Loading...
HomeMy WebLinkAboutAddendum - 1Docusign Envelope ID: B13B1DD1-C0CE-40B2-AC27-E3A059DF68A3 Public Works Department Memorandum DATE: TO: FROM: STAFF CONTACT: SUBJECT: June 11, 2024 Martin Pastucha, Administrator Michael Stenhouse, Maintenance Services Director Jayson Grant, Pavement Management Tech Change Order 1 to CAG-24-091 with Moriarty Enterprises/Macon Fence for the Handrail/Fencing Replacement Project Attached for your signature is Change Order 1 to CAG 24-091 with Moriarty Enterprises/Macon Fence to change the 90 days from the effective date in the original contract to 120 working days. CAG-24-091, Adden #1-24 Docusign Envelope ID: B13B1DD1-C0CE-40B2-AC27-E3A059DF68A3 Change Order No. 1 Contract Title: Handrail/Fencing Replacement Contractor:Moriarty Enterprises/Mocon Fence Contract No.: CAG 24-091 ----------------------------Feder a I Aid No.: n/a -'---------------------------- J r2l Ordered by Engineer □Proposed by the Contractor (VECP}□Unilateral Original Contract: Current Contract: Estimated Net Change This Order: New Contract: Prepared By: N/A Resident Engineer Date Reviewed By: N/A Engineer of Record Date D Force Account 0 Bid Item □Bid Item Price Adjustment□Lump Sum Amount Working Days $25,618.29 $25,618.29 $0.00 $25,618.29 I lssuedB � �� aintenance Services Director c)b-ll-;1-V Consent By: N/A Surety (Greater than 25% cost and/or 20% time increase) Date Date Endorsed By: ��---=:;�-�--�11 -_J _/ r -=-l,t),A �?2� �e/zf Reviewed By: City Attorney Change Order No. Contract Title: Contract No. #1 Date Contractor Date Date Executed By: laDocuSigned by: l Martin Pastucha 7 ;17 ;2024 1 4: os PM Pc ------"--88il34.J4W988449 . .....__ ______ _ City of Renton Public Works Date Administrator/ Mayor Handrail/Fencing Replacement CAG 24-091 Page 1 of 3 Approved by Cheryl Beyer via email 6/13/2024 Docusign Envelope ID: 81381 DD1-C0CE-4082-AC27-E3A059DF68A3 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: when the original contract was awarded to Moriarty Enterprises/Macon Fence CAG- 24-091 the terms of the Agreement were written no later than 90 days from the Effective date. Measurement: Payment: Reason for Change: change the 90 days from the effective date in the original contract to 120 working days. Affects DBE Work: D Yes 181 No Explain how this Change Order affects DBE work. Materials: List of materials with specification for each. Plans: List plan sheet numbers, if any. Equitable Adjustment: This Change Order does/does not include an equitable adjustment per Section 1-09.4 of the 2023 WSDOT/APWA Standard Specifications. See attached. Extension of Time: The Time for Completion is extended __ Working Days. Change Order No. Contract Title: Contract No. IH Handrail/Fencing Replacement CAG 24-091 Page 2 of 3