HomeMy WebLinkAboutContractAGREEMENT
CONTRACT NO. CAG-24-
THIS AGREEMENT, made and entered into this _15th___ day of August_____, ____2024_ by and between the CITY OF
Rodarte
Construction, Inc., hereinafter referred to as "Contractor."
Now, therefore the parties agree as follows:
1.Agreement. This agreement incorporates the following documents as if fully set forth herein: the 2024 Standard
Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of
Transportation and the Washington State Chapter of the American Public Works Association, including all published
amendments issued by t
Project, including but not limited to Addenda, Proposal Form, Special Provisions, Contract Plans, and Amendments
and all documents submitted therewith in response to the
Documents in Section 1-04.2 of the Standard Specifications, as revised by the Amendments and Special Provisions
2.Project. Contractor shall complete all work and furnish all labor, tools, materials, and equipment for the project
entitled Sanitary Sewer Replacement Project Phase I, WWP-27-04078, including all changes to the Work and force
account work, in accordance with the Contract Documents, as described in Section 1-04.2 of the Special Provisions.
3.Payments. City shall pay Contractor at the unit and lump sum prices, and by force account as specified in the
Proposal according to the Contract Documents as to time, manner, and condition of payment in a contract amount
not to exceed $780,857.82, unless modified by an approved change order or addendum. The payments to
Contractor include the costs for all labor, tools, materials and equipment for the Work.
4.Completion Date. Contract time shall commence upon City's Notice to Proceed to Contractor. The Work under this
Agreement shall be completed within the time specified in the Contract Bid Documents. If the Physical Work under
this Agreement is not completed within the time specified, Contractor shall pay liquidated damages and all
engineering inspection and supervision costs to City as specified in the Contract Bid Documents.
5.Attorney's Fees. In the event litigation is commenced to enforce this Agreement, the prevailing party shall be
entitled to recover its costs, including reasonable attorney's and expert witness fees.
6.Disclaimer. No liability of Contractor shall attach to City by reason of entering into this Agreement, except as
expressly provided in this Agreement.
7.Counterparts. This Agreement is executed in two (2) identical counterparts, by the parties, each of which shall for
all purposes be deemed an original.
CAG-24-105
Sanitary Sewer Replacement Project Phase I CAG 24-
08/06/2024
Contract Template Updated 12/29/2017
IN WITNESS WHEREOF, the City has caused these presents to be signed by its Mayor and attested by its City Clerk and
the Contractor has hereunto set his hand and seal the day and year first above-written.
CONTRACTOR:CITY OF RENTON:
President/Partner/Owner Armondo Pavone, Mayor
ATTEST
Secretary Jason Seth, City Clerk
FIRM INFORMATION
d/b/a
CHECK ONE:Limited Liability Company Partnership Corporation
STATE OF INCORPORATION:
CONTRACTOR CONTACT INFORMATION:CITY CONTACT INFORMATION:
City of Renton
1055 South Grady Way
Renton, WA 98057
(425) 757-7778
Rodarte Construction, Inc.
17 East Valley Hwy E
Auburn, WA 98092
(253) 939 - 0532
john@rodarteconstruction.com jnewman@rentonwa.gov
Attention:
If business is a CORPORATION, the name of the corporation should be listed in full and both the President and Secretary must sign the
contract. OR, if one signature is permitted by corporation by-laws, a copy of the by-laws shall be furnished to the City and made a
part of the contract document.
If the business is a PARTNERSHIP, the full name of each partner should be listed followed by d/b/a (doing business as) and firm or
trade name. Any one partner may sign the contract.
If the business is an limited Liability Company, an authorized managing member or manager must sign followed by his/her title.
8/15/2024