Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Large Format
- i m ; ~ ~ .l( ~ ! ---------- ----------_____ -:----------r~-=--_____ _ I \ ' \-APPRCX.\rlA-:-~ l.OC/.\TION OF EXISTING ?0" HD~~ STORtv'WAT~? -:GHTLII\E (,=-R:Jt-,rl :>iY or RENTO~I DRA\~_11~JG 1)-28-310.:i, ROLL 91, fR 115) _,,·,'1... i:..AS[l.4fN r ·---45' O!_ Y,'v!P{c; ,'-'}PE I "T -~ I I I I --------d----45' Ot y,,,,P,l(' p , ~ !Pf L IN£ EAS~/v/t,\1 , _,,' / ------------------- 2 20 FEET X X X X X ' / l ( I I L \ '\, EXISTING DETENTION POND I I I I I ~J ' I, CONSTRUCTION ENTRANCE BMP (SEE DETAIL 2, SHEET 4) \\\ EXISTING CATCH BASIN- INSTALL CATCH BASIN INSERT 30' / X ---X -----. X -----X -----X ------X --~---X ------X------% ------X ------X --~--X ------X ---- X A-----X ---- VICINITY MAP N W*E s 200 0 200 FEET LEGEND HA·1 • HAND AUGER COMPLETED BY GEOENGINEERS DP-1 + DRIVE PROBE COMPLETED BY GEOENGINEERS -If-If-I-I-If-SILT FENCE ~ WADDLES/ COMPOST FILTER SOCKS w//1 STAGING AREA 72 5-------EXISTING TOPOGRAPHIC CONTOURS (FEET ABOVE MSL) A' ~ CROSS-SECTION LOCATION (SEE SHEET 3) SITE ADDRESS: LANDSLIDE STABILIZATION AREA IS LOCATED APPROXIMATELY 150 FEET WEST OF LAUREL DRIVE AND 300 FEET SOUTH OF HEMLOCK DRIVE, RENTON, WASHINGTON ON PARCEL #1623059137 OWNER/APPLICANT: BP/OLYMPIC PIPE LINE COMPANY 2319 LIND AVE SW RENTON, WA 98057 T: 425-981-2520 IF: 425-271-5320 EDWARD.SMITH@BP.COM PARCEL AREA: 554,083 SQUARE FEET (12.7 ACRES) PROJECT SITE AREA: 16,600 SQUARE FEET (0.38 ACRE) -INCLUDES EXISTING ACCESS ROADS AREA OF WORK: 2,400 SQUARE FEET· AREA OF DISTURBANCE ON-SITE CRJTICAL AREAS: APPROXIMATELY 2,200 SQUARE FEET NEW IMPERVIOUS AREA: 7,920 SQUARE FEET (5,520 SQUARE FEET OF THE IMPERVIOUS AREA IS IMPROVEMENTS TO EXISTING ACCESS ROADS) EXISTING IMPERVIOUS AREA: NONE AT THE PROJECT SITE EXCAVATION VOLUME: 320 CUBIC YARDS (384 TONS) FILL VOLUME: 780 CUBIC YARDS (936 TONS) SOIL DISPOSAL LOCATION: CADMAN -BLACK DIAMOND FILL SOURCE I TYPE: FILL SOURCE: CADMAN TYPE RIP-RAP (1 TO 2 MAN) 19221 HIGH ROCK ROAD MONROE, WA 98272 TYPE: QUARRY SPALLS AND CRUSHED GRAVEL 26111 SE GREEN VALLEY ROAD BLACK DIAMOND, WA 98010 PROJECT CERTIFIED EROSION & SEDIMENT CONTROL LEAD (CESCL): BROOKE ASBURY, GEOENGINEERS CESCL#: 10220825 *ANY DISTURBED AREAS \\1THIN THE OLYMPIC PIPELINE EASEMENT SHALL / ~~~ BE RE-SEEDED WITH THE REVEGETATION MIX PROVIDED ON SHEET 4, / :; AND MULCH FROM COMPOST FILTER SOCKS SHOULD BE SPREAD OVER EXPOSED SOILS, :g i--------------------:::---------1 ---::-:::;;::;:-~-~,,c::..--c::..-----'--,---------....:------------,-,-----------------------,-----T-----,-----,-:-:----------------------nioiwmm:r-nirni'iJ:l----T-----,--i:c;-;:------,r--::::==::::----=-:-::--::-:-:::--:-:----:::-::--:=:--:---:-:--::::--:--::"'.:-:-::-"'.'"":--::--:--~ I GEOENGINEERS CJ J--------------------+----j------------------1----_j_-----1------l;rN~6~M~T~o~w~~~RE;~~s~~f HORIZONTAL DATUM: ENGINEER 1/~~/10 OLYMPIC PIPE LINE COMPANY ~ PROPERTY OF OLYMPIC PIPE VERTICAL DATUM: DRAFTER TJM 2319 Lind Avenue S.W. a! 841G JC'IH ,\1UJJE ,-t[, 0 4'3/&JHOOO l-----------------------+--l------------------------1---------l-------l--------l LINE COMPANY AND SHALL 1/28/10 Renton, Wosh1ngton ~ Rrn1,1WD, \l.'1 95J52 F: 42j_/56H050 NOT BE COPIED OR USED § 1----------------------------l EXCEPT FOR THE PURPOSE CCN~o=T=E-B~O~O~K-s-, _____ _, ENGINEER] NG ~ THE LOCATIONS OF ALL FEATURES SHOWN ARE APPROXIMATE. l-------------------l-----+--------------------l--------1--------1----------l FOR WHICH IT IS EXPRESSLY CHECK ~ THIS DRAWING IS A COPY OF THE MASTER DOCUMENT, THE OLYMPIC LINE DRAWING S-100-29 FURNISHED. THE DRAWING DRAFTING Site Plan and Vicinity Map Milepost 109 Landslide Stabilization Project Renton. Washington -MASTER FILE IS STOcsED BY GEOENGJNEERS, INC, AND WILL l-------------------+--l'--------------------------1-------1------1--------l AND ANY COPIES THEREOF 1--------------l--C;-;H~E;;Cco;Kc=;::----'----;:;-;c;c;c:-----l i SERVE AS THE OFFICIAL DOCUMENT OF RECORD, OLYMPIC LINE DRAWING S-100-112 Q ISSUED FOR PERMIT REVIEW TJM ABA SDS (PARTIAL OR COMPLETE) AFE NO'S: APPROVED DATE o: f-------------------1--~-------------------+-~3 /:.:2:::6:L./..:.1:::.D--1__:3';;,,/./:.:2:.:6'1-/..!.1 ,:::.0----1__:3c:.1./:.:2:.:6'L/.:.1 ::::_0 __J SHALL BE RETURN ED TO THE '"'s""'c"'"A"""LE"",--------.-,D'"'R""'A"'W""I N"'G-N"'o'"". ---1,-o'"'F-4-""R=Ev-.-NO---I, f .___ ______________________ --1, _______ _.1.... _______ .J.... ____ ..:.R::E::..FE:;R.;,;E:.;;N::C.:.E..:D:;;R..:.A..:.W~IN~G:.:S::_ ____ _J~N,:;,O;__, J..... ______ _:R:.::E;.;.V.:.:IS::,:10::,:N;:_ _______ J__..;B:,:.Y __ l....::C.!:!H~EC~K~E:.:D:....L.:A::.:P:.::P~R_::;0;:_V;;:ED;'.._Lo_w_N_E_R_o_N_D_EM_A_N_o_. __ .....J.__ ________ ....1 _________ _i ___ ..;.::N.:;;O:'...T~E;;;.D!;:__ ___ L __ ~D'..=.:::M:.=..!.1.:;;0~8::_ __ L~o_J " , ' :·· . ··"'·•·'·-·-·- t; w iii 0 0 V I I I / / / / / ---\ I I 1 / 1 / i / : / ! /!// \ \ / I I 1 I/,/; / , ; ' I PARCEL # 1623059137 ;l I I I / 1 \ I /1 ', , : : / // / / I I 1 / , I WETLAND (CATEGORY 2) J LOCATED 150 FEET TO THE NORTH (NO DISTURBANCE WITHIN 200 FT OF WETLAND) I I 1 I \ i i ri O C''1 ..;f-~ ;:] 1 1 1 1 1 l 1 --------------- I I / 1 I 1 / i , 1 I 1 : r 1 / 1 1 1 I I I---------------------I / 1 I ! I i '! ~ GJ N '( '(I / I I I I I I I I i I I ------------ / I < 1' ! ,, I I I I I / / / / / // / / I I I / / / / -------,-------45' ; I ' i I I I I I I , I I I I I I / I ! I I I I I I o, n,1~1c '''''E ' INF F' -- I / I ' ( / I , / / , / , --' oci,,fr,,T ' I ' ' I / I PROPOSED I I I I / I I I I -: I I I I I ,' ' / I i I / 16-INCH DIAMETER i' '~ 6 ':;, -/ '\,:;, // / I ,' ;; I I I I I I I I I I ' PERFORATED CV (:'; ;)1 I" \ !f I I / / I / / / / ', 1 \ I / / / / I FUSED HDPE PIPE / / (y V ''1 , ' I / ,' r,; ! \ f f f \ I O _/ / I / / (30 FT LONG), / / / / < / / / / / I I I f I I \ I " I I I I I I N N I I I I I ' ' I I I I / / I I I I I I I / I / cC.' J ("\I ("J '<;,j / J / / / / (.() /1,, I I / / I I ' ;;,-I \ I I I I I ; C:-0 N I I I I I I I 1' II ~I 11,0 't) I I / I I I 1' ' I / / I ' / ;; I I I ('\J f co I I I / / I I I I I I I I I I <I?' \ I I I I I I tb C'-/ I ' I I I I I I , / ,;r ({JI co' I I I I ' I I I ' ' \ I I i I ' ~· 0-/ 0 0-/ " co / / Cy tr; C 0-/ I I I I : / ,~ / \ : I I I I ; "' I ;::; ;::; 0 ;::; I I I I I I '1 / / / / f ;' iQ i';! io ~ !g [2 c ,, i / r}, ' I j I ff_ ,/ ---I I I I ! I I I I I I ! I I I I I;' / // I I / I 7 I 7 7 ;;,I I, ;:I__ !!? /'-._ '\ < L-;;} / ---, I I I I ! I I I I i I / I I I I\ Jf / I I I ' I 0-/ '( ", ';V / // ,,}( ,' UJ I \ I I I I I I I I I I I I I I I I I I I I I) '3 // / I ,, I ! I I I ! I I I I I I .''if/' ,' J; ' \ ', I I I I ,1 II I I I I I I ' I I I l I / i 1/)/ / / I II' I\ I I I I I I I I I I I I I 1 ·~1 / c. 1 \ I I !f: I I I I ' ' I ' 1 ~ / / I 1/ r ,' I ,' / I I / I 1 APPrWXIMATE ORDINARY HIGH WATER MARK / / '1 / 6 / \ 1 : 1 I I S I 1 1 1 I I 1 1 I I / I I I I 1 \ "' / / ')! J 1 !J ,' 1 I / J ; I / I 1 ; 1 (EASTERN OHWM APPROXIMA TEL y / / I < I \ I I I 0 I I I I I I ' I I I I I I I : 0 / / ./ I,/ / / \ I I I I I I I / I I I I 2 FEET FROM WORK AREA) / / I \ I / I / ci!,' I , I I I I I / ''/ / / ! {E I / if' "' / / J I j f / / I / : : ,I I i I I l;r I I I PRO~OSED ROCK BUTTRESS I I i I ; I T:ift;H I I I I I I O 2 I I ' I I I I ( I I I I I I I I / / I \ , / ,1 I (,; I I I (SEE ,PROFILE, ON SHEET 3) I / / ' / I \ [ , / ~ ii: / / I / / ; 1 I I / / / / ( / I / j / . \ I I "i I I I I i I I I I I I I c, / I '> I/ I I I I' I I I I ! r' \ I : I / 1' ; I I I I I I I I I I I I I // / / V ,_ -"' / I r;PROPOSED 1 I I I I I I I / (}-, 1 , 1 ' / I I I I I I , / / / \ / / / -/ 1 CROSS TRENCH DRAIN / / / / i I 1 r::C::: -~ 1 1,i---: 1 ,' 1 1 i _, • 1 1 1 : : 1 1 , 1 / 1 1 1 Y 1 , v.-· , 1 csEE DETAIL 2, SHEET 3) 1 1 1 1 ,, ,, 1 i ~ % I ,v1v -.'--__ ;__ r I i/ r : r i I ; r ! t :' r , I I / II/ ; // / / i I ; ; , ; I I i t .' ; , i I // ,.. ....-'1,.<Y"" \ ,,'-tr"1r / (' I ---7,J_ I; I / I I iv ; V • • ! I i i / i' I I { \ '/ / / / '/ / '/ / I I / I/ / / / / ,· / / I / / / 10 --•, ' -/ I / I I T; ___ _/ ____ '__ ! I /-40' I : ·~,--' I I ' / I )' I I / I I I / /I I / I I I / I I I ' I ,' ! ') , , _/, /1Y ~ _ , / J / I; f r ---.,/ / / I I I ,•v .. I ' I 1 , /' / 1 /-' I \' / / ' / / _ / _L / / ;_ I !-/. ------( // // __ LI \1" .·'-._ / I I /.---, / ////,,/ /I :'··1-··-'. I I I I I 'i \ ~\ '1"'·' \ I '{ (! ' // I I(/ It I I .' ,·-1 I., -t·; I I I I I -\ , / / -/ /, j>/ \ I I / / / ~·t>;"s // / ' I -' ···-L -I \ I I ) \ I ) / ' I/• I I / I I /; V I / I I I I I I / I I ' ! I I I / ; / , /_ \ I"' I / i 1 / ; , ;/ ;,, ";c,,,;q I / / ; / \ + 1 -i-.I 1 / i / i / I / p· I I / ! / ; f I I I I I I I I ;, 1 I I I I I : / / A/7 \' 1i{ \/ / / / OEJ:,l't.;(,,? 1 PROP6srn~; 1 I 1 '"* _/· oi._ I ! / / ; ,'\I//»/~~// ; ~ //I 1 1 I : 1 i .' I 1 1 I I 1 \ / c'" l//J! 1 //&J-.u_J_c_,,( ,,,--, y I// I II I I ROCK-LINEDSWALE I / / I \v(/_/,_"5'(]0_<1{/1~--,-._\ I I I I!' 1///1 ;:;/ I/// / / /1\ 11 / I I ,' I I I/,., I I // / ,") /,r· \, ',J w,~"k' )/ '\'~.r>. \ / 1 / / ; ; I / (SEE DETAIL 3, / I I 1 !,)c\Ti1\crn ~"--V(.J?f'')~-,1 i I I I I , / / ~/ [// >/ )/ I I I I I I I I , 1 / y i l / / 11 I\~ !<..1Y(r;J,1~'-''\"'l(' ,-;/I 11/ I ; ; I ; oNsH~ET3); I I i _(15l_l1A/C 11~Yi:'<?~fi-lrt:Jtq,~'' I/'·, ; ~'/' / v r; I I ; / r / .1 r I I I I 1 > TREES/ / cOj </ /, c> \\~t?co::,;,;_,~,~f~:],~0'.;J_{J.'ld)7)(f,:-;rj, cl// / (/ / /I \ /2-~c((.)t.;]]Z')-~t~~~"': -0j'(~t'~i,)i!;;,,~"'1/"'. /)\ ~ / / / //1 //// II / / / I / / II i I/ v11 /1 1 BRUSH/ /v :, l'~f'vlC>, ,£1.,1){',,.:( ,,-/ -,--,, d:_,'rl·,!t~f' )f' I I YI )(IJJ\/\._Y\__/(/ er ' \,~/ t Ir:?, -, /\ r/ Vi] \, I I I I I ,, / /I/ / lj p '-. -7'"/ 1/ l\),;}:l~;~,J!<:(7]?"''\i..C'--,"('Q,,,r ~J(_AfJtT-_DP4 / J 1 ___ _,,,(,_ §(/,..j-" ;-Y.\ P: ;"-_/1\~7, J< "\-~,Jr /', \ / / / ' ( I I I , ,' I I / I /I / / \ / / /" \ / / ) i i, ""f~~/;l~Y:_;;_q ">Y: ·rv:~'.,~6~-:JJ)\_,.ftf~:; ' -'/ I')\~;--;: ~~ +"'=--1J ~ \ _C) \f2 -i o;< ___ j~ct--~ "'\ ~ // , 1',J / ; J _--,-h--,l,-\r r1-+ I / i' / >, \'ln < , 1 . _ ,,,, I 1 1 1 , '. \ 1 I 1 1 ",-.1;:; 1w -f 0'f:f!)' c:c . .J 'i../"l.){iC/::i , -"-· r\, }-\ .::, 'J cl· ( v; ~ , 1 'h .:f 1 1,1 y , f '~~?", IJ 1 1 } , 1 1 \ 1 1 , ; 1 I _ _,,. I,. f/ 1 I/; I I \ };;," o' la (,(')le I \ I I I -' / V:lrot,V1;i.ff!,;J ~~,J~~, ):_Yfr>c!-?'/'-,1-.__Js;: J)(f~'A /, YI\ I / / // y' ~/ / f?i ) '1' I ! I I I I fi/" I I I I / / I:/; \ I I \ , \ El_,, /\'.72;_) / \ / I / I / / ' l'J,,J,,-"-'/,''J, /~ '~J'. -, ! ')( fjr '/:}, \ / --Yi f /'•,V\): ,f-__,} / ( /' H(.i j / / r" / I J{;:/c / I / / / / / / ' / ~" /c' / '> < i I J 1\'1 I \ \ I \ tl,!L,,SJ'1/ \ I r I I II ;;::rr ',t;j· -; ' \,,_'(71, ';'Z j,( )/bl)d~;J,');i/:1/-+~~AJJ (Y\ /I/ !)/~"'/ /Ay' / , / 1/ 1 ,~CJ)>,111 I II / II I I / [~"';-.,,; UJc/ I I ' I -... , \ ' \ ' I / I -')I_ -' \ j I) cf, I-'./\/ C -,/ ' ' ' I f/.{ '';{? ' . V J /' '/ /, 1/ ' ~'.r-I I I I cc 7 ""' / I )/ 1:J: '---~ '11,,..._,: \ \ ',IJJ 1/\ \ \ I I / / ~,'-?-:J--;;:57,'--/:)~f-(.'vf j,1J.,-kfK,~t,;<,{g,,1.("'\,,;"!:'' ilcf;,, / /// ///lJ£( ,///I I 1/!i'c-;~'.) / I I I ,, /-:-;-I 1 1 , 1 ,-, \ · 1 1, 1 1 1 1 , 1 1 / 1 -.·)r'i<:-~)--t 1 1.'::(-"0 ,/?:; 11f·r?".?,, , __ (:,--,c i ,~/ ,/"" ,,;1 r/ / //"· l:vLc~-Ji 1 1 1 1 ·..J__1/1 , -( 11 1 1 1 ,, 1 , r--1 ,-~A0 " / --, -. -:--L_ PROPOSED ~IP-RAP ; I I I ! 'i'··-. ~ --!-__ 11 \ I \ _J _ _/_ 1/ I ' I I rs~,,_~ ; ;; ~c o-r "-');-~\~ tJ,-f" / ~~ --:17ii r > : ;__ / /I!// // ,/ / / / / ,-?_52 /1 // / ;1 /--.?,}'I,!/.} ; -;< / (' ) /,:f\ I '\ r--/ / \1 (DETAIL 4, SHEET 3) ; I I I I ! I I I I I I I / I I ,' i' ',, ·ci;,!.,:;/~,; 1)l 0"·,1 //;t,:p;·/t<~J {i',,0 )er--//// / / /i / I ~~''}2 'i I ' I I I / / /: I \-•• 194 .::__.; // ~/-\\ 1 ,' I I I,: ,'//I // I i J 1 ,I / ;'.II 1 1 ; -:("j,\./_~jz(j,/i!,.J?\-i'";fy'.kC //,,-,-,;/'~ ~ "'/ //j!/"' /!/"~It'~'/ I I;' / I 1111 / / / , __/ -_/_ ., _ I , , , r I , 1 , I 1 / 1 /I'-,, , , y / /, yy / !!<,le ; ; I I / / ' ·-._ / 1 , _,,----..,,---·-\, : 1 1 1 ; / I I ".::I /, . ·,,v-,-.v; ';v--J _ -J. 1 ' ; 1 I I 1 7 I 1 /1 / ,,; I , 1' / 1 , ~aLcwcc T/ , I ( I I I ,,,,/~/s'-"'J _-//:r-:_J '\--\s;----,",-N-_w 1 ~1--r1--~~'T",~r:/j :,/ /"-1 // ,I / / / /V // --/~r·,/·7,,----/'--/ / {//' // 11 1// ;1 / /ir/ / / "' /'/ :?~1/ 111' \/ 1 .~~~.f0i~ / / //1 / / / / // ~\ //J/ '.,__ \ V --.,v----v~-,/~v1 /I I I I' I I I I I 1· I I I II I I I vr y_,_,-r., _v' ' ! / /J "'/ // '(Ii! / ;'· / / / / //I. I I , / _---, ; 1 , , r i , , 1 . I , 1 vr--·--.._,1 / I I . / / / I ~ ,;, / /:'~7' l' J ' ; / I ; ' / //.( ", ,. i I f 11 ( I 1,_ \ , I I ,1 / / / / / I I / / / / / / / ,, /..---y 11 1 1v /1/'/ / / / ,/?'/ r/"" // / 1:-C:~t;; // I "-.j__,,,,; I / / ,, ( / I / I -a \ I / 1 \ \ '\ \ \ \ \ / / 1 / / 1 / / / / / / ' / -\ 1/ / ,/ I/ / / / ,<i / / / / j 1 '._ ·(\, ; ' /I /'!\, / // \ i I , ) i _., J / i i / ' ·, i r i i i i r ,, -L I I / , i i ; i ' t i / / / /--i / / .c ,c i t i i ; i . _;__-( _ _/__A _____ /I'----/ • L1 i / / -I I I I I/ / I / I / / I/ / \ I I I I I / / ' , ,' / / / '>/ I / / / ,, / / / 'ii: ; I J I I ( / ) \ / I ,' I \/_ / \ : i i / / 11 / / / ! i i I /,,<,)' //y,I>;>> /,/ ,/ / //// / /-/</// / 11 ;11 // // // ///. ,/ //////!/ I t(/l<-7</ ',//'//,// i /1 / / '. I, I / / I I I ; I ,' I / I ; I I / /\/-1REES/ , / I I I I I i I I ) I I / / / / :;i:~,1,: / / 1 . --!,_,,-.,< ' I I J I I I I , , 1 ; I I I ! ; i I I 1 , ; II I I ; ;BRUSH?\.1 I I I I ' , I I I \1; / I ! // // ,,,, / / ~-\ '/ I ; I I ; \,,,,-:/L.___I L_ I I II I I I I ' ; / ' I ' I I I I I ' ' ' ' ' I I I, I I / / N,/ I I I /\/• -' 1' I ' I i i / • , r / ; ; I / I i ; i / i i ,. (: I / / / rt< ,. i / I ; / \ A---"" i ; / , I i' I / / I / • i I ) I . ' i ' / I I ' I I I I I I . I / / I I / I I / / ::-y\~ I I I I I ,' I /J ';--------< _j / I I I I / I I (SEE DETAIL 1, ON SHE,ET 4) / / 1 I , COMPOST FILTER SOCKS 1 / / / I , I / / · / i / ARf.A* / / / _., / , '--X{ j (SEE DETAIL 1, SHEET 3) / v 1 '--,1 TEMPORARY SILT FENCE__[_, / I I TE' MPORARY WADDLES/ / / I ,' , • / , I I I I I 1 1 I I I I 1 1 , I 1 / STAGIN(} / / / I ,''$:-r'_ I I I PROPOSED INTERCEPTOR TRENCH DRAIN / v I. '--. -- 1 I i(SEE DETAIL 3, ON .SHEET 4) I / I J I J / j I I I I I I I / I I I I I I / / I I / / / l1Jf!/ J, I ' 1ACTUAL LENGTH TD BE DETERMINED / I I / / I I I ' ' / I ,I / I ;' I j / / I / / 1 / I j I / I / I / / / 1 / I i , 1.( ;( ' 1 / / / / >' l's' 1' // IN FIELD DURING CO,NSTRUC110N I / I / I ; / / i / ; 1 , / 1 1 1 ; i I I J / ; / ,1 1 1 / ;' 1 I / / j I I / I / 1 / , , / / /I , /'5 ! ; // / I / / I / ./ / / / / / / I I / / / / / / / / // / / / / / / / / / / I / / / I / </ / ti // II /, /// /// >/: II II // II / II / /,/ '' / I / / I / ,/ ,' ' I i I I I I I / I I I I I I I I ! / / ,II / I I ,/ I/ ,' 1! I I I I/ / / / / I/! I ' I I I I I II I I II I I I , ! I ; I I I I I I I I ; I I I I ' , ; I J/ I, I I I / / /( °t I I I I I I , I l // / / // // / / / / / / I/ / / // / / / / !/ / / I/ / / I/ / /1 /! 1/ ,/ /) /; // 111 ~II // 1 // /l// ?/// ;11 /1 1 11 // / i' /i / // // // _.7 / / / I / / 1 / / / ,/ JI / / / / / / / / / / 1 / / / / / / / ' / / \, // / / / / iw/ // / / / / f I I 1 // I / / / ; / / / /--" -/ -/ I I I I I j I I I I I I ! I I I I I I I I ,, I I I I 6 0 / / / ) /' I I I I I I i I ---;_.,--! i I ' ! I I I I I I I I ! I I I I I I I I I I ' ,;,i I -"' / / / I / / J I I j I -/-' _.,-) I / I I / I I ( I ! I / I I I I I ! I ' I I I I ' I I / ' ,1 ;( J I I I 01 / / / / / / \ / / I I I I I I -1-/ -_;-/ -I I p? ro/ // // / // /; / / / / /// /; // / / / // / / / / / / / / / // // // / I/ /I 1~\)fi // /// I!/ ,/// //// //// I ;/:///II/I Ill // // --"/~:~~~/-";I // / I ~ ~o [] C\, "'7" cf) ~ C) t'-0 •::j-I I / / / / / / / / / I i / / / / I i I / / I / I / / / / ( I I I / J / ~----/ r I / i ; / c--';·1 -, i~' c,'9 a ''I [::, [::, ;9 tiJ c', I I I I I I I I I I I ! ! I o I ! ' I / I ); / I I I / // / / ',, /I I ' I --/ l--' I I I , I ! I I ,:-; ' I ( i / / ;' /,; (\; [::/ 'T ID al / I / / / ; / aJ 'n 'v / / / / / , I / / / / / / I I _; ---I I / I I / 6 I I / / i ,' I ! / ('1 '1\/ ~::j N N O ("\J ... ~ ,,., / 0 CV J ;J? c::!i 0,' 0 1.?; (O I ,· I I I I I / / / / f I I I -/ /!! r----I I I l ·") / ,' I I I ' ("\j ('.I ,'<J /') l"l 'V 0-J '<:;j-(\J / (\J If) co I 1 / / / i . / ----l / I I / 1 ,1 / / 1, / / / 11 I / 01 N11 C\/ '"' fv) ;z: (\J / 01 / / I ':·J l.f) "O 1 / I / / I / / /i / ~ _-_-/ ..,, i.--j' ' Lt) 0 6" I · I ,'./ i I I ,, 0/ I I i I 0.; '-0 C'v / / / / \ / -----I --/ Ct) 0) (') V co co / / / I I I / / / / / / / / / (\/ (() \;-1 / / / / / ), _.-.-----.--· ,-/ I <':\/ 0.j ·J ((/ 0) 0) ~J I I I ; ' i ' ; "1 'o ro . ; , / / _?-7 ----; , i I r ; i I' "' "" I ' I I 1 / 1 I / I ':I <o ~' CJ I / / /_ .. --( /.,, ; I I / / I I ,··'! I I I I J / ~; l"1 /:.) I 1 / 1 / _ ,,, /~1-.' J( I I I I 1 1 I I 1 ; 1 1 1 r\j1 ; (0 1 / ------· ____ ,,:-~ ;/ ; / l __ A.;.:;,;JRcx1.v1.AT': _bud1or~ I I / ,, / I\ / ''\ _(-------/ / 1 / / c::: B<JRl:J 20" -D?C: ['11'1-" / / / , .. 1' I i\PP.=wxlf,;1/\TF.'.._:JCAilO~l, I 0; \'., "v . I ,~ I r0-vc----T11· ' so!o1r::,,;;~~i ~o;f.~~~~ \ // ~,~ l!:.-_;'v'\~'b,-1·';~ /n'b_,_()_'/// ///// >(///// !f /" --<c'/\ c,//)/1 / / / ,I I w ~ E (rno,1 21 Tf OF Rf:c. -oc1 \ / 1 / -.---· I ; ; ; 1 w D~Ni'/l~JG D-28.3103, ___ ..1---·/ ---/ I / / / I C /'< s RC_L . 91, FR 1 '15) \ -----·~;-·-------/ I I I / / / i I GRADING PLAN _)-----_:.::.------/ I 1 1 ct'b'" I/ I I / / f-g~. * ANY DISTURBED AREAS WITHIN THE OLYMPIC PIPELINE EASEMENT SHALL 10 o 10 _ --~-·----:----;--I / // / 1,v\l~ I II / I BE RE-SEEDED WITH THE REVEGETATION MIX PROVIDED ON SHEET 4, ---I ::! AND MULCH FROM COMPOST FILTER SOCKS SHOULD BE SPREAD OVER EXPOSED SOILS, FEET ,_____.-------::. .. --.-----/ / I f / LEGEND HA-1 * HAND AUGER COMPLETED BY GEOENGINEERS DP-1 + DRIVE PROBE COMPLETED BY GEOENGINEERS --lf--/1---lf--/f-SILT FENCE ~ WADDLES/ COMPOST FILTER SOCKS l~/~I STAGING AREA ---2 2 5---EXISTING TOPOGRAPHIC CONTOURS (FEET ABOVE MSL) -----PROPOSED FINAL TOPOGRAPHIC CONTOURS A' ~ CROSS·SECTION LOCATION (SEE SHEET 3) i 1---------------------------,-----------.----------.-----------------·"'--=----------,--::::-:.._.-__,.----------------------...J I > I i / ~ I GEoENGINEERS CJ ~:;::i'~l t-------------------+--l--------------------l--------1-----1--------1~~6iMrT~O~w~~rRE~~~s ~~f ,H_O_R_lz_o_NT_A_L_D_A_T_UM_: __ _J-E_N_G_IN_E_ER_--t-~1/-:;~c;;~/'-;-A1_0----j (6Jymp1~c OLYMPIC PIPE LINE COMPANY 00 · ·\) Y>p '1$) PRO 1--~ !~l'~P;m: 2319 L/nd Avenue S. W. ~ ,, ,.i/,r, 0 ~1 WAsli, ., .. ,,.. PERTY OF OLYMPIC PIPE VERTICAL DATUM: DRAFTER TJM ~ .. ~ c-•·c /SCTH A'/EIJU· ,.,. P, 4C5/UGl-60CJ "" ,,,~ .,;. f;, . ,,,. t--------------------+---+-------------------------1-------1--------l------1 LINE COMPANY AND SHALL f-=====+__'.11_/.=2'::'8/_/.'_1 '::'0_l---'.:::::=::::::./ ______ __:_R::.e::.n::.l.:o:.:n:.., ...:W:~o:.sh...:1...:'n.;:.q.:./0::.n:.:... _____ -1 " 1---------R-EC_v"_'_'·_'9-BC,_2 _____ r._415-/8-El-_eo_co _______ --J I i'i ' ~;iE:TE F~~P~E~E i~R~3~~ 1-N-o=T=E_B_O_O_K_S_: _____ _,[NGINEERING G Pl g THE LOCATIONS OF ALL FEATURES SHOWN ARE APPROXIMATE. ~ ,,t fl ' 1-------------------+---l--------------------+------l-----l----------l FOR WHICH IT IS EXPRESSLY f-C_H_E:_cC:,;_Kc___ ___ f-------l roding an io THIS DRAWING IS A COPY OF THE MASTER DOCUMENT. THE \;;o,?.>,~·~s'~~-},.~~~"""'.,"'':'.,i OLYMPIC LINE DRAWING S-100-29 FURNISHED. THE DRAWING DRAFTING Milepost 109 Landslide Stabilization Project ~ MASTER FILE IS STORED BY GEOENGINEERS, INC. AND WILL ' "', •::;,, ,> '.'i'O' i" f--------------------+--i----------------------1-------1-----+---------l AND ANY COPIES THEREOF CHECK Renton, Washington I SERVE AS THE OFFICIAL DOCUMENT OF RECORD. "•·:,,;~~~~i:;;;("11;' l-o_L_Y_M_P_1c_L_1N_E-:-:D:-R-=A-=W-=IN-:-G:-::-S-:-:-1_0'"'.'o_-_1 _12 ______ +-0-l-1-ss_u_E_o_F_o_R_P_ER_M_1_T_R_E_v_1E_w _________ ---1-_::3:L,/.::ic:::iML/.:..1 D:::_-1-_3:::,/c.;~:.;~:L,...:1_:;0~+---=3:L/.;;.~::.~t..7.:.:1 o:;'._j ~~~;;'~~ Rir~RN~~;6Ei~~ AFE NO'S: APPROVED DATE SCALE: DRAWING NO. 2 OF 4 REV. NO, ;; .._ _____________________ _._ _______ _._ _______ _._ ____ ;.;.R;;;,E;.;FE;.;.R;;;,E;.;.NC;.;E;...;;.D;.;RA;.;.W.;.;l;.;,N;;..GS:..... ____ ...J.:N.:..0::.;·..1.-______ .....;,R:::E.:..Vl:::S:.::IO::,:N _______ ....!.._....::.BY.:...__.,L..::;C;.:H~E:;:;CK::,:E;.:D:_L..:A:.::P.::.P~RO:::;V:!E~D...1. _____ A_D_. __ ...J. _________ L ________ ...J.. ___ ~N::.;O;;;.T~E,:;:D'.._ __ .J.. __ .,!D:'..:!M~.21~0!.;8~ __ L_O~_J QUARRY SPALLS IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION 9-13.6 4' 'EXISTING GRADE TYPE 5 AGGREGATE PER CITY OF SEATTLE STANDARD SPECIFICATION 9-03.16 OR "GRAVEL BACKFILL FOR DRAINS" PER WSDOT STANDARD SPECIFICATION 9-03.12(4) 15' RIP-RAP (1 TO 2 MAN) \..._/ )C)I /" )--V_ \.-~--) -'=;\\ c \-" m'c'-'/'~ ,'/"" 'I-~ -"a"· -~.,. -,~~ . . 0 /0; Hf_-~u~9-··:[~ci'"~. -~ \_ _ ~A __,, ',&)Q('j, -i}osS,K-Ll~;~,s.:":'.ALE ~G!52 '·\) 11T ___ /----)~ \/1/. c~" ,u~;;L';;;~_lll~-B.c '-,____/ \_ "--'\.] C \~ '{ Fe ~ \ '16 -, SEE DETAIL 3, THIS SHEET FOR SWALE ROCK GRADATION REQUIREMENTS 12"T018" 0 ,/ 0 16" DIAMETER HDPE PERFORATED PIPE NON-WOVEN GEOTEXTILE TC MIRAFI 160N 1-----3' MINIMUM -----1 DETAIL#1-INTERCEPTOR TRENCH DRAIN 0 FEET HORIZONTAL SCALE: 1"= 1' VERTICAL SCALE: 1"= 1' VERTICAL EXAGGERATION: 1X QUARRY SPALLS IN ACCORDANCE TYPE 5 AGGREGATE PER CITY OF SEATTLE STANDARD SPECIFICATION 9-03.16 OR "GRAVEL BACKFILL FOR DRAINS" PER WSDOT STANDARD SPECIFICATION 9-03.12(4) WITH WSDOT STANDARD SPECIFICATION 9-13.6 16"0 HOPE PERFORATED PIPE 0 0 0 0 0 0 0 0 0 0 0 ---1% SLOPE (MIN.) 0 0 0 MAINTAIN e 18" BETWEEN CROSS f----------DRAIN AND OLYMPIC PIPELINES /~~%~~ -- 0 I 1----0L YMPIC 16" PIPELINE DETAIL #2 -CROSS TRENCH DRAIN 2 """"!iiiii~""liiiiF~EE~T~""""""""""""'l HORIZONTAL SCALE: 1 "= 2' VERTICAL SCALE: 1"= 2' VERTICAL EXAGGERATION: 1X 0 2 1-----------------7' -----------------, 1' ---+--------5' MINIMUM --------f---1' NON-WOVEN GEOTEXTILE TC MIRAFI 160N A WEST PROPOSED GRADE OHWM I ROCK-LINED SWALE (SEE DETAIL 3, THIS SHEET) EXISTING GRADE PLAN VIEW RIP-RAP OUTFALL PROTECTION RIP-RAP (1 TO 2 MAN) KEY IN 3 FT PROFILE VIEW DETAIL #4 -RIP-RAP OUTFALL PROTECTION 5 0 5 FEET HORIZONTAL SCALE: 1"= 5' VERTICAL SCALE: 1"= 5' VERTICAL EXAGGERATION: 1X PROPOSED FINAL GRADE EXISTING GRADE RIP-RAP (1 TO 2 MAN) CROSS DRAIN (SEE DETAIL 2, THIS SHEET) -":' <( :,: APPROXIMATE EXCAVATION LIMITS- ,;- II. C ~ :,: 16" DIAMETER HDPE PERFORATED PIPE A' EAST ~ EXISTING 16-INCH OLYMPIC PIPELINE EXIST! NG 20-INCH OLYMPIC PIPELINE NON-WOVEN GEOTEXTILE (140 N TYP.) : [ 12" MINIMUM I CONSTRUCT RIP-RAP OUTFALL PROTECTION PLACE RIP RAP AT END OF ROCK-LINED SWALE TO DISSIPATE FLOW (SEE DETAIL 4, THIS SHEET) CUT BENCHES INTO UNDISTURBED/ FIRM SOILS ~ ''\ ~Jalz--;-'-~z:? {t~--,-\Z.7)-'r--n. · \: /""' 1i /'.~/ ~~=~( ~-;_1 .. /t~· ;'c,s;:-\/<l:c-CJ~~ ~ -......_,\~ /S,:)(,_,_C:'. -'"~(-' / ... )z._;'{.JC5'(_)C71 "'...."~ a '>/' r, ';'<_-·( '>z--..;;r \>;-~r/ 'it·:::;r-,(".-Y--'{c ::;r:;",Y /)">/ Q '-./1vl'.L>......,)\_.c~·--·J,"1, _,/-}L/~ __ /f-'"5L./r1,,q':,_j1-:,' ,V ~ y)...'.1H "\ ··, __ e-· -'---f'J--lc~A y·, \,_ ... /·, 'oca/, _\.~ ;/1H_Y,'.Aj'.' ~ 24"MINIMUM "{'V0 -~:J'1-t:1Jct/'\/j"'' ,~,tr1t'?J~Z~f~f.~+~_) ~* ... / ~ />Y)>.> -1~,e,1.~ 01-·(=t.Jo~~-t:0.-<~'l\ <-J--"'-:;1/Y/N/// Q!i /'(/ ::(>~ )c-f( Jc::'7f 'i(~\ Jc-)z, ';--)! 'oC )c:;r )c~z MV, '"// ": -~c;.c -/--,0-',-w, n-kqL· ·,-o-_)(ie> --r1c,·--~ ;,/, ', '' NON-WOVEN GEOTEXTILE ;./ /'v "-!C:J c:( 'C -'C_ Cf C::( / /V , ~ ,//,// ,, }~,\ J/-, }-, ),-·,1 /,Q\ _ __,7 -,1 ,//-.../ TCMIRAFl16DN ~ v'-., ~/-/\_ __ /( _J-/v'-'-J-"' J 1 -"' ~'-» C~ V~ "'... ,'..'... ;, '-.. ''3' !J11NIMU"1;... ,'..'... .-...'... 2,. 7'.):;•/); SWALE ROCK MEETING THE FOLLOWING GRADATIONS. i /~(~·«~·«~;~~«~<2~v'0 1 ~~< / / ;:: /~//{//.·...._/;/:,/ /:.:: / ,>{//Y>/0~ ..;/,-< / m SIZE PERCENT PASSING w DETAIL #3 -ROCK-LINED SWALE 12" 100 OHWM OHWM UNNAMED STREAM ON SHEET 1 SWALE ROCK (SEE DETAIL 3, THIS SHEED CUT STEPS (2 FOOT VERTICAL) INTO UNDISTURBED/FIRM SOILS AT 20' ON CENTER. TWO STEPS AT A MINIMUM ALONG ROCK-LINED SWALE 16-INCH DIAMETER PERFORATED FUSED HOPE PIPE ENVELOPED IN 6-INCHES OF GRAVEL AND WRAPPED IN GEOTEXTILE (SEE DETAIL 1 THIS SHEET FOR GRAVEL AND GEOTEXTILE SPECIFICATIONS) LANDSLIDE STABILIZATION DESIGN PROFILE ~ r ~= o 10 . ..,.!iiiii~"'",iiiii,iio~""""""""""""~1 o ~ ~ W= C ~ ~u r o = g HORIZONTAL SCALE: 1"= 1' HORIZONTAL SCALE: 1"= 10' :g VERTICAL SCALE: 1"= 1' VERTICAL SCALE: 1""' 10' LEGEND: "I g; SAMPLE ID SM SOIL TYPE GROUNDWATER LEVEL OBSERVED IN PIEZOMETER 280 270 260 250 240 230 220 210 z 0 ~ w :::i' VERTICAL EXAGGERATION: 1X VERTICAL EXAGGERATION: 1X ~1--------------------------,--------------,---------,--------------------,-r-------------------,-----,----,-----T----------,.'.inim;:;-;:;'r.i'i,wm.:----,----,,--;;:;-;:--T--::::::=::::::---::-:---:-::--:::-::-::--::-:-::-::-;-;-:--;:=--::-::-::-:-::-:-:-::-:---i 51 THIS DRAWING AND ALL HORIZONTAL DATUM: ENGINEER ABA Olympic OL YMP/C PIPE LINE COMPANY ~ GEoENGINEERS CJ 1------------------+---t------------------i------+------t-------j INFORMATION THEREON IS THE 11 281 10 ~!,t~el:I,' 2379 Lir1d Avenue s.w. ;;, PROPERTY OF OLYMPIC PIPE i-c-V-E-R-TI_C_A_L_D_A_T.,..U-M-,------1 DRAFTER TJM • = 1--------------------+--+----------------------t------t------t-------j LINE COMPANY AND SHALL 1--------1-.......:1.1./..:2:.'::8'.!'./--'1_:::D:_-1-_ _::::::===-------..:R.:.e::.:n..:/:.:o.:.n:.:., _w_o_s_h_in..:g:..l_o_n ______ --1 ~" B•ilO 154TH A'/''1,' ,.,E C 425/86HD00 NOT BE COPIED OR USED ENGINEERING 0 1---------''°-"0_·m_. ''_'_""°_" _____ ''_"_'1_"1_-a_cso _______ ----; EXCEPT FOR THE PURPOSE t--N-O_T_E_B_O_O_K_S_: _____ -j i. i-c---------------------i----i---------------------,------,-----,------, FOR WHICH IT IS EXPRESSLY ,__c_H_EC_K __ --+---------, THE LOCATIONS OF ALL FEATURES SHOWN ARE APPROXIMATE. OLYMPIC LINE DRAWING s-100 _29 FURNISHED. THE DRAWING DRAFTING l THIS DRAWING IS A COPY OF THE MASTER DOCUMENT. THE 1-------------~------+---1---------------------+--------+----=----+------1AND ANY COPIES THEREOF CHECK Drainage Control Details and Landslide Profile Milepost 109 Landslide Stabilization Project ,:; MASTER FILE IS STORED BY GEOENGINEERS, INC. ANO WILL OLYMPIC LINE DRAWING S-100 _112 Q ISSUED FOR PERMIT REVIEW TJM ABA SOS (PARTIAL OR COMPLETE) AFE NO'S: APPROVED I SERVE AS THE OFFICIAL DOCUMENT OF RECORD. 3/26/10 3/26/10 3/26/10 SHALL BE RETURNED TO THE SCALE: DATE Renton, Washington DRAWING NO. 3 OF 4 t------R--EF--E:-R-E-NC __ E __ D_R-AW-IN_G_S-------+N-O--.+--------R:-E-V--IS-IO:--:-N-----------t-----:B-'Y--t--:C':"'.H::-EC:':K--E:-D-t-A--P'-P--R-'-0--VE--D~ OWNER ON DEMAND. NOTED liL-------------------------1-----------"---------'---------------------'---'--------------------.._ ____ ...__ ____ _._ ____ __. __________ ...._ _________ ...... ______________________ ...._ __________ ...__ __ ...., D-M-108 REV. NO. 0 0 = 0 Joints in filter fabric shall be spliced at posts. Use staples, wire rings or equivalent to attach fabric to posts ~/ I . I I I I I I I .. f .... ' .. ~ tL .: ,. "+;: t r-,-··r F . C T~ T + I I . g I 2"x2" by ·14 Ga. wire or equivalent if standard __ . strength fabric used .. , Filter fabric·---1 ,llrlllie¥Jillili!c-';l,i ~I ' . f I ' I ~ 1 !lPrn-11,a.l]Hlt'I ~,11c:111=1T1=rrec, ;,fl ll'cn~rn -'iTI , . ml.I.cm-,, .r,---,,1 __ 1t=11a-rET,U, .. • -1 I r:;. 6' max-------1 1-....-._ Minimum 4"x4" trench / ~ / L\I Backfill trench with native soil Post spacing may be increased or 3/4"-1.5" washed gravel / to 8' if wire backing is used ~ 2"x2" wood posts, steel fence posts, or equivalent DETAIL #1 -TEMPORARY SILT FENCE REFERENCE, WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON (FIGURE 4-19) INSTALL DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT 4"-8" QUARRY SPALLS NOTES, GEOTEXTILE 1. DRIVEWAY SHALL MEET THE REQUIREMENTS OF THE PERMITTING AGENCY. 12' MIN. 2. IT IS RECOMMENDED THAT THE ENTRANCE BE CROWNED SO THAT RUNOFF DRAINS OFF THE PAD. DETAIL #2 -STABILIZED ACCESS ROAD/ CONSTRUCTION ENTRANCE BMP REFERENCE: WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON (FIGURE 4-2) NOTES: SAND BAGS OR STAKES ~':i_ ~-:r-~,~ \__ COMPOST FILTER SOCK (TYP.) 1. 8" diameter Filtrexx Soxx filled with cedar grove compost or similar. 2. Upon completion of the project, the compost will be distributed throughout the area disturbed by construction. The filter sock will be removed from the site. DETAIL #3 -STRAW WADDLES ~1-------------------------------------------------------------_.j g " ~ a ~ ~ ~ a: ~ .. >-" ~ i ~ i ~ ~ " ~ >- 9 :g GRASS SEED MIX SPECIFICATIONS 1. WASHINGTON STATE D.O.T EROSION CONTROL MIX (Right-of,way !ROW] Reseeding Mix outside of wetlands and wetland buffers) Standard blend specified by the Department of Transportation. Quick to germinate; aggressive; hardy varieties for the Northwest. Seed Blend: Seed Rate: Ground Prep: 40% Red Creeping Fescue 40% Perennial Ryegrass 10% Highland Bentgrass 10% White Clover 40 -80 lbs per acre depending on the slope Soil must be loose enough for the roots to establish Preparation for Work 1. Complete One-Call Utility Locates 2. Install Temporary Erosion and Sedimentation Controls (TESC) per plans shown on Sheets 1, 2 and 3. a. Construct a stabilized construction entrance (approximately 12 feet wide) by placing at least 8 inches of quarry spalls over geotextile fabric to prevent tracking mud (see Detail 2, Sheet 4). b. Prepare unsurfaced access roads, and parking areas used by construction traffic by placing quarry spalls or crushed gravel over geotextite fabric to minimize erosion and prevent tracking mud (see Detail 2, Sheet 4). c. Install silt fence and straw waddles around the downslope perimeter of the work area (Detail 1, Sheet 4). 3. Mobilize equipment and materials to the site. 4. Delineate clearing limits/areas to remain undisturbed during the project with flagging. Landslide Stabilization 1. Excavate soft, disturbed, low-strength soil from the slide mass area (as shown on the profile on Sheet 3) to a maximum depth of about 8 feet below the ground surface at a maximum of 1H:1V slope. a. Cut steps/benches into the undisturbed, native soils to prepare stable surfaces for rock placement. b. Place excavated soil into haul trucks to be removed from the site. 2. Place a 16-inch-diameter perforated HDPE pipe at the bottom of the excavation in the toe of the landslide (oriented north-south) to collect water from the rock buttress. The perforated pipe should tie into a 16-inch tightline HOPE pipe to transmit the water collected in the perforated pipe out of the landslide repair area (see Sheets 1, 2 and 3). a. The perforated pipe should consist of 16-inch diameter HOPE with. fused fittings and should be perforated around 180 degrees of the top half of the pipe. The bottom half of the pipe should not be perforated. b. The tightline pipe should consist of 16-inch diameter HOPE with fused fittings. c. The tightline should be tied into the perforated pipe at the lowest point at the toe of the rock buttress and should slope down to the west at a minimum slope of 1 percent. d. The tightline should be buried in the riprap of the rock buttress and should discharge into a rock-lined swale constructed downslope of the landslide stabilization area (see Sheets 1, 2 and 3). 3. Place loose riprap (per Washington State Department of Transportation (WSDOT) Standard Specifications (2006) Section 9-13.1, and having a median diameter (050) of 18 inches or larger, on the excavated slide subgrade. The riprap shall be placed at an inclination of 1.5H:1V or flatter. a. Rock fill should be compacted by tamping in place with the bucket of the excavator. TEMPORARY EROSION AND SEDIMENT CONTROL NOTES FROM CITY OF RENTON P/BIPW DEVELOPMENT SERVICES Clearing Limits • Prior to any site clearing or grading, areas to remain undisturbed during the project shall be delineated with flagging. Keep Ground Covered • Minimize the amount of existing vegetation disturbed for construction. No work will take place within wetlands or wetland buffers. • All disturbed areas shall be covered and/or mulched within 12 hours, if they are to remain unworked for more than 7 days from May 1st to September 30th. During the months of October 1st through April 30th, disturbed areas must be covered or mulched if left unworked within 2 days. • Accepted mulch material includes straw, wood fiber, and cellulose. • Slopes and stockpiles 3H:1V or steeper and more than 10 feet of vertical relief shall be covered if they are unworked for more than 12 hours. • All areas being worked prior to October 1st, and are being seeded, shall be seeded by September 23. Mulching is required over any exposed soils to protect all seeded areas until an adequate growth is established. Perimeter Protection • Perimeter protection to filter sediment for sheetwash shall be located downslope of all disturbed areas and properly installed prior to upslope grading. • Install silt fence and straw waddles around work area, as shown on Sheet 1 and 2, per specifications on Detail 1, Sheet 4. Traffic Area Stabilization • Unsurfaced driveway entrances, access roads, and parking areas used by construction traffic shall be stabilized by placing quarry spalls over geotextile fabric to minimize erosion and prevent tracking mud (see Detail 2, Sheet 4). • A stabilized construction entrance shall be installed as the first step of clearing and grading (see Detail 2, Sheet 4). • Construction entrance shall be set up so that all traffic leaving the job site is required to travel the entire length of the entrance. • Any sediment that is tracked onto pavement shall be removed immediately by sweeping. The sediment collected by sweeping shall be removed or stabilized on-site. • If non-vactor type sweepers are used, the deposition of these sweepers must be removed from sideV-lalks and gutters. The sediment collected by sweeping shall be removed or stabilized on-site. • The pavement shall not be cleaned by washing streets. Sediment Retention & Surface Water Control • • No off-site discharge is anticipated during the project.. lf any runoff occurs during the project, seditneiit traps/stilling basins shall be used to collect, detain, and settle sediment from surface water runoff or water routed away from the excavation. Sediment control BMPs (silt fence and straw waddles) will be installed upslop~"qf.the""€Xisting stream adjacent to the site to prevent any sediment from leaving the site. Sensitive Area Restriction • Project shall be completed during the dry months to reduce potential for erosion and runoff from rain. • No work will take place in any sensitive areas (wetlands or stream). Maintenance Requirements • Routine inspections of the construction site shall be conducted to ensure effectiveness of the measure_s and to determine the need for maintenance or additional measures. , A Certified Erosion and Sediment Control Lead (CESCL# 10220825) will be available throughout the project· Brooke Asbury and will be responsible for ESC review, maintenance and compliance. • ESC will be inspected a minimum of once a week during the wet season and within 24 hours of significant storms (0.5 inches/24 hours, or where run-off is generated) . • The CESCL shall be available, 24 hours, for rapid response to ESC problems and emergencies. • The 24-hour phone number for the CESCL is 206-229-5698, which shall be posted in a clearly visible location on the project site. Final Stabilization Prior to final construction approval, the following conditions must be met • All disturbed areas of the site will be vegetated or otheiwise permanently stabilized; • Structural measures such as silt fence, slope drains, etc. will be removed from the site; • All permanent surface water facilities including catch basins, pipes, etc. will be cleaned; • Any off-site catch basins that required protection will also be cleaned; CONSTRUCTION NOTES Drainage Improvements 1. Construct a north-south oriented interceptor trench drainage system along the east side of the pipeline easement to collect water from upslope (as shown on Sheet 1 and Sheet 2, Detail 1). The interceptor trench drain will tie into an east-west oriented cross trench drain (Detail 2, Sheet 3) to transmit water across the pipeline easement to the head of the landslide repair area a. The interceptor trench drain should consist of a 4-foot-deep, 3-foot-wide trench filled with a 3-foot-thick layer of free-draining rock surrounding a 16-inch diameter perforated pipe. The perforated pipe and drain rock should be wrapped in a geotextile fabric (TC Mirafi 160N or equivalent). A 12-inch-thick layer of quarry spalls should be placed to fill the upper portion of the trench (Detail 1, Sheet 3). b. The cross trench drain (which crosses the pipeline easement) should consist of a 2.5-to 3-foot-deep, 3-foot-wide trench to allow at least 18 inches of separation between the bottom of the trench and Olympie's petroleum pipelines. The cross trench drain should be filled with an approximately 2-foot-thick layer of free-draining rock surrounding a 16-inch diameter perforated pipe (the pipe should slope at a minimum of 1 percent slope down to the west). The perforated pipe and drain rock should be wrapped in a geotextile fabric (TC Mirafi 160N or equivalent). A 12-inch-thick layer of quarry spalls should be placed to fill the upper portion of the trench ( Detail 2, Sheet 3). c. The perforated pipes should consist of 16-inch diameter HOPE with fused fittings and should be perforated around 180 degrees of the top half of the pipe. The bottom half of the pipe should not be perforated 2. A rock-lined swale should be constructed to drain water from the landslide repair area to a stable area at the bottom of the slope. The rock-lined swale should extend from the toe of the rock buttress and should discharge into a riprap outfall area constructed above the Ordinary High Water Mark (OHWM) of the unnamed stream at the bottom of the slope. a. The rock-lined swale should be excavated to a depth of at least 2 feet deep and 2 feet wide at the base with side slopes cut at a 1 H:1V slope or flatter (see Detail 3, Sheet 3). b. The rip rap outfall should fan out from the swale to a maximum width of 15 feet for a length of 15 feet from the end of the swale and should be keyed in at least 3 feet deep (see Detail 4, Sheet 4). 3. Place an approximately 1-foot-thick layer of 2-to 8-inch angular rock (shot rock/quarry spalls) within the excavated swales, forming a shallow U-shaped channel, approximately 12 inches deep. Revegetation and Restoration 1. Any grass within the pipeline easement or surrounding areas that is denuded during construction should be re-seeded with the Grass Seed Mix Specifications (Sheet 4) and any exposed soil should be covered with mulch. 2. Restore site to pre-existing conditions and remove all TESC BMPs, and equipmenUmaterials from the site. LEGEND 4 Longest Flow Path ™ Area 1 · Rir,-Rap (1,585 square feet) ~ Area 2 -Gravel (4,380 square feet) ~ Area 3. Lawn (5,090 square feet) ~ Area 4 -Light Forest (5,484 square feet) PARCEL I 1823059137 // /;/ 11( ~ I I~'/ I / if.· i I (j /;I/ 2::/ APP'ROXIMATE\1,/ff// / i1 ORDINARY HIGH / .,: I I 0' WATER MARK / /[! , 1 c" ::c-I -.c· I c,_£_ ,'f" ., -1/ ,\ I If I I I I I I I I I I 0 ,; N I I I I ////;'// 1 ~-./.._ ) i /, 1( J -/--1 I I r/ ;.,-~ (._, __ , / //,. ~, I ;/,.. ";"'"'"! I' r---1 -~-/ / l :o ·-7 "!'"'c-, I ) I nG / '< ~,' ;!, .,;, •. I· ' V I \ ' (i i" ; 111 / ' I I I ,C I i ' '! · , t i I ,. I "'"'i'J~ ; I '\~ \ t;J °'11 I ! I I I I I ) / I l'---__l____ 1\ 1. / 1 7 ~/ I / J 1r------;7--r""'"-l!t:,:i; ,...,.,:;;;":// '\ / / / I I I I I I -~irl< ,,.,..,.,./;.:/,,..,. / / 1'1 / //I/ / ,_,,,... .. / I ;! \/(II / I I I // /; I I / / //II I I I I I I !I I I I I I I I II I I I I I ! I II I I 1 i; l I I I I I II I I I II I // II I I I / / I I I I I I I I ' I 8 0:!}2, // r11 !:i,,1 r-.JJ!lou, "' 0 ,, ' Q I / r ·v ~ ;::J I I I , .. 0/ I \ 1-1\~PROXl,IATE l_l)CATIOfl ::;~ EX.STING 20" HDPE S[C·lfA\\'Alif! nc11ru~JE (f,:m,I CITY OF RENTOfJ ')RA\'.'I\JG D-WJ1D3, :.:OL 191, FR 115) I I C "' 'i' I I ! I I I I ! / I I I ::; I 0, 0 I ,, " I I I I ----- I 30 Estimated Volumes The total estimated volume of soils to be excavated is approximately 320 cubic yards. The total estimated volume of temporary and permanent fill material is approximately 780 cubic yards. The actual excavated volume and fill volume may be somewhat greater than the in-place volume of soil due to aeration of the excavated soils and the compaction of the fill material. Of the total fill volume, we estimate the following approximate volumes for each fill type: 500 cubic yards (600 tons) of riprap, 43 cubic yards (52 tons) of quarry spalls and swale rock, 25 cubic yards (30 tons) of drain rock, and approximately 210 cubic yards (252 tons) of crushed rock for road surfacing. Fill will consist of rip rap, which will be imported from the Cadman High Rock Quarry at 19221 High Rock Road, Monroe, Washington 98272. Quarry spalls and crushed gravel will be imported from Cadman Black Diamond Pit al 26111 SE Green Valley Road, Black Diamond, WA 98010. Excavated soils will be disposed of at the Cadman Black Diamond Pit Project Schedule The project is scheduled to begin in July, 2010. The work will take approximately 4 weeks to complete. I I I I \_-,~J I Q I ~ "1 I I I 4'1 . '¥ Ai-'-t I 9:-t,.,j I I . I I ' ' I I I I I I X X I I ! I I 0 i~~ I \. j / I I ' I \ ' \ r-~--~-/-~ I I I I I \ \ \ I I I ~-----------___j ~ ~ \ -,- \ ~ \ \ \ ' \ EXIS11NG ' DETENTION 1. POND ' ' ' \ I ' ' ' I DRAINAGE PLAN 0 30 FEET 1 ~XIST f,G / 2ATCH 8ASI > EX/STING MOBILE HOME PARK I ~ G E ? ~l1llt.s,,, THIS DRAWING AND ALL HORIZONTAL DATUM: ENGINEER ABA 1/28/10 OLYMPIC PIPE LINE COMPANY ~ . Eo NGINEERs /./~ (ff) ~p.s1:-iu'''' 1--------~------------+----+------------~~-~~--+~~~~+-~-~+--~---llNFORMATION THEREON 1s THE ii' 1 ~l'-[<1 • ~ f------------------------lf-----l------------------------1-------1-------+-------lllNE COMPANY AND SHALL TJM 1/28/10 Olympic ..:.i.a. 'PIPE UNO ~ COl.4PMfl" 2 319 Lind Avenue S. W. Renton, Washington :g ;, ;r<> 01 WAs7,~I'~~' PROPERTY OF OLYMPIC PIPE VERTICAL DATUM: DRAFTER 9 ~~6~0JtJ~ttJ~~\=/·E ~i t2tJ~l=~t~f -" f "'' NOT BE COPIED OR USED ,__ ____________ __, ENGINEERING ~ EXCEPT FOR THE PURPOSE NOTE BOOKS: CHECK Drainage Evaluation Plan, TESC Details and Notes ~ THE LOCATIONS OF ALL FEATURES SHOWN ARE APPROXIMATE. ' ' 1-----------------------1-----1-----------------------1-----_J__ ____ ---IL.. ____ _J FOR WHICH IT IS EXPRESSLY 1-------+--------1 ~ THIS DRAWING IS A COPY OF THE MASTER DOCUMENT. THE '\!~ 'a 1,;332509 \r,10 OLYMPIC LINE DRAWING S-100-29 FURNISHED. THE DRAWING DRAFTING Milepost 109 Landslide Stabilization Project -\,/'!!, ''"'"s-n:·,8 oif. >Ii' l-----------------------1----1------------------------1------_j__ _____ _j_ ____ ___J AND ANY COPIES THEREOF CHECK R t h 1 MASTER FILE IS STORED BY GEOENGINEERS. INC. AND WILL <'i:,is:s'!ow" -<i,"f.,,rti OLYMPIC LINE DRAWING S-100-112 0 TJM ABA SDS (PARTIAL OR COMPLETE) f------------GA'°'P'°'P;;-RO;:cVc;-E;ccD::--~--;ccDA-;-cT;c;Ec------l en on, Was ington I SERVE AS THE OFFICIAL DOCUMENT OF RECORD. ;., •• ;.;,,,.;';.rt"' 1-------------------+--l-1_s_su_E_D_F_o_R_P_E~RM_IT_R_Ev_1E_w _________ 4....:c0::.3/'-2::.6c;/_1:.::0~~0:.::3:.c/..::2:.::6!.../.:.1.::.0-4-....:co::.3/'-2::.6::.:/_1:.::o:_--J SHALL BE RETURNED TO THE AFE NO'S: 1-,s'"'c,..,A"'"L""E-, --------,..,,.D~RA-w~1-N=G-N=o-. --~4-o=F-4-~R~E~v-. ~N~0,-1. ii .._ _____________________ _._ _______ ...._ _______ _._ _____ R:.::E..;FE;.;.R::.E:.::NC:.::E;;...;;.D:.::RA:.::W..;l:.::N.;..GS""------1."-N0;;,,;'..1-------....;R;.;E:.::V;.;IS.;.;IO;.;.N;._ ______ ..... _ _;B.;,.Y _ __.__;c;.;.H;.:E~C;.;:KE:.:D;._.....:A.;;P..;.P.;.;R.;;.OV.:.;E;;;:D__._0_w_NE_R_o_N_D_E_MA_N_o_. __ ....J. ______ ....; __ .L ________ ..J. ___ _:N.:.O:;;;..:,T,:;E;.:;D;_ __ ..J. __ _:;:D__:M.::__1:..;0~8:._ _ _J,_..;'.o_.J 00 L{) a, 0 0 N . 0 N 0::: D.. <( z 0 0 :::, <( I u l:: f- >-a, 0 w IL 0 0 l:: -0 10 X ..t N CD <( 1- ---(.!) ~ 0 0 0 0 I 0::: 0 a, I (.!) w z 0 0 :.::: C/J <( I- 0 0 I 00 00 ..t a, 00 0 ---Cl <( (.) ---0 0 ---00 00 ..t a, 00 0 ---0 ---C/J f-u w ...., 0 0::: CL ---0 1434000010 1623059139 Notes ' ;1 ' I ' 830' 1623059138 PROJECT SITE 1623059137 4 I I l -0 I C'? ,N I ..- I I I ,---,' WORK AREA---~ I L ___ _J l 670' ---------11-.J l J ! 1623059048 1623059015 Renton 1623059022 1330' ' ,, ' I I ,,a_, ' ,' 1523059187 l-o 0::: ! 1- ! 8 ,..... N LO ..- City of Renton Planning Division A~k 2 6 Z010 1. The locations of all features shown are approximate. Neighborhood Detail Map 2. This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. can not guarantee the Olympic MP 109 Landslide Project accuracy and content of electronic files. The master file is Renton, Washington stored by GeoEngineers, Inc. and will serve as the official 100 0 100 record of this communication. ,-,; Figure 1 Reference: Klng County iMap. FEET GEO ENG I NEER~ 3:.___ ______________________________________________________ ___.!~==============================:=!::============~ z 0 l:: 0 w 0:: --- OL YM,P.1c P/pt·· ~11,'~,': F/t''c:-, ,-\ ·--'L'V,!::liT I TEMPORARY STAGING AREA* ~ i X X X I ' '-- ; I ; I I C I .. ') I I I I f I I \ I I I I _J ,, --~-------' \ I, CONSTRUCTION ENTRANCE BMP (SEE DETAIL 2, SHEET 4) \\\ EXISTING CATCH BASIN-,,;;~::>::""-' 30' <"1 ~ EXISTING MOBILE HOME PARK (,,,(\ ~. ' ''<;: ', : () ~. ~[.; ~ --X -----X-----X -----X ----X: ----X----·--X -----X --. ----X ------X ~---X ----. X -----X ------X --~-X I I ~ Ji I SITTP~N I VICINITY MAP W.E s 200 0 200 FEET LEGEND HA-1 '4r HAND AUGER COMPLETED BY GEOENGINEERS DP-1 + DRIVE PROBE COMPLETED BY GEOENGINEERS -lf-N-lf-/1--SILT FENCE ~ WADDLES I COMPOST FILTER SOCKS v~i STAGINGAREA ·225---EXISTING TOPOGRAPHIC CONTOURS (FEET ABOVE MSL) A ~ SITE ADDRESS: A' ~ CROSS-SECTION LOCATION (SEE SHEET 3) LANDSLIDE STABILIZATION AREA IS LOCATED APPROXIMATELY 150 FEET WEST OF LAUREL DRIVE AND 300 FEET SOUTH OF HEMLOCK DRIVE. RENTON, WASHINGTON ON PARCEL#1623059137 OWNER/APPLICANT: BP/OLYMPIC PIPE LINE COMPANY 2319 LIND AVE SW RENTON, WA 98057 T: 425-981-2520 IF 425-271-5320 EDWARD.SMITH@BP.COM PARCEL AREA: 554,083 SQUARE FEET (12.7 ACRES) PRbJECT SITE AREA: , 16,600 SQUARE FEET (0.38 ACRE) -INCLUDES EXISTING ACCESS ROADS AREA OF WORK: 2,400 SQUARE FEET· AREA OF DISTURBANCE ON-SITE CRITICAL AREAS: APPROXIMATELY 2,200 SQUARE FEET NEW IMPERVIOUS AREA: 7,920 SQUARE FEET I (5,520 SQUARE FEET OF THE IMPERVIOUS AREA IS IMPROVEMENTS TO EXISTING ACCESS ROADS) EXISTING IMPERVIOUS AREA: NONE AT THE PROJECT SITE EXCAVATION VOLUME: 320 CUBIC YARDS (384 TONS) FILL VOLUME: 780 CUBIC YARDS (936 TONS) SOIL DISPOSAL LOCATION! CADMAN -BLACK DIAMOND FILL SOURCE I TYPE1 FILL SOURCE: CADMAN TYPE: RIP-RAP (1 TO 2 MAN) 19221 HIGH ROCK ROAD MONROE, WA 98272 TYPE: QUARRY SPALLS AND CRUSHED GRAVEL 26111 SE GREEN VALLEY ROAD BLACK DIAMOND, WA 98010 City of Renton Planning Division APR 19 1010 ! 20 20 ~ 0 *ANY DISTURBED AREAS WITHIN THE OLYMPIC PIPELINE EASEMENT SHALL / O !I PROJECT CERTIFIED EROSION & SEDIMENT CONTROL LEAD (CESCL): ;j; BE RE-SEEDED WITH THE REVEGETATION MIX PROVIDED ON SHEET 4, FEET . BROOKE ASBURY, GEOENGINEERS fr3Jfc,1'ufeo'/iff ~ AND MULCH FROM COMPOST FILTER SOCKS SHOULD BE SPREAD OVER EXPOSED SOILS. I 11, CESCL#: 10220825 1Jll1£1(;.,u;;, v:/ /E[Q :i: ,--------~---:=---------::::--------,---:=;:;:;;~---,-=----=------'-T----------!._-----------,-,------------------------r--------i------r-----T-----------1HCwiTrw'w,'iA'i'iiiir~ :..· --,-----,---;:;:,;-;---r--:::::=::::-------------------------~ ~": GEOENGINEERS CJ./) THIS DRAWING AND ALL HORIZONTAL DATUMf' ENGINEER ABA OLYMPIC PIPE LINE COMP'ANY ::; t-------------------1------j--------------------+-----------l------l---------l INFORMATION THEREON IS THE l-----------4----1-----i---1~/-:;:2~8/~1 O_--j r\ ,e PROPERTY OF OLYMPIC PIPE VERTICAL DATUM: 'I DRAFTER TJM 2319 Lind Avenue S.W. ~ MlO lWH s:EUE 9[ ' 425/861-6C•OO 1------------------------+--t------------------------l---------l---------l-------l LINE COMPANY AND SHALL I ::-=====+-__'._1 /L=2.'::8'f_/_'1_co,__+--.::::::::::::::::... _______ :._R:.::e:.'.n:..l:.::o:.'.r::.1,_:W..:.o~s:..:h::.in.:,:9::_t:.::o:::n.:._ ______ --1 § 1---------'-''°-H0-110 ·-"_' "_"_" _____ .··-"-516-31 --50-50--------1 ~~;Eil F~iP~~E i~ R ~~~~ f--N __ O __ T __ E_B __ O __ O __ K __ s __ , __ _,__ __ __,r ENGINEER I NG Site PI a n a n d Vicinity Ma p ~ THE LOCATIONS OF ALL FEATURES SHOWN ARE APPROXIMATE. l--------------------+--+---------------------1-----_j__ ____ _J _____ _J FOR WHICH IT IS EXPRESSLY f--C __ H __ E __ C __ K ___ l--------1 ~ THIS DRAWING IS A COPY OF THE MASTER DOCUMENT. THE OLYMPIC LINE DRAWING S-100-29 FURNISHED. THE DRAWING DRAFTING Milepost 109 Landslide Stabilization Project j MASTER FILE IS STORED BY GEOENGINEERS, INC. AND WILL f-------------------+--l---------------------l-----_j _____ L ____ J AND ANY COPIES THEREOF CHECK R t W h' t ~ SERVE AS THE OFFICIAL DOCUMENT OF RECORD. OLYMPIC LINE DRAWING S-100-112 0 ISSUED FOR PERMIT REVIEW TJM ABA sos (PARTIAL OR COMPLETE) AFE NO'S: APPROVED DATE en on, OS ing on ~ t------::R:-EF;:-;E:--;:R:;:E'.'7N'.'.:"C E::--:D:::R:-"."A'."."W::71 N-::G:::S:--------+-:-:-+------------------+-.::3'.L/,;;.2~6 /c...1c..:0:...._+-.::3'.L/:;:,2 6::,/c...1;.,:0:...._+-.:;;:3L/.:;.2 6~/'...1:..'.:0'--1 60~~LR B5 N Rr5t~:~ 60 TO THE SCALE: DRAWING NO, 1 0 F 4 REV. NO, :ii L,... ______________________ _J ________ .1.... _______ ..1... ____ ..:.:,::;,.;,:.:.:;.:.:.::;,,:;;_:;::.:.::;~.:::.::.-----...l.!N~O:.;,·.,L _______ .'.;R,!;,EV::,:l,;;,S~IO:;::N ________ L_2.B.!..Y _ _J_C~H~E:,:C;!:K!E~D_J_;,A~P:!::P~RO~V~E;,.!:D:...J..::.:.:.:.::...:::::.::·~--J_------"'"---j_-----,-----L---N~O~T~E;;.D~ ___ L __ !;D'..:_~M~21~0~8~--L.10~J I I I I I I I I I I I I / I I / / / I I I I / / ( ' i I I ' I' /,' j ,, / \ / I I / / \ I ) I I I \ PARCEL # 1623059137 ~,,,,, ,~~00., ,,J I LOCATED 15D FEET TO THE NORTH / (NO DISTURBANCE WITHIN 200 FT : I I I ; ~fil~~ I I I / I I 1 ~) )1 l ,,!, ~ / / / 1 1 I / / / 1----------------------- I ~--------- I I // \) ,.;; N N N ~-II I I I 11 I 1/ 1111 /////I;/ 1; I 111' 1; ////;II I; I I//; ', I I I I I / I I I I ; I I I /I '1 I I I ! / 1 / / / PROPOSED / , / / / / qj 1 :, \ i / I , / / / / / 16-INCH DIAMETER 1 ;;.j o CV V '\ 1 ,t / / SC I I I I I / I I PERFORATED (\/ " v-(\ V (? I I / / I o: \ I I I 1 / / / FUSED HOPE PIPE I f• rv / 1 n, / ' / / , 1 1/) \ I I I I O ' / I I I (30 F; LONG),~ 1' I I I I I / ' ' I I I 11' I 01"1 I I , , I/, 1 I I I 1 1 1 ·, El \ / I c~ •-, -J-I I I I I I I · 1 I I 11 ,S> v~v ; • I ' I I i 1· I 1 <! I I I I I I I I "' \ I I / I 0/ N I I I ' / ' I/ ,-, '\, ' I I / / "' \ I I / / I 1 (~ / en 1 / I 1 1 / I ~· ,v / 'cf 1 / / ,, / / / / I f / 1' -2:'" I I I cb C\/ I I I I / / / I / / l.f) 5?1 I I i' / ~ \ I / I I I i J 0J er ~ ~ ;;; ifs f I I I / / / / / r:v (\; \ :2 g fc1 V (O ~ I J I I _j ---\ ,1 I I / i I I / ~ / ?J c;1 / / ' / / / / / i / / / / / / ((I ~1 ~ ~ 7 ~ r~ ,:_~, J co /2? ,; _:f--. I : I I I ' I I I i I ' I I I I I I I ( w / / I ' I I I I I I I ~ C/ ~ {::; '.'' /' ,'fi ", I : I I I I \ I I I I ' I : I I : I I , : I 3 // I ' : I ' I I I I / / i I I I ,f ·-I I I I I I • I I I I : I ; I / : r I / I • 1/)1 / / I /11 I ,:. ) I I , I I , i I I I I I I APPROXIMATE ORDINARY HIGH WATER MARK (EASTERN OHWM APPROXIMATELY 2 FEET FROM WORK AREA) \ I ' I I I g"' I 11, I I I I I I I I I / I / I I \ ; I I / ~~ I ( It I I I / I I / I / / / / ? \. I ' ' I ; i'/ I ' I I : I i I I I ! ' I I I I I ,5 I / °'; u I // I I ! I i / I i I I I I / \ / : I / s?' I '1 ) / ' I I / ) / / / / TREE'S/ / / / /ii / / Ou ,' // / ? / j I j ' , ' / / / / I I I / -le-I PRO~OSED ROCK BUTIRESS ~ I ' / \ I / / Q ,, I ' I I / ' / / / / / ) / \ 1 / I /i5 I [ I (SEE fROFILE, ON SHEET 3) I I / i I I / BRLJ,SH / / / I / I, I O '/-I II , I / ,1 ! I I I I 1 1 1 / I I / r / \ II ,' ,' ; )'/ I I ' I I II I I I I I / / / II / , r/ f I ~, Q, I I ) I I ,' I I I I I , / / ; I I / \ I ' I I I I I I I I I / < I I '. I I ' PROPOSED I / / J , -I I ·1 ) ?, I, I I I I I I I / / / I I I / I CROSS TRENCH DRAIN / I I / / / .~.::.. -,, 1 1,-, , ; 1 1 "f , l 1 / I 1 / , 1 1 1 / 1 1 '1 V ; , ~-, I (SEE DETAIL 2, SHEET 7) 1 / / ; 1 / / / / ; ~ I y!Y I I / I I I I I I ' / < ;/ I I / I I I ' I ' I ! I I I ! : \ ! I , .1,,:__/ 1Y' /-7----+-------I I /; I ,' I 1· I ·v., •. I I ,; I / I ! I I I I I I /1 I (, I Ii I: I I I I 'I ' / / /' I •. L.r° ' ; /·./ ·-/; / I ' '""'1 \' I i I I I ' / I / I I I I i ' ! ' 1 , , ,,),/ ,.v~. / ) ;1 / // /~7--T---r-----•. ) / t·0• : I I f ; vi / ! I I / ), ! / /// ;1 i \I/ r / I I / 1 / / _, / / / / / , :;' ,v'-·.,--I I I ,,,-'_/II_/ I 1-:.··1··--f -1-l I r _1._, I .. ec~v ~,.-I '\/1/ / / (,/ I/ I I I I I i l.--+1 I I I I / / --,-• :('-\ I , / / / / / ) . • • I \ I \ \ I ') I / I I I I I I ' I • I , / / / /; • I / ,(\ ' I , I / / / ~"Ir,'?,;// / / / I ' ·----L_ --~ I I I ) I ; I I / ,' /' I< I I / • / / / I< I / I / / / / ,' / ' ; i I I I / / A ~\,c~-'{I-' I I I / ]6!'. ,r ,"]/{ // I I I I I \ -I _I / / I / I / / / !( I // y / I 1 r I I I I ' I \ ' I I I I ~f;:?!/ \lt~~,'\/_:r)\-I/ ;,1/1////;';'i(fi!f ROC~;~~~i:T~~t~J~/ // //) /rtt·ii~~J/!fia;~t~~7r/~)'-\ ( \ /,;)/;/:'/ /,/8",~ (;: _/;11>\//j/!// ,//// ////// /11 J--~ / ;1 }( ! ~t-;!)'f/-.. .,f'A; ::; . \,I' I/ I ; I I J / ON SH~ET 3 ) / / I I ,.,(]J\ __ t·~;(: '/ :::;r J.<:J"'-g/~1•1CJ•;,: 1 '. / ~ // /: ~ (/ 1 /; / I I I I / 1 , , / I i 1 11 L , 0 < I I 61 "-A( ~·'x•1 ,,c, ~, 1{~!..,,1{;.L J.:J. 1 ',ri )\1 , I ( / ( I / / I I I j:S::.1 .) ::57, · -~•,;._ {-~ ( ~ \')'fjf..'.·._i,;,;/"fljz >,. /} / ( '/ / /; , y 1 11 / 11 I I I I I I i I / 1 / TREES/ 0 I c,',__/,'--./i1-, ,c,,,,JVL':5117>-, -' ri/ !\ l/,,C· -.. ' I ,c,_ ( ) C --~ ~ \ \_' / /1' r / //VII I ' I I I / / ,' / I I i I I; I / 1,; YI ,);l-1 C7 =5. " I/ /~//1/f (II I I I -I \ l~Ti i :/~/ / . \~" J-1-,,1 II \ ·· ---_ /// : / ·: :, \ ·., =~,. : !1rh?Yf~6i»;;b~' (~'i,-,l~' 1f};,'/f/;C?1t;~ ~;J/J~f:s~~~~~<JY);rtJt~·~11 /)1 ,1 :/ 1J[/ IT-1f < T1r1---"1"\11!1 1~ 1 1\ 1i 1 : 1li'J4 i / / / 111 ', I ' I ' \ u5!n ,'-,,\:1~ I \ I I / / / / ; -"::i 7J!:(1 7(/') -~ r), (\ ~~I CHV2~ J'cc.;c ~ /, HA-1 / / / / ~"(:, I I I I I I I I /~,)~" loa,, I \ / ;~, 1,\-'. I\ \ \, :i,:~~_J'/ \ I : / / / )-;:_5(.,/c;c):::,-;:~?:_S-)fa~?)lflOJ'(:jj~:;-J;{)f/,/~/(i/, /~ / V ;7 ~~;!, 1 1 ;11 / / ii: r-~i~ '/ --------"~ I II I \ \ \ ,:;-5:i'> · , 1 \ 1 1 1 1 ,, · \ 1 0 -, <, , Yi!) . '/ \ '( c· .,, 1 '-!!J~ l.,. / 1 ,1 y "' -'" A Jex -, .iY,17',,.'" s 1, --L__i,--;-1 , 1 1 1 • 1 , , . '------;1-~ -/ I \ ,' ' : '-,. ____ \, 1 \ 11 /1 \\ \ \ : ; / / I·-:;-(;/;'[']) 61r:Sll)f_~--J_-;__f!---;1fVJ)-t?.-t:J]~r1i--r/',1 ~//,!/ #"J,7 / / .,;;; ~(J,~~Jr ~ /1 1 / -/---f,.:fL1/(,'.,..,r 1. ;,1 I .,.1',1; 11 1 / ,-\?JD 1-'-.... {. I • , I ---\ \ I I I ? r--,, ( } ..... /\ ,_, _/, , \ / ':f-'J/ -A / ~ ~ ~ / / ,// ,,;;, r/ / / / ,,. --1 ~ / , f-,_;:--\' ::'f PROPOSEDRIP-RAP ',, ,·--;---J __ _I_!_ [ I ---~'-I, / 1 ,',''.) 1 l'',J.?.~12T(,)(';,,~~--Y/)_~.".'\ l;;---·/__./?/0 -, cl:, OUTFALL PROTECTION / ,' / 1 1 • / / 1-------1 -------f I T ' -( _ 1 ,I' /1 ' ~ / [," \;,?,'_y __).Jd_J.,c_c r.·-.-..d'°'--?< --'-/// / / '-j ;;;_ •/I I I I I I / /1 ;--J-::l-', , \ / 1 -, / ' , 1 , , / I / I / 1 7 h-!~ {le I ,' , ,/::-"/, , =J \ IC -• / 7 / ,7 ,,: 1 A tt }·, I ' I I I I I/ I I I / ' --1 a' -/ ,,; ,,,/ \.· , ; ,' , I I I I I I . I , I . I ; ' cet.. C· ~/Jk//:f-ltc"'/7 '1'/ i' , ;-_.,. ~/ / 4 I/ I / ;cf . ., I/ \ I I I I I i i I I , I , '... /---_/ __ ---.. __,,/ -1 , i i i t I ' , I ' ; I ; I .... r, ' \1 / Y / i ~,>c I \ / I ; I ' I , --._ .,./ 1 ~-/--·v--·---, '\,., ' / , / ! ,' ,' I J 1-( /' ·y/,'-V,'-·>,...--;"v-, £---. 1 I ; 1 I 1 ' 17 / 'I / / ,,;: /. -,-/ :'.. -3cCNou-; ' I I i I I // A, ...------.J "'---r~ l ! I , , , ~r -...v~/'. 1 v . 1 , I 1 "'< ""'v--t---",( 1 1 I 1 1 / / / // ,s~'' _/J·----._ \,,_:_--H--y1--t1-+1-~--v1·!/'1 I I I , I ' : ; I/ ; ; //,>,,,---1·, / , , ,'/ ; ;1 ; // I ,f ; ;2'.~-:/ 1/ i ,FEA-u,E i ; / i I : _1 I /,,,,--s~.,/ ··--., , '\,,-----·,iv,---vf---·/./ ;v,"' ,I / I/ / I / I I/ / / / /; / I iy"J ;~ , __ /1 /;· ' ~/ ~,f "" /// ~f YI IV...\ II I / I I ;Ii i / / / / ( \ I / ; I ( : I I I I / I I i I I I I I I I I I I I I I i ).-, ··y_ // 1 // ,;!' /, v~ :(, cl !/ I • L--' I / I I I; ! I I I ,,---;-" l \ 1 I / 1 1, 1 \ \ \ I \ \ / / / / / / / .L , 1 I I I / ; 1 ; I I \ 1 j I / I / /,/ ';;/ / . ., 1 / / ")1·.. / / I I '1-..___~.f. ,' / / ;I I A I I / r i i ; , I , / ; } i i ; ' i1 i i : r ; i i ' / i ; . , i ; i . r i / / -:-: /..--'J / / / / r ,t i t r i i / --...._, ~-__iA __ //'---; .. L..--, i _,/ ( TREES/ ' I I I / / I / ;' / / / I \ I I I / I / / ' / ~· '; ' / / /1 ' I / / / I /.,, / , / :.{;; J I I I I ) •,I / / 'v. : / ,--,, BRUS7 11 1 / / / I I I I I I I / 1 / / I / I \ \ I '1 / / / / / 50;~ J I\ / I / I / / // ~0,:, / , / I I / ; I ii ; 11 I ; -- ) // \ I I I I I I , ! I I ! ' I / / I ./ ) ) I I / I , I / I ~-I, I // // // //1~ ;;ii I I / / I I I I // I ' I / \ I \ I ,' / / / / / / : I I ' I ,, I I I // N/ / / / I / I / / / I / / / < (I / . I / /, / {--; I I ;:,-5 // II / / / / I / ,,1 I I \ \ II _; / ' / ! / I I I I / 'I _1 / I I II// // II I I / / , / / / / '111 I II / // // I /'c~l,.-..-'f;ll\...-r'\" / I ,' I/ II I I ' I ( j / \ ' / ' ' ' / ' ' • ' / I I I ~ I I / / / ::r1--, v----. ,; I I ' I , ' \ I / / I I / / ,' I I / / / / / / I 1REES/ / / , / / / ' / / / / / / / 2, ;f / / / '\,-~! I ' ' I I ,' I I 1 ; 1 , 1 1 , 1 1 1 1 , 1 1 1 ; 1 1 ;BRusH}\_ ; 1 1 1 1 1 1 1 1 I / 1 / 1 / ,c :r., '/ I 1 1 1 1 v 1~.i _L_ 11 1 1 1 1 ' f I I I I / ,' ' I ' I , ' I , I ( I I I I ( I I / I I) I ' / / / / / / ,,-'-Lf I I I ! ' l'v '\,,./--I I I I I / / 1 1 I I I ' I , , I / / / ,1 I ' / I 1 ; I ; / I I I I I J I I / ; / / '-/J1.i I I I / I I / 11 ~/-'-,/ I 1 TEMPORARY SILT F'ENCE-:'-" 1 1 1 1 TEMPORARY WADDLES/ 1 : 1 , 1 / / 1 1 1 . 1 1 1 1 1 1 1 1 \ 1 / 1 STAGIN()' _ 1 1 / / I j ~ 1 1 1 PROPOSED INTERCEPTOR TRENCH DRAIN 1 \,,--7··\..-/-. (SEE DETAIL 1, ON SHEET 4) ,' / 1 / / i(SEE CD0EMTAPIOLS 3T' F01LNTESRHESEOTCK4S) / 1 / / / / I 1 / I / / / / / / / / / I // / AR,EA* / / / / ,~:71·, I I / 1(SEE DETAIL 1, SHEET 3) ; / \, ' / i 1 , , / j I / I / 1 j / I / / //1 f I // / / / ,'f,/. _ w / ' / ACTUAL LENGTH TO BE DETERMINED / 1 1 ,' 1 1 / 1 ; ; I ,I 1 ; 1 J ; ; 1 / 1 I / J J I I I I _ I 1 \ 1 / 1 / 1 / / / 1 / if / 1 IN FIELD 9uR1~G C01Nsrnup110~ 1 / I I I i I I I / I I \ I I I I (,' I I ! I I I / / / / / I I I -' I . /J I I / / / , / I ) /" I I /. I I I I I ! ' I I I I / I ; I I I j I ! I I I I I I I / I I I / I I I I I I I ( I I ! I I I , / / I / ;;; I I // I I I , I I '! I I i I I I i / I /------!-----) I , ' I I I I I I I I I I I I I ; , I I I I I I I I / / // // > ;f I I I I I ; / /! I I I I / / / / / • / ,' / 1 1 I / I / I ! ( I I / / / I / / / / / / / I ;) / I I 1 1 / / / 1 ~ I , I I I 1 1 // /i / / / / / ,' / / / / i / / / / / / / // / / / / i / / / / / / / / /1 /( / /< {11' / /// * // /// /// ////) /°)' // // II / / / 1! / I // // // I 1 / ! I ; I I I I I ; /; I J f I I I I I I I I I I ) I I I /:!I 1 ,' ( I I I I I I I I/, I ' ' I 'I I , I I I I I I I / I I I I I I I I I ! I I I I I ! < !/ I I /:jl / / ){ / I I // I I I I I I ' i I I ,-7 '\ I ! ! i I / I / I I / ,1 I I I ( I I / / I I I I I I I I ( / I I \ ) 'I / / /;£ ~ / / / / ( // / I I I I I I I ', ! j, / / .,; : (, / /, //// // / i :· ,· ////// / //// i / / /////////l!l././JJv/ ,// ////)/j,/',/) 1 ///,// ///;//···/ ; \.._, 1 /') ,0 1 1 1 1 i 1 1 ' 1 1 1 1 1 1 i 1 1 1 / 1 / 1 1 1 1 1 / ; 1 1 1 I\. 1 / , 1 ?/ ,1 // 1 / / )( 1 / 1 1 1 / ; _,,r__.r-/ 1 1 1 ' ; .:2_1 /}? o / v-I I .. 1 c,1 ,' I I I I , I ! I I I I I I I I i J I I I I I I ! I ' I ; / / ( ; I I / /I--/// -/ ( I , I 1 i \'-,_~ / / ;--. (~ c.~/ ·~) CV/(§ !!] ,'::: '\' ,:;,;~ /!__l o.S 6 I 11 i I / / I / / / / / / / Cl / / / / / / // / / I / I // // .,. / II / / / / //'/ l-/ I / / / / / 0 I I ,' /:\ I ~ '1'?1 I ;\' 0.:: ~ 0 tj" U) co / / I i I l I I i !:? I.() /~ J I J i I I I I I / / / / / I I /; -----__ // 1 I i / 1' ,' g / g I I i ' / ,1' 'r N C'\J C'\I Cl 0 ~· '<f 6 (\J :: ::; (\J (\j ~ I.J) (D / I / / / / / / / / / ! f I [-/ l--(-I / / / t;J ! I ! i i / / ,I r / / S'J C~! C"-J/ ~ ;~ ~ ~ r~ ~i,-/0-/l\; 0/1 / / j j"' ~ $j CJ I / 1 I / / // / // /)I / /_-·J _,,-/ ,,l Co CJ ~/ I 1--/ ,·/ ! ;' I I ' I ! 0J rv1 . ,1 I I rv i:o (\; I / / I -----!,.-/_.. Cb o) ':1--co co l;i / / I I / / / ; ; I / /' ~-1 co v-/ / 1 / / / __.----__ --, I i ')I c-v C'\1 <)) o) o> ffi i \ i I I I i I I (\j (Q c6 ' / / / / /--/ / ------I I i I ( ?" '".\' ~ i I I / I I : ! I I ! I ~' !(} <~ {" / / / .,,.:-'! _/ -I I ( ! I I ! / ,.··Ii -1 I ; I I rv iv / 1 / 1 --1 J ,•\'/ 1 I , I / ; , 1 ::' / / / / / / / / / /1 _,.-----/---/ / / ~' A 0 PROXIM,4TE LOC,\TION / I 1 i!\ I I I I\'\; / :1"' ,,,,.--__ ,.--/ ;/( I I c.-OURl[D20"HDPEPIP 0 / I I ,,·',11 a:i APPRCXl\tl1\"'T __ OCA.TIOf\J I ; (\ <1 --~ 1 ; OF :::x1sm~c; 20" HDPE \ ; 1 :\'v. ,v -------_., / \ / ~ J (CITY OF RENTO~-J) ' / ~ w*N E STCRf/WAT.::~; T!Cflrllf\JC: \ 1 1 1 ,:-,1 ___ -/!--~--~----/L // 1 / 1) I '} / ,t / 1 I ,1 / 1 N (FR0/,1 Cl TY 0° RUITOlx \ / • --/ I / / / ' / / / " /JiiAWNG Q .. 283103, \ --;j .. ----... ,· AC/)/ / -I , I / ' / / I I ' I J s ROLL '9", FR 11s-) ------------~v c;.9 1 > I i i 1 1 g \ .-----~--!'--// . n,v iJ, / // / / / I ' I ~ GRADING PLAN ___ J.-----1 1 1 1 11; I,; / I / ,' ;! *ANY DISTURBED AREAS WITHIN THE OLYMPIC PIPELINE EASEMENT SHALL 10 0 10 -----------------:--------; / / 0:::> / / / I o BE RE-SEEDED WITH THE REVEGETATION MIX PROVIDED ON SHEET 4, ~--~""liiiiiiiil~~~~""'l --------->-----/ / / / / / ; AND MULCH FROM COMPOST FILTER SOCKS SHOULD BE SPREAD OVER EXPOSED SOILS. FEET __________ ------/ / \ / ( C /v ' LEGEND HA-1 * HAND AUGER COMPLETED BY GEOENGINEERS DP-1 + DRIVE PROBE COMPLETED BY GEOENGINEERS -~H-lf-lf-SILT FENCE ~ WADDLES/ COMPOST FILTER SOCKS I/ ~:I STAGING AREA ---225· --EXISTING TOPOGRAPHIC CONTOURS (FEET ABOVE MSL) PROPOSED FINAL TOPOGRAPHIC CONTOURS A ~ A' ~ CROSS-SECTION LOCATION (SEE SHEET 3) City of Renton Planning Division APR 19 2010 I 1----------------------------r---------,.----------.----------------~-:c:...·_~_----------,;;::..---------__ -_--_-________________ _. l \ / I / ~ I GEoENGINEERS a {!;~"1;;'0; l-------------------+-+------------------l---------l-------1------l~6~Mfii'o'it+~~RE~~~s ~~~ HORIZONTAL DATUM: ENGINEER 1/~~)10 ;61ympid\ OLYMPIC PIPE LINE COMPANY lo l---------/~11l'_d_(;:_'1'_1"',_I~_s'1_'1,'_· ____ r_:1_1;:_r-_.11_:: _______ ---IH,$) i WAs,~r:_·\'···w:.;,.'1 1--------------------+--+---------------------_j _____ __(_ _____ J_ ____ _j ~l~ri~~!;1ft~~csui~ '-v-ER_T_I __ CA_L_D_A_T __ U_M-,-~.--~-D=-;-R-;-;A:F:T~E~R:~:~:~~1~1:1:t~M1__/~1~0~:l--_\_~~.::ijjl:::='="=="'::.f_'J ______ 2_3..:.R.:.:'e:.:.~.:.:l.:~.:.::,:..,d_w:.:.A.::.;:.:h..:.~::.~:::~:.:.l:.;:.:.~_w_. -------1 ·~ EXCEPT FOR THE PURPOSE 1-N~O~T~E-B_O_O_K_S-·. --~-----1 ENGINEERING G Pl " 1--~----------------+--l------------------+--------l-------1--------l CHECK roding an I i~~ Li~:0:~~SIS0 : ~~p~E3;u~~~ ~~~ftR AoRict:~~f XIMi~f ' ~. :<)0 ,//r,(!(;;rc;\&t/},IYJ 1-0_L Y_M_P_1_c_L1_N_E_D_RA_w_1N_G_s_--_1_0_0_--_2_9 ______ -l---+----------------------l------l------1-------l f ~~Ni~J~c:ptrl1H~t!!~~ 1--"-g'--'RH A:::.E~-=-i'-',N-G--+-------1 Milepost 1 09 Lands Ii de s ta bi I iz a tion project ~ MASTER FILE IS STORED BY GEOENGINEERS, INC. AND WILL <, ·,.s:~ -~i,I.J,,, O TJM ABA SDS (PARTIAL OR COMPLE l Renton, Washington ~. SERVE AS THE OFFICIAL DOCUMENT OF RECORD. .,., 10NAL 'I-> 4·¥ OLYMPIC LINE DRAWING S--100--112 ISSUED FOR PERMIT REVIEW TE AFE NO'S: APPROVED DATE --<i~,,,,,,,.,,.;•,J/"'" l-------------------+--+--------------------J.__:3-:.1./...:2:..::6'L/..'.1::;.0_i---::::.31__/;c.26:::,/:.,.1,;.;0::_..j__:3-!././~2:.:6'.l/..'.1::::.0_j SHALL BE RETURNED TO THE SCALE: DRAWING NO. 2 OF 4 ; L-----------------------....1--------.I...-------..L..----..,;,;;RE:;.F.:E.:.:.R;;,;EN.;,;c;;,;E;..;;D.:.:.RA:.;.W:.;,.:;,:IN:,;;G,;;:.s _____ ...L:N.;.;0;;,:·..1-_______ .:;R;,:;E.:.;Vl:.;;S,:,;IO:.:,:N:,_ _______ 1---_.:;B.:.Y __ L.::.c:::,HE:;C;:,::K~E;,:;:D_~A~P~P~R:::.OV.:,;E::D;,...JLo_w_N_E_R_o_N_D_EM_A_N_D_. __ .....J _________ _J _________ _J ___ ...!.::N:,:0;:'._Tl_E~D'.,_ __ _1 __ .....!;D:.,:_!:M'.!_:_!1_:0;!.:8!:?_ __ J_RE-v..:O:...N_o_J. QUARRY SPALLS IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION 9-13.6 4' EXISTING GRADE TYPE 5 AGGREGATE PER CITY OF SEATTLE STANDARD SPECIFICATION 9-03.16 OR "GRAVEL BACKFILL FOR DRAINS" PER WSDOT STANDARD SPECIFICATION 9-03.12(4) RIP-RAP (1 TO 2 MAN) SEE DETAIL 3, THIS SHEET FOR SWALE ROCK GRADATION REQUIREMENTS I 0 0 1------3'MINIMUM -----< DETAIL #1 -INTERCEPTOR TRENCH DRAIN 0 FEET HORIZONTAL SCALE 1 "0 1' VERTICAL SCALE: 1"0 1' VERTICAL EXAGGERATION: 1X 16" DIAMETER HOPE PERFORATED PIPE NON-WOVEN GEOTEXTILE TC MIRAFI 160N QUARRY SPALLS IN ACCORDANCE TYPE 5 AGGREGATE PER CITY OF SEATTLE STANDARD SPECIFICATION 9-03.16 OR "GRAVEL BACKFILL FOR DRAINS" PER WSDOT STANDARD SPECIFICATION 9-03.12(4) WITH WSDOT STANDARD SPECIFICATION 9-13.6 EXISTING GROUND SURFACE 16"0 HDPE PERFORATED PIPE 0 0 0 0 0 0 0 0 0 0 0 0 ---1% SLOPE (MIN.) 0 0 0 ~~/~/,0/!:(~;f' ' /'.' ' I---------MAINTAIN~18"BETWEENCROSS DRAIN AND OLYMPIC PIPELINES DETAIL #2 -CROSS TRENCH DRAIN 2 0 FEET HORIZONTAL SCALE: 1"-:: 2' VERTICAL SCALE: 1"= 2' VERTICAL EXAGGERATION: 1X 2 (5)----0LYMPIC 16" PIPELINE !------------------7' -----------------, 1 ------j--------5' MINIMUM --------+---1' ---, NON-WOVEN GEOTEXTILE TC MIRAFI 160N A WEST PROPOSED GRADE OHWM ROCK-LINED SWALE (SEE DETAIL 3, THIS SHEET) EXISTING GRADE PLAN VIEW RIP-RAP (1 TO 2 MAN) KEY IN 3 FT PROFILE VIEW DETAIL #4 -RIP-RAP OUTFALL PROTECTION 5 0 5 FEET HORIZONTAL SCALE: 1"= 5' VERTICAL SCALE: 1"0 5' VERTICAL EXAGGERATION: 1X PROPOSED FINAL GRADE EXISTING GRADE RIP-RAP (1 TO 2 MAN) CROSS DRAIN (SEE DETAIL 2, THIS SHEET) SM APPROXIMATE EXCAVATION LIMITS- ;,;: Q - 16" DIAMETER HDPE PERFORATED PIPE A' EAST 0 ---------EXISTING 16-INCH OLYMPIC PIPELINE EXISTING 20-INCH OLYMPIC PIPELINE NON-WOVEN GEOTEXTILE (140 N TYP.) I 12" MINIMUM CONSTRUCT RIP-RAP OUTFALL PROTECTION PLACE RIP RAP AT END OF ROCK-LINED SWALE TO DISSIPATE FLOW (SEE DETAIL 4, THIS SHEET) CUT BENCHES INTO UNDISTURBED/ FIRM SOILS 24" MINIMUM SWALE ROCK MEETING THE FOLLOWING GRADATIONS: SIZE 12" PERCENT PASSING 100 o ~ so= OHWM OHWM UNNAMED STREAM ON SHEET 1 SWALE ROCK (SEE DETAIL 3, THIS SHEET) CUT STEPS (2 FOOT VERTICAL) INTO UNDISTURBED/FIRM SOILS AT 20' ON CENTER. TWO STEPS AT A MINIMUM ALONG ROCK-LINED SWALE 16-INCH DIAMETER PERFORATED FUSED HDPE PIPE ENVELOPED IN 6-INCHES OF GRAVEL AND WRAPPED IN GEOTEXTILE (SEE DETAIL 1 THIS SHEET FOR GRAVEL AND GEOTEXTILE SPECIFICATIONS) LANDSLIDE STABILIZATION DESIGN PROFILE 10 0 10 ! ~ ~= FEET 2" 0 FEET ! HORIZONTAL SCALE: 1"= 1' HORIZONTAL SCALE: 1"= 10' .... VERTICAL SCALE: 1"= 1' VERTICAL SCALE: 1"= 10' J VERTICAL EXAGGERATION: 1X VERTICAL EXAGGERATION: 1X LEGEND: '? g; SAMPLE ID SM SOIL TYPE GROUNDWATER LEVEL OBSERVED IN PIEZOMETER 280 270 260 250 240 230 220 210 z 0 ~ w _J w City of R Planning D:1.n.ton tv1s1on APR 1 9 2010 !Pd! ©f!U\lifEUJ :!:l-----------------,-----r-----r-------------r-r-----------i----~----r---r-----~~i?wi'iiTriA'i'TiTi;:------i---r--;;;-;--,------:;:::==:::::~-=-:-:-::-:=:-::-=-:-==---:-:-:-=--=-=--:-:=~:-:--1 I GEO ENGINEERS a .t~:;i:~;.~"il,,'11 l------------------+-----1------------------+-----+-----+-------l ~76iMf-!i'o~wi~fRE~~~s ~~~ I-H_o_R_1z_o_N_TA_L_D-AT_U_M_, __ -----IE_N_G_IN_E_ER_l_1~/T~~,c/,1_01 OL YMP~S 1:' ;~ ;!:!,~ f S.MPANY ~ ,'<"" "'"" "-~· PROPERTY OF OLYMPIC PIPE VERTICAL DATUM DRAFTER TJM ~ !k ·~, 0 1 0 " ~ef-' l----------------------+--1----------------------+-------+-----+--------l LINE COMPANY AND SHALL : l--::--c===c-:-l----'11_/-=2~B!_/_,1v_O_l-_...:::::::::=:::::... ______ :.:.R:.:e:.:.n:.:l.:o:.:.n;_, _w_:._o_sh __ , __ ·n.::.g..:.to,:_n ______ --1 i 6410 15m AV~t,UE IL[ P: L25/6:'-5CIJO 0 /1 r~ Q'ft"',l!,',,,,'l,p' NOT BE COPIED OR USED ,; 1----------'rn_'·'°_")_ .. ,,_"_so_o, _____ ,,_.,,_,;,_s.--oo_'°--------1 i'i . EXCEPT FOR THE PURPOSE t-N""o=r=E~B~O~O~K=s~,-------1 ENGINEERING § THE LOCATIONS OF ALL FEATURES SHOWN ARE APPROXIMATE. 1--------------------+--+--------------~--------+-----+-------+---------l FOR WHICH IT IS EXPRESSLY ,_C_H_EC_K ___ +-------< OLYMPIC LINE DRAWING S-100-29 FURNISHED, THE DRAWING DRAFTING j THIS DRAWING IS A COPY OF THE MASTER DOCUMENT. THE 1--------------------+--+-----------------------+-----+-------+---------l AND ANY COPIES THEREOF CHECK Drainage Control Details and Landslide Profile Milepost 109 Landslide Stabilization Project Renton, Washington 2 MASTER FILE IS STORED BY GEOENGINEERS, INC. AND WILL Q TJM ABA SOS (PARTIAL OR COMPLETE) APPROVED DATE i SERVE AS THE OFFICIAL DOCUMENT OF RECORD, t-O_L_Y_M_P_1c_L_1N_E_D_R_A_w_1N_G_s_-_1_0_0_-_1_12 ______ -t---i-1s_s_u_E_o_F_o_R_PE_R_M_1T_R_E_v_1E_w ___________ 3'-/_2~6/'-10_+-_3~/_2_6._/_1_0_1--_3'-/_26~/_1_0---I SHALL BE RETURNED TO THE AFE NO'S: SCALE: DRAWING NO. 3 OF 4 REV. NO. ~ OWNER ON DEMAND. -REFERENCE DRAWINGS NO. REVISION BY CHECKED APPROVED NOTED D-M-1 08 O ;;L-_________________________ .._ ________ ..._ _____________________________ _._...._ __________________________ __. ___________ __. __________ __. ___________ __. __________ __.._ __________ _._ __ ._ ___ ._ ____ .1..,,, __ __. 0 = 0 ~ g ! ~ i > . ~ i ., ! i ~ ~ w • O j Joints in filter fabric shall be spliced at posts. Use staples, wire rings or equivalent lo attach fabric to posts -I r-, JI r:: ·;;, ,- I I I I I I T ' r 2"x2" by 14 Ga. wire or equivalent, if standard __ -strength fabric used ·• Filter fabric--·--. I I · $llffi:!1iii!/lii'1"'!!1/,\'[l~ ,eITfc'IIBI-c!jjie;:f. ii"'il\lliin I ;:;f,J.llrnl-Llri', :nc,..,mi.LaT,!..!l;T, I r-:11 t:::111_ .;,, -I' 1 -Ir:_. ---6;-;;,ax ----I...;::__-Minirnurn 4"x4" trench /-,,,/ Ii LI LJ / ~Backfill trench with native soil Post spacing may be increased or 3/4"-1.5" washed gravel / to 8' if wire backing is used 2"x2" wood posts, steel fence posts1 or equivalent DETAIL #1 -TEMPORARY SILT FENCE l .£ E "' ~c : ·-111-:,JIT ·E ~ ~ REFERENCE: WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON (FIGURE 4·19) INSTALL DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT 4"-8" QUARRY SPALLS NOTES: GEOTEXTILE 1. DRIVEWAY SHALL MEET THE REQUIREMENTS OF THE PERMITTING AGENCY. 12' MIN. 2. IT IS RECOMMENDED THAT THE ENTRANCE BE CROWNED SO THAT RUNOFF DRAINS OFF THE PAD. DETAIL #2 -STABILIZED ACCESS ROAD/ CONSTRUCTION ENTRANCE BMP REFERENCE: WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON (FIGURE 4-2) NOTES: SAND BAGS \ OR STAKES ~~9 ~yx-~ COMPOST FILTER SOCK (TYP.) 1. 8" diameter Filtrexx Soxx filled with cedar grove compost or similar. 2. Upon completion of the project, the compost will be distributed throughout the area disturbed by construction. The filter sock will be removed from the site. DETAIL #3 -STRAW WADDLES GRASS SEED MIX SPECIFICATIONS 1. WASHINGTON STATE D.0.T EROSION CONTROL MIX (Right-of-way [ROW] Reseeding Mix outside of wetlands and wetland buffers) Standard blend specified by the Department of Transportation. Quick to germinate; aggressive; hardy varieties for the Northwest. Seed Blend: Seed Rate: Ground Prep 40% Red Creeping Fescue 40% Perennial Ryegrass 10% Highland Bentgrass 10% White Clover 40 -80 lbs per acre depending on the slope Soil must be loose enough for the roots to establish Preparation for Work 1. Complete One-Call Utility Locates 2 Install Temporary Erosion and Sedimentation Controls (TESC) per plans shown on Sheets 1, 2 and 3. a. Construct a stabilized construction entrance (approximately 12 feet wide) by placing at least 8 inches of quarry spalls over geotextile fabric to prevent tracking mud (see Detail 2, Sheet 4). b. Prepare unsurfaced access roads, and parking areas used by construction traffic by placing quarry spalls or crushed gravel over geotextile fabric to minimize erosion and prevent tracking mud (see Detail 2, Sheet 4). c. Install sill fence and straw waddles around the downslope perimeter of the work area (Detail 1, Sheet4). 3. Mobilize equipment and materials to the site. 4. Delineate clearing limits/areas to remain undisturbed during the project with flagging. Landslide Stabilization 1. Excavate soft, disturbed, low-strength soil from the slide mass area (as shown on the profile on Sheet 3) to a maximum depth of about 8 feet below the ground surface at a maximum of 1H:1V slope. a. Cul steps/benches into the undisturbed, native soils to prepare stable surfaces for rock placement. b. Place excavated soil into haul trucks to be removed from ttie site. 2. Place a 16-inch-diameter perforated HOPE pipe at the bottom of the excavation in the toe of the landslide (oriented north-south) to collect water from the rock buttress. The perforated pipe should tie into a 16-inch tightline HOPE pipe to transmit the water collected in the pertorated pipe out of the landslide repair area (see Sheets 1, 2 and 3). a. The perforated pipe should consist of 16-inch diameter HOPE with fused fittings and should be perforate<l around 180 degrees of the top half of the pipe. The bottom half of the pipe should not be pertorated. b. The tightline pipe should consist of 16-inch diameter HOPE with fused fittings. c. The tightline should be tied into the perforated pipe at the lowest point at the toe of the rock buttress and should slope down to the west at a minimum slope of 1 percent. d. The lightline should be buried in the riprap of the rock buttress and should discharge into a roc~-lined swale constructed downslope of the landslide stabilization area (see Sheets 1, 2 and 3). 3. Place loose riprap (per Washington State Department of Transportation (WSDOT) Standard Specifications (2006) Section 9-13.1, and having a median diameter (D50) of 18 inches or larger, on the excavated slide subgrade. The riprap shall be placed at an inclination of 1.5H:1V or flatter. a. Rock fill should be compacted by tamping in place with the bucket of the excavator. TEMPORARY EROSION AND SEDIMENT CONTROL NOTES FROM CITY OF RENTON P/B/PW DEVELOPMENT SERVICES Clearing Limits • Prior to any site clearing or grading, areas to remain undisturbed during the project shall be delineated with flagging. Keep Ground Covered • Minimize the amount of existing vegetation disturbed for construction. No work will take place within wetlands or wetland buffers. • All disturbed areas shall be covered and/or mulched within 12 hours, if they are to remain unworked for more than 7 days from May 1st to September 30th. During the months of October 1st through April 30th, disturbed areas must be covered or mulched if left unworked within 2 days. • Accepted mulch material includes straw, wood fiber, and cellulose. • Slopes and stockpiles 3H:1V or steeper and more than 10 feet of vertical relief shall be covered if they are unworked for more than 12 hours. • All areas being worked prior to October 1st, and are being seeded, shall be seeded by September 23. Mulching is required over any exposed soils to protect all seeded areas until an adequate growth is established. Perimeter Protection • Perimeter protection to filter sediment for sheetwash shall be located downslope of all disturbed areas and properly instal!ed prior to upslope grading. • Install silt fence and straw waddles around work area, as shown on Sheet 1 and 2, per specifications on Detail 1, Sheet 4. Traffic Area Stabilization • Unsurfaced driveway entrances, access roads, and parking areas used by construction traffic shall be stabilized by placing quarry spalls over geotextile fabric to minimize erosion and prevent tracking mud (see Detail 2, Sheet 4). • A stabilized construction entrance shall be installed as the first step of clearing and grading (see Detail 2, Sheet 4). • Construction entrance shall be set up so that all traffic leaving the job site is required to travel the entire length of the entrance. • Any sediment that is tracked onto pavement shall be removed immediately by sweeping. The sediment collected by sweeping shall be removed or stabilized on-site. • If non-vactor type sweepers are used, the deposition of these sweepers must be removed from sidewalks and gutters. The sediment collected by sweeping shall be removed or stabilized on-site. • The pavement shall not be cleaned by washing streets. Sediment Retention & Surface Water Control • No off-site discharge is anticipated during the project. If any runoff occurs during the project,. sedimSnf traps/stilling basins shall be used to collect, detain, and settle sediment from surface water runoff or water routed away from the excavation. • Sediment control BMPs (silt fence and straw waddles) will be installed upslope of the existing stream adjacent to the site to prevent any sediment from leaving the site. Sensitive Area Restriction • Project shall be completed during the dry months to reduce potential for erosion and runoff from rain. • No work will take place in any sensitive areas {wetlands or stream). Maintenance Requirements • Routine inspections of the construction site shall be conducted to ensure effectiveness of the measures and to determine the need for maintenance or additional measures. • A Certified Erosion and Sediment Control Lead (CESCL# 10220625) will be available throughout the project· Brooke Asbury and will be responsible for ESC review, maintenance and compliance. • ESC will be inspected a minimum of once a week during the wet season and within 24 hours of significant storms {0.5 inches/24 hours, or where run-off is generated) . • The CESCL shall be available, 24 hours, for rapid response to ESC problems and emergencies. • The 24-hour phone number for the CESCL is 206-229-5698, which shall be posted in a clearly visible location on the project site. Final Stabilization Prior to final construction approval, the following conditions must be met: 2 • All disturbed areas of the site will be vegetated or otheiwise permanently stabilized; ! • Structural measures such as silt fence, slope drains, etc. will be removed from the site: 9 • All permanent surface water facilities including catch basins, pipes, etc. will be cleaned; CONSTRUCTION NOTES Drainage Improvements 1. Construct a north-south oriented interceptor trench drainage system along the east side of the pipeline easernent to collect water from upslope (as shown on Sheet 1 and Sheet 2, Detail 1). The interceptor trench drain will tie into an ec1st-west oriented cross trench drain (Detail 2, Sheet 3) to transmit water across the pipeline easement to the head of the landslide repair area. a. The interceptor trench drain should consist of a 4-fool-deep, 3-foot-wide trench filled with a 3-foot-thlck layer of free-draining rock surrounding a 16·inch diameter perforated pipe. The perforated pipe and drain rock should be wrapped in a geotextile fabric (TC Mirafi 160N or equivalent). A 12-inch-thick layer of quany spalts should be placed to fill the upper portion of the trench (Detail 1, Sheet 3). b. The cross trench drain (which crosses the pipeline easement) should consist of a 2.5-to 3-foot-deep, 3-foot-wide trench to allow at least 18 inches of separation between the bottom of the trench and Olympie's petroleum pipelines. The cross trench drain should be filled with an approximately 2-foot-thick layer of free-draining rock surrounding a 16-inch diameter perforated pipe (the pipe should slope al a minimum of 1 percent slope down to the west). The perforated pipe and drain rock should be wrapped in a geotextile fabric (TC Mirafi 160N or equivalent). A 12·inch-thick layer of quarry spalls should be placed to fill the upper portion of the trench ( Detail 2, Sheet 3). c. The perforated pipes should consist of 16-inch diameter HOPE with fused fittings and should be perforated around 180 degrees of the top half of the pipe. The bottom half of the pipe should not be perforated. 2. A rock-lined swale should be constructed to drain water from the landslide repair area to a stable area at the bottom of the slope. The rock-lined swale should extend from the toe of the rock buttress and should discharge into a riprap outfall area constructed above the Ordinary High Water Mark (OHWM) of the unnamed stream at the bottom of the slope. a. The rock-lined swale should be excavated to a depth of at least 2 feet deep and 2 feet wide at the base with side slopes cut at a 1 H:1V slope or flatter (see Detail 3, Sheet 3). b. The rip rap outfall should fan out from the swale to a maximum width of 15 feet for a length of 15 feet from the end of the swale and should be keyed in at least 3 feet deep (see Detail 4, Sheet 4). 3. Place an approximately 1-foot-lhick layer of 2-to 8-inch angular rock (shot rock/quarry spalls) within the excavated swales, forming a shallow U-shaped channel, approximately 12 inches deep. Revegetatlon and Restoration 1. Any grass within the pipeline easement or surrounding areas that is denuded during construction sllould be re·seeded with the Grass Seed Mix Specifications (Sheet 4) and any exposed soil should be covered with mulch. 2. Restore site to pre--existing conditions and remove all TESC BMPs, and equipment/materials from the site. LEGEND Longest Flow Path ™ Area 1 · Rip-Rap (1,585 square feet) ~ Area 2 -Gravel {4,380 square feet) ~ Area 3 · Lawn {5,090 square feet) ~ · Area 4 -Light Forest (5,484 square feet) APPROXIMATE ORDINARY HIGH WATER MARK !; (( 1 0 I 1 /JI '( ; / , if i I I r.r,r I i O I I 0 1§/ I ;:; "'/ I 0 1 cc I 8-1 /01 J .. ".-&j', I ,z I ~ I / d.;-1 I Jc. T' "-, If I PARCEL # 182J0591.l7 I I I I I I I I I I I I I I I I I ' I I ' 0 "'" ,, I ' I I /7,,.,,, \ 111 I // // I /--1 ! I /' I/ ,';-1---< I I / 1/ / '~ I c··--.. , -' / ./'1 ;/ "" ";"fl r" Ir ---J_ / '7 \fbA I I I ) O I I~. C. , I / 't-0 I ,«.,...., ~ / ' I ,' I . 1 11 '--; 11 \ , • I ' I ' I I I 1( I '\'"'~ // 1,1 \$1 / ' ! i',,j_ /\ \ ' ~,.;::;' _ , / 1--,+----1--t-·--1/s <,;;:,... '\ / ;' I I I I ; ! //c:,'\'C'';,/ \ / / / / / / /' / ' / I I I I I r"r':!',;i> _ _,..,,/// i / ) ; i / // I I I I I I I I I I I I I / / I I I I I I I ! ! I I I I f I I . ' I I I I ! I I I I I I I / I I I 0 0 (f') ? .~j (~ I 0 ~ ~ I I ! I / I I I I I I I I I I I /fl I I ' ~? '"' I I J I I I I I I r :}'' _I / I <I / I I II /I I I;/ 1, / I I ( I 61scor1lEcTED~/ ~/ // / CORRUGATED /, I PLASTIC Pl\'E I f I I I I I</ I I I I I); I /!;1 1; I '!lo /1 I 0 ,"',,. ::Jo 1 / I ! "Ii (() 'JJ I <\· \o , / <:v I\Q I ? I d~,:?" ~ ~'-"'' ,,~~""'\''''"" ,c,>''cec>> I \ 0'-APPROXl~IATE LOCr,TICtC QF EXISWJG 20" rlclPE STCRl,1WA rE'i r:G-ITL1f,E (FROl,1 CITY CF RE\ -C.'J CRA',~ING C-2!:3103, RC~. 19·,, F.'s 1:S) I I I / / / 30 / Estimated Volumes The total estimated volume of soils to be excavated is approximately 320 cubic yards. The total estimated volume of temporary and permanent fill material is approximately 780 cubic yards. The actual excavated volume and fill volume may be somewhat greater than the in-place volume of soil due to aeration of the excavated soils and the compaction of the fill material. Of the total fill volume, we estimate the following approximate volumes for each fill type: 500 cubic yards (600 tons) of riprap, 43 cubic yards (52 tons) of quarry spalls and swate rock, 25 cubic yards (30 tons) of drain rock, and approximately 210 cubic yards (252 tons) of crushed rock for road surfacing. Fill will consist of rip rap, which will be imported from the Cadman High Rock Quany at 19221 High Rock Road, Monroe, Washington 98272. Quany spalls and crushed gravel will be imported from Cadman Black Diamond Pit at 26111 SE Green Valley Road, Black Diamond, WA 98010. Excavated soils will be disposed of at the Cadman Black Diamond Pit. Project Schedule The project is scheduled to begin in July, 2010. The work will take approximately 4 weeks to complete. I I ! ! I I , I I , ! I I I !!/ I I I I I I I I I I X X I I I x X ! 0 ;" I ) < < ( < f / \ -·-------·-- ,--J l I I / I l I . _______ ] I \ \ \ EXISTING DETENTION POND \ i 00' / EXISTING MOBILE HOME PARK I City Of R Planning o·enton ,v,sior, APR 1 9 ZOIO DRAINAGE PLAN !Pdrg ©ffiUY[Ef[}) 0 30 3 • Any off-site catch basins that required protection will also be cleaned; FEET ~i-----------------------==-----------,---r=-=----,-----------,-..J..-----------------------,--r---------------------1----,------r------,-------r-------------r;:m;;;7'r;;:,.ri:',riiinT.:i'."' ___ T ______ T---;-;:;;--,---::::=::::::------------------------------~ I GeoENGINEERS ? l--------------------1--.J___ ________________ .J___ ___ _J_ ____ .J___ ___ _J;rN~6iMfT\'~t~~~RE~~~s ~~~ HORIZONTAL DATUM: ENGINEER 1/~~)10 Olympic OLYMPIC PIPE LINE COMPANY :. l/~ M.!PIPELINE 2319 L. d A s w ~ PROPERTY OF OLYMPIC PIPE VERTICAL DATUM: DRAFTER TJM --,a'"'"" ;n venue , · :a l---------------~-------1----1------------------------1-------..L-----L-------lLINE COMPANY AND SHALL 1/28/10 Renton, Washington j ~tci~1]1~j~H~·.t'ia~s~~1.c ~'. ~J~;·J~U~~6 NOT BE COPIED OR USED i 1--------------------------i 1-------------------+---l--------------------l-------l-------"-------tEXCEPT FOR THE PURPOSE rN~o=T=E-B~o-o~K~s-,------1~~~~NKEERING Drainage Evaluation Plan, TESC Details and Notes ~.-THE LOCATIONS OF ALL FEATURES SHOWN ARE APPROXIMATE, FOR WHICH IT IS EXPRESSLY 1--------+-------1 0 y OF THE STER DOCUMENT OLYMPIC LINE DRAWING S-100-29 FURNISHED. THE DRAWING DRAFTING Milepost 109 Landslide Stabilization Project ~ THIS DRAWING IS A COP MA · THE J---------------------+--+----------------------ll-------1------1--------1 AND ANY COPIES THEREOF CHECK I MASTER FILE IS STORED BY GEOENGINEERS, INC. AND WILL Q TJM ABA SDS (PARTIAL OR COMPLETE) 1----~-------r~==c,:;-~-"~cc----i Renton, Washington "' SERVE AS THE OFFICIAL DOCUMENT OF RECORD. 1--o_L_Y_M_Pi_c_u_N_E _D_R_A_w_1 N_G_s_-_1 o_o_-_1_1_2 _____ -l----l-1s_s_u_E_D_Fo_R_P_E_R_M_1T_RE_v_1 E_w _________ .j......0::_:3-:.:,/..::,2:.::6L../..:.1 D:::.._.1.-D:::3-:.:,/..::.2:.:::6L../.:...10:::.._.L-0:::3::L/..::.2:.::6L../.:..1 o::'.__J SHALL BE RETURNED TO THE AFE NO 's: AP p ROVED DA TE 1-,S_C_A_L=E,---------D R_A_W_I-NG_N_0-.---4-0F_4 __ R_E_V_. _N_O.J. ; ._ ______________________ ........ ________ ...._ _______ _._ _____ R_E_F_E_RE_N_c_E_D_RA_w_1_N_G_s _____ ....a.;.N .. o;.;. . ..i.... _______ .. R .. EV;.;.1 .. s1;.;.o .. N _______ --'""--.. BY.;.__...1..._c .. H .. E;.;c .. K:.;;E .. D---1_.:.,A .. P.:...P .. RO:..V;.;E:.;;D---1_0_w_N_rn_o_N_oE_M_A_N_D. ___ ..1... _________ .1-_________ J.... ___ N~O:...T~E;;;D:;:... ___ J.... __ ,:::D:..._::,M:......:.1.:::0:.:8::.... __ .L....::O_.J