Loading...
HomeMy WebLinkAboutLarge Format~!' ' <l.1 ' z: (.) ~=: '. 2 : ' ' I 1 ! i ' i I LEGEND • • • ------ ·.: . . . . .. . •' ·~· . .. . .. ··~ ' ,... ~-.. . ... ;,: . . . • • •• • f ~ ........ --:,-. •• , • ·: "' . ~ . . . .. . ...... ' EXISTING IMPROVEMENT TO BE REMOVED PROPOSED WATER SERVI CE PROPOSED FIRE SERVICE PROPOSED FIRE HYDRANT PROPOSED P .I. V. PROPOSED SEWER SERVICE PROPOSED SEWER MANHOLE PROPOSED STORM DRAIN PIPE PROPOSED CATCH BASIN PROPOSED STORM DRAIN MANHOLE PROPOSED· STORM DRAIN CLEANOUT PROPOSED TRENCH DRAIN PROPOSED CONCRETE PAVEMENT PROPOSED ASPHALT PAVEMENT c · ,ty of Re nton Planning 0 ... IV/S1o n FEB -1 zon 60 30 0 60 ------ Level2 31' -O" 0 z w e5 __J u. 0 I I <.9 Level X3 , ! 4-TON DOUBLE GIRDER BRIDGE AND TROLLEY CRANE ! , :r:--------2-8, _ 3-1/2" I I ~ , , g ------~-----::::_ ___ Lev_eJ X2 I I LL 20' -8 1 /2" 6 ' ~ ------------------------------------------------Ii --------------------------------~ -~ -----------' 5' :JI ' o S ~ Mezz o 16' ~ -0-" ~ I-' ~ I 0 I ' - M I -!... + ~----- 31' -O" 0::: - ~ ~ I (.) ' -i-I Mezz z -------3k-~ 16' -O" Level 1 I--------- O' -O" ---------LOADING DOCK/ QA ----- VENDOR/ STORAGE AREAS E-W BUILDING ELEVATION, TYPICAL 1/16" = 1'-0" _,,_-OFFICE MEZZANINE BRACED FRAME E-W BUILDING ELEVATION, MEZZANINE 1/16"=1'-0" PROJECT: BOEING: NEW BFE BUILDING SCHEMATIC FEASIBILITY DESIGN, RENTON, WASHINGTON TITLE: INTERIOR ELEVATIONS SHEET: S.105 I I O """" """" __J -+· , N W I m DATE: 12/01/2010 DESIGNED BY: BGM APPROVED BY: TLP Level 1 ~---------------,I ..u.. O' -O" .. " .. . ,t,, f .v O Rent Planning D ... on . IVJSJon ZO// I MAGNUSSON KLEMENCIC ASSOCIATES PROJECT: TITLE: SHEET: \ . \ \ \ \ \ \ \ •, \ \ \ \ \ \ \, .. \ \ \ I I / \ \ \ I i i i ' I I l I \ \ ' \ \ \ \ i I J I I ' \ \ \ \ \ \ \ \ \ \ \ ' \ 1. I \ \ \ ' \ \ ., \ ~ \ \ \ \ ' \ ' I \ \\ \ ' \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ I I \ \ \ \ \ \ \ \ \ \ I. ' \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I \ ', I \ i \ \ i I i \ \ ' I i I I I I , ! \ \ \ I \ \ I l I I 1 I \ I \ ' \ I \ \ I I j\ I l i' Ii I j! Ii ! i/ I• '. I I j I I " ! ! ' EXISTING SITE PLAN 1/64" = 1'-0" BOEING: NEW BFE BUILDING SCHEMATIC FEASIBILITY DESIGN, RENTON, WASHINGTON EXISTING SITE PLAN S.101 \ I \ DATE: 12/01/2010 DESIGNED BY: BGM APPROVED BY: TLP I \ \ \ \ \ \ ·. ' ' \ \ \ \ \ \ ' \ \\ \ \ \() \ \() \ \2:'.. '\ \\Tl . '?' . ,{, \\\. \CJ ' '\ '"7 \ \ \:;:; . \ '\ I >f __ -7 .. ,, \ \ ·-;r ,. , L.-·-c·-~\ \ .<f'; \ --·: I \ '-r..~, \ \ \ \_··r..:• \ \ \ \\:t.\ \ I \ \ \ \ \'\1\\ \ \ \ \ \~ .. --\ \ \ 1· \ \ ·-··; ... -\ I •••• .,Y I ··1. \_ .... ,-... ,,., \ \ \ -----, \\, '1 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I \ I Planning Division I FEB -1 IU11 E9if /g(C[O~[~/QJ MAGNUSSON KLEMENCIC ASSOCIATES \ \ \ \ 20.\7 ~ \ \ 21.7 X o\ 0 0 0 0 PAVED PARKING \ I J 19.i \ 24.8 X I I I I X \ \ \ 0 \ x 20.12 \ I I I I \ I I 19. 7 ~ d I ::t( 19.8 I \ \ zt \ ~o. \ \ I 0 0 21. 7 X - I I I - ' ' ' ' , , I I I I I I I 2 .1 I I I -f-c!-f-~:~-~-L _T_O_P_O_P_LA_N ___ -----'0 21.9 X 21.8 -_x-- 20.2 X 0 0 ~ 0 q, 0 0 0 - • -- 0 0 I } ------!----- , , , ,,--/- Ox 20.5 20.4 :ii: 1, -- 11 11 I II II t.,, I II II II I II II I II II I II II I II II 'H' 1Y1 I I~ II I f :: I II I II 11 I II I II ~o.ffe .X .. X 21.7 0 PAVED PARKING 22.3 ~, X ~ 22.4 X 0 0 22.6 X X 21.3 X • (_') ---------s • -------- \ _.., --~ 21.9 X ----------- 22.4 X 0 00 0 • • 22.4 X x 22.4 D ------------------*---- 22.3 X 23.7 X 22.9 24.7 X ?4 7 0 0 - 0 PAVED PARKING • • 0 X 22.5 22.9 X 22.3 X 20 0 21.3 X -----X ---23.4 D X 23.5 21.4 X 0 _.., ... r-.:::-- \ 22.3 X 0 0 --- 0 WM 0 \ I 0 24.7 X 24.8 X • \ 0 I 21.5 ~ I \ \ 0 21.8 X \ I 21.5 X 0 • ~ 21.8 \ 0 \ \ 22.9 :__.,, --)( - PAVED PARKING X 22.6 22.6 • X PAVED Pl'> # 23.1 xo DATUM: NGVD29-0 0.0 ELEV = FORMER SEA LEVEL KEY PLAN ..... - • • C CIO C11 Cl2 Cl3 C14 Cl& .,. C17 .,. Cl9 C20 C21 C22 C2J C24 C2li C20 1 C'O C26 C20 call @ City of Renton Planning Division FEB -l 1011 ~ g 1:::::---r-------==.-------r-::---r----:=:::::--r;::;::-----r---::::-:-r---------=::::-----------,-=-~--:-===-----r--::-:=--r-----------------,-----------,--------=wi;r-----m=--------..==-------=-=:-=::=-=-:-::=-=-===-c-==--------,-,=""'"'==:--.,.,=a;-------.=-------I"' 7 737 RATE EXPANSION PROJ:;ION 11307504 J;MN APPRO'IEO o,::.,, SYM RE'IISION BY DATE ~~c~:r~~~~ ~J.Aii,N~DRrnE __ ---t.::_:01c:.:c.2""5 . .:....:11---J SUBlTTlE TPAORPTOIGALRARPEHNITCOANL SMIATPE CURRENT 1R~~~N504 SYMBOL A DATE 01.25.11 ~ ~~S~PE~CIFl~~~n~ON~l~S~AP~PR~M~O~---lmlGTREIEr--t-----trriii'-----,;-~~~~~~~~:;:------------l~sH=E=CT--------1..----+------------l~ IIIIEl,NO· APPROVED BY DEPT. DATE ~H~:~~IRI 01.25.11 TITLE 737 RATE EXPANSION PROJECT SEPA-13 : RENTON SITE f..Ja~e N=o.--------f=cOM=P~No~. ---------1~ 11307504 ~ 1-=c~-------~---------1"' RENTON, WA DWG NO. CIVIL MASTER SITE RTN-RATEEX-SEPA-13 " ' ; \ \ I ' NEW SEAL BOOTH LOCATION IN THE 4-20 BUILDING .. ::' ·- + -·---.. + ... -._ . ., ,_ \ • 010 C11 012 C1J 014 C15 01, 017 018 019 C20 C21 C22 C2J C:,4 C25 A • 0 ', . ' KEY PLAN ......... J K L I ' ··~· .. ' - -f~ ---• I ---- 1 · © City of A Planning Denton 1v1sion FEB -1 ZOii 00 ~ 1--,---------------,--=:--;-:::=:--r-:-:=---r--,-------,------=::---------;----,----;---,---------------,--------r--------=R>i~----,,. ... A ....--,r;:;;,=-::,------~-==--:----=--=::-:-----------.,...,,,.,,=.-==~~~---c==------1~ SYMA RoosioN 11301504 : ~.NAKHJIRI DATE SYM RE.VISION BY DATE ~~c~:~:~~~ J.ANDRE o1.21.11 suB1T1LE PARTISAL SITE PLAN cuRRENT 1R~~~N504 SYMBOL A DATE 01.27.11 5 737 RATE EXPANSION PROJECT ., 01.27.11 ('X .411 1--=S~PE~Cl~FICA'.'.'.'.Jl~ON~IS ~AP:.'.:'.PR~OVE~D~-IEFillllflEtlr"--t---tTi'fiF~-----::,:,'=i-N~E~W~~E~A~L ~Bi:O'-;O~TiiH~,=---------l'"""sH""E""ET----'-----+---~---1! ~oEi~o· APPROVED BY DEPT. DATE M.NAKHJIRI 01.27.11 TITLE 737 RATE EXPANSION PROJECT SEPA-11 A ~ 04-020 BUILDING :JOB:NO:. ========::CO:MP =NO.====~~ RENTON WA DWG NO. • CIVIL MASTER SITE RTN-RATEEX-SEPA-11A I I I I \ \ \ \ / / ·. / I r. ~/ ; .. . I II \ l I I I ,I Of I LJici I __ J 4-IS \ I I n I I l-L - I I I City of Renton Planning Division FEB -1 1011 ,.., iSYMsvi.i""t----~REVl;;SOOIIONl-----r;;BY:--r,APPROVE~;jDIMDATEir~SYM:;i------~Ria;EVISIOSIO;;-N ------r-,;:BY-;-r.;;;;;;;;;;;;;-T~DATE;;:--r------------~-----i---:-::::=-=-:=--~IMil--lllA'T!:------rssiiiiiuerimiJTLE;;,----------------_:_---r,;;CU""RRIDENf"'R""'EVl;;.,SIOmiN---r.;;;;SYMm;;BO"L----:-A---,"'DAn.'"JE----~! A 737 RATE EXPANSION PROJECT 11301so4 JA M.NAKHJ1R1 01.2s.11 ~~co~!~~~~ ~J.Fi.ANiiDR'"""E --t-'0"",.""'24 ::.!.· 11!.-J SITE PLAN , ==--1_1 _30_1s_o_J4 ----+---0_1._2s_.1_1 -~ ~ rX ..111 SPEClflCATION IS APPROVED 'sHEET "' l?'--lllll?IA,#;· ~~~P~R=~o~~~~D~E~~-~D~fil--lr~~=mK~m~I-Rl--t--01-.24-.1~1~~n.-----N~l.~w"AAWJ~B~F~E~AN~B~IU~l~L~D~IN~CT~G-----:JO=e~N~~--E_P_A_-_1_1_-1=ro=wp~N~O.---~' 1==~-----__J'------~~ RENTON, WA DWG NO. RTN-AATEEX-SEPA-11 CIVIL MASTER SITE A BOEING COMMERCIAL AIRPLANES LEGEND: u, I ~ <D ~'-------------- ::::::,_---~ ______ ,,,'1::, C> D D AREA MAP PUGET SOUND REGION 737 RATE EXPANSION PROJECTS PERIMETER ROAD B-5 '----APRON-A A-2 A-3 A-4 A-5 A-6 A-7 ~-A-_9__, 0 S1ADIUM -WILLIAMS AVE. N. z z ~ :r: z (J1 ---l OJ :r: WELLS AVE. N. ---i ,, " :;o fTl ~ ;d en fTl ---l ~ :;o fTl PELLY AVE. N. ~ J u,,...,__J ]~ ~-P_A_R_K -'--A"""'VE"'-. ....:.N'-'-. __, • I AIBJRN II.OONA Kr«lCO. PIERCE CO. @ NO SC\LE 11307504 JANDRE ,I GARDEN AVENUE N. I -~-A~-E -~--~o-1 ~-~--® 01.21.11 ' (J1 I -J>. 0 (.,.j ' (J1 I &-- •• •• w ::r I- __ ..... , ' ' ' • ,........ ..... _......,,, •• •' / \ BOEING OWNED PROPERTY RENTON, WASHINGTON 98055 737 RATE EXPANSION PROJECT LOCATIONS ,-4,-+----------+,'---,.._--+--------------,. C ----------. NEW BFE BUILDING ( ± 75K SF) FIRST FLOOR PLAN -DWG NO. RTN-RATEEX-SEPA-25A MEZZ. LEVEL PLAN -DWG NO. RTN-RATEEX-SEPA-25B NEW SEAL BOOTH IN LINE 6 ( ± 5,400) PROPOSED SEAL BOOTH-DWG NO. RTN-RATEEX-SEPA-25C LEGAL DESCRIPTION BOEING COMMERCIAL AIRPLANE PARCEL I-BO CoY OF RENTON, KING COUNTY, WASHINGTON The following described tract of land is the resultant consolidation of Record Title vested in the Boeing Company. a Delaware Corporation and Puget Sound Power & Li9ht Company. a Massachusetts Corporation, covered in the Pioneer National Title Insurance Company, Limited Liability Reports Number A-253802, A-253803, A-253804, Unit 13. dated January 11. through January 21, 1980. THAT PORTION OF GOVERNMENT LOTS 1 AND 3 IN SECTION 7; AND OF GOVERNMENT LOTS 1, 2 AND 3 AND THE NORTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 8, TOWNSHIP 23 NORTH, RANGE 5 EAST, WILLAMETTE MERIDAN, IN THE CITY OF RENTON, KING COUNTY, WASHINGTON; AND OF C.H. ADSIT'S LAKE WASHINGTON PLAT AS RECORDED IN VOLUME 8 OF PLATS, PAGE 79, RECORDS OF KING COUNTY, WASHINGTON; AND OF BLOCK C, THIRD SUPPLEMENTAL MAP OF LAKE WASHINGTON SHORE LANDS, AS RECORDED UNDER KING COUNTY AUDITOR'S FILE NUMBER 5927582; AND OF CERTAIN SHORE LANDS OF LAKE WASHINGTON SHOWN ON SHEETS 3 AND 4 OF THE MAP PREPARED BY UDO __ ---1:lf.SSE _llt!QEll_K!JilJi_QQUt!_JY __ ~LJ.!'E_[llQ[l CQllRJ _C/lU_SI;. N_UMBER __ 1.56371; AND__QF __ _ . -VACATED LAKE WASHINGTON BOULEVARD (FORMERLY PARK STREET); AND OF THE ABANDONED BURLINGTON NORTHERN INC. RAILWAY (FORMERLY NORTHERN PACIFIC RAILWAY) RIGHT-OF-WAY. PARCEL 11-80 CITY OE RENTON KING COUNTY, WASHINGTON The following described tract of land shows record Title vested in The Boeing Company, a Delaware Corporation, covered in the Pioneer National Title Insurance Company, Limited Liability Report A-253196, dated January 21 , 1980. ALL BEARINGS ARE REFERENCED TO THE GRID MERIDAN OF THE WASHINGTON COOORDINATE SYSTEM, NORTH ZONE. THAT PORTION OF GOVERNMENT LOTS 1, 2 AND 3 AND THE SOUTHEAST QUARTER 0 THE NORTHWEST QUARTER OF SECTION 8, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., IN THE CITY OF RENTON, KING COUNTY, WASHINGTON. PARCEL Ill BO CITY OE RENTON, KING COUNTY, WASHINGTON The following described tract of land shows record Title vested in The Boeing Company, a Delaware Carporatian, covered in the Pioneer National Title Insurance Company, Limited Liability Report A-253195, dated January 21, 1980. ALL BEARINGS ARE REFERENCED TO THE GRID MERIDAN OF THE WASHINGTON COOORDINATE SYSTEM, NORTH ZONE. THAT PORTION OF THE NORTHWEST QUARTER AND OF THE NORTHEAST QUATER OF SECTION 8, TOWNSHIP23 NORTH, RANGE 5 EAST, W.M. IN KING COUNTY, WASHINGTON. PARCEL IY-80 CITY OF RENTON. KING COUNTY, WASHINGTON The following described tract of land shows record Title vested in The Boeing Company, a Delaware Corporation, covered in the Pioneer National Title Insurance Company, Limited Liability Report A-253807, dated January 21, 1980. ALL BEARINGS ARE REFERENCED TO THE GRID MERIDAN OF THE WASHINGTON COOORDINATE SYSTEM, NORTH ZONE. THAT PORTION OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTIION 7, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M. IN KING COUNTY, WASHINGTON, LYING EASTERLY OF COMMERCIAL WATERWAY DISTRICT N0.2 RIGHT-OF-WAY AND WESTERLY OF LOGAN STREET NORTH AS DEEDE TO THE STATE OF WASHINGTON UNDER AUDITOR'S FILE NUMBER3261297. NOTE: Parcel bearing description is attached to permit packageCity Of ,., nenton Planning o,·v· . · 1s1on -DO NOf lYPE HERE - - GENERAL LANDSCAPE NOTES 1. ALL PLANTS ARE REQUIRED TO CONFORM TO THE GUIDELINES ESTABLISHED BY THE AMERICAN NURSERYMAN'S ASSOCIATION FOR AMERICAN STANDARD NURSERY STOCK. 2. ALL DEFECTIVE AND/OR DEAD PLANT MATERIAL WILL BE REPLACED WITHIN SIX (6) MONTHS AFTER NOTIFICATION FROM THE CITY/OWNER/ARCHITECT WITH NEW LIVING PLANT MATERIAL EQUAL TO THE ORIGINAL PLAN. 3. PLANTS ARE REQUIRED TO ORIGINATE FROM ESTABLISHED NURSERIES WITHIN 200 MILES OF THE PROJECT SITE. IF PLANTS ARE NOT AVAILABLE IN THE SPECIFIED SIZE AND/OR IN QUANTITY, THEY MAY BE SECURED FROM OUTSIDE THE REGION WITH PRIOR APPROVAL. 4. THE LANDSCAPE CONTRACTOR IS REQUIRED TO LOCATE BELOW-GRADE UTILITY LINES PRIOR TO COMMENCEMENT OF WORK. SITE UTILITY PLANS ARE INCLUDED WITHIN THIS PLAN SET. LANDSCAPE CONTRACTOR MAY FIELD ADJUST PLANT LOCATIONS TO AVOID UTILITY CONFLICTS AND MAINTAIN MINIMUM CLEARANCES. 5. PLANTS ARE TO BE BALLED & BURLAPPED OR CONTAINER GROWN AS SPECIFIED. BARE-ROOT PLANTS MAY BE ACCEPTED WITH PRIOR WRITIEN APPROVAL. NO CONTAINER STOCK WILL BE ACCEPTED IF DEEMED TO BE ROOT-BOUND. REMOVE ALL ROOT WRAPPING MATERIAL AS INDICATED ON THE PLANT INSTALLATION DETAIL. 6. PLANTS ARE REQUIRED TO MEET MINIMUM SIZE SPECIFIED. LABEL ONE PLANT PLANT OUT OF EACH GROUPING FOR AN ON-SITE REVIEW AND APPROVAL, THEN REMOVE LABEL AFTER SUBSTANTIAL COMPLETION. 7. INSTALL ALL PLANTS PER THE PLANT INSTALLATION DETAILS SHOWN ON THE DETAIL SHEET. ALTERNATE TREE STAKING METHODS MAY BE PROPOSED IF EQUAL TO OR SUPERIOR, UPON REVIEW AND APPROVAL. 8. STOCKPILE PLANT MATERIAL UPON DELIVERY TO THE PROJECT SITE IN A SHADY LOCATION, EMBED IN SAWDUST/MULCH. STOCKPILE NEAR A WATER SOURCE AND WATER PLANTS AT LEAST ONCE A DAY TO MAINTAIN HEALTH. 9. THE LANDSCAPE CONTRACTOR IS REQUIRED TO PROPOSE A HERBICIDE FOR PRE & POST EMERGENT WEEDS TO ALL BEDS. SUBMIT SPECIFIC HERBICIDE PRODUCT FOR REVIEW & APPROVAL BY THE ARCHITECT AND OWNER. THE HERBICIDE MUST MEET ALL LOCAL AND STATE ENVIRONMENTAL REGULATIONS. PROJECT LANDSCAPE NOTES 1. THE EXISTING SUB-SURFACE SOIL HAS BEEN PREVIOUSLY COMPACTED AND PAVED OVER IN ASPHALT (WITH A GRAVEL BASE COURSE) FOR SEVERAL DECADES. ANTICIPATE VERY POOR QUALITY, LOW NUTRIENT, COMPACTED SOIL AT NEW PLANTING AREAS. OVER-EXCAVATE TO A DEPTH OF 1 B" AND SCARIFY/LOOSEN SUBGRADE TO ALLOW FOR PROPER DRAINAGE AND FUTURE ROOT DEVELOPMENT. 2. IF STANDING WATER IS OBSERVED IN THE PLANTING AREAS DURING EXCAVATION, PROVIDE VERTICAL DRAINAGE VENT PIPES AT 25 TREE LOCATIONS. VERIFY FREE-DRAINING PLANTING PIT BY APPLYING WATER CONTINUOUSLY FOR 30 MINUTES. OBSERVE AND DOCUMENT RATE OF DRAINAGE. AS A PART OF THE SCOPE OF WORK, INCLUDE IN BID 50 LF OF 4" DIA. FLEXIBLE DRAIN PIPE, INSTALLED AT AREAS TO BE DETERMINED. IF NOT USED, PROVIDE COST CREDIT TO OWNER AT PRE-DETERMINED UNIT COST. 3. BACKFILL 18" DEEP EXCAVATED AREAS W/50% EXIST. TOPSOIL AND 50% 2-WAY TOPSOIL (LOAM + COMPOST @ 1/2" SCREEN) THOROUGHLY BLENDED AND MIXED INTO SUBGRADE TO PREVENT POTENTIAL SOIL LAYERING. ORGANIC COMPOST IS TO CONSIST OF YARD WASTE (LAWN CLIPPINGS, SHREDDED LEAVES, AGED MANURE, ETC.) VERIFY DRAINAGE SUITABILITY WITH AGRICULTURAL SOIL TEST LABORATORY RECOMMENDATIONS. 4. LANDSCAPE CONTRACTOR MAY CREATIVELY SCULPT BERMS TO COINCIDE WITH THE ROCK/BOULDER OUTCROPS. DO NOT EXCEED A 3: 1 SLOPE AND ASSURE NO ADVERSE DRAINAGE CONDITION IS CREATED. 5. PROVIDE A WEED BARRIER FABRIC AT ALL AREAS DESIGNATED AS "ROCKSCAPE" W/ FABRIC LAID DOWN & SECURED. COVER W/2" DEEP LAYER OF FREE-DRAINING, WASHED, 5/B" PEA GRAVEL PRIOR TO ADDING RIVER-RUN ROCKS ABOVE. APPLY HERBICIDE. 6. RIVER-RUN ROCK: ADD 3" TO 6" DIA. RIVER-RUN ROCK ABOVE 2" GRAVEL LAYER. INSTALL RIVER-RUN ROCK TO A DEPTH OF 10"-12". INSTALL TO CREATE A NATURAL ROCK OUTCROP. THE RIVER-RUN ROCK IS TO BE "ARCTIC BLEND" AND OF A LIGHT GRAY TONE TO MATCH GRAVEL BELOW AND ADJACENT BOULDERS. 7. BOULDERS: IGNEOUS RIVER BOULDERS IN THE FOLLOWING SIZES: LARGE: 4'x4'x4' (5,000 lbs.) 4-MAN ROCK MEDIUM: 3'x3'x3' (3,000 lbs.) 3-MAN ROCK SMALL: 2'x2'x2' (1,000 lbs.) 2-MAN ROCK SEE PLANTING PLAN FOR LOCATION AND QUANTITY. 10. INSTALL PLANTS ONLY DURING FAVORABLE WEATHER CONDITIONS AND WITHIN SEASONAL PLANTING LIMITATIONS. DO NOT PLANT 8. LANDSCAPE AREAS ARE TO RECEIVE THE FOLLOWING: WHEN DAILY HIGH TEMPERATURES EXCEED 85'(F) OR BELOW 32'(F) FOR OVER 3 HOURS DURING THE NIGHT. IF PROJECT SCHEDULE PERMITS, INSTALL PLANT MATERIAL DURING THE FALL TO ALLOW FOR OPTIMUM ROOT ESTABLISHMENT. 11. APPLY FERTILIZER TABLETS OR SLOW-RELEASE PACKETS TO EACH PLANT PER THE MANUFACTURER'S RECOMMENDATIONS. NATIVE PLANTS MAY NOT REQUIRE FERTILIZATION PER LOCAL CONDITIONS AND THE AGF!ICULTURAL SOIL TEST REPORT. 12. LANDSCAPE BEDS ON PRIVATE PROPERTY ARE REQUIRED TO BE MAINTAINED BY THE OWNER OR LESSEE OF THE PROPERTY TO PROVIDE AN ATIRACTIVE, SAFE APPEARANCE FOR THE DEVELOPMENT. A LACK OF MAINTENANCE WILL CONSTITUTE A VIOLATION OF THE LOCAL MUNICIPAL CODE. 13. AT THE COMPLETION OF THE LANDSCAPE INSTALLATION, ALL PLANTING BEDS ARE REQUIRED TO BE RAKED SMOOTH AND ALL DEBRIS, STONES, TRASH, LITIER, REMOVED. A) 3" FINE-MEDIUM TOP-DRESSING BARK MULCH. B) WHERE LANDSCAPE BERMS ARE INDICATED, ADD ADDITIONAL 2-WAY PLANTING TOPSOIL TO BERM HEIGHTS INDICATED, BLEND INTO SOIL BELOW TO CREATE A HO,MOGENOUS MIX TO AVOID LAYERING OF SOIL PROFILE. LIGHTLY COMPACT AND ADD ADDITIONAL SOIL AND BARK TO ACHIEVE DESIRED FINISH GRADE. TOPSOIL IS TO BE OF THE FOLLOWING MIX: 2-WAY LOAM/COMPOST MIX (SCREENED TO 1 /2'') AS SUPPLIED BY PALMER COKING COAL CO., CEDAR GROVE COMPOSTING, INC. OR PACIFIC TOPSOILS, INC. VERIFY SUITABILITY OF IMPORTED TOPSOIL WITH COMPATIBILITY OF EXISTING SOIL BASED ON THE AGRICULTURAL TEST REPORT. TOP MULCH IS TO CONSIST OF THE FOLLOWING: FINE TO MEDIUM FIR/HEMLOCK BARK, 3"(-) PARTICLE SIZE AS SUPPLIED BY PALMER COKING COAL CO., CEDAR GROVE COMPOSTING, INC. OR PACIFIC TOPSOILS, INC. 9. CERTAIN PLANTING BED LOCATIONS MAY ENCOUNTER WATER COLLECTING BEHIND NEW CURB LOCATIONS. INCLUDE IN BID SCOPE OF WORK THE PROVISION OF DRILLING 1-1 /2" DIA. WEEP HOLES W/ FREE-DRAINING 12" x 12" GRAVEL POCKETS BEHIND EACH HOLE AND WIRE MESH. CORE DRILL WEEP HOLES AT 10 LOCATIONS, TO BE DETERMINED DURING CONSTRUCTION. IF NOT REQUIRED PER FIELD CONDITIONS, PROVIDE COST CREDIT BACK TO OWNER AT A P -0 D J 10. 1 B MONTHS AFTER SUBSTANTIAL COMPLETION, TEMPORARY IRRIGATION WILL BE REMOVED. ADD "SOIL -MOIST PLUS" WATER-ABSORBING POLYMERS W/ 7,7,7, FERTILIZER. APPLY AT ROOT ZONE LEVEL PER MANUFACTURER'S RECOMMENDATIONS. .R<'t~fr@fill 0 Planning Division ~~(Q)W~[D) Date Sh/ ltz I. 7 SYM REVISION BY APPROVED DATE SYM REVISION A ASI 016 11713676 P.J.D. P.J.D. 02-09-12 BY PLANTING SCHEDULE TREES NOTE: QUANTITIES ARE FOR CONTRACTOR CONVENIENCE. CONTRACTOR SHALL BID PLANTS PER LANDSCAPE PLAN GRAPHIC. IF A QUANTITY CONFLICT OCCURS, THE HIGHER PLANT QUANTITY WILL GOVERN. SYMBOL ABB. BOTANICAL NAME ~ CN CHAMAECYPARIS NOOTKA. 'PENDULA' 0 JS JUNIPERUS SCOPULORUM 'SKYROCKET' .0 MRB MALUS 'ADIRONDACK'/'PRAIRIE FIRE' ... j;,{ ·1'$. CJR CRYPTOMERIA JAPONICA . IT , " I + ) PCC PYRUS CALLERYANA 'CHANTICLEER' " A 1f PNAS PINUS NIGRA 'ARNOLD SENTINEL' . EB PP PARROTIA PERSICA SHRUBS SYMBOL ABB. BOTANICAL NAME GD AC ACER CIRCINATUM COMMON NAME WEEPING ALASKAN CEDAR SKYROCKET JUNIPER ADIRONDACK CRABAPPLE PRAIRIE FIRE CRABAPPLE JAPANESE CRYPTOMERIA CHANTICLEER PEAR ARNOLD SENTINEL PINE PERSIAN IRONWOOD COMMON NAME VINE MAPLE SIZE 9'-10'(H) 7'-8'(H) 7' -8' (H) 1.5" CAL. 1.5" CAL. 7' -8' (H) 9'-10' (H) 2.5" CALIPER 5' -6' (H) 2.0" CALIPER SIZE 5.0' HIGH MULTI-TRUNK 0 BTM BERBERIS THUN. 'MONLERS' GOLDEN NUGGET BARBERRY 2 GAL. CONT. 0 BTC 0 BTR 0 CH & CV BERBERIS THUN. 'CRIMSON PYGMY' CRIMSON PYGMY BARBERRY 2 GAL. CONT. BERBERIS THUN. 'ROSE GLOW' ROSE GLOW BARBERRY CISTUS HYBRIDUS (WHITE) WHITE ROCK ROSE CEANOTHUS THYRSIFLORUS 'VICTORIA' VICTORIA CEANOTHUS 0 J-BP JUNIPERUS CHINENSIS 'BLUE POINT' BLUE POINT JUNIPER <§:, LA LAVANDULA ANGUSTIFOLIA 'MUNSTEAD' MUNSTEAD LAVENDER @ MA MAHONIA AQUIFOLIUM 'COMPACTA' OREGON GRAPE ® ND NANDINA DOMESTICA 'GULFSTREAM' GULFSTRE~M' NANDINA 0 PF POTENTILLA FRUTICOSA 'GOLD STAR' GOLD STAR POTENTILLA PM PINUS MUGHO 'SLOWMOUND' DWARF MUGHO PINE 5 GAL. CONT. 5 GAL. CONT. 5 GAL. CONT. 4'-0" HIGH 1 GAL. CONT. 5 GAL. CONT. 5 GAL. CONT. 2 GAL. CONT. 12"-15" WIDE <S/J VT VIBURNUM TINUS 'SPRING BOUQUET' SP. BOUQUET VIBURNUM 5 GAL. CONT. GROUNDCOVER SYMBOL ABB. BOTANICAL NAME COMMON NAME SIZE Cb AU ARCTOSTAPHYLOS U. 'GREEN CARPET' KINNKINNICK 1 GAL. CONT. . @ GS GAULTHERIA SHALLON SALAL 4" POT w SSVJ SEDUM 'VERA JAMESON' VERA JAMESON STONECROP 1 GAL. CONT. -- ! I/!; SSDB SEDUM 'DRAGON'S BLOOD' DR. BLOOD STONECROP 1 GAL. CONT. t:;'11!!;' ') !;. ! -v.,~ vvvv SRBS SEDUM REFLEXUM 'BLUE SPRUCE' BLUE SPRUCE STONECROP 1 GAL. CONT. vvvv~ vvvvv Vvvv - ORNAMENTAL GRASSES, PERENNIALS, FERNS SYMBOL ABB. BOTANICAL NAME COMMON NAME SIZE ,11,, FO FESTUCA OVI NA 'ELIJAH BLUE' ELIJAH BLUE FESCUE 1 GAL. CONT. ,,,,._ I I © LM LIRIOPE MUSCARI 'BIG BLUE' BIG BLUE LILLY TURF 1 GAL. CONT. ~ PA PENNESETUM ALO. 'LIL BUNNY' BUNNY FOUNTAIN GRASS 1 GAL. CONT. * PMU POLYSTICHUM MUNITUM WESTERN SWORD FERN 1 GAL. CONT. CT) RK RUDBEKKIA TRILOBA BLACK-EYED SUSAN 4" POT APPROVED DAlE nTY. DROUGHT NATIVE 4 GOOD PARTIAL 4 6 EXCELLENT NO 2 MODERATE NO 3 MODERATE NO 4 GOOD NO 2 8 GOOD NO 7 GOOD NO 7 EXCELLENT NO QTY. DROUGHT NATIVE 3 MODERATE YES (IN SHADE) 6 GOOD NO 11 GOOD NO 9 GOOD NO 14 EXCELLENT NO EXCELLENT NO 20 EXCELLENT NO 9 GOOD NO 8 GOOD YES 11 GOOD NO 30 GOOD NO 19 GOOD NO 9 MODERATE NO COMMENTS FULL, DENSE, NOT SPINDLY OR WITH AWKWARD BRANCH ANGLES. FULL, DENSE SELECT GOOD UPRIGHT FORM SELECT GOOD UPRIGHT FORM FULL, DENSE, GOOD FORM SINGLE-TRUNK, PEDESTRIAN BRANCH CLEARANCE, GOOD FORM. MATCH CANOPY FORM WHEN PLANTED IN A ROW OR CLUSTER. FULL, DENSE SINGLE-TRUNK, WELL-SHAPED, UPRIGHT FORM, FULL CANOPY. COMMENTS SELECT GOOD FORM, MULTI-TRUNK FULL, WELL-SHAPED, GOOD YELLOW COLOR. FULL, WELL-SHAPED, GOOD RED COLOR. FULL, WELL-SHAPED, GOOD RED COLOR. FULL, DENSE SELECT GOOD FORM FULL, DENSE, GOOD FORM, MATCH IN ROW OR TALLEST IN CENTER AT CLUSTERS OF 3. FULL, DENSE, GOOD FORM FULL, DENSE, GOOD FORM FULL, DENSE. MAY CONSIDER 'MOON BAY' & 'FIRE POWER' AT SOME LOCATION WITH PRIOR APPROVAL. FULL, WELL-SHAPED FULL, DENSE. MAY CONSIDER 'SHERWOOD COMPACT' & 'WHITE BUD' UP TO 50% IN QUANTITY, WITH PRIOR APPROVAL. FULL, DENSE QTY. DROUGHT NATIVE COMMENTS 138 sf MODERATE YES SPACE AT 18" O.C. 44 PLANTS (IN SHADE) 135 sf MODERATE YES SPACE AT 18" O.C. 43 PLANTS (IN SHADE) 454 sf EXCELLENT NO SPACE AT 24" O.C. 91 PLANTS 113 sf EXCELLENT NO SPACE AT 18" O.C. 34 PLANTS 280 sf EXCELLENT NO SPACE AT 18" O.C. 101 PLANT'. QTY. DROUGHT NATIVE COMMENTS 25 GOOD YES PLANT IN GEOMETRIC PATTERNS OR IN BETWEEN BOULDERS. 15 GOOD NO PLANT AS SHOWN 23 EXCELLENT NO PLANT IN NOOKS BEHIND OR BETWEEN BOULDERS 17 MODERATE YES SPACE AS SHOWN (IN SHADE) 32 EXCELLENT NO SPACE AS SHOWN PLANTING NOTES AND SCHEDULE SUBTITLE ACCEPTABILITY P. DIX 05.27.11 ·ASI #016 FEBRUARY 9, 2012 •• ~. • • •••• ASPEN LANDSCAPE ARCHITECTURE SITE PLANNING ASPEN DESIGN GROUP 3746 257TH AVENUE S.E. ISSAQUAH, WA 98029 (425l 313-3194 (P,J!(l!lI!)Of RENTO'! ., (425 313-3195 (~liXI): c; EI VE CONTACT: PAUL J. DIX O APR 1 2012 BUILDING DIVI[ :)i ,1 CURRENT REVISION SYMBOL A DATE 11713676 02.09.12 <ti--llllEIND" STATE Of WAS!ilfl\lTON R&GliTEREO THIS DESIGN AND/OR lcimciITTi-------t--"=~'-j L._::S:;PE::;:CIF::.::;IC;:::AT~ION::_l::_S .:,::AP:.::.:PR;:::,OY:.::ED::._...mp'!ciDITTIXn-__ ro5:C.C.2"-'7'-'-'11'--h;in<---------------------ISHEET N R TITLE LS10 APPROVED BY DEPT. DATE NEW BUILDING FOR BFE CHECKED LMIDIICAPI A1IClilTECT 1------+--1---+.-.AP=~a ---1------1 JOB NO. COMP NO. BUILDING 04-68-75 11713676 RENTON WA DWG NO. ' APPROV D LANDSCAPE MASTER RTN-LS10 p..91100'\3 ·• ·,, .-, ·-"· •· · ' ' , .... ,. ,• ',u,., -.,, ""' -.-, ·~.,, .. '· '''"' ·> -'"'-"· '· '•"·"· '' »--,-, .. ~:.-, ,,,, ... _, ·0 ·-•· ~" ~-• .c-. .,.._,,,,_,., ~'"'""' -,., ·.-,,~ ,-•• ·JI,, ,.,., :·_ -Z.:.f,,",-.-•ar·irc:·,.,,·,"'"· ,:r~,~:,,., .• , ·,a ·,· .,,.',,. i;•,;c,•: ,·-: ,,.:1e,<-, ... -•• ~.,1, t:"c , ·<:, \•L"<;;,r,,n,,r,-1"1"1,w, · \ ~ - ~ -~ ~ - DHA SUIJ'LEY LIMIT -3/2/2011 ~ - ) SYM \ \ \ \ \ \ \ \ \ ,, \1 \ I ~ • \\ ~ ~\\ REVISION A RESPONSE TO LEED COMMENTS B ASI 016 ' ' ' BY PD 11713676 P.J.D. APPROVED PD -~~ ~ ',, 1" UP \ ,,, \ ~ 3-PMU 1-AC 3-MA CN, 9'-10' HT. 2-NO 2-ND '--l'f-1-PP ',;f#s'--------1/rAU, 105 S.F. '1)1'0:'---J/-(2) LARGE, ( 1) MEDIUM BLDR'S. lr-------11--3-CJR 7'-8' 9'-10' 7'-8' -t1---1PLANTER BED ~;;f----,(./___ 3,272 S.F. SS-VJ, 114 S.F. ~~>-tJ'----:~ NEW STORMWATER SWALE ':i'P,;;t".] __.-ff-f-"'-47' BTM r#~;;;:::,AfJ, 33 S.F. ..,.__,/F-+-,f----1/---LANDSCAPE BERMS ARE SHOWN SS-VJ 95 S.F. AS CONCEPTUAL-CONTRACTOR ~ ~REATIVELY ADJUST IN FIELD. PLANTER BED 909 S.F. LDR'S. 3-FO DATE 08-31-11 ( 1) MEDIUM BOULDER OCKSCAPE 5 S.F. TOTAL PROJECT AREA _.\..---i 114,309 S.F. (2.62 ACRES) SYM TOTAL PROJECT SITE AREA = 114,309 S.F. PERVIOUS LANDSCAPE BEDS = 8,107 S.F. PERCENT IN LANDSCAPE = 7.1% (3) MEDIUM BOULDERS OCKSCAPE 80 S.F. 2-PM ', 3-BTCP l ----GRAVEL MULCH NORTH OF LINE \ REVISION P.J.D. 02-09-12 1-CN, 2-CN, 10' HT. 7'-8' HT. 1-AC 2-PMU 1-CN 3-ND 9'-10' HT. PLANTER BED 225 S.F. 7-LM 1-MA PLANTER BED 368 S.F. 4-68 A -- MATCH LINE -FOR CONTINUATION SEE SHEET T18D BY APPROVED DATE ~DE.IND" STATE Cf WAmrlGTC~ Alitll!ff'<tlf.O ~ Al':CHITTCT 4\~~00 \ 4-75 BUILDING FINISH FLOOR EL 22.36' ACCEPTABILITY P. DIX THIS DESIGN AND/OR CHECKED BUILDING FINISH FLOOR EL 22.28' ROOF LADDER 05.27.11 0 \\ \ \ ~~ ~~ 4-75 SUBTITLE \ ··,,.,,\, 0 PLANTING PLAN \ . ' \~ \~ \ I \ \ \ \ \ 0 GENERAL NOTES [I> ALL WORK IS REQUIRED TO BE PERFORMED IN ACCORDANCE WITH BOEING STD. SPECIFICATIONS. ~ SEE SHEET LS10 FOR GENERAL LANDSCAPE AND PROJECT PLAN NOTES. [I> SEE SHEET LS10 FOR PLANTING SCHEDULE FOR QUANTITY, SIZE, SPACING, ETC. IT::> ALL LOCATIONS OF EXISTING UTILITIES SHOWN ON THIS PLAN ARE APPROXIMATE AND SHOULD BE VERIFIED IN THE FIELD BEFORE CONSTRUCTION. CONSTRUCTION NOTES [I::> FIELD DEFINE AREA OF ROCKSCAPE W/PAINTED OUTLINE PRIOR TO WEED BARRIER FABRIC AND GRAVEL INSTALLATION. p ONCE ROCKSCAPE BEDS HAVE BEEN DEFINED, LAY BOULDERS IN APPROXIMATE LOCATIONS AS INDICATED, CREATING ROCK OUTCROPS. p CONSTRUCT LOW LANDSCAPE BERMS 18" TO 24" HIGH AS INDICATED WITH A MAXIMUM OF A 3:1 T1D T11 T12 T13 T14 T15 T16 T17 T18 T19 T2D T21 T22 T23 T24 T25 T26 T27 T28 T29 T30 SLOPE. CREATIVELY SCULPT BERMS AROUND BOULDERS TO CREATE A NATURAL ROCK OUTCROP. KEY PLAN SCALE : NONE ABCDEFGH ; /\' J K L J2. V/_ ..\ \ IG -_.. , \ \ / - \ fl\\ ~ \111 I 1~1 r I, -• D I , II - 1~ \, W.\ \ \ ' ,\ \ ·" I\ @ 20· 1 o· o 20· 40' ----SCALE IN FEET ASI #016 FEBRUARY 9, 2012 •• -. • • •••• ASPEN LANDSCAPE ARCHITECTURE SITE PLANNING ASPEN DESIGN GROUP 3746 257TH AVENUE S.E. ISSAQUAH, WA 98029 ( 425) 313-31 ifrv(ii'l#ilNIC}< (425) 313-~,,!'?Cl~)V E 0 CONTACT: PAUi: J. DIX /IPR 1 0 2012 BUILDING DIVIS\Ot, CURRENT REVISION sYMBOL B 11713676 DATE 02-09-12 SPECIFICATION IS APPROVED P. DIX 05.27.11 TITLE NEW BUILDING FOR BFE ::::_::;.;:.:.::::::~--lrnclfm::l'R---r=~TfffiI"---------:--:::---::----=-:-::--=---------; SHEET LS67D APPROVED BY DEPT. DATE CHECKED APP OVED BUILDING 04-68-75 APPROVED LANDSCAPE MASTER JOB NO. 11713676 COMP NO. RENTON, WA DWG NO. RTN-YD-LS67D 0 0 0 SYM REVISION A ASI 016 ,1 ' I ,, '\ \\ \\ \\ ' f 1\ \\ \1 \I \ \\ ~,......._,,, \\ \' j \\ \\ II ~ " 11 ·,I \I ,I 1\ 11 ii FL 11.83 I\ i\ i\ ii ii II II ! ' 11 11 ,, :1 Ir Ii I, I 11 11 I 11 Ii 'I i " 11 I, ii ' i: 'I 11 !I I I 11 Q_ 'I u : er I· • •I lJ.'.:j I, ,,~ ii __J r 11_ /y 11 <C I's: ,I 1,- j'I I en lz Ii II !/ ,/ I 11 ' ii 11 11 111 !/ I' rl I' ,I II '/ I· rl 'I ~11 ,, ~, ~11 '/ Ir I I, 11 1 :, II [: I 11 II ii 11, ii 11 ,I ,, I ,I I· 'I I. ., I ~ I I :,: g 0 l w :z: -' I iS w I~ ]' I '\ \ \ I I! If LL I I ' Ii I: ,I I I ,I I' .1 t II Ii 11 'I w i1 ct: 11 ,:;: LL ~I I I ,, i ,, I I I I Ii/ II Ii i Ii I I DHA SURVEY LIMIT 3/2/2011 -UT--- BY APPROVED DATE SYM 11713676 P.J.D. P.J.D. 02.09.12 ---- EL 22.28' ROOF LADDER TOTAL PROJECT SITE AREA = 114,309 S.F. PERVIOUS LANDSCAPE BEDS = 8,107 S.F. PERCENT IN LANDSCAPE = 7.1 % (3) MEDIUM BOULDERS \ fg --5-J-BP tr',;--SS-VJ 50 S.F. -+-ll--5.5'(w)PLANTE SS-BS, 50 S.F. 4-68 / / / / / / ~/ /\) / / / 4" GATE VALVE 4-75 0 0 ' ___.....-, PLANTER BED 1,867 S.F. ,.,::,"\ / / ROCKSCAPE 85 S.F, 4-PF (1) MEDIUM BLDR. SSDB, 25 S.F. ~ ----PROJEC TE LIMITS (2) MEDIUM, (1) SMALL y / / / ,,.. (2) MEDIUM, (1) SMALL ~, / BOULDERS / ,\l NEW STORMWATER SWALE PLANTER BED, 1,378 S.F. 2-MRB 1-CY BOULDERS 3-LA 3-JS 3-BTM 2-MRB ROCKSCAPE 30 S.F. -FW--~,,.._,cc / ,::,·\"' ,. · I 1 / :J'.'..LA / / SSlj, 20 S.F. ... ~--iiiiili_--...; ~ ~.. !, -e ::::. _, SRBS, 130 S.F. / / 5-PF 6-FO -4-CH MAINTAIN 5.0' CLEAR / /, ....__,. ,._,,'1~~~/ / -_ _ ZONE l.1...HYDRANJS / '--3-0R VAULT A2 ----SHEET METAL SIDING ECO WALL 8" cw er--- \-4---PROJECT SITE LIMITS ,,.. ,,.. -7'-B'/9'-10'/7'-8' i;,--4---._-------(Gsrso-OR"TNl!l-'-i--_._.-_2"0-RN-_O-.·_?)-~--,,..--,-,/-,.,.....,~ ..... o-..::_:.---~-=-=·-=~--=~2-=-.-.o·-=R-N--=o---=.-··)=··------'~=~==~~~::=~=:::=~~!;;::::~~~~~~~~;;c~~:_ _______ __ii- l(, \\ ,. , " ::.--"111111 ·-· -... , .-...... -. i---. ~--:--_. '.-i.'··: .~ ~. . .--.i ! .. · ·.·• >1COl'ERED ~ALKWAY ' j ·.. • ................. 1 > ........... <1 < I ---··· ----. _,. ,. / R'i'I\B 2 0°N . ~B . . . . . . .·. · · t. · . : .. "_,. , ~IYr " ~IYr r -. --·· ~ .. , .. ,.,. -----· --·. _J I I / / / / / / / t-----0,' ,. / / / / / [L ll " rr=,,_,J _....., ..:;;;;;.====:::::-t---~ 11 -,,..JP{?~~@llll ® Planning Division ~IT» if»l?tl© ~~ ff] s,//~a...£Afb,____ -__ D-='~.:.:~te:...:5~/2;""/-f!,1..;I o~---/ ----- ----+~-----~-~ '· y :>-, ' ,/, 7(}' '' :1 t:/:)~ I t·:::::. :. ----'-1· 1·., ·.· ·: .. n i -II P. .> ----1~11<13 <l I ···<·· I> ... ;;i: >I ------ti::.~-::1 111 r··--·-''.--, LI .:.:·i-·:1 ; . r. ·:1 ------>, :.:.~--_: Ii I, ··.2<·,· . .I 0 L> >J --------11· ,,, I i_ ! . : :. :. :! 1 ,· •. -----< ..... I n .. cc_·· lJ F~--·:: .. -----11..·· I I I< ...... <I ------<··· •... 1 ~ t < <-1 ,,. ,. . . ·I I • • • ' ' • • • ----~~j ii > I ·> I ~ !<:: ::> :_:_~ ---~ ' f ----f-;1'1 '1 .. ·.·.· I t >> < <i ___ __,] ..... ::·:1 II I .·.··.·. .< I Ii .'cc."" MATCH LINE-FOR CONTINUATION SEE SHEET T18D ~HA SURVEY LIMIT 3/2/2011 1 1 00 1, lJ I I I 9+ d I I I I I r=,,. r;J I: 'I I 0 'I 11 I I I lt---t------i----t---t-+--+-+---+-f+--+-----1-+--+---l-l----ll--lL: I ' ~ I M ~I ~/ ~g I I I I I I I I I REVISION BY APPROVEO DATE ACCEPTABILITY SUBTITLE P. DIX 05.27.11 PLANTING PLAN THIS DESIGN AND/OR H GENERAL NOTES [I:> ALL WORK IS REQUIRED TO BE PERFORMED IN ACCORDANCE WITH BOEING STD. SPECIFICATIONS. Cl:::> SEE SHEET LS10 FOR GENERAL LANDSCAPE AND PROJECT PLAN NOTES. CI> SEE SHEET LS10 FOR PLANTING SCHEDULE FOR QUANTITY, SIZE, SPACING, ETC. [I> ALL LOCATIONS OF EXISTING UTILITIES SHOWN ON THIS PLAN ARE APPROXIMATE AND SHOULD BE VERIFIED IN THE FIELD BEFORE CONSTRUCTION. CONSTRUCTION NOTES [}>-FIELD DEFINE AREA OF ROCKSCAPE W/PAINTED TlO Tl 1 T12 T13 T14 T15 T16 T17 T18 T19 T20 T21 T22 T23 T24 T25 T26 T27 T28 T29 T30 ' OUTLINE PRIOR TO WEED BARRIER FABRIC AND GRAVEL INSTALLATION. ONCE ROCKSCAPE BEDS HAVE BEEN DEFINED, LAY BOULDERS IN APPROXIMATE LOCATIONS AS INDICATED, CREATING ROCK OUTCROPS. CONSTRUCT LOW LANDSCAPE BERMS 18" TO 24" HIGH AS INDICATED WITH A MAXIMUM OF A 3:1 SLOPE. CREATIVELY SCULPT BERMS AROUND BOULDERS TO CREATE A NATURAL ROCK OUTCROP. KEY PLAN SCALE : NONE ABCDEFGHJKL , /1 , ,,!; /~\j \ I/, ~ --" ~ l --I \ / ' "' \ \ J I .P 0 , \< ~ ,\ ,__ \r11 ,J 1\ \'>: ·"\ :1 -----1 \ ':\\ I "' "' [l ,__ \ Ill I~ U° b J_ lillv ~' r ~ ~~' \ I D I D1 ,I - I ~ . I " ~ ,\ ( r'(,~ Ir \.., / ~ 'I;;. "' I • -e1 -~ -I; ~ :B ~ @ 20· 10' 0 20· ~--~ 40' SCALE IN FECT ASI #016 FEBRUARY 9, 2012 •• ...._ __....... • • •••• LANDSCAPE ARCHITEClURE SITE PLANNING ASPEN DESIGN GROUP 3746 257TH AVENUE S.E. ASPEN ISSAQUAH, WA 98029 f 425l 313-319~r(ll!i!lil.i'!iii}or• c62~At)3~}ls.tii";)I V f APR 1 0 Z: ,' BUILDINGD' 02.09.12 CURRENT REVISION SYMBOL A 11713676 DATE I\ ' SPECIFICATION IS APPROVED P. DIX 05.27.11 NGIN TITLE NEW BUILDING FOR BFE l-....:'.:~~:::.::..!:;..::::.~;:.'.:...--IOONITl~-l-=c~'-'-tiiiu~------------------------1 SHEET ~DEING" LS68E APPROVED BY DEPT. DATE CHECKED APPROVED BUILDING 04-68-75 LANDSCAPE MASTER JOB NO. COMP NO. 11713676 RENTON, WA DWG NO. RTN-YD-LS68E . -· -. ' -·· . ---j ,,.: ,, 0 _", -~-» ~ .,, "~ S •,, ... •"'' ~--,•<,•••,-'" 1'•A, S' SYM A B I ·o :::, lq_ I ~'"' \ - I - 0 \ 0 s. \ \ \ REVISION RESPONSE TO LEED COMMENTS ASI 016 \ \ I \ \ \ I \ \ UNKNOWN UTILITY MANHOLE INJ;C.QNG-i'llD\ \ o o\ 1"~~POST I \ BY 11713676 PD 11713676 P.J.D. ·-FOOTING 0 ,,, ---------------~ 4-68 \ \ \ ---MATCH LINE -FOR CONTINUATION SEE SHEET T18D APPROVED DATE SYM REVISION BY APPROVED DATE ~DEi.ND" PD 08-31-11 02.09.12 P.J.D. 0 STATE OF WAI\HINllTCiN IIWl$W1EO ~ AIICHl'l'iCT 4-75 BUILDING FINISH FLOOR EL 22.36' BUILDING FINISH FLOOR EL 22.28' ROOF LADDER T SUBTITLE \ \ \ ' ' I \ 'I ' \ \~ \ \)~I I I I \ I \...-. ~ ~~ ~~ 4-75 @ - 20 10 0 -20· 40 .... --·--SCALE IN FEET GENERAL NOTES [C> ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH BOEING STANDARD SPECIFICATIONS. IJ:> IRRIGATION SHOWN IS A TEMPORARY SYSTEM TO PROVIDE WATER TO NEW PLANTS FOR A MAXIMUM OF ( 18) CONSECUTIVE CALENDAR MONTHS AND WILL BE REMOVED AFTER THIS TIME PERIOD. [I> LANDSCAPE CONTRACTOR IS TO CONNECT TO THE ADJACENT IRRIGATION SYSTEM TO PROVIDE A NEW TEMPORARY LOW-WATER USE DRIP SYSTEM FOR IRRIGATING NEW PLANTS. NEW LANDSCAPE BEDS CONTAIN PRIMARILY DROUGHT-TOLERANT OR NATIVE PLANTS THAT WILL REQUIRE TEMPORARY IRRIGATION FOR ( 18) CONSECUTIVE MONTHS. DRIP TUBING TO BE HIDDEN BELOW BARK LAYER. TEMPORARY IRRIGATION SYSTEM IS A CONTRACTOR DESIGN-BUILD EFFORT AND WILL NEED TO BE SUBMITIED TO THE ARCHITECT AND CITY OF RENTON FOR REVIEW AND APPROVAL. THIS PLAN IS PROVIDED TO SHOW GENERAL GUIDANCE AND SITE EXTENT OF SYSTEM COVERAGE. [I> LOCATIONS OF EXISTING IRRIGATION SYSTEM COMPONENTS ARE APPROXIMATE AND SHOULD BE VERIFIED IN THE FIELD BEFORE CONSTRUCTION. u=> THE CITY OF RENTON WILL INSPECT TEMPORARY IRRIGATION SYSTEM AFTER INSTALLATION TO VERIFY OPERATION AND AFTER 18 MONTHS TO DETERMINE SUCCESSFUL ESTABLISHMENT OF PLANT MATERIAL. [I> l,.ANDSCAPE CONTRACTOR IS TO SET IRRIGATION CONTROLLER TO ONLY PROVIDE MINIMUM OF WATER NECESSARY AS PROPOSED PLANTS ARE EITHER NATIVE OR DROUGHT-TOLERANT. DO NOT OVER WATER PLANTS, SUBMIT IRRIGATION SCHEDULE FOR TEMPORARY SYSTEM TO ARCHITECT FOR REVIEW. CONSTRUCTION NOTES [l:> TIE INTO AND EXTEND EXISTING 1-1 / 4" IRRIGATION LATERAL LINE AND SLEEVING (FORMERLY FEEDING DEMOLISHED LANDSCAPE PARKING ISLANDS) TO THE NEAREST POINT WITHIN NEW LANDSCAPE BED. p ADD SCH. 40 PVC SLEEVING AT LOCATIONS SHOWN BELOW PAVEMENT TO CONNECT LANDSCAPE BEDS. SLEEVING TO BE INSTALLED AS A PERMANENT SITE FEATURE. no T11 T12 T13 T14 T15 T16 T17 T18 T19 T20 T21 T22 T23 T24 T25 T26 T27 T28 T29 T30 KEY PLAN SCALE : NONE ABCDEFGH JKL ,,,,...-j ,,{' ,/ ,,2;; V~J\ le /i \ --\ -·,\, rµ \ \ -/ " .l \ 1-:,; D '/ \< ~ -~ ...,,,,, \1) r ~ -l,I ';;/ -· '" i!1 ~\I -_....J ~ \ l ~ii~ [l -µ ~ 11· I:\ ·-l_ ti ~i ~ 1~71 r. -' -r ;:)1 ,~ -' , \ \,~'Ht "l)" ' ~ ~ - ~ •. \\I ~ ' I .... ~~ /1 \..' / ~~ -~ "L •• -~ -!- LJ§ ASI #016 FEBRUARY 9, 2012 LANDSCAPE ARCHITECTURE SITE PLANNING ,\ "'\ \,\ \ ,, I\ ~·· • • • •••• ASPEN DESIGN GROUP 3746 257TH AVENUE S.E. ISSAQUAH, WA 981l29Fc (425~ 313-319f! i!e,©rfE) {~26 F\l:~~J3 J.~5 (FAX) R ~® w.rVFtALli! J.AIJll'l A 8 p E N APR 1 0 2012BUILDl1' . BUILDING DIVISION CURRENT REVISION SYMBOL B DATE 11713676 02-09-12 ' ·' ··~ ACCEPTABILITY '=P.=Dl=X ~--05_.27_.1_,1 IRRIGATION PLAN (TEMPORARY) THIS DESIGN ANO/OR CHECKED 1-____:;S::.,:PE;:;:CIF~ICA:::;:Tl::::_ON:_:IS~A::._PP~R::_;OV'.:::ED_-!rPNC. :IIIDIXITl< __ 1 05~.2~7.~111ii'~-------:=:--::-:::--::-~-=-::-:-::---------isHEIT TITLE NEW BUILDING FOR BFE LS167D APPROVED BY DEPT. DATE CHECKED JOB NO. COMP NO. 11713676 1 r 1 -----+---+--+.A""'PP""RO""VE""D --+----1 "ii1j~/.i.~~ii1irari6iijhiii:tiU1Dui;-1 -,------r---r-fPA ~RilllOVIITED,---~/-ILANDSCAPE MASTER BUILDING 04-68-75 RENTON WA DWG NO. • RTN-YD-LS 167D il ;, FL 11.83 r 0 I [)._ u ct: ~ (/) ~ ... [)._ u "' • ~ z <( _j 0 0 SYM Rf.VISION BY A ASI 016 11713676 P.J.D. ~\ I I I ~ :c g 0 ! w z :J I~ w I g, ct: f [)._ APPROVED \ \ ( I u._ w ct: [;I'. u._ ~I I u._ I \ \ \ \ \ \ \ \ \ I \ \ 32 ~~ ..... -t ~rur ~rnr I! Hl--------1--'-----lH '-----C4-----J\ l r? DHA SURVEY LIMIT 3/2/2011 -UT--- / / / (~t() ~" ~" r1 u .. I lf,_,J DATE SYM Rf.VISION P.J.D. 02.09.12 BY ~/ / / APPROVED / / / 4-68 HA SURVEY LIMIT 3/2/2011 MATCH LINE -FOR CONTINUATION SEE SHEET T18D DATE <ti-.llDEING" ,< ,s./ / n I u • ___ __,1-:- / n 1 : •• --•• LI : .. \~.::\.:~. ---~ II I -: :: :'. J : :-:,::·:::. ___ __, ~ ~/Ii ___ __,1· ...... . [. 1<·. g>·.1 i i>>.'i\<1 ,! '.'. ::;;o::.·. ___ __, ... .fT1 .. n '·'.'.c",'? --~ f if: ___ __,···P'···/ ···>···\ ~ 1 :-:.-~::-:• ," .c"C i ___ _,~<~,->~~:-:~.:~ ri 1:::< <I 'I I -I ---~---1' :)>1 1l ~---0 • • • ' • • I ---[I-;',:-:--:::::! ___ __,LJ I : 1] rt:"' .. : j.'."::::::.! ------1· ' .. ' '. '., n .>: :>:: >:I u . -_ J ------1:: :-:-»: j ii I i ___ l~I (\:/:/:1 II ; .. \CJ -------i~ i : : ___ __,: :« <I I[>)/ I ---~········.· ~'1 _r:> »: :>t ,, -----1 1-.-:-.-... : ......... ___ _, / / / / / ,,.-.s. / / / n / / / / / ~--,,'0 UUIL.Llll~\7 FINISH FLOOR EL 22.28' ROOF LADDER / / / 4" GATE VALVE -----~ 0 ~HA SURVEY LIMIT 3/2/2011 ACCEPTABILITY P. DIX 05.27.11 4-75 - 8" cw -- SUBTITLE 0 0 VAULT A2 --SHEET METAL SIDING ECO BLOCK WALL cw " { ' 3' u @ 20' 1 o· 0 0 1 f I I I I I I I I 100 I I I 9+ d I I I I I Q I I I I 52 I "< I "' f-~ <!) :::, I I I I I I I I I 20' SCALE IN FEET I 40' GENERAL NOTES [L> ALL WORK IS REQUIRED TO BE PERFORMED IN ACCORDANCE WITH BOEING STD. SPECIFICATIONS. [I> IRRIGATION SHOWN IS A TEMPORARY SYSTEM TO PROVIDE WATER TO NEW PLANTS FOR A MAXIMUM OF ( 18) CONSECUTIVE CALENDAR MONTHS AND WILL BE REMOVED AFTER THIS TIME PERIOD. [I> LANDSCAPE CONTRACTOR IS TO CONNECT TO THE ADJACENT IRRIGATION SYSTEM TO PROVIDE A NEW TEMPORARY LOW-WATER USE DRIP SYSTEM FOR IRRIGATING NEW PLANTS. NEW LANDSCAPE BEDS CONTAIN PRIMARILY DROUGHT-TOLERANT OR NATIVE PLANTS THAT WILL REQUIRE TEMPORARY IRRIGATION FOR ( 18) CONSECUTIVE MONTHS. DRIP TUBING TO BE HIDDEN BELOW BARK LAYER. TEMPORARY IRRIGATION SYSTEM IS A CONTRACTOR DESIGN-BUILD EFFORT AND WILL NEED TO BE SUBMITIED TO THE ARCHITECT AND CITY OF RENTON FOR REVIEW AND APPROVAL. THIS PLAN IS PROVIDED TO SHOW GENERAL GUIDANCE AND SITE EXTENT OF SYSTEM COVERAGE. [I:> ~OCATIONS OF EXISTING IRRIGATION SYSTEM COMPONENTS ARE APPROXIMATE AND SHOULD BE VERIFIED IN THE FIELD BEFORE CONSTRUCTION. [}> THE CITY OF RENTON WILL INSPECT TEMPORARY IRRIGATION SYSTEM AFTER INSTALLATION TO VERIFY OPERATION AND AFTER 18 MONTHS TO DETERMINE SUCCESSFUL ESTABLISHMENT OF PLANT MATERIAL. [£> ~NDSCAPE CONTRACTOR IS TO SET IRRIGATION CONTROLLER TO ONLY PROVIDE MINIMUM OF WATER NECESSARY AS PROPOSED PLANTS ARE EITHER NATIVE OR DROUGHT-TOLERANT. DO NOT OVER WATER PLANTS, SUBMIT IRRIGATION SCHEDULE FOR TEMPORARY SYSTEM TO ARCHITECT FOR REVIEW. CONSTRUCTION NOTES [I> TIE INTO AND EXTEND EXISTING 1-1 / 4" IRRIGATION LATERAL LINE AND SLEEVING (FORMERLY FEEDING DEMOLISHED LANDSCAPE PARKING ISLANDS) TO THE NEAREST POINT WITHIN NEW LANDSCAPE BED. p ADD SCH. 40 PVC SLEEVING AT LOCATIONS SHOWN BELOW PAVEMENT TO CONNECT LANDSCAPE BEDS. SLEEVING TO BE INSTALLED AS A PERMANENT SITE FEATURE. T10 T11 T12 T13 T14 T15 T16 T17 T18 T19 T20 T21 T22 T23 T24 T25 T26 T27 T28 T29 T30 KEY PLAN SCALE : NONE ABCDEFGHJKL ,,,__.. , ,.; ' J _)c //LS I /A c.-.._ \ ~--. -\ -·~ !-; \ ' / h J \ I /; a,' ,\ \' ~i ,' " .._ I-ft· \d) ,J d~ -II' 1\ ~ - ~ ~ \\1,\ ....--' ,l'c I ~~a ~ ' [l ' ;· ~ ,-ll J.J ,..,, &ll!f HO -' j -' ':) --ml . ' I -''n - "' ,Ii II • " ' I -I =l, ,t,\'l. 1, / ro_~ a~ .~ ~ h < I-"' Wa ~ -SI ASI #016 FEBRUARY 9, 2012 LANDSCAPE ARCHITECTURE SITE PLANNING ' \ , ,\ \ ASPEN DESIGN GROUP 3746 257TH AVENUE S.E. ASPEN ISSAQUAH, WA 98029 (425) 313-3194 (PHONE) ( 425) ,oli\1:TI-:itl~fb,(FAX) COMTCP-,54L1JlfD1X APR 1 0 201? RUI DING DIV,, CURRENT REVISION SYMBOL A DATE 11713676 02.09.12 STATI: OF 'WASH!NGTCN l'lliJOIS7f .RE!) ~MCHrreCT IRRIGATION PLAN (TEMPORARY) 05.27.11 TITLE NEW BUILDING FOR BFE THIS DESIGN ANO/OR f:sicH""ECST,KE.,,-D --+-"~"'-'-! ~....:.S'.::;PEC'.:;_'.IF.'.::ICA~TIO~N~IS~Af':'.:'.P:'.:'.RO~VE~D-fupm;· DfmlX:El< __ r"-=--'-"'""'friiu'----------------------ISHEET LS168E APPROVED BY DEPT. DATE CHECKED lhl\• 1------+---+---hA""PP"'RO""VE"D--+-----I 4 ~1-00( A R D BUILDING 04-68-75 JOB NO. COMP NO. 11713676 RENTON WA DWG NO. ' RTN-YD-LS168E LANDSCAPE MASTER SYM EQUAL O.C. TRIANGULAR OR SQUARE SPACING PER SCHEDULE • • GENERAL NOTES: 1. KEEP PLANTS MOIST AND SHADED UNTIL PLANTING. 2. IN CLAY SOIL, BLEND IN IMPORTED TOPSOIL AMENDMENTS AND ORGANIC COMPOST PER THE SOIL LABORATORY TEST RESULTS AND RECOMMENDATIONS. 3. IN SANDY SOIL, BLEND IN IMPORTED TOPSOIL AMENDMENTS, ORGANIC COMPOST AND AGED MANURE PER THE SOIL LABORATORY TEST RESULTS AND RECOMMENDATIONS. GROUNDCOVER INSTALLATION SCALE: NTS .b ,, • I ,, .-,<'\.,p•' D ""' ' I 'R' 0 1' 1...y---~ ,,. -: \ I'' ,1~· ' v_ . ~-b 1.\ _ w·<f ,.I r-~ _,...,o •,1.J. 'C'~ /"'- ~,,. 1',,a , 1 1 , 1 ~ 1~a • 1,a \O t "1 , ·, : "-• • :.---- o ~o--'· ,,. .o O 1 .., . 1 '?;'-a 0 · , · ,,. O,i , ( .,,,:"' -:Ji '" , , , ::I&' .·q, ,;, ft!--o ; , o/ , .' 1· (r:i.o • ;.._, IQ I, , }O · .: ·a;, :, 0 r[ ... / lo ·.1 /' ~,.L/. (~, I? '·O·,, j V-~P ,, o. 0--,, oo1,1, -~Ji,, 1--. 0 '--1•,. r.... ._ 1 ~-, , __ o .,. 0 er.-Q·,.J> ," 6 ,',.o II' 0 q1&' i-.~-·1 ',l ._,, I • o'." (f.-" _,, ·-,,_\-. '1 0-... . ,, ,' ':': · _.,P_,,L_l .... o ,.vG'."\ o io-~~---o··,.--i---~-··1 ..... -CI'> i ~o·-, .... , 9 . i, _,-oi' _. o·_c./3 NOTES: 1. WHEN HEAVY, CLAY SOILS (HARDPAN) ARE ENCOUNTERED ON SITE, AUGER A 6' DIA. x 8.0' DEEP HOLE FOR EACH TREE STAKE & FILL W/GRAVEL. VERIFY DRAINAGE OF PLANTING PIT PRIOR TO INSTALLATION AND NOTIFY IF ADVERSE DRAINAGE IS EVIDENT . 2. INSTALL ROOT BARRIER PANELS WHEN TREES ARE PLANTED 4.0' OR CLOSER TO THE EDGE OF SIDEWALK OR PAVEMENT. PANELS SHALL BE PER "DEEP ROOT, INC." OR EQUAL. DO NOT ALLOW ROOT PANELS TO CREATE AN ADVERSE DRAINAGE CONDITION. 3. STAIN TREE STAKES A DARK BROWN PRIOR TO INSTALLATION. 4. NON-BIODEGRADABLE ROOTBALL WRAPS SHALL BE REMOVED IN THEIR ENTIRETY. 5. DO NOT COT _ CENTRAL TREE LEADER. . . ~o ~1 ... , -~-____ ;... 0 ---~--.-0"' ..... • ,-~ ". ___ • ~_9 0 ; ..., ,-_o __ .,-o,_ -0• D ,; ' .,. a-1 ,d .... ----(·s-~ 0 1--s.-"" ,, •• 0 ,,' 0 ._-o, ,-,o' Q"v · '"~----MAINTAIN 1" CLEARANCE BETWEEN ',. '' ',,,_ ,:·,-:·,·,~--' I •/, ', TREE TRUNK & CHAIN LOCK. ,, ~----DOUBLE-STRAND 12 GA. WIRE W/ RUBBER HOSE OR VINYL. _,,,------CHAIN-LOCK TREE TIE TO WOOD / STAKES TO SECURE TREE POSITION. l--~------.,L---f 2x ROOTBALL DIAMETER 3x ROOTBALL DIAMETER AT CLAY SOIL LOCATIONS. TREE INSTALLATION SCALE: NTS REVISION BY APPROVED DATE SYM REVISION SET SHRUBS IN BETWEEN NOOKS OF BOULDERS, AS A BACKDROP. DO NOT PLANT LARGE SHRUBS IN FRONT OF BOULDERS THAT WOULD BLOCK VIEW OF ROCK. WEAVE GROUNDCOVER IN AND AROUND BOULDERS TO CREATE A NATURAL SETIING. CONCEPTUAL PLAN VIEW FIELD ADJUST FOR OPTIMUM PLACEMENT WITH BEST SIDE OF STONE FACING TOWARD PEDESTRIAN WALKS. NOTE: POWER WASH BOULDERS PRIOR TO PLANT INSTALLATION TO REMOVE EMBEDDED DIRT. SECTION VIEW BOULDER PLACEMENT SCALE: NTS PRUNE ALL DEAD OR BROKEN BRANCHES. PRUNE TO SHAPE IF REQUIRED OR AS DIRECTED. CONSTRUCT LOW 12"-18" HIGH BERMS SURROUNDING BOULDERS OR HIGHER IF INDICATED ON PLAN. NEW IMPORTED BOULDERS, TYPE AS INDICATED ON LANDSCAPE PLAN. PARTIALLY BURY BOULDER INTO GROUND TO CREATE A NATURAL BOULDER EXTRUSION EFFECT, APPROXIMATELY 1/4 TO 1/2 BURIAL. LIGHTLY COMPACT TO PREVENT SINKING OF BOULDER INTO THE GROUND. ' NOTE: l WATER NEWLY INSTALLED SHRUBS IMMEDIATELY AFTER PLANTING AND ~00 SECURE SHRUB IN AN UPRIGHT ----~-.li.>-1 ir1f];fP;l POSITION. PROVIDE A SMALL ;~ N!!~:oo~ut~~~BD;;Ei~;H~~~ ORIGINAL NURSERY GRADq DO NOT COVER STEM WITH BARK qR TOPSOIL. PLANT SLIGHTLY HIGHER IN CLAY SOIL. WOOD STAKE IF REQUIRED TO SECURE PLANT AT WINDY SITES. LOOP SMALL ''TIE" AROUND STEM TO SECURE, YET ALLOW MOVEMENT. REMOVE THE TOP 1/3 TO 1/2 OF THE ROOTBALL BURLAP j .,----3" MIN. BARK MULCH LAYER. I CONSTRUCT A WATERING ,ASIN CONSISTING OF IMPORTED TOPSOIL AT PERIMETER OF SHRUB.1 ):.<i-,:;;c+,;;;;;;+J--R--UNDISTURBED BACKFILL. /SCARIFY SIDES & BOTIOM OF PLA,~TING PIT. EXCAVATE SHRUB PLANTING PIT AS INDICATED, GENTLY BACKFILL W/80% EXISTING SOIL AND 20% IMPORTED ORGANIC COMPOST, MIX AND LIGHTLY COMPACT. IN CLAY SOILS, HEAVILY )OOSEN SIDE SLOPE. u.........L.!-.LJ..J--".u........u.c....r--'_u_.,.~'-CONSTRUCT A 4"-6" LE'{LING MOUND OF COMPACTED TOPSOIL AT BOTIOM OF SHRUB PLANTING PITI SHRUB INSTALLATION SCALE: NTS BY APPROVED DATE 2x R-BALL 3x ROOTBALL AT CLAY SOIL LOCATIONS I ,' ·, ':i, .. •· .BOEING® - C:•;, ' '·, ,. ' ' ' ., ., . ' C FINISH GRADE • • 0 0 I I (',j -:.:i- @@ ' ' "' 0 I I -;... "' IMPORTED PLANTING TOPSOIL PER LANDSCAPE PLAN 13"-6" RIVER RUN ROCK SET IN NATURAL CHANNEL CONFIGURATION. PLACE LARGER ROCK AT EDGE. 2-0" TO 4'-0" MEANDERING CHANNEL WIDTH=3x PIPE DIAMETER 4" MIN. BURY DEPTH GENERAL NOTES: 1. INSTALL ROCK-LINED DRAINAGE CHANNEL WHERE ADVERSE DRAINAGE OCCURS ON SITE. 2. MINIMUM DEPTH OF CHANNEL SHOWN. NEW CHANNEL SHALL BE EXCAVATED UNTIL A FREE-DRAINING SOIL LAYER IS ENCOUNTERED. VERIFY EXISTING SITE CONDITIONS AND BID ACCORDINGLY. SEPARATION GEOTEXTILE FABRIC PER SPECIFICATIONS j,(tp~~l!,,i;l±lrr'±H f----1-1 /2" CLEAN WASHED GRAVEL BACKFILL TO FINISH GRADE jiiiii;,Hf-----SUBGRADE 6" DIA. PERFORATED PVC OR HOPE PIPE, ROCK-LINED DRAINAGE CHANNEL AT SATURATED SITE ZONES ROCK-LINED DRAINAGE CHANNELS SCALE: NTS SUBTITLE BUILDING 04-68-75 ~00 ISSUE FOR CONSTRUCTION JUNE 15, 2011 LANDSCAPE ARCHITECTURE SITE PLANNING ASPEN DESIGN GROUP 3746 257TH AVENUE S.E. ISSAQUAH, WA 98029 ASPEN (425) 313-3194 (PHONE) (!fi1~;i,1;lrroJ) 95 (FAX) Rcg'tf; ~l iJ"/:!l.[J.I· DIX APR 1 0 2012 IG D1VISIC CURRENT REVISION DATE LS500 JOB NO. 11713676 COMP NO. RENTON, WA DWG NO. RTN-YD-LS500