St. Thomas Orthodox Church TIR Flow Frequency Analysis Time Series File:dev c.tsf Project location:Sea-Tac ---Annual Peak Flow Rates--------Flow Frequency Analysis------- Flow Rate Rank Time of Peak -Peaks Rank Return Prob (CFS) (CFS) Period 0.037 7 2/09/01 2 :00 0.072 1 100.00 0. 990 0.033 8 l/05/02 16: 00 0.056 2 25.00 0 . 960 0.045 4 12/08/02 18 :00 0.045 3 10.00 0 .900 0.038 6 8/26/04 2 :00 0.045 4 5.00 0 .800 0.045 3 10/28/04 16: 00 0 .040 5 3.00 0.667 0.040 5 l/18/06 16 :00 0 .038 6 2.00 0.500 0.056 2 10/26/06 0 :00 0 . 037 7 1.30 0.231 0.072 1 l/09/08 6 :00 0 . 033 8 1.10 0.091 Computed Peaks 0 .067 50.00 0.980 Figure 3 -Developed Peak Flowrates (KCRTS) The 100-yr peak flowrate for the developed site is 0.072 els. Section 1.2.3.1 of the SWDM specifies that a project is exempt from flow control if the 100-yr peak flowrate for the developed site does not exceed more than 0.1 els from the pre-developed site. The 100-yr peak flowrate increase will be 0.06 cfs. Per the calculations above, this project is exempt from flow control. Water Quality Per section 1.2.8 of the SWDM, projects are exempt from water quality requirements if less than 5,000 sf of new pollution generating impervious surface is proposed. No water quality facilities are required or proposed. 5.0 Conveyance Systems Analysis and Design This proposed project will include extension of paved surface and roof surface to the already proposed surfaces on-site. The paved surfaces will continue to flow to the proposed bio-swales and beyond to the existing adjacent ditches. There are no additional conveyance systems necessary for this proposed surface. The additional roof surface for the church building expansion will be collected and conveyed via traditional gutter and downspout connections to the existing ditch east of the building. 6.0 Special Reports and Studies No additional special reports or studies have been required in conjunction with this proposed project. 7.0 Other Permits There will be an associated building permit required for the church building expansion. There are no additional required permits identified at this time. Additional permits will be obtained as necessary when required in conjunction with this proposed project. 7 St. Thomas Orthodox Church TIR 8.0 CSWPPP Analysis and Design ~\~Alta C'2r;c21clr:: . /, --------.. ,::;..; As required for Core Requirement #5, an erosion and sediment control plan has been provided in conjunction with the construction activities for this project to prevent the transport of sediment from the project site to downstream facilities, water resources, and adjacent properties. Due to the flat nature of the project site, no areas with high susceptibility to erosion have been identified. Erosion and sediment control measures are proposed An Erosion and Sediment Control plan has been included as part of the construction plans on sheet C-2. The erosion control plan can be seen in Appendix D-1. The ESC Measures as identified in 1.2.5.1 of the SWDM have been addressed as follows: Clearing Limits Clearing limits have been identified and depicted on the erosion and sediment control plan. The plan requires that the clearing limits shown on the plan shall be clearly flagged in the field prior to construction. No disturbance beyond the flagged clearing limits shall be permitted. Cover Measures The ESC plan requires cover measures for areas of striped vegetation that are anticipated to remain unworked for a period of two days. Additionally, the plan requires cover measures for any disturbed areas that remain unworked for more than two days during the rainy season. Perimeter Protection Perimeter protection measures will be provided through the installation of silt fencing around the perimeter of the project site. The plan also requires that silt fencing be inspected immediately after each rainfall and daily during prolonged rainfall. The plan also requires that any required repairs to the silt fencing be made immediately. Traffic Area Stabilization Stabilized construction entrances will be provided to prevent the transport of sediment to elf-site road ways. Sediment Retention It is not anticipated that a sediment trap is required for this project. Per Section 5.4.6 the 1990 King County Surface Water Design Manual (SWDM), perimeter protection is sufficient as the sole form of treatment for sites with small drainage areas. The site is nearly flat, has no flowpath greater than 150 ft, and will result in little to no runoff. Perimeter protection will be sufficient. Surface Water Controls Surface water controls are not anticipated to be necessary for this project site. The project area is small enough that perimeter protection should be sufficient. As an additional protection measure, the plan included inlet protection for downstream catchbasins to additionally prevent sediment from entering the public storm drainage system as necessary. 8 • • • • • • St. Thomas Orthodox Church TIR Dust Control ~/\~·Alta C'2r;c2idr:: '"b------- There are no anticipated traffic hazards expected to result from wind transport of soil. Preventative measures will be implemented through watering practices should the need arise. 9.0 Bond Quantities, Facility Summaries, and Declaration of Covenant A bond quantities worksheet has been provided for this project and can be seen in Appendix C-1. There are no storm drainage facilities proposed for this project. 10.0 Operations and Maintenance Manual A Maintenance and Operations Manual is not required as there are no additional drainage facilities proposed in conjunction with this project. 9 St. Thomas Orthodox Church TIR ~};-Alta C'a.'Jcacle ' './ Appendix A -General Exhibits Soil Information City of Renton Aquifer Protection Map Downstream Analysis Flow Control Application Map A-1 A-2 A-3 A-4 • • • • • • St. Thomas Orthodox Church TIR ~J2·Alta A-1 Soil Information 47° 26' 2· 4/" LS' S9'' " -~ 561490 0 ~ ~ ~ ~ ~ 0 N ~ m ~ ~ 2 ~ 0 0 ~ ~ 0 . [ ~ ~ m ~ ~ ~ ~ 0 ~ ~ N ~ 0 ~ fil ~ t2 ~ ; ~ 561500 Soil Map-King County Area, Washington (11651188th Ave. SE) 561510 561520 561530 561540 ~~op Scc1le. 1.577 it wi11ted on A c,i,::e (8.5" x 11") sheet N A 0 5 0 20 lJSDA Natural Resources =-----= Conservation Service 10 21] 40 Meters 30 Feet 120 Web Soil Survey National Cooperative Sari Survey 561550 561560 561570 b 1114/2010 Page 1 of 3 47' 26' 2" • • 47' 25' 53" • • USDA • Soil Ma~ing County Area, Washington (11651 188th Ave. SE) MAP LEGEND Araa of Interest (AOI) D Area of Interest (AOl) Soils LJ Soil Map Units Special Point Features (!) Blowout ll!I Borrow Pit * Clay Spot • Closed Depression X Gravel Pit Gravelly Spot <Ill landfill A. Lava Flow ..i. Marsh or swamp " Mine or Quarry @ Miscellaneous Waler ® Perennial water V Rock Outcrop + Saline Spot Sandy Spot -=-Severely Eroded Spot ~ Sinkhole l> Slide or SJip 16 Sadie Spot = Spoil Area l) Stony Spot Natural Resources Conservation Service a) Very Stony Spot ' Wet Spot .. other Special Line Features ''" Gully Short Steep Slope ~-Other Political Features • Cities Water Features f!!!l Oceans --Streams and Canals Transportation +++ - ,/'-/ - Ralls Interstate Highways us Routes Major Roads Local Roads Web Soil Survey National Cooperative Soil Survey MAP INFORMATION Map Scale: 1 :577 if printed on A size (8.5'' x 11") sheet. The soil surveys that comprise your AOI were mapped at 1 :24,000. Please rely on the bar scale on each map sheet for accurate map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: UTM Zone 10N NAD83 This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Su,vey Area Data: King County Area, Washington Version 6, Sep 22, 2009 Date(s) aerial images were photographed: 7/24/2006 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. • 1/1412010 Page 2 of 3 Soil Map-King County Area, Washington Map Unit Legend Map Unit Symbol AgB Totals for Area of Interest Natural Resources Conservation Service King County Area, Washington (WA633) Map Unit Name Acres inAOI Alderwood gravelly sandy loam, Oto 6 percent slopes --------- Web Soil Survey National Cooperative Soil Survey 1.4 1.4 11651188thAve. SE Percent of AOI 100.0% 100.0% 1/1412010 Page 3 of 3 • • • • • • St. Thomas Orthodox Church TIR ,tl,}J; Alta A-2 City of Renton Aquifer Protection Map \:\\;>f AQUIFER PROTECTION ZONES Raiton Muridpal Coda [~Zone1 ~ Zone 1 Mcdlled __ , ---Cilv LmH, \~;-: • • • • • • St. Thomas Orthodox Church TIR A-3 Downstream Analysis LEVEL 1 DOWNSTREAM ANALYSIS Prepared for: St. Thomas Orthodox Church, Seattle 11651 SE 188'h St. Renton, WA 98058 Prepared by Thomas Mudayankavil, P.E. 20207 25th Dr SE Bothell, WA 98012 August 20, 2008 I EXPIRES 10/0:a/oa • • • • • • St. Thomas Orthodox Church, Seattle LEVEL 1 DOWNSTREAM ANALYSIS TABLE OF CONTENTS I. INTRODUCTION I II. PROJECT OVERVIEW AND STUDY AREA DEFINITION I III. REVIEW OF AV AII.ABLE INFORMATION ON STUDY AREA 2 IV. FIELD INSPECTION & DESCRIPTION OF DRAINAGE SYSTEM 3 A. UPSTREAM DRAINAGE ANALYSIS B. ON-SITE DRAINAGE CONSIDERATIONS C. DOWNSTREAM DRAINAGE ANALYSIS V. CONCLUSION 5 LIST OF FIGURES FIGURE I -VICINITY MAP FIGURE 2 -SITE MAP FIGURE 3 -TOPOGRAPHIC MAP FIGURE 4 -SOILS MAP FIGURE 5 -DOWNSTREAM ANALYSIS MAP FIGURE 6 -STREAMS MAP FIGURE 7 -EROSION HAZARD AREAS MAP FIGURE 8 -LANDSLIDE HAZARD AREAS MAP FIGURE 9 -100 YEAR FLOOD PLAIN & WETLAND MAP FIGURE 10 -SEISMIC HAZARD AREAS MAP APPENDIX A 1. Off site Analysis Drainage System Table 2. K.C. Flow Control Application Map 3. King County Drainage Complaints INTRODUCTION This report was prepared at the request of St. Thomas Orthodox Church in sup~ort for their CUP application to remodel the existing shed located 11651 SE 188 h Street, Renton, King County to be used as a worship place. This Level 1 Drainage Analysis was prepared in accordance with Core Requirement #2 of the 2005 King County Surface Water Design Manual. PROJECT OVERVIEW AND STUDY AREA DEFINITION • The property is located near the intersection of 1881h street and 118th Avenue SE on the west side of 118th Avenue SE in King County and situated within the Soos Creek River Basin, a sub-basin of Soos Creek. The total site of 1.1 acres consists of a single family residence, a guest house and a mechanical shed. The project is to remodel the existing Mechanical Shed to be used as a Church with a sealing capacity for 70 people and to expand the existing parking area to have a total of 19 parking stalls including 1 ADA parking. The church will conduct Sunday services and occasional Saturday evening services or church activities at this site for the Indian Orthodox Christian community in and around Renton. Currently, the church has 20 family memberships and serving a total of about 50 people. • The proposed site is a 1.1 acre parcel located in Renton. THE EAST HALF OF TRACT 1 IN BLOCK 1 OF NORTHWESTERN GARDEN TRACTS, DIVISION NO. 4, AS PER PLAT RECORDED IN VOLUME 47 OF PLATS, PAGE 74, RECORDS OF KING COUNTY AUDITOR; SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON. The site is zoned R-4. (Figure 1: Vicinity Map, Figure 2: Site Location) Existing Site conditions: The site generally slopes from west to east with slopes from 1 to 2 percent. Along both the west and south sides of the site, the topography is parallel with the site which eliminates any off-site water from the west or south from entering the site. (Figure 3: Topographic map) A level 1 drainage analysis was performed for the site to determine any pre- existing drainage problems downstream. The onsite soils have been identified as Alderwood gravelly sandy loam(AgB, according to SGS soil survey for King County, which is Type "C" in SGS hydrologic soil groups. The offsite soil has been identified as Alderwood gravelly sandy loam (AgC). (Figure 4; Soils Map) LEVEL l DOWNSTREAM ANALYSIS l • • • • REVIEW OF AVAILABLE INFORMATION ON STUDY AREA The following is a description of the resources that were reviewed for the preparation of this Level 1 Drainage study: A. Basin Recognizance summary reports: Enclosed within are downstream and upstream basin area map which clearly define the flow pass and the drainage basins related to this project: See (Figure 5: "Downstream Analysis Map") a. Evidence of Existing and Predicted Problems Lack of capacity of constrictions in the existing drainage system On site: No evidence of any problem Off site: Ditch sections: None noted Channel section: None noted 12 inch culverts: 3 24 inch culvert: None b. Overlapping, Scouring, Bank, Sloughing of Sedimentation On site: No evidence of any problem Off site: -Ditch sections: None noted Channel section: None noted 12 inch culverts: 3 24 inch culvert: None c. Flooding, etc. None noted d. Significant Destruction of Aquatic Habitat or Organisms None noted B. Adopted Basin Plans: Soos Creek Basin Plan sub-basin of the Soos Creek (See appendix A: "K.C. Flow Control Application Map) C. Critical Drainage Map : The site is located with-in a "Level 1 Flow Control Area" as indicated by the King County Drainage Manual. (See Appendix A: "K.C. Flow Control Application Map) D. Floodplain/ Floodway (FEMA maps): The project is not located within a floodplain of a stream as determined by the FEMA maps. E. Other off -site analysis reports: None noted F. Sensitive Area: Each one of the sensitive area folio associated with this area was reviewed . LEVEL 1 DOWNSTREAM ANALYSIS 2 Sensitive Areas Folio (See figures 6-9) Wetlands Property: Property not affected 100-Year floodplain and streams: Property not affected Erosion Hazard Areas: Property not affected Landslide Hazard Areas: Property not affected Seismic Hazard Areas: Property not affected G. SWM Division Drainage Investigation Problem Records: An investigation in to King County SWM records shows that there appear to be no applicable drainage problems within 1/.i mile downstream of the site. Of the 59 complaints listed within one mile of the site, none of them were within the downstream area of the site. Most of these complaints dealt with issues other than flooding or capacity problems. See Appendix A: KC Drainage investigation Problems. H. Soils Survey: Attached with this report is a soils exhibit map for the subject area. The on site soils has been identified as Alderwood gravelly sandy loam (Figure 4: Soils Map) I. Wetlands Inventory Maps: There are no wetlands on or near this site J. Road Drainage Problems: A check with the maintenance department showed no drainage problems along 188th Street. K. Migrating river studies: There are no rivers or streams near this site. L. Downstream Table: See Appendix A: "Downstream Table" for drainage components table. FIELD INSPECTION AND DESCRIPTION OF DRAINAGE SYSTEM WITH EXISTING AND PREDICTED PROBLEMS Included in the report is a narrative of the field inspection. The level 1 analysis and the filed inspection of the property and the surrounding area were pertormed on July 15th 2008. Weather at the time of inspection was sunny. The total distance covered was about 3/4 mile downstream. (Refer to Figure 5 Downstream Analysis Map) A. UPSTREAM DRAINAGE ANALYSIS A review of the site showed that there is no off site runoff flowing onto the site. Along SE 188th Street and 118th Ave SE, access road has V-ditch with driveway culverts to intercept the runoff from the adjacent properties. The new development on the south side of the property has a drainage system to collect the runoff. B. ON-SITE DRAINAGE CONSIDERATIONS The property is mostly flat, but a slight slope can be noticed to the north east side of the property. One drainage system a V-Ditch on the property leaves the site to LEVEL 1 DOWNSTREAM ANALYSIS 3 • • • • • • the V-Ditch along the east side of the access road. The existing vegetation is mostly grass lawn and landscaping with small trees. 3 cedar trees are along the east side of the boundary line. There is no wetland in the area. C. DOWNSTREAM DRAINAGE ANALYSIS 1. Grass lined V-Ditch & Culverts Drainage leaves the site by a V-ditch and enters the V-ditch along the east side of the access road (1181h Ave SE) via a 12" culvert. So the natural point of discharge for the site is the lower SE side of the property. The drainage flows north along this V-ditch about 60 fl and joins the V-ditch along the south side of the SE188th st. It flows another 120 fl and cross the street via 12" diameter culvert and joins the seasonal stream. The ditch sections are vegetated and show no sign of problem, overtopping, capacity, erosion or scouring along this section. 2. The seasonal stream The seasonal stream runs from the north side of the SE 188th street and follows the property lines of a number of parcels and finally joins Soos Creek. 3. Soos Creek The seasonal stream discharges in to the Soos Creek. The creek is deep and wide with flat bottom with side slopes. II is heavily vegetated with slopes of approximately 1 % and flows south-east through heavy residential areas. The Soos Creek appeared to have adequate capacity. There was no indication of problems including overtopping, capacity, erosion or scouring along this section . LEVEL I DOWNSTREAM ANALYSIS 4 CONCLUSION The total distance covered was about a mile in the upstream and downstream analysis. This Level 1 analysis indicates that there appears to be no drainage problems downstream. The proposed internal modification of the shed is not adding any new impervious area and will have no impact on downstream conditions. The 0.15 acre of graveled parking surface is less than 10% of the total drainage area of 400 acres. The existing V-ditch along the side of the property can serve as the Level 1 flow control and will mitigate any impact the proposed development may have on off- site runoff. LEVEL 1 DOWNSTREAM ANALYSIS 5 • • • Z• • • • .... ,,. PATID EXISTING GUESTHOUSE l<--X f ®Ii SE 188TH ST .... i~ ii gf iii ~ i= ti~ lEX!STING CM!'ORT - EXlSTING SEPTIC SYTEH AND DRAINAGE FIELD EXlSTlt-16 3•BEDRO!JM HCJUS.£ L __ ~lSTING PATIO DITCH ® f'UM:RIED EXISTING DRIVEV.1''1' EN "'"""""' """'°' 1---... LAWN ,._ ..... ......_ ---16-4,8' \ .... i'i a I m ~ ! ! L.,J V) L.,J > <t: I I EIDPS L elW'.YIAIIllG 12 EXISTING LIGIT Pt1.E + EXISTING FIRE HYDRANT o EXISTING PD'IJ[R' PILE _,._.._ f'ENCC ------PAtPDIT'I' LINE ..nt WATER METER GM GAS METER EN D.ECTRICAL METER ... IWH1.E @ JJMINi'IGE SYMD. ... "' 5il :c"' :.l .. ~ .. "'z s~ o.., Oa,: ~,-: ocn ~~ "' a, o_ i=.., • en ..... .,,_ "' ... :: " WJ •. J ii i I I ~L i L z j D.. L,J !::: V) ~s ;i UL Map Output Page I of I ® King County • iMAP . 5H1!80012tJ . a 61 rn8tl02S'4' · -, · . _ _ · trnnsoo::100·-· ' ·411, -L· -. County Boundar~ ·-Contuur.. [5ft tigtit) 100;5;0,hXlO °"" Highways ,, Atnol.lftural f::lroduci-JCn Ontlitt Boundal')' ;v lncoiporatad Ara.a Streets /';;' ,t "'1-lft' ......... """ D Lalas and La,ge Rhtet'I /'/ S119a,,_ Parcels. D Pa.ts Unstc:mporatad KC L:ming A'Kl ~·.G"ll!·DtJ:is-10 ~ ~ A,,.M ~C!Ar ... tn!Oll!B'.15 -m • F far-mt liE1 .. ....... AA 2S R,...a N•. -o..i pw 5 ~ RA-'5 · f:t11•N•. c.'IIOIJ per 5:Q D RA 10 Ro;nr Nozi. am OU ?CS' 10 ' ~ oR u,~f;ieier .... aeou:ws '' ,s1ggoo(J,25 ~ ~ad/ I County. Date: 2-26-2007 FIGURE3 TOPOGRAPHIC MAP . • http://www5.metrokc.gov/ servlet/com.esri.esrimap .Esrimap ?ServiceName=overview &Client V ersion=4.0... 2/26/2007 dVW S'lIOS • • • • • • Ji/' ~i «I ii :iJ 11 u Jl ,,' !/ .m.:n11STCT' fi + /•' County Sounda,y COtllour& (100ft light) .a Oralnag,e Studle" Highways JV Jncorporatad Area 8: •• iMAP Renton UB 8E! 1MTH sr IIJ 0 A I Lagend Streets ;{);.i! -~ -UICOI D Lake11 and Large Rivers ,N'' Stream" SC t,!lJ~T ~T r \ \ ,(r'---- 1 f/ ( '~ a,, ... ...,.., ... ,, ~ ( ,_ 758ft FIGURES DOWNSTREAM MAP Map Output Page I of I / I (Cl 20D51Cilli,CNnly ( -. ·- Counly-,y /V Legend l·ncorporatad Area ,N Str1111ms X Mountain Peaka SW•ta P11n.el~ -(511 dafk) ,if/i -/V 100:!NID:toDO ........ ,N -...... Hlllh-Y• D Late• and Lafgll Rivets The informafiori if"lciucled o·r1 thfs map h8s-b8erl COnipi18a by'-kliiQ COUnty 'staff ri-ofll-8 VSnety··ot· soui-c:es and· i8 Sllbjed ·to ·change·witho-ut" notice. King i:oUiity makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness. or rights to the use of such information. King County shall not be liable for any general, special, iildirect, incidental, or consequential damages including, but not limited to, k>st revenues or lost profits resulting from the use or misuse of the information contained on this map. Any sale of this map or information on this map Is prohibited except by written permission of King County. Date: 3-26~2007 So':'rce: King __ Co~-"~ty __ ~~~p ~!~P~.rty lnfonnation (http;//www.melrokc.gov/GIS/iMAP) FIGURE6 STREAMS MAP http://www5.metrokc.gov/servlet/com.esri.esrimap.Esrimap?ServiceName=overview&ClientVersion... 3/26/2007 • • • Map Output Page I of I • tQ KingCow1ty • • ,,, ./ -, County lloundary ~ Lesenct ,_ -SAO Ermlon Highway• {f"~ -;,./ lnc«?O'atl!d Aru .__ Stnl•la D Lak•• affel Urga RI.vans (oonl) The infoniiatiOO inC1u·d8d on thiS map ha"s" bB8n-COniPlieci bY-KillQ CoUrity staff tram a vari8ty Of s-oorces-arufli SUbject to change withOUi notiCe. -Kiri·g· COunty makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. King County shall not be liable for any general, special, indirect, incidental, or consequential damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map. Any sale of this map or information on this map is prohibited except by written pennission of King County, Date: 3-13-2007 . Source: K!n? ~~f!o/_~~~_P_-~:~-~-~ve A~_s _(~~~~:~"!~~?~~·~~~/~IS/i~P). FIGURE? EROSION HAZARD AREAS MAP http ://www5 .metrokc. gov/serv let/com.esri.esrimap .Esrimap?ServiceName=overview &Client Version,.. 3/13/2007 Map Output Page 1 of 1 U1 KingCo..my ~ IAgand -. Countyllaundary -~ SAO LandoUdo ·-Highway• (? ...... -.# lncorporat.d Ania ..... an ... D Lak•s •nd Larga RIV&ni {cont) Toe irlfurmation -iriduded orl-thlS map· haS beei, oom·pi1ed bY'Kii,g ·eolinty Staff fl"Offi a variety O'i SOUrces arid iS sllbfect to ·charige WithOUf n'Oiice. -K1iig Courity makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights lo the use of such infom,ation. King: County shall not be liable for any general, special, indirect, incidental, or consequential damages including, but not limited to, lost revenues or lost profits resulting from the use or misuse of the information contained on this map. Any sale of this map or information on this map is prohibited except by written permission of King County. Date: 3-13-2007 So~~ce_:_ ~ng Cou_n.!_Y iM~P-~_~nsitii.ie Areas (htt~Jfwww.metrokc.gov/GJS/iMAPl FIGURES LANDSLIDE HAZARD AREAS MAP http://www5.metrokc.gov/serv let/ com.esri.esrimap.Esrimap ?ServiceN ame=overview &Client Version... 3/13/2007 • • • • Map Output Page I of I i...g.nd -I County-,y SAOStnlam ,,..,, Stream• ,_ Highway• ~ a-, Cl 100 Yaar FJood:plaln /V Jncorporatld Ma c ... 2...__ m SAO Wo~•l'KI Sino"'" /V Clla2Mmetnoid ~ -,to/ -· ~>":--u-._ D Lak•• and Larg11 Rlv•ra The infomiatiOn includE!d on· this maP h-as tieE!n 001Tlpiied bY Kf ng COUrity· Staff froni a V8riety of sources· i:il1d is subje"ct tO change without notice. King COUilty makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. King County shall not be liable for any general, special, indirect, incidental, or consequential damages including, but not limited to, lost revenues or lost profits resulting from the usa or misuse of the information contained on this map. Any sale of this map or information on this map is prohibited except by written permission of King County. Date: 3-13-2007 Source: Ki~~.?~-~~~ iMAP-Sensitive A~eas (http://www.metr?kc.gov/G1S/iMAP~ _ FIGURE9 100 YEA T FLOOD PLAIN & WETLAND MAP http://www5.metrokc.gov/serv let/com, esrLesrimap .Esrimap ?ServiceN ame=overview &Client Version,., 3/13/2007 Map Output Ii King County -I County Boundary ·-Hlgtw,aya ,II/ lnc"'l*lllld Ant• s'""'ta (cont) ;,/. ·-_..;~-t Alla-. ...... 0 Lakes and L.Mga River. ~ SAO 8•i•mic Pagel of l i I 1/ Lake Youngs The 1nfOrTnatiOfl inC1Uded ·on thiS map ·h·as·beeri Compiied by "Kfriii coUnty··statt frOITI a v8ricity Gt-sources 8rid i$ SubiElci to·change Ylithoi.it ·notice. Kfng Count"y· makes M representations or warranties. express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. King County . shall not be liable for any general, special, indirect, incidental, or consequential damages including, but not limited to, lost revenues or Jost profits resulting from the use or misuse of the Information contained on this map. Any sale of this map or information on this map is prohibited except by written permission of King County. Date: 3-13-2007 . 8.9~-~!:_ King_ ~.?'-~~!Y_, i~! ~-~-ensiJ~~e .Ar:~~---('2_~~~~--~_!!~~c.g~v~~~/.i~). FIGURE 10 SEISMIC HAZARD AREAS MAP http://www5.metrokc.gov/servlet/com.esri.esrimap.Esrimap?ServiceName=overview&ClientVersion... 3/13/2007 • • • • APPENDIX A • • A Sheet Flow B V-DITCH C V-DITCH D 12" CMP E V-DITCH F 12' CMP G 12" CMP H I Seasonal stream lsoos Creek • TABLE 1 DOWNSTREAM TABLE SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2 DOWNSTREAM PATH Lawn, Gravel < 1% O' None observed None Anticipated On Site Ditch -2% O' None Observed None Anticipated Along Access Road 118th Ave SE -2% 0-120' None Observed None Anticipated Along Access Road 118th Ave SE -2% -120' None Observed None Anticipated Along SE 188th St -2% 120-200' None Observed None Anticipated Drainage Pipe across Drive way -2% -170' None Observed None Anticioated Drainage Pipe across Se 188th St -2% 200'-230' None Observed None Anticipated None -Refer to Site Plan, Figure 2 None • Refer to Site Plan, Figure 2 None -Refer to Site Plan, Figure 2 None -Refer to S~e Plan, Figure 2 None -Refer to Site Plan, Figure 2 None -Refer to Site Plan, Figure 2 None -Refer to Site Plan, Figure 2 None -Refer to Downstream Map, Figure 5. It did not appear to be any Seasonal stream with vegetation 7-15% 230'-3000' None Observed None Anticipated I obstruction or history of erosion Stream discharges to the creek NA :.3000· None Observed None Anticip_ated • • • • • Ba,in Boundary Ith ~ko,r !ine dc,1gnate, oreas wi•h publi~hed Bo;,,, Pkm;) Urban Growth Area Boundary [ _._ lrcorporaled Area lf-4',\~..f'·-Forest Production Zone Area @King County Department af Natural Resources and PMk~ Water and Land Rasour,;;eS Division Kin3 County Flow Control Applications Map f'-_ -. . B<uic Flow Contrc>I An:o5 -Con$er'V(lnon Flow Control A.-.05 -Flood Problom Flow Contrgl Arco, IAlle, ~nt~. lol4 oos;,~, Mf>toc .r,lo. and Pao1h~· la\ol A" ;n!orncrlvo votl;M o! th,1 "00 "a,a,~,h:o on 1h, 51or.-.wo1er /J.np S•I, K,ng Co",t, ,Mop ~I hHp·//www ,,wol.c ,·o~/gi,/mappon'al/,1,•,A,0_,..,,.,;~ .\,a, Mojor 11:ei:ci..-ing Won!~ SAe Con:, Reci~•rerr;,~! NumbHr 3 Dira,1 D"chor90 Cri•orio I Co;o< II•" :I So"'"'"'""!!"" J ""''"'"""'"'~' ~SocthFd,Sk,,._;,t,,,,,.- 5 "01•Q,,. ~ r~-aJDuwomi,O R,..,. b.b. RM O o.d ulx.•• SR l ! 'Sn"'1·>0'r"•l:vo, ,d,d••"'"""--.. n,.JM,::ldl1 II\.••'"°""" ~ la" Wc,l,;,...,o I~ I.mo Somm,~,,h .,. ".~··· r< w,,-. ., ""'" _.,..«._· ling £111nty Watar 11111 LIIII RmrcBl llvlllllll -DralDBIB Slll'Vla8B Sllctlln • Printed: 08/15/200812:37:10 PM llnD' Typa Typa Bf,,... ... Bf Prablall cai.ts Tbrall'lga 1975-0076 C FLOG RD WY /FLD'D/112TH AVE SE/SE 186TH 686E2 1979-0047 C 11403 SE 204TH ST SOIL BULLDOZED/PANTHER LK AREA 686E2 1986-1166 C FLOG 11202 SE 186TH ST STORM OVERFLOW 686E2 1986-1185 C FLOG 11202 SE 186TH ST SEE: 86-1166 BRYANT, BILL 686E2 1986-1190 C FLOG 11001 SE 186TH ST BASEMENT GETTING WATER 686E2 1987-0334 C DANG 11202 SE 186TH ST CULVERTS BLOCKED 86-1166, 1185 686E2 1987-0471 C FLOG 11202 SE 186TH ST SPRING GLEN 86-1166,1185 686E2 1987-0545 C DANG 18627 109TH AVE SE INADEQUATE SYSTEM 686E2 1989-0650 C DANG 18631 111TH PL SE SN/ DANG AND DAMAGE 686E2 1989-0700 X DANG 18631 111THPL SE WATER ON SIDEWALK/89-0650 FRITON 686E2 1990-0075 C DANG 11254 SE 186TH ST PLUGGED CULVERT/STORM 686E2 1990-0141 C FLOG 18400 112TH AVE SE POND OVERFLOW/90-686E2 1990-0149 C FLOG 11202 SE 186TH ST RID POND OVERFLOW/ROBERT/ STORM 686E2 1990-0231 C DANG 18425 112TH AVE SE RID POND OVERFLOW/STORM 90-686E2 1990-0235 C FLOG 11202 SE 186TH ST WATER IN BASEMENT /STOA M/90-686E2 1990-0274 C FLDG 11022 SE 184TH PL RID POND FLOODED/STORM 686E2 1990-0342 C FLDG 11202 SE 186TH ST RID POND/ROBERT/ STORM EVENT 686E2 1990-0372 X DANG 11202 SE 186TH ST RID PONDS OVERFLOW9/90-686E2 1990-0709 CL FLDG 18504 112TH AVE SE CL#12959 SEE CL#13224 DUE 686E2 1990-0884 C DANG 18427 112TH AVE SE RID POND DRAINAGE/STORM 686E2 1990-1061 CL FLDG 11202 SE 186TH ST CL#13224 SEE CL#12959 GARAGE 686E2 1990-1186 CL FLDG 11044 SE 186TH ST MEMO/RUDDELLS STUDY TO PA 686E2 • 1990-i212 C DITCH 11044 SE 186TH ST RD/SIDE DITCH-FILU90-1186 686E2 1990-1212 E FILUDIT 11044 SE 186TH ST WILL START WORK 09/20 CHK ON 09/30/93 686E2 1990-1212 ER FILUDIT 11044 SE 186TH ST RU DELLS STUDY 686E2 1990-1226 C DANG 18615 107TH AVE SE FLOODED BASEMENT/BAD ROADWAY 686E2 1990-1445 C DANG 18427 112TH AVE SE RID POND OVERFLOWING TO STUDY/91-686E2 1990-1530 SR FLDG 18427 112TH AVE SE STORM EVENT 686E2 1990-1531 SR FLOG 18427 112TH AVE SE STORM EVENT NOT NDAP 686E2 1991-0150 C DANG 18624 112TH AVE SE 686E2 1991-0150 SR DANG 18624 112TH AVE SE NOT NDAP 686E2 1991-0196 C FLOG 18425 112TH AVE SE 686E2 1991-0196 SR FLDG 18425 112TH AVE SE NOTNDAP 686E2 1991-0253 C DANG 11254 SE 186TH ST 686E2 1991-0438 S1 SPK TO FINISH S1 3/4 -S2 TO '92 CON 686E2 1991-0667 CL DANG 18427 112TH AVE SE SEE 91-0438 SEE RUDDELL$ 686E2 1991-0837 C DAMAGEC 19001 116TH AVE SE C/B BELOW GRADE 686E2 1991-1095 C FLDG 11200 SE 186TH ST RUDDELL POND OVERFLOW 686E2 1991-1132 C DRAINAGE 19006 116TH AVE SE INFOTOPM&D 686E2 1991-1149 X FLDG RID 11200 SE 184TH ST CCF# SWM-1031 RID POND CAPICITY 686E2 1994-0038 C PONDING 11430 SE 192ND ST POSS GRADING/FILLING VIOLATION 686E2 1996-0805 C DANG 19400 120TH AVE SE DRAINGE FLOW QUESTION DEVELOP 1NF06B6E2 1996-1564 C DANG 18908 113TH WAY SE PRIVATE PROPERTY IMPACT TO PVT 686E2 1997-1123 C GRADING 18908 113THWAY SE PVT PROP IMPACT NO DANG INSTALLED 686E2 1997-1123 R GRADING 18908 113THWAY SE PVT PROP IMPACT NO DANG INSTALLED 686E2 1998-0019 C DRAINAGE 19016 116TH AVE SE NEW GRAVEL RD POSSIBLE PVT PROP 686E2 1998-0058 C DRAINAGE 18820 116TH AVE SE SFR CONST IMPACTING ADJACENT 686E2 1999-0306 C DRAINAGE 11618 SE 188TH ST ADJACENT PROP PAVED 2500 SQ FT 686E2 2000-0572 C DDM ACROS 19029120TH AVE SE APPARENT FILLING OF ROADSIDE 686E2 2000-0572 R DDM ACROS 19029120TH AVE SE APPARENT FILLING OF ROADSIDE 686E2 2002-0553 C DTA 19013 114TH CT SE CONCERN REGARDING POSSIBLE 686E2 2003-0847 C DDM 19230 116TH AVE SE APPARENT OBSTRUCTION OF OFFSITE 686E2 • 2003-0847 NDA-DDM 19230 116TH AVE SE APPARENT OBSTRUCTION OF OFFSITE 686E2 2003-0847 R DDM 19230 116TH AVE SE APPARENT OBSTRUCTION OF OFFSITE 686E2 ..-TYIII TJIII Df Pnaam A-. Df PrdJlaRI COlaltl TIJroal'IIII 2005-0428 C RFN 19128 113TH WY SE Water Hows across sidewalk from water 686E2 2005-0682 FCR MNM 19133 113THWY SE Referral from KC Health. Rats in D91898. 686E2 2006-0299 C RFN 18621 116TH AVE SE Broken drainage pipe @ Benson Hill Elem 686E2 2006-0450 C DTA 18621 116TH AVE SE School const causing water seepage into 686E2 2007-0221 C DTA 19128 113TH WY SE Request permission to remove veg from 686E2 • Paga 2 of 2 • St. Thomas Orthodox Church TIR A-4 Flow Control Application Map • • • • • • r Peak Rate Flow Control Standard {Existing Sile CondiUons) Flow Control Duration Standard (ExisLing Site Condilions) l_ SE 17ott (~ ' ' Flow Control Application Map N A Printed 1/14/2010 ------~{p}f [•(\j".I r:::;? J._,,,;, __ .... LJ~ ~ 0 2 Miles SI. Thomas Orthodox Church TIR Appendix B -Drainage Design Pre-developed Sub-basin Map Developed Sub-basin Map B-1 B-2 • • • • • • St. Thomas Orthodox Church TIR ~0Alta b------- 8-1 Pre-developed Sub-basin Map .08'1'91 3.l~,l't.690S 01;2010 :-'- -:SP ""7Lo ,_, ,., -. ' lJ ;;o rrl I 0 rrl < rrl ' 0 lJ rrl 0 (f) C rn I rn )> (f) z ~"' ST. THOMAS ORTHODOX CHURCH 11651 SE 183TH ST RENTON, WA 9!5058 PRE-DEVELOPED SUB-BASIN • • • • • • St. Thomas Orthodox Church TIR ~'\~·Alta '?/------- B-2 Developed Sub-basin Map .08"1r91 30 l',,H.6QOS / g --- 0112010 ::;-_ JSP JLO -1 ~ 1 \ I "'-I \ I \ I~ 1· \ \ .- • 0 ~ ["T] ' 0 I] ["T] 0 Ul C rn I rn )> Ul z ST. THOMAS ORTHODOX CHURCH 11851 SE 181f!H ST flEHTON, WA 9B058 DEVELOPED SUB-BASIN • • • • • • St. Thomas Orthodox Church TIR "1'§; Al ta C-1 Bond Quantities Worksheet Site Improvement Bond Quantity Worksheet Web date: 11/21/2005 @) King County Department of Development & Environmental Services 900 Oakesdale Avenue Southwest Renton, Washington 98055-1219 206-296-6600 TIY 206-296-7217 Project Name: St. Thomas Orthodox Church For alternate formats, call 206-296-6600. Date: 3/8/2010 Location; 11651 SE 188th St., Renton, WA 98058 Project No.: Clearing greater than or equal to 5,000 board feet of timber? ~~~~~~ yes If yes, Forest Practice Permit Number: (RCW 76.09) Page 1 of9 Cop.ing County Bond Quantities.xlsx x no Activity No.: Note: All prices include labor, equipment, materials, overhead and profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database. • Unit prices updated: 02112/02 Version: 04122102 Report Date: 411.10 • • • Site Improvement Bond Quantity Worksheet Web date: 11/21/2005 Reference# EROSION/SEDIMENT CONTROL Number Backfill & compaction-embankment ESC-1 Check dams, 411 minus rock ESC-2 SWDM 5.4.6.3 Crushed surfacinQ 1 114" minus ESC-3 WSDOT 9-03.9(3) Ditching ESC-4 Excavation-bulk ESC-5 Fence, silt ESC-8 SWDM 5.4.3.1 Fence, Temoorarv (NGPE) ESC-7 Hvdroseedina ESC-8 SWDM 5.4.2.4 Jute Mesh ESC-9 SWDM 5.4.2.2 Mulch, by hand, straw, 3" deep ESC-10 SWDM 5.4.2.1 Mulch, bv machine, straw, 2" deep ESC-11 SWDM 5.4.2.1 Piping, temporary, CPP, 6" ESC-12 Pipina, temporary, CPP, B" ESC-13 Pioino, temoorarv, CPP, 12" ESC-14 Plastic covering, 6mm thick, sandbaaaed ESC-15 SWDM 5.4.2.3 Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) Rock Construction Entrance, 50'x15'x1' ESC-17 SWDM 5.4.4.1 Rock Construction Entrance, 100'x15'x1' ESC-18 SWDM 5.4.4.1 Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 Sediment trao, 5' hiQh berm ESC-20 SWDM 5.4.5.1 Sect trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 Seeding, bv hand ESC-22 SWDM 5.4.2.4 Soddina, 1" deep, level ground ESC-23 SWDM 5.4.2.5 Sodding, 1" deep, sloped Qround ESC-24 SWDM 5.4.2.5 TESC Supervisor ESC-25 Water truck, dust control ESC-26 SWDM5.4.7 WRITE-IN-ITEMS **** /see naae 91 Page 2 of9 Copy of King County Bond Quantities.xlsx Unit Price Unit Quantltv $ 5.62 CY $ 67.51 Each $ 65.45 CY $ 8.08 CY $ 1.50 CY $ 1.36 LF $ 1.38 LF $ 0.59 SY $ 1.45 SY $ 2.01 SY $ 0.53 SY $ 10.70 LF $ 16.10 LF $ 20.70 LF $ 2.30 SY $ 39.08 CY $ 1,464.34 Each $ 2,928.68 Each $ 1,949.38 Each $ 17.91 LF $ 68.54 LF $ 0.51 SY $ 6.03 SY $ 7.45 SY $ 74.75 HR $ 97.75 HR Each ESC SUBTOTAL: 30% CONTINGENCY & MOBILIZATION: ESCTOTAL: COLUMN: #of Ann Ii cations Cost $ $ $ A Unit prices updated: 02/12/02 Version: 04/22/02 Report Date: 4/16/2010 GENERAL ITEMS No. Backfill & Comoaction-embankment GI -1 Backfill & Comoaction-trench GI -2 Clear/Remove Brush, bv hand GI· 3 ClearinQ/GrubbinQ/Tree Removal Gl-4 Excavation -bulk Gl-5 Excavation -Trench Gl-6 Fencino, cedar, 6' hiah Gl-7 Fencina, chain link, vimil coated, 6' hiah Gl-8 Fencina, chain link, aate, vinvl coated, 20' GI· 9 Fencina, solit rail, 3' hiah GI -10 Fill & comoact -common barrow GI -11 Fill & compact -gravel base Gl-12 Fill & compact -screened topsoil Gl-13 Gabion, 12" deen, stone filled mesh Gl-14 Gabion, 18"do:,,:>r,, stone filled mesh GI-15 Gabion, 36" d-., stone filled mesh GI-16 Gradina, fine, bv hand GI-17 Gradina, fine, with arader GI· 18 Monuments, 3' Iona GI-19 Sensitive Areas Sign GI -20 Soddino, 1" d ......... , slooed around Gl-21 Survevino, line & oracle Gl-22 Survevina, lot location/tines Gl-23 Traffic control crew ( 2 fl::anners ) Gl-24 Trail, 4" chinned wood Gl-25 Trail, 4" crushed cinder Gl-26 Trail, 4" top course Gl-27 Wall, retainina, concrete Gl-28 Wall, rockery Gl-29 Page 3 of 9 *KCC 27 A authorizes only one bond reduction. Cop.g County Bond Quantities.xlsx Site Improvement Bond Quantity Worksheet E"'8tlng Future Public Private Right-of-Way Road Improvements Improvements & Dralnaoe Facllllles Unit Price Unit Quant Cost Quant. Cost Quant. Cost $ 5.62 CY $ 8.53 CY $ 0.36 SY 770 $ 8.876.16 Acre $ 1.50 CY $ 4.06 CY $ 18.55 LF $ 13.44 LF $ 1,271.81 Each $ 12.12 LF $ 22.57 CY $ 25.48 CY $ 37.85 CY $ 54.31 SY $ 74.85 SY $ 132.48 SY $ 2.02 SY $ 0.95 SY $ 135. 13 Each $ 2.88 Each $ 7.46 SY $ 788.26 Day $ 1,556.64 Acre $ 85.18 HR $ 7.59 SY $ 8.33 SY $ 8.19 SY $ 44.16 SF $ 9.49 SF SUBTOTAL • Web date: 11/21/2005 Quantity Completed (Bond Reduction)' Quant. Comnlete Cost 277.20 277.20 Unit prices updated: 02112/02 Version: 4/22102 Report Date: 4/.10 • ROAD IMPROVEMENT Ng. AC Grindina, 4' wide machine< 1000sv RI -1 AC Grindina, 4' wide machine 1000-2000sv Rl-2 AC GrindinQ, 4' wide machine> 2000sv Rl-3 AC Removal/Disposal/Repair Rl-4 Barricade, tvoe I Rl-5 Barricade, rune 111 { Permanent ) Rl-6 Curb & Gutter, rolled Rl-7 Curb & Gutter, vertical Rl-8 Curb and Gutter, demolition and disoosal Rl-9 Curb, extruded asohalt Rl-10 Curb, extruded concrete Rl-11 Sawcut, asohalt, 3" death Rl-12 Sawcut, concrete, cer 1" death Rl-13 Sealant, asohalt Rl-14 Shoulder, AC, ( see AC road unit orice) Rl-15 Shoulder, aravel, 4" thick Rl-16 Sidewalk, 4" thick Rl-17 Sidewalk, 4" thick, demolition and disposal Rl-18 Sidewalk, 5" thick Rl-19 Sidewalk, 5" thick, demolition and disoosal Rl-20 Sian, handicao Rl-21 Strioina, oer stall Rl-22 Strioim:~. thermoelastic, ( for crosswalk) Rl-23 Stripina, 4" reflectorized line Rl-24 Page 4 of 9 "KCC 27A authorizes only one bond reduction. Copy of King County Bond Quantities.xlsx Site Improvement Bo! Quantity Worksheet Web date: .005 Unit Price Unit Quant $ 23.00 SY $ 5.75 SY $ 1.38 SY $ 41.14 SY $ 30.03 LF $ 45.05 LF $ 13.27 LF $ 9.69 LF $ 13.58 LF $ 2.44 LF $ 2.56 LF $ 1.85 LF $ 1.69 LF $ 0.99 LF $ -SY $ 7.53 SY $ 30.52 SY $ 27.73 SY $ 34.94 SY $ 34.65 SY $ 85.28 Each $ 5.82 Each $ 2.38 SF $ 0.25 LF SUBTOTAL Existing Futuni Public Right-of.way Raad lmprovamanta & Dralna-Facllltlaa Cost Quant. I Cost Private Bond Reduction• Improvements Quant. I 131 Quant. Cost Complete Cost 3,998.12 3,998.12 Unit prices updated: 02112102 Version: 4/22102 Report Date: 4/1612010 Site Improvement Bond Quantity Worksheet Existing Future Public . Prlvata ' Right-of.way Road Improvements Improvements ' ' & Draln•ne Facilities ' Unit Price Unit Quant. I Cost Quant. I Cost Quant. Cost ROAD SURFACING (4" Rock= 2.5 base & 1.5"top course) . For'93 KCRS ( 6.5" Rock= 5" base & 1.5"top course) For KCRS '93, (addltional 2.5" base) add: RS-1 AC Ovenav, 1.5" AC RS-2 AC Oven-. 2" AC RS-3 AC Road, 2", 4" rock, First 2500 SY RS-4 AC Road, 2". 4" rock. Qtv. over 2500SY RS-5 AC Road, 3", 4" rock, First 2500 SY RS-6 AC Road, 3", 4" rock, Qtv. over 2500 SY RS-7 AC Road, 5", First 2500 SY RS-8 AC Road. 5". Qtv. Over 2500 SY RS-9 AC Road, 6", First 2500 SY RS-10 AC Road, 6", Qtv. Over 2500 SY RS-11 Aschalt Treated Base, 4" thick RS-12 Gravel Road, 4" rock, First 2500 SY RS-13 Gravel Road, 4" rock, Qty. over 2500 SY RS-14 PCC Road, 5", no base, over 2500 SY RS-15 PCC Road, 6", no base, over 2500 SY RS-16 Thickened Edae RS-17 Page 5 of 9 ·KCC 27A authorizes only one bond reduction. Cop.g County Bond Quantities.xlsx $ 3.60 SY $ 7.39 SY $ 8.75 SY $ 17.24 SY $ 13.36 SY ' $ 19.69 SY $ 15.81 SY $ 14.57 SY $ 13.94 SY $ 16.76 SY $ 16.12 SY $ 9.21 SY $ 11.41 SY $ 7.53 SY $ 21.51 SY $ 21.87 SY $ 6.89 LF SUBTOTAL • Web date: 1112112005 Bond Reduction• Quant. Comolete Cost Unit prices updated: 02/12/02 Version: 4/22102 Report Date: 41.1 O • Site Improvement Bo! Quantity Worksheet Web date: -2005 I Unit Pries DRAINAGE (CPP • Corrugated Plastic Pipe, N12 or Equivalent) Access Road, RID D -1 Bollards -fixed D-2 Bollards -removable D-3 * (CBs include frame and lid) CB Tvoe I D-4 CBTvoe IL D-5 CB T""e JI, 48" diameter D-6 for additional danth over 4' D-7 CB Tune II, 54" diameter D-8 for additional death over 4' D-9 CB Tvne II, 60" diameter D -10 for additional deDth over 4' D-11 CB T""""" 11, 72" diameter D-12 for additional desith over 4' D-13 Throuah-curb Inlet Framework (Add) D-14 Cleanout, PVC, 4" D-15 Cleanout, PVC, 6" D-16 Cleanout, PVC, 8" D-17 Culvert, PVC, 4" D-18 Culvert, PVC, 6" D-19 Culvert, PVC, 8" D-20 Culvert, PVC, 12" D -21 Culvert, CMP, 8" D-22 Culvert, CMP, 12" D-23 Culvert, CMP, 15" D-24 Culvert, CMP, 18" D-25 Culvert, CMP, 24" D-26 Culvert, CMP, 30" D-27 Culvert, CMP, 36" D-28 Culvert, CMP, 48" D-29 Culvert, CMP, 60" D-30 Culvert, CMP, 72" D -31 Page 6 of 9 "'KCC 27 A authorizes only one bond reduction. Copy of King County Bond Quantities.xfsx $ 16.74 $ 240.74 $ 452.34 $ 1,257.64 $ 1,433.59 $ 2,033.57 $ 436.52 $ 2,192.54 $ 486.53 $ 2,351.52 $ 536.54 $ 3,212.64 $ 692.21 $ 366.09 $ 130.55 $ 174.90 $ 224.19 $ 8.64 $ 12.60 $ 13.33 $ 21.77 $ 17.25 $ 26.45 $ 32.73 $ 37.74 $ 53.33 $ 71.45 $ 112.11 $ 140.83 $ 235.45 $ 302.58 SUBTOTAL Unit SY Each Each Each Each Each FT Each FT Each FT Each FT Each Each Each Each LF LF LF LF LF LF LF LF LF LF LF LF LF LF Exlstlng Future Public Private Bond Reduction• Right-of-way Road Improvements Improvements & Drain-• Facllltiaa Quant. Quant. I Cost· Quant. Cost Quant. I Cost ComDlete Cost For Culwrt nrlces, Averaae of 4' cover was assumed. Assume aertorated PVC Is same nrice as aolld pipe, Unij prices updated: 02/12/02 Version: 4122/02 Report Date: 4/1612010 DRAINAGE CONTINUED No. Culvert, Concrete, 8" D -32 Culvert, Concrete, 12" D-33 Culvert, Concrete, 15" D-34 Culvert, Concrete, 18" D-35 Culvert, Concrete 24" D-36 Culvert, Concrete, 30" D-37 Culvert, Concrete, 36" D-38 Culvert, Concrete, 42" D-39 Culvert, Concrete, 48" D -40 Culvert, CPP, 6" D-41 Culvert, CPP, 8" D-42 Culvert, CPP, 12" D-43 Culvert, CPP, 15" D-44 Culvert, CPP, 18" D-45 Culvert, CPP, 24" D-46 Culvert, CPP, 30" D-47 Culvert, CPP, 36" D-48 Ditchina D-49 Flow Disoersal Trench (1,436 base+) D-50 French Drain (3' depth) D -51 Geotextile, laid in lrench, polvoropylene D-52 Infiltration oond testina D-53 Mid-tank Access Riser, 48" dia, 6' deec D-54 Pond Overflow Soillw= D-55 Restrictor/Oil SPnarator, 12" D • 56 Restrictor/Oil s~arator, 15" D-57 Restrictor/Oil SMarator, 18" D-58 Riprao, olaced D-59 Tank End Reducer (36" diameter) D-60 Trash Rack, 12" D-61 Trash Rack, 15" D-62 Trash Rack, 18" D-63 Trash Rack, 21" D-64 Page 7 ol 9 ·Kee 27 A authorizes only one bond reduction. Co.g County Bond Quantities.xlsx Site Improvement Bond Quantity Worksheet Existing ·Future Public Private Right-of-way Road Improvements . lmprovam1nta · & Drainage Facllltlas Unit Price Unit Quant. Cost Quant. Cost Quant. Cost $ 21.02 LF $ 30.05 LF $ 37.34 LF $ 44.51 LF $ 61.07 LF $ 104.18 LF $ 137.63 LF $ 158.42 LF $ 175.94 LF $ 10.70 LF $ 16.10 LF $ 20.70 LF $ 23.00 LF $ 27.60 LF $ 36.80 LF $ 48.30 LF $ 55.20 LF $ 8.08 CY $ 25.99 LF $ 22.60 LF $ 2.40 SY $ 74.75 HR $ 1,605.40 Each $ 14.01 SY $ 1,045.19 Each $ 1,095.56 Each $ 1,148.16 Each $ 39.08 CY $ 1,000.50 Each $ 211.97 Each $ 237.27 Each $ 268.89 Each $ 306.84 Each SUBTOTAL • Web date: 11/21/2005 Bond Reduction• Quant. Comolete Cost Un~ prices updated: 02/12/02 Version: 4/22/02 Report Date: 41.10 • Site Improvement Bonf auantity Worksheet Webdate: 11.05 Unit Price Unit PARKING LOT SURFACING No. 2" AC, 2" too course rock & 4" borrow PL-1 $ 15.84 SY 2" AC, 1.5" top course & 2.5" base course PL-2 $ 17.24 SY 4" select borrow PL-3 $ 4.55 SY 1.5" too course rock & 2.5" base course PL-4 $ 11.41 SY WRITE-IN-ITEMS Such as detention/water aualitv vaults.) No. Wl-1 Each Wl-2 SY Wl-3 CY Wl-4 LF Wl-5 FT Wl-6 Wl-7 Wl-8 Wl-9 Wl-10 SUBTOTAL SUBTOTAL (SUM ALL PAGES): 30% CONTINGENCY & MOBILIZATION: Pages of9 "'KCC 27 A authorizes only one bond reduction. Copy of King County Bond Quantities.xlsx GRANDTOTAL: COLUMN: Existing Future Public Rlghl-<>1-way Raad Improvements & Dralnaae FacllHlea Quant. Price Quant. I Cost B C Private Bond Reduction• Improvements Quant. I 480 Quant. Coot Comolete Cost 7286.4 7,286.40 11,561.72 3,488.52 15,030.24 D E Unit prices updated: 02/12/02 Version: 4/22/02 Report Date: 4/16/2010 Site Improvement Bond Quantity Worksheet Web date: 11/21/2005 Orlglnal bond computations prepared by: Name: St. Thomas Orthodox Church Date: 4/16/2010 PE Registration Number: 40567 Tel.#: (253) 864-6800 Firm Name: Alta Cascade, Inc. Address: 31 o N Meridian, Suite 200, Puyallup, WA 98371 Project No: ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS Stabilization/Erosion Sediment Control (ESC) (A) Existing Right-of-Way Improvements J (B) Future Public Road Improvements & Drainage Facilitie (C) Private Improvements Calculated Quantity Completed (D) $ $ $ $ PERFORMANCE BOND· AMOUNT 15,030.2 Total Right-of Way and/or Site Restoration Bond*/"" (First $7,500 of bond' shall be cash.) (A+B) _,_$ ______ _ BOND• AMOUNT REQUIRED AT RECORDING OR TEMPORARY OCCUPANCY-• (E) $ Performance Bond* Amount (A+B+C+D) = TOTAL (T) $ 15,030.2 Minimum bond' amount 1s $1000. T x 0.30 $ 4,509.1 OR Reduced Performance Bond* Total*** Maintenance/Defect Bond* Total NAME OF PERSON PREPARING BOND• REDUCTION: * NOTE: The word "bond" as used in this document means any financial guarantee acceptable to King County. *" NOTE: KCC 27 A authorizes right of way and site restoration bonds to be combined when both are required. (T-E) $ 15,030.2 Use larger of Tx30% or ( I -E) Date: PUBLIC ROAD & DRAINAGE MAINTENANCE/DEFECT BOND' (B+C) X 0.25 = $ ~------- The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on-and off-site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity. *** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes. SURETY BOND RIDER NOTE: If a bond rider is used, minimum addltional perfom,ance bond shall be j $ 15,030.2 j (C+D)-E REQUIRED BOND' AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DOES Page 9 of 9 Check out the DDES Web site at www.metrokc.gov/ddes Cop.ing County Bond Quantities.xlsx • Unit prices updated: 02/12/02 Version: 4/22/02 Report Date: 4/1.10 • • • St. Thomas Orthodox Church TIR ~/~Alta C'a.:;c21de: c;y-------- D-1 Erosion and Sediment Control Plan I~ I 0!;2010 :;" SHOWN JS~ JLO > C) ' D Al ~ D )> z ~ 0 a z ~ C) '-R> .> ~ 'I rTl " Al • • 0 '-U) .> . 0 g z z " ·" 0 ~ 0 z z • I • -I N Al 0 .z 0 s ' z 0 " -0 ~ ·" > • z z ST. THOMAS ORTHODOX CHURCH 111!51 SE 188'TH ST RENTON, WA 98058 GRADING & EROS ON CONTROL PLAN • • •