Public Works Department
Memorandum
DATE:
TO:
FROM:
STAFF CONTACT:
SUBJECT:
June 11, 2024
Martin Pastucha, Administrator
Michael Stenhouse, Maintenance Services Director
Jayson Grant, Pavement Management Tech
Change Order 1 to CAG-24-091 with Moriarty Enterprises/Macon
Fence for the Handrail/Fencing Replacement Project
Attached for your signature is Change Order 1 to CAG 24-091 with Moriarty Enterprises/Macon
Fence to change the 90 days from the effective date in the original contract to 120 working days.
CAG-24-091, Adden #1-24
Docusign Envelope ID: B13B1DD1-C0CE-40B2-AC27-E3A059DF68A3
Change Order No. 1
Contract Title: Handrail/Fencing Replacement
Contractor:Moriarty Enterprises/Mocon Fence
Contract No.: CAG 24-091 ----------------------------Feder a I Aid No.: n/a -'----------------------------
J r2l Ordered by Engineer □Proposed by the Contractor (VECP}□Unilateral
Original Contract:
Current Contract:
Estimated Net Change This Order:
New Contract:
Prepared By:
N/A
Resident Engineer Date
Reviewed By:
N/A
Engineer of Record Date
D Force Account
0 Bid Item □Bid Item Price Adjustment□Lump Sum
Amount Working Days
$25,618.29
$25,618.29
$0.00
$25,618.29
I
lssuedB
�
�� aintenance Services Director
c)b-ll-;1-V
Consent By:
N/A
Surety (Greater than 25% cost and/or 20%
time increase)
Date
Date
Endorsed By:
��---=:;�-�--�11 -_J _/ r -=-l,t),A �?2� �e/zf
Reviewed By:
City Attorney
Change Order No.
Contract Title:
Contract No.
#1
Date Contractor Date
Date
Executed By: laDocuSigned by: l Martin Pastucha 7 ;17 ;2024 1 4: os PM Pc
------"--88il34.J4W988449 . .....__ ______ _ City of Renton Public Works Date
Administrator/ Mayor
Handrail/Fencing Replacement
CAG 24-091
Page 1 of 3
Approved by Cheryl Beyer via email 6/13/2024
Docusign Envelope ID: 81381 DD1-C0CE-4082-AC27-E3A059DF68A3
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change: when the original contract was awarded to Moriarty Enterprises/Macon Fence CAG-
24-091 the terms of the Agreement were written no later than 90 days from the Effective date.
Measurement:
Payment:
Reason for Change: change the 90 days from the effective date in the original contract to 120 working days.
Affects DBE Work: D Yes 181 No
Explain how this Change Order affects DBE work.
Materials:
List of materials with specification for each.
Plans:
List plan sheet numbers, if any.
Equitable Adjustment:
This Change Order does/does not include an equitable adjustment per Section 1-09.4 of the 2023
WSDOT/APWA Standard Specifications. See attached.
Extension of Time:
The Time for Completion is extended __ Working Days.
Change Order No.
Contract Title:
Contract No.
IH
Handrail/Fencing Replacement
CAG 24-091
Page 2 of 3