HomeMy WebLinkAboutReport 01lei
AID..
N
11.1 L+4 ®r
ot lRenton
n: rl C
sioll
AUb 3
U,
Of Renton
PJ9onirlP Divisior?
AUG
Alw-
m
OitY Of Renton
Planning r)ivision
�lUG ri 0"I'lo.
i. IJ
dti [4�rr a1 �r Y' 1�• •�4 I I
c fr+ir c. h
i
in
s
�
Wd
lk
'4!' t1
t ix
vc V
*
�.,
"'11�. '�Ax ��`[� ,ry, n L°f l'•i4�� 1f �di� �YfJ
s
�
Wd
lk
'4!' t1
o A-V
ti
W-11
1.
0 0
CITY OF RENTON
DEPARTMENT OF COMMUNITY & ECONOMIC
DEVELOPMENT
MEMORANDUM
Date: January 13, 2011
To: City Clerk's Office
From: Stacy M Tucker
Subject: Land Use File Closeout
Please complete the following information to facilitate project closeout and indexing by the City
Clerk's Office.
Project Name: Faith Temple Temporary Use Permit
LUA (file) Number: LUA-10-062, TP
r
Cross -References:
AKA's:
i
Project Manager: Roeale Timmons
Acceptance Date: September 2, 2010
9
d
9
Applicant: Rev. Levi Bell
ro
Owner: Faith Temple Community Church of God in Christ
Contact: Same as applicant
PID Number: 0007200157
ERC Decision Date:
ERC Appeal Date:
Administrative Approval: September 20, 2010
Appeal Period Ends: October 4, 2010
9
Public Hearing Date:
Date Appealed to HEX: "
By Whom:
HEX Decision: Date:
Date Appealed to Council:
By Whom:
Council Decision: Date:
Mylar Recording Number:
A
Project Description: Application requesting Temporary Use Permit (Tier II) in order the change i
the existing funeral home use into a religous institution for Faith Temple Community COGIC
t
Location: 300 S 3rd Street
Comments: a
DEPARTMENT OF COAUNITY
AND ECONOMIC DEVELOPMENT f �' r i r1
PLANNING DIVISION
TEMPORARY USE PERMIT
DATE OF PERMIT ISSUANCE: September 20, 2010
LAND USE ACTION FILE NO.: LUA10-062, TP
PROJECT NAME: Faith Temple Community COGIC Temporary Use Permit
PROJECT MANAGER: Rocale Timmons, Associate Planner
OWNER/APPLICANT: Faith Temple Comminty COGIC
3003 rd Ave S
Renton, WA 98055
CONTACT (if other than Owner): Rev. Levi Bell
7827S114 th St
Seattle, WA 98178
PROJECT LOCATION: 3003 rd Ave S
DATE OF EXPIRATION: Septermber 20, 2011
PROJECT DESCRIPTION: The applicant is requesting Temporary Use Permit (Tier
II) in order to change the existing funeral home use into a religous institution for Faith Temple
Community COGIC. There are no additions or structural changes propoosed to the existing
7,000 square foot building. The proposal includes the retention of 29 surface parking stalls. The
subject property is located on the northeast corner of S 3rd St and Shattuck Ave S at 300 S 3rd
St. The project site totals 18,166 square feet in area and is zoned Center Downtown (CD).
Currently a Religious Institution use is permitted as a Conditional Use Permit granted by the
Hearing Examiner. There is currently a proposal to re-evaluate which permits would be
necessary for religious institutions to operate in the City's commercial zoning designations.
Given the similarity of the former and proposed uses and the fact that there are no physical
improvements necessary; the City finds that a Temporary Use Permit is justified in this
circumstance. Additionally the applicant will need to comply with the new terms and conditions
for religious institutions after the sunset date of the Temporary Use Permit.
The following Tier II Temporary Use Permit is hereby approved and subject to the following
conditions:
CONDITIONS OF APPROVAL:
City of Renton Department of *unity & Economic Development A ristrative Temporary use Permit
Faith Temple Community COGlC Temporary Use Permit LUA10-062, TP
DATE OF PERMIT: September 20, 2010 Page 2 of 2
1) Upon expiration of the Temporary Use Permit, Faith Temple Community Church shall be
required to obtain all necessary permits in order to operate a religious institution per
City Code.
A#
zc q
C.E. "Chip" Vince?ft, Planning Director Date
Planning Division
APPEALS: Appeals of permit issuance must be filed with the City of Renton Hearing Examiner
by 5:00 p.m. on October 4, 2010. Appeals must be filed in writing, together with the required
fee to the City of Renton Hearing Examiner, City of Renton, 1455 South Grady Way, Renton, WA
98057. City of Renton Municipal Code Section 4-8-110 governs appeals to the Hearing
Examiner. Additional information regarding the appeal process may be obtained from the
Renton City Clerk's Office, (425) 430-6510.
CirY of in Department of Community & Economic Alopment
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT:
COMMENTS DUE. SEPTEMBER 16, 2010
APPLICATION NO: LUA10-062, TP
DATE CIRCULATED: SEPTEMBER 2, 2010EVELOPM.ENT SERVIC
APPLICANT: Rev. Trevi Bell
L.
PROJECT MANAGER: Rocale Timmons
PROJECT TiTLE: Faith Temple Community Church Temp. Use
Permit
PROJECT REVIEWER: Kayren Kittrick SEP 0 2 2010
SITE AREA: 18,166 square feet
EXISTING BLDG AREA (gross): 7,000 square f hUtiv
LOCATION: 300 S 3`d Street
PROPOSED BLDG AREA (gross) N/A
SUMMARY of PROPOSAL: The applicant is requesting Temporary Use Permit (Tier II) in order the change the existing funeral home
use into a religous institution for Faith Temple Community COGIC. There are no additions or structural changes propoosed to the
existing 7,000 square foot building_ The proposal includes the retention of 24 surface parking stalls. The subject property is located
on the northeast corner of S 3rd St and Shattuck Ave 5 at 300 5 3rd 5t_ The project site totals 18,165 square feet in area and is
zoned Center Downtown (CD).
A. ENVIRONMENTAL IMPACT (e.g. Non -Code) COMMENTS
Element of the Probable Probable More
Environment Minor Major Information
Impacts Impacts Necessary
Eorth
Air
Water
Plants
Land/Shoreline Use
Animals
Environmental Health
Energy/
Natural Resources
B. POLICY -RELATED COMMENTS
C. CODE -RELATED COMMENTS
Element of the Probable Probable More
Environment Minor Major information
Impacts Impacts Necessary
Housin
Aesthetics
Li ht/Glare
Recreation
Utilities
Transportation
Public Services
Historic/Culturo)
Preservation
Airport Environment
10, 00O Feet
14,00OFeet
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact
or areas where additional information is needed to properly assess this proposal,
Signature of director or Authorized Representative Date
ES
City of Re on Department of Community & Economic Development
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT:
COMMENTS DUE: SEPTEMBER 16, 2010
APPLICATION NO: LUA10-062, TP
DATE CIRCULATED: SEPTEMBER 2, 2010
APPLICANT: Rev. Levi Bell
PROJECT MANAGER: Rocale Timmons
PROJECT TITLE: Faith Temple Community Church Temp. Use
Permit
PROJECT REVIEWER: Kayren Kittrick
SITE AREA: 18,166 square feet
EXISTING BLDG AREA (gross): 7,D00 square feet
LOCATION: 300 S 3rd Street
PROPOSED BLDG AREA (gross) N/A
SUMMARY of PROPOSAL: The applicant is requesting Temporary Use Permit (Tier II) in order the change the existing funeral home
use into a religous institution for Faith Temple Community COLIC. There are no additions or structural changes propoosed to the
existing 7,000 square foot building. The proposal includes the retention of 29 surface parking stalls. The subject property is located
on the northeast corner of S 3rd St and Shattuck Ave S at 300 5 3rd St. The project site totals 18,166 square feet in area and is
zoned Center Downtown (CD).
A. ENVIRONMENTAL IMPACT (e.g. Non -Code) COMMENTS
Element of the Probable Probable More
Environment Minor Major information
Impacts impacts Necessary
Earth
Air
Water
Plants
Land/Shoreline Use
Animals
Environmental Health
Energy/
Natural Resources
B. POLICY -RELATED COMMENTS
N&A)c,
Element of the Probable Probable More
Environment Minor Major information
Impacts Impacts Necessary
Housing
Aesthetics
Li hVGfore
Recreation
utilities
Transportation
Public Services
HistoricfCultural
Preservation
Airport Environment
10,000 Feet
14, 000 Feet
C CODE -RELATED COMMENTSAV
( r O
is J� w �(� �.�-�c�.�.wr��. /"�c-�2[�,,t✓c J,...� a t.r= *��C�..+�"
�� 160
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact
or areas where additional information is needed to properly assess this proposal.
Signature of Director or Authorized Representative
l t}
Date
City of Rento9 n Deportment of Community & Economic Development
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
4 `
REVIEWING DEPARTMENT.:P�a,
COMMENTS DUE. SEPTEMBER 16, 2010
APPLICATION NO: LUA10-062, TP
DATE CIRCULATED: SEPTEMBER 2, 2010 CITY OF RENTO) l
APPLICANT: Rev. Levi Bell
PROJECT MANAGER: Rocale Timmons
PROJECT TITLE: Faith Temple Community Church Temp. Use
PROJECT REVIEWER: Kayren Kittrick
Permit
RECEIVE
SITE AREA: 18,166 square feet
EXISTING BLDG AREA (gross): 7,000 square feet
LOCATION: 300 S 3rd Street
PROPOSED BLDG AREA (gross) N/A
SUMMARY OF PROPOSAL: The applicant is requesting Temporary Use Permit (Tier II) in order the change the existing funeral home
use into a religous institution for Faith Temple Community LOGIC_ There are no additions or structural changes propoosed to the
existing 7,000 square foot building. The proposal includes the retention of 29 surface parking stalls. The subject property is located
on the northeast corner of S 3rd St and Shattuck Ave S at 300 5 3rd St. The project site totals 18,166 square feet in area and is
zoned Center Downtown (CD).
A. ENVIRONMENTAL IMPACT (e.g. Non -Code) COMMENTS
Element of the Probable Probable More
Environment Minor Major information
impacts Impacts Necessary
Earth
Air
Water
Plants
Land/Shoreline Use
Animals
Environmental Health
Energy/
Natural Resources
B. POLICY -RELATED COMMENTS
NoUL,
C.��)) CODE -RELATED COMMENTS
/)&)"-f
Element of the Probable Probable More
Environment Minor Major information
impacts impacts Necessary
Housing
Aesthetics
Li ht/Giare
Recreation
Utilities
Transportation
Public Services
Historic/Cultural
Preservation
Airport Environment
10,000 Feet
14,000 Feet
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact
or areas where additional information is needed to properly assess this or000sal,
of Director or Aut) onzed Representative
Da
s
Ciry oF�
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDEN'TIHCATiON
DATE OF APPLICATION: August 30, 2010
NOTICE OF APPLICATION
A MasierAPPliotlon has been filed and a¢eoliad whh the IsepanmmH of Cont—nky & Economic DeYeldPment
(CFDI -'Planning DMSd or the City of R•Nm, rb following bnaRy de bes theapplkation and the nesesspry
PI ApPMvali. -
DATE Or NQ IIF OFAPPUCATPON: September 2, 2010
PROIECCNAMEtNUMOM, Faith Temple Corrin il' Church Temporary Use Pe -it f LUA10-M2, TP
PROICU DESCRIMON: The applicant is requesting Temporary Ilse Remit {Tier III in order the
rhange The eacong funeral home use irdo are at— Institution fD, Faith Temple Cnmmunky CU6iC There are rip
addi[ions or trurtu l changes ProPoosed M the eKrsting 7,000 =quare feat bpiI the proposal includes the
retention of 29 wr%Ce parking stalls. The subject Property is bated nn the northeast corner of 5 311 St and SharI
Ave 5 at 3p0 5 3rd SL The project site totals 18,166 square Feet in area and is meed Canter Do—,— (CDL.
PROJECT LOCATION: 300 5 3'0 SVeel
PUSUC APPROVALS: Tier 2 Temporary use Perm
APPUCANT/PR31FCT CONTACT PERSON: Rev-LeriWl, Earth Tempe Community Church; 300 S 3' Street: Renton,
WA 98055
C"Iter"s on Rw above appriotion oust be nrbmthitd In writlrq to Rocale Ti—, A. -late planner, D"armsem
or Conan , y Ewromic DevelopnI 1055 South Grady WaY� Rentne, WA 98057, by Sdott P.- on September 16,
2015 N you have questions abort this PmPosai, or wish to be made a patty o1 record and rece;ue addiijonal nobf—tion
by mall• N"I the P"I Manager a[ (4251 430-7219. Anyone wlw submits writtM [Ommerlls will aLtem "jV
become a party of record and will be MUI of any decision on this Project.
try" would "I m be made a partyef record to receive further information on this ,opoI pro)ect, oonlpleee this
fort" and r— W; dty of Renton, CED, R21ning Oivbmn, 1055 South Grady Way, rlerrton, WA 91
Fie Name/ N,, Faith Tempk Commundy Orurch Temporary Uae permit t LLM10i062, Tp
NAME:
MATING ADDRESS,
TELEPHONE NO.:
CERTIFICAr
NOTICE OF COMPLETE APPLICATION: September 2, 2010
oAny � hereby certify that copies of the above document
were posted in conspicuous places or nearby the described property on
Date: Ju. Signed�C �1�` �� C�� _ � _v) _
STATE OF WASHINGTON y
} SS
COUNTY OF KING }
certify that I know or have satisfactory evidence that
signed this instrument and acknowledged it to be his/her/their free and voluntary act for the
uses and purposes mentioned in the instrument.
Dated: 5 t. r, f.. c°• tL
Notary Publicfn and for the State of Washington
Notary (Print):
My appointment expires: , 1 x' `? { GJ i
_l
t-
1
CITY OF RENTON
DEPARTMENT OF COMMUNTY & ECONOMIC DEVELOPMENT - PLANNING DIVISION
AFFIDAVIT OF SERVICE BY MAILING
On the 2nd day of September, 2010, 1 deposited in the mails of the United States, a sealed envelope containing
Acceptance Letter & NOA documents. This information was sent to:
Name
Representing
Rev, Levi Bell
Owner/Applicant/Contact
300' Surrounding Property Owners
See attached
r5ffa(Signature of Sender):Ney
STATE OF WASHINGTON
+,_
Ss
9
COUNTY OF KING } qr OiFp,°�
44
.-
I certify that I know or have satisfactory evidence that Stacy M. Tucker
signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and purposes
mentioned in the instrument.
Dated: 4- -4 Lzi� :2. 2C lb
Notary Public in and for the State of Washington
Notary (Print): h- 4
My appointment expires: 4 ` { ?
rajec gj2,Wj
Faith Temple Community Church Temporary Use Permit
P�rajeecct l► umber•
LUA10-062, TP
Pi
0
922890004505 784130012502 784180004508
BISHOP OF CH JESUS CHRIST CCAS PROPERTY & CONST COMPASS CENTER THE
SOCIAL SERVICE CTR 710 9TH AVE 77 S WASHINGTON ST
50 E NORTH TEMPLE SEATTLE WA 98104 SEATTLE WA 98104
SALT LAKE CITY UT 84150
784180013509
FIRST CH OF CHRIST SCIENT
220 WHITWORTH AVE S
RENTON WA 98055
000720017201
KENDALL ]EFF
PO BOX 1452
BELLEVUE WA 98009
784130002008
MW SONS OF HAITI GRAND LODG
6304 S RYAN ST
SEATTLE WA 98055
000720011907
SAFEWAY INC STORE 1563
C/O COMPREHENSIVE PROP TAX
1371 OAKLAND BLVD STE 200
WALNUT CREEK CA 94596
000720018803
SEATTLE CITY OF
SPU/REAL PROP WTR
PO BOX 34018
SEATTLE WA 98124
000720011501
SOLO NOI LLC
12306 NE 100TH PL
KIRKLAND WA 98033
784180009002
T70A JAMES+JEANNE RYAN
3736 47TH PL NE
SEATTLE WA 98105
784180008590
WORLD ASSOCIATION FOR CHILD
PO BOX 88948
SEATTLE WA 98136
000720000306
FRONTIER BANK
PO BOX 2215
EVERETT WA 98213
784180014002
LOCKHART CRILLION AND EDNA
11211 AUBURN AVE S
SEATTLE WA 98178
000720014109
RENTON CITY OF
1055 S GRADY WAY
RENTON WA 98055
000720005404
SANDOY FRED B & ERNA M
220 SHATTUCK AVE S
RENTON WA 98057
784180015504
SHORTER ROYCE
243 E 64TH ST
TACOMA WA 98404
784080002008
SOUTH THIRD ST ASSC
413 S THIRD ST
RENTON WA 98055
784180012501
TRAM KIMHIEN
5601 S RYAN ST
SEATTLE WA 98178
784080004004
ZERBATO MARGHERITA
3300 MAPLE VALLEY HWY
RENTON WA 98058
784180011503
HARAMBEE CHURCH
316S3RD ST
RENTON WA 98055
000720017300
MCDONALD RONNIE A+ROBERTA K
216 NW 5TH ST
RENTON WA 98055
784130000507
S 3RD ST PROFESSIONAL BLDG
319S3RD ST
RENTON WA 98055
000720015700
SCI MANAGEMENT CORP
8TH FL #2920 PROP TAX DEPT
1929 ALLEN PARKWAY
HOUSTON TX 77019
000720011600
SOLO NOILLC
212S3RD ST
RENTON WA 98057
784130001505
SWEENCO LLC
315S3RD ST
RENTON WA 98055
784080003501
WONDERFUL PROPERTIES LLC AN
302 WHITWORTH AVE S
RENTON WA 98055
0
A Master Application has been filed and accepted with the Department of Community & Economic Development
(CED) — Planning Division of the City of Renton. The following briefly describes the application and the necessary
Public Approvals.
DATE OF NOTICE OF APPLICATION: September 2, 2010
PROJECT NAME/NUMBER: Faith Temple Community Church Temporary Use Permit / LUA10-062, TP
PROJECT DESCRIPTION: The applicant is requesting Temporary Use Permit (Tier II) in order the
change the existing funeral home use into a religous institution for Faith Temple Community LOGIC. There are no
additions or structural changes propoosed to the existing 7,000 square foot building_ The proposal includes the
retention of 29 surface parking stalls. The subject property is located on the northeast corner of S 3rd St and Shattuck
Ave S at 300 S 3rd St. The project site totals 18,166 square feet in area and is zoned Center Downtown (CD).
PROJECT LOCATION: 300 S 3'd Street
PUBLIC APPROVALS: Tier 2 Temporary Use Permit
APPLICANT/PROJECT CONTACT PERSON: Rev. Levi Bell, Faith Temple Community Church; 300 S 3`d Street; Renton,
WA 98055
Comments on the above application must be submitted in writing to Rocale Timmons, Associate Planner, Department
of Community & Economic Development, 1055 South Grady Way, Renton, WA 98057, by 5:00 p.m. on September 16,
2010. If you have questions about this proposal, or wish to be made a party of record and receive additional notification
by mail, contact the Project Manager at (425) 430-7219. Anyone who submits written comments will automatically
become a party of record and will be notified of any decision on this project.
If you would like to be made a party of record to receive further information on this proposed project, complete this
form and return to: City of Renton, CED, Planning Division, 1055 South Grady Way, Renton, WA 95057.
File Name / No.: Faith Temple Community Church Temporary Use Permit/ LUA10-062, TP
NAME
MAILING ADDRESS:
TELEPHONE NO.:
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION
DATE OF APPLICATION: August 30, 2010
NOTICE OF COMPLETE APPLICATION: September 2, 2010
Denis Law - �~
C
Mayor lty w1 ��f
Department of Community and Economic Development
September 2, 2010 Alex Pietsch, Administrator
Rev. Levi Bell
7827 S 114th Street
Seattle, WA 98178
Subject: Notice of Complete Application
Faith Temple Community Church Temporary Use Permit, LUA10-062; TP
Dear Rev. Bell:
The Planning Division of the City of Renton has determined that the subject application
is complete according to submittal requirements and, therefore, is accepted for review.
You will be notified if any additional information is required to continue processing your
application.
Please contact me at (425) 430-7219 if you have any questions.
Sincerely,
IRoc le Timmons
As ociate Planner
Renton City Hall • 1055 South Grady Way • Renton, Washington 98057 9 rentonwa.gov
L_
City of Renton
LAND USE PERMIT
MASTER APPLICATIO
PROPERTY OWNER(S)
NAME:
t -4x —I
u-ut,V,� 0-�- (5OA C ir-JS
ADDRESS:
CITY: ZIP:
TELEPHONE NUMBER:
` -- 4
NA
APPLICANT (if other than owner)
v
COMPANY (if applicable):
ADDRES5.-I l
C
ZIP.,
TELEPH E NUMBER: L
CONTACT PERSON
NAME:
,'. _ qtr
COMPANY (if applicable): kt,,
ADDRESS:
01141ti ZIP:
i
TE+,EP ON,E N A EMAIL ADDRESS:
T) --
PROJECT INFORMATIO
PROJECT OR DEVELOPMENT NAME:
ol
PROJECTIADDRESS(S)/LOCATION AND ZIP CODE:
C-37:9 '--L --T4L Cir "(-{ SA --
o � - Sic-)
KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S):
EXISTING LAND USE(S):
ne"ZLL
PROPOSED LAND USE(S):
EXISTING COMPREHENSIVE PLAN MAP DESIGNATION:
LA c, D
PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION
(if applicable)
EXISTING ZONING:
G
PROPOSED ZONING (if applicable): N 1A
SITE AREA (in square feet):
I`a j ,+LaLe
SQUARE FOOTAGE OF PUBLIC ROADWAYS TO BE
DEDICATED: 4
SQUARE FOOTAGE OF PRIVATE ACCESS EASEMENTS:
N
PROPOSED RESIDENTIAL DENSITY IN UNITS PER NET
ACRE (if applicable) -
NUMBER OF PROPOSED LOTS (if applicable)
0 I -A
NUMBER OF NEW DWELLING UNITS (if applicable):
H:10ED\Data\Fotms-TemplateslSelf-Help Handouts\Planninglmastcmpp.doc - 1 - 06/09
PRORCT INFORMATION continl.
NUMBER OF EXISTING DWELLING UNITS (if applicable): I PROJECT VALUE:
SQUARE FOOTAGE OF PROPOSED RESIDENTIAL
BUILDINGS (if applicable):
SQUARE FOOTAGE OF EXISTING RESIDENTIAL
BUILDINGS TO REMAIN (if applicable):
SQUARE FOOTAGE OF PROPOSED NON-RESIDENTIAL
BUILDINGS (if applicable): —I I OC, 0 S4—
SQUARE FOOTAGE OF EXISTING TION -RESIDENTIAL
BUILDINGS TO REMAIN (if applicable): 7, coo Sr
NET FLOOR AREA ON NON-RESIDENTIAL BUILDINGS (if
applicable):
NUMBER OF EMPLOYEES TO BE EMPLOYED BY THE NEW
PROJECT (if applicable): 3—
$t-4er-
IS THE SITE LOCATED IN ANY TYPE OF
ENVIRONMENTALLY CRITICAL AREA, PLEASE INCLUDE
SQUARE FOOTAGE (if applicable):
❑ AQUIFIER PROTECTION AREA ONE
❑ AQUIFIER PROTECTION AREA TWO
❑ FLOOD HAZARD AREA sq. ft.
❑ GEOLOGIC HAZARD sq. ft.
❑ HABITAT CONSERVATION sq. ft.
❑ SHORELINE STREAMS & LAKES sq. ft.
❑ WETLANDS sq. ft.
LEGAL DESCRIPTION OF PROPERTY
(Attach legal description on separate sheet with the following information included)
SITUATE IN THE QUARTER OF SECTION , TOWNSHIP , RANGE , IN THE CITY
OF RENTON, KING COUNTY, WASHINGTON
TYPE OF APPLICATION & FEES
List all land use applications being applied for: f
2. 4.
Staff will calculate applicable fees and postage: $
AFFIDAVIT OF OWNERSHIP
I, (Print Name/s) t /_7 declare under penalty of perjury under the laws of the State of
Washington that I am (please check one) the current owner of the property involved in this application or _ the authorized representative to act
for a corporation (please attach proof of auth rizabon) and that the foregoing statements and answers herein contained and the informaton herewith are
in all respects true and correct to the best of my knowledge and belief.
I certify that t know or have satisfactory evidence that Le -6 &11
signed this instrument and acknowledge it to be hislher/their free and voluntary�! act for the uses and purposes mentioned in the instrument.
(5i lure of Own erlRepresentative)
(Signature of Owner/Representative)
Notary Public in and 9or the Sthte of Washington r
Notary (P(nt)
My appointment expires:
14:10ED\DatalForms-TemplateslSelf-Help HandoutslPlanninglmasterapp.doe - 2 -
Faith Temple Community Church
of God In Christ
8323 Rainier Ave. So
Seattle, WA. 98118
August 24, 2010
To Whom it May Concern:
i
.r1�
i s ri
r% ;flit% Jivi siorl
1 � u
Project Narrative: Please provide 5 copies of clear and concise description of the proposed project,
including the following:
• Project name, size and location of site
Faith Temple Community Church of God in Christ.
• Land use permits required for proposed project
Temporary Use Permit
• Zoning designation of the site and adjacent properties
CD Zoning Designation
• Current use of the site and any existing improvements
Funeral Home
• Special site features ( i.e. wetlands, water bodies, steep slopes)
None
• Proposed use of the property and scope of the proposed development
Description of Use/Church
• Access
Describe how the Church will be accessed: Church services
Tuesday 7:00- 9:00 PM
Thursday 7:00-9:30 PM
Sunday 10:00-2:30 PM
• Proposed off-site improvements ( i.e. sidewalks, fire hydrants, sewer main, etc.)
None
• Total estimated construction cost and estimated fair market value of the proposed project
None
• Number, type and size of any tress to be removed
None
0 •
DEPARTMENT OF
COMMUNITY AND D City of
ECONOMIC DEVELOPMENT J�
M E M O R A N D U M
:�.
nenton
DATE: August 5, 2010 (Revised August 12, 2410) Ofann`rlc7 Division
TO: Pre -Application File No. 10-030 AUG ' [i IrDgn
FROM: Rocale Timmons, Associate Planner
SUBJECT: Faith Temple Community Church
General: We have completed a preliminary review of the pre -application for the above -
referenced development proposal. The following comments on development and permitting
issues are based on the pre -application submittals made to the City of Renton by the applicant
and the codes in effect on the date of review. The applicant is cautioned that information
contained in this summary may be subject to modification and/or concurrence by official
decision -makers (e.g., Hearing Examiner, Community & Economic Development Administrator,
Public Works Administrator, Planning Director, Development Services Director, and City
Council). Review comments may also need to be revised based on site planning and other
design changes required by City staff or made by the applicant. The applicant is encouraged to
review all applicable sections of the Renton Municipal Code. The Development Regulations are
available for purchase for $50.00 plus tax, from the Finance Division on the first floor of City Hall
or online at www.rentonwa.gov
Project Proposal: The subject property is located on the northeast corner of S 3`d St and
Shattuck Ave S at 300 S 3'd St. The project site totals 18,166 square feet in area and is zoned
Center Downtown (CD). The pre -application packet indicates that the proposal is to convert an
existing funeral home into a religious institution for Faith Temple Community Church. The
existing building is approximately 7,000 square feet and is three levels. The applicant is not
proposing any structural changes to the existing building. The proposal includes a total of 29
surface parking stalls. The site is located within a seismic hazard area.
Current Use: The property currently contains an existing single family residence used as Faull
Stokes Funeral Home.
Zoning: The subject property is located within the Center Downtown (CD) zoning designation.
Development Standards: The project would be subject to RMC 4-2-110A, "Development
Standards for Commercial Zoning Designations" effective at the time of complete application
(noted as "CD standards" herein). A copy of the current standards is included herewith.
Currently a Religious Institution use is permitted as a Conditional Use Permit granted by the
Hearing Examiner. However, there is currently a proposal to re-evaluate which permits would
be required for religious institutions to operate in the City's commercial zoning designations.
To that extent, the applicant may obtain a Temporary Use Permit as an alternative to the
h:\ced\planning\current planning\preapps\10-030.rocale\revised 10-030 (cd faith temple -funeral
horne).doc.docx
Faith Temple Community larch, PRE10-030
Page 2 of 4
August 5, 2010 (Revised August 12, 2010)
Conditional Use Permit in order to temporarily change the use of the mortuary to a religious
institution. The Temporary Use Permit would expire one Year from the date of approval.
Upon expiration, Faith Temple Community Church would be required to obtain all necessary
Permits reflected in the u comm chap es of the City Code, • which may continue to re wire a
Conditional Use Permit heard by the City's Hearing Examiner.
Many of the standards are not applicable (denoted with an "*" ) as the proposal does not include
an alteration to the existing structure.
Type of Standard
Minimum Standard
Lot Standards
*
Lot Size
None
*
Lot Width
None
*
Lot Depth
None
Setbacks
*
Min Front Yard
None
*
Max Front Yard
15 ft. —for buildings 25 ft or less in height.
None — for portion of building over 25 ft
*
Side Yard
None
*
Rear Yard
None
*
Min Side Yard Along-
A -Street
None
*
Max Side Yard Along-
A -Street
15 ft. —for buildings 25 ft or less in height.
None —for portion of building over 25 ft
Building Standards
*
Building Coverage
Ratio
None
*
Impervious Surface
None
*
Height
95 ft
Refuse and Recycle
Recycle. 5 SF / 1,000 GSF
Refuse: 10 SF / 1,000 GSF
Parking
Vehicular — Religious
Institution
1 stall / 5 seats in the main auditorium
Bicycle
10% of the number of required off-street parking spaces
Landscaping
On -Site Street
Frontage
10 ft
*Except for walk and driveways. In those cases, 10' of landscaping
h:`ced\planning\current plan ning\preapps\10-030.rocale`revised 10-030 (cd faith temple -funeral
home).doc.docx
Faith Temple Community 0rch, PRE10-030
Page 3 of 4
August 5, 2410 (Revised August 12, 2010)
shall be required where buildines are not located.
* I Tree Retention j 5 % of significant trees
Access/Parkine— It is not clear in the submitted materials how many seats are provided in the
main auditorium. The applicant will be required at the time business license application or
building permit to provide detailed parking information (i.e. stall and drive aisle dimensions) and
calculations of the subject site, specifically the number of seats provided in the main auditorium.
If the proposal provides more or less parking than required by code, a request for a parking
modification would need to be applied for and granted. This detailed written request should
be submitted by the applicant along with the formal land use application.
Additionally, the proposal would need to be revised in order to provide bicycle parking based
on 10 % of the required number of parking stalls.
it should be noted that the parking regulations specify standard stall dimensions. Surface
parking stalls must be a minimum of 9 feet x 20 feet, compact dimensions of 8% feet x 16 feet,
and parallel stall dimensions of 9 feet x 23 feet; compact surface parking spaces shall not
account for more than 30 percent of the spaces in the surface parking lots.
ADA accessible stalls must be a minimum of 8 feet in width by 20 feet in length, with an adjacent
access aisle of 8 feet in width for van accessible spaces. The appropriate amount of ADA
accessible stalls based on the total number of spaces must be provided. Surface parking lots
with 15 -- 50 stalls shall provide a minimum of 15 square feet of landscaping per parking
space. The landscaping shall be used to buffer impacts of the parking lot. Please refer to
landscape regulations (RMC 4-4-070 and RMC 4-4-080F.7) for further general and specific
landscape requirements (enclosed).
Landscaping— Except for critical areas, all portions of the development area which are not
covered by structures, required parking, access, circulation or service areas, must be landscaped
with native, drought -resistant vegetative cover. The minimum on-site landscape width required
along street frontages is 10 feet. Please refer to landscape regulations (RMC 4-4-070 and RMC
4-4-080F.7) for further general and specific landscape requirements (enclosed). A conceptual
landscape plan and landscape analysis meeting the requirements in RMC 4-8-1200.12, shall be
submitted at the time of land use application.
Refuse and Recycling Areas— Refuse and recycling areas are required to meet the requirements
of RMC 4-4-090, "Refuse and Recyclables Standards" (enclosed). Based on the proposal for
7,000 square feet of non-residential area; a minimum area of 100 square feet shall be
provided for recycling and refuse deposit areas. It is unclear whether or not the existing refuse
and recycle area would comply with the requirements of the code.
Environmental Review
The project is Categorically Exempt from SEPA requirements and, therefore, Environmental
Review would not be required.
Critical Areas
The site is located within a seismic hazard area. As there are no structural alterations proposed
the applicant would not be required to provide a geotechnical analysis. It is the applicant's
responsibility to ascertain whether additional critical areas are present on the site. If so, the
proposal would need to be revised accordingly.
h:\ced\planning\current planning\preapps\10-030.rocale\revised 10-030 (cd faith temple -funeral
home).doc.doex
Faith Temple Community Orch, PRE10-030
Page 4 of 4
August 5, 2010 (Revised August 12, 2010)
Permit Requirements: The proposal would require a Hearing Examiner Conditional Use Permit.
The Conditional Use Permit application fee is $2,000 and would be reviewed in an estimated
timeframe of 12 weeks. As an alternative the applicant may apply for a Type II Temporary Use
Permit. The Type 11 Temporary Use Permit application fee is $2,000 and would be reviewed in
an estimated timeframe of weeks. All permits are discretionary permits.
Temporary Permit Review Process: Once a complete land use application package has been
accepted for initial review, the Planning Division will post three notices of the pending
application at or near the subject site and mail notices to property owners within 300 feet of the
project site. The proposal will be routed to other City departments and other jurisdictions or
agencies who may have an interest in the application. The reviewers have two weeks to return
their comments to the Planning Division. In review of the proposal, the Planning Division will
ensure the following criteria have been addressed:
• The Temporary Use will not be materially detrimental to the public health, safety, or
welfare, nor injurious to property or improvements in the vicinity of the Temporary
Use
• Adequate parking facilities and vehicle ingress and egress are provided to serve the
Temporary Use and any existing uses on the site
• Hours of operation of the Temporary Use are specified, and would not adversely
impact surrounding areas
• The Temporary Use will not cause nuisance factors such as noise, light, or glare
which adversely impacts surrounding uses
• If applicable, the applicant has obtained the required right-of-way use permit
After review of the proposal and any staff or public comment, the Planning Division will issue
a decision. The decision to approve, conditionally approve, or deny the proposal will be
mailed to all persons listed on the Master Application and all parties of record.
Detailed information regarding the land use application submittal is provided in the attached
handouts.
h:\ced\planninE\current planning\preapps\10-030.rocale\revised 10-030 (cd with temple -funeral
home).doc.docx
PLANNING DIVISION
WAIVE* OF SUBMITTAL REQUIMENTS
FOR LAND USE APPLICATIONS
This requirement may be waived by: C'ty. G
1. Property Services Section. PROJECT NAME: '" fir—_ tru�rolan„, �et1to �
2. Public Works Plan Review Section C�ri�i�1�j 7
3. Building Section DATE: $ 7`7 Zb 1%-->
4. Planning Section 0
Q:IWEB\PWIDEVSERV\Forms\Planninglwaiverofsubmittalregs.xls 02108
`/�
PLANNING DIVISION
WAIVER F SUBMITTAL REQUIRLOENTS
FOR LAND USE APPLICATIONS
L{llVi� USS RRI:T:�BMTTAI i�YPI�
Parking, Lot Coverage & Landscaping Analysis a
Applicant Agreement Statement 2 AND 3
Inventory of Existing Sites 2 AND 3
Lease Agreement, Draft 2 AND 3
Map of Existing Site Conditions 2 AND 3
Map of View Area 2AND 3
PhotosimulationS 2AND 3
This requirement maybe waived by:
1. Property Services Section
2. Public Works Plan Review Section
3. Building Section
4. Planning Section
PROJECT NAME: - AITiA—VeRPL,1T
I �
DATE: S! S J.2 -0,o
Q:IW ES1P WIDE VS ERVIForm s\Pianni nglwa iverofsubm ittai regs.xls
02/08
ABATEMENT AGREEMENT
TEMPORARY USE
City fDivision
1055 South GadyWay, Renton, A 98057
_.
Phone: 425-430-7200 Fax: 425-430-7231
r �(j
".?'t�-- V • LSV! 1 �J :f- l..., being the Applicant for the Temporary
Use Permit at the Location of:
Hereby authorize the City of Renton to summarily eliminate the Temporary Use and all evidence
of the use if it has not been removed as required by the terms of the permit. I also agree to
reimburse the City for any a ense incurred in abating this Temporary Use.
Signature:���---�-
1 �� n
Print Name:`
Date:
STATE OF WASHINGTON )
) SS
COUNTY OF KING )
I certify that I know or have satisfactory evidence that Le -,;i -9 ,P. l signed
this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and
purposes mentioned in the instrument.
Dated: f G! D
}
s �
Of it
PW/DevSendFami f��lingf empuse. doc
f r
Notary Public in and f r the State of Washington
Notary (Print): 14- k
My appointment expires:C?l 3
01106
Release and Indnification Agreement f*Model Homes
This agreement is made by and between the City of Renton, Washington, a municipal corporation of the State
of Washington ("City") and ("Owners").
Recitals
The Owners own real property in the City legally described in Exhibit A, attached.
The Owners have submitted an application for building permit(s) and/or a Temporary Use Permit to construct
model homes on the real property prior to recording of a short plat or final plat. Since changes to the short plat
or final plat may be necessary after construction of the model homes rendering the homes illegal, there is some
risk in building the model homes.
In consideration of the inherent risks associated with the construction of buildings in advance of the recording of
the plat, the City requires the owner to execute an indemnification agreement prior to any model home
construction activities.
Agreement
The parties agree to the following:
1. The City authorizes the Owners to do the work as described in the Temporary Use Permit application
No. once building permits have been obtained.
2. The owners assume the risk that the model home(s) must be removed or reconfigured and therefore
release and discharge the City and its representatives from all known and unknown losses, claims,
damages or causes of actions which the owners have or may have relating to buildings or structures
authorized by the Temporary Use Permit.
3. As a condition of granting Owner permission to construct model homes, Owner agrees to indemnify,
defend and hold the City of Renton Harmless from any claims or liens that may be exerted against the
property as a result of construction of model homes and use of the unrecorded plat of
4. Owners understand and acknowledge that, should the model home construction not comply with the
proposed lot configuration of the final plat, that no variances to development standards for either the
lots or the homes may be granted as such a situation would be considered a "self-induced hardship".
5. Owners acknowledge that they understand that any construction begun prior to the recording of the final
plat must be in compliance with all City zoning and subdivision requirements (e.g_ setbacks, lot
coverage, etc.) or removed prior to recording of the final plat. If the final plat is not recorded prior to the
expiration of the Temporary Use Permit, Owners acknowledge that the homes must be removed unless
complying with all applicable code requirements (e.g. one home per lot, etc.).
6. Applicant will also provide an Abatement Agreement and a security device acceptable to the City to
ensure removal of any structures not in compliance with City regulations at the time of expiration of the
Temporary Use Permit and understands construction of the model homes is at Owners' own risk.
7. The provisions of this agreement shall bind the parties, their legal heirs, representatives, successors
and assigns and shall expire upon the recording of the final plat of
I, (Print Name) , declare that 1 am (please check one) ❑ the owner of the
property involved in the application, ❑ the authorized representative to act for the property owner (if a
corporation, please attach proof of authorization to sign), and that the foregoing statements and answers herein
contained and the information herewith submitted are in ail respects true and correct to the best of my
knowledge and belief.
Owner
Owner
ATTEST: Subscribed and sworn to before me, a Notary Public, in and for the
day of 20
ignature of Notary Public)
low
PW/DevSery/Forms/PlanningTempuse.doc 9 01108
an the
Printed: 08-30-2010
CITY OF RENTON
1055 S. Grady Way
Renton, WA 98055
Land Use Actions
RECEIPT
Permit#: LUA10-062
Payment Made: 08/30/2010 10:59 AM
Total Payment: 150.00
COGIC EXPENSE ACCOUNT
Current Payment Made to the Following Items:
Receipt Number: 81003856
Payee: FAITH TEMPLE COMMUNITY
Trans Account Code Description Amount
------------------------------------------------------ ----------------
5021 000.000000.007.345 Temp Use, Hobbyk, Fence 150.00
Payments made for this receipt
Trans Method Description Amount
Payment Check 1295 150.00
Account Balances
Trans
Account Code
Description
Balance Due
------
3021
------------------
303.000000.020.345
--------------------------------
Park Mitigation Fee
----------------
.00
5006
000.345.81.00.0002
Annexation Fees
.00
5007
000.345.81.00.0003
Appeals/Waivers
.00
5006
000.000000.007.345
Binding Site/Short Plat
.00
5009
000.000000.007.345
Conditional Use Fees
.00
5010
000.000000.007.345
Environmental Review
.00
5011
000.000000.007.345
Prelim/Tentative Plat
.00
5012
000.000000.007.345
Final Plat
-00
5013
000.000000.007.345
PUD
.00
5014
000.000000.007.345
Grading & Filling Fees
.00
5015
000.000000.007.345
Lot Line Adjustment
.00
5016
000.000000.007.345
Mobile Home Parks
.00
5017
000.000000.007.345
Rezone
.00
5018
000.000000.007.345
Routine Vegetation Mgmt
.00
5019
000.000000.007.345
Shoreline Subst Dev
.00
5020
000.000000.007.345
site Plan Approval
.00
5021
000.000000.007.345
Temp Use, Hobbyk, Fence
.00
5022
000.000000.007.345
Variance Fees
.00
5024
000.000000.007-345
Conditional Approval Fee
.00
5036
007.345.61.00.005
Comprehensive Plan Amend,
.00
5909
000.000000.002.341
Booklets/EIS/Copies
.00
5941
007.341.50.00.000
Maps (Taxable)
.00
5954
650.237.00.00.0000
DO NOT USE - USE 3954
.00
5955
000.05.519.90.42.1
Postage
-00
5998
000.000000.000.231
Tax
.00
Remaining Balance Due: $0.00
�L