Loading...
HomeMy WebLinkAboutCA_Shoreline_Tracking_Worksheet_TRIP_SSDP_171128_v1DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT 1 H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Shoreline Tracking Worksheet.docx Rev: 08/2016 SHORELINE TRACKING WORKSHEET Planning Division 1055 South Grady Way, Renton, WA 98057 Phone: 425-430-7200 | www.rentonwa.gov The City of Renton is required by the Washington State Department of Ecology to track and evaluate the effectiveness of the Shoreline Master Program at achieving no net loss of shoreline ecological functions with respect to shoreline projects. The City will use shoreline development tracking information to prepare a Shoreline Master Program report every eight years to comply with the Shoreline Management Act requirements. SHORELINE STABILIZATION 1.Is there currently a bulkhead on your site?Yes  No; If yes, fill out table below. If no, see “Site Conditions”, Section 2 below. What Type of Materials is Your Bulkhead Made of? Linear Feet of Hard Materials: Linear Feet of Soft Materials: Examples of Types of Bulkheads: Hard (e.g. rocks, wood); Soft (e.g. sand, plants); Combination-soft materials at the water with hard materials further inland, or a combination of hard and soft materials at the water. SITE CONDITIONS 4.List the size (in square feet) and type of all impervious surfaces (e.g. driveway, parking area, walkway, patio). X 2.List the size (in square feet) and type of all structures (1st floor only) on your property (e.g. 2,000 sq. ft. house, 125 sq. ft. greenhouse). I-405 Bridge over the Cedar River 3.List distance (in feet) from the water to the closest point of each structure. List each building separately (e.g. shed, dock, carport). The closest bridge pier will be approximately 30 feet landward of the ordinary high-water mark on the left (south) bank, and 80 feet on the right (north) bank. The bridge is directly over the Cedar River, as will the proposed expansion. Refer to (2) : 82,500 sq ft existing structure 9,500 sq ft proposed additional structure 2 H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Shoreline Tracking Worksheet.docx Rev: 08/2016 5.List distance (in feet) from the water to the closest point of each impervious surface (hard surface). 6.Describe the existing vegetation within 100 ft. of the waterline. Estimate the amount (in square feet) of 7.Will the project require any added fill? If so, how many cubic yards will be added: IN WATER AND OVER WATER STRUCTURES 8.Are there any in or over water structures on your site (e.g. docks, floats, bridges, mooring piles, boatlifts)?  Yes  No; If yes, fill out the table below. Describe the in- and over-water structures on your site Existing overwater structures on site include the I-405 bridges and a pedestrian bridge over the Cedar River. Refer to (3) native vegetation. Grass and ornamental plantings (e.g. plants requiring care or grown for decorative purposes) should not be counted. Vegetation under the bridge over the Cedar River is limited to shrubs, blackberry, and a few trees. River banks downstream and on the south side of the upstream channel support mixed vegetation consisting of Douglas fir, big-leaf maple, red alder, black cottonwood, and blackberry. There is approximately 2,000 square feet of vegetation within the project impact area. The proposed plan does not require added fill materials within the Cedar River floodplain. Disturbed areas are to be restored to the existing grade. There may be minor amounts of fill (approximately 100 cubic yards) in some locations associated with final grading. X 3 H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Shoreline Tracking Worksheet.docx Rev: 08/2016 Type (e.g. dock, float, bridge, mooring pile, boat lift, etc.) Surface Area (in square feet, if applicable) Light Penetrating Materials (the percentage of the surface area that is made of material that allows light to reach the water) Existing structures to remain Existing structures that will be removed Proposed structures there will be no light penetrating materials Bridge widening on the west side North and southbound bridges will remain in place None 9,500 sq feet of new pavement