PACIFIC
OCEAN
OLYMPIA
VICINITY MAP
NOT TO SCALE
CANADA
U. S. A.
EVERETI
~PROJECT
SITE
Rl 1VERVIEW PARK
RIDGE REPL · CEMENT
RENTON.W
LOCATION MAP
SHEET INDEX
1 TITLE SHEET AND SHEET INDEX
2 STRUCTURAL GENERAL NOTES
3 APS SURVEY
4 EXISTING CONDITIONS
.5 DEMOLITION PLAN
6 TEMPORARY EROSION AND SEDIMENT CONTROL
7 GENERAL SITE LAYOUT
~
8 GENERAL BRIDGE LAYOUT
9 ABUTMENT DETAILS
10 SUPERSTRUCTURE DETAILS 1 of 2
11 SUPERSTRUCTURE DETAILS 2 of 2
12 MISCELLANEOUS DETAILS
L.1 PLANTING PLAN WEST
l.2 PLANTING PLAN CENTRAL
L.3 PLANTING PLAN EAST
L.4 PLANTING SCHEDULE AND DETAILS
Q..
3::
,APR 1 ; ; ,
(1) ·~-----------
'>
-~
D::'.1-----------=::::...;
PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY ~ PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE
LD 1736 Fourth Avenues. Suite A CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS. 0 ~ li1 RI m .. l ni Seattle, Washington 98134 WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT,
:;:.-Bi ~ Phone: 206-624-1387 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF
~ Fax: 20 6-624-1 388 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY
g ENGINEERS, INC. AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN
,-;; mail@pndengineers.com APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED
REVISIONS PROJECT:
t----t---+--------------------1 TITLE:
;:::: g' IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT DESIGNED BY: .....___,-
CXJ "' DIRECTLY OR INDIRECTLY TO PND. DRAWN BY:
30°/o DESIGN
RIVERVIEW PARK
BRIDGE REPLACEMENT
TITLE SHEET AND INDEX
MTIB PROJECT NO: 134057.01 SHEET NO:
DMM DATE: APRIL 14
ON
.o,·,,,:j:()N
.......... 2 -st-o REV DATE DESCRIPTION CHECKED BY: SCALE: NOTED ._ _______________ ....i... ____________________________________ .. ________ ....__._ __ .1..... _______________ .i..;..;;;.;...;.; ......... ______ ,.___ _______ _;;;....__ _____ ---1 1 OF 16
STRUCTURAL GENERAL NOTES
The following General Notes are applicable and shall be considered part of this Specification.
APPLICABLE CODES AND STANDARDS
1. AASHTO LRFD Guide Specifications for the Design of Pedestrian Bridges, December 2009.
2. AASHTO LRFD Bridge Design Specifications, 6th Edition.
3. American Society for Testing and Materials (ASTM) Standards, current edition.
4. American Institute of Steel Construction (AISC), "Steel Construction Manual, Current Edition".
5. American Welding Society (AWS), "D1.1 Structural Welding Code -Steel, current edition".
6. American Concrete Institute (ACI), "ACI Manual of Concrete Practice, current edition".
The information contained in these General Notes is in addition to the details and notes provided on the individual plan
sheets. In case of conflict between notation in the above references, these General Notes, and notes and details on
individual sheets, the following priority shall be followed:
1. All project permit requirements.
2. Notes on individual plan sheets.
3. Details and callouts on individual plan sheets.
4. These General Notes.
5. Local Codes.
6. The specifications and standards listed above in order of appearance.
DESIGN CRITERIA
The following loads are prescribed by the AASHTO LRFD Guide Specifications for Design of Pedestrian Bridges.
DEAD LOAD
Weight of all materials of construction
LIVE LOAD:
Pedestrian loading -90 psf uniform
Equestrian loading -1,000 lb concentrated
Vehicle load -H5 -(10,000 lb)
WIND LOAD:
Horizontal -50 psf applied to leading exposed area.
Vertical -20 psf applied over full bridge width with resultant force applied at windward 1/4 pt. of deck width.
MATERIALS AND CONSTRUCTION
GENERAL
All material and equipment incorporated into this project shall be new unless otherwise noted on the plans. Material not
specifically noted in these General Notes or elsewhere on the drawings shall be submitted by the Contractor for approval
by the Engineer. Approval will be based on conformance to current standards utilized by the Owner. All materials shall
conform to good workmanship, acceptable industry standards and manufacturer's recommendations.
SURVEYS
The Contractor shall layout the work from established horizontal and vertical control points indicated on the drawings
and shall be responsible for all required measurements taken from these points.
STRUCTURAL STEEL
HP Shapes shall conform to A572 Grade 50.
Plates shall conform to A572 Grade 50, unless otherwise noted. All plate thicker than 1 1 /2" shall be 100% straight
beam UT tested for laminations per ASTM A435.
Rectangular and Square HSS shall conform to ASTM A500 Grade B.
Round HSS shall conform to ASTM A500 Grade B or C.
Pipe sections with 12-inches O.D. or less shall conform to ASTM A53 Grade B, Type E or S.
Angles and Flatbar shall conform to minimum ASTM A36.
All structural steel shall be galvanized or spray metalized unless otherwise noted.
~ REBAR
-a Rebar shull be new billet stock ASTM A615, grade 60 steel. Bars shall be clean and free from cutting oil or other
8 deleterious material.
I
~
0
r---
lD
0
"S/-
1")
/ z
0
(/) w
0
I,{!
0
I")
/
+-'
C
<Ll
E
<Ll
0
0
0..
<Ll
0:::
<Ll
0,
--0 ·.:::
DJ
BOLTS AND OTHER HARDWARE
All bolts or threaded rods connecting to steel or steel to concrete shall be ASTM A325, galvanized, unless noted
otherwise. All A325 bolts shall installed per AISC Turn-Of-Nut tightening, or other approved methods, unless noted
otherwise. All other bolts shall be ASTM A307, galvanized, unless noted otherwise. Galvanized washers shall be used in all
areas where the bolt head or nut shall bear against concrete or against oversized holes in steel
(i.e. more than 1/16 in. larger than bolt diameter). Galvanized nuts and washers shall conform to the specification for
the corresponding bolt.
STEEL WELDING
All field and shop steel welding shall conform per AWS D1.1 Structural Welding Code -Steel, current edition.
Deposited filler metal shall meet Charpy requirements of 20 ft-lbs. at O degrees F and have chemistry similar to the
base metal as approved by the Engineer. Filler metals shall only be used in welding positions recommended by the
manufacturer. Welding consumables shall be stored and the condition shall be maintained per AWS Section 5.
Pre-heat shall be based on material grade and thickness shown herewith, per AWS tables. Uniformity of pre-heat shall
conform to AWS stipulations.
ALUMINUM GRATING
Aluminum grating shall be type 7-SG-4 manufactured by Grating Pacific, LLC with 1'' x 1 /8" bearing bar or Engineer
approved equal. Grating shall be installed such that bearing bars span perpendicular to normal direction of traffic flow.
Aluminum used for grating shall conform 6061-t6. Open ends of grating shall be banded. Grating shall be sand-blasted
after fabrication to create a matte finish.
Welding personnel shall be qualified per AWS to weld procedures and weld positions necessary for the joint details
specified herewith. All steel fabrication shop drawings shall reference the weld procedure specification for each weld
detailed. Weld procedure specifications shall be submitted with the shop drawings. Submittals verifying welder
qualifications must be transmitted to the Owner for approval prior to any welding.
No welding through galvanized coating shall be performed. The galvanizing within 2-inches of the weld shall be removed
prior to welding and repaired as discussed in coating repair.
All welds shall be visually inspected to comply with the visual inspection criteria, for statically loaded non-tubular and
tubular connections, per AWS Section 6.
The Engineer at his discretion may non-destructively test welds using UT, RT, MT methods, per AWS Section 6.
Acceptance criteria shall be for non-cyclic loading. Welds failing shall be repaired at the Contractor's expense, which will
also include all costs for retesting, to achieve passing inspection test.
GALVANIZING
All steel shall be hot-dip galvanized per ASTM A 123 or A153 as appropriate, unless otherwise noted.
NON-SLIP SURFACE
All non-slip/non-skid steel walking surfaces noted shall be thermal sprayed with Plattzinc® 85/15, or approved equal,
to obtain a slip resistant surface. Prepare surface and apply per manufacturer's recommendations. Coating thickness
shall be 10 mils minimum. Submit samples of surface texture for approval to Engineer.
The following items shall have non-slip surfaces unless otherwise noted:
1. Transition plates
2. All Dolphin walking surfaces
3. Other specifically noted items
SPRAY METALlZING
Spray metalize with zinc per the Steel Structures Painting Council (SSPC) Guide No. 23. A minimum dry coating
thickness of 6 mils is required for steel. Contractor shall mask off all areas that will be field welded such as pile, plate
or stud locations.
COATING REPAIR
All damaged galvanizing and spray metalizing, including thut removed for welding, shall be repaired per ASTM A780 and
modified as follows:
Repair using zinc sticks to a minimum thickness of 12 mils, or repair by spray metalizing as described in these notes.
In either case, followed with a top coat of zinc rich paint.
SURF ACE RUBBLE
The Contractor is responsible to visit site and make own assessment of pile installation interferences. Surface rubble
may include but is not limited to broken rocks & boulders, timber piles, concrete debris, miscellaneous metal, and a
variety of other debris.
ALUMINUM
Aluminum shall conform to 6061-T6 unless otherwise noted.
Edges shall be cut true, smooth and free of burrs. Flame cutting in not permitted. Holes for bolts shall be drilled or
punched. Corner edges shall be ground smooth. Weld spatter, stamps and markings shall be removed from all exposed
surfaces. All aluminum surfaces shall be sand-blasted to create a matte finish.
ALUMINUM WELDING
All aluminum welding shall conform to AWS D1.2 aluminum welding code. Per AWS D1.2 all welders shall be qualified per
AWS for the type of welding anticipated. Weld procedure specifications and welder qualification shall be submitted with
the shop drawings.
~ PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY
;: PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE
lD 1736 Fourth Avenues. Suite A CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS.
SUBMITTALS
The following is a partial list of required submittals for this project. The Engineer may require additional submittals.
1. Contractor's complete project schedule and general work plan. Schedule shall be in Gantt Chart format & depict the
critical path for project completion. -14 days prior to beginning work on the Project.
2. Manufacturer's Mill Certificate: Steel Certification including chemistry, yield strength, and mill numbers. -14 days
prior to commencement of fabrication and steel shipment
3. Shop Drawings for all fabricated items. -14 days prior to fabrication.
4. Welding procedures. All weld metal proposed to be used in the shop or in the field shall be submitted and approved
for use prior to construction. The submittal shall contain all required information and the manufacturer's
recommendations for the use of the product on this Project. -14 days prior to welding.
5. Welder Certificates -Certify welders employed in the WORK with AWS qualifications within the previous 12 months. -
14 days prior to welding.
6. Galvanizing certificates verifying that coated material conforms to the Specifications. -7 days prior to shipment.
7. Steel coating repair methods. -14 days prior to surface application.
8. Non slip surface samples. -14 days prior to surface application
9. Bridge transport and lifting plan. -14 days prior to transport of catwalk.
10. Red-lined As-Built drawings. -Prior to demobilization.
AS-BUILT RECORDS
The Contractor shall maintain an updated set of red-line as-built drawings at the project site. The as-built drawings
shall include all surveyed dimensions for new work items tied horizontally and vertically to existing monuments or
prominent features. As-built drawings shall be submitted upon request to the Engineer at anytime throughout the
project and upon substantial completion. Final set of As-Built drawings shall be provided to Owner.
REVISIONS PROJECT:
30°/o DESIGN
RIVERVIEW PARK
BRIDGE REPLACEMENT
APf!1-··j
j_ / ...
CiTV N
~ ffl Im n.,_1 TM Seattle, Washington 98134 WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT,
7' 1,11 Bi !!!rd Phone: 206-624-1387 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF 1------t-----+------------------------t TITLE:
~ Fax: 206-624-1388 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY
~ ENGINEERS, INC. AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN
-;, mail@pnclengineers.com APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED
STRUCTURAL GENERAL NOTES
;! g' IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT DESIGNED BY: MTB PROJECT NO: 134057.01 SHEET NO:
------·-~ ~ DIRECTLY OR INDIRECTLY TO PND. DRAWN BY: DMM DATE: APRIL 14 2 16
-s1-o~--------------------~----------------------------------------------~~---------~~R_E_V~_DA_T_E_~--------D_E_sc_R_1P_T1_0N _________ ~C~H~E~CK_E_D_B_~ ________ ~s_c_A_LE_, ________ N_oT_E_D~----O-F ___ --1
-----------------------· ·-------------------------------------
WITHll'J THE SE 1/4 OF THE SVV 1/4 OF SE(~TION 16j TOWNS~1IP 23 NOl~T~i, R.ANGE 05 EAST, VV"M., 11\1 RENTON, WASH!l'JG··roN = ., ~ = UJ C,
1--0
Q_ 5gg
C u
'
u
C u
7
w
,;
c: z
~
NO.
10BO
1061
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1144
1145
1146
1147
1148
1149
1150
1151
1152
1216
1217
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1233
1237
1238
1239
1240
----·------
DESCRIPDON
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DEGIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECtLJUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
FIR
POPLAR
POPLAR
DECIDUOUS
DECIDUOUS
OAK
OAK
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
OAK
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
DIA. (INCHES)
16 12 10
14
6 6 6
10
12
12
10 8
18
a
6 8
6 6 6 6 6 8 10
6 6 6
8
6 6 6
6 6 6 6 8
12 8 6 (i
106666
12 8
8 6 6 6 6
14
12 10 8 8 8 8
24 18 20
24 8 8 8 8 6 6
6 6 6 6
12
26 24
12
10
12
12
12 8 10
22 18
12
14
16
42
32
20
20
12
44
6
12
10
12
14
14 12 8 CLUSTER
8 10
12
14
46
14 16
14 12 8
8
6
~
D L._---------------
-__ R~_600.00'
L~640~71'--
L\~61 "11 '00"
-------
BH-1111
SOIL BOREHOLE
N=176744.69
E=130738B.19
EL=fi3.08
TREE TABLE
NO.
1241
1242
1243
1244
1245
1287
1288
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1.325
1326
1327
1328
1329
1330
1331
1332
1333
1358
1359
1360
1361
1362
1363
1364
1365
1366
1.367
1-370
1371
J.372
1385
1366
1387
1368
1389
1390
"1391
1392
1420
1421
1422
1543
1544
1545
DESCRIPrlON
DECIDUOUS
OAK
OAK
OAK
OAK
DECIDUOUS
DECIDUOUS
DECIDUOUS
ALDER
OAK
ALDER
ALDER
POPLAR
POPLAR
POPLAR
ALDER
ALDER
ALDER
ALDER
ALDER
ALDER
ALUER
ALDER
ALDER
ALDER
ALDER
MAPLE
ALDER
ALDER
ALDER
ALDER
ALDER
ALDER
ALDER
MAPLE
ALDER
ALDER
ALDER
DECIDUOUS
DECIDUOUS
DECIDUOUS
DECIDUOUS
MAPLE
MAPLE
ALDER
MAPLE
ALDER
ALDER
ALDER
ALDER
ALDER
CHERRY
DECIDUOUS
CEDAR
POPLAR
DIA. (INCHES)
10 8
27
21
18
22 24
26
14121086
18
12 10
26
6
6
20
30
18
8
6
6
12
10
8
6 6
8 6 6
8
B
8
10
8 6
10
10
14
8
6 6 6
8 6
12 12
6
B
8 6
4.4
32
36
12
20 12 12 10
12 10
12
20
12
14 12 rn
8 6
10 8 6
12
10
8
12 6
38
NO.
1546
1547
1548
1549
·1sso
1551
1552
1553
1554
1555
1556
1557
1558
1559
1560
1561
1562
1563
1564
1565
1566
1567
1568
1569
1570
1571
1572
1573
1574
1575
1576
1577
1578
1579
1580
158i
1582
1583
1629
1630
1631
1632
'1633
1634
1630
1636
1637
1638
1639
1640
1641
1642
1643
1644
1645
1646
DESCRIPTION
FIR
POPLAR
POPLAR
POPLAR
POPLAR
POPLAR
POPLAR
POPLAR
ALDER
POPLAR
POPLAR
POPLAR
POPLAR
HEMLOCK
POPLAR
POPLAR
POPLAR
MAPLE
MAPLE
ALDER
MAPLE
ALDER
ALDER
MAPLE
MAPLE
ALDER
MAPLE
ALDER
MAPLE
ALDER
ALDER
MAPLE
POPLAR
ALDER
MAPLE
ALDER
ALUER
MAPLc
MAPLE
MAPLE
MAPLE
MAPLE
M,~PLE
ALDER
ALDER
ALDER
DECIDUOUS
ALDER
DECIDUOUS
ALDER
W'lLLOW
MAPLE
POPLAH
OAK
POPLAR
ALDER
PARCEL ·J 62305-9013 ~ LOT3 LOT 4
PARCEL
512640-0020
DIA. (INCHES)
10
28
33 28 10
32
10
12
28
24
10
14
20 12
14
22
8
24
24
28
12 10
12
10
10
8
0
10 8
12
12
12
12
8
12
14 12 8
18 8 6
20
10 8
10 10
12
10
8
28
28
43
16 14
16
12
10 6
10
10
12 10 8 6
24 24 12 26
14 12
8
18 16 J4.
22 22
1B
20
12
PILING
A
A
B
C
[)
E
E
F
G
H
I
J
K
L
M
N
0
p
(-,
" R
s
T
u
NOTE:
~ PARCEL 512640-0015
~'
LOT2 ~
PARCEL 512640-0010 "
LOT 5
PARCEL
5126',0-0025
0r .:::,.c. 5TH STREET
I
I
CTRL-400
SPIKE SET W/CAP
N=176555.12 _
[=1307652.38 0
EL~62.48
,,,.------------
BRIDGE SUPPORT PILING & BRIDGE DECK TABLE
ELEV,
42,72
62.87
42.55
42.37
42.17
41.97
6?.95
46.10
44.09
44.61
44.80
46.76
47.17
49.36
51.21
50.22
47.93
43.50
43.59
42,69
43.20
43.12
44.88
DESCRIPTION
BRIDGE SUPPORT PILING
BRIDGE DECK
BRIDGE SUPPORT PILING
Br!IDGE SUPPOIH PILING
BRIDGE SUPPORT PILING
BRIDGE SUPPOF/ r PILING
BRIDGE DECK
12" DIA. WOOD/ BOTTOM OF CEDAR RIVER
WOOD ·12 11 DIA.
i 2"
12"
12"
DIA.
DIA.
DIA.
WOOD
WOOD
METAL/
BRIDGE SUPPORT PILING i 2" DiA. WOOD
BRIDGE SUPPORT PILING 12" DIA. WOOD
BRIDGE SUPPORT PILING i 2" DIA. WOOD
BRIDGE SUPPORT PILING 12" DIA. WOO[)
BRIDGE SUPPORT PILING 12" DIA. WOOD
BOHOM OF CEDAR RIVER
BRIDGE SUPPORT PILING ·12" DiA. WOOD FOR DEFLECTION WALL
BRIDGE SUPPORT PILING 12" DIA. WOOD FOR DEFLECTION WALL
llflllJGE SUPPOl'<T PILING 12" DIA. WOOD FOR DEFLECTION WALL
BRIDGE SIJPPOfH PILING 16" DIA. WOOD WATER DEFLECTION WALL
BRIDGE SUPPORT PILING 16" DIA. WOOD
BRIDGE SUPPORT PILING 16" DIA. WOOD
BRIDGE SUPPORT PILl~IG ·12" DIA. WOOD
BRIDGE SUPPORT PILING 12" DIA. WOOD
BRIDGE SUPPORT PILING 12" DIA. WOOD
BRIDGE SUPPORT PILING 12" DIA. WOOD
BRIDGE SUPPORT PIUNG 12" DIA. WOOD
TOP OF THE PILINGS WERE NOT SURVEYED UNDER TIIE BRIDGE.
THE BOTTOM OF THE PILINGS WAS DETERMINED BY USING A LEAD
DURING HEAVY RAINS, WHICH LIMITED VISIBILITY.
LINE
N I
@)
~~§i-~
0 20 40
SCALE: 1''= 40'
CTRL-1603
SPIKE SET W /CAP 0
N=176373.34
E=l 307868.69
EL=66.28
NOTTO SCALE
AB
CD
3-D OHTHOGRAPHIC VIEVV
GENERAL NOTES
1. THE SOLE PURPOSE OF THIS SURVEY IS TO CREATE A
TOPOGRAPHIC IVIAP ABUTTING THE CEDAR RIVER, AS ILLUSTRATED
HEREON.
2. OUR CLIENT, PND ENGINEERS, INC .. HAS NOT FURNISHED APS
SUR.VEY & MAPPING WITH A TITLE REPORT OF THE BOUNDARIES. A
COMBINATION OF RECORD OF SURVEYS NJD PLATS WERE USED IN
CONCERT WITH FOUND IVIONIJIVIENTATION TO DETERMINE THE
BOUNDARIES SHOWN HEREON. ACTUAL OWNERSHIP STATUS MAY
VARY.
3. THIS SURVEY WAS BASED ON A RTK VRS SURVEY (USING TRIMBLE
R8 UNITS) IN COMBIN/\TION WITH fl CONVENTlot"/\L SURVEY (LEICA
1" TOTAL STATJot,). TI-IIS NETWORK MEETS OR EXCEEDS THE
ACCURACY STANDARDS SE r BY WAC 332-130-090.
4. ALL MONUMENTS WERE OCCUPIED OR OBSERVED DURING THE
IVIOeJTH OF JANUARY, 2014.
5. ALL MEASURING INSTRUMENTS AND EQUlf'MENT USED FOR THIS
SURVEY WERE MAINTAINED IN ADJUSTMENT ACCORDING TO
MANUFACTURER'S SPECIFICATIONS.
6. THIS SURVEY DOES NOT CONSTITUTE A SUBDIVISIO~I OF LNJD.
7. ALL COORDINATES AND BEARINGS Al',E BASED ON OBSERVATIONS
USING THE WASHINGTON STATE PHEFERENCE "IETVVORK, THE
WASHINGTON STATE PLAME COORDINATE SYSTEM, NORTH ZONE,
EXPRESSED IN US SURVEY FEH, AS DERIVED FROM NAO 83/07 DATA
9. ALL VERTICAL ELEVATIDr,S ARE BASED ON NAVD 88 DATUM.
SPECIAL SURVEY NOTE
THIS SURVEY WAS PREPARED FOR THE EXCLUSIVE USE OF PND
ENGINEERS, IMC . ., AND DOES MOT EXTEND TO Ai~Y UNNAMED PARTY
WITHOUT EXPRESS RECERTIFICATION BY APS SURVEY & IVIAPPING, LLC
AND/OR THE PROFESSIONAL LAND SURVEYOR NAMED HEREON,
NAMlt,G S.1110 PARTY.
(/) z (:.' (',J
CL j--o ~~
=<: UJ 1--c•J (")
UJ CJ t '
Oz a:;?;;~~
I-:::i:: r--r---(f) tJ) iii" i.n
>-~~~~ w--'--~
LI.! c~~u1?1 :.~ ~~I-l!. cc. -~ = N~
NW
UC, ;".? o:J
z
0
f-O> Cl "' L u
I x
(/) w
<( ;:::;
5' 0
a5
0
.s..i ~ ;a,;
F :;;] () D LU ~t',
-:,
0 -
0::: "' > CL 0
w LU 0 ro
0
> (:) z
0 (f) ci 0::: n:.'. O'.'. ,,;
:::) m w
U_J c--<
(I) ~ z u
r:,J a:: (') ,..,,
0 z -~1: z ~
CL w Pa
CJ ci :::;: > z rn ;:,~ rn U) w [:L 0..
w > ~ ..i: 0 --ti'.'.'. !J..
0 w ·-v ,,.? ' cc: "' "' UJ "--,
~-
T
1'c:i I--c--<
..i:
C:I
-
~
<i:
~
l,l
z ~ 0
f-0
z [/}
w l,l Q:'.
l,l
fl]
I I c,'
[L
I I [L
I I <(
I I
I I ----
0
;..: ~
;..: [D (.)
w
0
[) l.u
w >
"' 0
() Q:'.
l,J [L
I [L
() <( z
0
iJj
> w
"'
(/) --, Cl l-Cl
<(
~ :;, >-ca rn ;..: --0 m ~ w z ~ > s:
D:'. <( <(
::J [l'.'. 0
(/) 0
-'-•"' --·
~ 'F"(S ;-11
_ili ___ l_~F~·J· -. ,
-------------------------~--------1\-f!.~ ;
cnv ..
,,.I")
,·.'N. ' ! ; i "'-..-V/ ,,
: ',.: :;.::. / ,, ,, ! '. i : /i . PARKING ,/J /
/ V AREA . V
· .• //. · . CONCRETE,/J /.
· / V WALKWAY .•. V
' '·,~ ·,.:~
TIMBER DEFLECTOR
WALL
BOLLARD
/'/ i>.
I
APPROXIMATE
TOE OF B/\NK, TYP.
~
0
r---
Lf)
0
sj-n
/ z
(_')
(/] w
0
~
0 n
/
+-'
C
(])
E
(]) u
0
o_
Q)
0:::
(I) ' _,.
CJl
""O '··~ ·.:::
[D
\ ,,
i •
DI "
. I , I
~ I
I 135'± X 12'±
BRIDGE
EXISTING TIMBER
PILE, TYP.
~ EXISTING STEEL
TIMBER DEFLECTOR
WALL
PILE
EXISTING UTILITY LINES (WATER,
SEWER, IRRIGATION, FIRE (DRY LINE),
ELECTRICAL, AND TELEPHONE)
TIMBER APPROACH
WALL, TYP.
<
·~··
~ PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY
~ PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE
:g 1736 Fourth Avenues. Suite A CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS.
~ ffl Im ffl.1 "'' Seattle, \'1/ashington 98134 WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT,
/ Ill -1,1"1 Phone: 206-624-1387 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF
~ Fax: 206-624-1388 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY
~ ENGINEERS, INC. AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN ~ mail@pndengineers.com APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED
/
APPROXIMATE
TOP OF BANK, TYP.
, ..
REVISIONS
TIMBER
POST, TYP.
TIMBER
BULLRAIL, TYP.
EXISTING UTILITY
LINE, TYP.
8" CONCRETE
(DECK
W18 STEEL
BEAM, TYP.
• <l) <1)
. i!
i / !
! I
I , [
! ·,'
TYPICAL SECTION AT PIER
PROJECT:
30°/o DESIGN
RIVERVIEW PARK
BRIDGE REPLACEMENT
1----+------t-------------------1 TITLE:
EXISTING CONDITIONS
TIMBER
CAP
TIMBER
PILE, TYP.
· .. '·1r·· r'· ,. t • ' l r· ! .. ,.,,
~'( u· r·· ·,' , .• , I
I •• • , '\,,_,o' _,J
AP 0 1;i.
r:1r
~.r IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT DESIGNED BY: MTB PROJECT NO:
~ 2 DIRECTL y OR INDIRECTL y TO PND. DRAWN BY: DMM DATE: APRIL 14 4 16 134057.01 SHEET NO:
s;-oL-------------------..._-----------------------------------------..i...--------.....J~R-E_v ...... _D_AT_E.,...1 ________ D_Es_cR_IP_TIO_N _______ -1~CH~E~CK~ED;;_;,;BY~:-------l~SC~A=LE~:-------~N~OIT=D:.i.. ____ O_F ___ _i
.~ '' ::;:~.:
' 1,, :· 'i-'.
TIMBER RAILING
TO BE REMOVED
PARKING/
/L,,STOCKPILE~
AREA
REMOVABLE
BOLLARD
SAW-CUT CONCRETE
O WALKWAY ·
• ~FIRE DEPARTMENT
~ .· :--c ,._, c-c INLET CONNECTION
~ SIGN
INSTALL SILT FENCE PER
"TEMPORARY EROSION
AND SEDIMENT CONTROL"
PER COE No. 205-A
DEFLECTOR WALL
(TO REMAIN)
·,
TIMBER RAILING
TO BE REMOVED
CUT/CAP
UTILITIES
APPF10XIMATE
TOE OF BANK, TYP.
0,
3:
-ci
tr-i
0
I
~
0 ,...:
LO
0 "1-n
/ z
CJ
(/) w
0
~
0 n
/
~
C:
(l)
E
(l)
u
0
Q.
(l)
Ct'.'.
(l)
0,
-ci ·;::
(I)
""' L
0
0...
3:
"' '>
L
(l) >
Ct'.'.
,,
·~ .... -,-~~
,,
SALVAGE
INTERPRETIVE SIGNAGE
SALVAGE
INT[RPRETIVE SIGNAGE
135'± X 12'±
BRIDGE
o . , I
EXISTING TIMBER
PILE, TYP.
[>,n 1·. / /~EXISTING STEEL
/ PILE
I /
b I I ';
/ /
o I
D I I~ DEMOLISH EXISTING
b r> / ; BRIDGE AND APPROACH
I AS INDICATED
I /
"/ I I I~ I
I
SAW-CUT CONCRETE
WALKWAY
(
I
I
I
I
I
DEFLECTOR WALL
TO BE REMOVED
TIMBER APPROACH
WALL, TYP.
DEMOLITION PLAN
~ PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY
~ PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE
2 1736 Fourth Avenues. Suite A CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS.
;:!; ffl .... ffl.1 T\! Seattle, Washington 98134 WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT,
/ 1111 llill W Phone: 206-624-1387 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF 5 rax: 206-624-1388 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY
N ENGINHERS, INC. AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN
APPROXIMATE
TOP OF BANK, TYP.
CAUTION!
UNDERGROUND UTILITIES
OBTAIN UTILITY LOCATES
PRIOR TO DIGGING.
-,,
REVISIONS
DEMOLITION NOTES:
GENERAL:
THE CONTRACTOR SHALL REMOVE THE EXISTING BRIDGE SUBSTRUCTURE,
SUPERSTRUCTURE, DECK, AND BRIDGE RAILINGS IN THEIR ENTIRETY AS INDICATED IN THE
PLANS, ALONG WITH MISCELLANEOUS ABOVE AND BELOW DECK ITEMS ASSOCIATED WITH
THIS STRUCTURE. INTERMEDIATE SUBSTRUCTURE CONSISTS OF TIMBER PIER PILES,
TIMBER CAP, AND LATERAL TIMBER CROSS-MEMBERS. ABUTMENT SUBSTRUCTURE
CONSISTS OF TIMBER PILES, TIMBER CAP, AND CONCRETE FOOTING.
THE CONTRACTOR SHALL REMOVE ALL TIMBER AND STEEL PILES IN THEIR ENTIRETY. ALL
PILES SHALL BE PULLED BY MEANS OF A VIBRATORY HAMMER SUITABLE FOR THAT TYPE
OF OPERATION AND EQUIPPED WITH SUITABLE JAWS TO PREVENT BREAKING THE PILE. IN
THE INSTANCE WHERE TIMBER PILES ARE UNABLE TO BE PULLED FOR AN ACCEPTABLE
REASON OUTLINED IN THE PERMITTING DOCUMENTS, PILES MAY BE CUT AT MUDLINE.
REFER TO PERMIT DOCUMENTS FOR MORE INFORMATION.
UTILITIES:
CONTRACTOR IS NOTIFIED THAT THERE ARE UTILITIES UNDER EXISTING BRIDGE. WATER
SERVICE, SEWER, PIPING DUCTS, ELECTRICAL, ETC. SHALL BE CUT, CAPPED, AND REMOVED
WITHIN SPECIFIED DEMOLITION AREA, UNLESS NOTED OTHERWISE. COORDINATE SHUT-OFF
OF ALL UTILITIES WITH CITY AND LOCAL UTILITY COMPANIES PRIOR TO ANY WORK BEING
PERFORMED ON SITE.
ADJACENT STRUCTURES:
DAMAGE TO ADJACENT STRUCTURES IS NOT PERMITTED. CONTRACTOR SHALL REPAIR
ANY DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES AS DIRECTED BY ENGINEER AT NO
COST TO THE CITY.
FENCING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR FENCING THE SITE TO PREVENT ENTRY
INTO SITE AND STAGING AREAS. FENCING SHALL BE INSTALLED THROUGHOUT ENTIRE
DEMOLITION SEQUENCE.
DISPOSAL:
THE CITY SHALL HAVE FIRST PRIORITY ON ALL DEMOLISHED MATERIAL. ALL MATERIALS
REMOVED AS PART OF THE DEMOLITION FOR THIS PROJECT, EXCEPT THOSE ITEMS
SPECIFICALLY LISTED FOR SALVAGE, SHALL BECOME PROPERTY OF THE CONTRACTOR AND
SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN APPROVED SITE IN
COMPLIANCE WITH ALL PERMIT REQUIREMENTS.
SALVAGE:
MATERIALS LISTED FOR SALVAGE IN DEMOLITION PLAN, SHALL BE DELIVERED BY THE
CONTRACTOR TO A SITE CHOSE BY THE CITY WITHIN 10 MILES OF THE PROJECT SITE.
STEEL BRIDGE GIRDERS AND DIAPHRAGMS SHALL BE SALVAGED FOR SCRAP. CONTRACTOR
SHALL SEPARATE CONCRETE DECK FROM STEEL COMPONENTS AND TRANSPORT STEEL TO
RECYCLE CENTER FOR SALVAGE VALUE.
LEGEND:
o TIMBER PILES
t3 STEEL PILES
PROJECT:
30o/o DESIGN
RIVERVIEW PARK
BRIDGE REPLACEMENT
l---+---+-------------------1 TITLE:
DEMOLITION PLAN
"1-.-;; mail@pndengineers.com APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED
Z.. g' IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT DESIGNED BY: MTB PROJECT NO: 134057.01 SHEET NO:
o·-N 3: DIRECTL y OR INDIRECTL y TO PND. DRAWN BY: DMM DATE: APRIL 2014 5 16
~~L-~~~~~~~~~~--~~~~~~...L..~~~~~~~~~~~~~~~~~~-'-~~~~~~~~~~~~~~~~~~~~L--~~~~~~~~..L..,R_EV....L..--DA_IT~L--------~------DE_sc_RI_PT_1o_N----~--------..l..':.:CH~EC~K~ED~B~Y:~~--~----......l~SC~A~LE~:------------~N~OIT~DL. ______ O_F ____ ~~
~
0
r--.
l{)
0 <ct
t')
/ z
(.'.)
(f) w
0
~
0
t')
/ -,..,
C
(])
E
(]) u
0
Cl.
(])
Cr'.
(])
01
" ·;::
CI)
FILTER FABRIC MATERIAL IN
CONTINUOUS ROLLS: -
USE STAPLES TO WIRE.
2" X 2'' POST
AT 6' O.C. MAX
n n
II \ II
11 11
11 11
---11 II
11 11
11 11
11 I I
11 11
I ,_-<,.","/';-;,.,, 11 ','.',,./c'
I 11
WIRE MESH SUPPORT FENCE
FOR SLIT FILM FABRICS
-6"
n I
2' -0"
5'-o"
''--.Y;"',\':-·>;::-, I ! /_/".JC I --1--
1 I 11
--I ~------H -----f+---------1 I
11 11
11 11
11 11
V V
BURY BOTTOM OF FILTER MATERIAL
IN 8" BY 12'' TRENCH
PROVIDE WASHED GRAVEL
BACKFILL OR COMPACTED
NATIVE SOIL.
11 11 2'-6"
11 11
11 I I
V
2"X 2" WOOD POST
STANDARD OR BETTER
OR EXISTING FENCE
r 6"
1
2' -o"
s· -o"
-12"
SILT FENCE
PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY 0 r--: PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE
l{) 1736 Fourth Avenue S. Suite A CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS. ~ ffl mil l ... ,a 1
"' Seattle, \Xlashington 98134 WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT,
::;-Ill 1,1111 Phone:2066241387 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF
E; Fax: 206-624-1388 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY
N ENGINLiERS, INC. AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN
REVISIONS
GENERAL EROSION AND SEDIMENT CONTROL NOTES:
1. THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSTRUCTION, MAINTENANCE,
REPLACEMENT, AND UPGRADING OF THESE TESC FACILITIES IS THE RESPONSIBILITY OF
THE CONTRACTOR UNTIL ALL CONSTRUCTION IS APPROVED.
2. THE TESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN
CONJUNCTION WITH ALL CLEARING AND GRADING SO AS TO ENSURE THAT THE
TRANSPORT OF SEDIMENT TO SURF ACE WATERS, DRAINAGE SYSTEMS, AND ADJACENT
PROPERTIES IS MINIMIZED.
3. THE TESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR
ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE TESC
FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND
MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G., ADDITIONAL SUMP
PUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.).
4. THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND
MAINTAINED TO ENSURE CONTINUED PROPER FUNCTIONING. WRITTEN RECORDS SHALL
BE KEPT OF WEEKLY REVIEWS OF THE TESC FACILITIES DURING THE WET SEASON.
5. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT
BE DISTURBED FOR TWO DAYS DURING THE WET SEASON OR SEVEN DAYS DURING THE
DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED TESC METHODS
(E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.).
6. ANY AREA NEEDING TESC MEASURES NOT REQUIRING IMMEDIATE ATTENTION SHALL BE
ADDRESSED WITHIN FIFTEEN (15) DAYS.
7. THE TESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A
MINIMUM OF ONCE A MONTH OR WITHIN FORTY-EIGHT ( 48) HOURS FOLLOWING A
STORM EVENT.
8. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO
ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES
SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH
SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM.
9. STABILIZED CONSTRUCTION ENTRANCES AND ROADS SHALL BE INSTALLED AT THE
BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT.
ADDITIONAL MEASURES, SUCH AS WASH PADS, MAY BE REQUIRED TO ENSURE THAT
ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. WHERE
STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED
AT A MINIMUM THICKNESS OF 2 TO 3 INCHES.
10. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1 ), ALL DISTURBED AREAS
SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR
THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE
BEGINNING OF THE WET SEASON.
PROJECT:
30°/o DESIGN
RIVERVIEW PARK
BRIDGE DEMOLITION
qF1' F 1\/C [·-)· J ' ·-"\,,.../ -. ' .· !,_., ,_.
APR 1 I ?'.J !4
•• 11 ,:, ,,,_ \,' :• .
t-------t--------t-----~--------------1 TITLE:
TEMPORARY EROSION AND SEDIMENT CONTROL
<ct.-;; mail@pndengineers.com APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED
~ 01 IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT DESIGNED BY: MTB PROJECT NO: "-·'= 134057.01 SHEET NO: z_ ~ DIRECTLY OR INDIRECTLY TO PND. DRAWN BY: DMM DATE:
<ct o REV DATE DESCRIPTION CHECKED BY: SCALE: NOTED ..__ _________________ ...,_ __________________ _.. ____________________ ..__ ________ ...._ ________________________ _i, _________ __. _________ __...__ ______ .......J
APRIL 14 6 OF 16
I
'· .. ..
··· ... ,.,_~-.>-\. ~-...... .,, ·-. ,,-..
··~··.·•.'' :.::~:.
'!
NEW STEEL.
RAILING .
' NEW CONCRETE
APPROACH SLAB
EXISTING ./1 /
~PARKING· V
AREA
EXISTING.·
• ~CONCRETE<//·
. WALKWAY ·, . EXISTING
REMOVABLE
BOLLARD
CONNECT TO
EXISTING UTILITY
~
0 r--:
LO
0 -tj-
r-r)
/ z
(.'.)
(/) w
0
N'.
0
:),
+-'
C:
Q)
E
Q) u
CJ
0..
Q)
0::
Q)
en
'" ·.:::
OJ
,_
·-:-,.~
_,, --
NEW STEEL
RAILING, TYP.-
NEW CONCRETE
APPROACH SLAB
'
END BRIDGE
TOP OF DECK ELEV: 63.56
NEW ALUMINUM ARCHED TRUSS
PEDESTRIAN BRIDGE
~--.
'•.
REPLACE EXISTING
UTILITY IN-KIND
BEGIN BRIDGE
TOP OF DECK ELEV: 63.13
GENERAL SITE LAYOUT
EXISTING
DEFLECTOR WALL
-
APPROXIMATE
TOE OF BANK, TYP.
~ PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY
;:: PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE
LO 1736 Fourth Avenues. Suite A CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS.
0 ;,; li1 m. m., T." Seattle, Washington 98134 WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT,
7 -Bl l,IU Phone: 206-6241387 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF
;::: Pax: 206624-1388 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY
~ ENGINJ\ERS, INC. AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN -tj--,;;-mail@pndengineers.com APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED
z:_ g' IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT o·-
N ;: DIRECTLY OR INDIRECTLY TO PND.
APPROXIMATE
TOP OF BANK, TYP.
REVISIONS PROJECT:
TITLE:
DESIGNED BY:
DRAWN BY:
30°/o DESIGN
RIVERVIEW PARK
BRIDGE REPLACEMENT
GENERAL SITE LAYOUT
f<FC'.F\\i:·• [)
APR 1 ; ?iih
•. ' I ',\j ~'-.
MTB PROJECT NO: 134057.01 SHEET NO:
DMM DATE: APRIL 14 7 16 OF '---02 REV DATE
r-r) L---------------------IL-----------------------IL..----------------------L..----------L..---1---.1..-------------------..L::=:.::;::...-::.: _______ ..J..::;;::;.::;;;;;,_ ______ _.:.::;::.::;,:;:_J_ _______ __J
DESCRIPTION CHECKED BY: SCALE: NOTED
CONCRETE
APPROACH
SLAB
r
VJ
0
0..
0 z w
cc,l
i!
----------------
EXISTING SIDE SLOPE
WITH ARMOR, TYP.
1:55'-o"
......
CEDAR RIVER
NEW ALUMINUM ARCHED TRUSS
PEDESTRIAN BRIDGE
. \
;/ .
OHW ELEV. +46.5'
r
VJ
0
0..
0 z w
cc,l
CONCRETE
APPROACH
SLAB
CONCRETE
WINGWALL, TYP.
CONCRETE
CAP, TYP.
-~ STEEL PILE,
TYP.
,_-.....,--,-s:-:~~---------------------------------,cc,.-. -c-cc-~'7""~•7--77-,-77-,-77-•,. ,,,,-. ----------------------------------------4
'· ' ' ' ,, ,, > "'-,, --:/ '
/';.· /! ·/,', . . .
//' . .
BRIDGE ELEVATIOl'I
I co
0
I
~
0
r....:
l{)
0
-<l-n
/ z
(')
VJ w
0
!ls:
0 n
/
+-'
C
<l)
E
<l)
0
0
0..
Q)
0::
<l)
01
-0 ·.:::
(Il
EXISTING
CONCRETE
WALKWAY
> ..
I
I
I •
\
\\
NEW STEEL
• R~ILING
. ,/
. ·~,!
. NEW STEEL
;RAILING
0
l{)
j I
-,_.·._.
'
I
I
3 :r:
0
I
I
BEGIN BRIDGE
TOP OF DECK ELEV: 63.13
' ' :
CEDAR RIVER
BRIDGE PLAN
~ PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY
;::'. PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE
:g 1736 Fourth Avenues. Suite A CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS.
;:!J ffl al ··~ "1 Seattle, Washington 98134 WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT,
/ IJIII Ila · Phone: 206-624-1387 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF
~ Fax: 206-624-1388 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY
~ ENGINEERS, INC. mail@pndenuineers.com AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN
..-(f) ,,. APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED
NEW ALUMINUM ARCHED TRUSS
PEDESTRIAN BRIDGE
RE\IISIONS
END BRIDGE
TOP OF DECK ELEV: 63.56
PROJECT:
l--t----1------------------~-----l TITLE:
I I
'in $
-<l-:r:
0
0
l{)
' '
' I
0
'°
NEW STEEL
RAILING
i '
NEW STEEL
RAILING
30°/o DESIGN
RIVERVIEW PARK
BRIDGE REPLACEMENT
GENERAL BRIDGE LAYOUT
PARKING
AREA
EXISTING
CONCRETE
WALKWAY
r.;.,rc:F1,1i::r'1
APR 11 2014
l'""'V {'f; > , .,.,,_,,.~ I • "-'"' '. ,
..:::::._ g' IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT DESIGNED BY: MTB PROJECT NO: 134057.01 SHEET NO:
o·-~ 2 DIRECTL y OR INDIRECTL y TO PND. DRAWN BY: DRH DATE: APRIL 14 8 16
noL-----------------------"i.------------------------"-------------------------...&.-----------.L...R-EV....L-D-A_T_E_.._ _________ D_E_Sc_R_IP_T_lo_N _________ i.::;CH~E~C~KE~D~B~Y~:--------..1,.:;S~CA~L~E:;_ _______ ~N~O~T~ED:..J... _____ O_F ____ ~
en :;:
-0
~
~
I
0::,
0
I
~
0 r..:
L{)
0
-tj-t')
/ z
0
(/J w
0
~
0 t')
/
+"
C
<1)
E
<1)
u
0
n.
<1)
0::
<1)
en
-0 ·.::: m
-"' ._
0 o_
:;:
<1)
·;;: ._
\])
-,,-~~ .2:
0::
TOP OF
EXISTING SLOPE\
' .
/
CONCRETE
BACKWALl \
/
,/·
', / "·. '·,.
'",' /
·"
CONCRETE \./
WINGWALL, TYP. /
CONCRETE
CAP
GROUND\
12"¢ STEEL PILE, TYP.
GALVANIZE TOP 10'-0"
.,
(
' '
r1· !
' ' !j;
11!
'I ,1
"
I
I
1 •
•
•
•
•
•
• ALUMINUM DECK
BEAM, TYP.
ALUMINUM
HANDRAIL, TYP
ALUMINUM
GRATING
I
I
·1
•I
.I
I
·1
•I
• I
I
·1
I
fe:::;,;;;;;:====~====;i:;:;;::====:::::=i:;;;;=====;:;;;;::cil1 I i--··--
·------... I
I
I
I
1
I
I
I I======·=·-=-·-=--=-="=·-==·=·· ~-!=========···=· ·=-=·-·:t:·=· ·=-====···-:;:-=-=·-=-=--= .. =··=-·=-·=·· ::::::1-I I
,-,
I I
L_,.J ,-,
I I
L_..J
~ PILE
·;;·
'
,. ' ' '
'
UTILITY
SUPPORT
,,
.. •
•
1
g' -4"
UTILITY LINES
AS REQUIRED
.,
ABUTMENT ELEVATION
ALUMINUM : I
I
FLOOR BEAM, I "=,~,,!!
I I
L_,.J ,-,
I I
L_..J
' ' i '
~ PILE
8" r PENETRATION
FOR UTILITIES, TYP.
12'-o"
CONCRETE
BACKWALL
i
' . I. 'I '
'I I ',, I., ' ' [',,
. '
, ..
; I
: ·i_ i A ·-, ABUTMENT PLAN
, i ,_,
ALUMINUM
CAP fl'.. TYP
ALUMINUM END
POST, TYP.
WIRE ROPE,
TYP .
ALUMINUM
TOE fl'.. TYP.
ALUMINUM TOP
•CHORD, TYP.
ALUMINUM BOTTOM
CHORD, TYP.
.· ALUMINUM
8"
CONCRETE
CAP
BASE fl'.. TYP.
ROUGHENED CONSTRUCTION
JOINT WITH KEY
STEEL PILE
BELOW, TYP.
CONCRETE
WINGWALL, TYP.
~ PND ENGINEERS, INC. IS NOT RESPONSIBL.E FOR SAFETY
~ PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE
~ 1736 fourth Avenues. Suite A CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS.
~ Iii ml .... , "' Seattle, Washington 98134 WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT,
/ Bl l!!rJI Phone:206624-1387 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF 5 Fax: 206-624-1388 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY
'::!-ENGlNEERS, INC. ·i@ d 1.n AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN
-tj-_,.(f) mm pn eng eers.com APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED
./
/
NEW CONCRETE
WALKWAY
,/
/
/ /
TOP OF BACK WALL:
ABUT 1 ELEV: 63.13'
ABUT 2 ELEV: 63.56'
/.
/ "·
/ ', /
w
0
0
0:: m
0 z
~ z
0 w m
I
·' -,,:,
''
I
ii: i i
3'-o"
'
-· ~------~ ----;-·--,
CONCRETE
CAP
if~
i STEEL ,,
'! PILE
/
/
COMPACTED
STRUCTURAL FILL
,/
EXISTING
GROUND
SECTION A-A
REVISIONS PROJECT:
f----t---t---------------------1 llTLE:
30o/o DESIGN
RIVERVIEW PARK
BRIDGE REPLACEMENT
ABUTMENT DETAILS
APR 1 ". ··n·, I . '' l u' -
CHVO
JJI A ~-.lt\:i,-_
-:::::_ g' IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT DESIGNED BY: MTB PROJECT NO: 134057.01 SHEET NO:
~-~ DIRECTL y OR INDIRECTL y TO PND. DRAWN BY: DRH DATE: APRIL 14 9 16 t')OL.-------------------......1 ....... ___________________ ............. _____________________ ._ _________ .._RE_v...__o_A_rr_ ..... ________ o_Es_c_RIP_T_lo_N _______ ....J~C~HE~C~KE~D~B~~-------...L.:S~CA~LE~:-------~NO~T~ED:.J... ____ o_F ___ _,1
cr,
:;::
-0
~
~
I
00
0
I
~
0
r-..:
LO
0
tj-
n
/ z
('.)
(J) w
0
!;-i1
0 n
/
+'
C:
<l)
E
<l)
u
0
0.
<l)
0::
<l)
cr,
-0 ·.:::
(IJ
-"' L
0
0...
:;::
<l)
'> L
<l)
'-'~'¥; .2::
0::
ct END POST
DETAIL 1
ALUMINUM FLOOR
DIAGONAL, TYP.
ct SPLICE
18 BAYS @ 7'-6" = 135'-0"
SYMM ABOUT
~ BRIDGE
PLAN
ALUMINUM FLOOR
BEAM, TYP.
ALUMINUM TOP AND
BOTTOM CHORDS, TYP.
ct END POST
ct END POST 52'-6" ct SPLICE 41'-3" ct END POST
f----------------------------------t------------C-A_M_B-ER_T_OP-C-HO_R_D __ -::Scc--;YMc--cM---,-------;A--;:;:B:ccOU---;-:T;:-----S-IM-IL_A_R_T_0 ________ ~1-~--------------=---=---------------~i 41'-3"
ALUMINUM TUBE\
WIRE ROPE,~ TOP CHORD l•••i•••l
--l
-
NOTE:CAMBERED TOP AND BOTTOM CHORDS
SHALL BE PARABOLIC IN SHAPE
ALUMINUM TUBE J
BOTTOM CHORD
2 1 /2"
" /
"\l
... ··"
ALUMINUM FLOOR
BEAM, TYP.
ALUMINUM FLOOR
DIAGONAL, TYP.
'-/ ALUMINUM TUBE --... -____ ,,... ALUMINUM TUBE
BOTTOM CHORD
(BELOW) VERTICAL, TYP.
ALUMINUM TUBE
BOTTOM CHORD, TYP.
\
\
DETAIL 1
ALUMINUM TUBE
--DIAGONAL, TYP. ,.__
'-"' '-
\
\
\
\ ..k-+--,--,-
\
--------------,
\ I
\ 1 /2'' /
'-/ ..... / ', _________ ,,,,,,
DETAIL 2
I
I
12'-0" AT 't_ BRIDGE~~ BRIDGE ,,--f DETAIL 2 ALUMINUM TUBE r VERTICAL, TYP. SPLICE, TYP.
I 1 (SEE DETAIL) ALUMINUM TUBE ....... , r DIAGONAL, TYP.
~--~-_-_ ---~--~ -····-1-/1_~-:~ -_-;W2~: .-~~ -:~
"' "' II -~
CAMBER BOTTOM CHORD~
1' 6" AT ct BRIDGE
ELEVATION
II
' ' •••••••• ,
'-\_ DETAIL 2
z
<C
• 0... <.O (J)
.1 0
0 -~ ::a:
f-
<C
I
I
I
I
I
I
I ~o
•
•
•
•
ALUMINUM
GUIDE ft, TYP.
ALUMINUM
FLOOR BEAM
10'-o"
DECK BEAM TO TOP
FLANGE OF FLOOR BEAM
ALUMINUM TUBE
DECK BEAM, TYP.
UTILITY
SUPPORT
ALUMINUM
GRATING
ALUMINUM
FLOOR DIAGONAL
UTILITY LINES
AS REQUIRED
-'-------------~
MID SPAN SECTION
D
I
I
• 1
•I
.I
I
·1
•I
,I
I
, I
, I
I
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
D
ALUMINUM
POST, TYP.
ALUMINUM TUBE
TOP CHORD, TYP.
2"¢ ALUMINUM PIPE
HANDRAIL, TYP
ALUMINUM TUBE
VERTICAL/DIAGONAL, TYP.
WIRE ROPE,
TYP.
ALUMINUM
TOE ft. TYP.
ALUMINUM TUBE
BOTTOM CHORD, TYP.
30 °/o DESIGN
-
~ PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY
~ PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE
REVISIONS PROJECT: RIVERVIEW PARK <~r;/: 20 •1
7
4
BRIDGE REPLACEMENT CJTY()Ffl!:N/01',j ~ 173G Fourth Avenues. Suite A CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS.
;:;!; ffl ISi ffl .. l n, Seattle, \Vashington 98134 WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT,
:;:--Ill .. W Phone: 206-6241387 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF /5 Fax: 206-624-1388 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY
Cj.. ENGINJ\ERS, INC. AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN
'ui mail@pndengineers.com APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED
~ g' IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT DESIGNED BY: MTB PROJECT NO:
1---+---+-------------------1 TITLE:
SUPERSTRUCTURE DETAILS 1 of 2
134057.01 SHEET NO:
---.....·-00 s: DIRECTL y OR INDIRECTL y TO PND. DRAWN BY: DRH DATE: APRIL 14 1 0 16 ,e ~ ~OL-~~~~~~~~~~~~~~~~~..i...~~~~~~~~~~~~~~~~~~-i.~~~~~~~~~~~~~--------------.t-~~~--~~~--...i-R_Ev..J..._o_A_TE __ ._ ______________ DE_sc_R1_PT_1o_N ______________ ..!,.::;.cH~EC~K~ED~B~~------------_J~SC~A~LE~:------------~N~O~~o::..L __ ......::_..:.... ____ :.._~
~
~
I
OC)
0
I
~
0
r--..'.
L[)
0
-st
I"')
/ z
Cl
(f) w
0
~
0
?
+-'
C:
Q)
E
Q)
0
0
0..
Q)
0:::
Q)
en
-0 ·;::
[!l
I
1---ll
I
I
I
I
I
I
I
I
IL----------i lt===------1 I ------· ----------··-·" --
I---------------------
I --------------·---------------------
1 ----
1
---------------·-----------
I ---------------------I -------
I ------------------1-
1 -------------------------,
I
------" I ------·---------·---·------------
I ----
1
-----------------------
1 ---------1----------,------
1 -----
it---=--=-~_:==-=------,
:~========================~ I \L---1~--JL---------,
I 11 I
I II I
I II I ALUMINUM
ALUMINUM
TOP CHORD
I II I -GUSSET fE_ ~~L1 _..l------
I I _... _... --
ALUMINUM I I _-d~--_... _... \ ~ __,
END POST~ 0 "'' : : ~----~ \ ---~~
I I .--o-;:;-'-"c~-H+-,-,---
1 I --~ ~
ALUMINUM O
"'-I I~ //'--' V
BASE fE_ ~ " , '-... : : I ,
UHMW PAD~~ I I I \
~~ I I I '
GALV._/"
BOL.T
---"~~ I ~ \
~ -3" \__ ALUMINUM I/~ "_, " " ~. -BOTTOM CHORD
J L\
'' i; !
!·';
ii
!: ! ,: :
i: I
i! '
ii I
1; :
" J " I
</
<J
'
'
:1 i ,
,,
ii
II !:
,, 2'. __,,-CONCRETE
/ CAP
'
:
1
__,,_ STEEL
1/ PILE
'i ' '
ii 1'
DJ
END POST DETAIL
ALUMINUM SPLICE fE_.
ALUMINUM
BOTH SIDES OF TUBE
1
, TYP.\
(
SPLICE, TYP.
f --" r TOP CHORD
o p O II --.:i
/ II O > I) \ '~l===t~=d\ " --J
---3 3" 3" 3" '
BOLT, TYP. -
I
0
0
0
0 ,-
0
0
ALUMINUM
DIAGONAL
ALUMINUM r BOTTOM CHORD
Fr =-=c-;====ll'=,,====-~:,...,,-
o o o II
~ II
J;:-==c.::::===i!::"==:::! J
0 0 0
SPLICE DETAIL
~ PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY
~ PROGRAMS, METHODS OR PROCEDURES Or-OPERATION, OR THE
L[) 1736 Fourth Avenues. Suite A CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS.
0
REVISIONS
EXCAVATION
LIMITS DETAIL
TO DE DEVELOPED
30o/o DESIGN n (' t~' r· 11 Jr': r·~
i< "'>. l.. ·=•"'•--. I ,J }." ! ./ PROJECT: RIVERVIEW PARK APR 112ll!4
BRIDGE REPLACEMENTcrrvorr,u,i,o, ;:; D1 Im m_, "'' Seattle, \Vashington 98134 WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT,
/ 1111 Uf'.I Phone: 206-624-1387 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF I-----+---+-------------------1 TITLE:
~ Pax: 206-624-1388 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY
~ ENGINEERS,INC. AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN
SUPERSTRUCTURE DETAILS 2 of 2
s;---;;;' mail@pndengineers.com APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED
"'--g' IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT DESIGNED BY: MTB PROJECT NO: 134057.01 SHEET NO:
o·-N 3:: DIRECTL y OR INDIRECTL y TO PND. DRAWN BY: DRH DATE: APRIL 14 11 16 ~~L-~~~~~~~~~~~~~--~~~...i-~~~~~~~~~~~~~~~~~~ ....... ~~~~~~~~~~~~~~~~~~~~.&.-~~~~~~--~--R-EV ....... ~DA_~~~~~~~~~~DE_sc_R1_PT_1o_N~~~~~~~.i...;.;CH~EC~K~ED~B~Y;~~~~~~--l~SC~A~LE~:~~~~~~~N~OT~ED:..L~~~-O-F~~~~
CJ)
"' "U
N
~
I
~
0
I'-
L!)
0
-tj-
n
/ z
('.)
(f) w
0
~
0 n
/ .....
C
(l)
E
(l) u
0
0..
(l)
Cr:'.
(l)
CJ)
"U ·c
CD
--"'-'-0
0...
"' (l)
'>
'-(l) . ::::
Cr:'.
-~ .
B1 IETM
ENGINEERS, INC.
1736 Fourth Avenue S. Suite A
Seattle, Washington 98134
Phone: 206-624-1387
Fax: 206-624-1388
mail@pndengineers.com
DETAIL
PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY
PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE
CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWl~IGS.
WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT,
THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF
INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY
AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN
APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED
IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT
DIRECTLY OR INDIRECTLY TO PND.
30o/o DESIGN
REVISIONS PROJECT:
r---,---,------------------1 RIVERVIEW PARK r;ir:r··r:1\/: r1
Ct .... c \,~v .. , '
BRIDGE REPLACEMENT APR 111
t------t--------jf-------------------1 TITLE:
MISCELLANEOUS DETAILS
DESIGNED BY: MTB PROJECT NO: 134057.01 SHEET NO:
REV DATE DESCRIPTION CHECKED BY: SCALE: NOTED 12 OF 16 DRAWN BY: DMM DATE: APRIL 2014
E
~
" ..
I
~
I a
" • E
" 0 a:
E
C
Jl
-
n.1
ENCINEERS, lNC.
PARKING AREA
C
1736 Fourth ,\venue S. Suite A
Seattle, Washington 98134
Phone: 206-624-1387
Fax: 206-624-1388
mail@pn<le11ginecrs.com
I
PLANTING PLAN WEST 0 10 20
1''= 201
Macleod
Reckard PLLc
83 Columbia Street, Suite 306
Seattle, Washington 98104
P 206-323-7919
F 206-323-9242
SCALE
PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY
PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE
CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS.
WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT,
THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF
INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY
AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN
APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED
IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT
DIRECTLY OR INDIRECTLY TO PND.
LIMIT OF WORK
I
I
I
REVISIONS
------OHWM
PROJECT:
t-----t-----+-----------------------__J TITLE:
DESIGNED BY:
DRAWN BY:
REV DATE DESCRIPTION CHECKED BY:
LEGEND
1
.. ,-~~ •--~] :' .;·,.:. :·-~ .. !: ..
! ••• • ........ : ... •
1 ·"' . •. . • . ..... .
,' . . . ~.~ .... -.
0 (J0
NOTES
UPLAND LAWN RESTORATION
TOP OF BANK PLANTING
MID BANK RESTORATION PLANTING
LOW BANK RESTORATION PLANTING
ORNAMENTAL PLANTING
100 YEAR FLOOD ELEVATION (±54.5)
ORDINARY HIGH WATER (±46.5)
LIMIT OF WORK
SEE SHEET L.4 FOR PLANTING DETAILS AND SCHEDULE
PRELIMINARY
RIVERVIEW PARK
BRIDGE REPLACE APR 1120 MENTC!TY 01, r;n,r:c,
PLANTING PLAN WEST
CR PROJECT NO: 134057.01 SHEET NO:
BM DATE:
NOTED
MARCH 2014 L.1 OF SCALE:
I
E
~
ENG TN l~ERS, INC.
LIMIT OF WORK
1736 liourth ,\,Tnuc S. Suite A
Seattle, Washington 98134
Phone: 206-624-1387
Fax: 206-624-1388
mail@pndengineets.com
I
I
I
N
PLANTING PLAN CENTRAL 0 10 20
1"= 20·
Macleod
Reckard PLLc
83 Columbia Street, Suite 306
Seattle, Washington 98104
P 206-323-7919
F 206-323-9242
SCALE
PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY
PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE
CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS.
WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT,
THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF
INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY
AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN
APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED
IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT
DIRECTLY OR INDIRECTLY TO PND.
I
I
I
I
I
I
)(
------OHWM
REVISIONS . PROJECT:
t--+----+------------------------....J TITLE:
DESIGNED BY:
DRAWN BY:
REV DATE DESCRIPTION CHECKED BY:
LEGEND
k::~ . -::·; ),'
'
. •,.. •, . \ •,
•• ,:>,', •......
[Dill .. -..
~ r,r v· v-
r v v v v
!V V V V V
NOTES
UPLAND LAWN RESTORATION
TOP OF BANK PLANTING
MID BANK RESTORATION PLANTING
LOW BANK RESTORATION PLANTING
ORNAMENTAL PLANTING
100 YEAR FLOOD ELEVATION (±54.5)
ORDINARY HIGH WATER (±46.5)
LIMIT OF WORK
SEE SHEET L.4 FOR PLANTING DETAILS AND SCHEDULE
PRELIMINARY
RIVERVIEW PARK
BRIDGE REPLACEMENT APR 1 } ; J .
rnv
PLANTING PLAN CENTRAL
CR PROJECT NO: 134057.01 SHEET NO:
BM DATE: L.2 MARCH 2014
OF SCALE: NOTED
E
0
~
" E
" l
E
C
11
ENC IN EEKS, INC.
1736 Founh .-\venue S. Suite,\
Seattle, Washington 98134
Phone: 206-624-1387
Fax: 206-624-[388
mail(f_lJpndenginccrs.com
LIMIT OF WORK
N
~--~'
4'PS) PLANTING PLAN EAST 0 10 20
~. --' f
Macleod
Reckard PLLc
83 Columbia Street, Suite 306
Seattle, Washington 98104
P 206-323-7919
F 206-323-9242
SCALE 1"= 20'
PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY
PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE
CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS.
WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT,
THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF
INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY
AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN
APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED
IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT
DIRECTLY OR INDIRECTLY TO PND.
-----OHWM
MAINTAIN EXISTING TRAIL ON BANK
REVISIONS PROJECT:
t---r-----j----------------------1 TITLE:
DESIGNED BY:
DRAWN BY:
REV DATE DESCRIPTION CHECKED BY:
LEGEND
~;,,:. :~:id· .. -:
i' :: ...... :-, }:.: .. . _·· ·_· -', . ~ •.
_ _'.'. _ _._...: . "·~ .......
mIIl]
~
NOTES
UPLAND LAWN RESTORATION
TOP OF BANK PLANTING
MID BANK RESTORATION PLANTING
LOW BANK RESTORATION PLANTING
ORNAMENTAL PLANTING
100 YEAR FLOOD ELEVATION (±54.5)
ORDINARY HIGH WATER (±46.5)
LIMIT OF WORK
SEE SHEET L.4 FOR PLANTING DETAILS AND SCHEDULE
PRELIMINARY
RIVERVIEW PARK f<r-:c::r-1\i'
BRIDGE REPLACEMENT APR 11 . __
PLANTING PLAN EAST
CR PROJECT NO: 134057.01 SHEET NO:
BM DATE: L.3 OF
MARCH 2014
SCALE: NOTED
-.
E a
~
'" ..
" I a
I • ~
0 a:
E
C
1i
Plant Schedule
symbol Botanical Name Common Name Size Quantity (SF)
TOP OF BANK PLANTING 16,255
~ Acer circinatum Vine Maple
Amelanchier alnifolia Service berry
Gaultheria shallon Salal
Holodiscus discolor Ocean spray
Mahonia aquifolium Tall Oregon Grape
Mahonia nervosa Oregon Grape
Physocarpus capitatus Pacific Ninebark
Picea sitchensis Sitka Spruce
Polystichum munitum Sword Fern
Pseudostuga menziesii Douglas Fir
Ribes sanguineum Red Flowering Currant
Rosa nutkana Nootka Rose
Symphoricarpos alba Snowberry
Thuja plicata Western Red Cedar
Tsuga heterophylla Western Hemlock
Vaccinium ovatum Evergreen Huckleberry
MID BANK RESTORATION PLANTING 1,044
~ Abies grandis Grand Fir
Corn us stolonifera Redtwig Dogwood
Corylus cornuta Western Hazelnut
Gaultheria shallon Salal
Physocarpus capitatus Pacific Ninebark
Picea sitchensis Sitka Spruce
Polystichum munitum Sword Fern
Rosa pisocarpa Cluster Rose
Salix hookeriana Hooker's Willow
Salix lasiandra Pacific Willow
Salix scouleriana Scouler's Willow
Salix sitchensis Sitka Willow
Thuja plicata Western Red Cedar
LOW BANK RESTORATION PLANTING 1,279
Cornus stolonifera
IV V V 'TV Salix hookeriana
7VVVV Salix lasiandra Iv v v v v Salix scouleriana
@ 00
{'.<,[
EN GIN F•'.ERS, INC.
Salix sitchensis
ORNAMENTAL PLANTING
Acer circinatum
Amelanchier alnifolia
Gaultheria shallon
Mahonia nervosa
Polystichum muniturn
Ribes sanguineum
Vaccinium ovaturn
1736 Fourth ,\venue S. Suilc A
Sealtlc, Washington 98134
Phone: 206-624-1387
Fax: 206-624-1388
mail@pndeugineers.com
Redtwig Dogwood
Hooker's Willow
Pacific Willow
Scouler's Willow
Sitka Willow
Vine Maple 1,295
Service berry
Salal
Oregon Grape
Sword Fern
Red Flowering Currant
Evergreen Huckleberry
Macleod
Reckard
83 Columbia Street, Suite 306
Seattle, Washington 98104
P 206-323-7919
F 206-323-9242
PLLC
Remarks
PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY
PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE
CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS.
WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT,
THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF
INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY
AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN
APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED
IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT
DIRECTLY OR INDIRECTLY TO PND.
REVISIONS PROJECT:
i--,----ir----------------------l TITLE:
DESIGNED BY:
DRAWN BY:
REV DATE DESCRIPTION CHECKED BY:
PRELIMINARY
RIVERVIEW PARK n·r::r··r-1\/l"f'';
t {, ... ~.~~· r. ' ,, ; L ... ,
BRIDGE REPLACEMENT"PR l t 20·,i
. ' ...., . , .. •" ~
PLANTING ?[.Cl\ •'.c,!•, •.
SCHEDULE AND DETAILS
CR PROJECT NO: 134057.01 SHEET NO:
BM DATE:
SCALE: NOTED L.4 OF
MARCH 2014