CITY OF RENTON
DEPARTMENT OF COMMUNITY & ECONOMIC
DEVELOPMENT
MEMORANDUM
Date: October 1, 2013
To: City Clerk's Office
From: Lisa Marie Mcelrea
Subject: Land Use File Closeout
Please complete the following information to facilitate project closeout and indexing by the City
C'lerk's nffice_
Project Name: WSDOT Street Standards Modification
LUA (file) Number: LUA-13-000296
Cross -References:
AKA's:
Project Manager: Jennifer Henning
Acceptance Date: August 27, 2013
Applicant: Ross Fenton, PE
Owner:
Contact:
PID Number:
ERC Decision Date:
ERC Appeal Date:
Administrative Denial: August 27, 2013
Appeal Period Ends: September 10, 2013
Public Hearing Date:
Date Appealed to HEX:
By Whom:
HEX Decision: Date:
Date Appealed to Council:
By Whom:
Council Decision: Date:
Mylar Recording Number:
Project Description: Street standards modification to allow the State of Washington Department
of Transportation flyover ramp to reduce East Valley Road to be less than the standard 94 feet for
Industrial Collector Arterials (3 lanes) and to omit the required 8 -foot sidewalk on the east side of
East Valley Road.
Location: East Valley Road
Comments: WSDOT must provide written assurance to the City of Renton that the approved cross
section (two 11 -foot wide lanes, one 12 -foot wide turn lane, and a 7 -foot wide planting strip) will
be forward compatible with the I-405 Master Plan Improvements
Denis LawClt� of
Mayor C
_ Jl
Jr r r
V'
Department of Community and Economic Development
C.E."Chip"Vincent, Administrator
August 27, 2013
Mr. Ross Fenton, PE
1-405,1-5 to SR 169 Contract Manager
Washington State Department of Transportation
600-108t� Avenue NE, Suite 405
Bellevue, WA 98004
RE: Street Modification Request — East Valley Road Reconstruction
SW 16th Street to SW 19th Street (LUA13-000296)
Dear Mr, Fenton:
We have reviewed your request for a modification of the reconstructed street section needed in
order to accommodate the 1-405/SR 167 Direct Connector (405/167 DC) project improvements.
The modification is needed as the Direct Connector project as proposed would not meet the
City's Complete Street Standards (RMC 4-6-060F.2) for East Valley Road, between SW 161h Street
and SW 19th Street.
Staff from City Departments have reviewed and discussed your request and have determined
that the modification may be granted resulting in the following street section:
The section of East Valley Road will have two 11 -foot wide lanes, and one 12 -foot wide turn lane
for East Valley Road (34 feet total from the face of curb to the face of curb) and a reduced
planter width of 7 feet. However, this recommendation is conditioned upon WSDOT providing
assurance that this cross section will be forward compatible with the 1-405 Master Plan
Improvements, and that no further relocation of East Valley Road will be needed. This would
allow final placement of East Valley Road from SW 16th Street to SW 191h Street and avoid
further disruption to businesses in the future.
Therefore, the requested modification is approved, subject to the following condition:
WSDOT must provide written assurance to the City of Renton that the approved cross section
(two 11 -foot wide lanes, one 12 -foot wide turn lane, and a 7 -foot wide planting strip) will be
forward compatible with the 1-405 Master Plan improvements and that no further relocation of
East Valley Road will be needed.
The decision to approve the proposed modification is subject to a fourteen (14) day appeal
period from the date of this letter. Any appeals of the administrative decision must be filed with
the City of Renton Hearing Examiner by 5:00 p.m., September 10, 2013.
Renton City Hall • 1055 South Grady Way • Renton, Washington 98057 . rentonwa.gov
Mr. Ross Fenton
Page 2of2
August 27, 2013
If you have questions regarding this correspondence, please contact Jennifer Henning, Current
Planning Manager, at Lhenning@rentonwa.gov or 425-430-7286.
Sincerely,
r .
Neil Watts, Director
Development Services Division
cc; Chip Vincent, CED Administrator
Gregg Zimmerman, Public WorksAdministrator
Doug Jacobson, Deputy Public Works Administrator
Leslie Betlach, Parks Planning & Natural Resources Director
Jennifer Henning, Current Planning Manager
Jim Seitz, Transportation Planning Supervisor
Chris Barnes, Transportation Operations Manager
Kayren Kittrick, Development Engineering Supervisor
Keith Woolley, Transportation Civil Engineer
of
C1
PLAN REVIEW COMMENTS (LUA13-000296) "Aft �,0 r'
PLAN ADDRESS:
APPLICATION PATE; 03/0812013
DESCRIPTION: Street standards modification to allow the State of Washington Department of Transportation flyover ramp to reduce East Valley Road to
be less than the standard 94 feet for Industrial Collector Arterials (3 lanes) and to omit the required 8 -foot sidewalk on the east side of
East Valley Road.
Conditions
Planning Custom Created On: 0810302013
Jennifer Henning Ph: 425-430-7286 email: yhenning(grentanwa.goV
WSDOT must provide written assurance to the City of Renton that the approved cross section (two 11 -foot wide lanes, one
12 -foot wide tum lane, and a 7 -foot wide planting strip) will be forward compatible with the 1-405 Mater Plan Improvements and that
no further relocation of East Valley Road will be needed,
October 01, 2013 Page 1 of 1
E
AM
Washington State
Department of Transportation
Paula J. Hammond P -E.
Secretary of Transportation
February 8. 2013
0
lnrthttiest Ile inn
Design Buki & 14051SR167 Program
600-108"' Ave NE Ste 405
Bellevue 1NA 98004
Fax 425-456-8600
TTY: 1-800-833-6388
www wsdot.wa.gov
Mr. Chip Vincent
Community and Economic Development Administrator/Planning Director
City of Renton
1055 South Grady Way
Renton, WA 98055
RE: Request to Modify Street Standard for East Valley Road Reconstruction
Dear Mr. Vincent:
I' i
To accommodate I-405/SR 167 Direct Connector (405/167 DC) Project improvements, the
Washington State Department of Transportation (WSDOT) is requesting that the City of
Renton approve modifications from the City's Complete Street Standard for East Valley
Road (EVR) between SW 16th Street and SW 19th Street as outlined in the below " FVR
Proposed Modified Street Standard Description" section.
WSDOT Project Overview
The 405/167 DC Project is the next step towards completing WSDOT's Tukwila to Renton
Improvement Project in the Renton area. The purpose for the 405/167 DC Project is to
provide a high occupancy vehicle (HOV) direct connection that helps to relieve increasing
congestion and deteriorating mobility through the corridor. Currently, the Northbound SR
167 to Northbound I-405 (NB167-NB405) ramp has two lanes, one lane for general purpose
traffic and one lane for HOV 2+ traffic. As the ramp merges with N13405, the HOV traffic
must merge into the general purpose lane on the ramp and then merge with the general
purpose lanes on N13405. The completion of the 405/167 DC project will improve traffic
flows by eliminating these merges.
The 405/167 DC project will construct a new direct connector ramp for HOV/express toll
lane (ETL) traffic travelling in each direction between the SR 167 south leg high occupancy
toll (HOT) lanes and the I-405 north leg HOV lanes. Other key project elements are
reconstructing sections of I-405 and SR 167 to open up the medians of these two roadways
Mr. Chip Vincent
February 8, 2013
Page 2 of 6
and create room for the direct connector ramp, widening or replacing the I-405 Bridge over
SR 515 (Bridge Number 4051016), and constructing new retaining walls.
This project will modify two local roadways, East Valley Road and S. 14th Street, where
they are impacted by the interchange improvements and 1-405/SR 167 widening.
Existing EVR Conditions at Location of Proposed Modified Street Standard
Through the project area, EVR is a Collector Arterial and currently consists of a 36 -foot wide
roadway with one through lane in each direction and a center turn lane. There is a 6 -foot
wide sidewalk on the west side and no sidewalk on the east side of the roadway. At the East
Valley Office Center, the sidewalk is adjacent to the street and separated from the
commercial property by an approximately 45 -foot wide planting strip. Further south at the
Larkspur Landing and Hilton Garden hotels, the sidewalk is separated from the roadway by
an approximately 27 -Foot wide planting strip and separated from the commercial property by
an approximately 15 -foot wide planting strip.
EVR Improvements at Location of Proposed Modified Street Standard
EVR will be reconstructed to the west to accommodate the Project. The proposed design
calls for reconstructing the EVR roadway to match the current 36 -foot width with one lane
for each direction and a two-way left turn lane. On the west side of EVR there will be an 8 -
foot wide planting strip that will separate an 8 -foot wide sidewalk from the roadway.
Included in the City of Renton right of way will be a minimum 2 -foot wide buffer west of the
sidewalk. Including this 2 -foot buffer, there will be a 10 -foot wide buffer between the
sidewalk and the parking lots located on the adjacent private properties, except this buffer
width will be decreased from 10 -foot to 5 -foot at the Larkspur and Hilton Garden properties.
A minimum 6 -foot wide buffer will be provided on the east side of EVR between the
roadway and the SR 167 right of way.
The two existing driveways serving these hotels and the business center will require
reconfiguration in place to connect to the reconstructed EVR.
EVR Proposed Modified Street Standard Description
Proposed modifications to the street standard for EVR from SW 16th Street to south of SW
19th Street are as indicated in the below table:
Design Standard
Description
Renton City Codi
Section 4-6-060(F)2 Regwire10ents<
raposed
Modified Street Standard
For East Valley Road
Commercial -Mixed Use, industrial,
& Neighborhood Collector Arterial
Right -of -Way
94' (when 3-1ane roadway)
60'
Sidewalks
8' both sides
8' wide on west side only
Planting Strips
8' both sides
8' wide on west side only
Parking lane
8' bath sides
no parking (match existing)
Mr. Chip Vincent
February 8, 2013
Page 3 of 6
LJ
Bicycle Facilities
All classifications of Arterials will
None (match existing)
have Class I, or Class ll, or Class III
bicycle facility.
Paved Roadway
3 lanes - 41'
3 lanes - 36' (match
Width, not including
existing)
parking
Lane Widths
10' travel lanes, 5' bike lanes, and
12' travel lanes, no bike
11' center left turn lanes.
lanes, and 12' center left
turn lane. (match existing)
Intersection Radii
35' turning radius (may increase to
35' turning radius (match
50' for streets with industrial
existing)
access)
Attached are a plan (Exhibit A) and roadway typical sections (Exhibits B1 and 132) showing
EVR with the proposed modified street standards.
Anticipated Future EVR Improvements at Location of Design Variance
When the I-405 Tukwila to Renton Improvement Project is completed in the future, EVR
will need to be located further to the west than is currently proposed for the 4051167 DC
project. Originally, the 405/167 DC project included reconstructing EVR to a location that
accommodates planned future I-405 and SR 167 improvements. These planned future
improvements have many components including adding a new lane on southbound (SB) SR
167 and adding a general purpose flyover from SB 1-405 to SB SR 167 in the vicinity of the
reconstructed EVR. After consultation with City of Renton staff; a determination was made
to construct EVR in an interim location that accommodated the 4051167 DC project but not
the planned future improvements.
Constructing EVR in this interim location will delay significant impacts to the existing
parking areas for the adjacent properties located west of EVR and is more consistent with
City code requirements than will be experienced when EVR is constructed in its ultimate
location. Since additional I-405 Tukwila to Renton Improvement Project (other than the
405/167 DC project) elements are currently unfunded, the actual schedule for constructing
these future planned improvements is uncertain and may not be built for many years.
Sincgfel , f`+
i
Ross Fenton, PE
I-405, I-5 to SR 169 Contract Manager
Attach
cc: 1-405 Project Files
Mr. Chip Vincent
February 8, 2013
Page 4 of 6
S W 16th
Street ; _
Existing East Valley Road
10' Buffer Strip —�
East Valley Road
Larkspur Landing
8' Planting Strip
8' Sidewalk
5' Buffer Strip
°i
0
I-
Existing SR 167
SW 19th Street
jj
EXHIBIT A
IMPROVED EAST VALLEY ROAD
WITH
I-405/SR167
DIRECT CONNECTOR PROJECT
PLAN
Mr. Chip Vincent
February 8, 2013
Page S of 6
x
h 0
www
RRI)!9 0
I)
mI F
LU U) I
r�I �
U.�l !—
L__I
3Nn'133aVd X3
33N3d ONIISI%3
L
3NIl MON
isNno 9NUSIX3
EXHIBIT B-1
1�1 IMPROVED EAST VALLEY ROAD
° I WITH
zY I-405/SR167
g)ga DIRECT CONNECTOR PROJECT
ic1 aol
TYPICAL SECTION
Mr. Chip Vincent
February S, 2013
Page 6 o1'6
W
19
301+134 JFIIISIX3
r i
NI
N_
I I 1
CI
jr
N {
r �
3NI11213HYd X3 m
- I
iv °O
3Nn MOa �-
9Mf19'JN1S X3
EXHIBIT B-2
IMPROVED EAST VALLEY ROAD
WITH
I-405/SR167
DIRECTCONNECTOR PROJECT
TYPICAL SECTION
WA STATE DEPT OF TRANSPORTATION
AFS ACCOUNTS PAYABLE
PO Box 47420
OLYMPIA WA 98504-7420
CITY OF RENTON
1055 S GRADY WAY
RENTON WA 98057-3232
0
MAA 2 , aflj
PAYMENT DATE:
WARRANT #:
VENDOR #:
BATCH:
FLYER:
03/20/13
3950112
SWV0012200-11
D1-036
100000
405-0 *x**x***** S T A T E O F W A S H I N G T O N* PAGE #: 1
RPT DWP827IN V E N D O R S R E M I T T A N C E A D V I C E
FROM: DEPARTMENT OF TRANSPORTATION CALL (360) 705-7571
INV DT INVOICE NUMBER ACCOUNT NUMBER DOCUMENT # AMOUNT
VENDOR MESSAGE AGREEMENT # / ORDER ID PAYMENT ID
030813 00005276
LUA13-000296 E
07819000-54
103.00
103.00
00
Ln
0
0
0
RECEIPT EG00008279
BILLING CONTACT
Ross Fenton
Washington State Department of Transportation
600 108Th Ave Ne , #405
Bellevue, WA 98004
City of
Transaction Date: May 08, 2013
REFERENCE NUMBER FEE NAME TRANSACTION PAYMENT AMOUNT PAID
TYPE METHOD
LUA13-000296 PLAN - Modification Fee Payment Lheck ##3950112 $100.00
Technology Fee I Fee Payment rheck ##395011Z $3.00
SUB TOTAL $103.00
TOTAL
$103.00
Printed On: 5/812013 Prepared By: Holly Powers Page I of 1