Loading...
HomeMy WebLinkAboutContractAGREEMENT CONTRACT NO. CAG-24- THIS AGREEMENT, made and entered into this _15th___ day of August_____, ____2024_ by and between the CITY OF Rodarte Construction, Inc., hereinafter referred to as "Contractor." Now, therefore the parties agree as follows: 1.Agreement. This agreement incorporates the following documents as if fully set forth herein: the 2024 Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, including all published amendments issued by t Project, including but not limited to Addenda, Proposal Form, Special Provisions, Contract Plans, and Amendments and all documents submitted therewith in response to the Documents in Section 1-04.2 of the Standard Specifications, as revised by the Amendments and Special Provisions 2.Project. Contractor shall complete all work and furnish all labor, tools, materials, and equipment for the project entitled Sanitary Sewer Replacement Project Phase I, WWP-27-04078, including all changes to the Work and force account work, in accordance with the Contract Documents, as described in Section 1-04.2 of the Special Provisions. 3.Payments. City shall pay Contractor at the unit and lump sum prices, and by force account as specified in the Proposal according to the Contract Documents as to time, manner, and condition of payment in a contract amount not to exceed $780,857.82, unless modified by an approved change order or addendum. The payments to Contractor include the costs for all labor, tools, materials and equipment for the Work. 4.Completion Date. Contract time shall commence upon City's Notice to Proceed to Contractor. The Work under this Agreement shall be completed within the time specified in the Contract Bid Documents. If the Physical Work under this Agreement is not completed within the time specified, Contractor shall pay liquidated damages and all engineering inspection and supervision costs to City as specified in the Contract Bid Documents. 5.Attorney's Fees. In the event litigation is commenced to enforce this Agreement, the prevailing party shall be entitled to recover its costs, including reasonable attorney's and expert witness fees. 6.Disclaimer. No liability of Contractor shall attach to City by reason of entering into this Agreement, except as expressly provided in this Agreement. 7.Counterparts. This Agreement is executed in two (2) identical counterparts, by the parties, each of which shall for all purposes be deemed an original. CAG-24-105 Sanitary Sewer Replacement Project Phase I CAG 24- 08/06/2024 Contract Template Updated 12/29/2017 IN WITNESS WHEREOF, the City has caused these presents to be signed by its Mayor and attested by its City Clerk and the Contractor has hereunto set his hand and seal the day and year first above-written. CONTRACTOR:CITY OF RENTON: President/Partner/Owner Armondo Pavone, Mayor ATTEST Secretary Jason Seth, City Clerk FIRM INFORMATION d/b/a CHECK ONE:Limited Liability Company Partnership Corporation STATE OF INCORPORATION: CONTRACTOR CONTACT INFORMATION:CITY CONTACT INFORMATION: City of Renton 1055 South Grady Way Renton, WA 98057 (425) 757-7778 Rodarte Construction, Inc. 17 East Valley Hwy E Auburn, WA 98092 (253) 939 - 0532 john@rodarteconstruction.com jnewman@rentonwa.gov Attention: If business is a CORPORATION, the name of the corporation should be listed in full and both the President and Secretary must sign the contract. OR, if one signature is permitted by corporation by-laws, a copy of the by-laws shall be furnished to the City and made a part of the contract document. If the business is a PARTNERSHIP, the full name of each partner should be listed followed by d/b/a (doing business as) and firm or trade name. Any one partner may sign the contract. If the business is an limited Liability Company, an authorized managing member or manager must sign followed by his/her title. 8/15/2024