Loading...
HomeMy WebLinkAboutD_ERC_DNS_180129D E P A R T M E N T O F C O M M U N I T Y — “ R e n t o n 0 A N D E C O N O M I C D E V E L O P M E N T E N V I R O N M E N T A L ( S E P A ) D E T E R M I N A T I O N O F N O N - S I G N I F I C A N C E ( D N S ) P R O J E C T N U M B E R : L U A 1 7 - 0 0 0 8 6 9 , E C F A P P L I C A N T : V e r i z o n W i r e l e s s , 3 2 4 5 1 5 8 t h A v e S E , B e l l e v u e , W A 9 8 0 0 8 P R O J E C T N A M E : V e r i z o n S E A C l a s s i c s W i r e l e s s C o m m u n i c a t i o n s F a c i l i t y P R O J E C T D E S C R I P T I O N : T h e a p p l i c a n t i s r e q u e s t i n g a n E n v i r o n m e n t a l T h r e s h o l d D e t e r m i n a t i o n ( S E P A ) f o r t h e i n s t a l l a t i o n o f a c o n c e a l e d w i r e l e s s c o m m u n i c a t i o n s f a c i l i t y ( W C F ) o n t h e r o o f t o p o f a n e x i s t i n g 2 - s t o r y c o m m e r c i a l o f f i c e b u i l d i n g l o c a t e d a t 2 0 0 3 M a p l e V a l l e y H w y ( P a r c e l # 1 7 2 3 0 5 9 1 0 3 ) . T h e s u b j e c t p a r c e l i s 1 . 8 7 a c r e s i n s i z e a n d h a s a z o n i n g d e s i g n a t i o n o f C O R , C o m m e r c i a l - O f f i c e - R e s i d e n t i a l , i n a d d i t i o n t o a n U r b a n D e s i g n D i s t r i c t C o v e r l a y . T h e p a r c e l h a s a C o m p r e h e n s i v e P l a n L a n d U s e d e s i g n a t i o n o f C o m m e r c i a l - O f f i c e - R e s i d e n t i a l . A l l e x t e r i o r e q u i p m e n t a s s o c i a t e d w i t h t h e W C F w o u l d b e e n t i r e l y c o n c e a l e d w i t h i n t w o , e i g h t - f o o t t a l l e n c l o s u r e s t h a t m a t c h t h e a r c h i t e c t u r a l s t y l e o f t h e e x i s t i n g b u i l d i n g . T h e a p p l i c a n t h a s p r o p o s e d l o c a t i n g t h e a s s o c i a t i n g e q u i p m e n t c a b i n e t i n s i d e o f a r o o m o n t h e f i r s t f l o o r o f t h e e x i s t i n g b u i l d i n g . C r i t i c a l a r e a s m a p p e d o n - s i t e i n c l u d e a h i g h s e i s m i c h a z a r d a r e a , p r o t e c t e d s l o p e s , a s p e c i a l f l o o d h a z a r d a r e a , a n d a W e l l h e a d P r o t e c t i o n A r e a Z o n e 1 . T h e s i t e i s l o c a t e d w i t h i n t h e C e d a r R i v e r R e a c h C R e g u l a t e d S h o r e l i n e a r e a w i t h a d e s i g n a t i o n o f S h o r e l i n e H i g h I n t e n s i t y . T h e a p p l i c a n t h a s n o t p r o p o s e d t h e i n c r e a s e o f i m p e r v i o u s s u r f a c e c o v e r a g e o r t h e r e m o v a l o f a n y t r e e s o r v e g e t a t i o n o n t h e s i t e . P R O J E C T L O C A T I O N : 2 0 0 3 M a p l e V a l l e y H w y , R e n t o n , W A 9 8 0 5 5 L E A D A G E N C Y : C i t y o f R e n t o n E n v i r o n m e n t a l R e v i e w C o m m i t t e e D e p a r t m e n t o f C o m m u n i t y & E c o n o m i c D e v e l o p m e n t T h e C i t y o f R e n t o n E n v i r o n m e n t a l R e v i e w C o m m i t t e e h a s d e t e r m i n e d t h a t i t d o e s n o t h a v e a p r o b a b l e s i g n i f i c a n t a d v e r s e i m p a c t o n t h e e n v i r o n m e n t . A n E n v i r o n m e n t a l I m p a c t S t a t e m e n t ( E I S ) i s n o t r e q u i r e d u n d e r R C W 4 3 . 2 1 C . 0 3 0 ( 2 ) ( c ) . T h i s D e t e r m i n a t i o n o f N o n - S i g n i f i c a n c e i s i s s u e d u n d e r W A C 1 9 7 - 1 1 - 3 4 0 . B e c a u s e o t h e r a g e n c i e s o f j u r i s d i c t i o n m a y b e i n v o l v e d , t h e l e a d a g e n c y w i l l n o t a c t o n t h i s p r o p o s a l f o r f o u r t e e n ( 1 4 ) d a y s . A p p e a l s o f t h e e n v i r o n m e n t a l d e t e r m i n a t i o n m u s t b e f i l e d i n w r i t i n g o n o r b e f o r e 5 : 0 0 p . m . o n F e b r u a r y 1 6 , 2 0 1 8 . A p p e a l s m u s t b e f i l e d i n w r i t i n g t o g e t h e r w i t h t h e r e q u i r e d f e e w i t h : H e a r i n g E x a m i n e r , C i t y o f R e n t o n , 1 0 5 5 S o u t h G r a d y W a y , R e n t o n , W A 9 8 0 5 7 . A p p e a l s t o t h e E x a m i n e r a r e g o v e r n e d b y R M C 4 - 8 - 1 1 0 a n d m o r e i n f o r m a t i o n m a y b e o b t a i n e d f r o m t h e R e n t o n C i t y C l e r k ’ s O f f i c e , ( 4 2 5 ) 4 3 0 - 6 5 1 0 . P U B L I C A T I O N D A T E : F e b r u a r y 2 , 2 0 1 8 D A T E O F D E C I S I O N : J a n u a r y 2 9 , 2 0 1 8 D E P A R T M E N T O F C O M M U N I T Y — “ R e n t o n 0 A N D E C O N O M I C D E V E L O P M E N T S I G N A T U R E S : i I / i % G r e g g Z i m m e r r % i , n i s t r a t o r D a / e R i c k M . M a r s h a l l , A d m i n i s t r a t o r D a t e P u b l i c W o r k s D e a r t e n t ( R e n t o n R e g i o n a l F i r e A u t h o r i t y _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ / 2 K e l l y B e y m e r , A d m i ’ i s t r a r D a t e C . E . “ C h i p ” e n t , A d m i n i s t r a r D a r e C o m m u n i t y S e r v i c e s D e p a r t m e n t D e p a r t m e n t o f C o m m u n i t y & E c o n o m i c D e v e l o p m e n t DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ERC REPORT 17-000869 ENVIRONMENTAL REVIEW COMMITTEE REPORT ERC MEETING DATE: January 29, 2018 Project Name: Verizon SEA Classics Wireless Communications Facility Project Number: LUA17-000869, ECF Project Manager: Alex Morganroth, Associate Planner Owner: RaMac, Inc, 2003 Maple Valley Hwy, Renton, WA 98055 Applicant/Contact: Verizon Wireless, 3245 158th Ave SE, Bellevue, WA 98008 Project Location: 2003 Maple Valley Hwy, Renton, WA 98055 Project Summary: The applicant is requesting an Environmental Threshold Determination (SEPA) for the installation of a concealed wireless communications facility (WCF) on the rooftop of an existing 2-story commercial office building located at 2003 Maple Valley Hwy (Parcel #1723059103). The subject parcel is 1.87 acres in size and has a zoning designation of COR, Commercial-Office-Residential, in addition to an Urban Design District C overlay. The parcel has a Comprehensive Plan Land Use designation of Commercial-Office- Residential. All exterior equipment associated with the WCF would be entirely concealed within two, eight-foot tall enclosures that match the architectural style of the existing building. The applicant has proposed locating the associating equipment cabinet inside of a room on the first floor of the existing building. Critical areas mapped on-site include a high seismic hazard area, protected slopes, a special flood hazard area, and a Wellhead Protection Area Zone 1. The site is located within the Cedar River Reach C Regulated Shoreline area with a designation of Shoreline High Intensity. The applicant has not proposed the increase of impervious surface coverage or the removal of any trees or vegetation on the site. Site Area: 81,587 SF (1.87 acres) STAFF RECOMMENDATION: Staff Recommends that the Environmental Review Committee issue a Determination of Non-Significance (DNS). Project Location Map: DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ERC REPORT 17-000869 PART ONE: PROJECT DESCRIPTION / BACKGROUND The applicant is requesting Environmental (SEPA) Review to construct an unmanned Wireless Communications Facility (WCF) on the rooftop of an existing two-story commercial building. The antennas would be installed behind two, 24 square foot enclosures approximately eight feet in height. The enclosures would be made of RF-porous panels and would be painted to match the existing building façade. The associated cabinet equipment would be installed inside of the building on the first floor and connected to the exterior of the antennas via cabling contained within a covered exterior chase painted to match the façade. The project would not result in any ground disturbance, building footprint change, or increase in impervious surface coverage. PART TWO: ENVIRONMENTAL REVIEW In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project impacts that are not adequately addressed under existing development standards and environmental regulations. A. Environmental Threshold Recommendation Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials: Issue a DNS with a 14-day Appeal Period. B. Mitigation Measures None C. Exhibits Exhibit 1 Environmental Review Committee Report Exhibit 2 Site Plan w/ Elevations Exhibit 3 Photo Simulations Exhibit 4 Shoreline Tracking Worksheet Exhibit 5 Construction Mitigation Description D. Environmental Impacts The proposal was circulated and reviewed by various city departments and divisions to determine whether the applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction with the proposed development. Staff reviewers have identified that the proposal is likely to have the following probable impacts: 1. Water Impacts: The subject site is located along Reach C of the Cedar River, a regulated shoreline. The landward area where the proposed work would occur is designated as Shoreline High Intensity. The existing two-story office building on the site has a footprint of 4,050 sq. ft. and is located approximately 55 feet from the Ordinary High Water Mark (OHWM) at its closest point. The shoreline adjacent to the site is not in a natural state and has been heavily altered through the installation of riprap and various other shoreline armoring materials. The applicant has not proposed an increase in either the footprint of the existing building or impervious coverage on the site as part of the proposed WCF installation. Due to the proposed location of the WCF on an existing building, the project is not expected to cause any temporary or permanent impacts on the Cedar River or adjacent upland area. City of Renton Department of Community & Economic Development Environmental Review Committee Report VERIZON SEA CLASSICS LUA17-000869, ECF, CUP, SSDP Report of January 23, 2018 Page 3 of 3 ERC REPORT 17-000869 Mitigation Measures: No further mitigation required. Nexus: N/A E. Comments of Reviewing Departments The proposal has been circulated to City Department and Division Reviewers. Where applicable, their comments have been incorporated into the text of this report.  Copies of all Review Comments are contained in the Official File and may be attached to this report. The Environmental Determination decision will become final if the decision is not appealed within the 14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680). Environmental Determination Appeal Process: Appeals of the environmental determination must be filed in writing together with the required fee to: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057, on or before 5:00 p.m. on February 16, 2018. RMC 4-8-110 governs appeals to the Hearing Examiner and additional information regarding the appeal process may be obtained from the City Clerk’s Office, Renton City Hall – 7th Floor, (425) 430-6510. PROJECT SUMMARY PROJECT DESCRIPTION VICINITY MAP DRIVING DIRECTIONS CODE COMPLIANCE T-1 TITLE SHEET A-2 OVERALL SITE PLAN / ENLARGED ROOF PLAN ENLARGED RF PLANS A-1 NOT TO SCALE IMAGE SOURCE: GOOGLE MAPS PROJECT TEAM SHEET DESCRIPTION SIGNATURE BLOCK WO ADMINISTRATOR: EQUIPMENT COORDINATOR: THE FOLLOWING PARTIES HEREBY APPROVE AND ACCEPT THESE DOCUMENTS & AUTHORIZE THE SUBCONTRACTOR TO PROCEED WITH CONSTRUCTION DESCRIBED HEREIN. ALL DOCUMENTS ARE SUBJECT TO REVIEW BY THE LOCAL BUILDING DEPARTMENT & MAY IMPOSE CHANGES OR MODIFICATIONS. PROJECT ADMINISTRATOR: DISCIPLINE: RF ENGINEER: TELCO COORDINATOR: SITE ACQUISITION MANAGER: PARABOLIC: CONSTRUCTION MANAGER: SIGNATURE:DATE: SEA CLASSICS 2003 MAPLE VALLEY HIGHWAY RENTON, WA 98055 KING COUNTY ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH THE CURRENT EDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNING AUTHORITIES. NOTHING IN THESE PLANS IS TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THE LATEST EDITIONS OF THE FOLLOWING CODES. SEA CLASSICS 2003 MAPLE VALLEY HIGHWAY RENTON, WA 98055 KING COUNTY DRAWN BY:CHECKED BY: SHEET TITLE: SHEET NUMBER:REV.: DATE PROJECT INFORMATION: REVISION DESCRIPTIONREV. DAP PD THIS DOCUMENT AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF INFINIGY, LLC AND ARE NOT TO BE USED, IN WHOLE OR IN PART, FOR OTHER PROJECTS WITHOUT THE WRITTEN AUTHORIZATION OF INFINIGY, LLC. IT IS UNLAWFUL FOR ANY PERSON TO AMEND ANY ASPECT OF THESE DRAWINGS WITHOUT THE WRITTEN APPROVAL OF THE PROFESSIONAL OF RECORD. 2 THE INFORMATION CONTAINED IN THIS SET OF DRAWINGS IS PROPRIETARY & CONFIDENTIAL TO VERIZON ANY USE OR DISCLOSURE OTHER THAN AS IT RELATES TO VERIZON IS STRICTLY PROHIBITED F R O M Z E R O IOT N F I IN G Y T-1 90% ZONING DRAWINGS009/8/17 REVISED PRELIM. ZONING DRAWINGS109/12/17 100% ZONING DRAWINGS11/13/172 6+6.' 5*''6 ELEVATIONS LEGAL DESCRIPTION:SEE SHEET SV-1 APN:172305-9103 COUNTY: KING JURISDICTION: CITY OF RENTON CURRENT ZONING:&25±&200(5&,$/2)),&(5(6,'(17,$/ PLANNING APPLICANT'S REPRESENTATIVE LESSEE COMPANY:VERIZON ADDRESS:3245 158TH AVE SE CITY, STATE, ZIP:BELLEVUE, WA 98008 CONTACT:MICHAEL CUNNINGHAM PHONE: (713) 201-7503 EMAIL: michael.cunningham2@verizonwireless.com SITE AQUISITION COMPANY: MD7 ADDRESS: 9725 THIRD AVE NE, SUITE 410 CITY, STATE, ZIP: SEATTLE, WA 98115 CONTACT: BECKY TODD PHONE:(206) 802-4321 E-MAIL: btodd@md7.com PROPERTY INFORMATION: PROFESSIONAL OF RECORD COMPANY:INFINIGY ENGINEERING ADDRESS:50 116TH AVE SE, SUITE 210 CITY, STATE, ZIP:BELLEVUE, WA 98004 CONTACT:PAUL DANNEBERG PHONE:(425) 201-4215 x1603 E-MAIL:pdanneberg@infinigy.com PROPERTY OWNER: 5+6' IMPLEMENTATION CONTACT COMPANY:VERIZON ADDRESS: 3245 158TH AVE SE CITY, STATE, ZIP: BELLEVUE, WA 98008 CONTACT: TRAVIS NICHOLS PHONE: (425) 531-5224 COMPANY:RAMAC INC. ADDRESS: CITY, STATE, ZIP: CONTACT:GREG JAMES PHONE: 425-226-0309 COMPANY;MD7 ADDRESS: 9725 THIRD AVE NE, SUITE 410 CITY, STATE, ZIP: SEATTLE, WA 98115 CONTACT:CHRISTA KLUMB PHONE: (425) 350-9095 E-MAIL:cklumb@md7.com SITE SURVEYSV-1 N 1. 2015 INTERNATIONAL BUILDING CODE 2. 2014 NATIONAL ELECTRICAL CODE 3. 2015 INTERNATIONAL FIRE CODE 4. 2015 INTERNATIONAL MECHANICAL CODE 5. 2015 UNIFORM PLUMBING CODE FROM VERIZON OFFICE (3245 158th Ave SE, Bellevue, WA 98008): GET ON I-90 W 0.6 MI HEAD SOUTH ON 158TH AVE SE 197 FT TURN RIGHT ONTO SE EASTGATE WAY 0.1 MI TURN LEFT ONTO THE I-90 W RAMP TO SEATTLE 0.2 MI KEEP LEFT, FOLLOW SIGNS FOR I-90 W/SEATTLE AND MERGE ONTO I-90 W 0.2 MI TAKE I-405 S TO WA-900/SUNSET BLVD N IN RENTON. TAKE EXIT 4 FROM I-405 S 7.9 MI MERGE ONTO I-90 W 0.9 MI USE THE RIGHT 2 LANES TO TAKE EXIT 10 FOR INTERSTATE 405 S TOWARD RENTON 0.8 MI USE THE LEFT LANE TO MERGE ONTO I-405 S 0.2 MI CONTINUE STRAIGHT TO STAY ON I-405 S 5.8 MI TAKE EXIT 4 FOR WA-900 W TOWARD WA-169 S/RENTON/ENUMCLAW 0.2 MI DRIVE TO WA-169 S 0.9 MI MERGE ONTO WA-900/SUNSET BLVD N 0.4 MI USE THE LEFT 2 LANES TO TURN LEFT ONTO WA-169 S 0.5 MI DESTINATION WILL BE ON THE RIGHT 2003 MAPLE VALLEY HIGHWAY, RENTON, WA 98055 A-3 COMPANY;MD7 ADDRESS: 9725 THIRD AVE NE, SUITE 410 CITY, STATE, ZIP: SEATTLE, WA 98115 CONTACT:CHRISTA KLUMB PHONE: (425) 350-9095 E-MAIL:cklumb@md7.com CONSTRUCTION INFORMATION: LAT / LONG COORDINATES: AREA OF CONSTRUCTION:(48,30(17 $17(11$$5($“64)7 TOTAL ACREAGE:“$&5(6 TYPE OF CONSTRUCTION:II-B OCCUPANCY GROUP:U SEISMIC DESIGN CATEGORY:D PROPOSED USE:UNMANNED TELECOMMUNICATIONS FACILITY HANDICAP REQUIREMENTS: FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION. HANDICAPPED ACCESS NOT REQUIRED. LATITUDE:ƒ  ƒ LONGITUDE:ƒ  ƒ AMSL: 54' AMSL (NAVD '88) VERIZON PROPOSES TO CONSTRUCT AN UNMANNED TELECOMMUNICATIONS INSTALLATION CONSISTING OF: (4) PANEL ANTENNAS (2 PER SECTOR), (1) 2' MICROWAVE ANTENNA, (6) RRU'S, & (2) OVP'S WITHIN NEW SCREEN ENCLOSURES ON THE ROOFTOP OF AN EXISTING BUILDING; AND (2) EQUIPMENT RACKS & (2) OVP'S WITHIN AN EXISTING UNOCCUPIED OFFICE SPACE TO BE CONVERTED TO AN EQUIPMENT ROOM WITHIN THE EXISTING BUILDING, WITH CABLING AS NEEDED. RECEIVED 01/02/2018 amorganroth PLANNING DIVISION 145 SW 155th Street, Suite 102 Seattle, Washington 98166 Phone 206.244.4141 Fax 206.244.4455 1 inch = ft. (IN FEET) GRAPHIC SCALE 1 inch = ft. (11x17 SHEET)1020 FROM ZERO IOTNFIINGY N OVERALL SITE PLAN1 0"20'10'20' 22"x34" SCALE: 1" = 20'-0" 11"x17" SCALE: 1" = 40'-0" SEA CLASSICS 2003 MAPLE VALLEY HIGHWAY RENTON, WA 98055 KING COUNTY DRAWN BY:CHECKED BY: SHEET TITLE: SHEET NUMBER:REV.: DATE PROJECT INFORMATION: REVISION DESCRIPTIONREV. DAP PD THIS DOCUMENT AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF INFINIGY, LLC AND ARE NOT TO BE USED, IN WHOLE OR IN PART, FOR OTHER PROJECTS WITHOUT THE WRITTEN AUTHORIZATION OF INFINIGY, LLC. IT IS UNLAWFUL FOR ANY PERSON TO AMEND ANY ASPECT OF THESE DRAWINGS WITHOUT THE WRITTEN APPROVAL OF THE PROFESSIONAL OF RECORD. 2 THE INFORMATION CONTAINED IN THIS SET OF DRAWINGS IS PROPRIETARY & CONFIDENTIAL TO VERIZON ANY USE OR DISCLOSURE OTHER THAN AS IT RELATES TO VERIZON IS STRICTLY PROHIBITED F R O M Z E R O IOT N F I IN G Y A-1 90% ZONING DRAWINGS009/8/17 REVISED PRELIM. ZONING DRAWINGS109/12/17 100% ZONING DRAWINGS11/13/172 18'4#..5+6'2.#0 '0.#4)'&411(2.#0 P R O P E R T Y L I N E M A P L E V A L L E Y H I G H W A Y EXISTING BUILDING NOTES: 1.SITE PLAN SHALL MEET ALL ENGINEERING AND NPDES REQUIREMENTS. C L C E D A R R I V E R PR O P E R T Y L I N E P R O P E R T Y L I N E P R O P E R T Y L I N E EXISTING PARKING EGR E S S ING R E S S EXISTING PARKING EXISTING POWER VAULT, PROPOSED VERIZON POWER P.O.C. EXISTING FIRE HYDRANT PROPOSED LEASE AREA 0"8'8' 22"x34" SCALE: 3/32" = 1'-0" 11"x17" SCALE: 3/64" = 1'-0"4' N EXISTING ROOFTOP PROPOSED VERIZON 8'-0"x4'-0"x8'-0" FRP ENCLOSURE 2 ENLARGED ROOF PLAN EXISTING VENT PIPE (TYP.) EXISTING HVAC EXISTING ROOF DRAIN (TYP.) EXISTING ROOF ACCESS HATCH EXISTING HVAC PROPOSED VERIZON CABLE TRAY 8'-0 " PRO P O S E D LEA S E A R E A 2'-0 " 2 ' - 0 " 8'-0 " PRO P O S E D LEA S E A R E A 2 ' - 0 " EXISTING DUCTING PROPOSED VERIZON 8'-0"x4'-0"x8'-0" FRP ENCLOSURE 4' - 0 " P R O P O S E D L E A S E A R E A 2'-0 " EXISTING OFFICE ACCESS BELOW. PROPOSED EQUIPMENT ROOM. (SEE DET. 3/A-2) EXISTING PARKING EXISTING PARKING PROPOSED LEASE AREA 4' - 0 " P R O P O S E D L E A S E A R E A EXISTING BUILDING PARAPET. PROVIDE 2' CLEARANCE TO NEW FRP ENCLOSURE PROPOSED WALKING PADS PROPOSED HVAC UNITS MOUNTED ON EXISTING ROOFTOP PROPOSED VERTICAL CABLE TRAY ADJACENT PARCEL TAX LOT: 1723059026 SUBJECT PARCEL TAX LOT: 1723059103 SEA CLASSICS 2003 MAPLE VALLEY HIGHWAY RENTON, WA 98055 KING COUNTY DRAWN BY:CHECKED BY: SHEET TITLE: SHEET NUMBER:REV.: DATE PROJECT INFORMATION: REVISION DESCRIPTIONREV. DAP PD THIS DOCUMENT AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF INFINIGY, LLC AND ARE NOT TO BE USED, IN WHOLE OR IN PART, FOR OTHER PROJECTS WITHOUT THE WRITTEN AUTHORIZATION OF INFINIGY, LLC. IT IS UNLAWFUL FOR ANY PERSON TO AMEND ANY ASPECT OF THESE DRAWINGS WITHOUT THE WRITTEN APPROVAL OF THE PROFESSIONAL OF RECORD. 2 THE INFORMATION CONTAINED IN THIS SET OF DRAWINGS IS PROPRIETARY & CONFIDENTIAL TO VERIZON ANY USE OR DISCLOSURE OTHER THAN AS IT RELATES TO VERIZON IS STRICTLY PROHIBITED F R O M Z E R O IOT N F I IN G Y A-2 90% ZONING DRAWINGS009/8/17 REVISED PRELIM. ZONING DRAWINGS109/12/17 100% ZONING DRAWINGS11/13/172 '0.#4)'&4( 2.#05 1 PROPOSED ANTENNA PLAN 2'1'2'0" 22"x34" SCALE: 1/2" = 1'-0" 11"x17" SCALE: 1/4" = 1'-0" 2 PROPOSED ANTENNA PLAN 2'1'2'0" 22"x34" SCALE: 1/2" = 1'-0" 11"x17" SCALE: 1/4" = 1'-0" N N 3 PROPOSED EQUIPMENT PLAN 4 RF INFORMATION 2'1'2'0" 22"x34" SCALE: 1/2" = 1'-0" 11"x17" SCALE: 1/4" = 1'-0" PROPOSED VERIZON GPS ANTENNA PROPOSED VERIZON RRU'S MOUNTED BEHIND ANTENNAS (6 PER SECTOR, 12 TOTAL)PROPOSED VERIZON PANEL ANTENNAS MOUNTED WITHIN FRP ENCLOSURE (2 PER SECTOR, 4 TOTAL) PROPOSED VERIZON OVP (1 PER SECTOR) PROPOSED VERIZON 8'-0"x4'-0"x8'-0" FRP ENCLOSURE EXISTING BUILDING PARAPET PROPOSED VERIZON WALKING PADS PROPOSED VERIZON CABLE TRAY PROPOSED VERIZON 2' MICROWAVE ANTENNA PROPOSED VERIZON OVP (1 PER SECTOR) PROPOSED VERIZON PANEL ANTENNAS MOUNTED WITHIN FRP ENCLOSURE (2 PER SECTOR, 4 TOTAL) 8'-0 " PRO P O S E D L E A S E A R E A 4' - 0 " P R O P O S E D L E A S E A R E A 2' - 0 " 2'-0 " 8'-0 " PRO P O S E D L E A S E A R E A 4' - 0 " P R O P O S E D L E A S E A R E A 2' - 0 " 2'-0 " PROPOSED VERIZON RRU'S MOUNTED BEHIND ANTENNAS (6 PER SECTOR, 12 TOTAL) PROPOSED VERIZON 8'-0"x4'-0"x8'-0" FRP ENCLOSURE EXISTING BUILDING PARAPET PROPOSED VERIZON WALKING PADS PROPOSED VERIZON CABLE TRAY NOTE: PROPOSED LEASE AREA ON ),567)/225,6“64)7 PROPOSED VERIZON INDOOR HVAC UNIT PROPOSED 1-HOUR FIRE RATED WALL PROPOSED P1000T UNISTRUT MOUNTED TO WALL EXISTING 3'-6" WIDE STEEL DOOR TO BE USED BY VERIZON, WITH PROPOSED WITH VERIZON SIGNAGE PROPOSED VERIZON GEN PLUG MOUNTED TO EXTERIOR WALL PROPOSED VERIZON POWER RACK PROPOSED VERIZON BATTERY RACK FUTURE VERIZON EQUIPMENT RACK 200A PPC EXISTING BUILDING EXTERIOR WALLS 10 ' - 0 " VE R I Z O N L E A S E A R E A 14'-8" VERIZON LEASE AREA PROPOSED VERIZON ENTRY PORTS3'-6" 6"6" 2' - 0 " 3'-6" EXISTING BUILDING INTERIOR WALL PROPOSED VERIZON CABLE LADDER PROPOSED VERIZON CONDUIT ROUTED UP INTERIOR FACE OF OUTDOOR STAIRWELL WALL TO ROOF PROPOSED VERIZON OVP (2 AT EQUIPMENT ROOM) UP UP UP SEA CLASSICS 2003 MAPLE VALLEY HIGHWAY RENTON, WA 98055 KING COUNTY DRAWN BY:CHECKED BY: SHEET TITLE: SHEET NUMBER:REV.: DATE PROJECT INFORMATION: REVISION DESCRIPTIONREV. DAP PD THIS DOCUMENT AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF INFINIGY, LLC AND ARE NOT TO BE USED, IN WHOLE OR IN PART, FOR OTHER PROJECTS WITHOUT THE WRITTEN AUTHORIZATION OF INFINIGY, LLC. IT IS UNLAWFUL FOR ANY PERSON TO AMEND ANY ASPECT OF THESE DRAWINGS WITHOUT THE WRITTEN APPROVAL OF THE PROFESSIONAL OF RECORD. 2 THE INFORMATION CONTAINED IN THIS SET OF DRAWINGS IS PROPRIETARY & CONFIDENTIAL TO VERIZON ANY USE OR DISCLOSURE OTHER THAN AS IT RELATES TO VERIZON IS STRICTLY PROHIBITED F R O M Z E R O IOT N F I IN G Y A-3 90% ZONING DRAWINGS009/8/17 REVISED PRELIM. ZONING DRAWINGS109/12/17 100% ZONING DRAWINGS11/13/172 0146* '.'8#6+105 0" 22"x34" SCALE: 1/8" = 1'-0" 11"x17" SCALE: 1/16" = 1'-0"8'6'4'8'2'1 PROPOSED NORTHEAST ELEVATION 3 PROPOSED NORTH WEST ELEVATION 0" 22"x34" SCALE: 1/8" = 1'-0" 11"x17" SCALE: 1/16" = 1'-0"8'6'4'8'2' NOTE: PROPOSED EQUIPMENT ENCLOSURE AND ANTENNA ENCLOSURE TO BE TEXTURED AND PAINTED TO MATCH EXISTING BUILDING. 2 PROPOSED SOUTH EAST ELEVATION0" 22"x34" SCALE: 1/8" = 1'-0" 11"x17" SCALE: 1/16" = 1'-0"8'6'4'8'2' GRADE AT SOUTH CORNER ELEV. 0'-5" BGL (56.2' AMSL) (/(9“ $*/ RAD CENTER OF PROPOSED VERIZON ANTENNAS (/(9“ $*/ TOP OF PROPOSED VERIZON ANTENNAS & FRP ENCLOSURE (/(9“ $*/ EXISTING ROOF DECK AVERAGE GRADE ELEV. 0'-0" AGL (56.6' AMSL) (/(9“ $*/ TOP OF EXISTING PARAPET (/(9“ $*/ TOP OF EXISTING PARAPET GRADE AT EAST CORNER ELEV. 0'-6" AGL (57.1' AMSL) PROPOSED VERIZON GPS ANTENNA PROPOSED VERIZON RRU'S MOUNTED BEHIND ANTENNAS (3 PER SECTOR, 6 TOTAL) PROPOSED VERIZON OVP (1 PER SECTOR) PROPOSED VERIZON 8'-0"x4'-0"x8'-0" FRP ENCLOSURE EXISTING BUILDING PROPOSED VERIZON PANEL ANTENNAS (2 PER SECTOR, 8 TOTAL) 8' - 0 " GRADE AT WEST CORNER ELEV. 0'-8" BGL (55.9' AMSL) (/(9“ $*/ RAD CENTER OF PROPOSED VERIZON ANTENNAS (/(9“ $*/ TOP OF PROPOSED VERIZON ANTENNAS & FRP ENCLOSURE (/(9“ $*/ EXISTING ROOF DECK AVERAGE GRADE ELEV. 0'-0" AGL (56.6' AMSL) (/(9“ $*/ TOP OF EXISTING PARAPET GRADE AT NORTH CORNER ELEV. 0'-6" AGL (57.1' AMSL) (/(9“ $*/ TOP OF EXISTING PARAPET PROPOSED VERIZON 8'-0"x4'-0"x8'-0" FRP ENCLOSURE EXISTING BUILDING PROPOSED VERIZON PANEL ANTENNAS (2 PER SECTOR, 8 TOTAL) PROPOSED VERIZON MICROWAVE ANTENNA PROPOSED VERIZON RRU'S MOUNTED BEHIND ANTENNAS (3 PER SECTOR, 6 TOTAL) PROPOSED VERIZON OVP (1 PER SECTOR) EXISTING BUILDING PROPOSED VERIZON 8'-0"x4'-0"x8'-0" FRP ENCLOSURE PROPOSED VERIZON MICROWAVE ANTENNA 8' - 0 " EXISTING DOOR AT PROPOSED VERIZON EQUIPMENT ROOM PROPOSED VERIZON RRU'S MOUNTED BEHIND ANTENNAS (3 PER SECTOR, 6 TOTAL) PROPOSED VERIZON OVP (1 PER SECTOR) PROPOSED VERIZON GPS ANTENNA GRADE AT EAST CORNER ELEV. 0'-6" AGL (57.1' AMSL) (/(9“ $*/ RAD CENTER OF PROPOSED VERIZON ANTENNAS (/(9“ $*/ TOP OF PROPOSED VERIZON ANTENNAS & FRP ENCLOSURE (/(9“ $*/ TOP OF EXISTING PARAPET (/(9“ $*/ EXISTING ROOF DECK AVERAGE GRADE ELEV. 0'-0" AGL (56.6' AMSL) GRADE AT NORTH CORNER ELEV. 0'-6" AGL (57.1' AMSL) PROPOSED VERIZON 8'-0"x4'-0"x8'-0" FRP ENCLOSURE PROPOSED VERIZON PANEL ANTENNAS (2 PER SECTOR, 8 TOTAL) EXISTING HVAC RECEIVED 01/02/2018 amorganroth PLANNING DIVISION DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT 1 C:\Users\Becky\Desktop\SEA Classics - permits\Intake Folder\SEA Classics Shoreline Tracking Worksheet.docx Rev: 08/2016 SHORELINE TRACKING WORKSHEET Planning Division 1055 South Grady Way, Renton, WA 98057 Phone: 425-430-7200 | www.rentonwa.gov The City of Renton is required by the Washington State Department of Ecology to track and evaluate the effectiveness of the Shoreline Master Program at achieving no net loss of shoreline ecological functions with respect to shoreline projects. The City will use shoreline development tracking information to prepare a Shoreline Master Program report every eight years to comply with the Shoreline Management Act requirements. SHORELINE STABILIZATION 1. Is there currently a bulkhead on your site?  Yes  No; If yes, fill out table below. If no, see “Site Conditions”, Section 2 below. What Type of Materials is Your Bulkhead Made of? Linear Feet of Hard Materials: Linear Feet of Soft Materials: Examples of Types of Bulkheads: Hard (e.g. rocks, wood); Soft (e.g. sand, plants); Combination-soft materials at the water with hard materials further inland, or a combination of hard and soft materials at the water. SITE CONDITIONS 2. List the size (in square feet) and type of all structures (1st floor only) on your property (e.g. 2,000 sq. ft. house, 125 sq. ft. greenhouse). 8100 SF existing commercial office structure No additional structures will be added to the property 3. List distance (in feet) from the water to the closest point of each structure. List each building separately (e.g. shed, dock, carport). 32.5’ to parking lot; 55’ to building corner 4. List the size (in square feet) and type of all impervious surfaces (e.g. driveway, parking area, walkway, patio). 28,580 – approximate area of building, parking lots, access drives No change to impervious surfaces as a result of the project RECEIVED 01/02/2018 amorganroth PLANNING DIVISION 2 C:\Users\Becky\Desktop\SEA Classics - permits\Intake Folder\SEA Classics Shoreline Tracking Worksheet.docx Rev: 08/2016 5. List distance (in feet) from the water to the closest point of each impervious surface (hard surface). 32.5’ to parking lot; 55’ to building corner 6. Describe the existing vegetation within 100 ft. of the waterline. Estimate the amount (in squ are feet) of native vegetation. Grass and ornamental plantings (e.g. plants requiring care or grown for decorative purposes) should not be counted. Deciduous trees, grasses; 15,500 SF approximately None of the vegetation is within the project area 7. Will the project require any added fill? If so, how many cubic yards will be added: No; no ground disturbance is associated with this project IN WATER AND OVER WATER STRUCTURES 8. Are there any in or over water structures on your site (e.g. docks, floats, bridges, mooring piles, boatlifts)?  Yes  No; If yes, fill out the table below. Describe the in- and over-water structures on your site The city property includes docks and other park-related structures. Type (e.g. dock, float, bridge, mooring pile, boat lift, etc.) Surface Area (in square feet, if applicable) Light Penetrating Materials (the percentage of the surface area that is made of material that allows light to reach the water) Existing structures to remain Existing structures that will be removed 3 C:\Users\Becky\Desktop\SEA Classics - permits\Intake Folder\SEA Classics Shoreline Tracking Worksheet.docx Rev: 08/2016 Proposed structures 9725 3rd Ave NE, Suite 410, Seattle, WA 98115 CONSTRUCTION MITIGATION Project: SEA Classics - Verizon Project Location: 2003 Maple Valley Highway Parcel: 172305-9103 Zoning: COR – Commercial Office Residential Urban Design District C Adjacent roadway: Maple Valley Highway (SR 169) – 40 MPH Proposal: Verizon is proposing to construct an unmanned telecommunications facility on the rooftop of an existing two-story commercial office building. The existing parking lots will be utilized for construction staging and execution. Construction Dates: Current forecast is for work to occur approximately between 7/17/18-8/14/18. Hours/Days of Operation: The wireless site will be on-air 24/7, once constructed. It is a passive use, and unstaffed except for an occasional technician visit, 1-2x per month on average. Proposed Hauling/Transportation Routes: The construction access will be via the existing driveways leading to the property, from Maple Valley Highway. Construction debris will be minimal, as the proposed project is the installation of wireless equipment on a rooftop, not building demolition. Off-site warehousing locations for the proposed wireless equipment and shroud materials is TBD, as is the contractor assignment. Measures to Minimize Construction Impacts: The project is of short duration and is not anticipated to generate mud, erosion, or substantial noise that would impact adjacent properties. The construction will most likely occur on weekends or in the evening to minimize impact on the existing building tenants, preserve tenant parking in the on-site parking lot, and minimize impact on the Maple Valley Highway commuting hours. Construction Hours: Due to the presence of existing business tenants at the property, the construction will most likely be scheduled for the weekends and/or evenings after business hours. Hours are expected to be subject to City input regarding noise ordinances and project approval conditions. Weekend and evening construction hours are not expected to impact adjacent property uses. RECEIVED 01/04/2018 amorganroth PLANNING DIVISION 9725 3rd Ave NE, Suite 410, Seattle, WA 98115 Traffic Control: The location of the construction is not in right-of-way, and is more than 15 feet from the edge of the roadway. Staging and parking for construction machinery and vehicles will be in the parking lot adjacent to the office building, on private property. Project Contact: Becky Todd MD7 on behalf of Verizon Wireless 206-310-1793 btodd@md7.com 9725 3rd Ave NE, Suite 410 Seattle, WA 98115