HomeMy WebLinkAboutD_SR_Shoreline Management Permit_180131_v3_FINALDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Project Location Map
SR_Shoreline Management Permit_180131_v3_FINAL
A. ADMINISTRATIVE REPORT & DECISION
DECISION: APPROVED APPROVED SUBJECT TO CONDITIONS DENIED
REPORT DATE: February 2, 2018
Project Name: Verizon SEA Classics Wireless Communications Facility
Owner: RaMac, Inc, 2003 Maple Valley Hwy, Renton, WA 98055
Applicant: Verizon Wireless, 3245 158th Ave SE, Bellevue, WA 98008
Contact: Becky Todd, MD7, 9725 3rd Ave NE, Suite 410, Seattle, WA 98115
Project File Number: PR17-000670
Land Use File
Number:
LUA17-000869, SSDP, CUP-A, ECF
Project Manager: Alex Morganroth, Associate Planner
Project Summary: The applicant is requesting a Shoreline Substantial Development Permit and
Conditional Use Permit for the installation of a concealed wireless communications
facility (WCF) on the rooftop of an existing 2-story commercial office building located
at 2003 Maple Valley Hwy (Parcel #1723059103). The subject parcel is 1.87 acres in size
and has a zoning designation of COR, Commercial-Office-Residential, in addition to an
Urban Design District C overlay. The parcel has a Comprehensive Plan Land Use
designation of Commercial-Office-Residential. All exterior equipment associated with
the WCF would be entirely concealed within two, eight-foot tall enclosures that match
the architectural style of the existing building. The applicant has proposed locating the
associated equipment cabinet inside of a room on the first floor of the existing building.
Critical areas mapped on-site include a high seismic hazard area, protected slopes, a
special flood hazard area, and a Wellhead Protection Area Zone 1. The site is located
within the Cedar River Reach C Regulated Shoreline area with a designation of
Shoreline High Intensity. The applicant has not proposed the increase of impervious
surface coverage or the removal of any trees or vegetation on the site.
Project Location: 2003 Maple Valley Hwy, Renton, WA 98055
Site Area: 1.87 acres
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 2 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
B. EXHIBITS:
Exhibit 1: Staff Report
Exhibit 2: Site Plan and Elevations
Exhibit 3: Photo Simulations
Exhibit 4: RF/RS Documentation
Exhibit 5: Shoreline Tracking Worksheet
Exhibit 6: Construction Mitigation Description
Exhibit 7: SEPA Environmental Review Determination
Exhibit 8: Colocation Feasibility Analysis
C. GENERAL INFORMATION:
1. Owner(s) of Record:
RaMac, Inc, 2003 Maple Valley Hwy, Renton, WA
98055
2. Zoning Classification: COR, Commercial-Office-Residential
Urban Design District C Overlay
3. Comprehensive Plan Land Use Designation: Commercial-Office-Residential
4. Existing Site Use: Office (Multi-tenant)
5. Critical Areas: High seismic hazard area, protected slopes (40-
90%), a special flood hazard area, and a Wellhead
Protection Area Zone 1
6. Neighborhood Characteristics:
a. North: Commercial-Office-Residential (COR) Zoning District and Urban Design District C
Overlay
b. East: Vacant, Resource Conservation (RC) Zoning District and Urban Design District C
Overlay
c. South: Multi-family Residential, Commercial-Office-Residential (COR) Zoning District
and Urban Design District C Overlay
d. West: Cedar River
6. Site Area: 1.87 acres
D. HISTORICAL/BACKGROUND:
Action Land Use File No. Ordinance No. Date
Comprehensive Plan N/A 5758 06/22/2015
Zoning N/A 5758 06/22/2015
Shane Annexation N/A 1789 09/09/1959
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 3 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
E. PUBLIC SERVICES:
1. Existing Utilities
a. Water: Water service is provided to the existing structure by the City of Renton. There is an existing
water main in Maple Valley Hwy (SR 169).
b. Sewer: Sewer service is provided to the existing structure by the City of Renton. There is an existing
sewer main in Maple Valley Hwy (SR 169).
c. Surface/Storm Water: There is a public stormwater main in front of the site in the Maple Valley Hwy
ROW. The stormwater main travels across the site and enters the Cedar River via an outfall on the
south west side of the subject site.
2. Streets: Access to the site is provided via Maple Valley Hwy (169). Maple Valley Hwy (SR 169) is classified
as a Highway. There are not complete street improvements along the frontage of the site. There is an
existing sidewalk with no landscape buffer on the south side of Maple Valley Hwy (SR 169) in front of the
project site.
3. Fire Protection: Renton Fire Authority
F. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE:
1. Chapter 2 Land Use Districts
a. Section 4-2-020: Purpose and Intent of Zoning Districts
b. Section 4-2-070: Zoning Use Table
2. Chapter 3 Environmental Regulations
a. Section 4-3-050: Critical Area Regulations
b. Section 4-3-090: Shoreline Master Program Regulations
3. Chapter 4 Property Development Standards
a. Section 4-4-140: Wireless Communications Facilities Regulations
4. Chapter 9 Permits
a. Section 4-9-030: Conditional Use Permit
5. Chapter 11 Definitions
G. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN:
1. Land Use Element
2. Utilities Element
H. FINDINGS OF FACT (FOF):
1. The applicant, Verizon, is requesting an Administrative Conditional Use Permit and Shoreline Substantial
Development Permit for the installation of a concealed wireless communications facility on an existing
commercial building.
2. The Planning Division of the City of Renton accepted the above master application for review on
December 28, 2017 and determined the application complete on January 5, 2018. The project complies
with the 120-day review period.
3. The project site is located at 2003 Maple Valley Hwy (Parcel #1723059103).
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 4 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
4. A two-story, multitenant commercial/office building is located on the site.
5. Access to the site is provided via a single driveway off of Maple Valley Hwy.
6. The property is located within the Commercial-Office-Residential (COR) Comprehensive Plan land use
designation.
7. The site is located within the Commercial-Office-Residential (COR) zoning classification.
8. The majority of the site consists of impervious surface, including the existing building and associated
parking.
9. There are approximately ten (10) trees located on the site of which the applicant is proposing t o retain.
10. The site is mapped with high seismic hazard area, protected slopes, a special flood hazard area, and a
Wellhead Protection Area Zone 1 .
11. No grading is proposed on site.
12. The applicant is proposing to begin construction in July of 2018 and end in August of 2018.
13. Staff did not receive any public or agency comments.
14. Representatives from various city departments have reviewed the application materials to identify and
address issues raised by the proposed development. These comments are contained in the official file,
and the essence of the comments has been incorporated into the appropriate sections of this report and
the Departmental Recommendation at the end of this report.
15. Comprehensive Plan Compliance: The site is designated Commercial Office Residential (COR) on the
Comprehensive Plan Land Use Map. Lands in the COR designation are intended to evolve from
underutilized and vacant to compact, mixed-developments that act as a gateway to the City. The land
banking designation is characterized by enhanced master planning and coordinated design that takes
advantage of significant amenities and major transportation or transit routes. The proposal is compliant
with the following Comprehensive Plan Goals and Policies if all conditions of approval are met:
Compliance Comprehensive Plan Analysis
Policy U‐79. Require that the siting and location of telecommunications facilities be
accomplished in a manner that minimizes adverse impacts on the environment and
adjacent land uses.
Staff Comment: See analysis below under FOF 19.a CUP. If conditions of the CUP are met
the proposed concealed WCF would meet the policy objective.
Policy U‐80. Require wireless communication structures and towers to be designed and
site to minimize aesthetic impacts and to be co-located on existing structures and towers
wherever possible.
Staff Comment: See analysis below under FOF 19.g CUP. If conditions of the CUP are met
the proposed concealed WCF would meet the policy objective.
Goal L-P: Minimize adverse impacts to natural systems, and address impacts of past
practice where feasible, through leadership, policy, regulation, and regional
coordination.
Goal L-BB: Maintain a high quality of life as Renton grows by ensuring that new
development is designed to be functional and attractive.
Staff Comment: See analysis below under FOF 19.a CUP. If conditions of the CUP are met
the proposed concealed WCF would meet the policy objective.
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 5 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
Goal L-FF: Strengthen the visual identity of Renton and its Community Planning Areas
and neighborhoods through quality design and development.
Staff Comment: See analysis below under FOF 19.a CUP. If conditions of the CUP are met
the proposed concealed WCF would meet the policy objective.
Policy L-55: Protect public scenic views and public view corridors, including Renton’s
physical, visual and perceptual linkages to Lake Washington and the Cedar River.
Staff Comment: See analysis below under FOF 19.a CUP. If conditions of the CUP are met
the proposed stealth tower would meet the policy objective.
16. Zoning Development Standard Compliance: The site is located in the Commercial Office Residential
(COR) District and the Urban Design District C on the City’s Zoning Map. Land with the COR zoning
designation is intended to provide a mix of intensive office, hotel, convention center, and residential
activity in a high-quality, master-planned development while remaining integrated with the natural
environment. Commercial retail and service uses that are architecturally and functionally integrated are
permitted. The scale and intensity of these sites will typically denote a gateway into the City and should
be designed accordingly. The purpose of the design requirements in Urban Design District C is to
encourage high-quality, pedestrian-scale structures in areas zoned Urban Center (UC) or Commercial
Office Residential (COR). Although the design requirements for structures in Urban Design District C are
not applicable to wireless communication facilities, the design and siting of new towers or equipment
should be compatible with the goals and overall intent of the design regulations. All new wireless
communication facilities are required to meet the standards and requirements in RMC 4-4-140 in lieu of
the typical development standards based on zoning designation.
Compliance Wireless Communication Facility Standards Analysis
Compliant if
condition of
approval is met
a. Equipment Shelters/Cabinets:
Location - Equipment shelters and cabinets used to house related equipment
should be located within buildings or placed underground, unless it is infeasible.
Screening - Equipment shelters and cabinets shall be surrounded by a fifteen
foot (15') wide sight obscuring landscape buffer around the outside perimeter of
required security fencing with a minimum height that is no less than the height
of the compound fence at any point. Existing topography, vegetation and other
site characteristics may provide relief from the screening requirement
Size - The applicant shall provide documentation that the size of any equipment
shelters or cabinets is the minimum necessary to meet the provider’s service
needs.
Generators –
i. Architectural integration is required (if applicable).
ii. To the extent feasible, generators shall be enclosed along with the related
equipment. Similar to equipment shelters, the screening for the generator
shall utilize similar building materials, colors, accents, and textures as the
primary building; if no buildings exist on site, ensure that the building is
designed to blend in with the environment.
iii. A screening wall and/or landscaping material shall be required to mitigate
visual impacts.
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 6 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
iv. Fences shall be constructed of materials that complement and blend in with
the surroundings.
v. Anti-graffiti finish shall be applied to all solid fences, walls, and gates.
vi. A noise analysis shall be required to demonstrate that the generator will
operate within allowed noise limits if the generator is the sole power source.
Staff Comment: The associated cabinet equipment would be located inside a room
on the first floor of the existing structure and would not be visible when viewed
outside. The cabling used to connect the interior equipment with the roof-mounted
antennas would be located on the outside of the building in a fully enclosed exterior
chase painted to match the existing façade. A generator is not included in the
proposed project.
Shall comply
using the CUP
Criteria below
under FOF 19.a
b. Maximum Height: The maximum building height permitted in the COR zone is 10
stories and/or 125 ft., or determined through site plan review when the project site
is abutting a lot designated as residential. The maximum height of wireless
communication facilities is governed by RMC 4-4-140F, which limits the height of
concealed and/or camouflaged WCFs erected on a rooftop to sixteen feet (16') above
the allowed zone height.
Staff Comment: The max height above grade of the proposed concealed WCF is 33
feet. The proposal complies with the maximum height permitted in the COR zone.
Shall comply
using the CUP
Criteria below
under FOF 19.a
c. Visual Impact: RMC 4-4-140F.3 requires that site location and development
preserve the pre-existing character of the surrounding buildings and landscape to
the extent consistent with the function of the communications equipment. Towers
shall be integrated through location and design to blend in with the existing
characteristics of the site to the extent practical. Existing on-site vegetation shall be
preserved or improved, and disturbance of the existing topography shall be
minimized, unless such disturbance would result in less adverse visual impact to the
surrounding area. Towers, antennas and related equipment shall be uniformly
painted a non-reflective neutral color that best matches the colors within the
immediately surrounding built and natural landscape in order to reduce the contrast
between the WCF and the landscape.
Staff Comment: The proposed location of the concealed WCF, on the rooftop of the
existing structure, creates a negligible visual impact on the building and site as a
whole. Both enclosures would extend a maximum of five feet above the existing
parapet and would entirely screen the proposed antennas. The applicant has
proposed matching the aesthetic look of the enclosure walls with the façade of the
existing building. See Conditional Use Permit analysis provided below in FOF 19.a,
and the associated condition of approval.
N/A
d. Setbacks: RMC 4-4-140F.4 requires that towers be set back from each property
line by a distance equal to the tower height, unless an engineering analysis concludes
that a reduced setback is safe for abutting properties and the Administrator
determines that a reduced setback is appropriate for the site.
e. Maximum Noise Levels: RMC 4-4-140F.5 limits the noise of equipment associated
with Wireless Communication Facilities to forty five (45) decibels as measured from
the nearest property line on which the facility is located.
Staff Comment: The applicant has stated in their project narrative that they do not
anticipate any changes in the noise levels. If noise levels exceed the maximum decibel
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 7 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
limit, the applicant would be required to bring the proposed facility into compliance
with code.
e. Fencing: RMC 4-4-040 limits fences within commercial and industrial zoning to a
maximum height of 8 feet. In addition, RMC 4-4-140F.6 requires the installation of
security fencing coated with a non-reflective neutral fence.
Staff Comment: No fencing is proposed as a part of the concealed WCF project.
f. Lighting: RMC 4-4-140F.7 prohibits the artificial lighting of towers or antennas,
unless required by the FAA or other authority.
Staff Comment: No new lighting is proposed as a part of the concealed WCF project.
g. Advertising Prohibited: RMC 4-4-140F.8 prohibits the placement of advertising
on any part of the Wireless Communication Facility or associated equipment.
Staff Comment: The applicant has not proposed any type of advertising to be
included on the structure.
Compliance
not yet
demonstrated
h. Building Standards: RMC 4-4-140F.9 requires support structures to be constructed
so as to meet or exceed the most recent Electronic Industries
Association/Telecommunications Industries Association (EIA/TIA) 222 Revision G
Standard. Prior to issuance of a building permit the Building Official shall be provided
with an engineer’s certification that the support structure’s design meets or exceeds
those standards.
Staff Comment: The structural integrity of the proposed concealed WCF will be
evaluated via engineering analysis at the time of application for the building permit.
i. Radio Frequency Standards: RMC 4-4-140F.10 requires the applicant to ensure
that the Wireless Communication Facility will not cause localized interference with
the reception of area television or radio broadcasts.
Staff Comment: The applicant does not anticipate any inference with the reception
of the area television or radio broadcasts and would be required to immediately
address any interference issues should they be reported.
j. Concealed Wireless Communication Facility Standards: RMC 4-4-140 requires
concealed facilities to meet minimum standards that effectively disguise the tower.
1. Building Addition: All antennas shall be fully concealed within a structure
that is architecturally compatible with the existing building. Roof top additions
shall be concealed on all sides.
2. Related Equipment: The related equipment shall be completely concealed
inside a structure or inside an underground vault. Concrete masonry unit
(CMU) walls and prefabricated facilities do not meet the intent of a concealed
WCF. Equipment enclosures shall be designed to be compatible with the
existing building/structure.
3. Materials: Fiberglass reinforced plastic or radio frequency transparent
materials may be used to screen and integrate a WCF with an existing building.
Visible transition lines between the old and new surfaces are prohibited.
4. Architectural Elements: New architectural features such as columns,
pilasters, corbels, or other ornamentation that conceal antennas may be used
if it complements the architecture of the existing building.
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 8 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
Staff Comment: The antennas associated with the proposed WCF would be fully
screened behind RF-porous panels painted to match the color of the existing façade.
All associated cabinet equipment would be located entirely inside of a room on the
first floor the existing building and will not be visible from the outside of the building.
See FOF 19 below for analysis related to the concealed WCF.
17. Shoreline Master Program Analysis: The subject site is located in the Cedar River Reach C Regulated
Shoreline area and is therefore subject the shoreline regulations RMC 4-3-090 and requires a Shoreline
Substantial Development Permit.
SHORELINE MASTER PROGRAM CRITERA:
A. COMPREHENSIVE PLAN COMPLIANCE AND CONSISTENCY, SHORELINE ELEMENT:
The site is located in the Shoreline High-Intensity Overlay District. The objective of the High Intensity
Overlay is to provide opportunities for large-scale office and commercial employment centers as well
as multi-family residential use and public services. This district provides opportunities for water-
dependent and water-oriented uses while protecting existing ecological functions and restoring
ecological functions in areas that have been previously degraded. Development may also provide for
public use and/or community use, especially access to and along the water's edge. The proposal is
compliant with the following Shoreline policies:
Policy SH-14. Shoreline use and development should be carried out in a manner
that prevents or mitigates adverse impacts so that the resulting ecological condition
does not become worse than the current condition. This means ensuring no net loss
of ecological functions and processes in all development and use. Permitted uses
should be designed and conducted to minimize, in so far as practical, any resultant
damage to the ecology and environment (RCW 90.58.020). Shoreline ecological
functions that should be protected include, but are not limited to, fish and wildlife
habitat, food chain support, and water temperature maintenance. Shoreline
processes that shall be protected include, but are not limited to, water flow; littoral
drift; erosion and accretion; infiltration; ground water recharge and discharge;
sediment delivery, transport, and storage; large woody debris recruitment; organic
matter input; nutrient and pathogen removal; and stream channel
formation/maintenance.
Objective SH-E. Existing economic uses and activities on the shorelines should be
recognized and economic uses or activities that are water-oriented should be
encouraged and supported.
Policy SH-18. All economic activities on the shoreline shall provide for no net loss of
ecological functions during construction and operation.
B. DEVELOPMENT STANDARDS:
The subject site is classified as Shoreline High Intensity on the City of Renton Shoreline Overlay Map.
The following development standards are applicable to the proposal:
1. No Net Loss Required
Shoreline use and development shall be carried out in a manner that prevents or
mitigates adverse impacts to ensure no net loss of ecological functions and processes
in all development and use. Permitted uses are designed and conducted to minimize,
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 9 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
in so far as practical, any resultant damage to the ecology and environment (RCW
90.58.020). Shoreline ecological functions that shall be protected include, but are not
limited to, fish and wildlife habitat, food chain support, and water temperature
maintenance. Shoreline processes that shall be protected include, but are not limited
to, water flow; erosion and accretion; infiltration; groundwater recharge and
discharge; sediment delivery, transport, and storage; large woody debris recruitment;
organic matter input; nutrient and pathogen removal; and stream channel
formation/maintenance.
Staff Comment: The applicant has not proposed an increase in either the footprint of
the existing building or impervious coverage on the site. Due to the location of the
proposed WCF on an existing building, the proposed project would not impact any
shoreline process or ecological functions of the Cedar River or adjacent upland area.
2. View Obstruction and Visual Quality
View Corridors Required: Where commercial, industrial, multiple use, multi-family
and/or multi-lot developments are proposed, primary structures shall provide for
view corridors between buildings where views of the shoreline are available from
public right-of-way or trails.
Staff Comment: The proposed WCF would be approximately five (5) feet higher in
elevation than the existing structure and associated HVAC equipment. The proposed
WCF will not impact the view of the Cedar River from the Cedar River Trail located on
the other (south) side of the Cedar River.
N/A
Minimum Setbacks for Commercial Development Adjacent to Residential or Park
Uses: All new or expanded commercial development adjacent to residential use and
public parks shall provide fifteen feet (15') setbacks from adjacent properties to
attenuate proximity impacts such as noise, light and glare, and may address scale and
aesthetic impacts. Fencing or landscape areas may be required to provide a visual
screen.
Lighting Requirements: Display and other exterior lighting shall be designed and
operated so as to prevent glare, to avoid illuminating nearby properties used for
noncommercial purposes, and to prevent hazards for public traffic. Methods of
controlling spillover light include, but are not limited to, limits on the height of light
structure, limits on light levels of fixtures, light shields, and screening.
Staff Comment: See FOF 16.f.
Reflected Lights to Be Limited: Building surfaces on or adjacent to the water shall
employ materials that limit reflected light.
Staff Comment: See FOF 16.f.
Integration and Screening of Mechanical Equipment: Building mechanical equipment
shall be incorporated into building architectural features, such as pitched roofs, to the
maximum extent feasible. Where mechanical equipment cannot be incorporated into
architectural features, a visual screen shall be provided consistent with building
exterior materials that obstructs views of such equipment.
Staff Comment: See FOF 16.j .
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 10 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
N/A
Visual Prominence of Freestanding Structures to Be Minimized: Facilities not
incorporated into buildings including fences, piers, poles, wires, lights, and other
freestanding structures shall be designed to minimize visual prominence.
N/A
Maximum Stair and Walkway Width: Stairs and walkways located within shoreline
vegetated buffers shall not exceed four feet (4') in width; provided, that where ADA
requirements apply, such facilities may be increased to six feet (6') in width. Stairways
shall conform to the existing topography to the extent feasible.
3. Community Disturbances:
Noise, odors, night lighting, water and land traffic, and other structures and activities
shall be considered in the design plans and their impacts avoided or mitigated.
Staff Comment: The proposed WCF would be fully screened and located over a half
mile from the nearest residential use. The WCF would not create any noise, traffic,
visual, or odor impacts on or near the site.
4. Public Access
Physical or visual access to shorelines shall be incorporated in all new development when the
development would either generate a demand for one or more forms of such access, would impair
existing legal access opportunities or rights, or is required to meet the specific policies and regulations
of the Shoreline Master Program.
Cedar River Reach C: Public/community access along the waterfront should be
provided as private lands on the north side of the river redevelop, considered along
with the goal of restoration of ecological functions. Public or community access shall
be provided when residential development occurs consistent with standards of the
Shoreline Master Program.
Staff Comment: The proposed WCF is not considered redevelopment and therefore
does not trigger the public access requirement for the site.
5. Building and Development Location – Shoreline Orientation
Shoreline developments shall locate the water-dependent, water-related, and water-enjoyment
portions of their developments along the shoreline. Development and use shall be designed in a
manner that directs land alteration to the least sensitive portions of the site to maximize vegetation
conservation; minimize impervious surfaces and runoff; protect riparian, nearshore and wetland
habitats; protect wildlife and habitats; protect archaeological, historic and cultural resources; and
preserve aesthetic values.
Location of Development: Development and use shall be designed in a manner that
directs land alteration to the least sensitive portions of the site.
Staff Comment: The proposed location of the concealed WCF on an existing structure
is the least impactful method of siting a WCF as it would not increase impervious
surface or require the alteration of any land, vegetation, or trees.
Minimization of Site Alteration: Development shall minimize site alteration in sites
with substantial unaltered natural features by applying the following criteria:
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 11 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
(a) Vehicle and pedestrian circulation systems shall be designed to limit clearing,
grading, and alteration of topography and natural features.
(b) Impervious surfacing for parking lot/space areas shall be limited through the use
of under-building parking or permeable surfaces where feasible.
(c) Utilities shall share roadway and driveway corridors and rights-of-way wherever
feasible.
(d) Development shall be located and designed to avoid the need for structural
shoreline stabilization over the life of the development. Exceptions may be made for
the limited instances where stabilization is necessary to protect allowed uses,
particularly water-dependent uses, where no alternative locations are available and
no net loss of ecological functions will result.
Staff Comment: The site would not be altered in any way as a result of the proposed
WCF.
Location for Accessory Development: Accessory development or use that does not
require a shoreline location shall be located outside of shoreline jurisdiction unless
such development is required to serve approved water-oriented uses and/or
developments or unless otherwise allowed in a High Intensity designation. When
sited within shoreline jurisdiction, uses and/or developments such as parking, service
buildings or areas, access roads, utilities, signs and storage of materials shall be
located inland away from the land/water interface and landward of water-oriented
developments and/or other approved uses unless a location closer to the water is
reasonably necessary.
Staff Comment: Major utilities are a permitted use in the High Intensity shoreline
overlay. The proposed project would not impact the land/water interface and would
not impact the shoreline in any way.
Navigation and Recreation to Be Preserved: Shoreline uses shall not deprive other
uses of reasonable access to navigable waters. Existing water-related recreation shall
be preserved.
6. Standards for Density, Setbacks, and Height
Setbacks and buffers from the OHWM:
High Intensity Overlay District - For non-water oriented uses a 100 foot setback is
required from the OHWM.
Staff Comment: The existing site and structure are classified as legal non-conforming
due the buildings location within 100 feet of the OHWM. The rooftop-mounted WCF
would not increase the footprint or impervious surface on site and would not result in
a loss of ecological function. Alterations that do not expand the building footprint or
impervious surface coverage do not require any changes to the non-conforming site.
Vegetation Conservation Buffer: 100 feet.
Cedar River Reach C Standard: Enhancement of native riparian vegetation shall be
implemented as part of park management, balanced with needs of flood control
levees and opportunities to provide public visual and physical access to the shoreline.
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 12 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
Staff Comment: See “Setbacks and buffers from OHWM” under FOF 17.6 above.
Building Height – Maximum:
In water – 35 ft.
Within 100 feet of OHWM – 35 ft.
More than 100 feet from the OHWM – 35 ft.
Height up to that established in chapter 4-2 RMC, Zoning Districts – Uses and
Standards, may be allowed for non-water-dependent uses in the following reaches:
Lake Washington Reaches C, H, I, and J; Cedar River Reaches A, B, and C; Black River
Reach A; May Creek Reach B; and Springbrook Creek Reaches B, C, and D:
For buildings landward of one hundred feet (100') from OHWM, the maximum
building height shall be defined by a maximum allowable building height envelope
that shall:
i. Begin along a line laying parallel to and one hundred feet (100') from OHWM at a
height of either thirty five feet (35') or one half (1/2) the maximum height allowed in
the underlying zone, whichever is greater; and
ii. Have an upward, landward transition at a slope of one vertical to one horizontal
from the beginning height either (a) until the line at which the maximum height
allowed in the underlying zoning in chapter 4-2 RMC is reached (from which line the
height envelope shall extend landward at the maximum height allowed in the
underlying zoning), or (b) to the end of shoreline jurisdiction, whichever comes first.
Impervious area within the Buffer/Setback: 5%
Staff Comment: The project would not result in an increase in impervious surface area.
Impervious area within 100 feet of the OHWM: 50%
Footnote 11: No limit for the Renton Municipal Airport.
Staff Comment: See “Setbacks and buffers from OHWM” under FOF 17.6 above.
7. Use Regulations:
a. Major Service Utilities: Permitted in the High Intensity Overlay subject to the following criteria:
N/A
Local utility services needed to serve water-dependent and other permitted uses in
the shoreline are subject to standards for ecological protection and visual
compatibility
Major utility systems shall be located outside of shoreline jurisdiction, to the extent
feasible, except for elements that are water-dependent and crossings of water bodies
and other elements of shorelands by linear facilities.
Staff Comment: Locating the WCF outside of the shoreline jurisdiction area is not
feasible, as the entire site is located within the shoreline jurisdiction. The proposed
WCF would be located on top of the existing building on the site and fully screened in
order to ensure no impact on the shoreline.
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 13 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
N/A
New public or private utilities shall be located inland from the land/water interface,
preferably out of shoreline jurisdiction, unless: (a) Perpendicular water crossings are
unavoidable; or b) Utilities are necessary for authorized shoreline uses consistent
with the Shoreline Master Program.
N/A
Linear facilities consisting of pipelines, cables and other facilities on land running
roughly parallel to the shoreline shall be located as far from the water’s edge as
feasible and preferably outside of shoreline jurisdiction.
N/A
Utility crossings of water bodies shall be attached to bridges or located in other
existing facilities, if reasonably feasible. If new installations are required to cross
water bodies or wetlands they should avoid disturbing banks and streambeds and
shall be designed to avoid the need for shoreline stabilization. Crossings shall be
tunneled or bored where reasonably feasible. Installations shall be deep enough to
avoid failures or need for protection due to exposure due to streambed mobilization,
aggregation or lateral migration. Underwater utilities shall be placed in a sleeve if
reasonably feasible to avoid the need for excavation in the event of the need for
maintenance or replacement.
N/A
In areas where utility installations would be anticipated to significantly alter natural
groundwater flows, a barrier or conduit to impede changes to natural flow
characteristics shall be provided.
N/A
Excavated materials from construction of utilities shall be disposed of outside of the
vegetation conservation buffer except if utilized for ecological restoration and shall be
specified in submittal materials.
Utilities shall be located and designed to avoid natural, historic, archaeological or
cultural resources to the maximum extent feasible and mitigate adverse impacts
where unavoidable.
Utilities shall be located, designed, constructed, and operated to result in no net loss
of shoreline ecological functions with appropriate on- and off-site mitigation including
compensatory mitigation.
Staff Comment: See analysis under FOF 17.B.1.
N/A
Site planning and rights-of-way for utility development should provide for compatible
multiple uses such as shore access, trails, and recreation or other appropriate use
whenever possible. Utility right-of-way acquisition should be coordinated with
transportation and recreation planning.
Vegetation Conservation: (a) Native vegetation shall be maintained whenever
reasonably feasible, (b) When utility projects are completed in the water or
shoreland, the disturbed area shall be restored as nearly as possible to the original
condition, (c) All vegetation and screening shall be hardy enough to withstand the
travel of service trucks and similar traffic in areas where such activity occurs.
Staff Report: No vegetation would be altered or disturbed, either temporarily or
permanently, as a result of the proposed project.
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 14 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
18. Critical Areas: Project sites which contain critical areas are required to comply with the Critical Areas
Regulations (RMC 4-3-050). The proposal is consistent with the Critical Areas Regulations, if all conditions
of approval are complied with:
Compliance
not yet
demonstrated
Geologically Hazardous Areas: Based upon the results of a geotechnical report and/or
independent review, conditions of approval for developments may include buffers
and/or setbacks from buffers. A standard 15-foot building setback is required for all
structures from Protected Slope areas.
A 50-foot buffer and 15-foot building setback are required from Very High Landslide
Hazard Areas.
Staff Comment: The proposed WCF would be located outside of the 15 foot building
setback for protected slopes. A geotechnical report was waived as part of the land use
submittal application. However, a geotechnical report may be required as part of the
building permit submittal at the discretion of the Building Official.
Wellhead Protection Areas:
Staff Comment: The proposed wireless facility is not identified as a prohibited activity
in Zone 1 and does not have the potential to significantly impact groundwater quantity
or quality. If any fill is proposed to be brought to the site a fill source statement would
be required.
Special Flood Hazard Area:
Staff Comment: A small portion of the site is located in a flood hazard area. However,
the proposed WCF would be installed completely outside of the flood hazard area on
the roof of any existing building.
19. Conditional Use Analysis: In lieu of the criteria normally evaluated for Conditional Use Permits, the
following criteria (RMC 4-9-030E) will be considered in determining whether to issue a Conditional Use
Permit for a wireless communication facility.
Compliance Conditional Use Analysis for Wireless Facilities
Communications (applicable to radar transmission installations, cable television/radio
antennas, and wireless communications facilities):
a. Communications installations may be permitted in the shoreline area only
when there existing no feasible site out of the shoreline and water area.
b. All structures shall meet the screening requirements in the criteria for all
utilities, above.
c. If approved within the shoreline, such installations shall reduce aesthetic
impacts by locations as far as possible from residential, recreational, and
commercial activities;
d. Cellular communication facilities may be located in the shoreline only when
mounted on buildings and screened by architectural features compatible with
the design of the building.
Staff Comment: See analyses under FOF 17.7.a and FOF 16.c.
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 15 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
Compliant if
condition of
approval is
met
a. Height and Design of the Proposed Tower: The height of the proposed tower and/or
antenna as well as incorporation of design characteristics that have the effect of
reducing or eliminating visual obtrusiveness.
Staff Comment: The proposed location of the concealed WCF, on the rooftop of the
existing structure, creates no significant visual impact on the building and site as a
whole. All rooftop mounted equipment would be fully screened by RF-porous panels and
associated cabinet equipment would be located fully inside of the existing building. The
two enclosures would extend a maximum of five feet above the existing parapet and
would not have a big impact on the overall look of the building or site. The applicant
has proposed matching the aesthetic look of the enclosure walls with the façade of the
existing building. Detailed information on the screening wall material and color was not
provided to staff at the application submittal. In order to ensure that enclosures
adequately match the architecture and style of the existing building, staff recommends
as a condition of approval, that the applicant provide detailed information on the
screening color and materials to the Current Planning Project Manager prior to building
permit issuance.
b. Proximity of The Tower to Residential Structures And Residential District
Boundaries: The nature of uses on adjacent and nearby properties and the proximity
of the tower and/or antenna to residential structures and residential district
boundaries.
Staff Comment: The only existing residential uses nearby in the COR designation are
the Riviera Apartments to the south of the project site. The proposed concealed WCF
would be located approximately 250 feet from the nearest unit in the Rivera
Apartments building. Trees on the southeast side of the site between the site and the
residential uses already provide significant screening of the commercial building. Due
to the proposed rooftop location, the WCF would not have a negative impact on any
residential uses in the nearby area.
c. Nature of Uses On Adjacent and Nearby Properties: The nature of uses on adjacent
and nearby properties. The proposed use at the proposed location shall not result in
substantial or undue adverse effects on adjacent property.
Staff Comment: See FOF 19.b above.
d. Topography and Vegetation: The surrounding topography and tree canopy
coverage.
Staff Comment: No clearing or grading is proposed as a result of this project. There are
existing significant trees located on the project site that would not be affected as a
result of the proposed project.
e. Ingress/Egress: Vehicular access to the project site would be provided via an
existing driveway off of Maple Valley Hwy and through the existing parking lot on the
site. No changes are proposed to the existing vehicular access to the project site.
f. Impacts: The potential noise, light, glare, and visual impacts.
Staff Comment: The impacts of light, glare, and noise are not anticipated to be above
what would be permitted in the COR zone. See FOF 16 for additional analysis.
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 16 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
g. Colocation Feasibility: The availability of suitable existing towers and other
structures to accommodate the proposal.
Staff Comment: The applicant submitted satisfactory evidence that no existing tower
or support structure can accommodate the proposed equipment relocation. An existing
utility pole nearby with T-Mobile equipment has limited space for additional antennas
due to separation requirements between various antennas. In addition, there are no
existing towers within 0.5 miles from the project site and there is limited wireless service
in the immediate vicinity. A colocation feasibility analysis is attached as Exhibit 8.
j. Consistency With Plans And Regulations: The compatibility with the general
purpose, goals, objectives and standards of the Comprehensive Plan, this Title, and any
other City plan, program, map or ordinance.
Staff Comment: As previously discussed above under FOF 15 and 16, the proposed
installation of the proposed concealed WCF is consistent with the City’s adopted
Comprehensive Plan, Zoning Ordinance, and RMC 4-4-140 Wireless Communication
Facilities regulations provided the conditions of approval is complied with.
k. Landscaping: Additional landscaping may be required to buffer adjacent properties
from potentially adverse effects of the proposed use.
Staff Comment: All cabinet equipment would be installed inside of the building and
would not require landscape screening. The existing tree canopy would provide
adequate screening of the roof-top mounted WCF from the residential uses to the
southeast.
I. CONCLUSIONS:
1. The subject site is located in the Commercial Office Residential (COR) Comprehensive Plan designation
and complies with the goals and policies established with this designation if conditions of approval are
met, see FOF 6.
2. The subject site is located in the Commercial Office Residential (COR) zoning designation and complies
with the zoning and development standards established with this designation provided the applicant
complies with City Code and conditions of approval, see FOF 16.
3. The proposed concealed WCF meets the ten development standards that apply specifically to new
Wireless Communication Facilities, provided the applicant meets all conditions of approval, see FOF 16.
4. The proposed concealed wireless communication facility complies with the Critical Areas Regulations
provided the applicant complies with City Code and conditions of approval, see FOF 18.
5. The proposed concealed wireless communication facility meets the nine special decision criteria
considered when making a decision on a conditional use permit request for a Wireless Communications
Facility, as specified in RMC 4-9-030E, provided the applicant meets all conditions of approval, see FOF
19.
J. DECISION:
The Verizon SEA Classics Wireless Communications Facility Shoreline Substantial Development Permit and
Conditional Use Permit, File No. LUA17-000869, as depicted in Exhibit 2, is approved and is subject to the
following condition:
1. The applicant shall submit material and color details of the rooftop screening enclosure for approval by
the Current Planning Project Manager prior to Building Permit issuance.
C
i
t
y
o
f
R
e
n
t
o
n
D
e
p
a
r
t
m
e
n
t
o
f
C
o
m
m
u
n
i
t
y
&
E
c
o
n
o
m
i
c
D
e
v
e
l
o
p
m
e
n
t
A
d
m
i
n
i
s
t
r
a
t
i
v
e
R
e
p
o
r
t
&
D
e
c
i
s
i
o
n
V
E
R
I
Z
O
N
S
E
A
C
L
A
S
S
I
C
S
L
U
A
I
7
-
0
0
0
8
6
9
F
e
b
r
u
a
r
y
2
,
2
0
1
8
P
a
g
e
1
7
o
f
1
8
D
A
T
E
O
F
D
E
C
I
S
I
O
N
O
N
L
A
N
D
U
S
E
A
C
T
I
O
N
:
S
I
G
N
A
T
U
R
E
:
r
f
r
t
t
c
c
r
o
z
J
e
n
n
i
f
e
r
H
e
n
n
i
n
g
,
P
l
a
n
n
i
n
g
D
i
r
e
c
t
o
r
D
a
t
e
T
R
A
N
S
M
I
T
T
E
D
t
h
i
s
2
d
a
y
o
f
F
e
b
r
u
a
r
y
,
2
0
1
8
t
o
t
h
e
O
w
n
e
r
/
A
p
p
l
i
c
a
n
t
/
C
o
n
t
a
c
t
:
O
w
n
e
r
:
A
p
p
l
i
c
a
n
t
:
C
o
n
t
a
c
t
:
R
a
M
a
c
,
I
n
c
V
e
r
i
z
o
n
W
i
r
e
l
e
s
s
B
e
c
k
y
T
o
d
d
A
t
t
n
:
G
r
e
g
J
a
m
e
s
3
2
4
5
1
5
8
t
h
A
v
e
S
E
M
D
7
2
0
0
3
M
o
p
l
e
V
o
l
l
e
y
H
w
y
B
e
l
l
e
v
u
e
,
W
A
9
8
0
0
8
9
7
3
5
3
d
A
y
e
,
S
t
e
4
1
0
R
e
n
t
o
n
,
W
A
9
8
0
5
5
S
e
a
t
t
l
e
,
W
A
9
8
1
1
5
T
R
A
N
S
M
I
T
T
E
D
t
h
i
s
2
”
d
d
a
y
o
f
F
e
b
r
u
a
r
y
,
2
0
1
8
t
o
t
h
e
P
a
r
t
i
e
s
o
f
R
e
c
o
r
d
:
N
o
P
o
n
i
e
s
o
f
R
e
c
o
r
d
T
R
A
N
S
M
I
T
T
E
D
t
h
i
s
2
d
o
y
o
f
F
e
b
r
u
a
r
y
,
2
0
1
8
t
o
t
h
e
f
o
l
l
o
w
i
n
g
:
C
h
i
p
V
i
n
c
e
n
t
,
C
E
D
A
d
m
i
n
i
s
t
r
a
t
o
r
B
r
i
a
n
n
e
B
o
n
n
w
o
r
t
h
,
D
e
v
e
l
o
p
m
e
n
t
E
n
g
i
n
e
e
r
i
n
g
M
a
n
a
g
e
r
A
m
a
n
d
a
A
s
k
r
e
n
,
P
r
o
p
e
r
t
y
S
e
r
v
i
c
e
s
V
a
n
e
s
s
a
D
o
l
b
e
e
,
C
u
r
r
e
n
t
P
l
a
n
n
i
n
g
M
a
n
a
g
e
r
F
i
r
e
M
a
r
s
h
a
l
K
.
L
A
N
D
U
S
E
A
C
T
I
O
N
A
P
P
E
A
L
S
,
R
E
Q
U
E
S
T
F
O
R
R
E
C
O
N
S
I
D
E
R
A
T
I
O
N
,
&
E
X
P
I
R
A
T
I
O
N
:
I
T
h
e
a
d
m
i
n
i
s
t
r
a
t
i
v
e
l
a
n
d
u
s
e
d
e
c
i
s
i
o
n
w
i
l
l
b
e
c
o
m
e
f
i
n
a
l
i
f
t
h
e
d
e
c
i
s
i
o
n
i
s
n
o
t
a
p
p
e
a
l
e
d
w
i
t
h
i
n
1
4
d
a
y
s
o
f
t
h
e
d
e
c
i
s
i
o
n
d
a
t
e
.
A
P
P
E
A
L
:
T
h
i
s
a
d
m
i
n
i
s
t
r
a
t
i
v
e
l
a
n
d
u
s
e
d
e
c
i
s
i
o
n
w
i
l
l
b
e
c
o
m
e
f
i
n
a
l
i
f
n
o
t
a
p
p
e
a
l
e
d
i
n
w
r
i
t
i
n
g
t
o
t
h
e
H
e
a
r
i
n
g
E
x
a
m
i
n
e
r
o
n
o
r
b
e
f
o
r
e
5
:
0
0
P
M
o
n
F
e
b
r
u
a
r
y
1
6
t
h
,
2
0
1
8
.
A
n
a
p
p
e
a
l
o
f
t
h
e
d
e
c
i
s
i
o
n
m
u
s
t
b
e
f
i
l
e
d
w
i
t
h
i
n
t
h
e
1
4
-
d
a
y
a
p
p
e
a
l
p
e
r
i
o
d
(
R
C
W
4
3
.
2
1
.
C
.
0
7
5
(
3
)
;
W
A
C
1
9
7
-
1
1
-
6
8
0
)
,
t
o
g
e
t
h
e
r
w
i
t
h
t
h
e
r
e
q
u
i
r
e
d
f
e
e
t
o
t
h
e
H
e
a
r
i
n
g
E
x
a
m
i
n
e
r
,
C
i
t
y
o
f
R
e
n
t
o
n
,
1
0
5
5
S
o
u
t
h
G
r
a
d
y
W
a
y
,
R
e
n
t
o
n
,
W
A
9
8
0
5
7
.
R
M
C
4
-
8
-
1
1
0
.
6
g
o
v
e
r
n
s
a
p
p
e
a
l
s
t
o
t
h
e
H
e
a
r
i
n
g
E
x
a
m
i
n
e
r
a
n
d
a
d
d
i
t
i
o
n
a
l
i
n
f
o
r
m
a
t
i
o
n
r
e
g
a
r
d
i
n
g
t
h
e
a
p
p
e
a
l
p
r
o
c
e
s
s
m
a
y
b
e
o
b
t
a
i
n
e
d
f
r
o
m
t
h
e
C
i
t
y
C
l
e
r
k
’
s
O
f
f
i
c
e
,
(
4
2
5
)
4
3
0
-
6
5
1
0
.
A
p
p
e
a
l
s
o
f
S
h
o
r
e
l
i
n
e
S
u
b
s
t
a
n
t
i
a
l
D
e
v
e
l
o
p
m
e
n
t
P
e
r
m
i
t
i
s
s
u
a
n
c
e
m
u
s
t
b
e
m
a
d
e
d
i
r
e
c
t
l
y
t
o
t
h
e
S
h
o
r
e
l
i
n
e
s
H
e
a
r
i
n
g
s
B
o
a
r
d
.
A
p
p
e
a
l
s
a
r
e
m
a
d
e
b
y
f
i
l
i
n
g
a
r
e
q
u
e
s
t
i
n
w
r
i
t
i
n
g
w
i
t
h
i
n
t
h
e
t
w
e
n
t
y
-
o
n
e
(
2
1
)
d
a
y
s
o
f
r
e
c
e
i
p
t
o
f
t
h
e
f
i
n
a
l
o
r
d
e
r
a
n
d
c
o
n
c
u
r
r
e
n
t
l
y
f
i
l
i
n
g
c
o
p
i
e
s
o
f
s
u
c
h
r
e
q
u
e
s
t
w
i
t
h
t
h
e
W
a
s
h
i
n
g
t
o
n
S
t
a
t
e
D
e
p
a
r
t
m
e
n
t
o
f
E
c
o
l
o
g
y
a
n
d
t
h
e
A
t
t
o
r
n
e
y
G
e
n
e
r
a
l
’
s
o
f
f
i
c
e
a
s
p
r
o
v
i
d
e
d
i
n
s
e
c
t
i
o
n
1
8
(
1
)
o
f
t
h
e
S
h
o
r
e
l
i
n
e
s
M
a
n
a
g
e
m
e
n
t
A
c
t
o
f
1
9
7
1
.
A
l
l
c
o
p
i
e
s
o
f
a
p
p
e
a
l
n
o
t
i
c
e
s
s
h
a
l
l
a
l
s
o
b
e
f
i
l
e
d
w
i
t
h
t
h
e
C
i
t
y
o
f
R
e
n
t
o
n
P
l
a
n
n
i
n
g
D
i
v
i
s
i
o
n
a
n
d
t
h
e
C
i
t
y
C
l
e
r
k
’
s
o
f
f
i
c
e
.
E
X
P
I
R
A
T
I
O
N
:
T
h
e
C
o
n
d
i
t
i
o
n
a
l
U
s
e
P
e
r
m
i
t
d
e
c
i
s
i
o
n
w
i
l
l
e
x
p
i
r
e
t
w
o
(
2
)
y
e
a
r
s
f
r
o
m
t
h
e
d
a
t
e
o
f
d
e
c
i
s
i
o
n
.
A
s
i
n
g
l
e
t
w
o
(
2
)
y
e
a
r
e
x
t
e
n
s
i
o
n
m
a
y
b
e
r
e
q
u
e
s
t
e
d
p
u
r
s
u
a
n
t
t
o
R
M
C
4
-
9
-
0
3
0
.
U
n
l
e
s
s
a
d
i
f
f
e
r
e
n
t
t
i
m
e
p
e
r
i
o
d
i
s
s
p
e
c
i
f
i
e
d
i
n
t
h
e
s
h
o
r
e
l
i
n
e
p
e
r
m
i
t
a
s
a
u
t
h
o
r
i
z
e
d
b
y
R
C
W
9
0
.
5
8
.
1
4
3
a
n
d
s
u
b
s
e
c
t
i
o
n
i
i
o
f
R
M
C
4
-
9
-
1
9
0
,
c
o
n
s
t
r
u
c
t
i
o
n
a
c
t
i
v
i
t
i
e
s
,
o
r
a
u
s
e
o
r
a
c
t
i
v
i
t
y
,
f
o
r
w
h
i
c
h
a
p
e
r
m
i
t
h
a
s
b
e
e
n
g
r
a
n
t
e
d
p
u
r
s
u
a
n
t
t
o
S
R
_
S
h
o
r
e
l
i
n
e
M
a
n
a
g
e
m
e
n
t
P
e
r
m
i
t
_
1
8
0
1
3
1
_
v
3
_
F
I
N
A
L
City of Renton Department of Community & Economic Development Administrative Report & Decision
VERIZON SEA CLASSICS LUA17-000869
February 2, 2018 Page 18 of 18
SR_Shoreline Management Permit_180131_v3_FINAL
this Master Program must be commenced within two (2) years of the effective date of a shoreline permit, or the
shoreline permit shall terminate, and a new permit shall be necessary. However, the Planning Division may
authorize a single extension for a period not to exceed one year based on reasonable factors, if a request for
extension has been filed with the Planning Division before the expiration date, and notice of the proposed
extension is given to parties of record and the Washington State Department of Ecology. DEFINITION OF
COMMENCEMENT OF CONSTRUCTION ACTIVITIES: the construction applications must be submitted, permits
must be issued, and foundation inspections must be completed before the end of the two (2) year period.
THE APPEARANCE OF FAIRNESS DOCTRINE: provides that no ex parte (private one-on-one) communications
may occur concerning the land use decision. The Doctrine applies not only to the initial decision, but to Appeals
to the Hearing Examiner as well. All communications after the decision/approval date must be made in writing
through the Hearing Examiner. All communications are public record and this permits all interested parties to
know the contents of the communication and would allow them to openly rebut the evidence in writing. Any
violation of this doctrine could result in the invalidation of the appeal by the Court.