Loading...
HomeMy WebLinkAboutCM_Prelim Construction _180104_v1 9725 3rd Ave NE, Suite 410, Seattle, WA 98115 CONSTRUCTION MITIGATION Project: SEA Classics - Verizon Project Location: 2003 Maple Valley Highway Parcel: 172305-9103 Zoning: COR – Commercial Office Residential Urban Design District C Adjacent roadway: Maple Valley Highway (SR 169) – 40 MPH Proposal: Verizon is proposing to construct an unmanned telecommunications facility on the rooftop of an existing two-story commercial office building. The existing parking lots will be utilized for construction staging and execution. Construction Dates: Current forecast is for work to occur approximately between 7/17/18-8/14/18. Hours/Days of Operation: The wireless site will be on-air 24/7, once constructed. It is a passive use, and unstaffed except for an occasional technician visit, 1-2x per month on average. Proposed Hauling/Transportation Routes: The construction access will be via the existing driveways leading to the property, from Maple Valley Highway. Construction debris will be minimal, as the proposed project is the installation of wireless equipment on a rooftop, not building demolition. Off-site warehousing locations for the proposed wireless equipment and shroud materials is TBD, as is the contractor assignment. Measures to Minimize Construction Impacts: The project is of short duration and is not anticipated to generate mud, erosion, or substantial noise that would impact adjacent properties. The construction will most likely occur on weekends or in the evening to minimize impact on the existing building tenants, preserve tenant parking in the on-site parking lot, and minimize impact on the Maple Valley Highway commuting hours. Construction Hours: Due to the presence of existing business tenants at the property, the construction will most likely be scheduled for the weekends and/or evenings after business hours. Hours are expected to be subject to City input regarding noise ordinances and project approval conditions. Weekend and evening construction hours are not expected to impact adjacent property uses. RECEIVED 01/04/2018 amorganroth PLANNING DIVISION 9725 3rd Ave NE, Suite 410, Seattle, WA 98115 Traffic Control: The location of the construction is not in right-of-way, and is more than 15 feet from the edge of the roadway. Staging and parking for construction machinery and vehicles will be in the parking lot adjacent to the office building, on private property. Project Contact: Becky Todd MD7 on behalf of Verizon Wireless 206-310-1793 btodd@md7.com 9725 3rd Ave NE, Suite 410 Seattle, WA 98115