Loading...
HomeMy WebLinkAboutP_Tree_Removal_Restore_Plans_R2B_CA_171128_v1ATTACHMENT 5 – TREE REMOVAL AND RESTORATION PLAN SHEET OF SHEETS CONTRACT NO. JOB NUMBER WASH10 STATEREGION NO. LOCATION NO. P.E. STAMP BOX P.E. STAMP BOX ENTERED BY PROJ. ENGR. REVISION BYREGIONAL ADM. DESIGNED BY TIME DATE DATEDATE FED.AID PROJ.NO. CHECKED BY DATE $$$$$$$$DESIGNFILENAME$$$$$$ $TIME$ $$$$DATE$$$ PLOTTED BY$$USERNAME$$ INTERSTATE 405Project Team Washington State Department of Transportation $ T I M E $ $ $ U S E R N A M E $ $ $ $ $ $ D A T E $ $ $ FILE NAME: $ $ $ $ $ $ $ $ D E S I G N F I L E N A M E $ $ $ $ $ $ 100 200 SCALE IN FEET 0 4020 SCALE IN FEET 0 R R R R R R V MS RR RR RR R R R R R R T RR R R R R R R R R R R R R M B M B M B ? ? MBMB M BMBMBMBMBMBMB MB T T MB M B MB M B MB MB MB MB U U U U U U U U U U U U UU U U U U U U U U U U U U U U U U U UU UU U U U U U U U U U U U U U U UU U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U UU UU U U U U U U U U U U U U U U U U U U U U U U U UU U U UU U U U U U U U U U U U U U U U U UU U U U U U U U U UU UU U U C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C CC C C C C C C C C C C C C C C C C C C C C CC C C C C C C C C C C C C C C C C C C P P P P P P P P P P P P P PPP P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P MB MB MB MB MB MB MB MB MB MB MB MB MBMB MB UOBJUOBJ UOBJ UOBJ UOBJ UOBJ UOBJ UOBJ UOB J UOBJ UOBJ UOBJ UOBJ UOBJ UOBJ UOBJUOBJ UUU U U U U U U UU U U U U U U U U U U U U U U UUU UUU UU U U U UU U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U UU U U P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P S S W S S V M S U P P P P P P P U U P P U UU U UU U P U U UU P U U U U U U O BJ P U U U U U UO BJ P CV P BP B T CV PB T T CV CV PB CV CV V M S CV T PB PB PB + WL 4.1R-NJ WL 3.05R C E D A R R I V E R C E D A R RI V E R T R AI L C E D A R R I V E R T R A I L MUSEUM CITY OF RENTON S H A RI' S APARTMENTSMONTEREY HEALTHGROUP I N N S I L V E R C L O U D LIBERTY PARK SAM'S CLUB CITY HALLRENTON PARK CEDAR RIVER P A R K C E D A R RI V E R CARCO CENTER CENTER RENTON COMMUNITY SB I-405 OFF RAMP NB I-405 TO 169 N B I- 4 0 5 T O 1 6 9 NB I-405 ON RAMP NB I-405 SB I-405 S R 1 6 9 / M A P L E V A L L E Y H W Y H O U S E R W Y S HOUSER WY S WELLS AVE S B E A C ON W A Y S CEDAR AVE S CEDAR AVE S S G R AD Y W AY SUNSET BLVD HOUSER WAY N. 4 T H S T FACTORY AVE N. 3 R D S T HOUSER WAY N E 3 R D S T SUNSET BLVD F A C T O R Y P L N MAIN AVE S RENTON AVE S MILL AVE S VERMONT PL S 5 T H S T BENSON RD S S. 6TH ST 108TH AVE CEDAR AVE S S 4 T H S T M ILL AV E S RENTON AVE S S 3 R D S T R D K R A P R EVIR RA D E C N Y A W N O S N O R B N Y A W N O SN O R B N DVLB TESNUS SUNSET BLVD B R O N S O N W A Y N E C E DA R R I V E R MP 3.05 MP 3.10 MP 3.15 MP 3.20 MP 3.25 MP 3.30 MP 3.35 MP 3.40 MP 3.45 MP 3.50 MP 3 .55 M P 3. 6 0 M P 3. 6 5 M P 3. 7 0 M P 3 . 7 5 MP 3.80 MP 3.85 MP 3.90 MP 3.95 MP 4.00 MP 4.05 MP 4.10 MP 4.15 MP 4.20 MP 4.25 MP 4.30 MP 4.35 4 PAGE 4 SUMMARY TOTAL PLANTING AREAS: 4.04 ACRES PLANTING AREAS IN MASTER PLAN: 2.69 ACRES NEW PLANTING AREAS: .66 ACRES RESTORATION PLANTING AREAS: .69 ACRESRENTON TO BELLEVUE CONCEPTUAL LANDSCAPE PLANS C. BRENNAN B. ELROD PLANTING AREA POTENTIAL NEW PLANTING AREA POTENTIAL RESTORATION TREE REMOVAL AREA WITHIN MASTER PLAN POTENTIAL PLANTING TREE REMOVAL AND RESTORATION PLAN ... irn-R�E ---- j NTON TO BELLEVUE � : PACCAR BUILDINGS ::.1 ·- . - -....... FILE NAME• $$$ TIME • $Tl:::$$0ES1GNFILENAME$$$$$$ DATE UUOATEUS PLOTTED BYHUSERNA DESIGNED BY C. BREN:�· ENTERED BY CHECKED BY B.ELROD PROJ. ENGR. REGIONAL ADM. REVISI°" DATE BY ,/ __________________ ., ...... ----� [? CJ D D CJ � ---= " I I ' FED.AID PROJ.NO. - I - I - - TREE REMO V AL AREA POTENTIAL NEW PL ANT IN G AREA POTENTIAL R PL ANT IN G AR ��TORATION POTENTIAL PL ANTIN G W IT H IN MA STER PL AN SH[ETS TREE REMOVAL AND RESTORATION PLAN SHEET OF SHEETS CONTRACT NO. JOB NUMBER WASH10 STATEREGION NO. LOCATION NO. P.E. STAMP BOX P.E. STAMP BOX ENTERED BY PROJ. ENGR. REVISION BYREGIONAL ADM. DESIGNED BY TIME DATE DATEDATE FED.AID PROJ.NO. CHECKED BY DATE $$$$$$$$DESIGNFILENAME$$$$$$ $TIME$ $$$$DATE$$$ PLOTTED BY$$USERNAME$$ INTERSTATE 405Project Team Washington State Department of Transportation $ T I M E $ $ $ U S E R N A M E $ $ $ $ $ $ D A T E $ $ $ FILE NAME: $ $ $ $ $ $ $ $ D E S I G N F I L E N A M E $ $ $ $ $ $ 100 200 SCALE IN FEET 0 4020 SCALE IN FEET 0 P C C P P M B M B M B M B MB C C U U PPMBMB M B M B C P P P U U U M B PM B M B U M B M B M B M B M B M B M B M B U M B P P P U P P P MB U T C MB S T T C C U U U C C C U U U U U U U C C C U U U U U U C U U U U U U P P M B M B M B M B M B P M B M B P U U U U P P P M B M B M B M B U U U U P P M B M B M B P M B M B M B M B U P M B M B M B M B P P MBMB U P P M B M B P P MB MB MB U U U U U U U U U U U U M B M B P P P P PMB MB P MB MB P C C U U U M B P M B M B M B M B P T C M B P U U U U U U U M B M B M B M B P M B P M B M B M B M B M B M B P U U U U U U U U U U U P M B M B M B P P P P P M B M B M B M B M B M B M B C C U U U MB U MB MB P U U U U U U C C C C C C U U U U U MB M B M B M B MB MB M B M B M B U U U U U U U U U U U U U U U U U U U U U U CC C C C CC C C C C C C P P P P P P P P P P P P P P P P P P P P P P B U S B U S B U S O N L Y O N L Y O N L Y + + + CLOVER CREEK SCHOOL ELEMENTARY KENNEYDALE SB I-405 ON RAMP SB I -4 0 5 OFF RAMP NB I-405 OFF RAMP NB I-405 ON RAMP SB I-405 NB I-405 MEADOW AVE N. N 3 2 N D S T N 2 6 T H S T HIGH AVE NE N 3 6 T H S T N E 2 4 T H S T N 3 4 T H S T JONES AVE NE MEADOW PL N N E 3 0 T H S T N E 2 8 T H S T N E 2 7 T H C T JONES AVE NE N E 2 8 T H S T KENNEWICK PL NE N E 3 0 T H S T MEADOW PL N N 2 4 T H S T CLOVER CREEK MAY CREEK MP 5.65 MP 5.70 MP 5.75 MP 5.80 MP 5.85 MP 5.90 MP 5.95 MP 6.00 MP 6.05 MP 6.10 MP 6.15 MP 6.20 MP 6.25 MP 6.30 MP 6.35 MP 6.40 MP 6.45 MP 6.50 MP 6.55 MP 6.60 MP 6.65 MP 6.70 MP 6.75 MP 6.80 MP 6.85 NB405-NE30TH LINE NE30TH-SB405 LINE NB405 LINE SB405 LINE 14' NE30TH-NB405 LINE NB405 -NE30TH L INE 15' 8' 6 PAGE 6 SUMMARY TOTAL PLANTING AREAS: 4.04 ACRES PLANTING AREAS IN MASTER PLAN: 3.16 ACRES NEW PLANTING AREAS: 1.57 ACRES RESTORATION PLANTING AREAS: .2 ACRES RENTON TO BELLEVUE CONCEPTUAL LANDSCAPE PLANS B. ELROD C. BRENNAN PLANTING AREA POTENTIAL NEW PLANTING AREA POTENTIAL RESTORATION TREE REMOVAL AREA WITHIN MASTER PLAN POTENTIAL PLANTING . \ . . 1 \ '' . D FILE NAME: $$$$$$$$OES1GNFILENAME$$$$$$ TIME $TIME$ FED.AID PROJ.NO. - I - I -m 0• TREE REMOVAL AREA POTENTIAL NEW PLANTING AREA POTENTIAL RESTORATION PLANTING AREA POTENTIAL PLANTING WITHIN MASTER PLAN .. \ l C [ * DATE ""°'""' w RENTON TO BELLEVUE PLDTTEOBYHUSERNAMEH e; DESIGNED 8Y C. BRENNAN � EN,ESED s, ll __ �c�o�N�C�E�P�T�LJ�A�L-�L�A�N�O�S:C�A�P:E��P:L�A�N�S�----L ___________________________________________________________________________________ :_·�-�-��·-�-�oa�r'�J�!:;r;1:!!f�t��:�D�M.8;·�"�R�O�O ====:t====:i .. iii,,iis,�""c====5•i!•!!iTEd�BYil_ __ _J ______ J_ __ �,.,,,-.;.;;::·'.'.:·=L---"MC!·"!!!-e!•!!!!.....:·:::·_J _________ _L ______________ �---SH[ETS SHEET OF SHEETS CONTRACT NO. JOB NUMBER WASH10 STATEREGION NO. LOCATION NO. P.E. STAMP BOX P.E. STAMP BOX ENTERED BY PROJ. ENGR. REVISION BYREGIONAL ADM. DESIGNED BY TIME DATE DATEDATE FED.AID PROJ.NO. CHECKED BY DATE $$$$$$$$DESIGNFILENAME$$$$$$ $TIME$ $$$$DATE$$$ PLOTTED BY$$USERNAME$$ INTERSTATE 405Project Team Washington State Department of Transportation $ T I M E $ $ $ U S E R N A M E $ $ $ $ $ $ D A T E $ $ $ FILE NAME: $ $ $ $ $ $ $ $ D E S I G N F I L E N A M E $ $ $ $ $ $ 100 200 SCALE IN FEET 0 4020 SCALE IN FEET 0 U P P P P MBP C C C U P U C C S T T C C U U U C U U U C U P P U U P P P P P C P P P P P P P P P P P P P U MB P P U P P P T MBMB MB C MB C C MBMB U P P P P U P CCC V M S P P P P P P P UU P P MB MB CC P P P U U U U U C U U U U C U U MBMB MB MBMB P P P P P P U P U U C P P P U U P P P U U P P MBMB P P P P P P U M B M B P P P M B M B C H PB PB PB PB T CV PB PB T 1-24371 1-24372 1-24373 1-24374 1-24375 1-24376 1-24390 1-24391 1-43492 1-24393 1-24394 1-24395 1-24396 1-24397 + W L 9. 3 R W L 9. 3 2 R W L 8. 6 R W L 8. 5 L WL 8.44L W L 9. 2 R W L 8. 4 L WL 8.2R WL 8.8L WL 8.75L D-9.0L D- 8. 9 L D-8.7L D-8.6L D-8.2L D-8.4L S T R E A M 8 . 7 LAKEHURST CREEKS T R E A M 8 . 2 2 S T R E A M 8. 3 5 S T R E A M 8 . 5 5 S T R E A M 8 . 6 S T R E A M 8. 7 A S T R E A M 8 . 7 S T R E A M 8 . 9 L A K E H U R S T C R E E K PARK & RIDE NEWPORT HILLS NB I-405 SB I-405 SB I-405 NB I-405 SB I-405 ON RAMP N B I - 4 0 5 O F F R AM P SB I-405 NB I-405 SB I-405 OFF RAMP NB I-405 ON RAMP 116TH PL SE 106TH AVE SE LAKE WASH INGTON BLVD SE 106TH AVE SE 110TH AVE SE 109TH AVE SE S E 6 1 S T S T SE 66TH ST RIPLEY LN N HAZELWOOD LN SE S E 6 2 N D S T HAZELWOOD LN SE P L E A S U R E P O I N T L N S E 106TH AVE SE L A K E W A S H I N G T O N B L V D S E SE 50TH PL EASTSIDE RAIL CORRIDOR E A S T S I D E R A I L C O R R I D O R LAKEHURST CREEK S T R E A M 8 . 7 S T R E A M 8 . 4 S T R E A M 8 .7 MP 8.20 MP 8.25 MP 8.30 MP 8.35 MP 8.40 MP 8.45 MP 8.50 MP 8.55 MP 8.60 MP 8.65 MP 8.70 MP 8.75 MP 8.80 MP 8.85 MP 8.90 MP 8.95 MP 9.00 MP 9.05 MP 9.10 MP 9.15 MP 9.20 MP 9.25 MP 9.30 MP 9.35 MP 9.40 8 PAGE 8 SUMMARY TOTAL PLANTING AREAS: 5.57 ACRES PLANTING AREAS IN MASTER PLAN: 0 ACRES NEW PLANTING AREAS: .61 ACRES RESTORATION PLANTING AREAS: 4.96 ACRES TOTAL TREES REMOVED: 117RENTON TO BELLEVUE CONCEPTUAL LANDSCAPE PLANS B. ELROD C. BRENNAN PLANTING AREA POTENTIAL NEW PLANTING AREA POTENTIAL RESTORATION TREE REMOVAL AREA WITHIN MASTER PLAN POTENTIAL PLANTING SHEET OF SHEETS CONTRACT NO. JOB NUMBER WASH10 STATEREGION NO. LOCATION NO. P.E. STAMP BOX P.E. STAMP BOX ENTERED BY PROJ. ENGR. REVISION BYREGIONAL ADM. DESIGNED BY TIME DATE DATEDATE FED.AID PROJ.NO. CHECKED BY DATE $$$$$$$$DESIGNFILENAME$$$$$$ $TIME$ $$$$DATE$$$ PLOTTED BY$$USERNAME$$ INTERSTATE 405Project Team Washington State Department of Transportation $ T I M E $ $ $ U S E R N A M E $ $ $ $ $ $ D A T E $ $ $ FILE NAME: $ $ $ $ $ $ $ $ D E S I G N F I L E N A M E $ $ $ $ $ $ 100 200 SCALE IN FEET 0 4020 SCALE IN FEET 0 U U U P P C P C C C U U U U U U U U U U U U U U U U U U U U U U U U U U P P P MBM B MBM B MB U U U MB P P P U U P P MB P U U MB P P U U U C CC P C C U U MB MB U P MB U U MB U U U U M B MB M B MB MB P P C P P P P C C P P MB PP P P P P P P P U C P P U U U U U C C MB U U U U U U MB U U MB P P C M B M B U MB MB MB P C FLUME C C U P P M B M B M B MB MB MB C C C U U C C U U U U P P U U U U U U U U U M B MB MB MB MB U P P P P P MB MB P U U U MB MB U U U U U C U M B M B M B P MB U P P P U P P P P P MB C U U U U U U U C U P P M B U U U UU U P P P P P U U U U U U U U P P S T T U C C S T T U C C U P M B P P MB CC P P P P P MB C C C C C M B P P P U C C P U U C C P P U U P P M B M B M B M B H A R PB TT CV PB PB T PB CV P B CV T T P B PB C V CV PB PB CV V M S PB T T T T 1-24398 1-24399 1-24415 1-24416 1-24417 1-24419 1-24418 TO C ITY FOR REL INQU ISHMENT TURNBACK L INE WL 10.01R W L 1 0. 0 L W L 1 0. 1 6 L W L 1 0. 0 5 R W L 9. 6 8 L W L 1 0. 2 5 L- B W L 1 0. 2 5 L- A W L 9. 8 2 L W L 9. 8 3 L WL 9.5L D-10.3L-A D-10.3L-B S T R E A M 9 . 9 STREAM 9.9 STREAM 9.9 COAL CREEK C O A L C R E E K STREAM 10.0 S T R E A M 1 0 . 0 W L 1 0. 1 2 R N E W P O R T C R E E K B ICY C L E P A T H B ICYCLE PATH SB I-405 NB I-405 SB I-405 NB I-405 S B I-405 N B I-405 COAL CREEK PKWY SE 1 0 6 T H A V ELAKE WASHINGTON BLVD SE DECATUR KEY 122ND AVE SE S E 4 2 N D C T S E 4 2 N D S T S E 4 O T H L N 120TH AVE SE 119T H A VE SE LAKE WASHINGTON BLVD SE 120TH AVE SE 122ND AVE SE S E 3 9 T H S T 116TH AVE SE BAGLEY LN LK WASHINGTON BLVD SE CASCADE KEY 4 6 T H S T S E 1 1 6 T H A V E S E 4 5 T H P L S E C O A L C R E E K P K W Y S E E AS TSI D E R AIL C O R RI D O R EASTSIDE RAIL CORRIDOR EASTSIDE RAIL CORRIDOR EASTSIDE RAIL CORRIDOR CREEK C O A L STREAM 9.9 S T R E A M 9 .8 S T R E A M 9 .8 +++++++++++++++++++++++ MP 9.45 MP 9.50 MP 9.55 MP 9.60 MP 9.65 MP 9.70 MP 9.75 M P 9 .8 0 M P 9. 8 5 M P 9.90 MP 9.95 MP 10.00 MP 10.05 M P 1 0. 1 0 M P 1 0. 1 5 MP 10 . 20 MP 10.25 MP 10.30 MP 10.35 MP 10.40 MP 10.45 MP 10.50 MP 10.55 MP 10.60 MP 10.65 MP 10.70 MP 10.75 SB405-CC LINE SB405 LINE NB405 LINE S E 4 2 N D C T 9 PAGE 9 SUMMARY TOTAL PLANTING AREAS: .84 ACRES PLANTING AREAS IN MASTER PLAN: .21 ACRES NEW PLANTING AREAS: 0 ACRES RESTORATION PLANTING AREAS: .63 ACRES RENTON TO BELLEVUE CONCEPTUAL LANDSCAPE PLANS B. ELROD C. BRENNAN PLANTING AREA POTENTIAL NEW PLANTING AREA POTENTIAL RESTORATION TREE REMOVAL AREA WITHIN MASTER PLAN POTENTIAL PLANTING SHEET OF SHEETS CONTRACT NO. JOB NUMBER WASH10 STATEREGION NO. LOCATION NO. P.E. STAMP BOX P.E. STAMP BOX ENTERED BY PROJ. ENGR. REVISION BYREGIONAL ADM. DESIGNED BY TIME DATE DATEDATE FED.AID PROJ.NO. CHECKED BY DATE $$$$$$$$DESIGNFILENAME$$$$$$ $TIME$ $$$$DATE$$$ PLOTTED BY$$USERNAME$$ INTERSTATE 405Project Team Washington State Department of Transportation $ T I M E $ $ $ U S E R N A M E $ $ $ $ $ $ D A T E $ $ $ FILE NAME: $ $ $ $ $ $ $ $ D E S I G N F I L E N A M E $ $ $ $ $ $ 100 200 SCALE IN FEET 0 4020 SCALE IN FEET 0 U U U U U C C C C C C P P P P P M B M B P MB U U U C U U U U U C U U P P P P U U P U U P U U U U P C U U C U U U M B M B U U U U P U U P P P P P P P U C U U U U U T U U U U U U U U U U U U U P MB C C U P S T T C C C U VMS VMS VMS C C U C U U U U U C P P P P P C C C C C P P M B C C P P P U P U U U U M B P P P C U U P P P U V M S U P MB P U U U U U U U U C P U P P P P U P C C U U P U C U U U C C MB P P U U U U M B C U U U M B M B C M B U U U C MB P P P P P C U U U U U U CC C C U U U C C M B P P P P P U U U P P P P P P P U U U U U P P P M B P P M B M B P U U U C P C M B M B M B M B U U S T T U U U U U U U U U P S T T C C C C VMS VMS VMS S T T C P U U U U C C C U U U U U U U U U U U U C U C U U U U U U U U U C C C U U U U U U U U U U U C U U VMS VMS VMS VMS VMS V M S T PB PB PB T PB PB PB FTC CV PB PB PB PB PB TC PB PB PB PB PB PB P B P B P B T TCV FTC C V C H PB PB PB PB CV P B T T T PB T T T 1- 2 4 4 2 0 1- 2 4 4 2 1 1 - 2 4 4 2 2 1- 2 4 4 2 3 1- 2 4 4 2 4 1 - 2 4 4 3 1 1- 2 4 4 3 2 W L 1 0. 9 L W L 1 0. 8 L S T R E A M 1 1 . 5 5 NB I-405 SB I-405 SB I-405 NB I-405 E B I - 9 0 W B I - 9 0 E B I - 9 0 W B I - 9 0 S E 3 5 T H S T S E 3 2 N D S T S E 2 7 T H S T S E 2 6 T H S T 121ST AVE SE 11 8TH AVE SE S E 2 0 T H S T 1 2 4 T H A V E S E S E 3 8 T H S T 118TH AVE SE 120TH PL SE EASTSIDE RAIL CORRIDOR EASTSIDE RAIL CORRIDOR M P 10.7 5 M P 1 0. 8 0 M P 1 0. 8 5 M P 1 0. 9 0 M P 1 0 . 9 5 MP 11 . 00 MP 11.05 MP 11.10 MP 11.15 MP 11.20 MP 11.25 MP 11.30 MP 11.35 MP 11.40 MP 11.45 MP 11.50 MP 11.55 MP 11.60 MP 11.65 MP 11.70 MP 11.75 MP 11.80 MP 11.85 MP 11.90 MP 11 .95 M P 12 .0 0 NB405-E_90 LINE SB405 LINE NB405 LINE N B 4 0 5- E B 9 0 LI N E SB405-EB90 LINE NB405 LINE SB405 LINE K F N J K X F N V L S K V F S 10 RENTON TO BELLEVUE CONCEPTUAL LANDSCAPE PLANS B. ELROD C. BRENNAN TOTAL PLANTING AREAS: 5.91 ACRES PLANTING AREAS IN HIGH PRIORITY MASTER PLAN: 0.12 ACRES PLANTING AREAS IN MASTER PLAN: 1.85 ACRES NEW PLANTING AREAS: 2.82 ACRES RESTORATION PLANTING AREAS: .42 ACRES PAGE 10 SUMMARY PLANTING AREA POTENTIAL NEW PLANTING AREA POTENTIAL RESTORATION TREE REMOVAL AREA WITHIN MASTER PLAN POTENTIAL PLANTING SHEET OF SHEETS CONTRACT NO. JOB NUMBER WASH10 STATEREGION NO. LOCATION NO. P.E. STAMP BOX P.E. STAMP BOX ENTERED BY PROJ. ENGR. REVISION BYREGIONAL ADM. DESIGNED BY TIME DATE DATEDATE FED.AID PROJ.NO. CHECKED BY DATE $$$$$$$$DESIGNFILENAME$$$$$$ $TIME$ $$$$DATE$$$ PLOTTED BY$$USERNAME$$ INTERSTATE 405Project Team Washington State Department of Transportation $ T I M E $ $ $ U S E R N A M E $ $ $ $ $ $ D A T E $ $ $ FILE NAME: $ $ $ $ $ $ $ $ D E S I G N F I L E N A M E $ $ $ $ $ $ 100 200 SCALE IN FEET 0 4020 SCALE IN FEET 0 C P P U P U U P U P M B M B P U U P P U U P P C C C U U U P U U U P C U U U U C C P P U P U U P MB U C C C U U U U M B M B C U U U U C C U U U U U MB MB U U U U M B U U U U U U U U U U U M B M B C M B M B U U U U U M B M B M B P U C C C C C C C U U U U P C U U U C C P C U U U U C C C C U P CC C C P C C U U U U U U U U U C C C C U C C P U U U U U U C C U U C C C C C U U U U CC C U U U U U U U U U C C C C C C C C C C C U U U U U U U U U U U C C U U U C C C C P C MB U U U U U U U U U U U U U U U UC C C C C C U U U C C P U U U U U M B M B M B U U U U U P P P MB MB MB MB U C P C C C C C C C C ? ? P C C C U U U U U U U U U U U U C C C C C U U C CC C C C C U P U U U C C V MS C C C U P P U C C C C C C U P P C C P CC CC CCP U U P P P P P P P M B M B C C C C U U U P P C C C P P P P C T T T PB T H A R PB T PB PB T PB PB PB FTC T T CV PB T T CV PB PB T PB PB PB T TC PB TC PB PB CV PB PB PB T TC PB CVT T W L 1 2. 4 5 L W L 1 2 .8 2 R WL 13.25R WL 13.1L WL 13.0R M I T IG A T IO N 1 2. 4 L D-12.45L D -12.3 5L HIXSON CREEK K E LSE Y C R E E K N B I - 4 0 5 SB I-405 NB I-405 SB I -405 118TH AVE SE S E 6 T H S T 116TH AVE SE S E 8 T H S T S E 8 T H S T 118TH AVE SE 114TH AVE SE114TH AVE SE 12 1S T AV E SE SE 16TH PL S E 1 5 T H S T S E 1 4 T H S T 121ST AVE SE L A K E H I L L S C O N N E C T O R C R E E K T R A I L HIXSON CREEK K E L S E Y C R E E K M P 12 .0 0 M P 1 2. 0 5 M P 1 2. 1 0 M P 1 2. 1 5 M P 1 2. 2 0 M P 1 2. 2 5 M P 1 2. 3 0 MP 12 . 35 MP 12.40 MP 12.45 MP 12.50 MP 12.55 MP 12.60 MP 12.65 MP 12.70 MP 12.75 MP 12.80 MP 12.85 MP 12.90 MP 12.95 MP 13.00 MP 13.05 MP 13.10 MP 13.15 MP 13.20 NB405 LINENB405-E_RR LINE T R AI L- W LI N E SB405 L INE SB405 LINE NB405 LINE SE8-NB405 LINE 11 PAGE 11 SUMMARY TOTAL PLANTING AREAS: 2.04 ACRES PLANTING AREAS IN MASTER PLAN: .76 ACRES NEW PLANTING AREAS: 1.11 ACRES RESTORATION PLANTING AREAS: .17 ACRES RENTON TO BELLEVUE CONCEPTUAL LANDSCAPE PLANS B. ELROD C. BRENNAN PLANTING AREA POTENTIAL NEW PLANTING AREA POTENTIAL RESTORATION TREE REMOVAL AREA WITHIN MASTER PLAN POTENTIAL PLANTING SHEET OF SHEETS CONTRACT NO. JOB NUMBER WASH10 STATEREGION NO. LOCATION NO. P.E. STAMP BOX P.E. STAMP BOX ENTERED BY PROJ. ENGR. REVISION BYREGIONAL ADM. DESIGNED BY TIME DATE DATEDATE FED.AID PROJ.NO. CHECKED BY DATE $$$$$$$$DESIGNFILENAME$$$$$$ $TIME$ $$$$DATE$$$ PLOTTED BY$$USERNAME$$ INTERSTATE 405Project Team Washington State Department of Transportation $ T I M E $ $ $ U S E R N A M E $ $ $ $ $ $ D A T E $ $ $ FILE NAME: $ $ $ $ $ $ $ $ D E S I G N F I L E N A M E $ $ $ $ $ $ 100 200 SCALE IN FEET 0 4020 SCALE IN FEET 0 U C C C C C C C C C U U U U U C C C C C C ? C C C U U U U U U U U U C C C C C C C C C C C C CC U U U U U U U U U C C U U U U U U U U C C C C C U U U U U U U U U U U U U U U U U U U U U U C C C U C C C C C C C C U C C U U C C C C U U U U U U U U U U C C C C U U U C C U U U U U U U U U U C C C C C C U U U C C C C C C U U U U U U U U U U C C C C C C C C C P C C C C C C C U U U U P C U U U C C P C U U U U C C C C U P CC C C P C C U U U U U U U U U C C C C U C C P U U U U U U U U U U U U U U U C C P C C C U U C C C C C C C U U U U U U U C C U P C U C C C C C C C U U P U U U U U P U U U U U C C C C C C C C U U U U U U P C C S T T C P U UCCCC C C U P P C U U U U U U U U C U U U U U U U U U U C C C U U C C U U U U U U U U U ? C C U V M S C C C C C C C U U U U U U C C C C C P P C C C U C C U U U U U U U U U U U U U C U U U U U C U U U U U C C C P P P P C C U U U U U U U CC U U U C P U U U U U U U P P P U U U U U U U U U U U U U U U CC P P P P P P P U U U U U U U U U U U U C C C C C C C C P P P P C C C C U U U P P C C C C P P U U U U U U U C C C C C C C C P U U C U U U U U U U U U U C C CC C U U U U U U U U U C C C C C C C C C C C U U U U U U U U U U U C C U U U C C C C P C MB U U U U U U U U U U U U U U U UC C C C C C U U U C C P U U U U U M B M B M B U U U U U P P P MB MB MB MB U C P C C C C C C C C ? ? P U U U U U U U U U U C C C U P P T T T T T 148.608660BLDG.*148.598692 PVT.* A R E A U N D E R C O N S T R U C T I O N P A R K I N G A R E A O B S C U R E D A R E A S O B S C U R E D A R E A O p t o m e t r i s t s B e l l e v u e M e d i c a l C e n t e r O v e r l a k e H o s p i t a l M e d i c a l C e n t e r G r o u p H e a l t h B e l l e v u e T T T T P B PB PB PB PB P B CV CV CV CV CV C V E X I T E X I T T T C F T C T CV PB T PB T TC PB TC PB 1- 2 4 4 2 5 1- 2 4 4 2 6 1- 2 4 4 2 8 1- 2 4 4 2 7 1- 2 4 4 2 9 1- 2 4 4 3 0 4 6 .8 8 ' 29.84' WL 13.25R WL 13.1L WL 13.0R ST U RTE V A NT C REE K L I G H T R A I L S T A T I O N SB I -405 NB I - 4 0 5 NB I - 4 0 5 S E 6 T H S T 116TH AVE SE M A I N S T N E 4 T H S T 116TH AVE NE N E 8 T H S T N E 1 2 T H S T N E 6 T H S T STURTEVANT CREEK M A I N S T N E 4 T H S T 114TH AVE SE L A K E H I L L S C O N N E C T O R N E 1 2 T H S T N E 1 0 T H S T OPTOMETR ISTS BELLEVUE CENTER HOSP ITAL MED ICAL OVERLAKE CENTER OVERLAKE CH ILDB IRTH MP 12.85 MP 12.90 MP 12.95 MP 13.00 MP 13.05 MP 13.10 MP 13.15 MP 13.20 MP 13.25 MP 13.30 MP 13 .35 M P 13 .4 0 MP 13 .4 5 MP 13 .5 0 M P 13 .5 5 MP 13 .6 0 M P 13 .6 5 M P 13 .7 0 MP 13 .7 5 M P 13 .8 0 MP 13 .8 5 MP 13 .9 0 M P 13 .9 5 MP 14 .0 0 M P 14 .0 5 M P 14 .10 MP 14 .15 M P 14 .2 0 SB405 LINE NB405 LINE SE8-NB405 LINE SB405 LINE NB405 LINE NE4-SB405 LINE NB 40 5 -NE 4 L INE M A I N S T L I N E 12 B. ELROD C. BRENNAN RENTON TO BELLEVUE CONCEPTUAL LANDSCAPE PLANS PLANTING AREA POTENTIAL NEW PLANTING AREA POTENTIAL RESTORATION TREE REMOVAL AREA WITHIN MASTER PLAN POTENTIAL PLANTING Tree Impacts and Restoration – Preliminary Assessment May Creek Impacts to May Creek include: 0.41 acre of temporary stream buffer impact, 0.12 acre of permanent stream buffer impact, and 0.24 acre of temporary stream impact. Approximately 0.295 acre are proposed for restoration on-site. An estimated 33 trees will need to be removed, including two trees with a DBH greater than 30 inches. The species of impacted trees include: black cottonwood, red alder, Western red cedar, and Oregon ash. Gypsy Creek (Unnamed tributary (UNT) 08.LW.0283) Impacts to Gypsy Creek include: 0.073 acre of permanent conversion impact (modified to a non-habitat use), 0.105 acre of permanent stream buffer impact, and 0.11 acre of temporary stream buffer impact. Approximately 1.585 acres are proposed for restoration on-site. About 25 trees will need to be removed, including four trees with a DBH greater than 30 inches. The species of impacted trees include: bigleaf maple, hawthorn, Oregon ash, black cottonwood, and willow. Lake Washington at Ripley Lane Impacts to the site near Lake Washington at Ripley Lane include: 0.15 acre of permanent conversion impact and 0.17 acre of temporary stream buffer impact. Temporary impacts will be restored in-place and permanent impacts will be mitigated through off-site restoration at May Creek, Gypsy Creek, and Median Creek. About 30 trees will need to be removed, including one tree with a DBH greater than 30 inches. The Species of impacted trees include: red alder, arborvitae, yew, Western red cedar, willow, and black cottonwood. Johns Creek Impacts to Johns Creek include 0.01 acre of temporary stream impact and 0.03 acre of temporary stream buffer impact. About 0.22 acre will be restored in-place. No trees will be impacted at this site. Table 1. Preliminary Tree Assessment Shoreline Site Category # Impacted Avg. DBH Species 2-4" DBH 12 3 Fraxinus latifolia, Thuja plicata May Creek 5-30" DBH 19 12 Alnus rubra, Populus trichocarpa >30" DBH 2 35 Populus trichocarpa Total 33 10 Gypsy Creek 2-4" DBH 15 3 Acer macrophyllum, Crataegus monogyna, Fraxinus latifolia, Populus trichocarpa, Salix spp. 5-30" DBH 6 15 Populus trichocarpa >30" DBH 4 33 Populus trichocarpa Total 25 10.5 2-4" DBH 22 3 Alnus rubra, Thuja occidentalis, Taxus baccata, Salix spp. Stream 7.7A-7.8 5-30" DBH 11 11 Alnus rubra, Populus trichocarpa,Thuja plicata >30" DBH 1 30 Populus trichocarpa Total 34 6.5 Refer to attached figures for indicated locations.