HomeMy WebLinkAboutReport 1CITY OF RENTON DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT MEMORANDUM Date: July 3, 2013 To: City Clerk's Office From: Stacy M Tucker Subject: Land Use File Closeout Please complete the following information to facilitate project closeout and indexing by the City Clerk's Office. rr§=~~==========c=:'=':=:======':=:=='=~~========~'o , Project Name: Black River Pump Station Upgrade III LUA (file) Number: LUA-12-054, SME I~--~--~----------------------~-------------------------------------'!I Cross-References: 0 ., If--A_K_A_'S_: _____________________________ 1:\ Project Manager: Jennifer Henning 1 Acceptance Date: \ Applicant: Owner: I Contact: August 13, 2012 Karen Heidergott, King County Dept. of Natural Resources & Parks II Attn: John Koon, King County Dept of Natural Resources & Parks :! Ray Nikel, Parametrix ' If--P_ID_N_u_m_b_e_r: _______ 3_77_9_2_0_00_9_0 _________________ 11\ ERC Decision Date: ERC Appeal Date: II Ic------'~---------------------------------------------------------------'I I Administrative Approval: August 13, 2012 'I Appeal Period Ends: August 27, 2012 " Public Hearing Date: Date Appealed to HEX: By Whom: HEX Decision: Date: Date Appealed to Council: By Whom: I Council Decision: Date:! ICI-M-y-la-r--R-ec-o-r-d-in-g--N-U-m--be-r-:-------------------------------------------------;1 Ir-~--------~---------------------------------------------------------: Project Description: Application for Shoreline Exemption for upgrede to King County Black River ;1 Pump Station. 'I 1 Location: 550 Monster Road SW II I Comme"u' JI l h .. DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT PLANNING DIVISION CC[E~1~f~CCA1~ Of ~~[EM~l~O~ fROM SHOREUNlE SUBSTANTIAL DEVlElOPMENT EVALUATION FORM & DECISION DATE: PROJECT NAME: PROJECT NUMBER: PROJECT MANAGER: OWNER! APPLICANT: CONTACT (if other than Owner): PROJECT LOCATION: PROJECT DESCRIPTION: August 12, 2012 Black River Pump Station Upgrade LUA12·054, SME Jennifer Henning, Current Planning Manager King County Department of Natural Resources & Parks attn: John Koon 201 South Jackson Street, Suite 600 Seattle, WA 98104 Ray Nickel, PE, PMP Parametrix 109 39th Ave SE, Suite 100 Puyallup, WA 98374 rnickel@parametrix.com 550 Monster Road SW (APN 3779200090) Renton, WA 98057 King County Department of Natural Resources & Parks proposes to replace the bulk fuel secondary containment system and primary fuel piping at the Black River Pump Station. The facility was constructed in 1969 to prevent flooding. It includes a concrete dam and pump house with eight flood control pumps and seven 270-gallon interior aboveground storage tanks in the pump house, three 16,900 gallon aboveground diesel fuel storage tanks, 100 I.f. of buried steel fuel transfer piping, and a control building with a standby generator and small day tank. The proposed facilities include replacing the existing City of Renton Department of Communit» __ .:"conomic Development Black River Pump Station Upgrade Certificate of Exempti. )m Shoreline SubstantIal Development LUA12-054, SME DATE OF PERMIT: August 12, 2012 Page 20f3 temporary containment berm (that was installed in response to a spill event in 2005) with a new 64,600 gallon concrete containment wall (30-inches in height); replacing the existing fuel transfer pump, piping and valves inside the existing berm; cleaning and recoating of the exterior of the three aboveground storage tanks; and replacement ofthe buried steel fuel transfer pipe with a double-wall pipe from the containment area to the pump building. LEGAL DESCRIPTION: See Attachment "Au SEC-TWN-R: S13,T23N, R4E, WATER BODY/WETLAND: Black River An exemption from a Shoreline Management Substantial Development Permit is hereby granted on the proposed project in accordance with RMC4-9-190C. Exemptions from Permit System and/or for the following reason(s): 3. Maintenance and Repair: Normal maintenance or repair of existing structures or developments, including damage by accident, fire or elements. a. "Normal maintenance" includes those usual acts to prevent a decline, lapse, or cessation from a lawfully established condition. b. "Normal repair" means to restore a development to a state comparable to its original condition, including but not limited to its size, shape, configuration, location and external appearance, within a reasonable period after decay or partial destruction, except where repair causes substantial adverse effects to the shoreline resource or environment. c. Replacement of a structure or development may be authorized as repair where such replacement is the common method of repair for the type of structure or development and the replacement structure or development is comparable to the original structure or development including, but not limited to, its size, shape, configuration, location and external appearance and the replacement does not cause . substantial adverse effects to shoreline resources or environment. City of Renton Department of Community ~ ~conomic Development Black River Pump Station Upgrade DATE Of PERMIT: August 12, 2012 Certificate of Exemptic.. m Shoreline Substantial Development l.UA12-054, SME Page 3 of3 The proposed development is consistent or inconsistent with (check one): CONSISTENT INCONSISTENT x N/A x DATE OF DECISION ON LAND USE ACTION: SIGNATURE: Policies of the Shoreline Management Act. The guidelines of the Department of Ecology where no Master Program has been finally approved or adapted by the Department. The City of Renton Shoreline Master Program. C.E. "Chip" Vincent, CED Administrator/Planning Director Planning Division Attachments: Legal Descriptioin Vicinity/Neighborhood Detail Map Site Plan cc: Owner/Applicant Contact City of Renton Official File fl· . AiTACH M f3..NT • Pi' LEGAL DESCRIPTION JUNCTION ADD POR TRS 21-22-23-24 & 25A & POR TRS 26 & 29 RENTON SHORELANDS 2ND SUPL ADD BEG SW COR SEC 13-23-04 TH E 1271.74 FT TH N TAP ON BDRY LN BET TRS 28 & 29 OF SD RENTON SHORELANDS 2ND SUPL ADD & TPOB TH CONTG N 275 FT TH W 280.69 FT TH S 59-53-47 W 377.52 FT TH S 74-13-19 W TO ELY MGN OF CO RD TH SELY ALG SD ELY MGN TO SLY BDRY OF SD TR 29 TH ELY ALG SD SLY BDRY TO TPOB ALSO BEG TPOB ABOVE DESC TH N 250 FT TH ON TANGENT CURVE TO RGT RAD OF 627.46 FT TAP ON BDRY LN BEG TRS 26 & 27 OF SD RENTON SH . LDS 2ND SUPL ADD TH SWL Y ALG SD BDRY LN TO BEG LESS PORTION FOR CO ROAD 03/11 I , • + COMMENTS: Black River Pump Station Neighborhood Map iMAP 01 The informaijon Included 01'1 this map has been compiled by King County staff from a variety of sourQlSI'IOd Is subjact to change without notice. King County makes no representations or warranties, express or Implied, 8sl0 accuracy, completeness, timeliness, or lights to the ulle of such Information. This document Is nol intended for usa as a BUrvey product. King County shall not be liable for any general, spacial, indirect, Incidental, or consequential damagBslnctuding, but not limited 10, lost revenues Of losl proffts resulting from the use or misuse of the information contained on this map. My sala of this map or informaUon on this map Is prohibited except by wrttten permiSSion of King County, Dale: 5f2912012 Source; King County iMAP· Property InformatJon (http:/tw.vw.metrokc,gov/GISJiMAP) 1 483ft tAl King County EXISTING "-'-"' DITIONS iMAP (C)2DDIttn.County ;..;...",.,... II! .. -'! ,'.:...;..: ~~ __ ~~ ....... _. -..... :". 0 ...... COMMENTS: KkIg COIroIy _ Rho< ~_ ~ Tho 0"''' ___ on toll mop hoo -. ~ !Iv lOng County _tom • ......, a1_ and Ioldljod 10 c:hango _. KkIg COIroIy _ no 'op_'biM • or _, ____ or~. _ 10 occ:o.ncy, ~. _ or otgIobi to Ite .-a11Udo ~ 10 .... _lor __ • __ King CCunIy _ no! be _ for owoy ~ spodooI. __ 1ncIdoontiII. 0< ____ Ooc:iJdIoog, boot .... _10. loot ........... or ..... pollOi __ tom ... _ or _ a1110e ...-on toll mop. Ivry _ a111oi1 map or o,b,,_, on toll mop 10 I ~ .....-._by _poo,,_,a1Kk1g Coidy. "J I King County - " ENGINEERING. PLANNING. E!NVIRONMENTAL SCIENces To: City of Renton 1019 39th AVE SE, SUITE 100 PUYALLUP, WA 98374 T. 253.604.6600 F.253.604.6799 www.parametrix.com 1055 South Grady Way Renton, WA 98057 Date: July 10, 2012 Project Number: 554-1521,085 Project Name: Black River Pump Station Upgrade These are: 0 PER YOUR REQUEST Sent Via: 0 u.s. MAIL o EXPRESS SECOND DAY I)lI COURIER o FOR YOUR INFORMATION o FOR YOUR REVIEW AND APPROVAL o FOR YOUR FILES I)lI FOR YOUR ACTION We are transmitting the following materials: o EMAIL o FTP o HAND DELIVERY/PICK UP o GROUND SERVICE o INTEROFFICE MAIL o EXPRESS OVERNIGHT Attached for your review/approval are 1 original and 4 copies of the following: o City of Renton Land Use Permit Master Application Form/Packet -King County Black River Pump Station project. Comments: Please do not hesitate to contact me directly with any questions. Rnickel@parametrix.com or 253~604-6600. Sincerely, ~1f1{) Ray Nickel, PE cc: File Karen Heidergott, King County John Koon, King County David Sherrard, Parametrix I I I City of Renton LAND USE PERMIT MASTER APPLICATION PROPERTY OWNER(S) I I PROJECT INFORMATION PROJECT OR DEVELOPMENT NAME: NAME: King County Dept. of Natural Resources & Parks Water and Land Resource Division Black River Pump Station Upgrade Attn: John Koon ADDRESS: 201 South Jackson Street, Suite 600 PROJECTIADDRESS(S)ILOCATION AND ZIP CODE: 550 Monster Road SW Renton, WA 98057 CITY: Seattle ZIP: 98104 TELEPHONE NUMBER: Karen Heidergott, Project Manager (206) 296-0645 KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S): 3779200090 APPLICANT (if other than owner) I NAME: King County Dept. of Natural Resources & Parks Water and Land Resource Division EXISTING LAND USE(S): Flood Prevention Pumping Facility PROPOSED LAND USE(S): COMPANY (if applicable): Flood Prevention Pumping Facility ADDRESS: Same as above EXISTING COMPREHENSIVE PLAN MAP DESIGNATION: EAI: Employment Area Industrial CITY: ZIP: PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION (if applicable) NA 206-296-0645 TELEPHONE NUMBER: Karen Heidergott, Project Manager EXISTING ZONING: RC: Resource Conservation Shoreline Env Desig. -Natural CO NT ACT PERSON I PROPOSED ZONING (if applicable): NA NAME: Ray Nickel, PE, PMP SITE AREA (in square feet): 28,000 SQUARE FOOTAGE OF PUBLIC ROADWAYS TO BE COMPANY (if applicable): Parametrix DEDICATED: 0 ADDRESS: 1019 -39th Avenue SE, Suite 100 SQUARE FOOTAGE OF PRIVATE ACCESS EASEMENTS: 0 PROPOSED RESIDENTIAL DENSITY IN UNITS PER NET CITY: Puyallup ZIP: 98374 ACRE (if applicable) TELEPHONE NUMBER AND EMAIL ADDRESS: NUMBER OF PROPOSED LOTS (if applicable) 253-604-6604 mickel@parametrix.com NUMBER OF NEW DWELLING UNITS (if applicable): 03/11 I I PROJECTINFORMATrIO~N~~(4c~o~n=ti=n=ue~d=I) ______________ -, NUMBER OF EXISTING DWELLING UNITS (if applicable): SQUARE FOOTAGE OF PROPOSED RESIDENTIAL BUILDINGS (if applicable): SQUARE FOOTAGE OF EXISTING RESIDENTIAL BUILDINGS TO REMAIN (if applicable): SQUARE FOOTAGE OF PROPOSED NON-RESIDENTIAL BUILDINGS (if applicable): SQUARE FOOTAGE OF EXISTING NON-RESIDENTIAL BUILDINGS TO REMAIN (if applicable): 7,700 SF NET FLOOR AREA ON NON-RESIDENTIAL BUILDINGS (if applicable): 7,700 SF NUMBER OF EMPLOYEES TO BE EMPLOYED BY THE NEW PROJECT (if applicable): PROJECT VALUE: IS THE SITE LOCATED IN ANY TYPE OF ENVIRONMENTALLY CRITICAL AREA, PLEASE INCLUDE SQUARE FOOTAGE (if applicable): o AQUIFIER PROTECTION AREA ONE o AQUIFIER PROTECTION AREA TWO 0 FLOOD HAZARD AREA _all_sq. ft. 0 GEOLOGIC HAZARD __ sq. ft. 0 HABITAT CONSERVATION _all _sq. ft. 0 SHORELINE STREAMS & LAKES _all _sq. ft. 0 WETLANDS _buffer_ sq. ft . . LEGAL DESCRIPTION OF PROPERTY (Attach legal description on separate sheet with the following information included) SITUATE IN THE -NW QUARTER OF SECTION _24 __ , TOWNSHIP _23 __ , RANGE _04 __ , IN THE CITY OF RENTON, KING COUNTY, WASHINGTON AFFIDAVIT OF OWNERSHIP I, (Print Name/s) Karen Heidergott , declare under penalty of perjury under the laws of the State of Washington that I am (please check one) __ the current owner of the property involved in this application or _x_ the authorized representative to act for a corporation (please attach proof of authorization) and that the foregoing statements and answers herein contained and the information . ct to the best of my knowledge and belief. Date Signature of Owner/Representative Date STATE OF WASHINGTON) ) SS COUNTY OF KING ) I certify that I know or have satisfactory evidence that ~.t!l>-];~LJlll:::..l~±~~ signed this instrument and acknowledge it to be hislher/their uses and purpose mentioned in the instrument. Zio z,i) 12. I Notary (Print): _.L:.-.-'=...:~J..:::.=----.L.:.'---''-''l.k--''-'':....:!'''-..!.-4<-__ _ My appointment expires: ___ 1L-_--,l.fc--_-'Z"'-'/)L..!./~~=__ ______ _ P:\Black R PS Rentoo_Land_Use_Master_Appl-ML DES 2012-05-29 JK.docx -2-03/11 I PROJECT INFORMATION (continued) LEGAL DESCRIPTION JUNCTION ADD POR TRS 21-22-23-24 & 25A & POR TRS 26 & 29 RENTON SHORELANDS 2ND SUPL ADD BEG SW COR SEC 13-23-04 TH E 1271.74 FT TH N TAP ON BDRY LN BET TRS 28 & 29 OF SD RENTON SHORE LANDS 2ND SUPL ADD & TPOB TH CONTG N 275 FT TH W 280.69 FT TH S 59-53-47 W 377.52 FT TH S 74-13-19 W TO ELY MGN OF CO RD TH SEL Y ALG SD ELY MGN TO SLY BDRYOF SD TR 29 TH ELY ALG SD SLY BDRY TO TPOB ALSO BEG TPOB ABOVE DESC TH N 250 FT TH ON TANGENT CURVE TO RGT RAD OF 627.46 FT TAP ON BDRY LN BEG TRS 26 & 27 OF SD RENTON SH LDS 2ND SUPL ADD TH SWL Y ALG SD BDRY LN TO BEG LESS PORTION FOR CO ROAD P:\Black R PS Renton_Land_Usc_Mastcf_Appl·ML DES 2012-05-29 JK.docx - 3 -03111 'ENGINEERING. PLANNING. ENVIRONMENTAL SCIENces 1019 39th AVE SE, SUITE 100 PUYALLUP, WA 98374 T.253.604.6600 F.253.604.6799 www.parametrix.com Date: May 24~ 2012 To: Corey Thomas, Plans Reviewflnspector III, City of Renton Fire Department From: Michael Lubovich Subject: SEPA Exemption Project Narrative cc: Karen Heidergott, King County FMD John Koon, King County WLRD Project Number: 554-1521-085 Project Name: Black River Pump Station Upgrade Background: The Black River Pump Station is a flood prevention station located in the City of Renton at 550 Monster Road SW. The facility was built in 1969 and includes a concrete dam and pump house set across the Black River Channel, eight flood control pumps and seven 270 gallon interior aboveground storage (day) tanks in the pump house, three 16,900 gallon outdoor aboveground diesel fuel storage tanks, approximately 100 linear feet of buried steel fuel transfer piping, and a control building with a standby generator and small day tank. The recent diesel fuel spills at the station prompted a station evaluation, from which several critical upgrades were identified. The work associated with this project is a result of the deficiencies identified in the fuel transfer and containment system. Project Scope: New Facilities include o The exiting temporary containment berm that was installed in response to a 2005 spill will be replaced with a new 64,600 gallon concrete containment wall. Interior height of the containment walls will be 30 inches tall. o The existing fuel transfer pump, piping, and valves inside the existing berm will be replaced. o The exterior of the three aboveground storage tanks will be cleaned and recoated. o The buried steel fuel transfer pipe will be replaced with buried double wall pipe from the containment area to the pump building. + COMMENTS: Black River Pump Station Neighborhood Map iMAP 01 146311 The information included on thls map has been compiled by King County staff from a variety of sources end is subJact 10 Change without notice. King County makes no representations or warranties, express or Implietl, as to accuracy, completeness. timaliness, or lights to the use of such informa~on. - This document is not Intended for use I'IS a survey product. King County shall nol be liable for any general, spacial, Indiract, Incidental, or consaquentlal W' K"lng County damages Including. but not limited to, lost revenues or lost profits resulting from the USB or misuse of the information conlalned on this map. Any sale of this map or infOffllllUon on this map Is prohIbited except by written pIlrmil>slon of King County. Date; 512912012 Source: King County IMAP· Property Information (http://WMV,rnetrokc.gov/GISJiMAP) From: Koon, John [mailto:John.Koon@kingcountv.gov] Sent: Wednesday, February 01, 20126:09 PM To: Heidergott, Karen; Ray Nickel Cc: Meyers, Phyllis Subject: FW: Black River Pump Station SEPA Karen, Ray, Good news. I looked at the regulations with one of our ecologists and our proposed work at Black River is exempt from SEPA. See below for my request for concurrence from the City of Renton and their speedy response. We do still need the Shorelines Exemption. Ray, please let David know. Thanks John From: Jennifer T. Henning [mailto:Jhenning@Rentonwa.gov] Sent: Wednesday, February 01, 2012 5:52 PM To: Koon, John Cc: Brad Gould; Chip Vincent Subject: RE: Black River Pump Station SEPA Hello John, Yes, City of Renton concurs with your determination that the proposal to replace the bulk fuel secondary containment system and primary fuel piping at Black River Pump station is categorically exempt from SEPA per WAC 197-11-800 (3). The project does require a Shoreline Exemption from City of Renton. Jennifer Henning, AICP Planning Manager City of Renton Planning Division 1055 South Grady Way Renton, WA 98057 425.430.7286 From: Koon, John [mailto:John.Koon@kingcounty.gov] Sent: Wednesday, February 01, 2012 4:40 PM To: Jennifer T. Henning Cc: Brad Gould Subject: Black River Pump Station SEPA Jennifer, As I believe you are aware, King County, at the direction of the Renton Fire Department, is moving quickly toward the replacement of the bulk fuel secondary containment system and primary fuel piping at the Black River Pump station. We have hired Parametrix to do the design work and most of the permitting so you can expect them to contact you soon if they have not done so already. However, if we are required to prepare a SEPA checklist and determination for this project, we prefer to handle these products in-house at King County. After reviewing WAC 197-11-800 I believe that this project is categorically exempt from SEPA. WAC 197- 11-800 (3) describes categorical exemptions and includes remodeling of public structures that involve no material expansions or changes in use beyond that previously existing. The proposed project includes only replacement of existing structures (containment berm) and equipment (underground fuel pipe) so there is no change in previously existing use. The project will not include any work in lands covered by water. We have not completed our design yet;, however there is a chance that the footprint of the secondary containment berm will change slightly as we move from an oval shaped earthen berm to a rectangular concrete structure. We believe that this potential small change in footprint is not significant enough to trigger the SEPA process. The purpose of this e-mail is to determine whether the City of Renton concurs with our interpretation that this project is categorically exempt. If we do need to go through the SEPA process for this project we need to know as soon as possible so that we can get started. Please call if you need additional information or would like to discuss. 206890-2562. Thank you. John Koon King County River and Floodplain Management WAC 197-11-800 (3) Repair, remodeling and maintenance activities. The following activities shall be categorically exempt: The repair. remodeling, maintenance, or minor alteration of existing private or public structures, facilities or equipment, including utilities, involving no material expansions or changes in use beyond that previously existing From: Jennifer T. Henning [mailto:Jhenning@Rentonwa.gov] Sent: Thursday, January 26, 20129:15 AM To: David Sherrard Subject: RE: Black River Pump Station Retrofit -Shoreline Permit Process Hi David, • Yes, the proposal is subject to a Shoreline Exemption, and is considered maintenance and repair, as stated by Erika. Thanks! Jennifer Henning, AICP Planning Manager City of Renton Planning Division 1055 South Grady Way Renton, WA 98057 425.430.7286 From: David Sherrard [mailto:DSherrard@oarametrix.com] Sent: Wednesday, January 25, 2012 3:51 PM To: Jennifer T. Henning Cc: Erika Conkling Subject: Black River Pump Station Retrofit -Shoreline Permit Process Jennifer - In the body of this email-below -is a photo of the site vicinity. The three white tanks are sitting out in front along Monster Road. Attached is a photo showing the existing berm system around the tanks. The proposal is to - 1) Replace the existing berm system with a new 3' high concrete wall and a new concrete slab- leaving the tanks in place 2) Replacing the existing single wall piping with double wall piping. New parallel trenches would be dug and pipes installed. The old pipes would be abandoned in place. We would like to think it meets the definition of "maintenance and repair" per the highlighted text below -but of course it is your call. 3. Maintenance and Repair: Normal maintenance or repair of existing structures or developments, including damage by accident, fire or elements. a. "Normal maintenance" includes those usual acts to prevent a decline, lapse, or cessation from a lawfully established condition. b. "Normal repair" means to restore a development t..oast:ate comparable t~ lisor.igin,alcond.lt:ion, including but not limited to its size, shape, configuration, location and external appearance, within a reasonable period after decay or partial destruction, except where repair causes substantial adverse effects to the shoreline resource or environment. c. Replacement of a structure or development may be authorized as repair where such replacement is the common method of repair for the type of structure or development and the repiaceme;;tstructure or developme~tis.corriparahle to hleo;iginal structure oridevelopment including; but~ot limited to,its ," ",' _ _ _. , •• ,,' •• ,< •• _ ", "". '_', _".. ' _.. ..,,, .", .... _, "" " " •• "'~,' ," '''' .",,..,H~ , , .... " .. ~" ... size, shape, configuration, location and external appearance and the replacement does not cause substantial adverse effects to shoreline resources or environment. If you need more information, please let me know. David IP' ci!lll' ci!lllm](e~ ll' fi l! ~fteo/de-~~-~a~ David Sherrard Senior Project Manager/Environmental Planner phone: 425-458-6374 fax: 425-458-6363 cell: 206-450-2606 dsherrard@parametrix.com Project Description: There are three 16,900 gallon diesel storage tanks located on the site. These tanks provide fuel for 7 diesel driven pumps that are located in the building that spans over the river (Mechanical Building). Each diesel drive pump has its own 270 gallon diesel storage day tank. Just south of the mechanical building is a control building which houses all the electrical equipment and a diesel generator. The fuel piping between the three large tanks and the buildings is all underground and single wall pipe. The goal for this project is to provide secondary containment everywhere and bring the station into compliance with current codes. We will be replacing all the underground piping with dual walled pipe, constructing a large concrete berm around the three large storage tanks, and upgrading the control/monitoring equipment. EXISTING CONDITIONS iMAP .~~~ .~ King County -lubnwltun