Loading...
HomeMy WebLinkAboutcomment response August 14, 2024 Michael S. Sippo Civil Engineer III City of Renton 1055 South Grady Way Renton, WA 98057 RE: Responses to Comments – Development Engineering Division Chick-fil-A, Inc. 361 Rainier Avenue South, Renton, Washington 98055 Our Job No. 18963 Dear Michael: We have revised the plans and technical documents for the above-referenced project in accordance with your comment letter dated July 31, 2024. Enclosed are the following documents for your review and approval: 1. One (1) copy of the Civil Plans prepared by Barghausen Consulting Engineers, Inc. dated August 14, 2024 The following outline provides each of your comments in italics exactly as written, along with a narrative response describing how each comment was addressed: Sheet C5.0 • THE ORIGINAL PLAN SHOWS 8’’ NEW SD PIPE, WHY CHANGED TO 6’’? VERIFY AND UPDATE IF NEEDED Response: The plans were showing a flat 8-inch pipe previously; however, it was determined that these drains could be shallower with steeper slopes and the pipe size could be reduced. • THE APPROVED PLAN SHOWS 12’’. WHY CHANGED TO 8’’ PIPE? VERIFY AND UPDATE IF NEEDED. Response: The original piped connections were 8 inches, therefore, this was revised to match the existing configuration. This still works from a conveyance standpoint because the flow through these pipes is restricted by the flow splitter and there is an existing bypass in place. Sheet C8.0 • ADD WATER LINE LENGTH AND MATERIAL ON THIS PLAN SHEET Response: The water line length and material has been added to the plan sheet. • 95 LF 6’’ PVC SS @2%? Response: The pipe lengths and slopes have been updated and revised on the plan. Michael S. Sippo Civil Engineer III City of Renton -2- August 14, 2024 • 95 LF 6’’ PVC SS @2%? Response: Updated pipe lengths and slopes have been revised on the plan. Sheet C9.0 • ADD AND SHOW THE LUMINAIRE POLE THAT HAS BEEN RELOCATED BEHIND THE NEW SIDEWALK Response: The luminaire has been added to the plans. We believe that the above responses, together with the enclosed revised plans and technical documents, address all of the comments in your letter dated October 06, 2023. Please review and approve the enclosed at your earliest convenience. If you have questions or need additional information, please do not hesitate to contact me at this office. Thank you. Sincerely, Carmen Clinch Design Engineer CC/jd 18963c.016.docx enc: As Noted