Loading...
HomeMy WebLinkAboutAttachment 6 - May Creek EnhancementATTACHMENT 6 - MAY CREEK ENHANCEMENT PLAN CONCEPT LEGEND EXCAVATION FOR OVERBANK ;ABOVE OHWM -.,..,-EX ANGULAR ROCK BELOW OHWM -. . EX STREAM SCALEABLE EDGE ,-EX STREAM SCALEABLE EDGE '"""'"·""'"""""'" \_ m->!-.__EX ANGULAR ROCK BELOW OHWM EXCAVATION FOR OVERBANK ABOVE OHWM CJ PROPOSED FILL REMOVAUSTREAM GRADING (INCLUDES UPLAND STREAM BANK EXCAVATION, EX ANGULAR RIPRAP REMOVAL) -------ii# CONCEPT PLAN HYDRAULIC CROSS SECTION PLAN LEGEND -·· EXISTING STREAM :§ii: .>l.1.iL .>l.l.iL I WETLAND · · · · · · · · · · · WETLAND BUFFER • • • • • • STREAM BUFFER --OHW-ORDINARY HIGH WATER LINE - CUT --CUT LINE -FILL --FILL LINE EXISTING CONTOUR PROPOSED CONTOUR I I I I I I LEGEND NOTES EXISTING ANGULAR ROCK BELOW OHWM SHALL BE REMOVED AS DIRECTED IN THE FIELD BASED ON DRY SEASON WATER LEVEL AND OTHER EXISTING CONDITIONS AS EVALUATED AT THE TIME OF CONSTRUCTION. (, < ', I ,\ I I \ \ \ I \ \ \ \ \ \ \ \ \ \ \ I ' ' ' '7.17'"/7'?.1'7'"/7'? PROPOSED RIGHT OF WAY 7.17'"/7'?.1'7'"/7'? EXISTING RIGHT OF WAY \ SB 1405 \ \ I \ ' \ \ ' EXISTING EDGE OF PAVEMENT '\ ' ' ' ' ' ' \ I I \ I I EX MAY CREEK ,.. / / I / / STREAM EDGE, PER WSDOT FIELD SURVEY,, OF EX STREAM I \ I \ \ I I / I I / / I I \ I I I I / I / / X-SECS \ \ \ \ \ \ \ I I I I I \ \ \ \ ' ' ' I . ':, •I '\ \ \ '\ \ \ PROPOSED EDGE OF PAVEMENT ' \ \ \ I ' ' ' '�', '--,�-�--PROPOSED SING.LE SPAN PRESTRESSED CONC GIRDER \ \ BRIDG1E I I I \ I / \ \ I I I / \ \ \ , ..u C 0 () ... ·c m EXISTING WALL -.��.�.��• PROPOSED WALL / / / ' ' I I PROPOSED ROW I CONCEPT PLAN HYDRAWLIC \ CROSS SECTION \ f "' ', en \ f 1', f \ I f � I I h--1' \ '-. ' ' / / /�EX 36"DIA SS 1 -( $1 f r r \ ( I "' MAY CRK INTERCEPTOR ' -�1--------------------------------------------------------------------------------------------------·-.-_ MAY CREEK CONCEPT PLOTTED BY: LivingT i! -DATE: 10/6/2017 TIME: 5:55:19 PM ., � Washington State � 'f /1 Department of Transportation LINE 1: NO IN WATER WORK GENERAL CONCEPT LINE 2: • 0 25 50 SCALE IN FEET NOTES / / I / 1) EXIST CONTOURS SHOWN ARE PER AERIAL TOPOGRAPHY (2015), EXCEPT UNDER EXISTING MAY CREEK BRIDGE. CONTOURS UNDER EXISTING BRIDGE ARE PER WSDOT FIELD SURVEY (2017). EXISTING MAY CREEK STREAM CROSS SECTIONS WERE SURVEYED FOR HYDRAULICS ANALYSIS PURPOSES, BUT DUE TO INCONSISTENCIES IN AREAS BETWEEN GROUND SURVEY INFORMATION AND AERIAL TOPOGRAPY DATA, THE EXISTING HYDRAULIC SECTIONS DATA IS NOT SHOWN ON THE PLAN EXISTING CONTOURS, BUT THE SURFACE LINE FROM THAT SURVEY IS DISPLAYED IN CROSS SECTIONS AND USED AS THE ASSUMED SCALEABLE EDGE OF STREAM. THIS DATA MORE ACCURATELY REFLECTS THE ACTUAL STREAM BOTIOM ELEVATIONS AS COMPARED TO THE AERIAL TOPOGRAPHIC SURVEY OF EXISTING GROUND SURFACE LINE. CONCEPTUAL NOT FOR CONSTRUCTION 'C 'C m .,, i U'J X .. C :� ii : .?. EX BRIDGE / ABUTMENT/FOUNDATION� ' ,--..I.----r-, ' ''·-----------· VARIES (5' MIN) RELOCATED __/ 12" 0.1. WATER PIPE (IF IMPACTED) EX BRIDGE PIER AND FOUNDATION REMOVED WHERE EXPOSED BY UPLAND EXCAVATION TO A POINT 2-FT MIN. DEPTH FROM PROPOSED GROUND LINE SLOPE VARIES (2H:1V MAX) SEE NOTE 4 CONCEPTUAL NOT FOR CONSTRUCTION MAY CREEK REPRESENTATIVE SECTION PROPOSED BRIDGE MINIMUM CLEAR SPAN 100 YR FLOOD PLAIN REMOVE PORTIONS OF ANGULAR ROCK RIP-RAP WITHIN 100 YR FLOOD PLAIN (TYP) EX ANGULAR ROCK** EX 36"RCP KING CO. SS MAY CK. INTERCEPTOR (PROTECT IN PLACE) EX ANGULAR ROCK** .,, N.T.S '' S'MIN --- NOTES: 1) SECTION IS REPRESENTATIVE OF PROPOSED CONCEPT FOR BRIDGE AND STREAM BANK WORK . DIMENSIONS SHOWN REPRESENT THE MIN. OR MAX. BASED ON PERFORMANCE BASED DESIGN GUIDELINES AND OTHER PROJECT RELATED COMMITMENTS, SUCH AS TO NOT PRECLUDE AVAILABLE AREA WITHIN THE FUTURE BRIDGE SPAN LENGTH FOR FUTURE CITY OF RENTON MAY CREEK REGIONAL TRAIL CONSTRUCTION. 2) CONCEPT ASSUMES REMOVAL OF EXISTING ANGULAR ROCK AND PROPOSED STREAM BANK GRADING WILL RESULT IN NO NET RISE GREATER THAN 0.01-FT IN DESIGN WATER SURFACE ELEVATION BETWEEN EXISTING AND PROPOSED CONDITIONS. 3) EXISTING BRIDGE SUB SURFACE FOOTING CONDITIONS VARY. SPREAD FOOTINGS, PILE SUPPORTED FOOTINGS, AND DEEP SHAFT SUPPORTED FOOTINGS ARE ALL PRESENT AT THIS BRIDGE LOCATION. FOOTING ELEVATIONS VARY. THE SECTION SHOWN REPRESENTS THE SPREAD FOOTING LOCATION. THE PILE SUPPORTED FOOTING ON THE RIGHT (NORTH SIDE OF CHANNEL) IS ALSO PROJECTED INTO THE SECTION TO SHOW WHERE SUB SURFACE ELEMENTS ARE CLOSEST TO THE EXISTING GROUND SURFACE. 4) EXCAVATED SLOPES ABOVE OHWM SHOWN ON MAY CREEK REPRESENTATIVE SECTION ABOVE ARE CONCEPTUAL. FINAL PROPOSED GRADE SLOPES WILL BE DETERMINED BY DESIGN BUILD CONTRACTOR. VARIES, MIN 16' ZONE FOR FUTURE TRAIL FUTURE TRAIL -------------------_;.-...---.... .... PROPOSED ROADWAY �EX GROUND _ .... _____ .... .... �EX BRIDGE SLOPE VARIES (2H:1V MAX) SEE NOTE 4 ,-.... I ABUTMENTIFDUNDA noN ---------+ EX BRIDGE PIER AND FOUNDATION REMOVED WHERE EXPOSED BY UPLAND EXCAVATION TO A POINT 2-FT MIN. DEPTH FROM PROPOSED GROUND LINE EX PILE SUPPORTED FOOTING (DOWNSTREAM FROM REPRESENTATIVE SECTION) OHWM SHOWN FOR INFORMATIONAL PURPOSES ONLY. OHW ELEVATION SHALL BE VERIFIED BY A QUALIFIED BIOLOGIST PRIOR TO THE BEGINNING OF CONSTRUCTION. EXISTING ANGULAR ROCK BELOW OHWM SHALL BE REMOVED AS DIRECTED IN THE FIELD BASED ON DRY SEASON WATER LEVEL AND OTHER EXISTING CONDITIONS AS EVALUATED AT THE TIME OF CONSTRUCTION. �. MAY CREEK STREAM TYPICAL SECTION CONCEPT PLOTTED BY: LivingT DATE: 10/6/2017 TIME: 6:08:34 PM :,: Washington State 'lfff/1 Department of Transportation LINE 1: REPRESENTATIVE TYPICAL STREAM SECTION -NO IN WATER WORK CONCEPT LINE 2: .__ ________________________________________ ......_ _________________ .__ _____________________________________________________ __, STREAM BUFFER ENHANCEMENT PLANTING ,/1 v"v",/1v"v",7 SCIENTIFIC NAM E CO MMO N NAME VVVVVVV· r-------------+-----------------1 "v"v"v"v"v"v"v AM ELANCHIER ALNIFO LI A ' WESTERN SERVIC EBERRY "v"v"v"v"v"v"v,-,J-_B_E_R _B_E_R -IS_A_Q_U_I _FO -LI_U _M_' __ +-T-A_L_L_O_R_E_G_O_N_G_RA __ PE ------1 VVVVVVvr-------------+-----------------1 V V V V V V V BERBERIS NERVO SA 1 LOW OREGO N GR AP E v"v"v"v"v"v"v·v.1---C -O _R_Y_L _U _S _C _O _R_N_U _T _A _' ---+--WE--S-T _E _R _N _H _AZ_E -LN_U_T ___ _, vvvvvvv v" v"v" v" v" v"v" ,1--G-A _U _L_T_H _E_R_IA_S_H_A_L _O _N_' __ --+-_S _A _LA_L -----------1 vvvvvvv ,---------------+-------------� V V V V V V V HO LO DISC US DISCO LO R OCEANSPRA Y v:v:v:v:v:v:v:_,__P_O _L_Y_S_T_IC_H_U_M __ M_U_N_I_T_U _M_'_--+_WE_S_T_E_R_N_S_W_O _R_D_F_E_R_N __ __, "v"v"v"v"v"v"vm--R-U_B_U_S _P_A_R_V_I_F -LO_R_U _S ---+--T-H -IM_B _L _E _B _E_R _R_Y _____ __, VVVVVVVvr-------------+-----------------1 v"v"v"v"v"v"v" SYMPHORICARPO S ALBU S' SNOWBERRY v"v"v"v"v"v"v" VA CCINIUM OVATUM' EV ERGR EEN HUCKLEBERRY vvvv v v v,---------------+-------------� V V V V V V V LO NI CERA INVOLUCRA TA TWI NB ER RY VVVVVVVr-------------+-----------------1 V V V V V V V RO SA NU TKANA NO O TKA RO SE v:v:v:v:v:v:v:....+--R_U_B_U_S _S_P_E_C_T_A_B_I_L _IS-----+-S-A_L_M_O_N_B_E_R_R _Y _____ __, vvvvvvv =-------------+-----------------1 V v"v" v" v" v"v". J--T _H _U _JA_P_L_I_C _A _T _A _____ +-WE __ S_T _E _R _N _R _E_D _C _E_D _A _R __ ----1 vvvvvvv CO s s c 2 "v"v"v"v"v"v"v· 1--__ R_N_U __ E_R_I _E_A ____ -+_R _E_D_-O_S_I_E_R _D_O_G_W_O_O_D __ ---1 v v v v v v v FRA XINU S LATIFO LI A 2 OREGO N ASH VVVVVVVl-----------------+-------------� :v:v;v;v;v;v;v_,__P_H_Y_s_o_c _A_R_P_u_s_c_A_P _IT_A_T_u _s_+-_P_A_C_IF_I_C _N_IN_E _B_A _R_K ___ _____, v v v v v v v SALIX SITC HENSIS2 SITKA WI LLOW • To be installed in drier conditions. 2 To be installed in wetter conditions. • Planting Design shall use species from this list and shall be selected based on specific site conditions. ,----....... 1-------- ....... / --:------I ------------ ./ ; -:- '-4 // _, � ---.c::> ------.._ ..... ' ' . ---, -=-1-- L ... � : ' I I LEGEND I .iii, .iii, .iii, .iii, .iii, WETL AND . .ui. >I.LI., .ui. .w. .w. -----.. -------· WETL AND BO UND A RY • • • • • • • • • • • • • • • • • WETL AND BU FFER STR EAM CENTER LINE -OHW------ STR EAM BU FFER ORDIN ARY HIGH WA TER MARK BO UND ARY DITCH BO TTO M PIP ED STREAM -OR -FLOW DI RECTIO N PROPERTY LINES [v:v:v:v:v:v:v:v:v) BU FFER MITIGA TIO N IMP ERVIO US SU RFA CEREMOVAL ED GE OF PAVEM ENT NEW RETAINING WALL STR E AMBED GRAVEL / AGGR EGATES; LWD '­' \ ' \ \ ' '\ I - . J . , \ I' \ �-----, \ '......_ I ----........ -,-- QUANTITY THIS SHEET 0.117 AC STREAM BUFFER IMPACT -TEMP FILE NAME c:\users\taylorsu\pw _ wsdotld0139111 \XL4653 _EB _M itigation_ 02_MayCreek.dgn TIME 11:28:51 AM DATE 10/10/2017 PLOTTED BY taylorsu DESIGNED BY J. LONG ENTERED BY S. TAYLOR CHECKED BY R. THOMAS PROJ.ENGR. REGIONAL ADM. L. ENG REVISION DATE a.u, :E Q : l m VJ u, Q l m VJ MAY CRK PROPOS ED GRADING NO L II H a. II a. H :E II :E :H : II H II z u. H 0 II u. 0 H u, II Q u, s:I' u Q ..!. l m VJ m z ---- c( C FINISHED GRADE / / -/ -� �'�" '""" Q ..!. m z ___ S _T _R-EA_M_..,'1,1-IMPACT \__ STREAM BUFFER BY REGION STATE NO. 10 WAS JOB NUMBER CONTRACT NO. IMPACT -TEMP FED.AID PROJ.NO. LOCATION NO. XL4653 P.E. STAMP BOX I : u. u. 0 u, Q 1 P.E. STAMP BOX I I ,_ WETL AND 7.2R / --I I FU TURE TRAIL I I I / / ( MAY CR EEK (EXJSTING ALIGNM ENT) -- ' ) r--_.,, I \ \ \ \ \ \ \ 682 SF "' I / --/ / / / / I I / / / I -- I < \ __ .J /-_.,,,. \ I r- \ I I I I \ ) / I I I I I I I I ' "' I -_......- ....... � I J ./ ( J \--,.1 I I I I I I I I I I r --1 \ \ \ I I I I \ I I I I I I I \ o\ ' : /'-. I -- I / '-.. I ) \' I }- _.. / "' ,1 I\ I I ' I : ' : ) I I 'I I • I \ • ' �' I', .. ' ' ' .-' : / \ I '/ / � :, I I ' I ' r ': ,I \• >\ ,---\ I 2,7 14 SF\ I / I I I I I I I I I I I I : I .� •\ ,, \ \ I I I \ \ \ \ I '-, ', I I \ I \ \ \ \ ' I ,_ '\ I \ I I I I ', I \ I I I I I \ I \ I \ I I I I \ \ I I \ I '-...., "-....... ---/ I I I \ I ,-I I I I ' I I I / I I I ( I I J / / I I MAY CREEK ' \ 1-405 \ ' ' \ : I •J I\ :1 : \ : I I 'I : ))1 : ; : I I I I , I I '1: ( \ :''J _//: I J •, / ' I I I : / ' I I '/ / I�\:/ / I . ,i \ , I g;' 1, \ I <C I , I en ( I / lLJ I I : I Z I •i Q \ :1 ' •I I., '! r ' I I / / --: ) �// 'I ' '---/ ' 1-50 I� FEE';r : : I RENTON TO BELLEVUE CORRIDOR WIDENING & EXPRESS TOLL SHEET STREAM & CRITICAL AREA BUFFER MITIGATION -MAY CREEK 2 OF 7 SHEETS