HomeMy WebLinkAboutMiscRenton CARR ROAD WENDY'S RESTAURANT DELTA TRIP GENERATION, ACCESS REVIEW AND TIF TRAFFIC LETTER October 9, 2013 JTE . Jake Traffic Engineering, Inc. Mark J. Jacobs, PE, PTOE, President 2614 39th Ave SW -Seattle, WA 98116 -2503 RECE f VE D Tel. 206.762.1978 -Cell 206.799.5692 E-mail jaketraffic@comcast.net OCT 2 2 2013 JTE . Jake Traffic Engineering. Inc. . •; Cj1fPs Dave Krout, Construction Manager THE WENDY'S COMPANY 12244 S. Business Park Drive, Suite 100 Draper, Utah 84020 Kark J. Jacobs, PE, PTOE President 2614 19• Ave. SW -Seattle, WA 98116 -HOJ Tel. 206.762.1978 • Cell 206.799.5692 [-mail jaketraffic@comwtnet October 9, 2013 Re: Carr Road Wendy's Restaurant -Renton, WA Renton Pre-application #13-000154 & 13-000093 Delta Trip Generation, Access Review and TIF Traffic Letter Dear Mr. Krout, I am pleased to present this Delta Trip Generation, Access Review and IFC Traffic Letter for the proposed 3,227 sf Wendy's Restaurant with drive up service. This restaurant would replace the existing 3,927 sf Shari's Restaurant (per City Pre-application Meeting Notes, February 14, 2013). The site is located at 10619 SE Carr Road. No new street accesses are proposed. The project site shares access with significant adjacent retailing uses including Fred Meyer. A substantial portion of site traffic is expected to be shared with theses adjacent uses. I have reviewed the site and surrounding street system. The study scope was determined pursuant my past correspondence with Renton, my recent Renton project experience and review of the City's TIA Guidelines for new developments. The City peak hour trip threshold is 20 trips. The general format of this report is to describe the proposed project, calculate the traffic that would be generated by the project, and ascertain the Traffic Impact Fee for the project PROJECT INFORMATION Figure 1 is a vicinity map showing the location of the proposed site and surrounding street network. An aerial image of the site obtained from King County IMap is depicted to the right. Figure 2 shows a preliminary site plan prepared by HG Kimura Architect, PLLC. The site plan consists of the 3,227 sf Wendy's Restaurant with drive up service, 29 parking stalls and internal circulation into the adjacent retailing activities. No new access is proposed to the City street grid. \\i-,0,\0\->'1-,F-\:101Jo.J2 Cor•Ro .. w-,. w,ody,J HK.O-R,oloo\W_<>oru,,G-Tl•«n .. 00< COLORCOPVONLY Dave Krout, Construction Manager THE WENDY'S COMPANY October 9, 2013 Page -2- JTE, Inc. Full development and occupancy of the proposed of the Carr Road Wendy's project is anticipated to occur by 2014, presuming the permits are issued in a timely manner. EXISTING ENVIRONMENT Project Site The project site is presently developed with a 3,927 sf Shari's Restaurant, per Pre-application Meetjng Notes. This existing facility is to be removed from the site to make way for the proposed Carr Road Wendy's. Street System The primary streets within the study area and their classifications per the City of Renton Comprehensive Plan Figure 1-6 are depicted in the graphic to the right: Traffic Volumes -" Legend -../' City Lirnit I .,.. I ~ .... Renton Planning Area Principal Arterial .... Minor Arterial - Colleclor Arterial 1 ,.__+· .--·" -~-~ -~~ The City of Renton Traffic Flow Map, 2010 shows 31,100 vehicles per day use SE Garr Road and 26,000 vpd use SR -515. in the site vicinity; see graphic below. \\E"l'0-21\c\·"'o)O<lr-\:xlll on. Co" ~o .. w....,. ·W•-~AA· ~••100\W•-·~TG TIFLotm ooc COLOR COPY ONLY Dave Krout, Construction Manager THE WENDY'S COMPANY October 9, 2013 Page -3- Accident History JTE, Inc. WSDOT electronically provided 3 years (January 1, 2010 to December 31, 2012) of accident data for SE Carr Road and SR -515 in the vicinity of the re-development site. I have reviewed the data, in particular at the locations site customers are likely to ingress or egress the site from the City street grid. Primarily the SE Carr Road/106"' Pl. SE signalized intersection and the 3/4 driveway (no egress left turn) off of 108"' Ave. SE (SR -515). The data indicates 11 incidents at the SE Carr Road/106"' Pl. SE intersection. The daily traffic volume on SE Carr Road in the vicinity of the intersection is 31,300 vpd, thus the accident rate is calculated to be about 0.3 incidents per million entering vehicles. WSDOT a number of years ago installed raised channelization on SR-515 (108"' Ave. SE) between SE 108"' St. and SE Carr Road. This channelization restricts left turning traffic within this stretch of highway. The traffic data indicates that in this stretch of highway there were 9 incidents in the 3 year time period reviewed; 3 incidents/year. The accident rate for this -1/ 4 mile stretch of highway is about 1.3 incidents per million vehicle miles (9/(0.25 x 365 X 26,000 X 3) X 1,000,000). The WSDOT 2011 Washington State Collision Data Summary identifies a collision rate of 2.07 and 2.57 incidents per million vehicle miles for Urban Principal and Minor Arterials, respectively. 0.43 0.57 1 7.12 The above WSDOT accident rates are per million vehicle miles. The rates I calculated at the SE Carr Rd/106th Pl. SE intersection is per million entering vehicles. Accident rates of less than 1 per million entering vehicles at intersections typically indicate that the intersection is operating satisfactorily and over 2 a more detailed review is appropriate. The site access intersections are noted to be operating with no apparent safety issues. Other notes: There are 5 noted incidents between 106"' Pl. SE and 108'" Ave SE that correlate into a accident rate of about 1.5 incidents per million vehicle miles (5/(0.1 x 365 x 31,300 x 3) x 1,000,000). And the high traffic volume SE Carr Rd/SR -515 signalized intersection has an accident rate of about 1.5 incidents per million entering vehicles. A good \\foel.....,?a\t\-...._. ,_IJ<l,30~ .r:.,, _w._ "'4n<l)'S ~M-Ront<>n\Wemm-r:>ri!olG '"I.OI"'""" COLOR COPY ONLY Dave Krout, Construction Manager THE WENDY'S COMPANY October 9, 2013 Page -4- JTE, Inc. portion of the incidents were rear end and side swipe incidents that are indicative of a high volume busy intersection. STREET IMPROVEMENT PROJECTS The City of Renton 6 year Transportation Improvement Program, 2013 to 2018 was reviewed. A portion of Exhibit 'A' from the program is depicted to the right. TIP #10 Garr Road Improvements project is noted in the immediate vicinity of the project site. _,.____! ~ TRIP GENERATION AND DISTRIBUTION Definitions ' ' ' ' ' A vehicle trip is defined as a single or one direction vehicle movement with either the origin or destination (existing or entering) inside the proposed development. Traffic generated by development projects consists of the following types: Pass-By Trips: Diverted Link Trips: Captured Trips: Primary (New) Trips: Trip Generation Trips made as intermediate stops on the way from an origin to a primary trip destination. Trips attracted from the traffic volume on a roadway within the vicinity of the generator but which require a diversion from that roadway to another roadway in order to gain access to the site. Site trips shared by more than one land use in a multi-use development. Trips made for the specific purpose of using the services of the project. The proposed Garr Road Wendy's Restaurant is expected to generate the vehicular trips during the average weekday, street traffic AM and PM peak hours as shown in Table 1. The trip generation for the project is calculated using trip rates from the Institute of Transportation Engineers (ITE) Trip Generation, 9th Edition, for Fast Food Restaurant with drive up service (ITE LUC 934). In addition Table 1 notes the traffic associated with the 3,927 sf Shari's Restaurant facility (High Turnover Sit Down Restaurant, ITE LUC 932). All \\E"l>""..,2•\o\·Plo,..:tfot .. \2013032 c,,,, R0>0 ,.•Ml" -Wor.""' """ l!«lt..,\Wooar,1-ll<l~•rn-lFL.tt<,~,:,e COLOR COPY ONLY Dave Krout, Construction Manager THE WENDY'S COMPANY October 9, 2013 Page -5- JTE, Inc. site trips made by all vehicles for all purposes, including commuter, visitor, and service and delivery vehicle trips are included in the trip generation values. Restaurants tend to attract a significant amount of pass-by traffic. Tables 5.22 and 5.24 contained in the ITE Trip Generation Handbook Second Edition, June 2004 provides pass-by data for the existing and proposed use. The tables (copy attached) identifies the average pass-by rate at 43 percent for a high turnover sit down restaurant and The site includes internal connectivity to significant other commercial facilities including a Fred Meyer. A portion of the site traffic would be shared with other uses. Tables 7.1 and 7.2 in the Trip Generation Handbook provide Trip Origin and Destination within Multi-use sites, respectively. The data indicates that 20% of the site traffic would be shared. Based on my analysis, the net new trips generated by the Wendy's Restaurant are calculated to be 24 to 25 during the PM street peak hour. These trips would disperse among the 2 primary site driveways and a number of other site accesses. SITE ACCESS No new access to the City street grid is proposed. The project traffic would use existing access intersections. The primary intersections would be the signalized SE Garr Road/106'" Pl. SE and a % access driveway off of 108th Ave SE (SR -515). Additionally there are a number of other shared access locations to the City street grid. By inspection the site accesses operate well. AGENCY TRAFFIC IMPACT MITIGATION REQUIREMENTS The City of Renton has a Traffic Impact Fee program per Ordinance #5670 effective January 1, 2013. The TIF is scheduled to be phased in over time. Review of the phasing schedule indicates the 2013 TIF rate of ($9.54 sf for a High Turnover Sit Down Restaurant and $26. 78 for a Fast Food Restaurant with drive up service. These rates were also noted in Pre- application Meeting Notes. Renton's TIF is based on Rate Study for Impact Fees for Transportation. Parks and Fire Protection dated August 26, 2011. I have reviewed the Transportation Section of the report; and in particular Table 8 that denotes TIF rates per unit of development. The traffic generation rates used in this table incorporates pass-by rates but does not factor for shared traffic. In other words the City TIF rates are for stand alone facilities. The Wendy's Restaurant will share both access to the City street grid and traffic with the adjacent commercial establishment. The Shari's Restaurant also shared traffic. Based on ITE data 20% of the site traffic during the PM peak time period would be shared. The following table provides a TIF for the re-development, based on City 2013 rates, accounting for shared traffic: \\c"IJ"""''""\-f'«>r,,¢1 .... '7(>13 032-c.,,,~ ... --w·-"""· Rontan\W•M)'>-D<ttoTG-TIF~-· ~"'-COLOR COPY ONLY Dave Krout, Construction Manager THE WENDY'S COMPANY October 9, 2013 Page -6- Estimated Traffic Impact Fee City TIF Rate Shared Trip Adjusted Use Size (sf) per sf TIF*/per sf Fast Food Restaurant 3,227 $26.78 $21.42 -----------------------------------------------------------------High Turnover Sit Down Restaurant 3,927 $9.54 $7.63 Net Total JTE, Inc. Estimated TIF $69,135.25 -------------------- $29,970.86 $39,l.64.38 * National ITE data identifies 20% of site traffic during the PM peak hour are shared, both the existing and proposed use Carr Road SE is developed with curb, gutter and sidewalk. The City has plans to improve the street. Coordination with the City to ascertain appropriate requirements will be necessary. This street is noted in the TIF cost basis, thus any ROW dedication or other improvement cost should be credited against the TIF cost. SUMMARY AND CONCLUSION This letter was prepared to identify the Delta Trip Generation, Access Review and TIF Traffic Letter of the proposed re-0evelopment project. Based on my analysis the proposed Wendy's Restaurant project is expected to generate 24 to 25 net new PM peak hour trips that would be dispersed amongst a number of existing access driveways. The City trip threshold is 20 peak hour trips, no City classified intersection would be effected by site traffic. The City has a TIF requirement. The published City TIF rates are for stand alone facilities. A significant portion of the Wendy's Restaurant traffic, and the prior Shari's Restaurant use, is expected to be shared with the adjacent connected commercial facilities including a Fred Meyer. National data identifies 20% of the site traffic would be shared during the PM peak period. Accounting for this shared traffic I calculated the City TIF to be $39,164.38. Based on my analysis I recommend that Wendy's Redevelopment be allowed with the following traffic impact mitigation measures. ;,. Construct site in accordance with applicable City requirements. ;,. Pay lawful traffic impact mitigation fee. The estimated TIF is $39,164.38 with appropriate credit. \\[...,o,.,,,\'l·"'-'f""'\201.l Ol2 C..r~o1dWOM)>,-W••"l'I ....,. . """'-\W..,<tr>-0.••'" mun., o.x COLOR COPY ONLY Dave Krout, Construction Manager THE WENDY'S COMPANY October 9, 2013 Page -7- JTE, Inc. No other traffic mitigation should be necessary. Please contact me at 206.762.1978 or email me at 1aketraffic@comcast.net if you have any questions. MJJ: mjj( EXPIRES 4/3/ COi t Sincerely, Mark J. Jacobs, PE, PTOE, President JAKE TRAFFIC ENGINEERING, INC ;o.o<c;.Zo/'~ \\Enitn-2•\c\-"1....._F,,..\21Jl.>037 C."-W•-"'""""'""" """""-·Oeulll-11Fl.Orulro<>< COLOR COPY ONLY TABLE 1 VEHICULAR TRIP GENERATION CARR ROAD WENDY'S RESTAURANT -RENTON DELTA TRIP GENERATION, ACCESS REVIEW AND TIF LETTER Enter Enter Exit Exit Sha red I Sha red I Pass-I Pass-by Time Period Size TG Rate % Trips % Trips Total Trip % Trips by% Trips Prof)OSed: Wendy's Restaurant (ITE LUC 934; 3,227 sf} Weekday ________ 3,227 496.12 50% 800 50% 800 1601.0 -----·----------------·-----------------·-------------------------------------- AM peak hour 3,227 45.42 51% 75 49% 72 146.6 -------------------------------------------------------------------------------·---------------- PM peak hour 3,227 32.65 52% 55 48% 51 I 105.4 I 20% I 21.1 I 50% I 42.1 Existing Shari's Reataurant (ITE WC 932; 3,927 sf} _Weekday ________ 3,927 127.15 50% 250 50% l 250 j 499.3 ----------~---------------------------· ----·-----. AM peak hour __ 3,927 10.81 55% 23 -· 45% __ ----_ 19 -·-· 42.5 1-----------. 1----------~--------------------------------------7.7 I 43% I 13.3 -~~e::~ ~~~~--}---= -l-----= ------=----t----5~~ ----=---1----5~~ 1-_ 1~::~ ~----- JTE, Inc. I 42.1 I 17.6 A vehicle trip is defined as a single or one direction vehicle movement with either the origin or destination (existing or entering) inside the study site. The above trip generation values account for all the site trips made by all vehicles for all purposes, including commuter, visitor, recreation, and service and delivery vehicle trips. l\ii"l·"""'''"''""'O'""' ,, ... ,2013 ~32, ,:,., ""'' Wo,<lyll -w...i,,. H,U. ~""""""O)'l·O•,coTC '"l-~lt<' "" COLOR COPY CNl 'i Project: Carr Road Wendy's Restaurant -Renton Location: 10619 SE Carr Road NORTH JTE, Inc. CARR ROAD WENDY'S RESTAURANT -RENTON FIGURE 1 DELTA TRIP GENERATION, ACCESS REVIEW AND TIF TRAFFIC LETTER VICINITY MAP Project: Carr Road Wendy's Restaurant -Renton Location: 10619 SE Carr Road Note: An 8.5 x 1r copy of the site plan is in<:tuded with this Traffic Letter NORTH JTE, Inc. CARR ROAD WENDY'S RESTAURANT -RENTON FIGURE2 DELTA TRIP GENERATION, ACCESS REVIEW AND TIF TRAFFIC LETTER SITE PLAN !! 11 : ii I,, I 1: I . r\' ' I ,· -,.,··. ' ''! --1,i t,r<",,;,,>-' _i.:,·~-E'.. -:,f·' ' ' . ' ' I 'r ' \ > .. 'i(D\ 1, _,II ---· ' ' 1.,, .. 5 • t '1 ~o· ~-=::..--~ ]4' ®' ,if ;.:,1,Jw .~._ __ _::.:JSIGN [';~'_:: :(IA,-• ,- 1 ,,_: I APPENDIX Mark J Jacobs, PE, PTO From: Sent: To: Neil R. Watts [Nwatts@Rentonwa.gov] Friday, September 27, 2013 4:39 PM 'Mark J Jacobs, PE, PTO' Subject: RE: 2013.01x -Wendy's Re-development Follow Up Flag: Follow up Flag Status: Red Mark l. Cl!:,\,., I U1 I Yes, I worked with Kayren for over 20 years, and she was an awesome person to work with here. She has elected to retire from municipal work at this time, and is pondering her next life adventure. I concur fully with your suggested approach on the traffic letter for this project proposal. No additional information should be required for the project submittal purposes. Neil Watts, Director Development Services Division From: Mark J Jacobs, PE, PTO [mailto:JakeTraffic@comcast.net] Sent: Monday, September 23, 2013 10:04 AM To: Neil R. Watts Subject: 2013.0lx -Wendy's Re-development Neil I just tried to contact Kayren and I understand she is no longer with the City. She was a good person to work with! By chance do you know where she went to? I have a Client looking to re-develop the existing Shari's restaurant into a Wendy's restaurant in the SEC of the SECarr Road/1061h Pl. SE 1/S. No new accesses to the City street grid are proposed. The project redevelopment is projected to generate about 25 net new PMPHT's after netting out existing s~e traffic, shared traffic with the significant adjacent retailing. After dispersing the traffic to the site accesses less than 20 net new peak hour trips at any location would be expected. My sense is that a Traffic Letter including the following: project site review review the site accesses -calculate the delta traffic generation -ascertain the appropriate City TIF, the City TIF is for stand alone facilities and does not account for shared traffic that will occur with the re-development of the restaurant pad site prepare and sign a Traffic Letter detailing my findings Please take a look and let me know if I should incorporate any other information? Thank you Mark Mark J Jacobs, PE, PTOE JAKE TRAFFIC ENGINEERING, INC 2614 39th Ave. SW Seattle, WA 98116 206. 762.1978 206. 799.5692 cell 10/9/2013 {j) 0, 0, ~ Table 5.22 • Pass-By Trips and Diverted Linked Trips 3' Weekday, p.m. Peak Period "O G) (D Land Use 932-High-Turnover (Sit-Down) Restaurant :, (D el. ,r • :, :r: S0' DIVERTED ADJ STREET "' (1,000 so. WEEKDAY NO.OF TIME PFIIMARY NON-PASS-LINKED PASS-BY PEAK HOUR :, a. SEATS FT. GFA) LOCATION SURVEY DATE INTERVIEW'S PERIOD TRIP(%) BY TRIP(%) TRIP(%) TRIP(%) VOLUME SOURCE g ~ • "' n/a 5.8 Orlando, FL 1992 150 2:00-6:00 p.m. -68 -32 n/a TPD Inc. :, a. n/a 5 Casselberry, FL 1992 65 2:00-6:00 p.m. -42 -58 n/a TPD Inc. ~ 168 5.3 Louisville area, KY 1993 24 4:00-6:00 p.m. 37 -13 50 1,615 Barton-Aschman Assoc. iS" :, Barton-Aschman Assoc. g 169 2.9 Louisville area, KY 1993 41 4:00-6:00 p.m. 27 -36 37 3,935 -§ 150 3.1 Louisville area, KY 1993 21 4:00-6:00 p.m. 29 -33 38 2,580 Barton-Aschman Assoc. co 250 7.1 New Albany, IN 1993 n/a 4:00-6:00 p.m. 23 54 23 1,565 Barton-Aschman Assoc. ~ - 0, n/a 8 Kissimmee, FL 1995 664 2:00-6:00 p.m. 39 -21 40 n/a TPD Inc. n/a 11.4 Orlando, FL 1996 267 2:00-6:00 p.m. 43 -19 38 n/a TPD Inc. ~ n/a 11.5 Orlando, FL 1996 317 2:00-6:00 p.m. 51 -20 29 n/a TPD Inc. n/a 4.6 Orlando, FL 1992 276 2:00-6:00 p.m. -37 -63 n/a TPD Inc. n/a 5.7 Orlando, FL 1994 308 2:00-6:00 p.m. -43 -57 n/a TPD Inc. n/a 6.2 Orlando, FL 1995 521 2:00-6:00 p.m. 43 -11 46 n/a TPD Inc. Average Pass-By Trip Percee ,_ fl\ Ill II Ill !ll ,n [U lll (U [ll u u IL II.-IL II:, L_ ~JW !:I.\. • ~ -,, 'II • r .,-u"'u ........ 'Tl 'II IP .rt" "' ~ ............ 'II Table 5.24 Pass-By Trips and Diverted Linked Trips Weekday, p.m. Peak Period Land Use 934-Fast-Food Restaurant with Drive-Through Window SIZE DIVERTED ADJ. STREET (1,000SQ. WEEKDAY NOOF TIME PRIMARY NON-PASS-LINKED PASS-BY PEAK HOUR SEATS FT. GFAI LOCATION SURVEY DATE INTERVIEWS PERIOD TRIP(%! BYTAIP (%) TRIP(%) TRIP(%) VOLUME SOURCE n/a -2.6 Minn-St. Paul, MN 1987 50 3:00-7:00 p.m. 27 -48 25 n/a n/a n/a <5.0 Chicago suburbs, IL 1987 80 3:0D-6:00 p.m. -62 -38 n/a Kenig, O'Hara, Humes, Flock n/a <5.0 Chicago suburbs, IL 1987 100 3:0D-6:00 p.m. -45 -55 nla Kenig, O'Hara, Humes, Flock n/a <5.0 Chicago suburbs, IL 1987 159 3:00-6:00 p.m. -44 -56 n/a Kenig, O'Hara, Humes, Flock n/a <5.0 Chicago suburbs, IL 1987 225 3:00-6:00 p.m. -52 -48 nla Kenig, O'Hara, Humes, Flock =i! n/a <5.0 Chicago suburbs, IL 1987 88 3:00-6:00 p.m. -65 -35 n/a Kenig, O'Hara, Humes, Flock 1J n/a <5.0 Chicago suburbs, IL 1987 84 3:00-6:00 p.m. 56 44 n/a Kenig, O'Hara, Humes, Flock f~ -- 88 1.3 Louisville area, KY 1993 n/a 4:0D-6:00 p.m. 22 -10 68 2,055 Barton-Aschman Assoc. ~ 120 1.9 Louisville area, KY 1993 33 4:0D-6:00 p.m. 24 -9 67 2,447 Barton-Aschman Assoc. 5· ::, I 87 4.2 New Albany, IN 1993 n/a 4:0D-6:00 p.m. 25 -19 56 1,632 Barton-Aschman Assoc. ~ 150 3.0 LouiSVille area, KY 38 Barton-Aschman Assoc. 0. 1993 n/a 4:0Q-6:00 p.m. 31 -31 4,250 a 0 0 nla 3.1 Kissimmee, FL 1995 28 2:00-6:00 p.m. -29 n/a 71 nla TPD Inc. 1' "' nla 3.1 Apopka, FL 1996 29 2:0D-6:00 p.m. -62 nla 38 n/a TPD Inc. ::, 0. m n/a 2.8 Winter Springs, FL 1995 47 0. 2:0D-6:00 p.m. -34 -· 66 nla TPO Inc. 5: n/a 4.3 Longwood, FL 1994 304 ::, 2:0Q-6:00 p.m. -38 -1)2 nla TPD Inc. ~ n/a 3.2 Altamonte Springs, FL 1996 202 2:00-6:00 p.m. 39 -21 40 n/a TPO Inc. '<J n/a 2.9 Winter Park, FL 1996 271 2:00-6:00 p.m. 41 -18 41 n/a TPD Inc. ~ "' nla 3.3" several 1996 varies 4:0Q-6:00 p.m. -38 -62 nla Oracle Engineering • ::j • Average of several combin~. rn Average Pass-By Trip Percen g~ Cl) "' to OFFICE to RETAIL to RESIDENTIAL Table 7.2 Unconstrained Internal Capture Rates for Trip Destinations Within a Multi-Use Development WEEKDAY p.m. PEAK HOUR MIDDAY PEAK HOUR OF ADJACENT STREET TRAFFIC from Office 6% 6% from Retail 38% 31% from Residential 0% 0% from Office 4% 2% from Retail 31% G2~ from Residential 5% 9% from Office 0% 2% from Retail 37% 31% from Residential N/A N/A DAILY 2% 15% N/A 4% 28% 9% 3% 33% N/A Caution: The estimated typical intema capture rates presented in this table rely directly on data collected at a limited number of multi-use sites in Florida. While ITE recognizes the limitations of these data, they represent the only known credible data on multi-use internal capture rates and are provided as illustrative of typical rates. ff local data on internal capture rates by paired land uses can be obtained, the local data may be given preference. NIA-Not Available; logic indicates there is some interaction between these two land uses; however, the limited data sample on which this table is based did not record any interaction. 94 ITE • Trip Generation Handbook, 2nd Edition Chapter 7 (j) = ' • r ( .. L • -• from OFFICE from RETAIL Table 7.1 Unconstrained Internal Capture Rates for Trip Origins within a Multi-Use Development WEEKDAY p.m. PEAK HOUR MIDDAY PEAK HOUR OF ADJACENT DAILY STREET TRAFFIC to Office 2% 1% 2% to Retail 20% 23% 22% to Residential 0% 2% . ' 2% to Office 3% 3% 3% to Retail 29% av 30% to Residential 7% 12% 11% from RESIDENTIAL to Office N/A NIA N/A to Retail 34% 53% 38% to Residential NIA N/A NIA Caution: The estimated typical internal capture rates presented in this table rely directly on data collected at a limited' number of multi-use srtes in Flortda. While ITE recognizes the limitations of these data, they represent the only known credible data on multi-use internal capture rates and are provided as illustrative of typical rates. ff local data on Inter- nal capture rates by paired land uses can be obtained, the local data may be given preference, NIA-Not Available; logic indicates there is some interaction between these two land uses; however, the limited data sample on which this table is based did not record any interaction. CD Trtp Generation Handbook, 2nd Edition Chapter 7 • ITE 93 Washington State Departmec,t of Transportation Lynn Peterson Secretary of Transportat1ori October 8. 2013 Mr. Mark Jacobs -JTE Inc. :61-+ ~q 1 " A\·e SY\. Seattle. WA 981 16 Re: Collision Data D..:.lr !\fr. J;.u.:ub::;: "{rm1spor1at10n 8mldm(J 310 Mapie Par"k A,,:.1\u:' ~u. P.O. 80_}( .~ 7::ltJG O!yrnp1a. WA 98504-lJOC 360-70~>-iOOO TIY 1-800-H:~3-6:Jikl wvAv.wJdot wa no-,, ln response to your September 25 request. we have prepared a history of repo1ted collisions that occurred on State Route 515 I mp 4.51 to 6.28) from SE 186th St to S 23rd St, on or in the "icinity of SE Carr Rd betv,een Tnlho: Rd S In I lhth An· SJ· nnd on nr in thr ,icinitv oflk~snn Rrl S hctwcen SR ,1, :ind S Pngct nr in Kc11im1. .... .2U 1 iJ -20 L2 Federal law 23 United States Code Section 409 governs use of the data you requested. Under this law. data maintained for purposes of evaluating potential highway safety enhancements: " ... s/ta/1 not he suhjecr to cliscm·e,y or admitted 11110 cvtdcnce 111 a federal or state court proceeding or considered /i>r other purposes in any action/or damaKes arising from any occurrence at a location mentioned or addressed in such reports. surveys. schedules, lists. or data." [Emphasi.1 added.] The Washington State Department ofTmnsportation (WSDOT) is releasing this data to you with the understanding that you will not use this data contrary to the restrictions in Section 409. which means you will not use this data in discovery or as evidence at trial in any act inn for damages against !he WSDOT. the State of Washington. or any other jurisdiction imolvcd in the locations mcnlioned in the data. [fyou should :1t!~n1:pt t,., u~r: ~his '..!Jl:! '.!~ ~!!~ :11:tlt,n fr~t· J:..trn-::t~1.:s ~t~ains! \\ ~UU l. thi...· ~l:H•: uf ,~./ashrngton, or any nthi;;r jurisdiction involved in the locations mentioned in the data. these entities expressly reserve the right. under Section 409. to object to the use of the data. including any opinions dra"n from the data. If we may be of any ti.irther assistance. please contact myself or Mr. Dan Davis. Collision Data and Analysis Superd~:0~ . .it n00) 570-:-~~ 1. (!!" L'-!T'.~!i! :l<ld!··:~:-: .J3\·!sd·lfv,;sd0t.v.'a.go\·. Michael E. Bernard Collision Data Analyst Statewide Tru, d & Collision Data Office Sl1atcgi1,.· Plannio~ Di\ i:-iiu11 Q Ccwe: Naftsa Peshtaz & Lauretta Lew. WSDOT Northwest Region Tl,_ c:.-1 , f) b , .,,LJ ... ,.r ..,...,,~; l~l..fr e( e cf..,-,-~ .JJ 7 -f~,.. (_.) 1 L<..k 1 i,t .....;,_ reb ..,,:;t v,.I. -1~ f,.,.ff-,i WC •-c .. ~f ,,J f,...)J-.d-,,,_ {", 7 . D 72-- Reqort2dcall§lqns that 9ffYUfd on 5tqtr BPHk 515 (mp 4.51 to 5.28/ from SE JB6th St to S 23n1St. on qrlp tflt yldn/fV of SE Can: Rd between Talbot Rd S to Jl§th AW! SE and &wan Rd S lpetweyn SR 515 and S Puaet Pc In Reotan ..... 2QJO • 2012 UNPfR 23 UNITED STATES CODE SEQIQN 4Q9 THIS DATA CANNOT BE USED IN DISCOVERY OR AS {VIDE/VCf AT TRIAL IN ANY A en ON FQR QAMAG{S AGAINST THE WSDQT, QR ANY JLJRISDICT/0~ INVDlVEDfN THE DATA PRIMARY MILE JURISDICTION TRAFFICWAY POST =S-BENSON ROS City StTI!et BENSON RDS Street SE CARR RD Oty Street SE CARR RD City Street SE CARR RD City Street SE CARR RD City Street SE CARR RD City Street SE CARR RD City street SE CARR RD Crty Street SE CARR RO City Street SE CARR RD Cltv Street SE CARR RD City Street SE CARR RD City Street SE CARR RD City Street SE CARR RD City Street SE CARR RO City Street SE CARR RO City Street SE CARR RD City Street SE CARR RD City Street SE CARR RD City Street SE CARR RD City Smet SE CARR RD City Street SE CARR RD Otv Street BENSON ROS Prepared by: WSOOT/STCOO/CDAB/MB 10/08/13 BLOCK NUMBER 16400 2900 10000 10000 10000 10000 0000 10000 10000 10100 10200 10200 10300 9800 9800 9900 9900 10300 10300 10500 10700 2700 DIST FROM INTERSECTING REF TRAFFICWAY POINT Ml or FT 483 F "' F 80 F 200 F 300 F 100 F 198 F 0.1 M 145 F 100 F 419 F 100 F 0.12 M 0.11 M 436 F 454 F 100 F 80 F '90 F 277 F 30 F ~ .... "--" .. ., 125 F 30 F COMP DIR FROM REF REFERENCE POINT REPORT MOST SEVERE POINT NAME NUMBER DATE TIME lNJUR't' TYPE .,., #FAT #VEH #PEDS s S 26TH ST '°96903 03/13/11 10:45 PM Notnjurv 0 0 1 SE SE 29TH ST £154312 02/13/12 5:09 PM No Injury 0 0 3 SW 103RD AVE SE 3070997 12/07/12 11:04AM Serious lnjurv 3 0 2 SW 103RDAVESE El78616 06/30/12 6:00AM Unknown 0 0 1 SW 103RD AVE SE El60895 03/19/12 5:04AM No Injury 0 0 2 SW 103RD AVE SE El60892 03/24/12 12:15 AM Evident Injury 1 0 1 SW l03RDAVESE 3106561 01/05/10 2:30 PM Possible lnlury 1 0 3 w 103RDAVESE E065251 08/17/10 3:39 PM No Injury 0 0 2 ,_sw 103RD AVE SE 3070298 01/12/10 7:55AM Pouible Injury 1 0 2 NE 103RDAVE SE E1S07l7 01/17/12 7:48PM No Injury 0 0 3 NE 103RDAVE SE E082964 12/18/10 1:00PM No Injury 0 0 1 SW 103RDAVESE E129S09 10/07/11 4:30AM No Injury 0 0 1 E 103RDAVE SE Elll018 06/17/11 5:55 PM No Injury 0 0 2 w 103RDAVE SE El9269B 09/12/12 3:22 PM Possible Injury 1 0 2 w 103RDAVESE 3106S45 03/19/12 5:17 AM serious Injury 1 0 1 SW 103RDAVE SE E056679 06/20/10 5:52 PM No Injury 0 0 1 w 103RDAVE SE E091484 02/14/11 7:57PM Evident lniurv 2 0 3 SW 105TH PL SE El77741 06/06/12 8:05PM No lniury 0 0 1 SW 105TH PL SE E086362 01/07/11 1:00 PM Possible Injury 1 0 3 SW 105TH PL SE 3106838 06/14/10 4:45 PM Possible lnjurv 1 0 ' SW 105TH PLSE E.094352 02/28/11 7:35 PM Possible lniurv ' 0 ' NE 105TH PLSE El01809 04/24/11 9:24AM No lniury 0 0 ' E 106 PLSE El27834 09/27/11 5:15 PM No Injury 0 0 ' NW 106TH AVE SE E039534 01/08/10 3:34 PM No Injury 0 0 2 l of90 (j) Reported co111s1ons that pccUn'fd on Staff ROUfl Sl5 /me 4 51 to i:2BJ from SE 1S§th 5t to 5 23rd 5t on or In die llldnltv at SE ca" Rd between Tq/bot Rd s to 115th Ave 5E and k0690 Rd s #cC»flnSRs1s and5 PufflDrln RffltOn-.wa -2012 UNDER 11 UNITED STATES CODE -5ECTIQN 409, THIS DATA CANNOT BE USED IN QJSCQVfRYQR AS EVIDENCE AT TRW IN ANY AQJQN FQR DAMAGES AGAINST THE W$00T, QR ANY JLJRl5DIC11QN INVOLVED IN THE DATA PRIMARY MILE JURISDICTION TRAFFICWAY POST Citv Street BENSON RDS City Street St: CARR RO """ SE CARR RD City Street SE 168TH ST City Street SE 174TH ST City Street SE 176TH ST Citv Stred SE CARR RD City Street SE CARR RD City Street SE CARR RO City Street SE CARR RD Oty Street SE 176TH ST City Street SE 176TH ST City Street SE 176TH ST City Street SE 176TH ST City Street SE 176TH ST City Street SE PETROVITSKY RD Qty Street SE 176TH ST City Street SE 176TH ST City Street SE 176TH ST Oty Street SE PETROVITSKY RD City Street SE PETROVITSKY RO City Street 0AV1SAVE 5 Oty Street OAV1SAVES City Street TAI.BOTROS Prepared by: WSOOT/STCDO/CDAB/MB 10/08/B BLOCK NUMBER 2800 10500 10600 16700 10700 10800 10600 10700 10700 10700 10800 10900 11000 11300 11400 11600 11500 11500 moo 11600 11600 4300 4300 18000 DIST FROM INTERSECTING REF TRAFF!CWAY POINT M!orFT 100 F 200 F 150 F 150 F . • •• 1S3 F m F 100 F ... .., .. 261 F • •J .... 2S9 F . . ... 247 F 130 F 107 F 82 F 334.3 F 7S F ., F 100 F 100 F 80.2 F " F 100 F 7S F S6 F COMP DIR FROM REF REFERENCE POINT REPORT MOST SEVERE POINT NAME NUMBER DATE TIME INJURY TYPE #INJ #FAT "''" #PEOS SE 106TH AVE SE 3106828 05/26/10 9:22 AM No Injury 0 0 ' SW 106TH PLSE Ell4596 07/12/11 9:31 PM No Injury 0 0 ' E 106TH PLSE E082705 12/08/10 8:55 AM No lniury 0 0 ' N 108TH AVE SE 3052867 09/25/11 3:15PM No Injury 0 0 ' w 108TH AVE SE E077101 11/15/10 6:09 PM No Injury 0 0 ' E 108TH AVE SE E191762 09/11/12 8:46 PM No Injury 0 0 ' w 108TH AVE SE E12304S 08/25/11 6:30 PM No lniurv 0 0 ' w 108TH AVE SE E184493 08/04/12 9:37 PM No Injury 0 0 2 w 108TH AVE SE E071125 10/09/10 11:15 AM Po:.sible Injury 1 0 ' w 108TH AVE SE E181738 07/19/12 11:03 PM No Injury 0 0 2 w 109TH AVE SE E112177 06/14/11 10:26AM Possible lniury 2 0 4 E 109TH AVE SE :1107083 01/31/11 5:26 PM Possible lniurv 1 0 1 1 ' 110TH AVE SE E145539 12/23/11 10:27 AM Nolniury 0 0 2 E 113TH PL SE E076912 11/14/10 6:16 PM Possible Injury 1 0 ' E 113TH PLSE E165792 04/18/12 S:09 PM No Injury 0 0 2 E 116 AV SE E1l6SS2 07/27/11 1:10 PM No Injury 0 0 2 w 116THAVE SE E06S730 09/24/10 S:23 PM No Injury 0 0 2 w 116TH AVE SE E217~7 12/29/12 4:52 PM No Injury 0 0 2 w 116THAVE SE E060889 07/26/10 7:58 PM Notnjury 0 0 ' E 116THAVESE E155299 02/21/12 4:14PM Possible Injury 1 0 2 E 116THAVESE E093305 02/09/11 8:28AM Possible Injury 1 0 ' s 43RD ST E099835 04/09/11 11:58 PM No Injury 0 0 1 s 43RD ST E071130 10/10/10 11:44PM No Injury 0 0 2 s 43RD ST 3106855 08/13/10 2:10PM Evident Injury 2 0 2 7of90 Reported colllsloru that occurred on State Route 5l5 (ma 4,SJ to 6.ZBI from SE 186th St to s 23rd St on or In the llldnJtv of SE Carr Rd bftwclo Talbot RdS tp Jl§tla Ave SE and Bgnson Rd S betwttn SR 5l5 and$ Puaet Pr In Rentonm,·2Dl0 • 2Ql2 UNDER 23 UNITED STATES CODE SECT!QN.409 THIS DATA CANNQT BE US£01N O!SCQVERYQRAS EVIQENqATTRIAJ, INANY~CTJQN FQRDAMAG£SAGAJN5T THEWSDQT, QR ANY JLJR15DICTIQN PRIMARY MILE JURISDICTION TRAFFICWAY POST City Stre~ SCARR RD City Street SE CARR RO City Street SE CARR RD City Street SE CARR RD City Street SE CARR RO City Street S 15TH ST Ci..,Street S PUGET OR C"rty Street S PUGET OR City Street S PUGET DR City Street S PUGET OR Crty Street S43ST Qty Street SW43RO ST City Street BENSON RDS City Street BENSON RDS City Street BENSON ROS City Street BENSON ROS Ci.., Street ALBOTRDS City Street TALBOT RDS oty Street TALBOT RDS City Street TALBOT RDS City Street TALBOT ROS City Street TALBOT RDS C"rty Street TALBOT RDS City Street TALBOT RDS Prepared by: WSDOT/STCOO/CDAB/MB 10/08/13 BLOCK NUMBER 600 10000 10000 9800 9900 700 1BOO 1800 4700 S400 2200 2200 2400 2500 17800 17800 17900 18000 18000 18000 18000 18000 DI. /NV DIST FROM INTERSECTING REF TRAFFICWAY POINT Ml or FT 200 F 0.11 M 0.1 M 100 F ,oo F 79 F 0.1 M 212 F " F 78 F 100 F 500 F 0.5 M 0.2 M 246.4 F 100 F O.S M 369.2 F 128 F 312 F 316 F " F 170 F 316 F VEDINTHE~TA COMP DIR FROM REF REFERENa POINT REPORT MOST SEVERE POINT NAME NUMBER DATE TIME INJURY TYPE #INJ #FAT #VEH #PEOS SW 98TH AVES E152617 01/27/12 2:29 AM Possible Injury 1 0 1 E 9aTHAVES E070S46 00/27/10 12:01 AM Evident lniurv 1 0 1 E 98TH AVES E12la07 08/17/11 6:20PM Possible Injury 1 0 1 E 98TH AVES E072496 10/19/10 9:14 PM No Injury 0 0 1 E 98THAVES E098107 03/26/11 8:36PM No Injury 0 0 1 w BENSON DR 5 E096S89 03/16/11 3:00PM No Injury 0 0 2 SE BENSON DRS 3106764 04/21/10 7:59AM No lnlury 0 0 2 E BENSON DRS E200215 10/22/12 2:43 PM No lnjuf'/ 0 0 2 E BENSON DRS E179026 07/04/12 11:20 PM Pos5fble Injury 1 0 3 E BENSON DRS E178855 07/04/12 6:30PM No Injury 0 0 2 w DAVIS AV S E1208SO 08/18/11 1:31 PM No Injury 0 0 2 w UNO AVE SW E162004 03/31/12 1:34AM Possible lnjurv 1 0 3 s PUGET DRS E132174 10/19/11 7:00AM Possible lniury 1 0 ' E S23RD ST £166455 04/27/12 1:55AM Evident Injury 1 0 1 s S26ST Ell6984 07/23/11 6:50AM No Injury 0 0 1 N S26THST E107300 05/30/11 5:45PM No Injury 0 0 2 N S43RDST E110562 06/16/11 11:03 AM No lniury 0 0 2 N SCARR RD 301;9836 05/16/12 S:05 PM Possible Injury 1 0 1 N SCARR RO E068777 00/24/10 7:34PM No Injury 0 0 2 5 SCARR RD EOS8726 07/04/10 l:SS PM Possible Injury 1 0 ' s SCARR RD E166S4S 04/27/12 7:05AM Evident lniury 1 0 1 s SCARR RD E105334 OS/18/11 5:26 PM Evident Injury 1 0 1 s SCARR RD 3106726 02/10/10 7:00AM Possible Injury 1 0 2 s SCARR RD E193601 09/19/12 1:29PM No Injury 0 0 2 13 of90 Reported cofllsJoni that occurred on State Route SlS (mp 4.SJ to 6.2BJ from SE 186th St tq S23rd St on pr In the llidnlt,t of SE'°" Rd between Talbot Rd S to J16th Aw SE and sen.son Rd S beti.w!en $R 515 and S Puaet Dr In Renton ..... 2Q.1D -2012 UNDER 23 UNITED STATEliOD£ -SECTION 409 THIS DATA CANN QT BE USED lN D1SCQV£RY OR AS EVIDENCE AT TRIAL IN ANY ACTlQN FQR DAMAGES AGAINST THE WSDOT OR ANY JUR!SDtCTIDN fNVOLVEDfN THC DATA PRIMARY MILE JURISDICTION TRAFFICWAY POST City Street BENSON RDS City Street BENSON RDS. Citv Street BENSON RDS City Street 108TH AVE SE Crty Street BENSON RDS City Street 106TH PLSE City Street 116TH AVE SE CityStr~~ 43RD ST ---~ ---------· -- City Street 43RD ST ----·-------.. . .. City Street S43 ST Oty Street S43 ST Oty Street SCARR RO Qty Street SCARR RD City Street SCARR RO City Street SCARR RD Qty Street SCARR RD OtyStreet SCARR RD Qty Street SCARR RD Oty Street SCARR RD City Street SE CARR RD Crty Street SE CARR RO City Street SE CARR RD Cit)' Street SE CARR RD City Street SE CARR RO Prepared by: WSDOT/STCOO/CDAB/MB 10/08/13 BLOCK NUMBER 2000 2000 2200 17100 16600 10500 17400 ~ ~ -·--·---soo 9900 soo 600 600 600 9400 10100 10100 10100 10100 10100 DIST FROM INTERSECTING REF TRAFFICWA'I' POINT Ml or FT 200 F 1,000 F 191 F 114 ' "' F " F 100 F 200 F ~--------· ....... --··- 123 . ----~-------------------·- 50 F 50 F 345.6 F 316 F 300 F 141 F 409 F 486 F 376 F 23 F 103RDAVE SE 103RD AVE SE 103RD AVE SE 103RDAVE SE 103RD A.VE SE COMP DIR FROM REF REFERENCE POINT REPORT MOST SEVERE POINT NAME NUMBER DATE TIME INJURY TYPE #INI #FAT #VEH #PEDS N S PUGET DR E212536 12/10/12 4:30PM Possible lnjUP/ 1 0 2 s S PUGET DR E15B409 03/11/12 B:30 PM No tnjurv 0 0 2 N S PUGET DR 3070999 06/01/12 9:09AM Serious Injury 2 0 2 s SE 172ND ST E138073 11/21/11 5:20PM No Injury 0 0 3 SW SE 29TH ST E202531 10/31/12 5:15 PM Possible Injury 1 0 3 NW SE CARR RD E074003 10/29/10 1:33 PM No Injury 0 0 2 N SE PETROVlTSKY RD 30S2857 04/26/10 6:40 PM No lnjurv 0 0 1 w TALBOT RDS :~~:~ 03/01/11 12:40 PM Pouible lnj~ry-l 0 2 '-----, 4:31 p~,1 1--.'!Y ___ TALBOT ROS 03/28/10 Possible Injury ___ 1 0 2 ----------------- E TALBOT RDS E117139 07/18/11 4:54 PM Possible lniurv 1 0 2 w TALBOT RDS E129676 10/08/11 11:20AM Possible lniurY 2 0 2 E TALBOT RDS E172121 05/22/12 11:37 AM Nolniurv 0 0 2 E ALBOT RDS E051564 05/07/10 3:10 PM Nolnjurv 0 0 2 E TALBOT RDS E133610 10/30/11 12:30 PM No lnjurv 0 0 2 E TALBOT RDS E1S9S50 03/19/12 11:55AM No rnjurv 0 0 2 E TALBOT RDS E160100 03/13/12 2:30 PM Serious Jnju"I ) 0 2 E TALBOT RD5 E0946l.2 03/04/11 6:54AM Evident Injury 3 0 2 E ALBOT RDS 3106826 05/06/10 3::HPM No Injury 0 0 2 SE ALBOTRDS E104035 05/05/11 4:S8 PM No Injury 0 0 2 3070361 10/06/10 8:55AM Evident lnjurv 1 0 2 E067601 09/16/10 2:44PM No lnjurv 0 0 3 E19B12 09/14/12 3:30PM No Injury 0 0 2 E052048 05/11/10 12:04 PM No Injury 0 0 2 E06<;2.49 08/17/10 3·28 PM Possible tnjurv ' 0 2 19 of90 ® Reportffl co/Hsipm that ott;urr,d cm State Route 515 (mp 4.51 to 6.28) from SE 186th St to S 23rd St on or In the 11/dnity of SE Corr Rd betwm, Tplbpt Rd 5 ta ,U§th AW Sf pnd Benson Rd ~en SR 5l5 ands ""'1et or In Renton-.... w.io • 201..2 WYDER 13 UNITED !iTArfS C0Df • SECTION 4M THIS DATA CANNOT Bf U.SfDJN DISCOVERY OR AS EVIDENCf ATTRIA! INANYAGtON fOR OAMAGfSAGAIN5T THE WSDOT, QR ANY JURISDICTION PRIMARY MILE JURISDICTION TRAFFICWAY POST City Street SE CARR RO City Street SE CARR RO Qty Street SE CARR RO City Street SE CARR RO City Street SE CARR RO 0ty Street SE CARR RO City Street SE CARR RO City svcct SE CARR RO City Street SE CARR RO City Street SE CARR RO City Street SE CARR RO City Street SE CARR RD Gty Street SE CARR RO City Street SE CARR RO City Street SE CARR RO City street SE CARR RO Qty Street SE CARR RO City Street SE CARR RO City Street SE CARR RO City Street SE CARR RO Crty Street SE CARR RO City Street SE CARR RO City Street 108WVSE City Street 108 AVE SE Prepared by; WSDOT/STCOO/CDAB/MB 10/08/13 BLOCK INTERSECTING NUMBER TRAFFICWAY 10100 103RD AVE SE 10100 103RD AVE SE 10100 103RD AVE SE 10100 103RD AVE SE 10100 103ROAVESE 10100 103RD AVE SE 17600 103RD AVE SE 10500 lOSTH PLSE 10500 105TH PL SE 10500 lOSTH PLSE 106TH Pl SE 10500 106TH PLSE 10600 106TH PLSE 10600 106TH PL SE 1D600 106TH PL SE 10600 106TH PLSE 10600 106TH PLSE 10600 106TH PLSE 10600 106TH Pl SE 10600 106TH Pl SE 10600 106TH PLSE ~" 106TH PL SE-, 10600 108AVSE 108WAVSE INVOlVWJN "fHE DATA ---~------ COMP DIST DIR FROM FROM REF REF REFERENCE P01r-4T POINT Ml or FT POINT NAME --.---·--""- REPORT MOST SEVERE NUMBER DATE TIME INJURVTYPE #INJ #FAT #VEH #PEOS E068297 00/16/10 9:56AM Possible lniury 1 0 ' 3070369 02/02/11 3:14PM No lnlury 0 0 2 El11014 06/17/11 5:23 PM Possible lniu..., l 0 3 E067227 00/01/10 9:13 AM No lniury 0 0 2 E097748 03/27/11 5:10 PM No lniurv 0 0 2 E054115 05/16/10 5:38 PM Na Injury 0 0 2 El43018 12/15/11 9:48 PM No Injury 0 0 2 E107257 05/31/11 4:0S PM No Injury 0 0 2 E057766 06/29/10 2:31 PM No Injury 0 0 2 E091798 02/W/11 8:07 AM No lnjurv 0 0 2 E202530 10/30/1'2. 7:21 PM No Injury 0 0 2 Ell0327 06/15/11 9:34AM No ln;uru 0 0 2 El67943 05/05/12 10:04AM Possible lniury 1 0 ' EOn613 10/20/10 12:57 PM No Injury 0 0 2 3106584 06/27/10 12:54 PM Evident Injury 1 0 ' E064104 08/17/10 9:00PM No Injury 0 0 2 E066693 09/05/10 4:58AM No lnjul)' 0 0 1 E054117 05/16/10 6:28PM Possible Injury 1 0 2 El47395 01/03/12 3:15 PM Pos$ible Injury ' 0 2 E106747 05/27/11 10:55 PM No Injury 0 0 2 E173512 06/05/12 10:01 PM No Injury 0 1--_(} ___ 2 E057554 06/23/10 7:46PM No Injury 0 0 2 E093526 02/26/11 2:20AM Possible Injury 1 0 1 E067600 09/15/10 6:53 PM Possible lnJury ' 0 2 25 of90 Reported colllJlqm that oq:UOJd qn Stpte Route 515 (mp 4151 to 6.2BJ from SE 186th St to S 23rd St, on or In the vldnltv of SE Co" Rd between Talbot RdS to J16th Ave SE and Benson Rd s between SR 515 ands fu9ct Pc la Bcoton, .. ,.2QJQ -2012 UNDER 23 UNITED STATES CODE -SEC110N4{)2 THl$0ATA CANNOT SE LJSEOJN 01SCQVERYQRA5 EVIQENCfAT TRfALINANYACT10N FOR QAMAGE$AGAINST THE W5DQT, QRANYJLJRISDICTION INVDLVEDIN THE DATA PRIMARY Mil£ BLOCK JURISDICTION TRAFFICWAY POST NUMBER City Street SE U6THST 10900 City Street SE 176TH ST City Street SE 176TH ST City Street SE 176THST 11000 City Street SE 176TH ST 11100 City Street SE 176TH ST 11200 City Street SE 176TH ST 11200 City Street SE PCTROV!TSKV RD 11600 SE PETROVITSKY RO 11600 C~!!_?t!_e!'t ----------- City Street SE PETROVITSKY RD Oty Street SE PETII.OVITSKY RD City Street SE PETII.OVITSKV RD City Street SE PETROVITSKV RD City Street SE PETROVITSKV RD City Street SE PETROVITSKV RD City Street SE PETROVITSKY RD Citv Street SE PEH!OVl151(Y F<LJ City Street TAL80TROS Qty Street ALSOT RDS City Street TALBOT ROS cav Street TALBOT ROS Cit)' Street SE CARR RO City Street SE CARR RO City Street ACCESS RO Prepared by: W500T/STCDO/C0AB/MB 10/08/13 11600 11600 11600 11600 11600 11600 17500 17SOO 17900 17900 17900 17900 9800 9800 COMP DIST DIR FROM FROM INTERSECTING REF REF TRAFFICWAY POiNT Ml or FT POINT 110TH AVE SE 110TH LN SE 111TH AVE SE 111THAVE SE 111TH AVE SE 113TH PLSE 113TH PLSE 116TH AVE SE 116TH AVE SE - 116TH AVE SE U6THAVESE U6THAVESE 116TH AVE SE 116TH AVE SE 116TH AVE SE 116TH AVE SE 1161H AVE :iii: 43RO ST 43RD ST 43RO ST 43RD ST 98THAVES 98THAVES BEIIISQN RDS REFERENCE POINT REPORT MOST SEVERE NAME NUMBER DATE TIME INJURY TYPE #INJ #FAT #VEH #PEDS E09H62 03/18/11 6:40AM Evident Injury 1 D 2 E1S4026 02/12/12 3:47 PM No Injury 0 0 2 E179800 07/10/12 11:45 PM No lniury 0 0 2 E069SSS 09/30/10 11:03 PM Possible Injury l 0 2 E187934 08/22/12 2:12 PM No Injury 0 D 2 E181001 07/11/12 7:38AM Po5Sible Injury 1 D 2 E069S54 09/23/10 5:15 PM No Injury 0 0 2 E105741 05/2V11 3:13PM No Injury 0 0 2 E071131 ~~ 7:07 PM No Injury 0 0 2 ------ E070570 10/06/10 10:19 AM No Injury 0 0 2 EM8281 03/28/11 4:47 PM PO$$ibJe Injury 2 0 2 3052855 04/13/10 5:06PM No Injury D 0 2 E090306 02/02/11 6:35 AM No Injury D 0 2 E211140 12/05/12 2:05 PM No Injury 0 D 2 3106833 06/02/10 3:16PM Possible Injury 1 0 2 El47397 01/05/12 12:44PM No Injury 0 0 2 El4851~ 01/15/12 6:20PM No ln;u...., 0 0 2 E162015 03/31/12 11:25 AM No Injury 0 0 2 E2079S7 11/23/12 12:14 AM No Injury 0 0 2 E067698 09/17/10 5:44PM No Injury 0 0 2 E066692 09/06/10 10:33 AM Evident Injury 2 0 1 E113160 07/03/11 10:23 AM EVldent Injury 1 0 l E071391 10/12/10 6:17 PM Possible Injury 1 0 l E%S002 08/27/tO 10:1.4 PM P\!o Injury 0 0 1 31 of 90 Repqrtfd' cpll§iq115 that 9"turfd on State Route SlS (mo 4.SJ to 6.281 from SE l86th St to S 23rd St, on or In the vldnlty of SE Corr Rd bftween Tqlbqf RdS to Jl§th AYC g ond kD$9n Rd S between SR 515 andS Puget Dr In Rffftpn ..... 2Q10 • 2012 UNDER 13 UNITED STATES CODE SECTION409 THIS DATA CANNOT BE USED IN DISCQVERYQRAS EVIDENCE AT TRIAL IN ANY ACTJON FOR DAMAGES AGAINST THE WSDQT OR ANY JURISDICTTON INVOLVEDI/V THE DATA PRIMARY MILE JURISOICTION TRAFFICWAY POST City Street S PUGET DR City Street SPUGETOR City Street S PUGET OR City Street S PUGET DR City Street SPUGETOR City Street 43RD ST City Street SE CARR RO C'rty Street BENSON ROS City Street BENSON ROS City Street BENSON RDS City Street BENSON RDS City Street BENSON RDS City Street BENSON RDS City Street BENSON RDS City Street 8ENS0N RDS City Street BENSON RDS Qty Street BENSON RDS City Street BENSON RDS Cit,' Street erns~i RDS City Street BENSON ROS Qty Street 108TH AVE SE City Street 108TH AVE SE City Street 108TH AVE SE Citv Street BENSON RDS Prepared by: WSDOT/STCOO/COAB/MB 10/08/13 BLOCK NUMBER 10100 3100 3100 3100 3100 2000 16800 16900 COMP 01ST DIR FROM FROM INTERSECTING REF REF TRAFFICWAY POINT Ml or FT POINT BENSON ROS BENSON ROS BENSON ROS BENSON RDS BENSON RDS DAVIS AVES MILL AVES S 26TH ST M S 26TH ST S 26TH ST S 26TH ST S 26TH ST S PUGET DR S PUGET DR 5 PUGET DR S PUGET DR S PUGET DR M S PUGET OR 5 f'\..!GETDR S PUGET DR SE 168TH ST SE 170TH ST SE 172ND ST SE 29TH ST REFERENCE POINT REPORT MOST SEVERE NAME NUMBER DATE TIME INJURY TYPE #INJ #FAT #VEH #PEOS 3107051 07/29/10 8:57 AM Possible Injury 1 0 ' E122341 08/28/11 7:33PM No Injury 0 0 ' E074982 10/29/10 3;26PM No Injury 0 0 ' El01410 04/20/11 5:10PM No Injury 0 0 2 E090114 02/01/11 4:00PM Possible Injury 2 0 ' E135669 11/04/11 2:25PM Possible lmury 1 0 ' 3105952 03/19/10 7:49AM No lniury 0 0 2 E153754 02/11/12 6:11 PM Possible Injury 1 0 2 El80158 07/06/12 11:25 AM Possible lniury 1 0 2 ED4-9027 04/14/10 1:21 PM No Injury 0 0 2 EOS2875 05/15/10 10:59 AM Possible lnjurv 2 0 2 E071995 10/16/10 11:45 PM Possible lnJurv 1 0 2 E075655 11/06/10 3:21 PM No Injury 0 0 2 E042522 02/13/10 10:50 PM No Injury 0 0 2 E210100 12/02/12 12:52 PM No Injury 0 0 2 E129188 10/01/11 2:44AM No Injury 0 0 2 El62990 03/26/12 9:48 PM No Injury 0 0 2 3106279 04/24/10 2:11AM Evident Injury 2 0 ' ElC3707 11/05/12 5:~SAM !IIC1r.jUl"J 0 0 2 E122796 08/30/11 4:39 PM No Injury 0 0 2 3069841 Of,/01/12 2:38 PM Evident lnjul)I 2 0 2 3106648 01/04/10 8:35AM No Injury 0 0 2 E143731 12/17/11 12:2S PM Possible Injury 1 0 2 El68020 05/06/12 12:54 PM Evident Injury 2 0 1 37 of 90 Reported collisions that occurred on State Route 515 {mp 4.51 to 6.28/ from SE 186th St tp S 23rd St, on prin the Wdnity of SE Carr Rd between Talbot RdS to JJ6th Ave SE and Benson Rd s between SR 515 ands Puaet Dr In Bmtonc ... 2010 · 2012 !,JNDER 13 UNITED STATES CODE ·SECTION 409 THJS DATA CANNOT BE USED IN DISCOVERY QR AS EVIQENCE AT TRIALINAN'f ACTION FOR DAMAGfSAGAI/VST TH£ W5DOT, OR ANY JURISDICTION INVDLVEOJN THE DATA COMP DIST D" FROM FROM PRIMARY MILE BLOCK INTERSECTING '" "' REFERENCE POINT REPORT MOST SEVERE JURISDICTION TRAFFICWAY POST NUMBER TRAFFICWAY POINT Ml or FT POINT NAME NUMBER DATE TIME INJURY TYPE #INJ #FAT #VEH #PEDS City Street BENSON RDS Oty street B£NS0NRDS City Street 103RDAVESE City Street 106TH PLSE City Street 106TH PLSE City Street 106TH PLSE City Street 106TH PLSE City Street 106TH PLSE City Street 106TH PLSE City Street TALBOT RDS City Street 116TH AVE SE c;,.,., Street 116TH AVE SE City Street 116TH AVE SE City Street 116THAVESE City Street 116TH AVE SE City street 116TH AVE SE City Street 116TH AVE. SE Qty Street 116THAVESE City Street l!STH AVE SE City Street ll6THAVESE City Street 116TH AVE" SE City Street 116THAVESE Qty Street CARR RD City Street SCARR RD Prepared by: WSDOT/STCOO/CDAB/MB 10/08/13 2800 2800 17500 9800 11600 11600 17400 17400 17400 17400 17400 171100 17400 moo 17500 600 4200 SE 29TH ST £201718 11/20/12 SE29THST £095457 03/00/U SE CARR RD £053046 05/19/10 SE CARR RD E171850 05/26/12 SE CARR RD E193259 09/19/12 SE CARR RD £203336 11/02/12 SE CARR RD £094647 03/05/11 SE CARR RD E061339 07/28/10 SE CARR RD El41694 12/06/11 SE CARR RD Ell5700 07/13/11 SE PETROVffSKY RO E146720 01/04/12 SE PETROVITSKY RD £118022 08/02/11 SE PETROVITSKY RD E140301 11/19/11 SE PETROVITSKY RO ED40571 01/17/10 SE PETROVITSICY RD E1662S2 04/25/12 SE PETROVlTSICY RD E082961 12/14/10 SE PETROVITSKY RO El14128 07/08/11 SE P£TROVITSKY RO E07S421 11/04/10 SE f'ETROV!TSKY RD E1£CC84 03/07/12 SE PETROVITSKY RO E090059 02/02/11 SE PETROVITSl(V RD El85626 OS/10/12 SE PETROVITSKY RO 3106870 07/14/11 SMITHERS AVES El42634 11/30/11 SMITHERS AVES 2452185 11/16/11 5:01 PM No lniury D D ' 12:24 PM No Injury D 0 ' 5:52 PM No Injury 0 0 ' 7:17 PM Evident Injury l 0 l l 6:00 PM No lniurv 0 0 ' 8:0S PM Evident Injury l 0 l l 12:52 PM No lniury D 0 ' 7:21 PM Evident Injury l 0 l l 5:14 PM No Injury 0 0 ' 4:23 PM No Injury 0 0 ' 7:52 PM No lniury 0 0 ' 7:11 PM No Injury 0 0 ' 6:18 PM No lnjUry 0 0 ' 1:53 AM No Injury 0 0 ' 7:11 PM No Injury 0 0 2 5:59 PM No Injury 0 0 2 4:48PM Evident lniury ' 0 2 7:33 PM No tniurv 0 0 2 8:41AM ~Jo Ir.jury 0 0 3 4:57 PM Possible Injury l 0 2 10:23 PM Evident lniury 4 0 ' 11:20AM No Injury 0 0 ' 9:52AM No lniury 0 0 ' 5:19 PM Possible Injury 2 0 2 43 of90 RepartJd collision5 that «curred on State Route SJS fmp 4.5J ta 6,281 from SE JB6fh St to S 23rd St on or in the vidnln, of SE Carr Rd between Talbot Rd S to 1J6tft Aye SE and Benson Rd s between SR Sl5 ands ewer Pc In BMwr -WP· wz UNDER Z3 UNITED STATES CODE· SECTION 4'09, THIS DATA (ANNOT BE USED IIV OISCQVERY QR A5 fVIQENCE AT TRIAL IN ANY AcnON FOR DAMAGES AG.4'NST THE WSDQT, OR ANY JURISDICTIQN PRIMARY MILE JURISDtCTION TRAFFJCWAY POST City Street SCARR RO Cit>f Street S Ci\RR RO atv Street SCARR RO Oty Street SCARR RO City Street SCARR RO City Street 43RD ST Gty Street 43RD ST City Street 43RD ST Gty Street 43RD ST - City Street 43RD ST Citu Street 43RD ST Street 43RD ST Gty Street 43RD ST Oty Street 43RD ST City Street 43RDST City Street 43RDST Oty Street 43HLJS,'J Gty Street 43RD ST CitV Street 43RD ST OtyStreet 43RD ST City Street 43RD ST a,ys..,.. 43RDST City Street 43RD ST (\tySt~t S 43 ST Prepared by: WSOOT/STCOO/CDAB/MS 10/08/13 BLOOC NUMBER 600 600 600 600 600 '"' INVOJ.VED IN me DAT· " COMP DIST DIR FROM FROM INTERSECTING REF REF REFERENCE POINT TRAFFICWAV POINT Ml or FT POINT NAME SMITHERS AVES SMITHERS AVES SMITHERS AVES SMITHERS AVES SMITHERS AVES TALBOT ROS TALBOT ROS TALBOT ROS TALBOT RDS .. , .. -·---··-··-·-·-···---·-···-·---·--". --·--- TALBOT RDS TALBOT RDS TALBOT RDS TALBOT RDS TALBOT RDS TALBOT RDS TALBOT RDS 1ALbUl KLJ:, TALBOT RDS TALBOT RDS TALBOT RDS TALBOT RDS TALBOT RDS TALBOT RDS T41P.nTfl:DS REPORT MOST SEVERE NUMBER DATE TIME INJURY TYPE ""' #FAT #VEH #PEDS 3105844 01/01/10 12:02 PM Possible Injury 2 D 2 E2l2677 12/12/12 e:!!S r~.~ No Injury D D 2 £040971 01/27/10 2:34 PM No Jniury D D 2 310S9S3 03/19/10 3:09 PM No1njury D D 2 E038030 01/02/10 4:47 AM Evide-nt Injury 1 D 2 E073106 10/23/10 10:48 PM Possible lnjurv 2 D 2 E069671 10/01/10 10:22 AM No lnjurv D D ' El71759 05/25/12 4:52 PM Possible Injury l D 3 3070319 10/15/10 11:35AM No Injury D D 2 - El49114 01/17/12 1:51 PM Possible Injury l D 2 El67939 05/03/12 7:17 PM Nolnjury D D 2 3069955 10/31/10 4:07 PM Possible lniun, l D 2 £041603 01/20/10 12:05 PM No Injury 0 D 2 E07574S 11/06/10 12:18 PM Possible Injury 1 D 3 E194471 09/25/12 5:07 PM Possible Injury 2 D 3 E12667S 09/19/11 1:12 PM Serious Injury ' D 2 f.09148.1 Ulil4/ll D:111-'M No Injury u 0 ' 3107078 11/08/10 9:23AM Possible Injury l D ' E202529 10/26/12 6:10PM Possible !njuru 1 D 2 E049509 04/19/10 5:17 AM Evident Injury l D 2 El065S6 05/25/11 9:51 PM Possible Injury 1 D 2 E062193 07/13/10 4;SOPM No Injury D D 2 E202793 10/12/12 12:23 PM No Injury D D 2 !::14S~OS 1212111, ~:21;1>¥ !'o~~it,I~ lnj•1,y l 0 2 49 of 90 ~ col!l!kms !Mt !w.:_ll!'?"ed !>!! SMte Ra~~ 515 /mp_4.5:Z tQ .• q._.~ft) from SE 186!'h St to S 1.3!'fJ St. im !J!' In the v!dP.l!>/ !Jf SE Ca!'!' R!! ~ T!J!~~~ g_!J 5 t~ lt!it~ A~•e SE~!!!!~~!! Rd S between SR 515 and 5 Puaet Or In flenton .. , .. 2010 -1011 ~INnFP H {11\/ITFO (]"ATF4;-rnm:. (~(TJ()#U ,f'1Q Tl,lj~ {'l}liT.11 r.llN/YnT RF l.f<;Ff!l/111 ni<"("(lVf"Y(lll A<; FVlnFNf"I" ATTPIA/ ,,y "'"'VA(Tl("'I ~()'l nl!l!\A'At;F~ ,11(;'.A/N',"T Tf'F W'-OOT OSI JIN¥ IUR/t:;fllmnN INVOLVED IN THI: DArA PRIMARY MIL£ JURISDICTION TRAFFICWAV POST rrty"tr-t <;('AAA An St;ite Route 515 4.52 Stiite Route 515 4.53 Stiite Route 5!5 4.53 Stiite Route 5!5 4.53 State Route 5!5 4.53 State Route 515 4.53 :;Lai..! nvute 515 4.53 State Route 515 4.54 State Route 515 4.61 St.ite Route 515 4.75 St;ite Route 515 4.80 State Route 515 4.80 State Route 515 4.80 State Route 515 4.81 State Route 515 4.83 State Route 515 4.88 State Route 515 4.88 State Route 515 4.88 State Route 525 4.88 State Route 515 4.88 State Route 515 4.88 St;ite Route 515 4.88 State Route 515 4.88 Prepared by: WSDOT/STCDO/CDAB/MB 10/08/13 BLOCK NUMBER COMP DIST DIR FROM FROM INTERSECTING REF REF REFERENCE POINT TRAFFICWAY POINT Ml or FT POINT NAME TAIRnTRn~ ---~-"' -··"·---·---- @ REPORT MOST SEVERE NUMBER DATE TIME INJURY TYPE #INJ ltFAT IIVEH #PEDS ~1!"1f';h7C! n111;_11n 11•7nAM J\lr'I Injury n n ' E125488 00/09/11 4:07 PM No Injury 0 0 2 E056989 06/21/10 11:20AM Unknown 0 0 l E093252 02/24/11 9:41 AM Serious lniury 2 0 2 E174739 06/07/12 10:18AM No Injury 0 0 2 E180734 07/13/12 11:43AM No Injury 0 0 2 [0?0191 01/28/11 6:08 PM No lnJury 0 0 2 c:.:;;-;..o:; 03/30/11 6.:;...,;;.; P1miblo: inju,y 2 0 2 E196947 10/08/12 1:05 PM No Injury 0 0 2 E152603 01/08/12 6:38 PM Evident lnJury 3 0 2 E040134 01/15/10 4:43 PM Possible lniurv ' 0 2 E11096S 06/17/11 9:12 PM Possible lniurv l 0 2 E155S81 02/18/12 10:14 PM No Injury 0 0 2 E204665 11/09/12 12:15 PM No Injury 0 0 2 E203384 11/03/12 6:05 PM No Injury 0 0 3 E213826 12/11/12 2:45 PM No1.,·..,,~ ' ' ' E202533 10/31/12 9:17 PM No!njury 0 0 2 E2l2S01 12/10/12 7:49AM No Injury 0 0 3 E181002 07/11/12 12:27 PM Nolnjury 0 0 2 E066632 09/09/10 1:55 PM No Injury 0 0 2 E193256 09/15/12 1:21 AM No Injury 0 0 2 £1/3985 06/01/12 8:15AM No Injury 0 0 ' E173496 06/05/12 7:04AM Possible Injury 3 0 3 E072497 10/19/10 7:41 PM No Injury 0 0 ' 55 of 90 R,eortfd colllslons tltat wumdon State Routt 515 {mo 4.51 to 6,281 from SE JS6fh St to s 23rdSt on or In the vldnlty of SE corr Rtl bftwffn Talbot RdS to 11§#! Aye SE and s,n.wn Rd Skfween SR$.1:iandSPuaftPtln RffltDn. 2lJ1D ~2012 !lfYPER 13 UNtTED STATES CODE -SECTION 4D9 THIS DATA CANNOT BE USED IN DISCOVERY Q6 A.5 !VlDENC£ AT TR/Al IN ANY AqlQN FQR DAMAGES AGAINST THE WSDOT QR ANY JUR/SDICTJON PRIMARY Mil£ JURISDICTlON TRAFFICWAY POST City Street SCARR RO State Route S1S 4.52 State Route S1S 4.53 State Route SlS 4.53 State Route 515 4.53 State Route 515 4.53 State Route 515 4.53 State Route S1S 4.53 State Route 515 4.54 State Route 515 4.61 State Route 515 4.75 State Route S1S 4.80 State Route 515 4.80 State Route 515 4.80 SUlte Route 515 4.81 State Route 515 4.83 State Route 515 4.88 State Route 515 4.88 Slate Route 515 .... State Route 515 4.88 State Route 515 4.88 State Route 515 4.88 State Route 515 4.88 State Route 515 4.88 Prepared by: WSDOT/STCOO/CDA8/M6 10/08/13 NvotvtOIN THE DATA , COMP DIST DIR FROM FROM BLOCK INTERSECTING REF REF REFERENCf POINT NUMBER TRAFFICWAY POINT Ml or FT POINT NAME ALBOTRDS (,J n.f. Fre Q l'1 ere, f-e.1f r:le c .. ,.,- M.f. J.,,-,vY.J•r re ~ ~J~ _[ L> :pc. REPORT MOST SEVERE NUMBER DATE TIME INJURYTYPE IINJ #FAT OVEH #PEDS n06679 01/12/10 11:20AM Nolniury 0 0 2 E125488 09/09/11 4:07PM No Injury 0 0 2 £056989 06/21/10 11:20AM Unknown 0 0 1 £093252 02/24/11 9:41AM Serious ln;u..., 2 0 2 E174739 ~/07/12 10:18AM No ln;urv 0 0 2 El80734 07/13/12 11:43AM No Injury 0 0 2 E090191 01/28/11 6:08PM No 1n1urv 0 0 2 E099485 03/30/11 6:54AM Possible Injury 2 0 2 El96947 10/08/12 1:05 PM No Injury 0 0 2 El52603 01/08/12 6:38 PM Evident Injury 3 0 2 E040134 01/15/10 4:43 PM Po"lble 1n1t,ry 2 0 2 £110965 06/17/11 9:12 PM Possible lnju"' 1 0 2 E1S5S8l 02/18/12 10:14PM No Injury 0 0 2 '204665 11/09/12 12:15 PM No lniun1 0 0 2 £203384 11/03/12 6:05 PM Notniu"' 0 0 3 E213826 12/11/12 2:45 PM No Injury 0 0 2 E202533 10/31/12 9:17PM No Injury 0 0 2 E212501 12/10/12 7:49 AM No Injury 0 0 ' E181002 07/11/12 12:27 PM No Injury 0 0 2 E066632 09/09/10 1:55 PM No lnluru 0 0 2 E1932S6 09/15/12 1:21AM No lniury 0 0 2 El73985 06/01/12 8:lS AM No Injury 0 0 2 E173496 06/05/12 7:04AM Possible Injury 3 0 ' E072497 10/19/10 i':41PM No Injury 0 0 ' 55 of 90 t?- Reported cqlllslons that occurred on State Route 515 {mp 4.51 tq 6-281 (rpm SE 186th St to S 23rd st en arin the vicinity et SE Corr Rd between TaJbot Rd Sta ll@h Awe SE and Benson Rd S between SR ill and5 Puqet Dr in Repton.-.• 2QJ:0 • 2012 UNQER 13 µNfTED5TATE5 COD£ ·SECT/QN409, fHl5 QATA (ANNQT BE USEp IN DIKQVfRYQRASfVWENffATTRIAt IN ANYAfiQN FOR DAMAGES AGAJNST THE WSDOT, ORANI' JURfSIHCT10N PRIMARY MILE JURISDICTION TRAFFICWA'f POST St.lte Route S1S 4.88 State Route S1S 4.88 State Route S1S 4.88 State Route S1S 4.88 State Route Sl5 4.88 St.ite Route S1S 4.92 St.ate Route Sl5 4.96 St.ite Route 515 4.97 St.ite Route 515 4.97 State Route 51S 4.99 State Route 515 5.02 State Route 515 5.02 State Route S1S 5.02 State Route S1S 5.09 Stilte Route 515 5.14 State Route S15 5.14 State Route 515 5.14 State Route 515 5.14 State Route SlS 5.14 State Roote 515 5.14 State Route SlS 5.14 State Roote 515 5.14 State Route 515 5.14 State Route 515 5.14 Prepared by: WSDOT/STCDO/COAB/MB 10/08/13 DIST FROM BLOCK IIIITERSECTING REF NUMBER TRAFFICWAY POINT . ~ " . v ~ • . • . ' ' L ~ " • -r, ~ ,..,. -- --; . 111 VO VE L Q!!i. :00:QiUA COMP DIR FROM REF REFERENCE POlNT REPORT MOST SEVERE Ml or FT POINT NAME NUMBER DATE TIME INJURY TYPE #INJ #fAT #VEH #PEDS 3106881 05/17/12 1:16 PM No 1niurv 0 0 2 EOS2047 05/12/10 4:19 PM No lnjuiv 0 0 2 3067843 04/17/10 11:36 PM Evident lniury 3 0 2 E11S702 07/15/11 2:00PM No Injury 0 0 2 E091460 02/13/11 7:46PM No Injury 0 0 2 E211549 12/07/12 S:OOPM No Injury 0 0 2 3106827 05125/10 8:07 AM Possible Injury 1 0 2 E09?.416 02/25/11 5:07PM No Injury 0 0 2 E169732 05/14/12 12:28 PM No Injury 0 0 2 El2638S 09/21/11 12:34 PM No lniury 0 0 2 E21212S 12/10/12 8:30PM No lnjul)' 0 0 2 E138572 11/22/11 12:20 PM Possible tniul)' 1 0 2 E100741 04/16/11 8:16PM Evident lniury 1 0 1 E212842 12/13/12 12:35 PM No lniury 0 0 2 El44411 12/18/11 4:02 PM EYldent lnjul)' 3 0 3 E111061 06/t9/11 8:45AM No Injury 0 0 2 E047536 03/31/10 10:54 AM No Injury 0 0 2 '204409 11/08/12 9:15AM Possible ln;ury 1 0 2 E0959B 03/14/11 8:43 PM No Injury 0 0 3 £160788 03/20/12 6:30PM No Injury 0 0 2 E09S993 03/10/11 1:15 PM PosSible Injury 1 0 3 E202338 10/30/12 3:08 PM No Injury 0 0 2 E119220 08/04/11 4:28 PM Possible Injury 1 0 2 '200340 10/22/12 10:lO AM No Injury 0 0 2 61 of90 Reported col#i51qns that occurred 00 State Route 515 (mp 4.51 ta §.2BJ from SE JB6th St to s 23rd St on pri,t the \lldnltll afSE Ca" Rd bffWUO Ta/bot Rd 5 to U6th Ave SE and Beru:an Rd s bftWun SR 51s and 5 Puaet Pc In 8,aton ....• 2010 • 20J2 UNDER 13 Ufl'ITfDSTATES CODE -5Eq1DN4Q9, THIS DATA CANNOT BE USEDfN D15CQVERYQRA5 CVIDfNCE AT TR/Al IN ANY ACTIQN FOR DAMAGES AGAINST THE wspor QR ANY JU(USDI~ /NVOLVCDIN THE DATA COMP 01ST DIR FROM FROM PRIMARY MILE BLOCK INTERSECTING REF REF REFERENCE POINT REPOflT MOST SEVERE JURISDICTION TRAFFICWAY POST NUMBER TRAfflCWAY POINT Ml or FT POINT NAME NUMBER DATE TIME INJURY TYPE #INJ #FAT #VEH #PEDS State Route 515 S.14 y E207721 11/20/12 6:00 PM Possible Injury 1 0 3 St.ata Routa "' 5.14 V 3052S65 05/08/10 10:57 PM Possible Injury 1 0 3 State Route 515 5.14 ... E208255 11/24/12 7:26PM No ln;ury 0 0 1 State Route 515 5.14 ... E110563 06/16/11 8:03AM No Injury 0 0 1 State Route 515 5.14 .... E216066 12/24/12 12:06PM serious Injury 1 0 1 1 State Route 515 5.14 V E099833 04/09/11 11:30 PM No Injury 0 0 2 State Route 515 5.14 ., ElS7556 03/01/12 4:47 PM No lniurv 0 0 1 State Route 515 5.14 V E050901 05/03/10 1:05 AM No Injury 0 0 2 State Route 515 5.14 .... 3052859 04/17/10 7:01 AM No lniury 0 0 1 State Route 515 5.14 ,,. 3107077 11/02/10 4:23 PM Possible lnJury 1 0 ' State Roule 515 5.14 y EOS6414 06/14/10 10:15 PM P03Sible Injury 1 0 2 State Roule 515 5.14 V E211984 12/10/12 8:00AM No Injury 0 0 2 State Roule 515 5.14 ,I' E153805 02/12/12 6:18 PM No Injury 0 0 2 State Route 515 5.14 v E199297 10/18/12 9:21 PM Possible Injury l 0 3 State Route 515 5.14 V 3106880 05/17/12 7:44AM No Injury 0 0 ' State Route 515 5.14 ,,, El98216 10/14/12 3:16 PM Possible Injury 2 0 2 5tate Route m S.14 J E1266S4 08/27/11 10:43 PM No lniurv 0 0 2 State Route 515 5.14 V E090158 02/03/11 8:06AM No lniury 0 0 2 State Route 515 S.14 ,,, E:040372 01/13/10 7:10 PM No Injury 0 0 2 State Route 515 5.14 ./ E173239 06/03/12 8:35 PM Nolniury 0 0 2 State Route 515 5.14 ., E:083286 12/18/10 7:55 PM No lniurv 0 0 2 State Route 515 S.14 ,I' E:071117 10/10/10 11:26 PM No Injury 0 0 2 State Route 515 S.14 ,r, E139439 11/23/11 7:02 AM Ewdent Injury 1 0 l 1 Sate Route 515 5.14 ., E045591 03/13/10 7:32 PM No Injury 0 0 ' Prepared by: WSDOT/STCOO/COAB/MB 10/08/13 67 of 90 r -10 (fj) Reporf£d cqllislons thqt qcq,nJd qn Statr Routf 515 (mp 4.51 to 6.2811mm SE 186th St to 5 23rd St, on or iq tftt: Jltdo#ty e(SE Cqq Rd bft:wt:tO Talbqt RdS to l!§tlt Allf SE and S,,,Son Rd S between SR 515 and S PveU 0: ta Bcotan WP ~ W2 YNDFR ]1 UNITED STATf5 CODE SF.CTION409 THIS DATA CANNOT BF USED IN m5COVERYOR AS EV1DfNCE AT TRIAi IN A/VY ACTION FOR DAMAGES AGAINST THE wspor QR AN'f JURt~otCTrON INVOl VED IN THE DA TA PRIMARY MILE JURISDICTION TRAFFICWAY POST State Route SlS 5.14 State Route SlS 5.14 State Route 515 5.14 State Route 515 5.14 State Route 515 5.14 State Route 515 5.14 State Route 515 5.14 State Route SlS S.14 State Route SlS 5.14 State Route S1S 5.14 State Route SlS S.14 State Route 515 S.14 State Route 515 S.14 Stilte Route 515 5.14 State Route 515 5.14 State Route 515 5.14 State Route 515 5.22 State Route 515 5.29 State Route 515 5.29 State Route 515 5.29 State Route 515 5.2.9 State Route 515 5.29 State Route 515 5.29 State Route 515 5.29 Prepared by: WSDOT/STCOO/COAB/MB 10/08/13 BLOCK NUMBER V ,/ V v ,,. V' V ., V ~ v V --- " COMP OIST DIR FROM FROM INTERSECTING REF REF TRAFFtCWAY POINT Ml or FT POINT ,,.. . ,, ,. ,;; C J ,6 J REFERENCE POINT REPORT MOST SEVER£ NAME NUMBER DATE TIME INJURY TYPE #INJ #FAT #VEH #PEDS 3070317 10/14/10 2:57 PM No Injury D D 2 £140117 11/28/11 6:36 PM Po~ible Injury 2 D 2 E142618 11/20/11 4:50 PM No Injury D D 2 £198158 10/13/12 10:12 AM Po~ible lniurv 1 0 1 1 £136390 11/09/11 1:22 PM No Injury 0 0 4 £100456 04/14/11 5:58 PM No Injury 0 0 2 E047063 03/27/10 6:20 PM No Injury 0 0 2 El945135 09/27/12 2:42 PM Poulble Injury l 0 2 E076714 11/13/10 9:42 PM Po~ible Injury l 0 3 E082323 12/09/10 1:42 PM No Injury 0 0 2 £091487 02/14/11 7:58 PM No Injury 0 0 3 El84917 08/06/12 8:27 PM No Injury 0 0 2 £183113 07/28/12 2:42 PM No Injury 0 0 2 £180696 07/15/12 2:41AM Possible Injury 2 0 2 £187329 08/15/12 3:13 PM No lniury 0 0 3 E154538 02/15/12 6:29 PM Nolnjury 0 0 2 E090777 02/07/11 2:05 PM Po~ible lniurv 1 0 2 E046462 03/22/10 6:25 PM No1njurv 0 0 2 E050840 05/03/10 5:55AM No lniury 0 0 2 E217388 12/29/12 6:00PM Possible Injury 1 0 2 E057829 06/26/10 2:19PM Evident Injury 1 0 2 E1S8406 03/10/12 1:13AM No Injury 0 0 2 £154260 02/14/12 12:32 PM Possible lniury 1 0 2 £139146 11/25/11 7:40PM Evident Injury 1 0 1 1 73 of 90 1DOT-RNB160J SR 515 MAINLINE STATE OF WASHINGTON DEPARTMENT OF TRANSPORTATION T R I P S S Y S T E M STATE HIGHWAY LOG STATE ROUTE SRSH COUNTY KING DATE 02/04/13 TIME 17:04:35 PAGE 1473 DOT DISTRICT 1 -------WIDTH AND SURFACE INFORMATION------- :OIRECTION TO INVENTORY 1-BRIOGE DECREAS/DIV INCRES/UNDI SPC ------CLASSIFICATIONS- :LEFT/RIGHT INDICATOR -UXING-NBR LFT RHT LFT REIT USE TOT I LEGAL' 1 -XROAD-LNS SHD ROY SHD MEDIAN-SHD ROY SHD LNS ROY MTCEICITYIST SPEEDITIPIS _'R_M_' __ " I ARM ___ I •_•_•_T_UR_E __ ! ~I~\ _"_'_'c_R_1_P_T_r_o_• _____ . __ : I: 1 ~ ~I~ _w i_s i"_i_s i"_i_s wo_i_s I BR w_i_s 1 _w i_s I w_i_s w_r_o w_1_0 ~ I ~ _••_R_ FC ~ I IB : : : 4.41 4. 38 2 ' C 49A C 11 60 4 01 1070 U2 45 R P * 4 .5' 4 .50 INTRSECTN B SE 186TH ST CT y 4 .60 4 ·" INTRSECTN B SE 184TH LN PV y 4 .75 4 . 72 INTRSECTN R SE 182ND ST CT N 4 . 76 4 . " MISC E-'EATR L BUS PULLOUT 4 . BO 4. 77 INTRSECTN R SB 181ST ST CT y 4 .83 4 .BO END SU LN C TWO WAY TURN I!A 2 ' C 60A C $$$ 60 4 01 1070 U2 45 R P * .BB 4 .85 INTRSECTN L SE 180TH ST CT SG y BNT/EXIT R FIRE STATION PV SG y 4 ·" 4 .95 MP MARKER R 5 5 .02 4 ·" ENT/EXIT L SHOPPING CENTER PV y 5 .OB 5.05 2 2 C 66A C 66 4 01 1070 U2 45 R P .. s. " 5.11 INTRSECTil L SE CARR RD CT SG y INTRSECTN R SE 176TH ST CT SG y 5 .22 5.19 INTRSECTN L SE 174TH ST CT y 5 .29 5.26 END ST 106TH AVE SE 2 2 C 60A C 60 4 01 1070 U2 45 R p BEG ST BENSON DR S INTRSECTN R BENSON RD CT SG y 5 .43 5 .40 2 2 C 48A C " 4 01 1070 U2 45 R p 5 ·" 5 ·" INTRSECTN L SE 172ND ST CT y 5 .63 5 .GO 2 2 C 48A C 48 4 01 1070 U2 35 R p 5 . 90 5 .87 2 2 C 60A C 60 4 01 1070 U2 35 R p 6 . 00 5 .97 MP MARKER R 6 6 . 03 6. 00 tNTRSECTN R s 27TH ST CT y 6 .16 6 .13 2 2 C 48A C 48 4 01 1070 U2 35 R P • 6 .24 6 .21 [J}UNG B PED XING ST BRDG NUM 515/010 6 .26 6.23 INTRSECTN R S 23RD ST CT y 6. 32 6. 29 2 2 C 60A C 60 01 1070 U2 35 R P 6. 37 6.34 INTRSECTN L S 21ST ST CT SG y INTRSECTN R PV'T RD CT SG y 6 .so 6 .,7 2 2 C 48A C 46 4 01 1070 U2 35 R P * INTERSECTION DETAIL ----TURN LANES-------ACCELERATION LANES------ L NEAR R NEAR L FAR R FAR LEE-'T--L-CNTR R-CNTR RIGHT- SRMP B ARM LGT WC LGT WD LGT WO LGT WO LGT WD LGT WD LGT WO LGT WD 4.88 4 .BS . 03 12 .07 12 5.02 4 .99 . 03 11 5. 14 5. 11 .06 22 . 07 21 5.29 5. 26 .03 11 6 03 6 .00 .03 11 .03 11 6 .37 6 .34 03 12 . 03 12 {ij) llf ,j ABOSSEIN ENGINEERING, LLC _JlL MecL . I .... . • I ,.,. .. p~-"--Ci .• T """" ,,.,., en1oa .. DJeCmOU -rue ~QUD -vu -.&..tQ.Q.V -"'giq October 14th, 2013 City of Renton Ref: Wendy's Restaurant on Carr Road Consider this letter and attached documents as an application for using Filterra Bioretention System Curb Inlets with Internal Bypass for water quality control and oil treatment on this project. This is an application request per Section l.4.5 Adjustment/Variance Application Process of City of Renton 2009 Surface Water Design Manual Amendment. Per requirement of City of Renton 2009 Surface Water Design Manual Amendment Section l.2.8.2 E - Use of Experimental Water Quality Facilities will be considered for approval by the City of Renton through an adjustment process for water quality treatment. Filterra Bioretention System was given a general use level designation through the state Department of Ecology's Technology Assessment Protocol-Ecology (TAPE) program for Basic, Enhanced, and Oil Treatment on June 2013. Please contact me, if any additional questions or information is needed. Sincerely, Josef Valenta PE Civil Project Manager OCT 222013 c1·.1·y c;r .. ~J f)J /',1··ii\'!l\'C.: u.1\/[;i:."_J:\ Main O(l.., 2100 11211, Jr,,. NB. Smte 201, Belt-'l'A 9IOCU Pl.om. 425--662-%411 Pmc 426-662-9451 260 Petaluma Bl,,,! N. Saile A,~ CA 94962 829 2..d si-t. &mo 2. M,,l.;h-.,, WA 98275 728 B 1 ;. S-. :m, T-WA 9M02 •• aL e com T: \213087\Civil\Submiuals\Adjustment Submittal\Adjustment Application.docx Pag, &ffj ABOSSEIN ENGINEERING, LLC ,,J _ M...L . I "' . • I ,,. . n_ -·. ~ . .. c· ., T '1Tln =u 4DJ04 -DNOa10U -m .r~... 1VU -1..llJ;.L.I -\...~ There are three essential conditions for WA DOE approval: 1. Adhere to Filterra Design Guidelines -there are 4 Filterra Curb Inlets with internal bypasses. The site layout has been sent to Americast for review and approval. Review comments have been incorporated in the design. Western Washington Engineering Design Assistance Kit (DAKit) vO 1-W A by Filterra Bioretention System has been used and followed for design. Table 2 for Enhanced Treatment of this guidelines has been used to initial sizing. 2. Size Filterra units correctly (see attached DOE Conditions of Use, paragraph 7) -WWHM3 program has been used for final design calculations. Here are input Sand Filter parameters used: Filter material depth = 1.8' Effective ponding depth= 0.75 feet Riser height= 0. 7 feet Riser diameter = I 00 inches Filter Hydraulic Conductivity = 24.82 inches per hour 3. Submit complete Project Information to Americast for review and approval -entire design including TIR report, drainage plan, design calculations and this application have been sent to Americast for review and approval. List of Attachments: • WA DOE June 2013 General Use Level Designation for Basic, Enhanced, & Oil Treatment • Drainage Control Plan • Design Calculations M... Officeo 2100 112t1, >-NE, &mo 201, e.H.vu.. 'l"A 980IU Piao.. "26-462 9"1 / Fa.., •25-462-94.51 260 Potolama Bl..! N. S.-A. P.lala-, CA 9'962 829 2nd si-t, Saa. 2, 14u!rihw. TA 98275 728 e......_ Saibl 2B, T-9A 98"0l we 1 · omn T\213087\Civil\Submittals\Adjustment Submiual\Adjusunent Application.docx Pag, ill WA$Mll 6101 $141! m 1 , , 1 r w ! • , o f ECOLOGY June 2013 GENERAL USE LEVEL DESIGNATION FOR BASIC (TSS), ENHANCED, & OIL TREATMENT & CONDITIONAL USE LEVEL DESIGNATION FOR PHOSPHORUS TREATMENT For Americast Filterra® Based on Americast's submission~ induding the Fmal Technical Evaluetioll Report, dated. December 2009 and additional information ,,provided to Ecology dated October 9, 2009, Ecology hereby issues the following u~ level designations: 1. A Gene I Use Level Des.io!ttion tor Basic, Enhanced and Oil Treatme=n-t. __ i. 3. • Sized for Basic and Oil Treatment using a filter hydraulic conductivity of 35.46 inches/hour (asswning a hydraulic gradient of 1.41 inchrmch as listed in the TER). • Sized for Enhanced TreahD,nt using a filter hydraulic conductivity of24.82 inches/hour (assuming a hydraulic gradient of 1.41 inch/inch u listed in the 1'ER). • Western Washington: For ffeatmeat installed upstream of detention or retention, the water quality desip flow rate & tbe peak 15-miaate flow rate as calculated u,5ing the sand filter module ia tlae latest venion of tlae Western Wuhia~ Hydmlpgy Model or .other Ecoaogy-apprnved eoatinaoas runoff modeL The model mast indicate tbe uit is capable of processing 91 pen:eat of the influent runoff file. • Eastern Was~n: FoJ. treatment 1nsf .• 11~,chapstream pf detention or retention, the water qulity desip Gow nte Is the pak 15-minate flow rate as calculated using one of the three methods d el£ribed ia Cu.,.. 2.2.5 of the Stormwater Management Maiaual for Euten Wasb~gtoa (SWMMEW) or local manual · • Entire State: For treatment in,called downstream of deteation, the water ..qoalijy des~ ~ rate is the faD l-te f he detention facility. 4. The Conditional Use Level Designation for osphorus treatment expires oo December l, 2014 unless exteaded by Ecol!>b, and is subject to the coaditioos specified below,. 5. The General Use Level Designation has no expiration date bat Ecology may revoke or amend th~ despatioa, aad is su ject to the nditions s~ified: below:. Ecology's Conditions of Use: 2. Each site plan 1Qa1t undergo mterra• miew before Ecology can approve the unit for site installation. nis will ensure that site gndinj and slope are appropriate for use of a Filterra• unit. .3. Filterra • media shaft conform to the -.,eclf'"IC8tioDS submitted to aad ai,proved by Ecology. 4. Mainteaaace iacllides removin1 tnsh, degn.ded malch, and accumulated debris from the filter nrface and replacbag tbe ••~ la.yet:. Use ~DI to detenniae the site- specif"ac illaiatenance schedules and r.qu,~eats. Follow maiateaatice proced"res · given in the moit recent venion of di,,tilteme ()periadon and Maintenance Manual 5. Filterra• commits to sabmittinf a QAPP by Jaaaary 31, 1013 for Ecology review and approval of a new tnt lite that meets .the TAPE nqairements for attaining a GULD for phosphorus treatment. FDterra• mlilt fpbmlt a QAPP ud monitor• minimum of one site where die aait will provide phosplions treatment. 6. Fllterra• shall submit a TER for Ecok»gy review for phosphorus treatment ~ December 1, 2013.r 7. Filterra• units eome la standard sizei. ne mhri$am size filter surface-area is determined ~ 11Q11 dae dad filter moc1ule ill the lawst venion of WWIIM pr other- Ecoh)gy approved ~aou l'IIJloff•odel for western WasfaiJl&ton ancJ jing~eveat model for eastera Waslain~. Mod.a lapuq iadude L FIiter media deptht lA feet b. Effective Poadiag Deptll:-0.75 feet (This is equivalent to the 6-iach dear zone between the top er tbe m•ldl ud the bottom of the 1lab phli ~es of mulch.) c. Side slopes: Vertical d. Riser laeipt: 8..78 feet e. :Filter R:,41'.f!alieCo•d•~ Use the ~nalie eondadi.)'ity as described in paragrapltl t aad 2 (iepeadlag OD die lffll of treatmeat reqaired) aader · . Eco 91 De.d.,ioa-' above.. 8. Fitterra• may request to put deadline or expiration date extension, upon showing came for S1ICla euensh>nL EcoJogy does not Yiew lack of lands to cqmplete the monitoring__ as sufradent came for dme atensiou. 2 9. Disc~es from Chen..-.• ••Ifs sllaP nQt cause or eoatdbate to water quality standards Yiolado8' In ~jilt-., · . . The Fi~ lntemat Bypa.ta--):i~ allows for}>iped-in flow from area drains, ~ inlets, trench drains and/or roof c:lraiu. Design Captl!l'e flows and J>C8k flows enter the structure through an internal slotted pipe. Filtetra mv<Med the .slotted pipe to allow design flows to dtop through to ~ ieries of 5P-lash j>lates that then disperse the design flows over the top surface of the F~plantet area. Jii$lir flows continue to bypass theJlotted pwe·an'd convey out the structure. . · · 2. Initial Sizing £stiinatc!: Ose ~ imormation from ihe fotkiwibg table to~ the size of , the FTIB-P unit. You mall~ the actual size of the brut using tht Diode~ analysis descn"bed above. 3 Filtern Bioretentioa Shallow 1. The Filterra Bioretentlon Shallow prqvides additional flexibility for design ~eers arid designers in situations ~tliae is liniteid ~and~ elevation ~ints to applying a stanaard Piltii'ri eohfisu.iut ~eu ~ this system up to fix inches shallower thin any of the~ plliiri{tin1t·~~ liote(l lbove. 2. &ology requird that the Filteira Bio~ Shallow~ a contact time equivalent to that of the standard unit. 'Ibis~ that with a smaller depth ot med~'lhe surface area musi increase. · · · iJ. To select a Ytlteria 13ioretemion Shallow S~ unit, the~ must fust Identify the size of the staitlard Ul\it IWDS the ritodelq guida1ace ~ pve. 4. Once you establish the Jize of the standard F-Uterra unit -\ISjng the ~ling technique ·· described above, use ilifonnation from the following table to select the appropriate size " Filterra Bioretention Shallow S~_um ____ rt. _____________________ ~ Applicant: Applicant's Address: Application Documents: Filterra Bioretention Systems, division of Americast, Inc . 11352 Virginia Precast Road Ashland, VA, 23005 • State of Washington Department of Ecology Application for Conditional Use Designation, Americast (September 2006) • Quality Assurance Project Plan Filterra® Bioretention Filtration System Performance Monitoring, Americast (April 2008) • Quality Assurance Project Plan Addendum Filterra® Bioretention Filtration System Performance Monitoring, Americast (June 2008) • Draft Technical Evaluation Report Filterra® Bioretention Filtration System Performance Monitoring, Americast (August 2009) • Final Technical Evaluation Report Filterra® Bioretention Filtration System Performance Monitoring, Americast (December 2009) 4 • Technical Evaluation Report Appendices Filterra® B ioretention Filtration System Performance Monitoring, Americast, August 2009 Draft) • Me morandum to Department of Ecology Dated October 9, 2009 from Americast, Inc. and Herrera Environmental Consultants • Quality Assura nce Project Plan Filterra Bioretention System Phosphorus treatment and Supplemental Basic and Enhanced Treatment Performance Monitoring, Americast (November 2011) • Filterra letter August 24, 2012 regarding sizing for the Filterra Shallow System. • University of V irginia Engineering Department Memo by Joanna Crowe Curran, Ph. D dated March 16, 2013 concerning capacity analysis of Filterra internal weir inlet tray. • Terraphase Engineering letter to Jodi Mil1s , P .E. dated April 2, 2013 regarding Terraflume Hydraulic Test, Filterra Bioretention System and attachments . Applicant's Use Level Request: General Level Use Designation for Basic, Enhanced, and Oil Treatment and General Use Level for Phosphorus Treatment. Applicant's Performance Claims: Field-testing and laboratory testing show that the Filterra® unit is promising as a stormwater treatment best management practice and can meet Ecology's performance goals for basic, enhanced and oil treatme nt and has the potential to meet Ecology's goal for phosphorus treatment. Findings of Fact: I . Filterra® completed field-testing at two s ites at the Port of Tacoma. Continuous flow and rainfall data collected during the 2008-2009 monitoring period indicated that 89 storm events occurred. The monitoring obtained water quality data from 27 storm events. Not all the sampled storms produced information that met TAPE criteria for storm and/or water quality data. 2. During the testing at the Port of Tacoma, 98.96 to 99.89 percent of the annual influent runoff volume passed through the POTJ and POT2 test systems respectively. Stormwater runoff bypassed the POT l test system during nine storm events and bypas sed the POT2 test system during one storm event. Bypass volumes ranged from 0.13% to 15.3% of the influent storm volume. Both test systems achieved the 91 percent water qual ity treatment-goal over the I-year monitoring period. 3. Consultants observed infiltration rates as high as 133 in/hr during the various storms. Filterra d id not provide any paired data that identified percent removal ofTSS, metals, oil, or phosphorus at an instantaneous observed flow rate. 4 . The maximum storm average hydraulic loading rate associated with water quality data is <40 in/hr, with the majority of flow rates < 25 in/hr. The average instantaneous hydraulic loading rate ranged from 8.6 to 53 inches per hour. 5 5. The field data showed a removal rate greater than 80% for TSS with an influent concentration greater than 20 mg/l at an average instantaneous hydraulic loading rate up to 53 in/hr (average influent concentration of 28.8 mg/I, average effluent concentration of 4.3 mg/I). 6. The field data showed a removal rate genera11y greater than 54% for dissolved zinc at an average instantaneous hydraulic loading rate up to 60 in/hr and an average influent concentration of 0.266 mg/I (average effluent concentration of0.115 mg/]). 7. The field data showed a removal rate generally greater than 40% for dissolved copper at an average instantaneous hydraulic loading rate up to 35 in/hr and an average influent concentration of 0.0070 mg/l (average effluent concentration of 0.0036 mg/]). 8 . The field data showed an average removal rate of93% for total petroleum hydrocarbon (TPH) at an average instantaneous hydraulic loading rate up to 53 in/hr and an average influent concentration of 52 mg/I (average effluent concentration of 2 .3 mg/I). The data also shows achievement of less than 15 mg/I TPH for grab samples. Filterra provided limited visible sheen data due to access limitations at the outlet monitoring location. 9. The field data showed low percentage removals of total Phosphorus at all storm flows at an average influent concentration of 0.189 mg/] (average effluent concentration of0.171 mg/1). We may relate the relatively poor treatment performance of the Filterra® system at this location to influent characteristics for total phosphorus that are unique to the Port of Tacoma site. It appears that the Filterra® system will not meet the 50 percent removal performance goal when you expect the majority of phosphorus in the runoff to be in the dissolved form. 10. Filterra performed laboratory testing on a scaled down version of the Filterra® unit. The lab data showed an average removal from 83-91 % for TSS with influents ranging from 2 I to 320 mg/L, 82-84% for total copper with influents ranging from 0.94 to 2 .3 mg/L, and 50-61% for orthophosphate with influents ranging from 2.46 to 14.37 mg/L. 11. Filterra® conducted permeability tests on the soil med ia. 12. Lab scale testing using Sil-Co-Sil 106 showed percent removals ranging from 70 .1 % to 95 .5% with a median percent removal of 90.7%, for influent concentrations ranging from 8.3 to 260 mg/L. Filterra® ran these laboratory tests at an infiltration rate of 50 in/hr. 13. Supplemental lab testing conducted in September 2009 using Sil-Co-Sil 106 showed an average percent removal of 90.6%. These laboratory tests were run at infiltration rates ranging from 25 to 150 in/hr for influent concentrations ranging from 41 .6 to 252.5 mg/I. Regression analysis results indicate that the Filterra® system's TSS removal performance is independent of influent concentration in the concentration rage evaluated at hydraulic loading rates of up to 150 in/hr. 6 Contact Information: Applicant: Chris French Filterra Bioretention Systems, division of Americ ast , In c. 11352 Virginia Precast Road Ashland, VA 23005 (800) 752-1427 (vo ice) (804) 798-8400 (fax) cfrench@filterra.com Applicant's Website: http://www.filterra.com E cology web link: Ecology: Date December 2009 September 2011 September 2012 January 2013 February 201 3 March 2013 April 2013 June 2013 http://www.ecy.wa.gov/programs/wg/storm water/ newtec h/i ndex. htm 1 Douglas C. Howie, P .E . Department of Ecology Water Quality Pr ogram (360) 407-6444 douglas.howie@ecy.wa.gov Revision GULD for Basic, Enhanced, and Oil granted, CULD for Phosphorus Extended CULD for Phosphorus T reatment Revised desi1rn storm discussion, added Shallow System . Revised format to match Ecology standards, changed Filterra contact information Added FTIB-P system Added FTIB-C system Modified reauirements for identifying appropriate size of unit Modified description of FTIB-C alternate configuration 7 L I, \ \ \ ' e ee a \ ' . . \ , ,/•' ,!i ~::~ -~~it· - f ( i c•" ~ .,...- ·g .. -------------.. _ ... .----__ .. DRAINAGE AREAS FOR FILTERRA DESIGN DRAINAGE AREAS F1 F2 F3 F4 ' (; t.\ \ -i.;\,t'I, '-' .. 'r. t i J l r 1 j i 1 t l 1 I / ~·+ - "' () .;4,v , .... ,O ·,::} " --- IMPERV. (AC) PERV. (AC) TOTAL(AC) 0.086 0.037 0.123 0.160 0.029 0.189 0.015 0.115 ----=~~....;:.-'1 \~ .;.::. _, ,__ ;' _,, .:.---- CD~~~ER~ .. ?~INAGE AREA FOR FILTERRA DESIGN FH~ Edit Vie:w Hetu -·-. --,,._, ------· -· -~-·· c' ~-, .,. ,. -,-,_,..,_, -" ·--·-... _ ·-· ... :.,,.._ __ _:,J_~~~--~~ .. .:.,..;..;;..:;_;__-::.,;,,;.,.~..:.--:;..;;;.~ .. "'·L"",;.~ , .,. . ......_~~~~-~-.. ~ ... ._._..,._. ____ ._;;.:;.. ' --·-~ .. ~ -• -._.~.~_.,;.:-~~~...,_- D ~ liil I ei I,~•~ l\ -- I -I ~...,. :5= .1 =:we I .......... I .. = !F&raFl Outlet 1 Outlet 2 Outlet 3 Downstream Connections ~ _ _ ]jo~ 1.,....16 ____ 1 l1--:-"'·;..;.."' ---"'I Facility Type ~ ....... ~f Facil)i _, ... '.l~·~·o. Facitity Dimensions Bottom L81'9h Effective Depth Left Side Slope Bottom Side Slope Right Side Slope . Top Side Slope I ,, tnfiltration IYEs H}'(iauic Cord.lctivlyflnll'vJ Fikor materiol depth(ft) I - I Total VQbne Flratec(&ae-ft) 'I ._ .. : -I I __ 111 (t olal Volt.me Through Riser(aae.fl) Total Volt.me (acre-ft) Perceli Filtered ~w~~ I Quick Alte r OuUet Structure Riief H~(ft))o ... -_7 ---:-f Riser Diameter{in) hoo -:1 Ri$er T )'Pe I Flat -:i Notch Type Orifice OMax Diameter Height f 24.82 --:1 Number (In) (Ft) (cfs) 1 ro---:1 ro-~ 0 fre~ 2 ro--.-:, ro-,-:-f 0 11 .726 3 ro-~ro-~ 0 0.303 12.029 filer ~~orage Volume at Riser Head .OOl 97.48 Pond Increment Jo.io -:i Show Pond Table jopen Table ~ • f" ' ~HM3 . .,; , . ~, _ , .. ,;,,:: -~-~"'----~ ,~.-~id Jii.~ -~Elt -~~~-lf .. !lp ..------~ ·-· .~· .~.-;~.-;~~~~~~~~~~t~~~:~~-~~~~~~?~~~~~~=r~~~~-.. ~~~-,-~ Cl ~lil l at l t ~' Gt:\1 8 ... . ~ , . __ .:._ ___ .,_. _,-_ , " .. _ _ _ _ _ _ I IS't'Sand !film 2 Mitigated I -t, 1 l~ -l.1-·· · .... , ... J, J •.. n ~ , · Facility Name l~F2 0~~1 Outl~2 Outl~l 1 _ . .. 1 Downstream Connections 'Facility Type lo . ~ 11Q~ . ~ 110 I Sa'ldFter I r{~~to'F~ Quick Filter Facility Bottom Elevation (ft) jo .. .• .~,...,. . 1 Fadlity Dimensions · · --I' . Iii . -I Bottom Length If .lJ.£,:._~'.f ~-, ~:BottQmW'dh __ __. ll> --~ I ~ . I I I Effec.tive Depth Left Sido Slope BottClffi Side Slope Right Side Slope Top Side Slope Infiltration [YE's -;-f Hyct~ CondJclivilyffllhr) Fil"' moterial deplh(ft) 'Total Volume Flrate<(acre-lt) I _ ,,, •. J' ·~ -. . I ..: ---IT ota!Volume Through Aiser{acre-ft) Total Volume (acre-ft) Percent Filered Outlet Structure AiMr Height (ft) W.,--t"f Riser Oi«nete,fr1) r,oo-'"!1 Riser Type !Flat "";'"f Notch Type Orifice Diameter Height OMax !24.82 --=1 Number On) (Ft) (cfs) ~~ lo --:-1 o r,:e--:-1 2 ro--:-i lo ~ o 20.421 3 ro--~ ~ "';1 0 1.02 21 .441 ~ilter· ~~age Voll.me at Riser Head .000 95.24 Pond Increment lo.1 o --:1 Show Pond Table lopen Table ~ u ·rnn• ',, I •I ~--....L-----~J I· . [ --I ~' ....... L.~..c..~ Iii wyJHMl . Flit _l!lit _ View Help D~lil l 5 1X~@ !fBterra,F3 Outlet 1 Outlet 2 Outlet 3 ,~nf FleJ ~ .! ,~ ' t , -,o ----, Facility Dimensions Bottom Length I u •• i 'tf-.~-. I >-~-'.tsa D J ,··," ~Bottom'wdh Effective Depth Left Side Slope Bottom Side Slope Rvt Side Slope . 1 Top Side Slope I n-.s:,:"''"' i:i' Infiltration ~-;-! Hy«tdc Conductivlyfinlhr) !24.82 -!1 Filer material depth(ft) rr:e-~ T otalVoklne Fitratec(aae-ft) 12279 a;:~·~ ·· t. 'J _IT otalVoune Through Rlser{acre-ft) 0.468 •• Total Vobne (acre-ft) 12. 748 96.32 ~~~~~_,•r== [ Oui gs filter Outlet Structure Aiier HeighHft) ~ --!'-f Riser Oiamete,fr1) r,oo-~ Aiier T we !Flat --!; Notch Type Orifice Diameter Height Number (In) (A) OMax (ds) , ro--:-i ~ -!-1 0 2 ro-'":1 ~ -!1 0 3 re--'":1 ro-~ 0 ~er ~\or age Volume at Riffl Head .IXXJ Pond Increment ro:,o--;-j Show Pond Table !Open Table -:-f -~~ Fi te -Edit View 11 H~p~ . ?'"~,.. 5''2':"~"~'t,:"'.~it~~~ ~.,..;w.. ""'""".,.....~. ~ .... "~~ ...... ~...-.........._. ' ' . Cl ~lil l ci l ¥.. ~ft f(lcllity Name !Fhrr~F'"4 Outl~l Outl~2 Outl~l lo . ; I ro .. J ~,o ----1 _S~Fl,r. I Quick Filter Facility Bottom Elevation (ft) p · .,. ~ I _Facility Dimensions Bottom Length · Bottom \vidth Outlet Structure Riser H~·(ft) -10-. 7-.-:, RiJer DiameteqinJ J1 00 --:1 AisertYPe !Flat ~ Notch Type lnfi~ra.tion 'IYEs r-:-l Orifice Dia.meter Height OMa.x . H~dc Conduc;:tMYfrv'hrJ !24.82 ~ Number (In) (ft) (d.s) 1 ro-~to ~ 0 11.e '-:1 2 Jo ~ro-~ 0 Total Volt.me Filratec(acre-ft) 12.061 3 lo ~lo ~ 0 T otalVolt,ne Through Aiset{acre-ftJ 0.43 12.491 filter ~!orage Volume at Riier H~d .000 96.56 Pond Increment fo.10 ~ Show Pond Ta.hie fopen Table ~ Western Washington Hydrology Modal PROJECT REPORT Project Name: Site Address: City Report Date Gage Data Start Data End Precip Scala: WWHM3 Version: Filterra Renton 10/14/2013 Seatac 1948/10/01 1998/09/30 1.00 PREDEVELOPED LAND USE Name Fl Bypass: No GroundWa ter: No Pervious Land Use C, Forest, Flat Impervious Land Use DRIVEWAYS FLAT Element Flows To: Acres .037 Acres 0.086 Surface Fl, Fl, Interflow Name Fl Bottom Length: 4ft. Bottom Width : 4ft. Depth : 0.75ft. Side slope 1: 0 To 1 Side slope 2: 0 To 1 Side slope 3: 0 To 1 Side slope 4: 0 To 1 Filtration On Hydrau1ic conductivity Depth of filter medium Discharge Structure Riser Height: 0.7 ft. Riser Diameter: 100 in. Elem.ant Flows To: 24.82 i. 8 OUtlet 1 outlet 2 Groundwater Sand Filter Hydraulic Table S!:!9:e{~t! Area(acr) Voluaa{acr-~t! Dachr9(c£a) Inf'ilt(cfa) 0.000 0.000 0.000 0.000 0.000 0.008 0.000 0.000 0.000 0.000 0.017 0.000 0.000 0.000 0.000 0. 025 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.000 0.000 0.042 0.000 0.000 0.000 0.000 0.050 0.000 0.000 0.000 0.000 0.058 0.000 0.000 0.000 0.000 0.067 0.000 0.000 0.000 0.000 0.075 0.000 0.000 0.000 0.000 0.083 0.000 0.000 0.000 0.000 0 .092 0.000 0.000 0.000 0.000 0.100 0.000 0.000 0.000 0.000 0.108 0.000 0.000 0.000 0.000 0 .117 0.000 0.000 0.000 0.000 0.125 0.000 0.000 0.000 0.000 0.133 0.000 0.000 0.000 0.000 0 .142 0.000 0.000 0.000 0.000 0.150 0.000 0.000 0.000 0.000 0.158 0.000 0.000 0.000 0.000 0.167 0.000 0.000 0.000 0.000 0.175 0.000 0.000 0.000 0.000 0.183 0.000 0.000 0.000 0.000 0.192 0.000 0.000 0.000 0.000 0.200 0.000 0.000 0.000 0.000 0.208 0.000 0.000 0.000 0.000 0.217 0.000 0.000 0.000 0.000 0.225 0.000 0.000 0.000 0.000 0.233 0.000 0.000 0.000 0.000 0.242 0.000 0.000 0.000 0.000 0.250 0.000 0.000 0.000 0.000 0.258 0.000 0.000 0.000 0.000 0.267 0.000 0.000 0.000 0.000 0.275 0.000 0.000 0.000 0.000 0.283 0.000 0.000 0.000 0.000 0.292 0.000 0.000 0.000 0.000 0.300 0.000 0.000 0.000 0.000 0.308 0.000 0.000 0.000 0.000 0.317 0.000 0.000 0.000 0.000 0.325 0.000 0.000 0.000 0.000 0.333 0.000 0.000 0.000 0.000 0.342 0.000 0.000 0.000 0.000 0.350 0.000 0.000 0.000 0.000 0.358 0.000 0.000 0.000 0.000 0.367 0.000 0.000 0.000 0.000 0.375 0.000 0.000 0.000 0.000 0.383 0.000 0.000 0.000 0.000 0.392 0.000 0.000 0.000 0.000 0.400 0.000 0.000 0.000 0.000 0. 408 0.000 0.000 0.000 0.000 0.417 0.000 0.000 0.000 0.000 0.425 0.000 0.000 0.000 0.000 0. 433 0.000 0.000 0.000 0.000 0.442 0.000 0.000 0.000 0.000 0.450 0.000 0.000 0.000 0.000 0.458 0.000 0.000 0.000 0.000 0.467 0.000 0.000 0.000 0.000 0.475 0.000 0.000 0.000 0.000 0. 483 0.000 0.000 0.000 0.000 0. 492 0.000 0.000 0.000 0.000 0.500 0.000 0.000 0.000 0.000 0.508 0.000 0.000 0.000 0.000 0.517 0.000 0.000 0.000 0.000 0.525 0.000 0.000 0.000 0.000 0.533 0.000 0.000 0.000 0.000 0.542 0.000 0.000 0.000 0.000 0.550 0.000 0.000 0.000 0.000 0.558 0.000 0.000 0.000 0.000 0.567 0.000 0.000 0.000 0.000 0.575 0.000 0.000 0.000 0.000 0.583 0.000 0.000 0.000 0.000 0.592 0.000 0.000 0.000 0.000 0.600 0.000 0.000 0.000 0.000 0.608 0.000 0.000 0.000 0.000 0. 617 0.000 0.000 0.000 0.000 0. 625 0.000 0.000 0.000 0.000 0.633 0.000 0.000 0.000 0.000 0. 642 0.000 0.000 0.000 0.000 0.650 0.000 0.000 0.000 0.000 0.658 0.000 0.000 0.000 0.000 0.667 0.000 0.000 0.000 0.000 0.675 0.000 0.000 0.000 0.000 0.683 0.000 0.000 0.000 0.000 0.692 0.000 0.000 0.000 0.000 0.700 0.000 0.000 0.000 0.000 0.708 0.000 0.000 0.062 0.000 0. 717 0.000 0.000 0.175 0.000 o. 725 0.000 0.000 0.321 0.000 0.733 0.000 0.000 0.494 0.000 0.742 0.000 0.000 0.690 0.000 0.750 0.000 0.000 0.907 0.000 0.758 0.000 0.000 1.143 0.000 MITIGA'l'ED LAND USE ANALYSIS RESULTS F1ow Frequency Return Return Period 2 year 5 year 10 year 25 year 50 year 100 year Flow Frequency Return Return Period 2 year Periods for Flow(cfa) Pradevel.opad. POC t1 0 0 0 0 0 0 Periods for Mitigated. Flow(cfs) 0 POC i1 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Yearly Peaks for Predaveloped and Mitigated. POC 11 Year Predavelopecl Mitigated Ranked Yearly Peaks for Predaveloped and Mitigated. POC 11 Rank Predeveloped Mitigated POC fl The Facility PASSED The Facility PASSED. Flow(CFS) Predev Dav Percentage Pass/Fail 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass Wa"teir Quality BHP l'low and Volume for POC 1. On-l.ine facility volume: 0.011 acre-feet On-.line f'acil.ity target f'low: 0. 01 cfa. Adjuated for 15 ain: 0.0132 cl'•. Of'f-lina facility target fl.ow: 0.0069 d•. Adjuated for 15 ai.n: 0.0075 cf'a. Per1nd and Imp1nd Changes No changes have been made. This program and accompanying documentation is provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by the user. Clear Creek Solutions and the Washington State Department of Ecology disclaims all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions and/or the Washington State Department of Ecology be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions or the Washington State Department of Ecology has been advised of the possibility of such damages. Western Washington Hydrology Model PROJECT REPORT Project Name: Site Address: City Report Date Gage Data Start Data End Precip Scale: WWHM3 Version: Filterra Renton 10/14/2013 Seatac 1948/10/01 1998/09/30 1.00 PREDEVELOPED LAND USZ Name F2 Bypass: No GroundWater: No Parvious Land Use C, Forest, Flat Impervious Land Osa DRIVEWAYS FLAT Element Flows To: Acres .029 Acres 0.16 Surface F2, F2, Interflow Name F2 Bottom Length: 6ft. Bottom Width : 4ft. Depth : 0.75ft. Side slope 1: 0 To 1 Side slope 2: 0 To 1 Side slope 3: 0 To 1 Side slope 4: 0 To l Filtration On Hydraulic conductivity Depth of filter medium Discharge Structure Riser Height: 0.7 ft. Riser Diameter: 100 in. 24.82 1. 8 Element Flows To: outlet 1 outlet 2 Groundwater Sand Filter Hydraulic Table Sta~ (ft) Area (acr) Volume!acr-ft) D•chro(cf'e) In£i1t(cfa) 0.000 0.001 0.000 0.000 0.000 0.008 0.001 0.000 0.000 0.000 0.017 0.001 0.000 0.000 0.000 0.025 0.001 0.000 0.000 0.000 0.033 0.001 0.000 0.000 0.000 0.042 0.001 0.000 0.000 0.000 0.050 0.001 0.000 0.000 0.000 0.058 0.001 0.000 0.000 0.000 0.067 0.001 0.000 0.000 0.000 0.075 0.001 0.000 0.000 0.000 0.083 0.001 0.000 0.000 0.000 0.092 0.001 0.000 0.000 0.000 0.100 0.001 0.000 0.000 0.000 0.108 0.001 0.000 0.000 0.000 0.117 0.001 0.000 0.000 0.000 0.125 0.001 0.000 0.000 0.000 0.133 0.001 0.000 0.000 0.000 0.142 0.001 0.000 0.000 0.000 0.150 0.001 0.000 0.000 0.000 0.158 0.001 0.000 0.000 0.000 0.167 0.001 0.000 0.000 0.000 0.175 0.001 0.000 0.000 0.000 0.183 0.001 0.000 0.000 0.000 0 .192 0.001 0.000 0.000 0.000 0.200 0.001 0.000 0.000 0.000 0.208 0.001 0.000 0.000 0.000 0.217 0.001 0.000 0.000 0.000 0.225 0.001 0.000 0.000 0.000 0.233 0.001 0.000 0.000 0.000 0.242 0.001 0.000 0.000 0.000 0.250 0.001 0.000 0.000 0.000 0.258 0.001 0.000 0.000 0.000 0 .267 0.001 0.000 0.000 0.000 0.275 0.001 0.000 0.000 0.000 0.283 0.001 0.000 0.000 0.000 0.292 0.001 0.000 0.000 0.000 0.300 0.001 0.000 0.000 0.000 0.308 0.001 0.000 0.000 0.000 0.317 0.001 0.000 0.000 0.000 0.325 0.001 0.000 0.000 0.000 0.333 0.001 0.000 0.000 0.000 0.342 0.001 0.000 0.000 0.000 0.350 0.001 0.000 0.000 0.000 0.358 0.001 0.000 0.000 0.000 0.367 0.001 0.000 0.000 0.000 0.375 0.001 0.000 0.000 0.000 0.383 0.001 0.000 0.000 0.000 0. 392 0.001 0.000 0.000 0.000 0.400 0.001 0.000 0.000 0.000 0.408 0.001 0.000 0.000 0.000 0.417 0.001 0.000 0.000 0.000 0.425 0.001 0.000 0.000 0.000 0.433 0.001 0.000 0.000 0.000 0.442 0.001 0.000 0.000 0.000 0.450 0.001 0.000 0.000 0.000 0.458 0.001 0.000 0.000 0.000 0.467 0.001 0.000 0.000 0.000 0.475 0.001 0.000 0.000 0.000 0. 483 0.001 0.000 0.000 0.000 0. 492 0.001 0.000 0.000 0.000 0.500 0.001 0.000 0.000 0.000 0.508 0.001 0.000 0.000 0.000 0.517 0.001 0.000 0.000 0.000 0. 525 0.001 0.000 0.000 0.000 0.533 0.001 0.000 0.000 0.000 0.542 0.001 0.000 0.000 0.000 0.550 0.001 0.000 0.000 0.000 0.558 0.001 0.000 0.000 0.000 0.567 0.001 0.000 0.000 0.000 0.575 0.001 0.000 0.000 0.000 0.583 0.001 0.000 0.000 0.000 0.592 0.001 0.000 0.000 0.000 0.600 0.001 0.000 0.000 0.000 0.608 0.001 0.000 0.000 0.000 0.617 0.001 0.000 0.000 0.000 0.625 0.001 0.000 0.000 0.000 0.633 0.001 0.000 0.000 0.000 0. 642 0.001 0.000 0.000 0.000 0.650 0.001 0.000 0.000 0.000 0.658 0.001 0.000 0.000 0.000 0.667 0.001 0.000 0.000 0.000 0. 675 0.001 0.000 0.000 0.000 0.683 0.001 0.000 0.000 0.000 0.692 0.001 0.000 0.000 0.000 0.700 0.001 0.000 0.000 0.000 0.708 0.001 0.000 0.062 0.000 0. 717 0.001 0.000 0.175 0.000 0. 725 0.001 0.000 0.321 0.000 0.733 0.001 0.000 0.494 0.000 0.742 0.001 0.000 0.690 0.000 0.750 0.001 0.000 0.907 0.000 0.758 0.001 0.000 1.143 0.000 MJ:TIGATED LAND USE ANALYSIS RESULTS Flow Frequency Return Return Period 2 year 5 year 10 year 25 year 50 year 100 year Flow Frequency Return Return Period 2 year Period.a for Fl.ow(cfa) Predevel.oped. POC #1 0 0 0 0 0 0 Periods for Mitigated. Fl.ow(cfs) 0 POC ft1 5 year 0 10 year 0 25 year 0 SO year 0 100 year 0 Yearly Peaks for Pradevalopad and Mitigatad. POC fl Year Pradavalopad Mitigated Ranlcad Yearly Peaks for Pradavelopad and Mitigated. POC ll Rank Predavalopad Mitigated POC Ill The Facility PASSED The Facility PASSED. Flow(CFS) Predav Dev Percentage Pass/Fail 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass wate::c" Qual.ity ma l'low and VolmN :for POC 1. On-li.na faoi.li.ty voluae: 0.0195 acre-feet On-li.mt facility target flow: 0.01 cf'a. Adjusted :for 15 ai.n: 0.025 c:fa. Of:f-1.ine :faaili.t:y targat. f!l.ow: 0.0129 ds. Adjuated :for 15 m.i.n: 0. 0143 af'a. Perind and Impind Changes No changes have been made. This program and accompanying documentation is provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by the user. Clear Creek Solutions and the Washington State Department of Ecology disclaims all warranties, either expressed or implied1 including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions and/or the Washington State Department of Ecology be liable for any damages whatsoever {including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions or the Washington State Department of Ecology has been advised of the possibility of such damages. Western Washington Hydrology Model PROJECT REPORT Project Name: Site Address: City Report Date Gage Data Start Data End Preoip Scala: WWHM3 Version: Filterra Renton 10/14/2013 Seatac 1948/10/01 1998/09/30 1.00 PREDEVELOPED LAND USE Nam.a F3 Bypass: No GroundWater: No Pervious Land Use C, Forest, Flat Impervious Land Use DRIVEWAYS FLAT Element Flows To: Acres .015 Acres 0.1 Surface F3, F3, Interflow Name F3 Bottom Length: 4ft. Bottom Width : 4ft. Depth : 0.75ft. Side slope 1: 0 To 1 Side slope 2: 0 To 1 Side slope 3: 0 To 1 Side slope 4: 0 To 1 Filtration On Hydraulic conductivity Depth of filter medium Discharge Structure Riser Haight: 0.7 ft. Riser Diameter: 100 in. 24.82 1.8 Element Flows To: outlet l outlet 2 Groundwater Sand Filter Hydraulic Table Sta5a:a (ft) Area i•cr! Vol.ume !•o.r-~t) Dach.rs: (els) In.f'il.t !cl'e) 0.000 0.000 0.000 0.000 0.000 0.008 0.000 0.000 0.000 0.000 0.017 0.000 0.000 0.000 0.000 0.025 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.000 0.000 0.042 0.000 0.000 0.000 0.000 0.050 0.000 0.000 0.000 0.000 0.058 0.000 0.000 0.000 0.000 0.067 0.000 0.000 0.000 0.000 0.075 0.000 0.000 0.000 0.000 0.083 0.000 0.000 0.000 0.000 0.092 0.000 0.000 0.000 0.000 0.100 0.000 0.000 0.000 0.000 0.108 0.000 0.000 0.000 0.000 0.117 0.000 0.000 0.000 0.000 0 .125 0.000 0.000 0.000 0.000 0.133 0.000 0.000 0.000 0.000 0.142 0.000 0.000 0.000 0.000 0.150 0.000 0.000 0.000 0.000 0.158 0.000 0.000 0.000 0.000 0.167 0.000 0.000 0.000 0.000 0.175 0.000 0.000 0.000 0.000 0.183 0.000 0.000 0.000 0.000 0 .192 0.000 0.000 0.000 0.000 0.200 0.000 0.000 0.000 0.000 0 .208 0.000 0.000 0.000 0.000 0.217 0.000 0.000 0.000 0.000 0.225 0.000 0.000 0.000 0.000 0.233 0.000 0.000 0.000 0.000 0.242 0.000 0.000 0.000 0.000 0.250 0.000 0.000 0.000 0.000 0 .258 0.000 0.000 0.000 0.000 0.267 0.000 0.000 0.000 0.000 0.275 0.000 0.000 0.000 0.000 0.283 0.000 0.000 0.000 0.000 0.292 0.000 0.000 0.000 0.000 0.300 0.000 0.000 0.000 0.000 0.308 0.000 0.000 0.000 0.000 0.317 0.000 0.000 0.000 0.000 0. 325 0.000 0.000 0.000 0.000 0.333 0.000 0.000 0.000 0.000 0.342 0.000 0.000 0.000 0.000 0.350 0.000 0.000 0.000 0.000 0.358 0.000 0.000 0.000 0.000 0.367 0.000 0.000 0.000 0.000 0.375 0.000 0.000 0.000 0.000 0.383 0.000 0.000 0.000 0.000 0.392 0.000 0.000 0.000 0.000 0.400 0.000 0.000 0.000 0.000 0.408 0.000 0.000 0.000 0.000 0.417 0.000 0.000 0.000 0.000 0.425 0.000 0.000 0.000 0.000 0.433 0.000 0.000 0.000 0.000 0.442 0.000 0.000 0.000 0.000 0.450 0.000 0.000 0.000 0.000 0. 458 0.000 0.000 0.000 0.000 0. 4 67 0.000 0.000 0.000 0.000 0.475 0.000 0.000 0.000 0.000 0.483 0.000 0.000 0.000 0.000 0. 492 0.000 0.000 0.000 0.000 0.500 0.000 0.000 0.000 0.000 0.508 0.000 0.000 0.000 0.000 0.517 0.000 0.000 0.000 0.000 0.525 0.000 0.000 0.000 0.000 0.533 0.000 0.000 0.000 0.000 0.542 0.000 0.000 0.000 0.000 0.550 0.000 0.000 0.000 0.000 0.558 0.000 0.000 0.000 0.000 0. 567 0.000 0.000 0.000 0.000 0.575 0.000 0.000 0.000 0.000 0.583 0.000 0.000 0.000 0.000 0.592 0.000 0.000 0.000 0.000 0.600 0.000 0.000 0.000 0.000 0.608 0.000 0.000 0.000 0.000 0.617 0.000 0.000 0.000 0.000 0.625 0.000 0.000 0.000 0.000 0.633 0.000 0.000 0.000 0.000 0.642 0.000 0.000 0.000 0.000 0.650 0.000 0.000 0.000 0.000 0.658 0.000 0.000 0.000 0.000 0. 667 0.000 0.000 0.000 0.000 0. 675 0.000 0.000 0.000 0.000 0. 683 0.000 0.000 0.000 0.000 0. 692 0.000 0.000 0.000 0.000 0.700 0.000 0.000 0.000 0.000 0.708 0.000 0.000 0.062 0.000 0. 717 0.000 0.000 0.175 0.000 o. 725 0.000 0.000 0.321 0.000 0.733 0.000 0.000 0.494 0.000 0.742 0.000 0.000 0.690 0.000 0.750 0.000 0.000 0.907 0.000 0.758 0.000 0.000 1.143 0.000 MITIGATED LAND USE ANALYSIS RESULTS F1ow Frequency Return Return Period 2 year 5 year 10 year 25 year 50 year 100 year Flow Frequency Return Return Period 2 year Periods for Flow(cfs) Pradeveloped. POC #1 0 0 0 0 0 0 Periods for Mitigated. Flow(cfs) 0 POC fl 5 year 0 10 year 0 25 year 0 SO year 0 100 year 0 Yearly Peaks for Predeval.oped and Mitigated. POC Ill Year Predavel.oped Mitigated Ranked Yearl.y Peaks for Predaval.oped and Mitigated. POC fl Rank Predavel.oped Mitigated POC fl Tha Facil.ity PASSED The Facil.ity PASSED. Fl.ow(CFS) Pradev Dev Percentage Pass/Fail. 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass Water Quality BNP l"lov and Vo.lume for PCX: 1. On-li.ne facility voluae: 0.0121 acre-feet On-line f'aci.l.ity target f'low: 0.01 cf'e. Adjuat.ed f'or 15 min: 0.0156 c:fa. Off'-line facility target fl.ow: 0.008 cfs . .Adju•t.ad for 15 lllli.n: 0.009 cf•. Parlnd and Implnd Changes No changes have been made. This program and accompanying documentation is provided 1 as-is 1 without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by the user. Clear creek Solutions and the Washington State Department of Ecology disclaims all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions and/or the Washington State Department of Ecology be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like} arising out of the use of, or inability to use this program even if Clear Creek Solutions or the Washington State Department of Ecology has been advised of the possibility of such damages. Western Washington Hydrology Model PROJECT REPORT Project Name: Site Address: City Report Date Gage Data Start Data End Precip Scale: WNHM3 Version: Filterra Renton 10/14/2013 Seatac 1948/10/01 1998/09/30 1.00 PREDEVELOPED LAND USE Nam.a F4 Bypass: No GrounclWa ter: No Parvious Land Use C, Forest, Flat Impervious Land Use DRIVEWAYS FLAT Element Flows To: Acres .015 Acres 0.098 Surface F4, F4, Interf1ow Name F4 Bottom Length: 4ft. Bottom Width: 4ft. Depth : 0. 75ft. Side slope 1: 0 To 1 Side slope 2: 0 To 1 Side slope 3: 0 To 1 Side slope 4: 0 To 1 Filtration On Hydraulic conductivity Depth of filter medi.wn Discharge Structure Riser Height: 0.7 ft. Riser Diameter: 100 in. Element Flows To: 24.82 1.8 Outlet 1 Outlet 2 Groundwater Sand Filter Hydraulic Tabla St!i•!ft2 Araa(acr} Volume!acr-ft2 Dechri!cf•2 Infi1t!cf•! 0.000 0.000 0.000 0.000 0.000 0.008 0.000 0.000 0.000 0.000 0.017 0.000 0.000 0.000 0.000 0.025 0.000 0.000 0.000 0.000 0.033 0.000 0.000 0.000 0.000 0.042 0.000 0.000 0.000 0.000 0.050 0.000 0.000 0.000 0.000 0.058 0.000 0.000 0.000 0.000 0.067 0.000 0.000 0.000 0.000 0.075 0.000 0.000 0.000 0.000 0.083 0.000 0.000 0.000 0.000 0.092 0.000 0.000 0.000 0.000 0.100 0.000 0.000 0.000 0.000 0.108 0.000 0.000 0.000 0.000 0.117 0.000 0.000 0.000 0.000 0.125 0.000 0.000 0.000 0.000 0.133 0.000 0.000 0.000 0.000 0.142 0.000 0.000 0.000 0.000 0.150 0.000 0.000 0.000 0.000 0.158 0.000 0.000 0.000 0.000 0.167 0.000 0.000 0.000 0.000 0.175 0.000 0.000 0.000 0.000 0.183 0.000 0.000 0.000 0.000 0.192 0.000 0.000 0.000 0.000 0.200 0.000 0.000 0.000 0.000 0.208 0.000 0.000 0.000 0.000 0.217 0.000 0.000 0.000 0.000 0 .225 0.000 0.000 0.000 0.000 0 .233 0.000 0.000 0.000 0.000 0.242 0.000 0.000 0.000 0.000 0.250 0.000 0.000 0.000 0.000 0.258 0.000 0.000 0.000 0.000 0.267 0.000 0.000 0.000 0.000 0.275 0.000 0.000 0.000 0.000 0.283 0.000 0.000 0.000 0.000 0.292 0.000 0.000 0.000 0.000 0.300 0.000 0.000 0.000 0.000 0.308 0.000 0.000 0.000 0.000 0.317 0.000 0.000 0.000 0.000 0.325 0.000 0.000 0.000 0.000 0.333 0.000 0.000 0.000 0.000 0.342 0.000 0.000 0.000 0.000 0.350 0.000 0.000 0.000 0.000 0.358 0.000 0.000 0.000 0.000 0.367 0.000 0.000 0.000 0.000 0.375 0.000 0.000 0.000 0.000 0.383 0.000 0.000 0.000 0.000 0.392 0.000 0.000 0.000 0.000 0.400 0.000 0.000 0.000 0.000 0.408 0.000 0.000 0.000 0.000 0. 417 0.000 0.000 0.000 0.000 0. 425 0.000 0.000 0.000 0.000 0.433 0.000 0.000 0.000 0.000 0.442 0.000 0.000 0.000 0.000 0.450 0.000 0.000 0.000 0.000 0. 458 0.000 0.000 0.000 0.000 0. 467 0.000 0.000 0.000 0.000 0.475 0.000 0.000 0.000 0.000 0. 483 0.000 0.000 0.000 0.000 0.492 0.000 0.000 0.000 0.000 0.500 0.000 0.000 0.000 0.000 0.508 0.000 0.000 0.000 0.000 0.517 0.000 0.000 0.000 0.000 0.525 0.000 0.000 0.000 0.000 0.533 0.000 0.000 0.000 0.000 0.542 0.000 0.000 0.000 0.000 0.550 0.000 0.000 0.000 0.000 0.558 0.000 0.000 0.000 0.000 0.567 0.000 0.000 0.000 0.000 0.575 0.000 0.000 0.000 0.000 0.583 0.000 0.000 0.000 0.000 0.592 0.000 0.000 0.000 0.000 0.600 0.000 0.000 0.000 0.000 0.608 0.000 0.000 0.000 0.000 0.617 0.000 0.000 0.000 0.000 0.625 0.000 0.000 0.000 0.000 0.633 0.000 0.000 0.000 0.000 0.642 0.000 0.000 0.000 0.000 0.650 0.000 0.000 0.000 0.000 0.658 0.000 0.000 0.000 0.000 0. 667 0.000 0.000 0.000 0.000 0.675 0.000 0.000 0.000 0.000 0.683 0.000 0.000 0.000 0.000 0.692 0.000 0.000 0.000 0.000 0.700 0.000 0.000 0.000 0.000 0.708 0.000 0.000 0.062 0.000 0. 717 0.000 0.000 0.175 0.000 0. 725 0.000 0.000 0.321 0.000 0.733 0.000 0.000 0. 494 0.000 0.742 0.000 0.000 0.690 0.000 0.750 0.000 0.000 0.907 0.000 0.758 0.000 0.000 1.143 0.000 MITIGATED LAND OSE ANALYSIS RESULTS F1ow Frequency Return Return Period 2 year 5 year 10 year 25 year 50 year 100 year Flow Frequency Return Return Period 2 year Periods for Flow(cfs) Predavalopad. POC 111 0 0 0 0 0 0 Periods for Mitigated. Flow(cfs) 0 POC 11 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Yearly Peaks for Predeveloped and Mitigated. POC 11 Year Predeveloped Mitigated Ranked Yearly Peaks for Predaveloped and Mitigated. POC 11 Rank Predeveloped Mitigated POC 11 The Facility PASSED The Facility PASSED. Flow(CFS) Predav Dav Percentage Pasa/Fai1 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass watar Quality BNP Flow and Volume f'or POC 1. On-line facility volume: 0.0121 acre-feet On-U..ne f'ac:.ility tar;.t f'low: 0. 01 d•. Adjuated f'or 15 mi.a.: 0.0156 cfa. Off-l.ine f'acili.ty targat f'l.ow: 0.008 c£a. Adjusted f'or 15 ai.n: 0.009 cf's. Parlnd and Implnd Changes No changes have been made. This program and accompanying documentation is provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by the user. Clear Creek Solutions and the Washington State Department of Ecology disclaims all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions and/or the Washington State Department of Ecology be liable for any damage:, whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions or the Washington State Department of Ecology has been advised of the possibility of such dam.ages. • \ \ \ \ --- l l !I I ,1r :J; , ----- 372 CD ~~~E~~ .. ~~INAGE AREA FOR CONVEYANCE DESIGN ii ---~ ,. ... ---- -· ,----. -- \ I I I / I I I I I I __ .,.--~ --.---- . __ .. --- \ \ \ ' \ ' •. l •. \ ; '\ \ -~- ----------________ .... -----·. .. -------------~---· _;_~--; -------" -~~--.,..,.-· --·-~-------·--·--·- ~ ___ ... ------·· _____ ...,.---_ ..... ----·- .• _,.-· -~-----_.------·-..... ----· : 213087 Weltd'ts on Carr Road. Renton 100 year storm Subbasin Summary SN.._.., A,ea Weighted Tota Tota Total -rime Of 10 Runoff Rsnfal Rungff ...... ...... "°"""*""' Coefficient -ac -els hh:mm:as 1 OA1 0.12 0.7000 0.00 0.28 0 OO:o8:18 2 DA2 0.10 0.8200 0.00 0.28 D 00:08:18 3 OA3 0.19 0.8000 0.05 0 ... 0 OO:Oe:18 40A4 0.12 0.8100 0.00 0.30 0 00:08:18 5DA5 0.11 0.8200 0.00 0.29 0 00:08:18 6 OA6 0.02 0.7400 0.01 0.06 0 00:08:18 MAXIMIM BYPASS FLOW FOR 6" BYPASS PIPE IS 0.66 CFS Page2d14 Geotechnical Engineering Report New Wendy's Restaurant 10619 SE Carr Road Renton, Washington July 2, 2013 Terracon Project No. B2135007 Prepared for: The Wendy's Company Tempe, Arizona Prepared by: Terracon Consultants, Inc. Tacoma, Washington RECEIVED ocr222013 CiYY or -~;~f/Y(\f;j P!_i-.i\Jf·<!.~,JG !_J/\//SJ~),": • July 2. 2013 The Wendy's Company 1501 W. Mountainhead Parkway Suite 601 Tempe, Arizona 85282 Attn: Ms. Valerie L. McCulloch P: (602) 466-9207 E: Valerie.Mcculloch@wendys.com Re: Geotechnical Engineering Report New Wendy's Restaurant 16330 Bothell Everett Highway Renton. Washington Terracon Project No. 82135007 Dear Ms. McCulloch: lrerracon Terracon Consultants, Inc. (Terracon) has completed the geotechnical engineering services for the above referenced project. These services were performed in general accordance with the Master Services Agreement (MSA) between The Wendy's Company and Terracon. dated January 31. 2013 and Terracon's Proposal No. PB2130017. dated March 6. 2013. This geotechnical engineering report presents the results of our subsurface exploration and provides geotechnical recommendations concerning earthwork and the design and construction of foundations. floor slabs, pavements, and utilities for the proposed project. We appreciate the opportunity to be of service to you on this project. If you have any q uestlons concerning this report, or if we may be of further service, please contact us at (425) 771-3304. Senior Staff Engineer > /-, l ; -// t:~ !!:::!!-~ -- Senior ProJect Geotechnical Engineer Geotechnical • Environmental • Con,truction Materials • Facilities TABLE OF CONTENTS Page EXECUTIVE SUMMARY ............................................................................................................. i 1.0 INTRODUCTION ................................................................................................................. 1 2.0 PROJECT INFORMATION ................................................................................................. 1 2.1 Project Description .................................................................................................. 1 2.2 Site Location and Description .................................................................................. 2 3.0 SUBSURFACE CONDITIONS ............................................................................................ 2 3.1 Regional Geologic Conditions .................................................................................. 2 3.2 Surface Conditions .................................................................................................. 2 3.3 Subsurface Conditions ............................................................................................. 3 3.4 Groundwater ............................................................................................................ 3 4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION ......................................... 4 4.1 Geotechnical Considerations ................................................................................... 4 4 .2 Earthwork ................................................................................................................ 5 4.2.1 Site Preparation ....................................................................................... 5 4.2.2 Structural Fill ........................................................................................... 6 4.2.3 Compaction Requirements ...................................................................... 6 4.2.4 Grading and Drainage .............................................................................. 7 4.2.5 Construction Considerations ..................................................................... 7 4.3 Seismic Considerations ........................................................................................... a 4.4 Foundations ............................................................................................................. 9 4.4.1 Design Recommendations ....................................................................... 9 4.4.2 Construction Considerations ................................................................... 1 o 4.4.3 Below-grade Drainage ............................................................................ 11 4.5 Floor Slabs ............................................................................................................ 11 4.5.1 Design Recommendations ..................................................................... 12 4.5.2 Construction Considerations ................................................................... 12 4.6 Pavements ............................................................................................................ 13 4.6.1 Design Considerations........ .. ............................................................ 13 4.6.2 Estimates of Minimum Pavement Thickness ............................................ 13 4.6.3 Pavement Materials ................................................................................. 14 4.6.4 Pavement Drainage ................................................................................. 14 4.6.5 Pavement Maintenance ........................................................................... 14 5.0 GENERAL COMMENTS ................................................................................................... 15 Responsive Resourceful Reliable TABLE OF CONTENTS-continued APPENDIX A -FIELD EXPLORATION Exhibit A-1 Site and Exploration Plan Exhibit A-2 Field Exploration Description Exhibits A-3 to A-8 Boring Logs B-1 to B-6 APPENDIX B -LABORATORY TESTING ExhiM B-1 Exhibit B-2 ExhiM B-3 Laboratory Testing Description Grain Size Distribution Organic Content APPENDIX C -SUPPORTING DOCUMENTS Exhibit C-1 Exhibit C-2 General Notes Unified Soil Classification Responsive Resourceful Reliable Geotechnical Engineering Report New Wendy's Restaurant Renton, Washington July 2, 2013 Terracon Project No. B2135007 EXECUTIVE SUMMARY lrerracon A geotechnical exploration has been performed for the new Wendy's Restaurant located near the southwest corner of SE Carr Road and 108,,, Avenue SE in Renton, Washington. Terracon's geotechnical scope of work included the advancement of six borings to approximate depths of 6% to 16Y:. feet below existing site grades, document review, laboratory testing, geotechnical engineering analysis, and preparation of this report. The site appears suitable for the proposed construction based upon geotechnical conditions encountered in the explorations and our current understanding of the proposed development. The following geotechnical considerations were identified: Subsurface Conditions: Explorations disclosed existing silty sand fill with organics to depths of approximately 2Y:. to 6% feet above a 1 to 4 foot thick layer of medium stiff to stiff silt. Below the fill and silt, medium dense silty sand was observed to 12 to 1 SY:. feet above very dense glacial till. Groundwater was observed in three of the borings perched above the glacial till at depths ranging from 8 to 1 OY:. feet below the ground surface. Structural Fill: Due to fines content, occasional organics, and in situ moisture levels, on-site existing fill and native soils are not suitable for reuse as structural fill. Imported soils should consist of Select Borrow or Common Borrow meeting the requirements of WSDOT section 9-03.14(2) and 9-03.14(3), respectively. Foundations: Conventional shallow spread footings will provide adequate support for the proposed structure provided that existing fill below the footings is completely removed and the foundation subgrades are properly prepared. Footings bearing on silt encountered below the fill or structural fill above the silt should be designed for an allowable bearing capacity of 1,500 psf. An increased allowable bearing capacity of 2,500 psf may be used for footings bearing on at least 12 inches of structural fill if the compressible silt soils are completely removed. Floor Slabs: Concrete floor slabs may be supported by a capillary break layer above at least 12 inches of compacted structural fill above compacted existing fill soils. Seismic Design Considerations: The 2009 International Building Code, Table 1613.5.2 IBC seismic site classification for this site is C. This summary should be used in conjunction with the entire report for design purposes. It should be recognized that details were not included or fully developed in this section, and the report must be read in its entirety for a comprehensive understanding of the items contained herein. The section titled GENERAL COMMENTS should be read for an understanding of the report limitations. Responsive Resourceful Reliable GEOTECHNICAL ENGINEERING REPORT NEW WENDY'S RESTAURANT 10619 SE CARR ROAD RENTON, WASHINGTON Terracon Project No. 62135007 July 2, 2013 1.0 INTRODUCTION This report presents the results of our geotechnical engineering services performed for the proposed new Wendy's Restaurant to be located near the southwest comer of SE Carr Road and 108'" Avenue SE in Renton. Washington. Our geotechnical engineering scope of work for this project included the advancement of six borings ranging in depth from approximately 6% to 16% feet below existing site grades. The purpose of these services is to provide information and geotechnical engineering recommendations relative to: • • • subsurface soil conditions earthwork • • • groundwater conditions foundation design and construction pavement design and construction floor slab design and construction • seismic considerations 2.0 PROJECT INFORMATION 2.1 Project Description Site layout Structure ITEM Building construction Maximum loads Grading ! DESCRIPTION -+------------- See Appendix A. Exhibit A-1: Site and Exploration Plan ------- · 3.520 square-foot one-story restaurant building · Steel frame supported on conventional spread footings and slab on _ grade floors (assumed) ~-- Columns: 60 kips (assumed) Walls: 2 kif (assumed) Slabs: 150 psi max (assumed) Cuts and fills of less than 2 feet (assumed) 1 Geotechnical Engineering Report 1rerracon New Wendy's Restaurant · Renton, Washington July 2, 2013 , Terracon Project No. 62135007 2.2 Site Location and Description ITEM Location Section, Township, Range Adjacent site features DESCRIPTION -------------------- ! The site is located south of SE Carr Road and west of 1 as'' , Avenue SE. The site is a roughly rectangular parcel that measures : approximately 0.85 acres. ---------------- : NE Y. of NW Y. of Section 32, T23N, R5E Developed retail/service properties to the east, west, and south. SE Carr Road to the north. ---------------------- Current ground cover Existing topography ; Asphalt covered parking lot bordered by landscaped areas to the north and west and concrete retaining wall to the east. The s~e __ J_ als_c> contains a closed restaurant structure. i Slopes gently up from north to south. Cast-in-place concrete : retaining wall up to 8 feet tall along eastern border. Vegetated ' slope down to sidewalk and roadway on north and west site , boundaries. 3.0 SUBSURFACE CONDITIONS 3.1 Regional Geologic Conditions The USGS Geologic Map of the Renton Quadrangle, King County, Washington (GQ-405), indicates the entire project site is underlain by glacially consolidated Vashon ground moraine deposits (09,), mainly ablation till over lodgment till. The lodgment till soils are described as a compact, unsorted mixture of sand, silt, clay and gravel and are commonly referred to as hardpan. The lodgment till is nearly impermeable and relatively difficult to excavate, but relatively stable in cut slopes. The ablation till is described as similar, but much Jess compact and coherent. 3.2 Surface Conditions The site is currently developed with a small, single story structure previously occupied by a Shari's restaurant. The ground surface on the Jot slopes gently up from north to south and is covered with asphalt-concrete paving. The pavement section typically consisted of approximately 2 to 3 inches of asphalt-concrete over 3 to 4 inches of crushed rock base course at our boring locations. Ivy covered slopes extend down to 106'" Street on the west side of the site and down to SE Carr Road on the north side of the site. Responsive Resourceful Reliable 2 Geotechnical Engineering Report New Wendy's Restaurant , Renton, Washington July 2, 2013 Terracon Project No. 82135007 3.3 Subsurface Conditions 1rerracon Subsurface conditions presented in this report are based on the conditions encountered at the specific exploration locations. Variations in subsurface conditions may exist between the exploration locations and the nature and extent of variations may not become evident until construction. If variations then appear, it may be necessary to reevaluate the recommendations of this report. Due to the existing building, Terracon was limited to where borings could be performed. However, we are of the opinion that adequate information was obtained for the purpose of this study. Below the asphalt-concrete surfacing, each of the borings disclosed a layer of possibly undocumented silty sand fill with organics to a depth of approximately 2% to 6% feet. Below the fill, 1 to 4 foot thick layer of medium stiff to stiff silt with variable sand content and occasional organics was encountered above medium dense silty sand with trace gravel. Very dense glacial till was observed below the medium dense silty sand at a depth of 12 to 15% feet to the full exploration depths in borings B-1 and B-3. Laboratory tests were conducted on selected soil samples and the test results are presented in Appendix B. Laboratory test results indicate that both the native silty sand and silty sand fill soils have a fines content (that portion passing the #200 sieve) ranging from approximately 37% to 41%. A test on the near surface fill material at the south end of the site indicated an organic content of over 6% by weight. Specific conditions encountered at each boring location are indicated on the individual boring logs. Stratification boundaries on the logs represent the approximate location of changes in soil types; in-situ, the transition between materials may be gradual. Details for each of the borings can be found on the boring logs included in Appendix A of this report. 3.4 Groundwater The borings were observed while drilling and after completion for the presence and level of groundwater. The water levels observed in the borings are noted on the attached boring logs, and are summarized below: Boring Number 8-1 8-3 8-6 Depth to groundwater while drilling (ft) ------------~------------- 8 9 10% Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff and other factors not evident at the time the explorations were performed. Therefore, Responsive Resourceful Reliable 3 Geotechnical Engineering Report New Wendy's Restaurant , Renton, Washington July 2, 2013, Terracon Project No. 82135007 1rerracon groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. Additionally, perched groundwater may develop above low permeability layers, such as the glacial till observed at the bottom of borings B-2 and B-3. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project. 4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION 4.1 Geotechnical Considerations Based on our subsurface exploration program and analyses, the site appears suitable for the proposed construction with the building supported by conventional shallow spread footings bearing on native soils or properly compacted fill. Silty sand fill was observed in all explorations to a depth of up to 6% feet. Fill, especially undocumented fill, by nature can be highly variable and could very between sample locations. Therefore, it should be understood that there is a higher risk of differential settlement or non-uniform subgrade behavior when constructing on existing fill. This risk of unforeseen conditions cannot be eliminated without completely removing the existing fill, but can be reduced by performing additional testing and evaluation. Due to the risk of excessive settlements (both total and differentiaO resulting from the existing undocumented fill soils mantling the site, we recommend one of the following options for supporting the new building. Overexcavation and Replacement: Removal of the fill and replacement with structural fill is a typical measure for mitigating possible unsuitable fill soils. We recommend complete removal of any fill soils below building footings and replacement with structural fill. For practical and economic reasons, removal and replacement of existing fill soils below floor slabs and pavements may be reduced to at least 12 inches, provided the owner is willing to accept some risk of variable and unpredictable settlements. Aggregate Piers: As an alternative to overexcavation and replacement, aggregate piers could be installed below the building footings. Aggregate piers (one proprietary type is called Geopiers) require specialized equipment but result in much smaller import and export quantities. If the owner wishes to utilize aggregate piers for this site, we can provide supplemental information upon request. Geotechnical engineering recommendations for foundation systems, floor slabs, pavements, and other earth related phases of the project are outlined below. The recommendations contained in this report are based upon the results of data presented herein, engineering analyses, and our current understanding of the proposed project. ASTM and Washington State Department of Transportation (WSDOT) specification codes cited herein respectively refer to the current manual published by the American Society for Testing & Materials and the 2012 Responsive Resourceful Reliable 4 Geotechnical Engineering Report New Wendy's Restaurant , Renton, Washington July 2, 2013, Terracon Project No. B2135007 lrerracon edition of the WSDOT Standard Specifications for Road, Bridge, and Municipal Construction (Publication M41-10). 4.2 Earthwork The following sections present our recommendations for site preparation, subgrade preparation and placement of structural fills on the project. The recommendations presented for design and construction of earth-supported elements including foundations, slabs and pavements are contingent upon following the recommendations outlined in this section. Earthwork on the project should be observed and evaluated by Terracon. The evaluation of earthwork should include observation and testing of structural fill, subgrade preparation, foundation bearing soils, and other geotechnical conditions exposed during the construction of the project. 4.2.1 Site Preparation Site stripping in the conventional sense will be limited to existing landscape areas. Stripping efforts should include removal of any vegetation, organic materials, and deleterious debris from areas slated for structural fill placement and in building and pavement locations. All elements of existing structures should be removed completely from the site. Excavations associated with removing existing site improvements should be backfilled with structural fill placed and compacted in accordance with the recommendations presented in this report. Existing underground utilities, such as storm sewer, sanitary sewer pipe, and water line that will not be used as part of the new development should either be removed completely or filled with Controlled Density Fill (CDF) conforming to WSDOT section 2-09.3(1)E, Backfilling. In the event that existing utilities are abandoned in place, we recommend density testing of the trench backfill in order to verify that it is compacted to the density recommendations provided herein. The silty sand and silt soils encountered in the borings may be sensitive to disturbance from construction activity and increased moisture. If precipitation occurs prior to or during construction, the near-surface soils could increase in moisture content and become more susceptible to disturbance. Construction activity should be monitored, and should be curtailed if the construction activity is causing subgrade disturbance. A Terracon representative can help with monitoring and developing recommendations to aid in limiting subgrade disturbance. After building and pavement removal and excavation to subgrade elevation, proofrolling of pavement and building slab areas should be performed with heavy rubber tire construction equipment such as a fully loaded tandem-axle dump truck. A geotechnical engineer or his representative should observe proofrolling to aid in locating unstable subgrade materials. Proofrolling should be performed after a suitable period of dry weather to avoid degrading an otherwise acceptable subgrade and to reduce the amount of remedial work required. Unstable Responsive Resourceful Reliable 5 Geotechnical Engineering Report New Wendy's Restaurant , Renton, Washington July 2, 2013 . Terracon Project No. 62135007 1rerracon materials located should be stabilized as directed by the engineer based on conditions observed during construction. Replacement and densification in place are typical remediation methods. 4.2.2 Structural Fill All fill material placed in building, pavement, and non-landscaped areas should be placed in accordance with the recommendations herein for structural fill. The suitability of soils used for structural fill depends primarily on their grain-size distribution and moisture content when they are placed. As the fines content (that soil fraction passing the U.S. No. 200 Sieve) increases, soils become more sensitive to small changes in moisture content. Soils containing more than about 5 percent fines (by weight) may exhibit difficulty in compacting to a firm, unyielding condition when the moisture content is more than 2 percentage points above or below optimum. Optimum moisture content is the moisture at which the maximum dry density for the material is achieved in the laboratory following ASTM procedures. We understand that only minor cuts are planned for the site after removal of the existing structure and pavements. However, removal of the existing fill soils may generate large soil quantities during site grading. These moisture-sensitive soils include a significant percentage of organics and are therefore not considered acceptable for reuse as structural fill. Silt and sandy silt soils encountered at approximately 2% to 6% feet below the ground surface are extremely moisture-sensitive and may be difficult or impossible to compact to a firm, non-yielding condition if exposed to moisture. Disturbed site soils will likely need to be hauled off site for disposal if disturbed. The type of imported fill used at the site should depend on the weather conditions at the time of placement and the anticipated weather conditions until the fill subgrades are protected. All- weather fill should consist of Select Borrow meeting the requirements of WSDOT section 9- 03.14(2), with the modification of a maximum of 5 percent by weight passing the US No. 200 mesh sieve. Select Borrow is recommended for use in wet weather conditions, and for filling in wet site or trench conditions to reduce the risk of wet weather delays during the winter and spring months. Dry-weather fill can consist of Common Borrow, which is a lesser quality, more moisture-sensitive soil that can be compacted to a firm and non-yielding condition. Common Borrow should meet the requirements of WSDOT section 9-03.14(3) and only be used during dry conditions. The maximum particle size for both Select Borrow and Common Borrow may need to be reduced in certain areas, such as directly surrounding and above buried utilities. The use of other fill types should be reviewed and approved by Terracon. 4.2.3 Compaction Requirements Structural fill materials should be placed in horizontal lifts not exceeding about 12 inches in loose thickness. We recommend that each lift then be thoroughly compacted with a mechanical compactor to a uniform density of at least 95 percent, based on the modified Proctor test (ASTM D 1557). Where light compaction equipment is used, as is typical within a few feet of retaining walls and in utility trenches, the lift thickness may need to be reduced to achieve the desired degree of compaction. Soils removed which will be used as structural fill should be protected to Responsive Resourceful Reliable 6 Geotechnical Engineering Report New Wendy's Restaurant Renton, Washington July 2, 2013 "Terracon Project No" B2135007 lrerracon aid in preventing an increase in moisture content due to rain and other factors" Moisture contents at the time of compaction should be within 2 percent of the optimum moisture content. 4.2.4 Grading and Drainage Adequate positive drainage should be provided during construction and maintained throughout the life of the development to prevent an increase in moisture content of the foundation, pavement and backfill materials" Surface water drainage should be controlled to prevent undermining of cut and fill slopes and structures during and after construction" Gutters and downspouts that drain water a minimum of 1 O feet beyond the footprint of the proposed structures are recommended" This can be accomplished through the use of splash- blocks, downspout extensions, and flexible pipes that are designed to attach to the end of the downspout. Flexible pipe should only be used if it is daylighted in such a manner that it gravity- drains collected wateL Alternatively, roof drains may be tied directly into the site storm system or terminated over paved surfaces; provided the pavements are sloped adequately away from the building to prevent water from infiltrating into soils supporting the foundations and floor slabs" Splash-blocks should also be considered below hose bibs and water spigots" 4.2.5 Construction Considerations It is anticipated that excavations for the proposed construction can be accomplished with conventional earthmoving equipment. Upon completion of filling and grading, care should be taken to maintain the subgrade moisture content prior to construction of floor slabs and pavements" Construction traffic over the completed subgrade should be avoided to the extent practical. The site should also be graded to prevent ponding of surface water on the prepared subgrades or in excavations" If the subgrade should become frozen, desiccated, saturated, or disturbed, the affected material should be removed or these materials should be scarified, moisture conditioned, and recompacted prior to floor slab and pavement construction and observed by Terracon" Surface water should not be allowed to pond on the site and soak into the soil during construction" Construction staging should provide drainage of surface water and precipitation away from the building and pavement areas" Any water that collects over or adjacent to construction areas should be promptly removed, along with any softened or disturbed soils" Surface water control in the form of sloping surfaces, drainage ditches and trenches, and sump pits and pumps will be important to avoid ponding and associated delays due to precipitation and seepage" Groundwater was encountered at 8 to 1 OY:. feet in three of the borings during our exploration" Based on our understanding of the proposed development, we don't expect groundwater to significantly affect construction, except possibly for deeply buried utilities" If groundwater is encountered during construction, some form of temporary dewatering may be required" Conventional dewatering methods, such as pumping from ditches and sumps, should likely be Responsive Resourceful Reliable 7 Geotechnical Engineering Report New Wendy's Restaurant , Renton, Washington July 2, 2013 · Terracon Project No. B2135007 1rerracon adequate for temporary removal of any groundwater encountered during excavation at the site. It should be noted that the groundwater conditions at the site are expected to vary over time depending on season and recent weather conditions. All temporary excavations should comply with applicable local, state and federal safety regulations, including the current Occupational Health and Safety Administration (OSHA) Excavation and Trench Safety Standards. The grading contractor, by contract, is usually responsible for designing and constructing stable, temporary excavations and should shore, slope or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. Construction site safety is the sole responsibility of the contractor who controls the means, methods and sequencing of construction operations. Under no circumstances shall the information provided herein be interpreted to mean that Terracon is assuming any responsibility for construction site safety or the contractor's activities; such responsibility shall neither be implied or inferred. Terracon should be retained during the construction phase of the project to observe earthwork operations and to perform necessary tests and observations during subgrade preparation, placement and compaction of structural fill, backfilling of excavations, and just prior to construction of foundations and floor slabs. 4.3 Seismic Considerations As part of our services. we evaluated the risk of liquefaction at this site. Based on our understanding of groundwater and geology at the site, it is our opinion that the risk of liquefaction at the site is low. The potential for seismic related settlement is also considered low. Based on our analyses, foundation bearing capacity failure is considered unlikely, and settlement of greater than 1 inch is considered unlikely during a design-level earthquake provided the soils in the building pad are prepared as recommended in this report. It is our opinion that no additional engineering geology investigations or geologic hazard evaluations are necessary relative to seismic hazards for this project. We reviewed the USGS Earthquake Hazards Program Quaternary Faults and Folds Database available online (http://earthguake.usqs.gov/reqional/qfaults/usmap.php). The nearest fault to the project site is the Seattle fault zone approximately five miles north/northwest of the project site. According to this source, the fault age is in the less than 15,000 years category, has been mapped with west striking features, and is in the slip rate category of between 0.2 and 1.0 mm/year. Based on the information described above, we estimate that the risk associated with surface rupture at the site is low. Values provided below are based upon data from the 2002 USGS National Seismic Hazard Mapping Project. The table summarizes our recommended seismic design criteria. Responsive Resourceful Reliable 8 Geotechnical Engineering Report New Wendy's Restaurant • Renton, Washington July 2, 2013 Terracon Project No. 82135007 DESCRIPTION 2009 International Building Code Site Classification (IBC) 1 Site Latitude lrerracon VALUE c2 47.4448° N --+-----------------"·-------·---Site Longitude 122.19860 w Ss Spectral Acceleration for a Short Period for 1.382g Site Class B -------------··---_ __;_ ____________ _ s, Spectral Acceleration for a 1-Second Period for Site Class B 0.472g F, Site Coefficient for a Short Period 1.00 -· -------·----- F, Site Coefficient for a 1-Second Period 1.328 --------------- 1. The 2009 International Building Code (IBC) indicates that the seismic site classification is based on the average soil and bedrock properties in the top 100 feet. The current scope does not include a 100-foot soil profile determination. This seismic site class definition considers that soils encountered at depth in our borings continue below the termination depth. Additional exploration to deeper depths would be required to confirm the conditions below the current depth of exploration. 2. Site Class C applies to an average soil profile within the top 100 feet consisting predominantly of very dense soils. These soils are characterized by Standard Penetration Test blowcounts of greater than 50, a shear wave velocity of between 1,200 and 2,500 feet per second. and an undrained shear strength of greater than 2,000 pounds per square foot. 4.4 Foundations In our opinion, conventional spread footings will provide adequate support for the proposed building provided that the foundation subgrades are properly prepared. Foundation support for the proposed structures may be obtained from either undisturbed native soils or new structural fill placed in accordance wrrh the recommendations in this report. Existing, possibly undocumented fill materials were encountered in our explorations within the proposed building area to depths of up to SY. feet below existing site grades. The following foundation design recommendations for the proposed structure are based on the assumption that (1) all fill materials below the footings will be completely removed and replaced. or (2) aggregate piers will be installed below the footings. 4.4.1 Design Recommendations The allowable foundation bearing pressures apply to dead loads plus design live load condrrions. The design bearing pressure may be increased by one-third when considering total loads that include wind or seismic conditions. The weight of the foundation concrete below grade may be neglected in dead load computations. Footings. foundations. and masonry walls should be reinforced as necessary to reduce the potential for distress caused by differential foundation movement. The use of joints at openings or other discontinurries in masonry walls is recommended. Responsive Resourceful Reliable 9 Geotechnical Engineering Report New Wendy's Restaurant , Renton, Washington July 2, 2013 . Terracon Project No. B2135007 DESCRIPTION Net allowable bearing pressure 1 Minimum dimensions Minimum embedment below finished grade for frost protection 2 1rerracon Column Wall 1,500 psi 1,500 psi 24 inches 16inches 18 inches 18 inches Allowable passive pressure 3 300 pct (triangular distribution) Ultimate coefficient of sliding friction 0.40 1. The recommended net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation. Assumes any unsuttable fill or soft soils, if encountered, will be removed and replaced wtth structural fill. Based upon a Factor of Safety of 3. 2. Applies to perimeter footing and footings beneath unheated areas. Interior footings should bear a minimum of 12 inches below finished grade. Finished grade is the lowest adjacent grade for perimeter footings and fioor level for interior footings. 3. Assumes that foundation backfill is compacted in accordance with the Earthwork section of this report. Based upon a Factor of Safety of 1.5. The above allowable bearing pressure recommendations assume footings for the proposed structure bear on native silt soils encountered below the existing fill or on structural fill placed above the sill soils. If the native silt soils observed to depths of up to 9'h feet below existing grades are removed, allowable bearing pressures may be increased to 2,500 psf for both column and wall footings bearing on at least 12 inches of structural fill placed above the native silty sands encountered below the silt. The lateral extent of existing fill and native silt removal and replacement for building footings should be two-thirds of the depth of excavation on all sides. As discussed in the Earthwork section of this report, due to the in sttu moisture and high fines content, the native silt soils will not be suitable for reuse as structural fill and will need to be hauled off site for disposal. 4.4.2 Construction Considerations The base of all foundation excavations should be free of water and loose soil and rock prior to placing concrete, and should be compacted as recommended in this report. Concrete should be placed soon after excavating and compaction to reduce bearing soil disturbance. We recommend that Terracon be retained to observe and test the soil foundation bearing materials. If the soil condttions encountered differ from those presented in this report, supplemental recommendations will be required. If undocumented fill or unsuttable bearing soils are encountered in footing excavations, the excavations should be extended deeper to suttable soils. The footings could bear directly on these soils at the lower level or on lean concrete or compacted structural fill extending down to the suitable soils. If compacted structural fill is utilized, overexcavation below footings should extend laterally beyond all edges of the footings at least 8 inches per foot of overexcavation depth below footing base elevation. The overexcavation should then be backfilled up to the Responsive Resourceful Reliable 10 Geotechnical Engineering Report New Wendy's Restaurant , Renton, Washington July 2, 2013 Terracon Project No. B2135007 ,rerracon footing base elevation with structural fill placed in lifts of 12 inches or less in loose thickness and compacted to at least 95 percent of the material's maximum modified Proctor (ASTIM D-1557) dry density per the recommendations in the Earthwork section of this report. The overexcavation and backfill procedure is illustrated in the figures below. [•c,si~, Footing :...ev~ Recc,mrn':lro;!ei:! Excav:11Kll, L&vel .,... LEAN CONCRETE Lean Concrete Backfill R&commli.>rl(lo:IC E•,::a~oMn ,_811~ COMPACTED STRUCTURAL D FILL ~--'---,.--,'----' Overexcavation I Backfill NOTE: Excavations in sketches sho·.~·r, -.,ertical for conveni6nce. Excavations should be sloped as necessary for safety. 4.4.3 Below-grade Drainage In our opinion, the new building should be provided with a permanent footing drain system to reduce the risk of future moisture problems. Footing drains should consist of a minimum 4-inch- diameter, Schedule 40, rigid, perforated PVC pipe placed at the base of the footing with the perforations facing down. The pipe should be surrounded by a minimum of 6 inches of drain rock, conforming to WSDOT section 9-03.12(4) Gravel Backfill for Drains. A non-woven filter fabric, such as Mirafi 140N or equivalent, should envelope the drain rock. Footing drains should be directed toward appropriate stormwater discharge facilities. Ideally, the drain invert would be installed at or slightly below the base of the perimeter footings. Roof downspouts, parking lot drains, and drains from any other runoff surfaces should not be tied into the perforated piping system of the foundation drains. Instead, the runoff water collected from such sources should be routed through a separate tightline piping system and sent to a municipal catch basin or other appropriate discharge location. 4.5 Floor Slabs As discussed in section 4.1 of this report, due to the presence of existing, possibly undocumented, fill soils within the proposed building pad, floor slabs for the proposed structure should be supported on at least 12 inches of new structural fill placed in accordance with the recommendations provided in this report. Existing fill soils that remain below the 12 inches of new structural fill should be further assessed during construction and recompacted as necessary to meet to the compaction recommendations in this report. Design recommendations for floor slabs are presented in the following sections. Responsive Resourceful Reliable 11 Geotechnical Engineering Report New Wendy's Restaurant · Renton, Washington July 2, 2013 , Terracon Project No. 82135007 4.5.1 Design Recommendations DESCRIPTION VALUE Interior floor system' --·~-----· ·--'-------- Slab-on-grade concrete. lrerracon Floor slab subgrade Minimum 12 inches of imported structural fill compacted in accordance with the Earthwork section of this report. -----~---~- Base course/capillary break' · 4-inch compacted layer of free draining, uniform gravel. 1 _ Floor slabs should be structurally independent of any building footings or walls to reduce fioor slab cracking caused by differential movements between the slab and foundation. Narrower, turned- down slab-on-grade foundations may be utilized at the approval of the structural engineer. The slabs should be appropriately reinforced to support the proposed loads. 2. To provide a capillary break, the base course should consist of clean, free-draining, uniformly graded gravel, containing less than 5 percent fines, based on that soil fraction passing the US No. 4 sieve. Alternatively, material meeting the requirements of WSDOT section 9-03.9(3) Crushed Surtacing Top Course could be considered, with the modification of a maximum of 5 percent by weight passing the US No. 200 mesh sieve. Where appropriate, saw-cut control joints should be placed in the slab to help control the location and extent of cracking. For additional recommendations refer to the ACI Design Manual. Joints or any cracks in pavement areas that develop should be sealed with a water- proof, non-extruding compressible compound specifically recommended for heavy duty concrete pavement and wet environments. The use of a vapor retarder or barrier should be considered beneath concrete slab-on-grade floors that will be covered with wood, tile, carpet or other moisture-sensitive or impervious coverings, or when the slab will support equipment sensitive to moisture. When conditions warrant the use of a vapor retarder, the slab designer and slab contractor should refer to ACI 302 and ACI 360 for procedures and cautions regarding the use and placement of a vapor retarder/barrier. To avoid puncturing of the vapor barrier, construction equipment should not be allowed to drive over any vapor retarder material. 4.5.2 Construction Considerations On most project sites, the site grading is generally accomplished early in the construction phase. However as construction proceeds, the subgrade may be disturbed due to utility excavations, construction traffic, desiccation, rainfall, etc. As a result, the floor slab subgrade may not be suitable for placement of the capillary break and concrete and corrective action may be required. We recommend the area underlying the floor slab be rough graded and then thoroughly proofrolled prior to final grading and placement of capillary break material. Particular attention should be paid to high traffic areas that were rutted and disturbed earlier and to areas where backfilled trenches are located. Areas where unsuitable conditions are located should be repaired by removing and replacing the affected material with properly compacted structural fill. All floor slab subgrade areas should be moisture conditioned and properly compacted to the Responsive Resourceful Reliable 12 Geotechnical Engineering Report New Wendy's Restaurant .· Renton, Washington July 2, 2013 , Terracon Project No. B2135007 1rerracon recommendations in this report immediately prior to placement of the capillary break and concrete. We recommend subgrades be maintained at the proper moisture condition until floor slabs are constructed. If the subgrade should become desiccated prior to construction of floor stabs, the affected material should be removed or the materials scarified, moistened, and recompacted. Upon completion of grading operations in the building areas, care should be taken to maintain the recommended subgrade moisture content and density prior to construction of the building floor slabs. 4.6 Pavements 4.6.1 Design Considerations We anticipate that traffic loads will be produced primarily by automobile traffic and occasional delivery and trash removal trucks. The thickness of pavements subjected to heavy truck traffic should be determined using expected traffic volumes, vehicle types, and vehicle loads and should be in accordance with local, cny or county ordinances. Pavement performance is affected by its surroundings. In addition to providing preventive maintenance, the civil engineer should consider the following recommendations in the design and layout of pavements: Final grade adjacent to parking lots and drives should slope down from pavement edges at a minimum 2%; The subgrade and the pavement surface should have a minimum Y. inch per foot slope to promote proper surface drainage; Install pavement drainage surrounding areas anticipated for frequent wetting (e.g., landscaping areas, etc.); Install joint sealant and seal cracks immediately; Seal all landscaped areas in, or adjacent to pavements to reduce moisture migration to subgrade soils, and; Place compacted, low permeability backfill against the exterior side of curb and gutter 4.6.2 Estimates of Minimum Pavement Thickness Please note that the pavement section recommendations provided below do not consider heavy construction vehicle loading. If the pavements will be subjected to construction traffic, we recommend provisions be made during the pavement design to include an allowance for construction traffic or repairing the pavements and placing a new wearing surface near the end of construction should be anticipated. The light-duty pavement section alternatives are appropriate for areas that will be frequented largely by passenger vehicles. The heavy-duty pavement section would be appropriate for areas frequented by heavier delivery vehicles and garbage trucks. Responsive Resourceful Reliable 13 Geotechnical Engineering Report New Wendy's Restaurant Renton, Washington July 2, 2013 Terracon Project No. 62135007 lrerracan As a minimum, we recommend the following typical pavement sections be considered for asphalt concrete pavement areas. Material Minimum Thickness (inches) Standard-Duty Traffic Heavy-Duty Traffic ... ---· -·-· ---------. Subgrade At least 1 foot of compacted existing fill or new structural fill Crushed Aggregate Base Asphalt Concrete Pavement Total Pavement Section 4.6.3 Pavement Materials 6 6 2% 3% 8Y2 9% Crushed aggregate base should confonm to WSDOT section 9-03.9(3) Base Course and be compacted to a minimum of 95 percent of the material's modified Proctor (ASTM D-1557, Method C) maximum dry density. Where base course thickness exceeds 8 inches, the material should be placed and compacted in two or more lifts of equal thickness. We recommend that the asphalt concrete conform to WSDOT sections 5-04 and 9-02.1(4) for PG 58-22 or PG 64-22 Perfonmance Graded Asphalt Binder. We also recommend using a mix with aggregate meeting the requirements presented in WSDOT sections 9-03.8(2) and 9-03.8(6) for a %-inch or %-inch gradation. Asphalt pavements should be compacted to a minimum of 92 percent of the Rice (theoretical maximum) density or 96 percent of Marshall (maximum laboratory) density. 4.6.4 Pavement Drainage Pavements should be sloped to provide rapid drainage of surface water. Water allowed to pond on or adjacent to the pavements could saturate the subgrade and contribute to premature pavement deterioration. In addition, the pavement subgrade should be graded to provide positive drainage within the crushed aggregate base section. 4.6.5 Pavement Maintenance It should be realized that asphalt concrete pavements (ACPs) are not maintenance-free. The pavement sections provided above represent our minimum recommendations for an average level of perfonmance for a 10-year design period. Thicker asphalt and base course would offer better long-term perfonmance, but would cost more initially; thinner courses would be more susceptible to distress and failure. As such, pavement design can be considered a compromise between a high initial cost and low maintenance costs versus a low initial cost and higher maintenance costs. The pavement sections provided in this report represent minimum recommended thicknesses and, as such, periodic maintenance should be anticipated. Therefore preventive maintenance should be planned and provided for through an on-going pavement management program. Preventive maintenance activtties are intended to slow the rate of pavement deterioration, and to Responsive Resourceful Reliable 14 Geotechnical Engineering Report New Wendy's Restaurant , Renton, Washington July 2, 2013 · Terracon Project No. 62135007 lrerracon preserve the pavement investment. Preventive maintenance consists of both localized maintenance (e.g., crack and joint sealing and patching) and global maintenance (e.g., surface sealing). Preventive maintenance is usually the first priority when implementing a planned pavement maintenance program and provides the highest return on investment for pavements. Prior to implementing any maintenance, additional engineering observation is recommended to determine the type and extent of preventive maintenance. Even with periodic maintenance, some movements and related cracking may still occur and repairs may be required. 5.0 GENERAL COMMENTS Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications. Terracon also should be retained to provide observation and testing services during grading, excavation, foundation construction and other earth-related construction phases of the project. The analysis and recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this report. This report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either express or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing. Responsive Resourceful Reliable 15 APPENDIX A FIELD EXPLORATION LEGEND: SB-1 "'80('5 aJTPACi'CB ~ $G. Fr.+/- BORING NUMBER AND APPROXIMATE LOCATION 20 0 5 10 SCALE IN FEET 20 L. __ .:=.iiL..-___;=~i.:==--..;;::;.:=::....iL-5-IT_E_A_N_D_EX_P..;,.L_O_RA~T-10-N-PLA-N--'~ New Wendy's Restaurant 1 0619 SE Carr Road Renton, Washington --POO _ .. 02135007 llerracon _,, ... RMS AS SHOWN ._,. FiillNII. Conllulting Enginl!ll!II'& and Scientists RMS ExA1 _., -ZUI s 611111Shll. •a _ ...... POD June2013 PH.{2$ljmal FAX.!2$1)513-8a Geotechnical Engineering Report New Wendy's Restaurant · Renton, Washington July 2, 2013 , Terracon Project No. 92135007 Field Exploration Description llerracon The subsurface exploration consisted of drilling and sampling 6 borings at the site to depths ranging from about 6Y:z to 16Y:z feet below existing grade. The boring locations were laid out by Terracon personnel. Distances from these locations to the reference features indicated on the attached diagram are approximate and were estimated. The locations of the borings should be considered accurate only to the degree implied by the means and methods used to define them. The borings were drilled with a truck-mounted rotary drill rig using hollow stem augers to advance the boreholes. Representative soil samples were obtained by the split-barrel sampling procedure. In the split-barrel sampling procedure, the number of blows required to advance a standard 2-inch O.D. split-barrel sampler the last 12 inches of the typical total 18-inch penetration by means of a 140-pound hammer with a free fall of 30 inches, is the standard penetration resistance value (N). These values are indicted on the borings logs at the depths of occurrence. This value is used to estimate the in-situ relative density of cohesionless soils and the consistency of cohesive soils. The sampling depths and penetration distance, plus the standard penetration resistance values, are shown on the boring logs. The samples were sealed and taken to the laboratory for testing and classification. A CME automatic SPT hammer was used to advance the split-barrel sampler in the borings performed on this site. A greater efficiency is typically achieved with the automatic hammer compared to the conventional safety hammer operated with a cathead and rope. Published correlations between the SPT values and soil properties are based on the lower efficiency cathead and rope method. This higher efficiency affects the standard penetration resistance blow count (N) value by increasing the penetration per hammer blow over what would obtained using the cathead and rope method. The effect of the automatic hammer's efficiency has been considered in the interpretation and analysis of the subsurface information for this report. Field logs of each boring were prepared by the engineer on site. These logs included visual classifications of the materials encountered during drilling as well as the engineer's interpretation of the subsurface conditions between samples. Final boring logs included with this report represent an interpretation of the field logs and include modifications based on laboratory observation and tests of the samples obtained in the field. The enclosed boring logs indicate the vertical sequence of soils and materials encountered in each exploration. Where a soil contact was observed to be gradational, our logs indicate the average contact depth. The samples were classified in the laboratory based on visual observation, texture and plasticity. The descriptions of the soils indicated on the boring logs are in general accordance with the enclosed General Notes and the Unified Soil Classification System. Estimated group symbols according to the Unified Soil Classification System are given on the boring logs. A brief description of this classification system is included in Appendix C of this report. i i L -. -----"~------·------------------------ Exhibit A-~ BORING LOG NO. B-1 Page 1 of 1 PROJECT: New Wendy's Restaurant CLIENT: The Wendy's Company SITE: 10619 SE Carr Road Renton, Washington (!) LOCATION See Exhibit A-2 ~ 00 w ~ 0: w l 00 g -wZ Q. !'-~ m w ~ ;,Q i': 00 00 :, z ~ w~ ~ w~ => «~ ~ I ~" w 0: ~~ z Wz ~ I ffiii: w 0 => <w Q. ~ ~ ~ w z Q. Q. ~ 00 "~ w " w ~w ~~ ~ u "' Apprmdmate Sulface Elev. 100.5 (Fl) 1--/-0 "00 :i u Q. 0 0: " (!) "ill "' ~ " u w DEPTH ELEVATION ifll 00 Q. 0.5 2 inches ASPHALT over 4 inches CRUSHED ROCK 11)(}+-f. FILL -SIL TY SAND (SM), trace gravel, dark t;;T'if'/, loose to medium dense, - moist - · 2.6 98+{- SILT IMLl, with sand and gravel, dark brONn, soft, \oVet ~ X -16 2-2-3 S-1 18 $IL 1Y SAN) (SM). trace gravel, brown. loose, moist N=5 ---__ _,_ ---·----~---- grades to mottled gray and brCJIM'l, wet 5- X 18 2-3-4 S-2 16 39 r . -N=7 . . - ·, grades to brown, saturated -X 12 4-8-8 S-3 :: ' \ N=16 - 10-- X 14 4-5-7 S-4 -N=12 12.0 88.5+1--.~: 1.·· SILTY SArc> (SM}. trace gravel, gray--brONn, very dense, moist (Glacial ~:D: TIii) -o· .z:: 0( i:,.(\" - o~rs' 1&-0-C 'i 18 18-28-42 S-5 :,-[)"'--/ \ N=70 ' . ~· 16.5 84+1- Boring Terminated at 16.5 Feet Stratification lines am approximate. In-situ, the transition may be gradual. Hammer Type: Automatic SPT Hamme, Elevatioos l:esed on assumed Shari's finished floor elevation of 100.0. Advancement Method: See Bdlibit A-2for desCflption of field procedures Note,, Hollo.v Stem Auger See Appendix B for description af laboratory procedures and .idditional cl.ita (if any). Abandonment Method; SeeAppendixCforelq)lanation of symbols and Borings bac;kfilled with bentonite chips upon completion abbreviations. WATER LEVEL OBSERVATIONS -lrerracon Boring Started; 6119'2013 Boring Completed; 6119/2013 8' Perched While Drilling Drill Rig; ~1 Driller. EDI ~--------··---21905 •j,i\, .4vs. '!',". 5.Jl'.e '.00 r,,r0:m".'1kr, fe.--r;;r:e, '/'/;;sh ng:on Project No.: B2135007 Emlbit A-3 BORING LOG NO. B-2 Paae 1 of 1 PROJECT: New Wendy's Restaurant CLIENT: The Wendy's Company SITE: 10619 SE Carr Road Renton, Washington LOCATION See Exhibit A-2 ~ 00 w -~ " w ,i 00 0 -wZ 0. §. t;~ m w ~ t >2 ~ :> ~;:: z s2 w~ ~ I!!~ :, ~ I ~" w z Wz ~ I ~> w o" a: w ~ ~ > w z "-"-w~ "-0 ~"' ~ s: !a w " w ~w ~ irl !!!~ "-~ ~ Appn:ndmate Surface Elev. 9B (FL)+/. 0 "00 ~ :> 0 " s: 1l "' ~ " 0 w ELEVAllONIFtl "-DEPTH 00 .5 3 inches ASPHALT over 3 inctles CRUSHED ROCK 97.5+1- I . FILL -SILTY SAND (SM), with organics, trace gravel, dark brown, loose. - moist to wet - I -y\ 16 2-2-5 S-1 N=7 - 5- IX 14 2-3-5 S-2 18 -N=8 ·_ ·_ .. 6.5 91.5+/- SANDY SILT (ML), dark gray-brown, soft, wet - -X 14 0-1-1 S-3 N=2 - 9.5 88.5-1-/. SIL TY SAPol> (SM), dark gray, loose, wet 10--- X 14 1-2-4 S-4 -N=6 ----. - . - - 15---- . X 4-4-6 -14 N=10 S-5 . 165 81.5+/- Boring Terminated at 16.5 Feet stratificatioo lines are approximate. In-situ, the transitloo may be gradual. HammerType: AutomaticSPTHammer Elevations based on assumed Shari's finished floor etevation d 100.0. A.d\.sncement Method:: See E:dlibitA-2 for description of field procedures """'' Hollow Stem Auger See Appendiit B for description cl labomtory procedures and additional data (if any). Abandonment Method: See Appendix C for ~anation of s~bols and Borings backfilled wi1h bentonite chips upon completion abbreviations. WATER LEVEL OBSERVATIONS --------lrerracon Boorg Started: 6/1912013 Boring Completed: 6119.'2013 Not Encountered Drill Rig: B-61 Driller: EDI ----·-~---2·o:_.-,,jt, •Y,th ,:,,\~ ·,t. ',:1.,ite 'iJl, '•:'!oLc:ti~,f;_e Ter:2.r~e, f./a3:·;p;;lo·; Project No.: 82135007 E>diibit A-4 BORING LOG NO. B-3 Page 1 of 1 PROJECT: New Wendy"s Restaurant ·. CLIENT: The Wendy's Company SITE: 10619 SE Carr Road Renton, Washington ~ LOCATION See Exhibit A-2 ~"' w -"' "' w l 0 ~ wZ 0. g ... m w ~ ;; >o i'.: "'"' " z Q W>-~ w>-:, "' ... ~ I ~ <( ~ ... ~ z Wz ... I oc> w 0:, >-w a. ... ~ w ~~ z a. woe a. ~"' w ~ ~~ ~ w >-W ~ irl a. u Approldmate Surface Elev: 99 (Ft)~,-0 <("' 0 "' ~ ;:cm " u w 0 "' "' <( a. DEPT>< ELEVATION fFll "' 0.5 3 inches ASPHALT over 3 inches CRUSHED ROCK 98.5•< ·. FILL -SILTY SAND (SM), trace gravel, gray, loose, wet - . - .· 'X -3-3-5 6 N=8 S-1 · 4.0 95., - SILIY SAND (SM), trace gravel, mottled gray aid brONn, medium dense, wet 5- X 18 2-4-6 S-2 18 41 -N=10 . - ~ 8.5 -x 16 3-5-6 S-3 17 90.5+/-N=11 SILTY SAND (SM}. gray, medium dense, wet to saturated \ .. - 10-- ·. ,X 16 5-6-8 S-4 -N=14 . - - - 15--·. 15.5 83.5"-1-'X ._....,., SILTY SA~ (~M), trace gravel, dark gray, very dense, moist (Glacial Till) 14 17-37-50/5" S-5 ::,-(\;;, 16.4 82.5+/--N=50/5" Boring Terminated at 16.4 Feet Stratification lines are approxim.ite. l~ltu, the transition may be gradual. HanmerT:fPE!: Automatk:: SPT Hammer Elev.:itions based oo assumed Shari's finished noor eleVation of 100.0. Advancement Method: See Exhibit A-2 for desctlption of field procedures Not,s, HalCPN stem Auger see Appendix B for desc::ription a laboral.oly procedures and additional data (if any). Abandonment t.1athod: See Appendix C for explanation of symbols and Borings backfilled with bentonite chips upon completion abbrew3tions. WATER LEVEL OBSERVATIONS ·-lrerracon Boring started: 6119'2013 Boring Completed; 6119/2013 9' Perched While Drilling ~-" Drill Rig: B-61 Driller. EDI ;•,"!()5 6':.th 1\•c<o. '.'i, SL:te '.f)-'.1 --- /~ur.tlaf.e Tecr;;c~,. ·f..',d:;11gto~ Project No.: B2135007 EJdlibit A-5 BORING LOG NO. B-4 Page 1 of 1 PROJECT: New Wendy's Restaurant 1 CLIENT: The Wendy's Company SITE: 10619 SE Carr Road Renton, Washington " LOCATION SeeE>mibitA-2 J"' w -<r w -;, "' g -wZ .. :§_ .... "' w ~ >!2 I:: ill~ ~ <r ;:-z 12 w .... ir ~ ~ I J" w .... ~ z i!!Z >-I ffi 6: w .. .... ~ > o,,, w "w z .. .. 8 Jw J ,d, w ~ w >-W ~ "QC .. u " Appro:idmate Surface Elev. 99 {Fl)+/. 0 ""' w ~ ~ 0 QC ;o ~ <r " u w ELEVA110N 1Ft\ "' .. DEPTH "' -o.5 2 inches ASPHALI over 3.5 inches CRU~!:::H;Q RQ!;:ts, 98.51'/- .. FILL -SILTY SANO (SM). trace organics and gavel, dark gray and brown, - .·• medium dense, wet - .·.-. -X 16 4-6-7 S-1 20 37 N=13 --- 5- . 55 93.5+/- SIL TY SAND (SM\, trace gravel, gray, medium dense, moist X 14 4-7-7 S-2 -N=14 65 92.5+/- Boring Terminated at 6.5 Feet Stratification lines are appro)dmate. In-situ, the transition may be gradual. Hammer Type: Automatic SPT Hammer Elewtions based on assumed Shari's finished floor elevation of 100.0. Adll8ocement Method: See Eldlibit Ae2 for descl'lption cf fiek:I procedures -· HoUcrN Stem Auger See Appendix B rm description of laboratory procedures and additional data (if any). Abandonment Matnd: See Appendix C for explanation of symbols and Borings backfilled wilh bentonite chips upon completion abbreviations. WATER LEVEL CJBSERVATKlNS 1rerracon Boring Started: 6119/2013 Boring Completed: 611912013 Not Encountered ·- Drill Rig: B-61 Driller. EDI -:18()5 6"-Tbi\w. 'N . .::,~,te 1:x, )/0c:n112xc T,:,rr;ice, '/l/;,s~ingt,y Project No.: 82135007 E»libit M BORING LOG NO. B-5 Page 1 of 1 PROJECT: New Wendy's Restaurant CLIENT: The Wendy's Company SITE: 10619 SE Carr Road Renton, Washington LOCATION SeeExllibitA-2 til~ w -oc ~ w ;, ::J 0 -a. ,§. >-m ~ t >Q ~ ~ ~~ ~ oc;: z sl w >-~ "' I ~ .. ~ oc >-~ z Wz >-I >-oc> w Ow >-w z a. a. w oc a. > w ~~ w 0 ~w ~ ~ w >-W :ii u "'oc a. ~ Approximate Surface Elev: 101.5 (FL)+/-0 <w 0 ~ ~m w ~ ~ u w "' oc < DEPTH ELEVATION 'Ft.' 0 w a. 0.5 2 inches ASPHALT over 3.5 inches CRUSHED ROCK 101+/- FILL -SIL TY SAND (SM), trace gravel, dark (J:ay, loose to medium dense, - moist - 2.7 99+1- SILT (ML). with sand and organics, trace gravel, dark brown, medium stiff, -IX 2-4-5 ' moist 16 N=9 S-1 - 5-. grades to bro.vn IX 1-2-3 ' -4 N=5 S-2 14 6.5 95-+-f- Boring Terminated at 6.5 Feet Stratification lines are approximate. lrHiilu, the transition may be gradual. Hammer Type: Automatic SPT Hammer Ele-.ations based on assumed Shari's finished floor elevation cl 100.0. Advancement Method: See E:itiibit A-2 for description ct lield procedures Notes, Hollow Stem Auger See Appendix B for description ct laboratory procedures and additbnal data (if any). Abandonment Method: See Appendix C for explanation of symbols and Borings backfilled with bentooite chips upon completion abbieviations. WATER LEVEL OBSERVATIONS lrerracan Borir,g Started: 611912013 Boring Completed: 611912013 Not Encountered Drill Rig: 8<11 Driller. EDI ' --------2·1)15 ,wir ;,,-,-e. w. su,te 100 "y",:,,_rclat\~ Tr.,rn,ce. •N,,si-:1r1gtor· Project No.: 62135007 Exhibit A-7 BORING LOG NO. B-6 Page 1 of 1 PROJECT: New Wendy's Restaurant CLIENT: The Wendy's Company SITE: 10619 SE Carr Road Renton, Washington ~ LOCATION See E:<llibit A-2 m~ w ~ QC w l 00 0 ~ 0. ~ ~~ "' w ~ ~ >o I:: ::, z ~ w~ r => QC~ ~ I ~" w "' ~5 z l!!z ~ I "'> w 0. ~ .., 6 0 00 w "w z ~ 0. w"' 0. ~w ~ ;::~ w w ~w :l u "'"' a. u ~ Approximate Surface Elev: 105.5 (Fl)+/-0 ~ gs w ~ :> 0 "' "' "' ;,; u w DEPTH ELEVATION /Ft l 0 0. -o.s 2 indles ASPHALI over 3.5 inches C:!:ru§tt;D ROCK 105+/- FILL -SIL TY SAND (SM). trace gravel, dark gay, medium dense, moist - - . . 3.0 102.5+/-X I SILT (ML), with sand and organics, trace gravel, dark brown, stiff, moist -7-7-6 S-1 14 N=13 - 5- 99.5'1"/-X 12 3-3-6 S-2 -N=9 SILTY SAND (SM}, trace gravel and organics, dark gray, loose to medium dense, moist - .' _·. ~- 8.0 97.5+/. · .. SIL TY SAND (SM), trace gravel, gray, medium dense, wet -X 12 2-5-7 S-3 N=12 <·. -~ 10-- grades to saturated X, 14 3-4-6 S-4 -N=10 · .. 11.5 94+/- Boring Terminated at 11.5 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic SPT Hammer Elevations based on assumed Shari's finis had floor elevation of 100.0. Advancement Metho::I: See E;,;hibit A-2 for description of Held procedures "°'"'' HollDY,1 Stem Auger See Appendill; B for description of laboral.ory procedures cmd additional data (if any). .Abandonment Metho::l: See Appendix C for explanation of syml:ols and Borings backfilled with bentonite chips upon oompletion abbreviations. WATER LEVEL OBSERVATIONS lrerracon Boring Started: 6119/2013 Boring Completed: 6119"2013 .. 10.5' While Drilling -~~--Drill Rig: 8~1 Driller: EDI --.:·~<J5 ('4·r ,\·,e. ··N. Su1 1.e 1:)J '/,,-,,,,,,1a~r, Tr,:-rvce, ,'!a~r,n,:r-::,n Project No.: 02135007 E>61ibit ... APPENDIX B LABORATORY TESTING Geotechnical Engineering Report New Wendy's Restaurant Renton, Washington July 2, 2013 , Terracon Project No. 82135007 Laboratory Testing lrerracon As part of the testing program, all samples were examined in the laboratory by experienced personnel and classified in accordance with the attached General Notes and the Unified Soil Classification System based on the texture and plasticity of the soils. The group symbol for the Unified Soil Classification System is shown in the appropriate column on the boring logs and a brief description of the classification system is included with this report in the Appendix. At that time, the field descriptions were confinmed or modified as necessary and an applicable laboratory testing program was fonmulated to detenmine engineering properties of the subsurface materials. Laboratory tests were conducted on selected soil samples and the test results are presented in this appendix. The laboratory test results were used for the geotechnical engineering analyses, and the development of foundation and earthwork recommendations. Laboratory tests were performed in general accordance with the applicable ASTM, local or other accepted standards. Results of the laboratory tests are presented in this Appendix and on the boring logs. Selected soil samples obtained from the site were tested for the following engineering properties: In-situ Water Content Organic Content Grain Size Distribution Exhibit 8-1 U.S. SIEVE OPENING IN INCHES I 6 4 3 2 1.5 1 ,, 1123/8 100 I i ! ' 'I'; =·-:: I 95 I - 90 ,, i• 85 ! \! i 80 I I ,. 75 70 I ' ! 65 ... I ' "' 60 ' iii ;: ! >-55 ' <II :· 0:: w 50 z 1: u: ... 45 z : ' : w ~ 40 : . UJ a. ! 35 !' ' ' 30 i : 25 - ! i ! ,: 20 : ' i\ 15 ! : 10 ---- I ' : 5 :! i :I ' 0 100 10 [~OBBLES I GRAVEL coar.;e I fine Boring ID Deptj • B-1 5.0 :z: B-3 5.0 ,., B-4 2.5 I I Boring ID Dept Du~ . • B-1 5.0 25 ' ::i: B-3 5.0 19 -~-• B-4 2.5 12.5 ··-·- PROJECT: New Wendys Restaurant SITE: 10619 SE Carr Road Renton, Washington GRAIN SIZE DISTRIBUTION A5Th1D422 U.S. SIEVE NUMBERS I HYDRO~TER 3 4 6 810 1416 20 30 40 so 60 100140200 J-L I I I j: I I ! I i I ,~ ~' I 1 --- : , I ~--.~ ' i ;: -----! '\ '' I : t\ i . ! ' IC I i i I ! 1 : i\ : ! :, I ' ' I I '' i !: : ! i 1 ' : : I i: i ' ' ' '. I : i I " I i i I I ! : i ·. i - ! : _j_ I ' : ,., : l'I ' 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS t =rse I SAND -l SILT OR CLAY i medium I fine uses Classification LL PL Pl Cc Cu - SIL TY SAND (SM), trace gravel SIL TY SAND (SM), tracs gra~ SIL TY SAND (SM), trace gravel D., D,. D10 I o/oGravel %Sand %Silt %Clay 0.181 I 8.2 52.9 38.9 -··-··- 0.162 • I 2.4 56.7 40.9 0.175 ! 1.6 61.6 I 36.8 I lrerracon ' PROJECT NUMBER: 82135007 I CLIENT: The Wendy's Company I 21905 64th /\ve. VV, Suite 1(H) I :'vloL.:nti;:ike Te1Tace, V\iasringlcr EXHIBIT: B-2 lrerracon Cun~lting Engilfl'rs & Scientists Project Name: New Wendy's Restaurant Project Number: 62135007 Date: Client: The Wendy's Company Sample: Location: Depth: Organic Content, percent: Moisture Content: Tested by: BD Reviewed by: JW Respectfully submitted, By Jeff Ward Report of Determination Organic Content ASTM D29741 D2216 S-1 B-6 2.5' 6.44% 20.3% 6/21/2013 Exhibit B-3 APPENDIX C SUPPORTING DOCUMENTS GENERAL NOTES DESCRIPTION OF SYMBOLS AND ABBREVIATIONS rn ~ _5Z_ Water Initially Encountered (HP) Hand Penetrometer Aug..-Split Spoon _]Z_ Water Level Mer a (T) Torvane Specified Period of Time I [I] ..J _y___ Water Level After en (bl~ Standard Penetration C!) w a Specified Period of Time I- > en Test (blows per foot) z Shelby Tube Macro Core w w ::::; ..J Water levels indicated on the soil boring I-(PIO) Photo-Ionization Detector ll. D a a: logs are the levels measured in the Q ::;; w OOrehole at the times indicated. ..J <{ i w en Groundwater level variations will occur ;:;: (OVA) Organic Vapor Analyzer Ring Sampler R-Con over time. In low penneability soils, § 0 accurate determination of groundwater levels is not possible with short term water level observations. Grab Sample No Recove,y DESCRIPTIVE SOIL CLASSIFICATION Soil dassification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency. LOCATION AND ELEVATION NOTES Unless otherwise noted, Latitude and Longitude are approximately determined using a hand-held GPS device. The accuracy of such devices is variable. Surface elevation data annotated with+/-indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the area. RELATlVE DENSITY OF COARSE-GRAINED SOILS (More than 50% retained on No. 200 sieve.} Density determined by Standard Penetration Resistance Includes gravels, sands and silts. en Descriptive Tenn Standard Penetration or Ring Sampler ::;; N-Value a: (Density) Blows/Fl Blows/Ft. w I-Very Loose 0-3 0-6 :c I-Loose 4-9 7 -18 C!) z w Medium Dense 10-29 19 -58 a: I-en Dense 30-50 59-98 -·. Very Dense > 50 .::_ 99 RELATIVE PROPORTIONS OF SAND AND GRAVEL Descriptive Term(!!) of other constituents Trace With Modifier Percent of DryW@jght < 15 15-29 > 30 RELATIVE PROfORJIONS OF ANES Descriptive Tenn(s) of other coostituents Trace With Modifier Percent of DryW@jght <5 5-12 > 12 CONSISTENCY OF FINE-GRAINED SOILS (50% or mae passing the No. 200 sieve.) Consistency determined by laboratory shear strength testing, field visual-manual procedures or standard penetration resistance Descriptive Term Unconfined Compressive Standard Penetration or Ring Sampl81" N-Value (Consistency) Strength, Qu, tsf Blows/Ft. BlowslFt ----- Very Soft less than 0.25 0-1 <3 Soft 0.25 to 0.50 2-4 3-4 Medium-Stiff 0.50 to 1.00 4-8 5-9 Stiff 1.00 to 2.00 8-15 10 -18 ·---·-i-------------- Very Stiff 2.00 to 4.00 15 -30 19 -42 Hard > 4.00 > 30 >42 GRAIN SIZE TERMINOLOGY Maior Component of Sample Particle Size Over 12 in. (300 mm) Boulders Cobbles Gravel Sand Silt or Clay Imn Non-plastic Low Medium High 12 in. to 3 in. (300mm to 75mm) 3 in. to #4 sieve (75mm to 4. 75 mm) #4 to #200 sieve (4. 75mm to 0.075mm Passing #200 sieve (0.075mm) P\,,ASTICIJY DESCRIPTION Plasticity Index 0 1 -10 11 -30 > 30 lrerracon Exhibit C-1 UNIFIED SOIL CLASSIFICATION SYSTEM Soil Classification Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A Group Symbol Group Name 8 Gravels: i Clean Gravels: Less than 5% fines c Cu>4and 1 <Ccs;3e 'Cu< 4and/or 1 >Cc> 3e · : GW · Weti-Qraded graVet r -·-----GP : Poorly graded gravel Coarse Grained Soils: More than 50% retained on No. 200 sieve More than 500AI of coarse fraction retained i on No. 4 sieve -Gra~;1s--;-ithFin~~-~Fines c·1assify·as ML" or MH . More than 12% fines c , Fines classify as CL or CH -----GM ,SiltygravelF.G,H GC f Clayey gniveFw----- --.--~:weif-graded sand 1 'Sands: Clean Sands: Cu;:: 6 and 1 :5 Cc ,s;: 3 e 1 50% or more of coarse [ fraction passes No. 4 sieve , Less than 5% fines° Cu< 6 and/or 1 >Cc> 3e -· ----+--SP ! Poorly graded sand 1 ---------------- Fine-Grained Soils: 50% or more passes the No. 200 sieve Sitts and Clays: Liquid limit less than 50 . Silts and Clays: Liquid limit 50 or more Sands with Fines: ' More than 12% fines 0 Inorganic: i Organic: Inorganic: Fines classify as ML or MH Fines classify as CL or CH Pl > 7 and plots on or above "A" line J Pl < 4 or plots below "N line J SM SC CL ML ! Silty sand G,H,I I Clayey sand G.H.i Lean clay KL t,1-- i S11t R L ~--- Liquid limit -oven dried~ r OrganiC clay l(,l,jjf.N Liquid limit-not dried < 0 ·75 OL larganic sirfU,M;iY ------ 1 --Pl plots on or above ''A" line CH I Fat clay ~L, Pl plots below MA" line MH j Elastic Si1t'U.M Liquid limit -oven dried ; 1 0-ganic clay K.L.M.P _____ -L-iq-u-id-linltf~-not--·dried=-~--<-O_. 7_5 ____ 0_H_...c!_Or_g=-a_n_ic_s_i_lt_'_t,M_. __ Highly organic soils: Primarily orgarlic matter, dark in color, and organic odor PT ! Peat . Organic: ----''--''-__c__ ______________________ , _____ --~-____ ,. __ ··-·-·-·-·- A Based on the material passing the 3-inch (75-mm) sieve 8 If field sample contained cobbles or boulders, or both, add "with cobbles or boulders, or both. to group name. c Gravels with 5 to 12% fines require dual symbols: GW-GM \Yell-graded gravel with silt, GW-GCv.iell-graded gravel with clay, GP-GM poorly graded gravel with silt, GP-GC poorly graded gravel with clay. 0 Sands with 5 to 12% fines require dual symbols: SW-SM \Nell-graded sand with silt, SW-SC \Yell-graded sand 'INith clay, SP-SM poorly graded sand with silt, SP-SC !X)orly graded sand with clay ' E (D30) Cu = Dscl010 Cc= -~~- 010 X 080 F If soil contains ;::: 15% sand, add ''with sand~ to group name. G If fin~classify as CL-ML,_use dual symbol GC-GM, or SC-SM. a. X w Cl z ~ 60 50 - 40 30 For classification of fine-grained soils and fine-grained fraction of coarse-grained soils Equation of ~A" -line Horizontal at Pl=4 lo LL=25.5. then Pl=0.73 (LL-20) Equation of ~u~ -line Vertical at ll=16 to Pl=7, then Pl=0.9 (LL-8) , -,.,," , , , o" H If fines are organic, add "with organic fines" to group name. 1 If soil contains;::: 15% gravel, add "with gravel" to group name. J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay. K If soil contains 15 to 29% plus No. 200, add "with saner or "with gravel," lMlichever is predominant. L If soil contains;::: 30% plus No. 200 predominantly sand, add "sandy" to group name. "'If soil contains~ 30% plus No. 200, predominantly gravel, add "gravelly" to group name. N Pl ;::: 4 and plots on or above "A" line. 0 Pl < 4 or plots below MA" line. P Pl plots on or above "A" line. a Pl plots below "A" line. .~0,,,/ ,,\} // .... '-J.,,-- ,,,, 0~ , ' c,~o , , / u ;:: Cf) <( ....J a. 20 ,,..,.,. o" ---------,'---,-,.,,___ c,'----,L-+-- MH or OH 10 ------/r 7 -----,L..=c~L~-~M~L---/ 4 ---,'-~~-,-,=-./ 0 a 10 16 20 30 --------------------- ML or OL 40 50 60 70 80 90 100 110 LIQUID LIMIT (LL) 1rerracon Exhibit C-2 TECHNICAL INFORMATION REPORT (TIR) Portion of Parcel No. 3223059063 Wendy's PRE 13-000154 & 13-000093 10619 SE Carr Rd Renton, WA 98055 Prepared for: Trimark North Benson, LP 420 Ellingson Rd Pacific, WA 98047 October, 2013 Prepared by: Josef Valenta, P.E. Abossein Engineering, LLC Main Office 2100 112" Ave NE, #201 Bellevue, WA 98004 Branch Offices Mukilteo, WA I Tacoma, WA I Pelaluma, CA Phone (425) 462-94411 Fax (425) 462-9451 JN: 213087 IVED 22013 TABLE OF CONTENTS SECTION 1 -PROJECT OVERVIEW SECTION 2 -CONDITIONS AND REQUIREMENTS SUMMARY SECTION 3-OFF-SITE ANALYSIS REPORT SECTION 4 -FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS DESIGN SECTION 5 -CONVEYANCE SYSTEM ANALYSIS AND DESIGN SECTION 6-SPECIAL REPORTS AND STUDIES SECTION 7 -OTHER PERMITS SECTION 8-CSWPPP ANALYSIS AND DESIGN SECTION 9-BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT SECTION 10-OPERATIONS AND MAINTENANCE MANUAL 1 14 16 35 60 91 92 93 101 108 APPENDICES APPENDIX A -GEOTECHNICAL REPORT 121 SECTION 1 -PROJECT OVERVIEW General Description of Proposal This report and plans are being submitted to the Renton as a part of Wendy's Restaurant commercial development permit for review and approval. The design for this project is in accordance with the requirements of the 2009 King County Surface Water Design Manual and 2009 City of Renton Amendments to the KCSWM, Chapters 1 and 2. Project is subject of Full drainage review. Wendy's Restaurant Proiect The parcel No. 3223059063 is located on the south side of SE Carr Road, west of Benson Drive Sat 17605 108th Ave SE. The site totals 4.58 acres in area. Wendy's parcel has been leased of this parcel. Wendy's portion of this parcel is 0.784 acre. Pre developed Conditions o[the Site The drainage pattern is a sheet flow on asphalt pavement at approximately 5% slope in northwest direction toward the existing catch basins and conveyed via storm drainage piping into an existing catch basin at southwest comer of intersection of Carr Road and 106th Pl SE access road to the west of subject property. The site is occupied by the Shari's restaurant. Most of the site has been paved. The existing structure is located at the northwest comer of subject property and is surrounded by asphalt paved parking and drives with few islands with scares small trees. Entire site is one drainage basin and drains via catch basins and pipes to a single point. Small frontage portion sheet flows over the existing sidewalk to Carr Road gutter. Developed Conditions o[the Site Wendy's project includes re-grading the site and construction of a 2,898 square foot building. The site grading will generally follow the existing slopes and elevations. The existing retaining wall along the entire east side of the property and its bottom grade will be preserved. A new retaining wall will be built along the west side property line, replacing the existing rockery wall and steep grades. An access road along the east property will serve this site as a main entrance and exit. Storm runoff from the parking, drives, roof, and landscaping areas will flow to the proposed catch basins and will be detain in 8' diameter corrugated metal tanks 226.1 feet of total length. Treatment will be provided by Filterra Bioretention System Curb Inlets with Internal Bypass. Filterra Curb Inlets are designed and sized for enhanced treatment. It is providing also an oil/grease treatment. Utility installation will include a stonnwater conveyance system, detention and treatment facilities, a sanitary sewer service with grease interceptor, a domestic and irrigation water services, electricaVcommunication lines, and gas. 2 Figure 1. TIR Worksheet 3 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 1 PROJECT OWNER AND PROJECT ENGINEER Part 2 PROJECT LOCATION AND DESCRIPTION Project Owner ________ _ Phone------------ Address ----------- ProjectName WENf)'"fl<' .. pec,'\l\\ltl ]i OQES"Permit # ffiE n -0 00 i S~ t ' ' -, .:, Project Engineer -lO<;.E:V VA.LE:.t:!:IA Company /'f'.,:56<:Elf:.) E.1:,X I r-lSF.12 !..;t; Phone '1.1_C'. 4~1-., °\~.:I,. \ Part 3 TYPE OF PERMIT APPLICATION CJ Landuse Services Subdivison / Short Subd. / UPD CJ Building Services M/F / Commerical I SFR CJ Clearing and Grading CJ Right-of-Way Use Other 4 1 Tl:: L.l:\i,..l {2. EV l r-Lv Part 5 PLAN AND REPORT INFORMATION Technical lnfonnation Report Type of Drainage Review ~/ Targeted I (circle): rge Site Date (include revision Gc-t-l '& 0 '.I"'.!:. dates): Date of Final: Part 6 ADJUSTMENT APPROVALS Location Township ""2 • !., I,) Part 4 OTHER REVIEWS AND PERMITS CJ DFWHPA CJ COE404 CJ DOE Dam Safety CJ FEMA Floodplain CJ COE Wetlands CJ Other __ _ CJ Shoreline Management CJ Structural RockeryNault/ __ CJ ESA Section 7 Site Improvement Plan (Engr. Plans) Type (circle one): ~ Modified I Site Date (include revision 'CC-"i I '1 . .i~\ "t, dates): Date of Final: Type (circle one): ~ I Complex / Preapplication I Experimental I Blanket Description: (include conditions in TIR Section 2) ~~ ~e_-,-,c~ -C.OQ.E 12.E~\Q.C';~NEt..fi : ~ Date of "nnroval: 2009 Surface Water Design Manual l/9/2009 I KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 7 MONITORING REQUIREMENTS Monitoring Required: Yes/ NY Describe: Start Date: ~ Completion Date: Part 8 SITE COMMUNITY AND DRAINAGE BASIN Community Plan:------------- Special District Overlays:---------------------- Drainage Basin:-----=~~~.....,..~~~~ Stormwater Requirements: E®:Ai3c£z3> \~ ./.fl-,\ C. Part 9 ONSITE AND ADJACENT SENSITIVE AREAS Cl River/Stream --------- 1:1 Lake Cl Wetlands _________ _ Cl Closed Depression ------- Cl Floodplain _________ _ Cl Other ___________ _ Part 10 SOILS Cl Steep Slope -------- Cl Erosion Hazard ------- Cl Landslide Hazard------- Cl Coal Mine Hazard------- Cl Seismic Hazard ------- Cl Habitat Protection-------Cl ________ _ Soil Type Slopes Erosion Potential '4!,J t]l'sI:-:('[o hfi:DI 1.1b c; L!',CIAL t 1ll.. ._,,., h~'-!2' sJ !::l • '7 eq Cl High Groundwater Table (within 5 feet) Cl Sole Source Aquifer Cl Other Cl Seeps/Springs Cl Additional Sheets Attached 2009 Surface Water Design Manual 2 1/9/2009 5 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 11 DRAINAGE DESIGN LIMITATIONS REFERENCE LIMITATION/ SITE CONSTRAINT '.Ca: Core 2 -Offsite Analysis \)N OF,2 £:; s.?,,"'ll l t.J 'rs • f'1 Pt:::':;> I t,) F' ,"'<,_,_} CJ Sensitiv~/Critical Area§ .Ja'sEPA CJ Other CJ CJ Additional Sheets Attached Part 12 TIR SUMMARY SHEET ,~~vide one TIR Summa~ Sheet =r Threshold Discharoe Areal Threshold Discharge Area: /name or descriotionl Cora Requirsments (all 8 apply) Discharae at Natural Location Number of Natural Dischame Locations: \ ·.\'Al-.)~ Ci>t;; CC\/ Offsite Analysis Level: C)i 2 / 3 dated: J I '.:2Q I -z_ o r"f, Flow Control Level: 1 'lg,/ 3 fincL facilitv summarv sheet) Small Site BM s or Exemption Num~er ~, L.::, ' t,. ·~ (t.;..,-v -"t=-ls...1"'1"\_ a ') Conveyance System Spill containment located at: Erosion and Sediment Control ESC Site Supervisor: """''.) ('. ,,,: I \;.· \·t:Q t, I >J€- Contact Phone: A~· I'?,. I t> t;:, I N q After Hours Phone: Maintenance and Operation Responsibility: ,-Prtliat!,,P Public ' , -·- If Private, Maintenance L R""Uired: Yes I No Financial Guarantees and Provided: Yes Liabilitv Water Quality Type: Basic / Sens. Lake , need Basir.rn '.>/ Bog (include facility summary sheet) or Exemption No. . Land sea= Mana""ment Plan: Yes/,~ Soeclal RAnuirsments las annllcabl•• Area Specific Drainage Type: CDA / SDO / MDP /BP/ LMP / Shared Fae./ None R""uirements Name: Floodplain/Floodway Delineation Type: Major / Minor I Exemption ~ 100-year Base Flood Elevation (or range): Datum: Flood Protection Facilities Describe: Source Control Describe landuse: (comm./industrial landuse) Describe any structural controls: 2009 Surface Water Design Manual 1/9/2009 3 6 KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Oil Control High-use Site: e / No Treatment BMP: \>"l\.."l">::. ttl?. j\ ~IO\?';""\ B 1-J·n Maintenance Agreement: Yes / t,t§;) wtth whom? ._., Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION .3' Clearing Limns ..tii(' Cover Measures ~Perimeter Protection Traffic Area Stabilization ~Sediment Retention .i:(surface Water Collection CJ Dewatering Control Dust Control ~Flow Control MINIMUM ESC REQUIREMENTS AFTER CONSTRUCTION ,.l!:a Stabilize Exposed Surfaces J.I' Remove and Restore Temporary ESC Facilities Clean and Remove All Silt and Debris, Ensure Operation of Permanent Facilities CJ Flag Limits of SAO and open space preservation areas CJ Other~~~~~~~~- Part 14 STORMWATER FACILITY DESCRIPTIONS /Note: Include Facilitv Summarv and Sketch\ Flow Control Tvne/Descriotion Water Qualitv Tvoe/Descri"'ion ~Detention \I">,µ\<.<; .);il Biofiltration ~ I L:D?RRA CJ Infiltration CJ Wetpool CJ Regional Facility CJ Media Filtration CJ Shared Facility ~ii Control AL ""ffi,Q_ Q..c,., CJ Flow Control CJ Spill Control BMPs CJ Flow Control BMPs CJ Other CJ Other 2009 Surface Water Design Manual 4 119/2009 7 Figure 2. Site Location 8 .. ; , ·, ·, 2 O> a Figure 3. Drainage Basins, Subbasins, aud Site Characteristics 10 . :, ii ',} \_ I [ ----· 1,. i ' 1 ,' '' 11 '' I' I . , ii ./ l.,.....--- ' \ ) \ ·.~· .' ________ .· --~ .... \ -- .---,. ·' ,' .··1 -~~-~ __ .--· j i __ .-._ ·--\ , . ,_. _______ _ / ·,_,, .., \ \ ·~-·. ' ) . _________ ,..._ ·~-~---_, -, '· '· -----··· --~ •• 1 ---.- I '- ..:··~---·· ·., 1 ••.••. -\ .~. ·-- ·-, ' / ....._:: . . f -----.:----------. -~ ···--·--.... '· -·----·----- ' ' .'"-__ :\ .. l. __ - '-._ . .., .-.-'1. j ,,- \ ... - / ,' ,· ·- .~-· i . ,/ -~· -~. ·~ ' I I -·,·J"(c;...----~--· _.- ',,, .... , .. ..-- ,., ·,_ --~ \ i ' -----i; s"f_! 4·10 : --·--------. -~ _.-. (1 .---------· 1 • --. ' 1 '1 i JS "'.a, H 1901 ~~ __ . .:_. J !~·-.......-----~--'.----· / i ·------~--·~-··-... _ .. ----· ' / ,I i~o J J,_ l. ,, (-- , __ -- ~--- ) ' '· / \ ',. ', 'r I ----..:::.<-: -· ·-::-:-=:.::=.-: •..• -:;,......_- ----~----~ .. .--- -' / / .,· _/ ·-·---. ..---.. __ .,.... ~. .........-- ---- \ 1. ' I ,_. 355. --~ \ \ ---------- --, \ ' '·. I ! / \ •• I ·- ·, i l ' { ,' ' ·, __ j-· ". ,"' / J '· ---.. --.. -· / \ ) / { I f \ I ' --· \ \ '· ---------·-' ' i . ' ' i I / ', '1 \ •, I I \ '• --.... __ \ .. '-..,_ \ "\ -.._. ' 1'-----·., ·,_ "I'-------------<-------.'------- .----- -..... .. -----1 .,..---,. ' I ------- · .. _ _.. I,, ' 1. \ I l ) ____ -' ,/ / i i / i ---------. \ -........... ·, / r1 . ! ·1 \ ' ?i·. ~- C> ·---~- / ( \ ___ _ ~ c • • I _.,I . -----~ .... \, .. , .., I I , .-., I " la .. ., Figure 4. Soils Terracou Cousultants prepared a geotechnical report for this site in July 2013. This report has been updated and soil infiltration recommendation has been added. The existing soils consists of medium dense, gravelly, silty sand to stiff sandy silt or fill material up to 2.5' depth. This is underlain by very dense, silty, gravelly sand, interpreted as a glacial till. Water table at the time of exploration was 8 to 10 feet. Fines content of soils tested were on the order of 30 to 40 perceut and the site is not suitable for infiltration as a flow control BMP. See Appendix A -Geotechnical Report 13 SECTION 2 -CONDITIONS AND REQUIREMENTS SUMMARY Conditions and requirements for this project include all eight Core Requirements listed in 2009 King County Surface Water Design Manual (KC SWDM) and special requirements as adopted by the City of Renton. Core Requirement #1: Discharge at the Natural Location This site has single natural discharge location at the northwest property comer. Site sheet flows over the parking lots and drive and then the runoff is collected by catch basins and conveyed northwest to the catch basin at west side of access road. Drainage will be maintained at the current discharge location. The site development will not adverse impact downstream properties or drainage systems. Core Requirement #2: Offsite Analysis A level one downstream analysis is included in this report. Refer to Section 3, Offsite Analysis for more details. Core Requirement #3: Flow Control This site will utilize underground pipe tanks to control quantity of discharge. Flow Control Duration Standards, Forested Conditions (Level 2 Stream Protection) are required. Since infiltration is not feasible for this site no other BMPs except Filterra bioretention are to be utilized. Refer to Section 4 -Flow Control and Water Quality Facility Analysis and Design for more details and calculations. Core Requirement #4: Conveyance System The conveyance system is designed to collect and convey the 25-year peak flow. A 100- year flow was checked not to cause a severe flooding or erosion problems. See Section 5 -Conveyance System Analysis and Design. Core Requirement #5: Erosion and Sediment Control The subject site is not located in the area of erosion and landslide hazard. A Temporary Erosion and Sediment Control (TESC) plans will be prepared and submitted to limit and mitigate erosion and sediment control. See also Section 8 -CSWPPP Analysis and Design of this TIR. Core Requirement #6: Maintenance and Operations The proposed drainage improvements require an Operation and Maintenance Manual. Refer to Section 10 -Operation and Maintenance Manual. The drainage facilities will be privately maintained. Core Requirement #7: Financial Guarantees and Liability The owner and developer will post financial guaranties and liabilities, as required by the City of Renton. 14 Core Requirement #8: Water Quality Water Quality is based on land use per Renton SWDM. This site is a commercial development, therefore the enhanced treatment is required. PGIS area is over the threshold of 5,000 sf, therefore, a water quality treatment using Filterra Bioretention System Curb Inlet with Internal Bypass has been provided. Sizing calculations are included for enhanced basic water quality treatment. Filterra Bioretention System has received General Use Level Designation by the Washington State Department of Ecology for basic, enhanced and oil/grease treatment. Refer to Section 4 -Flow Control and Water Quality Facility Analysis and Design for more details and calculations. Adjustment approval is required by City of Renton for this application. Special Requirement #1: Other Area-Specific Requirements There are not known any specific requirements or regulations for this site at this time. Special Requirement #2: Flood Hazard Area Delineation The project does not lie within and is not adjacent to 100-year floodplain or flood way per FIRM Flood Insurance Rate Map Number 53033C0979 F. Special Requirement #3: Flood Protection Facilities The project is not protected and is not modifying or constructing flood protection facilities. Special Requirement #4: Source Control Required BMPs for commercial site development (Activity Sheet A-1) will be used as necessary per King County Stormwater Pollution Prevention Manual. The following BMPs are used for Source Control: • Catch basins with sump • Eliminate Illicit Connections -All internal floor drains, appliances, sinks, and toilets have been connected to sanitary sewer • Protection Marker for Storm Drains -Inlets will have protection markers "Don't Pollute Drains to Habitat" Special Requirement #5: Oil Control Oil control applies for this site since it is high-use site. Filterra Bioretention System is used for oil control as approved by Washington State DOE. Special Requirement #6: Aquifer Protection Area (AP A) The proposed project is not located within the AP A area. SEPA SEPA is required for this project by the City of Renton. 15 SECTION 3 -OFF-SITE ANALYSIS REPORT The analysis consists of information and data obtained through site visit observations, site surveying, and by researching King County and the City of Renton resources. Task 1. Study Area Definition and Maps: For the purpose of task 2 below, the study area extends 1 mile downstream from the project discharge location, and also includes the upstream offsite tributary areas. For purpose of tasks 3, 4, and 5, the study extends Is mile downstream. The study extends upstream to cover offsite drainage area east of the property. The study area comprise of the site, Eastern upstream offsite drainage area from small shopping complex parking and drive, downstream area West along SE Carr Road, crossing 106th Pl SE, crossing SE Carr Road, turning again West through the natural deep ravine, crossing 103rd Ave SE and connecting to Panther Creek before crossing Talbot Road S. See attached Maps. 16 Task 1. Study Area Map 17 H4SW -29 T23N ROSE SW 1/4 -Pg. 129 J i) 1 1~t. I J 1· ------~~~-(o:~ ,-· \10706 ) .J / I • ';r/• I, ' I "'· ---i I 1181 ----', ---00 _J ,,,,~ - . ----r-. r:: f'~' ,om / ' .>..-,.~, m, r -' " .., ';,, rfu """'I;;.. , -( ' I ' ' '->-.. ') )372Bt.'.135611-.1850i.:g.-~37422' --l I ----,----'"" / ~ / / > , ---->--,-. 56l~3st'ffi • --l"" 't , ' -' . ----,,,-,,,-,, --'""1 ""f 1 138676 !;; ~12 ( 38S11 j 10727 214 1 . _ lur.· ID _ . __ .91a .a24 1 / _. . 137 ·r:l!l./'2" ~ 810 I :38~ 13S678 ( 1012s 1161s 185078 13711,'F 1 JS!383 , S th 13868:_JO ' -' ""' ""' / " ~J 8181!_a21--~ __ -_re_ ___ -3 6 B4~- 38 ·. /-38681 · · · 91 1 9.1 7 -~ "' W.!_ ~ \\ 10719 762S '~ n;J,O . o " "~ ----•=• _--~ _r_\,___-r---__ ---~-..... \ ~, 1 , 17~633 ,i ~ ,m, .)I , I- ~(-Edlujd/Kon,-;arm ••• ,• ' . h '""'/ ~ ,I! ( ~ Rnng Gle ~//~ \ • ~ S~ping ,m, J '""f'1 ( " , 1 -•• • Cel'\jer r . .. 137299 I i .l\ ----J' \ "\ \ \ \ .... , ""' -' , I i i \ 17801 : <. \ ~ I ) ! \ \ ) l_, ,.-) / J ) ( (h,\' -I . -"-. i/lr 138387 ~~-/0.,.! / /""%, .!'/ / (,...._;, ( -~ \ ) .\.113767 '\, \_, ( i /.· \ _ . \ 1~7~5. \ 1 r;,~? !~ 137285 1::9""\\ 1 ( '--~" / , 101x~-• "I r . 1 r . . . i ---1 13• I :3721- I j ' 1. \Y •• ~1~ I '-I 0 • --... '-113770 J!· ~ 1 . 7815 l ..... :::, . 'a 113114 113112 < < J' SE 1;:.,a,' ~ , 181 i... r1·· . , ,.__...., ci, -;,'0r , , ;:;::---1., , . ~ ,-./ !____.,r; ~r' 11., \ ) · 1. . · ·. ""'---/ ~ -----137 8, a_ ,-~)\ ~ \~ ~ c;-11'1 "' 101 I ~ \ I \; \_ ' "'."\ ~/-"" < I ' -I I l '™' "i - r W I I -~I '·1-;,o,~:,.,\ / --. ·--. _ j 1 / , ~8100 \ ) ' ~o 1065 , 1791S Z ', :•; : ' ' '\":, / __ . / , / 18100 ..... ;' , 137281 I e\; _; '!!921,o I / u i • -• ,' } ; I / / I O 17923 0 W -) i I ii \ ) \ -. -( // <fl ( / --;--(f) 8100 '_ 13728 17 ~ , 137225 C:: 1.,/.i \~,1._·-,,1_,\,;~·.'~·--i / / _//1 /(/,'j / ,,\.1. 181~0;:J--.11 j 112137 •7279 137i~E180thQ\. 13727~(_ Z ( / / fr:---', /;:\~ , "'-'-':-... ~ / r ____) 1 \ ( 7 . 60 -· Pps1oo·. \ 137280 M I , 1 ~~-••• \""'"" ~".... _.,, • ~I' '-\ , / ~8100 , I . \ \ ,.,._, / ! \ /' ' -('J 1 / -': '· '· \. ~ \ ~ ~~ ·• 1810D 18100 1 , -· -' , f-f)J/~~ ·\~~i ~ ~ ~ ,/ -· 145516 J ' -· ~ ,, \~\\ ~ 1810 ; 81 : .. -.,il!('o..1!1~;22.~ 137227 T"" I._--::......' ' I-~. ~0 I ]1,\· \ .so/__.... ;'1 , · __ _,. ' 18100 ,18100 .\ ' ', · C--. ', · . .r:. 18100 , 18 (") ' \ ; I .-1" u I ' . J C ' \ 1810~ ,,~, 18100 . --• 10B03 ~Ii~>;\'\. 1()1)\1 ~~ / ?( '.I -~--~"''\~ .. o _ 18100..-~"'./S' 1sfoo , .... Ji1e100-J1 .' ' ' ' ' ' • • • • • ' ' ' ' ' ' • • ' ~ I ' m ' u) • N -; N ~ u) z ::a I i 0 ~ I t ~I ' ....>. ~ ' I • "T'I Task 1. Topographic Survey 11 ,/ . m!,!!!!!i!M!,!~!!!!~!•llm~ ,I !ii 0 a 1-11·,,,, 1 is 1 1 • 1• 1 • 1 ! • i 111 111 1 §!!.!I. !!l,!,!!111 jlj! ...J ;t ... [l-.-@/J,'U,1~ 8 e---<>-1<1l.• a1• ~ fi I ! , I Ii I i ,; 11 ;! II 1; in:_!HI !ii!H .. 1ij•; I®"•' ,•,o,• ~l'",o •1•,o •,•1• I I j ! i I ; I i! ! • i I I ' 111 ! ! ! ! ! ! , ! ! I•'. ! l I Ii 1! Ji :, o 0 1~•°'1""-' 1i ®•"" e i:i 8ot• Clf*S" ,., \ • ~ \ \ .~ .. - \ "' ~ ~ z en ~ • ... lt ~ 0 ~ .. • -.1-~------1 I I I , : i :1J I I I I 11 I I I I I I I I I I I i ~ I I I I lJ I I I I ., .• , .u.u. .. • -..r-.-I ._._..._..__,-,,-_----:.===='---{ I I trl6~0f:U( '!'Id~ \ \ 0 "' Task 2. Resource review: A resource review has been conducted to gather information regarding existing and potential flooding or erosion problems. The following is a list of resources used. • King County iMap Data Maps • FEMA Flood Insurance Rate Map (FIRM) • USGSMaps • City of Renton records and GIS maps 21 Task 2 -FEMA FIRM Map, City of Renton APA, Coal Mine Hazard, Erosion Hazard, Flood Hazard, Landslide Hazard, and Drainage Complains Map 22 NGE 5 EAST. KING COUNTY UNINCORPORATED AREAS 530071 / I/ sTRE.ET - ZONE X I I I I I I I >-V, <( w iE :::, 0 V, w s "- :r: ~1 -~OUTHEAST I _176TH STREf:T >-V, ;S i= :::, 0 V, I I I w :::, z ~ :r: >-~ SI I w :::, z w "' :r: ~ 32 500 • APPROXIMATE SCALE IN FEET 0 500 FLOOD INSURANCE RATE IIAP KING COUNTY, WASHINGTON AND INCORPORATED AREAS (SEE MAP INDEX FOR PANELS NOT PRINTl:01 NUMBER ~ SUF~IX !l3UlW W7\I ll3007! 00}11 !i.:IOCU3 l)iJjl MAP NUMBER 53033C8979 F MAP REVISED: MAY 16, 1995 Ftderal Emergency Management Agmcy n,i. Is an ollclal copy of a portiClf'I al the ~ referenced load map. It waa extracted using F-MIT On-Uno. TNs map dQe9 not relect changes or amendment. which may haY8 been madlt sut»eq1.Htnt to the date on the title block. For the latee.t prodUct Information about National Flood lnaurance Program tlood maP9, check the FEMA Flood Map Store at www.m.c.fema.gov I. ....I I Cl) ~.,. ~ - E.lst Valley Rd E3 I:? bi .tilt st <j,Z''i-p ,.,i,,,,;? $~ \ "-e , ;o C. ,;25th sr "' "' 4:" 'Wr,, St ,;iTll> s,. S '1-'!'f' S 271n St Ill c;\ t ~ • \a \,;1,'lll' \ ~ 'i. ~ ::J t 0 .. g ~ ? < r ,, .. ,I' "'\ ",i, i g "' w i "' • w SE ,1 <I' SJ1Y.St " "' Ill • " > • s :i;,,,lsl ~ < " .. " I ~ t SE 170Ch St ,S J2nd, e.,' !;1 i ,; .,,i, St .,,,,.s, SE 172nd St S J6ta SI ~ s ' ' s36lh Pt ' SE 173m SI .. se 11.,,, Sr 5 J71h St l u. "· S 3111, Pl .5 /!t 1a, .c s 38m Cl ~ f ., SW 271119t ? I ii! .... f sw:w~r ! ! ' < " " .... • St ... w' .,, llj SE tcfqP w ' .. w ! l Ill "' 'ii 4J, IS. .c 5 IS. .. " r "' ~ ~ ! g ~· 1. SE.·-S1 r.?' ~ s 09791 SW 411t ~ • " ? .... -3F S 47th St S .i,tll SI -.s'f T&ll"Ln SE 1-SI Pl SE t~t<' SE 181 /SS0.. .S-, s !I01h St w ., j S500IPI < ¥ .c ~ ... JI ~ SEl9DlhSt V/, < ! S !,OU,SI -SE 192/ldSI f "' 't s ii "' "' I IS. "' I > • I ~ > ! Ii w f-• "' 8: "' • J I:: • ,! ::G L !! ;z .. 3 81\ 419~~ .... en __ ... _ 1£] ~! Ell [Jl JS:JA'YH.1.DU ·+ .. I .. j Task 3. Field Inspection: Field inspection was conduction to assess potential offsite drainage impacts associated with development of the project site on July 30th. Weather was sunny, 65° F. Offsite and site areas were inspected. No visible drainage problems were observed. Offsite runoff does not reach subject site. It is collected by storm drainage system which by-passes the property. Task 4. Drainage System Description and Problem Description: Drainage system descriptions The site is a rectangular shaped property located south of SE Carr Road and East of I 06 1h Pl SE. The existing ground slopes in Northwest direction. Onsite storm water from parking areas and drive is collected into the existing catch basins and conveyed via underground 10 inch and 12 inch corrugated metal pipe system off the subject property to the existing CB at southwest comer of Carr Rd and 106th Pl.. An unknown diameter storm drain pipe conveys storm drain West along the adjacent property, then West along the Carr Road, crossing Carr Road to the North side of ROW. Then, through deep ravine, densely vegetated, being a tributary creek to Panther Creek. An unknown size culvert conveys flows under 103rd Ave SE, via Edlund/Komm Farm well define creek to conjunction with Panther Creek. There were no visible sign of any system deficiencies. Problem Description No problems were observed during the site visits. I did not observe any lack of capacity, drainage problems, flooding or nuisance problems, overtopping, scouring, bank sloughing, or extensive sedimentation. There is no evidence of any erosion from the road overtopping. Also, searching through downstream drainage complaints, there are only few old ones: 1. I 0545 SE Carr Rd -1994 Oil Dumping 2. I 0443 SE Carr Rd -2003 Audit 3. Edlund/Komm Farm -2000 Erosion Task 5. Mitigation of Existing or Potential Problems No drainage problems were determined by downstream analysis. The project site will utilize storm water quantity and quality BMPs. Detention tanks are proposed to control flow volumes to Conservation Flow Control requirements. Treatment will be designed to Enhanced Basic Quality requirements with Oil Control. 30 This project will not aggravate any existing storm drainage upstream or downstream of the subject site, and in general, it will not adversely impact existing basin conditions. 31 Task 3, 4, and 5 -Off-site Analysis Drainage System Map and Table 32 Pl 138754 -,- !OS a~;:a\T m· )531_.......1lSJ52 1 J :38676 : 138677 '\ 1:ti!ZI ~Ool ,111 j.ll!li ~ !112 ~ 13Blj83 -·-~.:::.... .-m. -~~ !~~38,Zlli S 3Sth £1 1 r,~ 1~&1s L_ r . 138681 r 138680 ·1 /1.u m:e-0i ;• -----~ " I I \ ·! ' \ I --~~:;,r ' 'v~c"I -,.....//°"-_:r, _'/ I .:;:===~;\7, •/i. I -~;;~r----~ ."' \ i .-, J -----< ,...~ \ ' ,/ ' ' ' \ \ ' \ ( I \ ' \ / I \ ( I \! I I I I ~ ) I I "\-:-: ,,.-....,_·.~-~ cl I 1014 // r (' \ \ I I ( -.i-· i I~ ( H4SW • 29 T23N ROSE SW 1/4 • Pg. 129 I ( ' i ' I I '· i ~a~~i 1383Ma>,r~ i I -· . , i 131294 . \ ) ·, _.J I ) , 1· -· --) too&O, 11 .~-r-~------ ... \I ., ,, ,o,,s· \ i ----~r~ \ r-----~ '; \ 138367 ! ··' ':I-] / ,roeo ll5748~3r9 • '!,., .. • ' I I 137290__... 1J5746ii.1 -4, ~ ,1 1 .165079 13i422 137 J5 ~ l•'.l'i -~~111 \:J~:, l!M,1 ,or:1 I 137214 _ to7a 111,15 IMO?B 13~2,I-. ,on, 111421 i •, 1ont HZ.I 11,:1 1Q71.5 10TI~ 17'-l~ 1J7298 1070'1 17iJ7 :T ,070) 1771 I .. l7JQ7 I 13i21~ ! ,·,~~299 Jt ~ingGle\ ~~~ ""' \ 177~, o ,)_}11 i.n L--___.,..-~ . . ! a1m&1--., r/ '.CJ I / /,/ .~ 1· 11 .~., I IOUO, ..._ _/i··· ', , -~ '--._ 1 <. · 113768 ' 'I ..::_--;,,;;3 ~~1m1 -~ ____ ..,,_ ,YliJ76e9 / l'"',·o \ , --~ .-u:·· .. _· .! 17~-. hn.,J ) r ~ C> a. :!!: ~ w z w ~ a:: z "' ~ ~ "' 111'12 ( ..... 113710.-....SE • af1' n----:-, ! \ . I~ ', . ,. __ . .113774 • , , ~7 > I ._ \ 1BIOI} ............... r1_-1 ?-,1·,=+~ ~ ____ _,,. j " --r J• , f"'. i I " 1 ;':f / 137 ', I ' "-,.---_/ .,---' .. / ~. \ . '· -. ~ ' 7234 ,'-.... _ . ·. . -' ~ .. j _ _./52·107 ' I . f ---.,_ 131001· ,· { ,,,9C ---..."-" ' . ' I --c:::__ ..,_,~ ' '\ I ' I . ·-·. \ ·'. ti,(/ -..,_ -·'''"'-". "'"' ! I '"'/ -i I ,,). I ' I ", '-/ !·': ._,, · ~ j r , ~ :.~ : 1 _ 1 ia100 1110~·'., · -.......__-....._ -' l. L:<, L · _ l?''' 1! i 11n 1 1 .. / -~,c\> . ."_ . ·. --, "' ! • • •.. '.\ • ..._:.;.,, I • , ...._,____ 1, ,../ / , 1a100 ~ I , ~ 1ou1 ~>'.·, <: . I ' ', ,/ U\M' ', --~ _ 17U1 cJ \'.\_ '-'-;'-. ~ • / (. /,/oo _//; .-:~Imo t 1 '( ~ !~~~m/~ ' -:: ', ' , \' i r ; , ~ , / .•, ' I ! , , , --~ . -::::---..., ~ ,.-r· , .:. ,_;,,, ! --1' moo_1f. ) .i I m ,.i31-21~~"' 131226 "~ -~ ------• • : 1 "(' r-:' ·--.: ' 1 1 , --~.;ci,100 1 , --13\ -I -i137274 •· ·' • . -/ / / 1·· , . ""f i ' """ ,,.--,,,. e 1solh : 1' ·-... , -..,->,-,._;......-'~~~--,------·/ _.,,, ... ~ ..... __ ....._/. ';, ,'/ ·;. ___ 1")1' _1 ia1ool1 Ii 137280 / J13727S1,op,1e1ao 1 ----• ' ._ --.,,,:::-,,'1-~,,.,,· " .. , .,...-/· ·I,. ' 1 1 1 1 -----1a100 I . -< _ --,:-,::-"-~C:---.. ', , ~ -./ , ._,:.,.. _,,./" __ ___, ~ ,.. .r 1_ I 1a100 a1aG , , .,,-,, 1 J• -''"' · -,•,.C:---.'-' ' ' ' r ' "145516 ' ' ' ' ' ~-.-----~ ~-.__.----.. --' ~ ~ , _.....-// __,.,,..,....____J . 1· , ---~-1/ H10D ,.._ 1J7228 ---....__ ..__ . ' ! ___.. ./ ,--,-._ ' \ ' .--,-~-~ l I '---' ~,--i ,) ' .·/ /' / / r~ ~ · ·,, ,., .. Imo , , c______.----~00 .,o\ " .S ,o,o, -... "-· J ,• _;,, ---.,..... -~ __,.. ._. // ,. , -... • ,; ,1a100 --~ -~·\'\, 1(1·1': 11, .... ----~-/ / _,,.,../ -----; ( --1':. '""'"~ ...... \•~ l8100/'bf:J~ 1SfCD~ ~~ tt1QOI , ,-,,;i\ \ \. , . ; , r--___. / ..-/ ~____,/ a 1Hnn '---..._--....... -• ___ _,.----... ,..._;"~•••~~ "-, 33 137224 -~ 137225 110.,;:; 1J7227 10~0) ~ z m kl --1 "' <,) z ;;JJ 0 0, m z m ~ :is }J OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE SURFACE WATER DESIGN MANUAL, CORE REQUIREMENT #2 Basin: PA 1'-l"\\-1 IS,(? C QE(:, \~ Subbasin Name: Subbasin Number: Symbol Drainage Drainage Slope Distance Existing Potential Observations of field Component Type, Component from site Problems Problems inspector, resource Name, and Size Descriotion discharae reviewer. or resident see map Type: sheet flow, swale, drainage basin. vegelation, % Y. ml= 1.320 ft. constridions, under capacity, ponding, tributary area. likelihood of problem. stream, dlannel, pipe, cover. depth, type of sensitive overtopping, flooding, habitat or organtSm overflow pathways, potential impacts pond; Size: diameter, area, volume destruction, scouring, bank sloughing, surface area sedimentation, incision. other erosion \ \2' Ct'\ p rfu-.f1 ot· \o 1i )I N//\ 0-\<co' µa "..1L_ /..:)OWf f...l'C \JIS1e,L t:_ {"l':~)i,t~ ..., 2-fl\£ -SI~ µp CA-r<,R n. D R..ol......) N/A 'W-S-10' f,..JOlvE fJ Ot.J F;_· !JO VIS,11.'.,L. f;, /1"'--00 t. V, ·• ~ f>\f~-S\c.~. "'I~ ~\).>C, ('JI\~ ~ N/A ~-d-,4o' !JO ~f;: rvo t-'.lF ,-Jo vc,1:...1. e: ~~e,, r h : 4 '¥q\.) 12.AL. ~ \J 11-.lE. \-1 .._ ~'l?A'-C IIA -8% ~ -I 11,\ol t,.l O kl VZ: E..~15Llj:t "T't.~ I 1.,-:)Q C>!) DE:.10<;c VFL. E:: 'T"l.~c,, r,(""' IZ_ (2 \ """ c;-~\..VE;R,-'Pl?L CUL.V~ Qi '(.JI PC:: ~, nlcl.Jt;t. \JfiL ' I 11, (,:,\d-1;-~ 1d µof'.:,~ I'} 0 \'-l\ tJI'.) '.Jl':-1'1' .. '-~ ~ilf,HJ, S lo "7-,ls.JTtt "·R ~ i,,-~-.: ~ti.'C. T\\~ µ ~1d-3 101o' tvaWf.i I-JO/I.JI;;: l'..l#\1 PR\\J/"·"i"t ~f. -\· ,;t., ,t?. \ ), /"-17'., ~\\JATr~ . PIA 1/9/2009 34 SECTION 4-FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS DESIGN Flow control and water quality treatment for the project are subject to the requirements of King County 2009 Surface Water Design Manual and the City of Renton Amendments to theKCSWM. Existing Site Hydrology (Part A) The site used to be Shari's Restaurant. Entire area is one drainage basin, where storm water sheet flows to the natural discharge point by sheet flow and via catch basins and piping system. The existing slope is around 5% in Northwest direction. The existing site is over 70% impervious. There is no detention or water treatment on the site at this time. Below the asphalt surfacing there is a layer of silty sand with organics to a depth 2.5' to 6.5' below the fill, a layer of medium stiff to stiff silt was encountered above very dense glacial till was observed. Native soils have a fines content ranging up to 41 %. Water table was encountered at the depth of 8 to IO feet. Due to high content of fines in the native soils the geotechnical report classifies site be not suitable for infiltration BMPs. Pre-Developed flow characteristics for KCRTS analysis: Area Land Use Type Perv/Imp Acreage Wendy's Site Till-Forest Perv 0.803 Ac Rainfall Region: Sea-Tac Location Scale Factor: 1.0 Time Step: Hourly Data Type: Historic All characteristics were validated by site investigations including an engineering site visit. Soil type was verified by soil investigation. 35 Part A -Existing Site Hydrology Map 36 I . f I CH _J " --------------==------t<• ------C-:: -----V I i----.---,-·· I 1.------\ I "' \ I . I -~< I \\ I @ I -._°J.~ ~ _/ · .. "<~ ' 0 o-.!! I .-A' :: . he I,. \1, I Jr I (e, _:{I., ·. ~ j I \\, I -I • •• I . • I o., i4 AC (L.~Al.) 1 . . D~~ I '------~~J_ CH <1 4 · <=t""b t~ I APN: 3223059016 FRED AJEYE:R STORES INC ~~\~1 41~ M'10A03\-~'1 11"P "5eALE.: \ "'= ~1 Developed Site Hydrology (Part B) Approximately 69% of Wendy's site will be impervious. Storm runoff from the parking, drives, and portion of landscaping areas will flow via Filterra Inlets to an 8' diameter corrugated metal tanks. Runoff from roof and paved pedestrian plaza will by-pass Filterra. After the treatment facility, detention, and oil water separator it will be conveyed to the existing catch basin in 106'h Pl SE. Developed Areas: Wendy's Areas: New Building Asphalt Drives and Parking Sidewalk and Patio Total Impervious Total Pervious TOTAL WENDY'S 0.067 Ac 0.440 Ac 0.049 Ac 0.556 Ac or 69% 0.247 Acor31% 0.803 Ac These data were used as an input into KCRTS program. Part B -Developed Site Hydrology Map 39 pP ·1 : I 1 I ., I i ! I ii q' r ~t 0 ~! -!!. 86°J128. !!.,L__J (F'ROPQS£o cur-aH L/Nf) D&:VE 1-0f»SO ~' i E 11,-.01..0~~ t-tA.P 1 .::;;.~a , ... = t!\o Performance Standards (Part C) The subject property is located within the City of Renton limits. The City adopted KC SWDM 2009 performance requirements. The performance standards are listed as follows. Flow Control System Flow Control Duration Standard, Forested Conditions as defined as a Conservation Flow Control applied the historic Level 2 flow control standards by KCRTS. Infiltration is not feasible for this site per geotechnical engineering report. Section 1.2.3 .3 of 2009 King County SWDM require to use flow control BMPs to maximize infiltration and retention of stormwater onsite. The goal is to apply flow control BMPs to the maximum extent practicable level. The minimum levels are specified in Section 5.2 which are considered to be a maximum extent practicable level. This project would be in category of Large Lot High Impervious BMP Requirements per Section 5.2.1. 1. Full dispersion is not feasible for this site since there is not enough of the native vegetated surface. 2. Since full dispersion is not feasible, the following BMPs must be considered: • Full Infiltration • Limited Infiltration • Basic Dispersion • Rain Garden • Permeable Pavement • Rainwater Harvesting • Vegetated Roof • Reduced Impervious Surface Credit • Native Growth Retention Credit Full and limited infiltration, basic dispersion, rain gardens, permeable pavement, reduced impervious surface credit, and native growth retention is not possible for this site due to low permeability of the native soils and site configuration. See attached letter from geotechnical engineer about flow control BMPs not being feasible for this site. Rainwater harvesting and vegetated roofs were considered but they would be very impractical for this land use type. These two options require lots of attention and maintenance. Fast food restaurant do not have a site management capacity to provide necessary maintenance. 3. Perforated pipe connections of roof downspouts to the drainage system will be provided as the only flow control BMP practicable. In addition, Filterra Bioretention System using Filterra Inlets will be used, providing bioretention and LID development. 41 Water Quality System Enhanced Basic Water Quality menu applies for this site. Special Requirement #8 -Oil Control was also applied. Stormwater runoff enters Filterra System through a curb inlet opening and flows through a specially designed filter media mixture contained in a landscaped concrete container. Stormwater flows through the media and into an underdrain system at the bottom of the container, where the treated water is discharged. Filterra with Internal Bypass is designed to be used in a sag condition and will accept flow from both directions along the gutter line. Treatment flow entering the unit through the curb inlet is directed to the treatment chamber by an internal terraflume tray. Flow in excess of the treatment flow crest the edge of the bypass pipe, enters pipe, then connects with the underdrain piping, and exists the system. Filterra sizing design has been provided in accordance with Western Washington Design Assistance Kit (DAKit) vO 1-W A using Step to Sizing a Filterra Bioretention System for Enhanced treatment with hydraulic conductivity of 24.82 in/hour. Layout has been approved by Americas! and design documents have been submitted for review as required by WA DOE approval conditions. See attached sizing calculations. Flow Control System (Part D) Conservation Flow Control King County Runoff Time Series Hydrologic Simulation Model computer program was used to size detention storage requirements and flow controls. Since the site is in Flow Control Duration Standard, Forested Conditions as defined as a Conservation Flow Control applied the historic Level 2 flow control standards by KCRTS, which match historic flow durations for 50% of 2-year peak flow up to the full 50-year peak flow and to match the 2-and I 0-yaer peak rates to the pre-developed levels. Historic data types and hourly time step options were used in calculations. Forested Conditions were used for pre-developed flow calculations. Storm water detention tank has been designed using three rows and header 8' diameter pipes with minimum storage volume of 11,069 cf and with a control structure with two orifices and top overflow. Small portion of the site and off-site improvements bypass detention facilities. This was mitigated by the oversizing detention facilities and including these areas in detention sizing. 42 Part D -Detention Tanks Design Calculations PREDEV.pks Flow Frequency Analysis LogPearson III coefficients Time Series File:predev.tsf Mean= -1. 712 stdDev= 0.234 Project Location:Sea-Tac skew= -0.163 ---Annual Peak Flow Rates--------Flow Frequency Analysis------- Flow Rate Rank Time of Peak --Peaks Rank Return Prob (CFS) (CFS) Period 0.024 16 2/16/49 22:00 0.054 1 89. 50 0.989 0.047 5 3/03/50 16:00 0.051 2 32.13 0.969 0.051 2 2/09/51 18:00 0.049 3 19. 58 0.949 0.016 32 1/30/52 9:00 0.047 4 14.08 0.929 0.012 41 1/18/53 20:00 0.047 5 10.99 0.909 0.018 28 1/06/54 4:00 0.039 6 9.01 0.889 0.032 9 2/07/55 21:00 0.038 7 7.64 0.869 0.027 13 12/20/55 17:00 0.034 8 6.63 0.849 0.021 21 12/09/56 15:00 0.032 9 5.86 0.829 0.022 20 1/16/58 20:00 0.032 10 5.24 0.809 0.018 24 1/24/59 2:00 0.031 11 4.75 0.789 0.034 8 11/20/59 21:00 0.028 12 4.34 0.769 0.019 23 2/24/61 16:00 0.027 13 3.99 0.749 0.011 44 1/02/62 22:00 0.026 14 3.70 0.729 0.015 36 11/25/62 15:00 0.025 15 3.44 0.709 0.018 25 1/01/64 14:00 0.024 16 3.22 0.690 0.013 39 11/30/64 12:00 0.024 17 3.03 0.670 0.014 38 1/06/66 3:00 0.023 18 2.85 0.650 0.031 11 1/19/67 14:00 0.023 19 2.70 0.630 0.019 22 2/03/68 23:00 0.022 20 2. 56 0.610 0.018 26 12/03/68 17:00 0.021 21 2.44 o. 590 0.015 34 1/13/70 23: 00 0.019 22 2.32 o. 570 0.012 42 12/06/70 8:00 0.019 23 2.22 0. 550 0.038 7 2/28/72 3:00 0.018 24 2.13 0. 530 0.017 29 1/13/73 5:00 0.018 25 2.04 0. 510 0.018 27 1/15/74 2:00 0.018 26 1.96 0.490 0.028 12 12/26/74 23:00 0.018 27 1.89 0.470 0.017 30 12/02/75 20:00 0.018 28 1.82 0.450 0.002 50 3/24/77 19: 00 0.017 29 1. 75 0.430 0.014 37 12/10/77 17: 00 0.017 30 1. 70 0.410 0.009 46 2/12/79 8:00 0.016 31 1.64 0. 390 0.024 17 12/15/79 8:00 0.016 32 1. 59 0.370 0.013 40 12/26/80 3:00 0.016 33 1. 54 0.350 0.023 18 10/06/81 15:00 0.015 34 1.49 0.330 0.023 19 1/05/83 8:00 0.015 35 1.45 0.310 0.015 35 1/24/84 12:00 0.015 36 1.41 0.291 0.007 47 2/11/85 6:00 0.014 37 1. 37 0.271 0.039 6 1/18/86 20:00 0.014 38 1. 33 0.251 0.032 10 11/24/86 4:00 0.013 39 1. 30 0.231 0.012 43 1/14/88 12: 00 0.013 40 1. 27 0.211 0.007 48 12/30/88 6:00 0.012 41 1.24 0.191 0.054 1 1/09/90 9:00 0.012 42 1.21 0.171 0.047 4 4/05/91 2:00 0.012 43 1.18 0.151 0.016 33 1/27/92 17:00 0.011 44 1.15 0.131 0.016 31 3/22/93 23:00 0.009 45 1.12 0.111 0.004 49 2/17/94 20:00 0.009 46 1.10 0.091 0.025 15 2/19/95 20:00 0.007 47 1.08 0.071 0.049 3 2/09/96 1:00 0.007 48 1.05 0.051 0.026 14 1/02/97 9:00 0.004 49 1.03 0.031 0.009 45 1/07/98 9:00 0.002 50 1.01 0.011 Computed Peaks 0.064 100.00 0.990 Computed Peaks 0.056 50.00 0.980 Computed Peaks 0.048 25.00 0.960 computed Peaks 0.038 10.00 0.900 computed Peaks 0.036 8.00 0.875 computed Peaks 0.031 5.00 0.800 Page 1 Computed Peaks Computed Peaks PREDEV.pks 0.020 0.013 Page 2 2.00 0.500 1.30 0.231 DEV.pks Flow Frequency Analysis LogPearson III Coefficients Time Series File:dev.tsf Mean= -0.826 StdDev= 0.100 Project Location:Sea-Tac skew= 0.489 ---Annual Peak Flow Rates--------Flow Frequency Analysis------- Flow Rate Rank Time of Peak --Peaks --Rank Return Prob (CFS) (CFS) Period 0.151 20 2/16/49 21:00 0.252 1 89. 50 0.989 0.230 4 3/03/50 16:00 0.243 2 32.13 0.969 0.151 21 2/09/51 2:00 0.235 3 19. 58 0.949 0.127 38 10/15/51 13:00 0.230 4 14.08 0.929 0.118 44 3/24/53 15:00 0.217 5 10.99 0.909 0.141 28 12/19/53 19:00 0.213 6 9.01 0.889 0.149 22 11/25/54 2:00 0.195 7 7.64 0.869 0.144 24 11/18/55 15:00 0.195 8 6.63 0.849 0.167 16 12/09/56 14:00 0.182 9 5.86 0.829 0.149 23 12/25/57 16:00 0.177 10 5.24 0.809 0.114 47 11/18/58 13: 00 0.176 11 4.75 0.789 0.144 25 11/20/59 5:00 0.176 12 4.34 0.769 0.126 39 2/14/61 21:00 0.175 13 3.99 0.749 0.128 37 11/22/61 2:00 0.172 14 3.70 0.729 0.126 40 12/15/62 2:00 0.168 15 3.44 0.709 0.144 26 12/31/63 23:00 0.167 16 3.22 0.690 0.129 36 12/21/64 4:00 0.163 17 3.03 0.670 0.130 35 1/05/66 16:00 0.162 18 2.85 0.650 0.195 7 11/13/66 19: 00 0.158 19 2.70 0.630 0.213 6 8/24/68 16:00 0.151 20 2.56 0.610 0.119 43 12/03/68 16:00 0.151 21 2.44 0. 590 0.130 34 1/13/70 22: 00 0.149 22 2.32 0. 570 0.124 41 12/05/70 9:00 0.149 23 2.22 0.550 0.182 9 2/27/72 7:00 0.144 24 2.13 0. 530 0.117 46 1/13/73 2:00 0.144 25 2.04 0.510 0.133 32 11/28/73 9:00 0.144 26 1.96 0.490 0.176 12 12/26/74 23:00 0.143 27 1.89 0.470 0.117 45 12/02/75 20:00 0.141 28 1.82 0.450 0.143 27 8/26/77 2:00 0.136 29 1. 75 0.430 0.195 8 9/17/78 2:00 0.136 30 1. 70 0.410 0.175 13 9/08/79 15:00 0.134 31 1. 64 0.390 0.163 17 12/14/79 21:00 0.133 32 1. 59 o. 370 0.176 11 11/21/80 11: 00 0.133 33 1. 54 0. 350 0.243 2 10/06/81 0:00 0.130 34 1.49 0. 330 0.177 10 10/28/82 16:00 0.130 35 1.45 0.310 0.136 29 1/03/84 1:00 0.129 36 1.41 0.291 0.122 42 6/06/85 22:00 0.128 37 1. 37 0.271 0.162 18 1/18/86 16:00 0.127 38 1. 33 0.251 0.217 5 10/26/86 0:00 0.126 39 1.30 0.231 0.102 49 11/11/87 0:00 0.126 40 1.27 0.211 0.133 33 8/21/89 17:00 0.124 41 1.24 0.191 0.252 1 1/09/90 6:00 0.122 42 1.21 0.171 0.235 3 11/24/90 8:00 0.119 43 1.18 0.151 0.134 31 1/27/92 15:00 0.118 44 1.15 0.131 0.093 50 11/01/92 16:00 0.117 45 1.12 0.111 0.107 48 11/30/93 22:00 0.117 46 1.10 0.091 0.136 30 11/30/94 4:00 0.114 47 1.08 0.071 0.168 15 2/08/96 10:00 0.107 48 1.05 0.051 0.158 19 1/02/97 6:00 0.102 49 1.03 0.031 0.172 14 10/04/97 15:00 0.093 50 1.01 0.011 Computed Peaks 0.277 100.00 0.990 computed Peaks 0.254 50.00 0.980 computed Peaks 0.232 25.00 0.960 computed Peaks 0.203 10.00 0.900 computed Peaks 0.197 8.00 0.875 computed Peaks 0.180 5.00 0.800 Page 1 computed Peaks Computed Peaks DEV.pks 0.147 0.125 Page 2 2 .00 0. 500 1.30 0.231 47 Retention/Detention Facility Type of Facility: Tank Diameter: Tank Length: Effective Storage Depth: Stage O Elevation: Storage Volume: Riser Head: Riser Diameter: Number of orifices: Detention Tank 8.00 ft 226.10 ft 7. 50 ft 359.44 ft 11069. cu. ft 7. 5 6 ft 18.00 inches 2 Full Head Pipe Orifice# Height (ft) 0.00 5.63 Diameter (in) 0.41 l. 04 Discharge (CFS) Diameter (in) 1 2 Top Notch Weir: None Outflow Rating Curve: None 0. 013 0.041 4.0 Stage (ft) 0.00 0.01 0.02 0.03 0.06 0.19 0.32 0.44 0.57 0.70 0.83 0. 96 l. 09 l. 21 l. 34 1. 47 1. 60 1. 73 1. 85 1. 98 2 .11 2.24 2.37 2.49 2.62 2.75 2.88 3.01 3.14 3.26 Elevation Storage Discharge (ft) 359.44 359.45 359.46 359.47 359.50 359.63 359.76 359.88 360.01 360.14 360.27 360.40 360.53 360.65 360.78 360.91 361. 04 361.17 361.29 361. 42 361. 55 361.68 361.81 361. 93 362. 06 3 62 .19 362.32 3 62. 45 362. 58 362.70 (cu. ft) (ac-ft) 0. 0. 000 0. 0. 0. 0. 120. 253. 384. 536. 697. 865. 1040. 1222. 1395. 1588. 1786. 1989. 2196. 2391. 2605. 2823. 3043. 3267. 3475. 3702. 3932. 4163. 4395. 4629. 4845. 0.000 0.000 0.000 0.000 0.003 0.006 0.009 0.012 0.016 0.020 0.024 0.028 0.032 0.036 0.041 0.046 0.050 0.055 0.060 0.065 0.070 0.075 0.080 0.085 0.090 0. 096 0.101 0.106 0 .111 (cfs) 0.000 0.001 0.001 0.001 0.001 0.002 0.003 0.003 0.003 0.004 0.004 0.004 0.005 0.005 0.005 0.006 0.006 0.006 0.006 0.006 0.007 0.007 0.007 0.007 0.007 0.008 0.008 0.008 0.008 0.008 Percolation (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.39 362.83 5079. 0 .117 0.008 0.00 3.52 362. 96 5314. 0.122 0.009 0.00 3.65 363.09 5550. 0.127 0.009 0.00 3.78 363.22 5785. 0.133 0.009 0.00 3.90 363.34 6001. 0 .138 0.009 0.00 4.03 363.47 6235. 0.143 0.009 0.00 4.16 363.60 6468. 0.148 0.009 0.00 4.29 363.73 6700. 0.154 0.009 0.00 4.42 363.86 6930. 0.159 0.010 0.00 4.54 363.98 7142. 0.164 0.010 0.00 4.67 364 .11 7369. 0.169 0.010 0.00 4.80 364.24 7593. 0 .174 0.010 0.00 4.93 364.37 7816. 0.179 0.010 0.00 5.06 364.50 8035. 0.184 0.010 0.00 5.19 364.63 8251. 0.189 0.010 0.00 5.31 364.75 8448. 0.194 0. 011 0.00 5.44 364.88 8658. 0.199 0. 011 0.00 5.57 365.01 8863. 0.203 0. 011 0.00 5.63 365.07 8956. 0.206 0. 011 0.00 5.64 365.08 8972. 0.206 0. 011 0.00 5.65 365.09 8987. 0.206 0.012 0.00 5.66 365.10 9003. 0.207 0.013 0.00 5.67 365 .11 9018. 0.207 0.014 0.00 5.68 365.12 9033. 0.207 0.016 0.00 5.69 365.13 9049. 0.208 0.018 0.00 5.70 365.14 9064. 0.208 0.019 0.00 5.71 365.15 9079. 0.208 0.020 0.00 5.72 365.16 9095. 0.209 0.020 0.00 5.85 365. 29 9290. 0.213 0.025 0.00 5.98 365.42 9480. 0.218 0.029 0.00 6.11 3 65. 55 9664. 0.222 0.032 0.00 6.24 3 65. 68 9842. 0.226 0.034 0.00 6.36 3 65. 80 10000. 0.230 0.037 0.00 6.49 365.93 10164. 0.233 0.039 0.00 6.62 366.06 10320. 0.237 0.041 0.00 6.75 366.19 10467. 0.240 0.043 0.00 6.88 366.32 10604. 0.243 0.045 0.00 7.00 366. 44 10720. 0.246 0.047 0.00 7.13 366.57 10833. 0.249 0.048 0.00 7.26 366.70 10931. 0.251 0.050 0.00 7.39 366.83 11010. 0.253 0.051 0.00 7.52 366. 96 11062. 0.254 0.053 0.00 7.56 367.00 11069. 0.254 0.053 0.00 7.66 367.10 11069. 0.254 0.516 0.00 7.76 367.20 11069. 0.254 1. 360 0.00 7.86 367.30 11069. 0.254 2. 460 0.00 7. 96 367.40 11069. 0.254 3.750 0.00 8.06 367.50 11069. 0.254 5.220 0.00 8.16 367.60 11069. 0.254 6.650 0.00 8.26 367.70 11069. 0.254 7.180 0.00 8.36 367.80 11069. 0.254 7.670 0.00 8.46 367.90 11069. 0.254 8.140 0.00 8.56 368.00 11069. 0.254 8.570 0.00 8.66 368.10 11069. 0.254 8.990 0.00 49 8.76 368.20 11069. 0.254 9.390 0.00 8.86 368.30 11069. 0.254 9.770 0.00 8. 96 368.40 11069. 0.254 10.140 0.00 9.06 368.50 11069. 0.254 10. 4 90 0.00 9.16 368.60 11069. 0.254 10.830 0.00 9.26 368.70 11069. 0.254 11. 160 0.00 Hyd Inflow Outflow Peak Storage Target Cale Stage Elev (Cu-Ft) (Ac-Ft) 1 0.15 ******* 0.06 7.56 367.00 11069. 0.254 2 0.17 0.05 0.05 7.07 366.51 10785. 0.248 3 0.18 ******* 0.05 6.94 366.38 10665. 0.245 4 0.23 ******* 0.04 6.56 366.00 10250. 0.235 5 0.14 ******* 0.03 6.20 365.64 9784. 0.225 6 0.22 ******* 0.03 5.90 365.34 9366. 0.215 7 0.13 ******* 0.01 4.40 363.84 6901. 0.158 8 0.10 ******* 0.01 3.55 362.99 5362. 0.123 ---------------------------------- Route Time Series through Facility Inflow Time Series File:dev.tsf Outflow Time Series File:RDOOT Inflow/Outflow Analysis Peak Inflow Discharge: 0.252 CFS at 6:00 on Jan 9 in 1990 Peak Outflow Discharge: 0.057 CFS at 19:00 on Feb 9 in 1951 Peak Reservoir Stage: 7.56 Ft Peak Reservoir Elev: 367.00 Ft Peak Reservoir Storage: 11069. Cu-Ft 0.254 Ac-Ft Flow Duration from Time Series File:rdout.tsf Cutoff Count Frequency CDF Exceedence Probability CFS % % % 0.001 211361 48.256 48.256 51. 744 0.517E+OO 0.002 43509 9.934 58.189 41.811 0.418E+OO 0.004 54895 12.533 70. 723 29.277 0.293E+00 0.006 54769 12.504 83.227 16.773 0.168E+OO 0.007 46918 10. 712 93.939 6.061 0.606E-01 0.009 14537 3.319 97.258 2.742 0.274E-01 0.010 10653 2.432 99.690 0.310 0.310E-02 0.012 913 0.208 99.898 0.102 0.102E-02 0.013 30 0.007 99.905 0.095 0.947E-03 0.015 22 0.005 99.910 0.090 0.897E-03 0.016 14 0.003 99. 913 0.087 0.865E-03 0.018 6 0.001 99.915 0.085 0.852E-03 0.020 22 0.005 99.920 0.080 0. 801E-03 0.021 45 0.010 99.930 0.070 0.699E-03 0.023 31 0.007 99.937 0.063 0.628E-03 0.024 25 0.006 99.943 0.057 0.571E-03 0.026 23 0.005 99.948 0.052 0.518E-03 0.027 20 0.005 99.953 0.047 0.473E-03 0.029 18 0.004 99.957 0.043 0.432E-03 50 0.031 26 0.006 99. 963 0.037 0.372E-03 0.032 17 0.004 99. 967 0.033 0.333E-03 0.034 39 0.009 99.976 0.024 0.244E-03 0.035 17 0.004 99.979 0.021 0.205E-03 0.037 16 0.004 99.983 0. 017 0.169E-03 0.038 15 0.003 99.987 0.013 0 .135E-03 0.040 15 0.003 99.990 0.010 O.lOOE-03 0.042 11 0.003 99. 992 0.008 0.753E-04 0.043 10 0.002 99.995 0.005 0.525E-04 0.045 4 0.001 99.996 0.004 0.434E-04 0.046 8 0.002 99.997 0.003 0.251E-04 0.048 5 0.001 99.999 0.001 0 .137E-04 0.049 2 0.000 99.999 0.001 0. 913E-05 0.051 2 0.000 100.000 0.000 0.457E-05 0.053 0 0.000 100.000 0.000 0.457E-05 0.054 1 0.000 100.000 0.000 0.228E-05 0.056 0 0.000 100.000 0.000 0.228E-05 51 COMPARE.prn Duration comparison Anaylsis Base File: predev.tsf New File: rdout.tsf cutoff units: Discharge in CFS cutoff 0.010 0.013 0.017 0.020 0.023 0.027 0.030 0.034 0.037 0.040 0.044 0.047 0.050 0.054 -----Fraction of Time--------------check of Tolerance------- Base New %change Probability Base New %Change 0.93E-02 0.98E-02 5.1 I 0.93E-02 0.010 0.010 0.1 0.50E-02 0.95E-03 -81.1 I 0.50E-02 0.013 0.010 -24.6 0.28E-02 0.86E-03 -68.9 I 0.28E-02 0.017 0.011 -35.8 0.17E-02 0.77E-03 -55.3 I 0.17E-02 0.020 0.011 -45.2 O.llE-02 0.60E-03 -42.9 I O.llE-02 0.023 0.011 -52.3 0.67E-03 0.49E-03 -27.8 I 0.67E-03 0.027 0.022 -19.6 0.44E-03 0.39E-03 -11.3 I 0.44E-03 0.030 0.029 -4.9 0.31E-03 0.26E-03 -15.7 I 0.31E-03 0.034 0.033 -2.6 0.21E-03 0.17E-03 -21.3 I 0.21E-03 0.037 0.035 -5.6 0.12E-03 0.94E-04 -22.6 I 0.12E-03 0.040 0.039 -3.3 0.59E-04 0.48E-04 -19.2 I 0.59E-04 0.044 0.042 -2.7 0.34E-04 0.23E-04 -33.3 I 0.34E-04 0.047 0.045 -3.2 0.91E-05 0.68E-05 -25.0 I 0.91E-05 0.050 0.050 -0.8 0.23E-05 0.23E-05 0.0 I 0.23E-05 0.054 0.057 5.5 Maximum positive excursion= 0.005 cfs ( 9.3%) occurring at 0.052 cfs on the Base Data:predev.tsf and at 0.057 cfs on the New Data:rdout.tsf Maximum negative excursion= 0.012 cfs (-52.7%) occurring at 0.024 cfs on the Base Data:predev.tsf and at 0.011 cfs on the New Data:rdout.tsf Page 1 52 Water Quality System (Part E) Enhanced Basic Water Quality Menu The Enhanced Basic Treatment WQ menu is designed to achieve 50 percent total zinc removal. Sizing meets WA DOE 2009 Stormwater Manual's 91 % annual stormwater volume filtered since Filterra are located upstream of detention. Water quality design flow has been sized by WWHM as required by Filterra recommendation. Sand filter design option has been used with input data: • filter material depth I . 8' • effective ponding depth 0.75' • riser height 0.7' • filter conductivity 24.82 inches per hour Three 4x4 and one 4x6 Filterra Box Sizes were with bypass have been designed. 53 Part E -Water Quality Treatment Design Calculations 54 DRAINAGE AREAS FOR Fil TERRA DESIGN DRAINAGE IMPERV. AREAS (AC) PERV. (AC) TOTAL (AC) Fl 0.086 F2 0.160 F3 0.100 F4 0.098 ----- '" CD ;~~i~ .. ?~~INAGE AREA FOR FILTERRA DESIGN 55 ~le ;d-; ' Help Schematic r Predeveloped ~~Iii ·iillt!! ~-~ ~ ~ Move Elements ·1J~ Save x,y I Load x,y I X to I y i3CI I ~ -=-I I ~ ;I 1@1-1.ID 15 · Sand Filter 1 Mitigated .----..-------Fa ci Ii ty Name IFi1terra F 1 I Outlet 1 Outlet 2 Outlet 3 Downstream Connections 1----i lo I lo I lo I 1----1 Facility Type r Precipitation Applied to F aciay r Evtp0rationApplied to Faci;il Is and Fiter I Quickfilter Facility Bottom Elevation (tt) O '------------' Facility Dimensions Bottom Length ~1 .. --~1 f----\BottomWidlh 14 I Effective Depth lo. 75 I Left Side Slope 10 I 1----1 Bottom Side Slope IO I Righi Side Slope IO ·1 Top Side Slope 10 I ---+---1 lnfittration ~ -:1 Hydraulic Conooctivitl'(in/hr) Filter material depth(ft) Total Volume Fihrated(acre4t) I T otalVolume Through Riser(acre-ft) Total Volume [acre4t) Percent Flilered ill Outlet Structure Rise! Height [ft) ~ -:1 Rise< Diameter[in) r,oo--:1 Rise, Type Notch Type Orifice !Fiat -:1 Diameter Height OMu.x l24.82 -:1 Number (In) (Ft) (ds) 1 lo -:1 ro--:-1 0 ha -:-1 2 lo -:-1 lo -:-1 0 11.726 3 lo -:-1 ro--:-1 0 0.303 12.029 Filer Storage Volume at Riser Head .000 97.48 Pond ll'IC/ement lo.io -:1 Show Pond Table jOpen Table -:-1 56 -~ ~le~d-; Help ..... -=-...=. - ID Schematic i:i, Sand Filter 2 Mitigat•d I Predeveloped ~~Iii iill!!I ~Ii~ n ~ · Move Elements ·t~ Save x,y I Load x,y I X 120 I y [2 Facility Nn.me [Fllterra F2 Outlet 1 Outlet 2 Outlet l 1 1 Downstream Connections [o I [o I l~o ---~ Facility Type [sanct Filler [ r Precipitation Applied to Faciity Quick Filter I Ir Evlll)O(.Appied to Faciiy Facility Bottom Elevation (ft) o ~---------~ Facility Dimensions ------, Bottom Length jl=B=====i Bottom Width j.t ~=====i Effective Depth j!lr.! Lett Side Slope "=jo=====i "t-------, Bottom Side Slope j!l ~==9 R91! Side Slope jo Top Side Slope jO I /---+---1 ~-~ Infiltration iYEs -:-1 H)ldrdc Conductiv~y(in/hr] 124.82 -:-1 Filer material depth(ft) T otaf Volume Filtrated(acie.ft] 1------1----1-----1 Total Volume Through Riser(acre-ltJ T otaf Volume (acre-It] Percent Filtered ~ _J ~ -:-1 20.421 1.02 21.441 95.24 Outlet Structure Riser Height (It] [a.? -:--J Riser Diameter(in] r,oo---:--J Riser Type Notch Type /Flat -:-1 Orifice Diameter Height OMlllC Number (In) (Ft) (ds) 1 ro--:-1 ro--:-1 0 2 ro--:-1 ro--:-1 0 3 ro--:-1 ro---;-J 0 Filer Storage Volume at Riser Head .000 Pond Increment [iiTrJ"° -:--J Show Pond Table lopen Table ...:..J . ' 57 --~ie~d-; HelF ~"'; ~ -=-ID Schematic d:, Sand Filter 3 Mitigated I SCENARIOS I Facility Name r Piedeveloped Downstream Connections ,;-----; Facility Type r Precipitation Applied to Facility 1 r Evaporll!i!l(IAppli<,d tofdio - [Fiterra F3 OuUet 1 OuUet 2 Outlet 3 10 11° 11° I 1Sandfliter I Quick Filter ~~Iii liillt!! ~Ii~ Facility Bottom Elevation (ft) O '--------------' n ~ Move Elements ·!~ Save •-Y J Load •.y J x 160 I y 00 Facility Dimensions , I Bottom Length "'14-.. --~ t J Bottom Width 14 ~-==i Effective Depth jll75 as====i Left Side Slope IO .,_ ___ Bottom Side Slope a=IO=====i Righi Side Slope @ . I 1---· ,-----+-----t Top Side Slope jO I Infiltration !YES --;-J Hyckaulic Conductivity{in/tv) Filter material depth(ft) Total Volume Filtrated(acre-ft) 1 Total Volume Ttvough R iser(acie4t) Total Volume (acie-lt) Percent Fitered ~ __J Outlet Structure Riser Height (ft) ~ --:-J Riser Diameter{in) ~ --:-J Riser Type iFlal --:-J Notch Type Orifice i24.82 --;-J Number Diameter Height OM6X rs---;-J 12.279 0.468 12.748 96.32 (In) (Ft) (cfs) 1 ro---;-j ro---;-j 0 2 ro---;-j ro---;-j 0 3 ro---;-j ro---;-j 0 Filter Storage Volume at Riser Head .000 Pond Increment [o.io --;-J Show Pond Tnble iDpen Table ...,J • I 58 -Fde fd,t Help D~I..~. Schematic , Predeveloped ~~Iii iillt!J ~Ii~ n ~ Move Elements ·!~ Save x.y ! Load x.y I X 160 I v rra '~ .---...,...----,---.,......, -=- ti"· Sand Filter 4 Mitigated Facility Name Downstream Connections Facility Type r Precipitation Applied to F aciity r Ev..-elionApptied to Facily -"' l".IILID [Filerra F 4 OuUet 1 OuUet 2 OuUet 3 10 110 I~ IS and Filter I Q_uick Filter 1----+-I Facility Bottom Elevation (ft) o ~----------~ Facility Dimensions Bottom Length I• ~ I BottomWdh I• Effective Depth 10.75 Lelt Side Slope 10 Bottom Side Slope 10 Right Side Slope 10 Top Side Slope 10 Infiltration /YES -;1 H)'drdc CorKluctiv~JllivhrJ Filter material depth(ft) Total Volume Filtrated(acre-ft) 1 I Total Volume Through Riser(acie-ft) T otaf Volume (acie4t] Percent Filtered _!.] _J I I I I I I /24 82 -:--j r,:a--:--1 12.001 0.43 12.491 96.56 OuUet Structure Riser Height (ftJ .-,o-=.7---;1 Riser Diameler(in) /loo -;1 R iser Type / Fial -:--J Notch Type Orifice Diameter Height OMllX Number (In) (Ft) (cfs) 1 ro--;1 ro--;1 D 2 ro--;1 /0 -;1 D 3 lo -;1 lo -;1 D Filter Storage Volume at Riser Head .000 Pond Increment lo 10 -;1 Show Pond Table fopen Table -;1 59 SECTION 5 -CONVEYANCE SYSTEM ANALYSIS AND DESIGN On-site conveyance system was sized using Rational Method as described in KCWSDM Section 3.2.1. Storm and Sanitary Analysis Extension software of Autodesk Civil 3d software was used for design calculations. Pipe system has been designed using backwater analysis to convey the 25-year peak flows and checked if I 00-year peak flow would not cause severe flooding or erosion problems. All new pipes have been sized to have a minimum slope of 0.5%. Flow velocities are greater than the minimum full flow velocity per SWDM of 3.0 FPS. Pipes shall be HDPE Lined Corrugated Polyethylene Pipe (LCPE). 60 Section 5 -Conveyance System Calculations 61 __,__------~~----~= ~---r------------------~==--~~---r,:;:=:;;:.::--..;.-,....-- -~-~--11 -------,· ----~-,1 __.----~ --------·;/· - ----~---~-:_-:-:-~-~--- /~--~,,:------· . . /:,-?· -· -// ~-----------~·-·-/ ,(/ // I ! / ---~==---~ I / ~ _/ _.,..,,~/ ---. --- ' . -·· ......... / -<'}------------ / I \ \ 62 213087 Wendy's on Carr Road, Renton Project Options Flow Units. CFS Elevation Type.. Elevation Hydrology Method ............................................................... Rational Time of Concentration (TOC) Method User-Defined Link Routing Method . . ................................ Kinematic Wa110 Enable Overflow Ponding at Nodes ...................................... YES Skip Steady State Analysis Time Periods . NO Number of Elements Rain Gages .. Subbasins .. Nodes .. Junctions .. Outfalls. Flow Diversions .. Inlets .. Storage Nodes .. Links .. Channels. Qty .. ····· ................................. 0 . ................................. 6 14 12 2 0 0 0 12 0 Pipes.. 12 Pumps.. O Orif,ces .. O we.rs.. o Outlets.. 0 Pollutants ............................................................................. O Land Uses.. O Rainfall Details Return Period .. 25 year(s) 25 year storm 213087 Wendy's on Carr Road, Renton 25 year storm Subbasin Summary SN Subbasin Area Weighted Total Total Total Peak Time of ID Runoff Rainfall Runoff Runoff Runoff Concentration Coefficient Volume (acj (inl (inj iac-inj ,cfsj ,days hh:mm:ss) 1 DA1 0.12 0.7000 0.29 0.20 0.02 0.24 0 00.06:18 2 DA2 0.10 0.8200 0.29 0.24 0.02 0.22 o oo:os:1s 3 DA3 0.19 0.8000 0.29 0.23 0.04 0.42 0 00:06:18 4 OA4 0.12 0.8100 0.29 0.23 0.03 0.26 0 00:06:18 5 DAS 0.11 0.8200 0.29 0.24 0.03 0.25 0 00:06:18 6 DAB 0.02 0.7400 0.29 0.21 0.01 0.05 0 00:06:18 Pag~of14 213087 Wendy's on Carr Road, Renton 25 year storm Node Summary SN Element Element lnYert Ground/Rim Peak Max HGL Min ID Type Elevation (Max) Inflow Elevation Freeboard EleYation Attained Attained (ftl (ftl [cfsJ (ftl (ft} 1 CB-1 Junction 359.40 369.66 1.40 359.91 9.75 2 CB-2 Junction 359.49 370.63 1.50 360.02 10.61 3 CB-3 Junction 366.22 370.31 1.34 366.57 3.74 4 CB-4 Junction 367.52 371.99 0.86 367.86 4.13 5 CB-5 Junction 367.78 371.89 045 368.10 3.80 6 CB-6 Junction 367.89 372.30 0.41 368.13 4.17 7 CB-7 Junction 366.30 369.98 0.50 366.65 3.33 8 F1 Junction 367.98 371.81 0.24 368.17 3.64 9 F2 Junction 368.18 372.01 0.41 368.43 3.58 10 F3 Junction 366.43 370.26 0.26 366.63 3.63 11 F4 Junction 366.67 370.50 0.25 366.82 3.68 12 OUT OET Junction 359.52 370.63 1.34 359.86 10.77 13 EX CB Outfall 359.00 1.39 359.61 14 IN OET Outfall 365.50 1.34 365.72 Pag~~ of 14 213087 Wlfldy's oo Car Road, Re.., 25year- Link Summary SN E-Elomont film To (°'1111) ~ lnot Olilet A-Diametlr ~ Malllingt Peak Dllign Flow Peak Fk>w/ Put Flow Ptak Fkro Peak Fkro ID TY!II OnlllJ Node lmllt hNllt Slope Heqi Roughnea Fbw C,paciy Design Fkro Velocity llejj!I lleph/ Nole EOYllionElevalion Ratio Tolllile¢1 Ratio l!l l!l l!l I!} [•I lclsl iclsl ~ l!l 1 SD-1 Pipe CS.1 EXCB 611.16 35140 351.10 0.5IXMI 12.000 0.01211 1.39 2.73 051 3.49 0.51 0.51 2 SD-10 Pipe CS.7 CB-3 15.62 366.311 36622 0.5IXMI 8.000 0.01211 0.50 0.92 0.54 2.71 0.36 0.52 3 SD-11 Pipe Fl CS.7 11.08 366.67 3611.311 33700 8.000 0.01211 0.25 2.40 0.10 4.45 Q15 022 4 SD-12 Pipo F3 CS.I 1328 366.43 366.311 1.000Q 8.000 0.01211 01! 1.31 0.19 2.91 020 0.311 5 Sl).l Pipo ~ CS.1 18.01 351.49 359.40 0.5000 12.000 0.01211 1.40 2.73 0.51 3.63 0.52 0.52 6~ Pipo OUTDET~ 5.1111 359.52 351.49 0.581111 36.000 0.01211 1.50 5!.03 0.03 3.39 0.34 0.11 7 SD-4 Pipo CB-3 tHJEI' 6.73 36622 365.50 10.1111111 12000 0.01211 1.34 1262 0.11 10.47 022 022 8SO. Pipo CB-4 CB-3 79.57 367.52 36622 1.6400 8.000 0.01211 0.85 !Bl 0.51 4.81 0.34 0.50 9SD-9 Pipo C8-8 CB-4 43.36 367.78 367.52 0.60IIII 8.000 0.01211 D.45 1.01 0.44 2.84 0.31 0.47 10 SD-7 Pipo Ft C8-8 19.74 367S8 367.78 1.000Q 8.000 0.01211 023 1.31 0.18 3.1111 0.19 029 11 SO,l Pipe cu CB-4 29.76 367B9 367.52 1221111 8.000 0.01211 0.41 1.45 028 3.58 024 0.36 12 SD-9 Pipo F2 cs.a 24.54 311.18 367.69 120IIII 8.IIIIO 0.01211 0.41 1.43 D29 3.77 024 037 213087 Subbasln Hydrology Subbasin : DA 1 Input Data Area (ac) . 0.12 Weighted Runoff Coefficient ...................... 0.7000 Subbasin Runoff Results Total Rainfall (in) ................................... 0.29 Total Runoff (in) ......................................... 0.20 Peak Runoff (cfs) ........................................ 0.24 Rainfall Intensity ...................................... 2.734 Weighted Runoff Coefficient ...................... 0.7000 Time of Concentration (days hh:mm:ss) ..... O 00:06:18 Wendy's on Carr Road, Renton 25 year storm 67 Page 5 of 14 213087 Subbasin : DA2 Input Data Area (ac) ........................ . Weighted Runoff Coefficient . Subbasin Runoff Results 0.10 0.8200 Total Rainfall (in) .................................. 0.29 Total Runoff (in) 0.24 Peak Runoff (cfs) .. 0.22 Rainfall Intensity .......................................... 2.734 Weighted Runoff Coefficient. 0.8200 Time of Concentration (days hh:mm:ss) ..... 0 00:06:18 Wendy's on Carr Road, Renton 25 year storm Pag\\ of 14 213087 Subbasin : DA3 Input Data Area (ac) 0.19 Weighted Runoff Coefficient ....................... 0.8000 Subbasin Runoff Results Total Rainfall (in) -····· ......................... 0.29 Total Runoff (in). 0.23 Peak Runoff (cfs) ........................................ 0.42 Rainfall Intensity ......................................... 2.734 Weighted Runoff Coefficient ................ 0.8000 Time of Concentration (days hh:mm:ss) ..... O 00:06:18 Wendy's on Carr Road, Renton 25 year storm Pa:~of14 213087 Subbasin : DA4 Input Data Area (ac) . Weighted Runoff Coefficient .. Subbasin Runoff Results 0.12 0.8100 Total Rainfall (in) ......................................... 0.29 Total Runoff {in). 0.23 Peak Runoff (cfs). 0.26 Rainfall Intensity.. 2.734 Weighted Runoff Coefficient.. 0.8100 Time of Concentration (days hh:mm:ss) ..... O 00:06:18 Wendy's on Carr Road, Renton 25 year storm 213087 Subbasin : DAS Input Data Area (ac) Weighted Runoff Coefficient. Subbasin Runoff Results Total Rainfall (in). Total Runoff (in). Peak Runoff {cfs). 0.11 0.8200 ········· 0.29 0.24 0.25 Rainfall Intensity.. . ............... 2.734 Weighted Runoff Coefficient.. 0.8200 Time of Concentration {days hh:mm:ss) ..... 0 00:06:18 Wendy's on Carr Road, Renton 25 year stem, PaJ\ of 14 213087 Subbasin : DA6 Input Data Area (ac) . Weighted Runoff Coefficient Subbasin Runoff Results 0.02 0.7400 Total Rainfall (in). 0.29 Total Runoff (in). 0.21 Peak Runoff (cfs) 0.05 Rainfall Intensity .. 2. 734 Weighted Runoff Coefficient. . .......... 0.7400 Time of Concentration {days hh:mm:ss) .... 0 00:06:18 Wendys on Carr Road, Renton 25 year storm Pag/~ of 14 213087 Wendy's on Carr Road, Renton 25 year storm Junction Input SN Element Invert Ground/Rim Ground/Rim Minimum ID Elevation (Max) (Max) Pipe Offset Cover ft ,n 1 CB-1 369.66 10.26 111.15 2 CB-2 359.49 370.63 11.14 97.67 3 CB-3 366.22 370.31 4.09 37.04 4 CB-4 367.52 371.99 4.46 45.57 5 CB-5 367.78 371.89 4.11 41.29 6 CB-6 367.89 372.30 4.42 44.98 7 CB-7 366.30 369.98 3.68 36.15 8 F1 367.98 371.81 3.83 37.96 9 F2 368.18 372.01 3.83 37.96 10 F3 366.43 370.26 3.83 37.96 11 F4 366.67 370.50 3.83 37.96 12 OUTOET 359.52 370.63 11.11 97.32 213087 Wendy's on Carr Road, Renton 25 year storm Junction Results SN Element Peak Peak Max HGL Max HGL ID Inflow Lateral Elevation Depth Inflow Attained Attained ~cfsl lcfsl !ftl lfll 1 CB-1 1.40 0.05 359.91 0.51 2 CB-2 1.50 0.00 360.02 0.53 3 CB-3 1.34 0.00 366.57 0.35 4 CB-4 0.86 0.00 367.86 0.34 5 CB-5 0.45 0.22 368.10 0.32 8 CB-6 0.41 0.00 368.13 0.24 7 CB-7 0.50 0.00 366.65 0.35 8 F1 0.24 0.24 368.17 0.19 9 F2 0.41 0.41 366.43 0.25 10 F3 0.26 0.26 366.63 0.20 11 F4 0.25 0.25 366.82 0.15 12 OUT OET 1.34 1.34 359.86 0.34 Pag/~ of 14 213087 Wendy's on Carr Road, Renton 25 year storm Pipe Input SN Element Length Inlet Outlet Total Average Pipe Pipe Manning's Entrance Exit/Bend Additional ID Invert Invert Drop Slope Shape Diameter or Roughness Losses Losses Losses Elevation Elevation Height ft " ,n 1 SD-1 359.40 359.10 12.000 0.0120 0.5000 0.5000 0.0000 2 SD-10 15.62 366.30 366.22 0.08 0.5000 CIRCULAR 8.040 0.0120 0.5000 0.5000 0.0000 3 SD-11 11.08 366.67 366.30 0.37 3.3700 CIRCULAR 8.040 0.0120 0.5000 0.5000 0.0000 4 SD-12 13.28 366.43 366.30 0.13 1.0000 CIRCULAR 8.040 0.0120 0.5000 0.5000 0.0000 5 SD-2 18.02 359.49 359.40 0.09 0.5000 CIRCULAR 12.000 0.0120 0.5000 0.5000 0.0000 6 SD-3 5.00 359.52 359.49 0.03 0.5800 CIRCULAR 36.000 0.0120 0.5000 0.5000 0.0000 7 SD-4 6.73 366.22 365.50 0.72 10.6900 CIRCULAR 12.000 0.0120 0.5000 0.5000 0.0000 8 SD-5 79.57 367.52 366.22 1.30 1.6400 CIRCULAR 8.040 0.0120 0.5000 0.5000 0.0000 9 SD-6 43.36 367.78 367.52 0.26 0.6000 CIRCULAR 8.040 0.0120 0.5000 0.5000 0.0000 10 SD-7 19.74 367.98 367.78 0.20 1.0000 CIRCULAR 8.040 0.0120 0.5000 0.5000 0.0000 11 SD-8 29.76 367.89 367.52 0.36 1.2200 CIRCULAR 8.040 0.0120 0.5000 0.5000 0.0000 12 SD-9 24.54 368.18 367.89 0.29 1.2000 CIRCULAR 8.040 0.0120 0.5000 0.5000 0.0000 Pag/fj or 14 213087 Wendy's on Carr Road, Renton 25 year storm Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Occurrence Ratio Total Depth Ratio {cfsl {da:z:§; hh:mmj lcfsl lftlsecl {min} 'ft} 1 SD-1 1.39 0 00:06 2.73 0.51 3.49 0.29 0.51 0.51 2 SD-10 0.50 0 00:06 0.92 0.54 2.71 0.10 0.35 0.52 3 SD-11 0.25 0 00:06 2.40 0.10 4.45 0.04 0.15 0.22 4 SD-12 0.25 0 00:06 1.31 0.19 2.91 0.08 0.20 0.30 5 SD-2 1.40 0 00:00 2.73 0.51 3.63 0.08 0.52 0.52 6 SD-3 1.50 0 00:00 55.03 0.03 3.39 0.02 0.34 0.11 7 SD-4 1.34 0 00:06 12.62 0.11 10.47 0.01 0.22 0.22 8 SD-5 0.85 0 00:07 1.68 0.51 4.86 0.27 0.34 0.50 9 SD-6 0.45 0 00:06 1.01 0.44 2.84 0.25 0.31 0.47 10 $0-7 0.23 0 00:06 1.31 0.18 3.00 0.11 0.19 0.29 11 SD-8 0.41 0 00:06 1.45 0.28 3.58 0.14 0.24 0.36 12 SD-9 0.41 0 00:06 1.43 0.29 3.77 0.11 0.24 0.37 76 Page 14 of 14 213087 Wendy's on Carr Road, Renton Project Options F!ow Units ........................... CFS Elevation Type .......... Elevation Hydrology Method ............................................................... Rational Time of Concentration (TOC) Method ......................... User4 Defined Link. Routing Method Kinematic Wave Enable Overflow Ponding at Nodes ...................................... YES Skip Steady State Analysis Time Periods . NO Number of Elements Qty 0 Rain Gages. Subbasins .. Nodes .. . .... ····························································· 6 Junctions .. Outfalls .. Flow Diversions . Inlets .. Storage Nodes .. Links. Channels .. Pipes .. Pumps .. Orifices .. wers .. Outlets. Pollutants. Land Uses. Rainfall Details Return Period .... 14 12 2 0 0 0 12 0 12 0 0 0 0 ·········· ......... 0 0 100 year(s) 100 year storm 77 Page 1 of 14 213087 Wendy's on Carr Road, Renton 100 year storm Subbasin Summary SN Subbasin Area Weighted Total Total Total Peak Time of ID Runoff Rainfall Runoff Runoff Runoff Concentration Coefficient Volume (ac) (inl (inl (ac-inl (cfs} (days hh:mm:ss) 1 DA1 0.12 0.7000 0.34 0.24 0.03 0.28 0 00:06:18 2 DA2 0.10 0.8200 0.34 0.28 0.03 0.26 0 00:06:18 3 DA3 0.19 0.8000 0.34 0.27 0.05 0.48 0 00:06:18 4 DA4 0.12 0.8100 0.34 0.27 0.03 0.30 0 00:06:18 5 DAS 0.11 0.8200 0.34 0.28 0.03 0.29 0 00:06:18 6 DA6 0.02 0.7400 0.34 0.25 0.01 0.06 0 00:06:18 Pagi~ of 14 213087 Wendy's on Carr Road, Renton 100 year stonn Node Summary SN Element Element Invert Ground/Rim Peak Max HGL Min ID Type Elevation (Max) Inflow Elevation Freeboard Elevation Attained Attained (ftl (ftl (cfs} (ftl (ftl 1 CB-1 Junction 359.40 369.66 1.63 359.96 9.70 2 CB-2 Junction 359.49 370.63 1.74 360.07 10.56 3 CB-3 Junction 366.22 370.31 1.57 366.60 3.70 4 CB-4 Junction 367.52 371.99 1.00 367.89 4.09 5 CB-5 Junction 367.78 371.89 0.53 368.13 3.77 6 CB-6 Junction 367.89 372.30 0.48 368.15 4.15 7 CB-7 Junction 366.30 369.98 0.59 366.68 3.29 8 F1 Junction 367.98 371.81 0.28 368.19 3.62 9 F2 Junction 368.18 372.01 0.48 368.45 3.56 10 F3 Junction 366.43 370.26 0.30 366.65 3.61 11 F4 Junction 366.67 370.50 0.29 366.83 3.67 12 OUT DET Junction 359.52 370.63 1.57 359.87 10.76 13 EXCB Outfall 359.00 1.63 359.66 14 INDET Outfall 365.50 1.57 365.74 Pa/e~ of 14 213087 Wendy's on car Road. Rtnton 1 Oil yur slDm1 Link Summary SNE-~frum Ta (Oullot) Lqlh Inlet Oullot Am,ie IAamlUr or Miming', Pok c.sign fow Puk fowl Peak Fow Peak Fow Peal Fow 10 Typo Onie!) Node Invert Invert Sk>pe Height Ro,ghnea fow Capacity c..gn Fow Velocity lleph Ooph/ Node EMlonEJevatio1 Ratio Totalileph Rao !!l !!l !!l l!l [ml ~ 1c111 I!!!! l!l 1 S0.1 Pipe CS-1 EXCB 00.16 359.40 359.10 0.5000 11000 0.0120 1.63 2.73 0.00 3.63 0~ 0.56 2 S0.10 Pipe CS-1 CB,J 15.62 366.311 36622 0.5000 8.000 0.0120 0.59 092 0.63 181 0.39 0.56 3 51).11 Pipe F4 CS-7 11.118 366.61 366.311 3.3100 8.000 0.0120 0.29 140 0.12 4.66 0.16 0.24 4 51).12 Pipe F3 CB-7 1328 366.43 366311 1.0000 8.000 0.0120 0.311 1.31 0.23 3.114 022 0.32 5 50,1 Pipe C8-2 CS-1 18.02 359.49 359.40 0.5000 12.000 0.0120 1.63 2.73 0.60 3.15 0.51 0.51 6 50,1 Pipe OUT DET C8-2 5.1111 359.52 359.49 0.581111 36.000 0.0120 1.14 55.03 0.03 3.69 0.36 0.12 7 51}4 Pipe C8-3 tlDET 6.73 36622 385.SO 10.691111 11000 0.0120 1.51 12.62 0.12 10.96 024 024 8SOo Pipe C8-4 C8-3 79.51 367.52 36622 1.6400 8.000 0.0120 1.1111 1.68 0.59 5.114 0.37 0.55 9 so., Pipe C8-3 C8-4 43.36 367.78 361.52 0.6111111 lOOO 0.0120 0.53 1.01 0.52 2.95 0.34 0.51 10 51).7 Pipe F1 C8-3 19.74 361SI 361.18 1.0000 lOOO 0.0120 027 1.31 021 3.10 021 0.31 11 5().9 Pipe C8-6 C8-4 29.76 361.19 361.52 1221111 lOOO 0.01211 0.4' 1.45 0.33 3.73 0.26 0.40 12 5().9 Pipe f2 C8-6 24.54 366.18 361.89 1.2111111 8.000 0.01211 0.4' 1.43 0.33 3.91 027 0.40 aoPag,4~14 213087 Subbasin Hydrology Subbasin : DA1 Input Data Area (ac) .................................................... 0.12 Weighted Runoff Coefficient ...................... 0.7000 Subbasin Runoff Results Total Rainfall (in) .. . ........................ 0.34 Total Runoff (in) ......................................... 0.24 Peak Runoff(cfs) .. . 0.28 Rainfall Intensity ....................................... 3.192 Weighted Runoff Coefficient ....................... 0.7000 Time of Concentration (days hh:mm:ss) ..... O 00:06:18 Wendy's on Carr Road, Renton 100 year storm Pag~\ of 14 213087 Subbasin : DA2 Input Data Area (ac). Weighted Runoff Coefficient .. Subbasin Runoff Results Total Rainfall {in). Total Runoff {in) .. Peak Runoff (cfs). Rainfall Intensity . Weighted Runoff Coefficient .. Time of Concentration (days hh:mm:ss) 0.10 0.8200 0.34 0.28 0.26 3.192 0.8200 . 0 00:06:18 Wendy's on Carr Road, Renton 100 year storm 213087 Subbasin : DA3 Input Data Area (ac) .............. . Weighted Runoff Coefficient Subbasin Runoff Results 0.19 0.8000 Total Rainfall {in). . .................................. 0.34 Total Runoff (in) . 0.27 Peak Runoff (cfs) .. 0.48 Rainfall Intensity ........................................ 3.192 Weighted Runoff Coefficient. 0.8000 Time of Concentration (days hh:mm:ss) .. 0 00:06:18 Wendy's on Carr Road, Renton 100 year stonn 213087 Subbasin : DA4 Input Data Area (ac). 0.12 Weighted Runoff Coefficient ...................... 0.8100 Subbasin Runoff Results Total Rainfall (in) ......................................... 0.34 Total Runoff (in).. 0.27 Peak Runoff (cfs). 0.30 Rainfall Intensity ..................................... 3.192 Weighted Runoff Coefficient ....................... 0.8100 Time of Concentration (days hh:mm:ss) ..... O 00:06:18 Wendy's on Carr Road, Renton 100 year storm Pagt\of14 213087 Subbasin : DA5 Input Data Area (ac). Weighted Runoff Coefficient .. Subbasin Runoff Resu Its 0.11 0 8200 Total Rainfall (in) ......................................... 0.34 Total Runoff (in). 0.28 Peak Runoff(cfs). 0.29 Rainfall Intensity ..................................... 3.192 Weighted Runoff Coefficient. 0.8200 Time of Concentration (days hh:mm:ss) ..... 0 00:06:18 Wendy's on Carr Road. Renton 100 year storm 213087 Subbasin : DAS Input Data Area (ac). Weighted Runoff Coefficient . Subbasin Runoff Results 0.02 ····· 0.7400 Total Rainfall (in) ..................................... 0.34 Total Runoff (in) 0.25 Peak Runoff {cfs). 0.06 Rainfall Intensity.. 3.192 Weighted Runoff Coefficient ....................... 0.7400 Time of Concentration (days hh:mm:ss). . O 00:06:18 Wendy's on Carr Road, Renton 100 year storm PageSfb of 14 213087 Wendy's on Carr Road, Renton 100 year storm Junction Input SN Element Invert Ground/Rim Ground/Rim Minimum ID Elevation (Max) (Max) Pipe Elevation Offset Cover ft • ft in 1 CB-1 359.40 369.66 10.26 111.15 2 CB-2 359.49 370.63 11.14 97.67 3 CB-3 366.22 370.31 4.09 37.04 4 CB-4 367.52 371.99 4.46 45.57 5 CB-5 367.78 371.89 4.11 41.29 6 CB-6 367.89 372.30 4.42 44.98 7 CB-7 366.30 369.98 3.68 36.15 8 F1 367.98 371.81 3.83 37.96 9 F2 368.18 372.01 3.83 37.96 10 F3 366.43 370.26 3.83 37.96 11 F4 366.67 370.50 3.83 37.96 12 OUTOET 359.52 370.63 11.11 97.32 17 Page 11 of 14 213087 Wendy's on Carr Road, Renton 100 year storm Junction Results SN Element Peak Peak Max HGL Max HGL ID Inflow Lateral Elevation Depth Inflow Attained Attained lcfsl (cfsl 'fQ (ftl 1 CB-1 1.63 0.06 359.96 0.56 2 CB-2 1.74 0.00 360.07 0.58 3 CB-3 1.57 0.00 366.60 0.38 4 CB-4 1.00 0.00 367.89 0.37 5 CB-5 0.53 0.26 368.13 0.35 6 CB-6 o"" o.oo 368.15 0.26 7 CB-7 0.59 0.00 366.68 0.38 8 F1 0.28 0.28 368.19 0.21 9 F2 0.4" 0.4" 368.45 0.27 10 F3 0.30 0.30 366.65 0.22 11 F4 0.29 0.29 366.83 0.16 12 OUTDET 1.57 1.57 359.87 0.35 Page~of14 213087 Wendy's on Carr Road, Renton 100 year storm Pipe Input SN Element Length Inlet Outlet Total Average Pipe Pipe Manning's Entrance Exit/Bend Additional ID Invert Invert Drop Slope Shape Diameter or Roughness Losses Losses Losses Elevation Elevation Height " " In 1 SD-1 359.10 12.000 0.0120 0.5000 0.5000 0.0000 2 SD-10 366.22 8.040 0.0120 0.5000 0.5000 0.0000 3 SD-11 11.08 366.67 366.30 0.37 3.3700 CIRCULAR 8.040 0.0120 0.5000 0.5000 0.0000 4 SD-12 13.28 366.43 366.30 0.13 1.0000 CIRCULAR 8.040 0.0120 0.5000 0.5000 0.0000 5 SD-2 18.02 359.49 359.40 0.09 0.5000 CIRCULAR 12.000 0.0120 0.5000 0.5000 0.0000 6 SD-3 5.00 359.52 359.49 0.03 0.5800 CIRCULAR 36.000 0.0120 0.5000 0.5000 0.0000 7 SD-4 6.73 366.22 365.50 0.72 10.6900 CIRCULAR 12.000 O.D120 0.5000 0.5000 0.0000 8 SD-5 79.57 367.52 366.22 1.30 1.6400 CIRCULAR 8.040 0.0120 0.5000 0.5000 0.0000 9 SD-6 43.36 367.78 367.52 0.26 0.6000 CIRCULAR 8.040 0.0120 0.5000 0.5000 0.0000 10 SD-7 19.74 367.98 367.78 0.20 1.0000 CIRCULAR 6.040 0.0120 0.5000 0.5000 0.0000 11 SD-8 29.76 367.89 367.52 0.36 1.2200 CIRCULAR 8.040 0.0120 0.5000 0.5000 0.0000 12 S0-9 24.54 368.18 367.89 0.29 1.2000 CIRCULAR 8.040 0.0120 0.5000 0.5000 0.0000 Page8! of 14 213087 Wendy's on Carr Road, Renton 100 year storm Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak FIOw ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Occurrence Ratio Total Depth Ratio (cfsJ (da::t:2 hh:mm} {cfsJ (ft/secl (minl (fll 1 SD-1 1.63 0 00:06 2.73 0.60 3.63 0.28 0.56 0.58 2 SD-10 0.59 0 00:06 0.92 0.63 2.81 0.09 0.39 0.58 3 SD-11 0.29 0 00:06 2.40 0.12 4.66 0.04 0.16 0.24 4 S0-12 0.30 0 00:06 1.31 0.23 3.04 0.07 0.22 0.32 5 S0-2 1.63 0 00:00 2.73 0.60 3.75 0.08 0.57 0.57 6 S0-3 1.74 0 00:00 55.03 0.03 3.69 0.02 0.36 0.12 7 S0-4 1.57 0 00:06 12.62 0.12 10.96 0.01 0.24 0.24 8 SD-5 1.00 o 00:06 1.68 0.59 5.04 0.26 0.37 0.55 9 SD-6 0.53 o 00:06 1.01 0.52 2.95 0.24 0.34 0.51 10 SD-7 0.27 0 00:06 1.31 0.21 3.10 0.11 0.21 0.31 11 SD-8 0.48 0 00:06 1.45 0.33 3.73 0.13 0.26 0.40 12 SD-9 0.48 0 00:06 1.43 0.33 3.91 0.10 0.27 0.40 Page~of14 SECTION 6 -SPECIAL REPORTS AND STUDIES Geotechnical Evaluation Report prepared by Terracon, dated July 2, 2013, was studied. This report has been updated for infiltration data on July 30, 2013. The project does not lie within and is not adjacent to 100-year floodplain or floodway per King County Flood Maps and FIRM. This site is not and is not adjacent to any known critical or environmental sensitive area. There are not known any other special reports and studies related to subject area. 91 SECTION 7 -OTHER PERMITS Other permits that may be required for this project include: Building Permit for retaining walls from the City of Renton Demo Permit by the City of Renton King County Health Department Permit Soos CreekWater & Sewer District Permit Sewer disconnect permit by Soos CreekWater & Sewer District Binding Site Plan Permit from the City of Renton 92 SECTION 8 -CSWPPP ANALYSIS AND DESIGN This section include the analysis and design information which will be used to prepare the required construction stormwater pollution prevention plan. ESC Plan Analysis and Design (Part A) No portion of the site is delineated as an erosion hazard area. The project meets or exceeds minimum Erosion and Sediment Control Requirements of Core Requirement #5 of KCSWDM. ESC use standard ESC measures per Appendix D of KCSWDM as a clearing and grading limits, silt fence, stabilized construction entrance, sediment trap, filter fabric protection for inlets, interceptor swales and dikes, and temporary and permanent cover measures to protect disturbed areas. A sediment trap will be designed as a primary sediment control. Stormwater runoff will be directed by interceptor swales and dikes to the sediment trap. Riprap or level spreader shall be used to stabilize downstream of trap's weir overflow. A 2-year peak discharge using KCRTS with 15 minutes time step at developed conditions will be used for design. ESC Measurement: I. Clearing Limits -Prior to any site clearing or grading, undisturbed areas will be staked and delineated. Property lines will be staked by the surveyor. Security or construction fence will be used. 2. Cover Measures -Temporary and permanent cover measures shall be provided to protect all disturbed areas. Temporary cover shall be installed if an area is unworked for more than seven days during dry season (May I to September 30) or for more than two days during wet season (October I to April 30). Any area to remain unworked for more than 30 days shall be seeded or sodded. All slopes and stockpiles 3: I and steeper over I 0 feet of vertical high shall be covered during wet season if they are unworked for more than 12 hours. The material necessary to cover all disturbed areas shall be stockpiled on site. All slopes steeper than 3:1 and greater than 5 vertical feet require surface roughening. Plastic covering will be used as temporary erosion protection to slopes and disturbed areas. Permanent cover measurements will be used per landscaping plan. 3. Perimeter Protection -Perimeter protection is to reduce the amount of sediment transported beyond the disturbed areas. It will be installed prior to any clearing and grading. Silt fence will be used along the west, north, and portion of east property lines. This fence will be used as a secondary means of sediment control. 4. Traffic Area Stabilization -The purpose of traffic area stabilization is to reduce the erosion of areas disturbed by vehicle traffic and to prevent transport of sediments onto paved streets. 93 Quarry spalls stabilized construction entrance or a portion of the existing pavement will be used at the entrance on the south side of property. 5. Sediment Retention -The purpose of the sediment retention is to prevent sediment laden waters from leaving the site untreated. The sediment trap will be used as a primary means of sediment control in the initial construction face. Silt fence will be provided as a secondary or emergency control measure. Catch basin inserts will be used on all existing and new catch basins to prevent coarse sediments from entering storm drain system. 6. Surface Water Collection -The purpose of surface water collection is to convey surface water from disturbed areas to a sediment pond. An interceptor dike and swale will be used along the north and west side to prevent un- treated run-off water from leaving the construction site. 7. Dewatering Control -If dewatering is used during the construction, sediment laden water will be pumped to a settling tank for pre-treatment if necessary or directly to the sanitary sewer system. No dewatering water will be discharged to surface and storm waters without a permit. 8. Dust Control -Dust control will be implemented when exposed soils are dry to the point that wind transport is possible. Exposed soils will be sprayed with water until wet, but runoff shall not be generated by spraying. High Susceptibility areas to erosion: There are no steep slopes on the site or any areas with high susceptibility to erosion. Special Reports: There are no ESC recommendations in any of special reports for this project. Exceptions or Modifications: There are no exceptions or modifications to any standard details or techniques. Wet Season Requirements: No additional wet season controls have been design. Critical Area Restrictions: There are no critical areas on the site or in adjacent properties. Section 8, Part A -Sediment Trap Design, ESC Plan, Notes, and Details To be provided at final design. 95 SWPPS Plan Design (Part B) SWPPS was prepared for this project and will be held at the construction site all the time. See also KC SWPPP Activity Worksheet attached. The following construction activities have been identified as significant erosion and sediment generating activities and specific BMPs have been chosen as appropriate for the conditions. • Required BMPs for all commercial properties • Clearing, grading, and preparation ofland • Demolition of building • Building construction The BMPs selected to address the pollution generated from the construction activities listed are: Required BMPs for all commercial properties Clean your storm drainage system -maintain your drainage system by removing sediments and other debris to prevent transportation into receiving waters. Eliminate illicit connection to the storm drainage system -there will not be any non- stormwater discharges to the storm drainage system. Sanitary sewers from the office will be connected to the sanitary sewer system. Stencil your storm drains -all catch basins will have stenciled message "Don't Pollute Drains to Habitat" next to grates. Clearing, grading, and preparation of/and Clearing, grubbing, and excavation are the largest sediment producing activities on the project. Subgrade stabilization and placement of new aggregates can also generate sediments during storm event. New aggregate placement can also generate dust at dry weather. For these reasons, perimeter protection, traffic stabilization, and sediment retentions must be applied. Unworked areas and stockpiles shall be covered, catch basins provided with filter fabric inlet control, a water truck shall be on-site during earthwork activities. During subgrade preparation, site grading, backfilling, and compaction, use of water truck to control dust is required. Demolition ofbuilding Water truck will be used to help control dust from demolitions. The amount of water must be controlled to eliminate runoff from the site. 96 Catch basin inlet control measurements will be applied. Sweeping surrounding street gutters, sidewalk, and driveway will be used to collect debris and garbage. Building construction No dumping of washed water or liquid waste to storm waters is allowed. Drop cloth underneath of outdoor painting and scraping shall be used. Ground cloth or tubs shall be used for paint mixing and tool cleaning. All wash water shall be disposed to sanitary sewers. Catch basin filter fabric inserts will be used to protect storm drainage from pollutants as a secondary feature. The containment device must be in place at beginning of the workday and accumulated dirty runoff and solids must be disposed of in an appropriate manner at the end of the workday. Routine maintenance, cleanup, sweeping, covering, must be provided on regular basis. 97 Section 8, Part B -Activity Worksheet ~il\11®1,P,tl,M~ Name: Business T e: Add Activity Sheet Number A-3 A-4 A-5 A-6 A-7 A-8 A-9 A-11 A-12 A-13 A-14 A-15 A-16 A-17 A-18 Use this worksheet to identify the activities that you conduct. Interpret the categories broadly. Numbers A-1 -A-43 correspond to sheets located in Chapter Ill. Storage of Liquid Materials in Stationary Tanks This does not include unde round tanks or small containers Storage of Any Liquid Materials in Portable Containers Such as drums, buckets ·u s or barrels Storage of Soil, Sand, and Other Erodible Materials This includes stora e of all es of erodible materials Storage of Pesticides and Fertilizers This includes non-Ii uid esticides and ba s or iles of fertilizer Storage and Treatment of Contaminated Soils This a lies to contaminated soils that are excavated and left on site Storage and Processing of Food Items This includes storage of fruits, vegetables, meats. and other foods and processing activtties at wineries, fresh and frozen juice makers, and other food and bevera e rocessin o erations Storage of Solid Wastes and Food Wastes (Including Cooking Grease) This includes r ular arba e and all other discarded non-Ii uid items Storage of Scrap and Recycling Materials (Including Auto Recycling Facilities) This includes scrapped equipment, metal, empty metal drums, junk a liances and vehicles and assorted rec clables Cleaning or Washing of Tools and Equipment This includes tools, all types of manufactured equipment components, and work e ui ment such as lawn mowers and fork lifts Cleaning or Washing of Cooking Equipment This includes vents filters ots and ans rills and related items Vehicle Washing and Steam Cleaning This covers cleaning and washing at all types of establishments, including fleet vehicle ards car dealershi s car washes and maintenance facilities Interior Washing Operations (Including Mobile Contractors) This includes ca et cleaners u holste cleaners and dra e cleaners Pressure Washing of Buildings, Rooftops, and Other Large Ob" t TRANSFER OF LIQUfD MATERIALS Truck or Rail Loadin Fueling Operations This includes gas stations, mobile fuel trucks, pumps at fleet vehicle yards or sho s and other rivatel owned um s Engine Repair and Maintenance This covers oil chan es and other handlin of en I halt Production at Stationa Do you conduct this activity? If so, where? 99 Activity Sheet Number A-20 A-21 A-22 A-23 A-24 A-25 A-31 A-32 A-33 A-34 A-35 A-36 A-37 A-38 A-39 A-40 A-41 A-42 A-43 Use this worksheet to identify the activities that you conduct. Interpret the categories broadly. Numbers A-1 -A-43 correspond to sheets located in Chapter Ill. TYPE OF ACTIVITY Concrete and Asphalt at Temporary Sites This includes construction sites, remodeling, and driveway and parking lot resurfacin Manufacturing and Post-Processing of Metal Products This includes machining, grinding, soldering, cutting, welding, quenching, rinsin etc. Painting, Finishing, and Coating of Vehicles, Products, and E ui ment Wood Treatment and Preserving This includes small scale contractor operations (such as patio decks) and la e scale lumber treatment o erations Chemical Applications-Other than for Landscaping This includes use of al aecides fun icides, esticides, and rodenticides I Swimming Pool and Spa Cleaning and Maintenance This includes all swimmin ools and s as not at a sin le famil residence Keeping Animals in Controlled Areas This includes kennels rabbit hutches and similar animal rearin and care Keeping Livestock in Stables, Pens, Pastures or Fields This includes cattle horses i s shee oats and other hoofed animals Logging and Log Yards This a lies to Class IV eneral forest ractices onl Mining and Quarrying of Sand, Gravel, and Other Materials This covers sand, gravel, minerals, peat, clay, rock, etc. but does not include excavation at construction sites Well and Geotechnical Drilling This includes mechanical drilling and directional drilling for water wells and utilities, environmental protection and monitoring wells, and geotechnical borin s Roof Vents and Fu itive Emissions lncludin Dust Street Deicing Operations This includes deicin and anti-icin of streets and hi hwa s Use of Soil Amendments on Construction Sites Do you conduct this activity? If so, where? INDOORS OUTDOORS 100 SECTION 9-BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT Bond Quantities Worksheet will be prepared and attached at the end of this section at final design. Flow Control and Water Quality Facility Summary Sheet and Sketch were prepared and were attached. Declaration of Stormwater Facility Maintenance Covenant for Private Storm Facilities and Pervious Pavement BMP's to City of Renton will be provided. 101 Section 9 -Bond Quantities Worksheet To be provided at fmal design. 102 Section 9 -Stormwater Facility Summary Sheet and Sketches 103 KING COUNTY. WASHINGTON. SURFACE WATER DESIGN MANUAL STORMWATER FACILITY SUMMARY SHEET DD~~ P@miit Number 9;>£. \J,-OOD1S-,l.._ ~ )::,-Oo~';,. (provide one Stormwater Facility Summary Sheet per Natural Discharge Location) Overview: Project Name -----'~=""';;-""1-...l""--'D"-':T__._' ,;2.._---'Q...,__,_tv:::_..::C:::A-'----"R"'R."=-...!(2...::....:.a~,..,.-.()~,_,L__ ___ Date \ 0 /1 -i. .. / 'UJ \~ Downstream Drainage Basins Major Basin Name 'Pl' ~STl+t:'.: R.. ClcEc. \<:.. Immediate Basin Name ----------- Flow Control: Flow Control Facility Name/Number Facility Location 00 -S,' l°E lfnone, Flow control provided in regional/shared facility (give location) __ -,-___________ _ No flow control required Exemption number General Facility Information: Type/Number of detention facilities: Type/Number of infiltration facilities: ___ ponds ponds vaults tanks --- _ _.\_ tanks ( '3 -~· t:,1 A.) trenches Control Structure Location Ou -~ tTF • t:0 w~ ':aT::f2. 6' A. t::, oi:: ""IA"" ~ ':::i Type of Control Structure Q, S.S '2. t,li1B oe.18 (SC... Number of Orifices/Restrictions ~ ~ Size of Orifice/Restriction: No.2 No. I 0. 4 \ I r-..JC.1.\ I o4 I "l'.' 1-f No. 3 ______ _ No. 4 ______ _ Flow Control Performance Standard __ L=...cE"cc.· _V'--"e-"--'L..=-------''L=-------- 2009 Surface Water Design Manual 1 104 1/9/2009 KING COUNTY. WASHINGTON. SURFACE WATER DESIGN MANUAL ' Live Storage Volume \\, 06'4 C. E Depth __,6-... ____ Volume Factor of Safety Number of Acres Served O, ~ 0 ;;, ----~-~-- Number of Lots----'------ Dam Safety Regulations (Washington State Department of Ecology) Reservoir Volume above natural grade __ IJ~/~A~--- Depth of Reservoir above natural grade -~t,,J"'---1'/~Ac=.--- Facility Summary Sheet Sketch All detention, infiltration and water quality facilities must include a detailed sketch. ( 11 "x 17" reduced size plan sheets may be used) 2009 Surface Water Design Manual 2 1/912009 105 KING COUNTY. WASHINGTON. SURFACE WATER DESIGN MANUAL Water Quality: Type/Number of water quality facilities/BMPs: biofiltration swale large) above --- (regular/wet/ or continuous inflow) large) ___ combined detention/wetpond --- (wetpond portion basic or large) combined detention/wetvault ___ filter strip ___ flow dispersion ___ farm management plan ___ landscape management plan oil/water separator --- (baffie or coalescing plate) Liner? --------- catch basin inserts: --- Manufacturer ___ sand filter (basic or large) ___ sand filter, linear (basic or --- --- y p1 t... ,i:_;: R RA sand filter vault (basic or sand bed depth? .. \ l (inches) stormwater wetland storm filter ___ wetpond (basic or large) wetvault --- ___ Is facility Lined? If so, what marker is used -------------------- ___ pre-settling pond ___ pre-settling structure: Manufacturer ------------------- ___ high flow bypass structure (e.g., flow-splitter catch basin) source controls --- Design Information Water Quality design flow Water Quality treated volume (sandfilter) -------- Water Quality storage volume (wetpool) --------- Facility Summary Sheet Sketch 2009 Surface Water Design Manual 3 106 1/912009 Section 9 -Declaration of Stormwater Facility Maintenance Covenant for Private Storm Facilities To be provided at final design. 107 SECTION 10 -OPERATIONS AND MAINTENANCE MANUAL Operation and Maintenance Manual for Privately Maintained Drainage Facilities 1s attached. Appendix A of King County Surface Water Design Manual has been used. No.3 -Detention Tanks and Vaults No.4 -Control Structure/Flow Restrictor No.5 -Catch Basins and Manholes No.6 -Conveyance Pipes and Ditches No. I I -Ground (Landscaping) No.20-Sand Filter Vault (Filterra box) No.24 -Catch Basin Insert 108 Section IO -Operation and Maintenance Manual 109 APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL. CONVEYANCE. AND WQ FACILITIES NO. 3-DETENTION TANKS AND VAULTS Maintenance Defect or Problem Conditions When Maintenance is Needed Component Site Trash and debris Any trash and debris which exceed 1 cubic foot per 1.000 square feet (lhis is about equal to the amount of trash it would take to fill up one standard size office garbage can). In general, there should be no visual evidence of dumping. Noxious weeds Any noxious or nuisance vegetation which may constitute a hazard to County personnel or the public. Conlaminants and Any evidence of contaminants or pollution such pollution as oil, gasor.ne, concrete slunies or paint. Grass/groundcover Grass or groundcover exceeds 18 inches in height. Tank or Vault Trash and debris Any trash and debris accumulated in vault or tank Storage Area (includes floatables and non.floatables). Sediment Accumulated sediment depth exceeds 10% of the accumulation dtameter of the storage area for %: length of storage vault or any point depth exceeds 15% of diameter. Example: 72--lnch storage tank would require cleaning when sediment reaches depth of 7 inches for more than Xi length of tank. Tank Structure Plugged air vent Any blockage of the vent Tank bent out of Any part of tank/pipe is bent out of shape more shape than 10% of its design shape. GaJ)5 between A gap wider than %--inch at the joint of any tank sections, damaged sections or any evidence of soil particles entering joints or cracks or the tank at a joint or through a wall. tears in wall Vault Structure Damage to wall, Cracks wider than "!4-tnch, any evidence of soil frame, bottom, and/or entering the structure through cracks or qualified top slab inspection personnel determines that the vault is not strudurally sound. lnleVOutlet Pipes Sediment Sediment filling 20% or more of the pipe. accumulation Trash and debris Trash and debris accumulated in inlet/outlet pipes (includes floatables and non-floatables). Damaged Cracks wider than %--inch at the joint of the inleVoutlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes. 2009 Surface Water Design Manual -Appendix A A-5 Results Expected When Maintenance is Perfonned Trash and debris deared from site. Noxious and nuisance vegetation removed according to applicable regulations. No danger of noxious vegetation where County personnel or the public might normally be. Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Grass or groundcover mo"wVed to a height no greater than 6 inches. No trash or debris in vault. All sediment removed from storage area. Tank or vault freely vents. Tank repaired or replaced to design. No water or soil entering tank through joints or waits. Vault is sealed and structurally sound. Inlet/outlet pipes clear of sediment. No trash or debris in pipes. No crack.s more than Y.-lnch wide at the joint of the inlet/outlet pipe. 1/9/2009 110 APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL. CONVEYANCE. AND WQ FACILITIES NO. 3 -DETENTION TANKS AND VAULTS Maintenance Defect or Problem Component Access Manhole Cover/lid not in place Locking mechanism not working Cover/lid difficult to remove Ladder rungs unsafe Large access Damaged or difficult doors/plate to open Gaps, doesn't cover completely Lifting Rings missing, rusted 1/9/2009 Conditions When Maintenance Is Needed Results Expected When Maintenance is Performed Cover/lid is missing or only partially in place. Manhole access covered. Any open manhole requires immediate maintenance. Mechanism cannot be opened by one Mechanism opens with proper tools. maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not work. One maintenance person cannot remove Cover/lid can be removed and cover/lid after applying 80 lbs of lift. reinstalled by one maintenance person. Missing rungs, misalignment, rust, or cracks. Ladder meets design standards. Allows maintenance person safe access. Large access doors or plates cannot be Replace or repair access door so it opened/removed using normal equipment. can opened as designed. Large access doors not flat and/or access Doors dose flat and covers access opening not completely covered. opening completely. Lifting rings not capable of lifting weight of door Lifting rings sufficient to lift or or plate. remove door or plate. A-6 2009 Surface Water Design Manual -Appendix A 111 APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL. CONVEYANCE. AND WQ FACILITIES NO. 4-CONTROL STRUCTURE/FLOW RESTRICTOR Maintenance Component Defect or Problem Condition When Maintenance Is Needed Structure Trash and debris Trash or debris of more than 1-1 cubic foot which is located immediately in front of the structure opening or is blocking capacity of the structure by more than 10%. Trash or debris in the structwe that exceeds 1h the depth from the bottom of basin to invert the lowest pipe into or out of the basin. Deposits of garbage exceeding 1 cubic foot in volume. Sediment Sediment exceeds 60% of the depth from the bottom of the structure to the invert of the lowest pipe into or out of the structure or the bottom of the FROP-T section or is within 6 inches of the invert of the lowest pipe into or out of the strudure or the bottom of the FROP-T section. Damage to frame Comer of frame extends more than % inch past and/or top slab curb face into the street (If applicable). Top slab has holes larger than 2 square inches or cracks wider than X inch. Frame not sitting flush on top slab, i.e., separation of more than % inch of the frame from the top slab. Cracks in walls or Cracks wider than lS inch and longer lhan 3 feet, bottom any evidence of soil particles entering structure through cracks, or maintenance person judges that structure is unsound. Cracks wider than Xi inch and longer than 1 foot at the joint of any inleUoutlet pipe or any evidence of soil particles entering structure through cracks. Settlement/ Structure has settled more than 1 inch or has misalignment rotated more than 2 inches out of alignment. Damaged pipe joints Cracks wider than %-inch at the joint of the inlet/outlet pipes or any evidence of soil entering the structure at the joint of the inletlouttet pipes. Contaminants and Any evidence of contaminants or pollution such pollution as oil, gasoline, concrete slurries or paint. Ladder rungs missing Ladder is unsafe due to missing rungs, or unsafe misalignment, rust, cracks, or sharp edges. FROP-T Sedion Damage T section is not securely attached to structure wall and outlet pipe structure should support at least 1,000 lbs of up or down pressure. Structure is not in upright position (allow up to 10% from plumb). Connections to outlet pipe are not watertight or show signs of deteriorated grout. Any holes-other than designed holes-in the structure. Cleanout Gate Damaged or missing Cleanout gate is missing. 2009 Surface Water Design Manual -Appendix A A-7 Results Expected When Maintenance is Performed No Trash or debris blocking or potentially blocking entrance to structure. No trash or debris in the structure. No condition present which would attract or support the breeding of insects or rodents. Sump of structure contains no sediment. Frame is even with curb. Top slab is free of holes and cracks. Frame is sitting flush on top slab. Structure is sealed and structurally sound. No cracks more than 1(4 inch wide at the joint of inlet/outlet pipe. Basin replaced or repaired to design standards. No cracks more than ~-inch wide at lhe joint of inlet/outlet pipes. Malerials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Ladder meets design standards and allows maintenance person safe access. T section securely attached to wall and outlet pipe. Structure in correct position. Connections to outlet pipe are water tight; structure repaired or reptaced and works as designed. Structure has no holes olher than designed holes. Replace cleanout gate. 1/9/2009 112 APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL. CONVEYANCE. AND WQ FACILITIES NO. 4 -CONTROL STRUCTURE/FLOW RESTRICTOR Maintenance Defect or Problem Component Orifice Plate Damaged or missing Obstructions Overflow Pipe Obstructions Deformed or damaged lip lnleUOutlet Pipe Sediment accumulation Trash and debris Damaged Metal Grates Unsafe grate opening (If Applicable) Trash and debris Damaged or missing Manhole Cover/Lid Cover/lid not in place Locking mechanism Not Working Cover/lid difficult to Remove 1/9/2009 Condition When Maintenance is Needed Results Expected When Maintenance ts Performed Cleanout gate is not watertight Gate is watertight and works as designed. Gate cannot be moved up and down by one Gate moves up and down easily and maintenance person. is watertight. Chain/rod leading to gate is missing or damaged. Chain is in place and works as designed. Control device is not working property due to Plate is in place and works as missing, out of place, or bent orifice plate. designed. Any trash, debris, sediment, or vegetation Plate is free of all obstructions and blocking the plale. works as designed. Any trash or debris blocking (or having the Pipe is free of all obstructions and potential of blocking) 1he overflow pipe. works as designed. Up of overflow pipe is bent or deformed. Overflow pipe does not allow overflow at an elevation lower than design Sediment filling 20% or more of the pipe. Inlet/outlet pipes dear of sediment. Trash and debris accumulated in inleVoutlet No trash or debris in pipes. pipes (indudes floatables and non-floatables). Cracks wider than %-inch at the joint of the No cracks more than Y.-inch wide at inleUoutlet pipes or any evidence of soil entering the joint of the inleVoutlet pipe. at the joints of the inleVoutlet pipes. Grate with opening wider than 7/s inch. Grate opening meets design standards. Trash and debris that is blocking more than 20% Grate free of trash and debris. of grate surface. footnote to guidelines for disposal Grate missing or broken member(s) of the grate. Grate is in place and meets design standards. Cover/lid is missing or onty partially in place. Cover/lid protects opening to Any open structure requires urgent structure. maintenance. Mechanism cannot be opened by one Mechanism opens with proper tools. maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not work. One maintenance person cannot remove Cover/lid can be removed and cover/lid after applying 80 lbs. of lift. reinstalled by one maintenance person. A-8 2009 Surface Water Design Manual -Appendix A 113 APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL. CONVEYANCE. AND WQ FACILITIES NO. 5 -CATCH BASINS AND MANHOLES Maintenance Defect or Problem Condition When Maintenance is Needed Component Structure Sediment Sediment exceeds 60% of the depth from the bottom of the catch basin to the invert of the lowest pipe into or out of the catch basin or is within 6 inches of the invert of the lowest pipe into or out of the catch basin. Trash and debris Trash or debris of more than !4 cubic foot which is located immediately in front of the catch basin opening or is blocking capacity of the catch basin by more than 10%. Trash or debris in the catch basin that exceeds 1 /3 the depth from the bottom of basin to invert the lowest pipe into or out of the basin. Dead animals or vegetation that could generate odors that could cause complaints or dangerous gases (e.g., methane). Deposits of garbage exceeding 1 OJbic foot in volume. Damage to frame Comer of frame extends more than % inch past and/or top slab curb fao, into the street (If applicable). Top slab has holes larger than 2 square inci"les or aacks wider than Y. inch. Frame not sitting flush on top slab, i.e., separation of more than % inch of the frame from the top slab. Cracks in walls or Cracks wider than Y2 inch and longer than 3 feet, bottom any evidence of soil particles entering catch basin through cracks, or maintenance person judges that catch basin is unsound. Cracks wider than % inch and longer than 1 foot at the joint of any inleUoutlet pipe or any evidence of soil particles entering catch basin through cracks. SettlemenV Catch basin has settled more than 1 inch or has misalignment rotated more than 2 inches out of alignment. Damaged pipe joints Cracks wider than ~inch at the joint of the inlet/outlet pipes or any evidence of soil entering the catch basin at the joint of the inleVoutlet pipes. Contaminants and Any evidence of contaminants or pollution such pollution as oil, gasoline, concrete slurries or paint. lnleUOutlet Pipe Sediment Sediment filling 20% or more of the pipe. accumulation Trash and debris Trash and debris accumulated in inleVoutlet pipes (indudes floatables and non-floatables). Damaged Cracks wider than ~inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inleVoutlet pipes. 2009 Surface Water Design Manual -Appendix A A-9 Results Expected When Maintenance is Performed Sump of catch basin contains no sediment. No Trash or debris ~ocking or potentially blocking entrance to catch basin. No trash or debris in the catch basin. No dead animals or vegetation present within catch basin. No condition present which would attract or support the breeding of inseds or rodents. Frame is even with curb. Top slab is free of holes and cracks. Frame is sitting flush on top slab. Catch basin is sealed and strudurally sound. No cracks more than 11. inch wide at the joint of inlet/outlet pipe. Basin replaced or repaired to design standards. No cracks more than %-inch wide at the joint of inlet/outlet pipes. Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. lnleUoutlet pipes clear of sediment. No trash or debris in pipes. No cracks more than Y.-inch wide at lhe joint of the inlet/outlet pipe. 1/9/2009 114 APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL. CONVEYANCE. AND WQ FACILITIES NO. 5 -CATCH BASINS AND MANHOLES Maintenance Defect or Problem Component Metal Grates Unsafe grale opening (Catch Basins) Trash and debris Damaged or missing Manhole Cover/Lid Cover/lid not in place Locking mechanism Not Working Cover/lid difficuh to Remove 1/9/2009 Condition When Maintenance is N88ded Results Expected When Maintenance is Performed Grate with opening wider than 7 le inch. Grate opening meets design standards. Trash and debris that is blocking more than 20% Grate free of trash and debris. of grate surface. footnote to guidelines for disposal Grate missing or broken member(s) of the grate. Grate is in place and meets design Any open structure requires urgent standards. maintenance. Cover/lid is missing or only partially in place. Cover/lid protects opening to Any open structure requires urgent structure. maintenance. Mechanism cannot be opened by one Mechanism opens with proper tools. maintenance person with proper tools. Bolts cannot be seated. Sett-locking cover/lid does not work. One maintenance person cannot remove Cover/lid can be removed and covernid after applying 80 lbs. of lift. reinstalled by one maintenance person. A-10 2009 Surface Water Design Manual -Appendix A 115 APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL. CONVEYANCE. AND WQ FACILITIES NO. 6 -CONVEYANCE PIPES AND DITCHES Maintenance Defect or Problem Conditions When Maintenance is Needed Component Pipes Sediment & debris Accumulated sediment or debris that exceeds accumulation 20% of the diameter of the pipe. Vegetation/roots Vegetation/roots that reduce free movement of water through pipes. Contaminants and Any evidence of contaminants or pollution such pollution as oil, gasoline, concrete sfunies or paint. Damage lo protective Protective coating is damaged: rust or corrosion coating or corrosion is weakening the structural integrity of any part of pipe. Damaged Ally dent that decreases the cross section area of pipe by more than 20% or is determined to have weakened structural integrity of the pipe. Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1.000 square feet of ditch and slopes. Sediment Accumulated sediment that exceeds 20% of the accumulation design depth. Noxious weeds Any noxious or nuisance vegetation which may constitute a hazard to County personnel or the public. Contaminants and Any evidence of contaminants or pollUtion such pollution as oil, gasoline, concrete slurries or paint. Vegetation Vegetation that reduces free movement of water through ditches. Erosion damage to Any erosion observed on a ditch slope. slopes Rock lining out of One layer or less of rock exists above native soil place or missing (lf area 5 square feet or more, any exposed native Applicable) soil. 2009 Surface Water Design Manual -Appendix A A-11 Results Expected When Maintenance is Performed Water flows freely through pipes. Water flows freely through pipes. Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Pipe repaired or replaced. Pipe repaired or replaced. Trash and debris cleared from ditches. onch deaned/flushed of all sediment and debris so that it matches design. Noxious and nuisance vegetation removed according to applicable regulations. No danger of noxious vegetation where County personnel or the public might normally be. Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oij film. Water flows freely through ditches. Slopes are not eroding. Replace rocks to design standards. 1/9/2009 116 APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL. CONVEYANCE. AND WQ FACILITIES NO. 11 -GROUNDS (LANDSCAPING) Maintenance Delaet or Problem Component Site Trash or litter Noxious \.Yeeds Contaminants and pollution Grass/groundcover Trees and Shrubs Hazard Damaged 1/9/2009 Conditions When Maintenance is Needed Results Expected When Maintenance Is Perlormed Any trash and debris which exceed 1 cubic toot Trash and debris cleared from site. per 1,000 square feet (this is about equal to the amount of trash it would take to fill up one standard size office garbage can). In general, there should be no visual evidence of dumping. Any noxious or nuisance vegetation which may Noxious and nuisance vegetation constitute a hazard to County personnel or the removed according to applicable public. regulations. No danger of noxious vegetation where County personnel or the public might nonnally be. Any evidence of contaminants or pollution such Materials removed and disposed of as oil, gasoline, concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Grass or groundcover exceeds 18 inches in Grass or groundcover mowed to a height. height no greater than 6 inches. Any tree or limb of a tree identified as having a No hazard trees in facility. potential to fall and cause property damage or threaten human life. A hazard tree identified by a qualified arborist must be removed as soon as possible. Limbs or parts of trees or shrubs that are split or Trees and shrubs \Wh less than 5% broken which affect more than 25% of the total of total foliage with split or broken foUage of the tree or shrub. limbs. Trees or shrubs that have been blown down or No blown down vegetation or knocked over. knocked over vegetation. Trees or shrubs free of injury. Trees or shrubs which are not adequately Tree or shrub in place and supported or are leaning over, causing exposure adequately supported; dead or of the roots. diseased trees removed. A-16 2009 Surface Water Design Manual -Appendix A 117 APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES NO. 20-SAND FILTER VAULT ( F\ L"1""'c:RRA_ ~°><) Maintenance Defect or Problem Co pdltion When Maintenance is Needed Results Expected When Component Maintenance is Performed Site Trash and debris Tn sh and debris accumulated on facility sile. Trash and debris removed from facility site. Noxious weeds An noxious or nuisance vegetation which may Noxious and nuisance vegetation cor lstitute a hazard to County personnel or the removed according to applicable put lie. regulations. No danger of noxious vegetation where County personnel or the public might normally be. Contaminants and Am evidence of contaminants or pollution such Materials removed and disposed of pollution as ii, gasoline, concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Grass/ground cover Gr, lss or groundcover exceeds 18 inches in Grass or groundcover mowed to a hei ht. height no greater than 6 inches. Pre-Treatment Sediment Se< iment accumulation exceeds the depth of the Sediment storage contains no Chamber accumulation sed ment zone plus 6 inches. sediment. Sand Filter Media Sediment Secli~ent depth exceeds 112-inch on sand filter Sand filter freely drains at nomial accumulation me, ,a. rate. Trash and debris Tra h and debris accumulated in vault (floatables No trash or debris in vault. and non-floatables). Plugging Dra Mlown of water through the sand filter media, Sand filter media drawdown rate is tak, s longer than 24 hours, and/or flow through normal. the overflow pipes occurs frequently. A sieve ana vsis of >4% -100 or >2% -200 requires rep acing sand filter media. Short circuiting Se, page or flow occurs along the vault walls and Sand filter media section re-laid and cor liers. Sand eroding near inflow area. compacted along perimeter of vault Cle ~nout wyes are not watertight to form a semi-seal. Erosion protection added to dissipate force of incoming flow and curtail erosion. Vault Structure Damaged to walls, era pks wider than %-inch, any evidence of soil Vault replaced or repaired to provide frame, bottom and/or ent ring the structure through cracks or qualified complete sealing of the structure. top slab. ins edion personnel determines that the vault is not tructuralty sound. Ventilation Ver tilation area blocked or plugged. No reduction of ventilation area exists. Underdrains and Sediment/debris Un erdrains or dean-outs partially plugged, filled Underdrains and clean-outs free of Cleanouts witt sediment and/or debris or not watertight. sediment and debris and sealed. Inlet/Outlet Pipe Sediment Se< iment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment. accumulation Trash and debris Tra 1h and debris accumulated in inlet/outlet No trash or debris in pipes. pill< s (indudes floatables and non-floatables). Damaged Cra cks wider than Yr-indl at the joint of the No cracks more than %-inch wide at inle t/outtel pipes or any evidence of soil entering the joint of the inlet/outlet pipe. at I e joints of the inlet/outlet pipes. 119/2009 2009 Surface Water Design Manual -Appendix A A-28 118 APPENDIX A MAINTENANCE R QUIREMENTS FOR FLOW CONTROL. CONVEYANCE. AND WQ FACILITIES -C3ox) NO. 20-SAND FILTER VAULT j 'FI l-T'£<2_12A. Maintenance Defect or Problem Co fidition When Maintenance is Needed Results Expected When Component Maintenance Is Performed Access Manhole Cover/lid not in place Co ~rllid is missing or only partially in place. Manhole access covered. An open manhole requires immediate ma ntenance. Locking mechanism Me tianism cannot be opened by one Medlanism opens with proper lools. not working ma ntenance person with proper tools. Bolts car not be seated. Self-locking cover/lid does not WO•· Cover/lid difficult to Orn maintenance person cannot remove Cover/lid can be removed and remove cov ernid after applying 80 lbs of lift. reinstalled by one maintenance person. Ladder rungs unsafe Mis ing rungs, misalignment. rust. or cracks. Ladder meets design standards. Allows maintenance person safe access. Large access Damaged or difficull Lar N access doors or plates cannot be Replace or repair access door so it doors/plate to open ope hed/removed using nonnal equipment. can opened as designed. Gaps, doesn't cover Lar e access doors not flat and/or access Doors dose flat and covers access completely ope hing not completely covered. opening completely. lifting Rings missing, Lifti l9 rings not capable of lifting weight of door Lifting rings sufficient to lift or rusted Of! ate. remove door or plate. 2009 Surface Water Design Manual -Appendix A 1/9/2009 A-29 119 APPENDIX A MAINTENANCE RcQUIREMENTS FOR FLOW CONTROL CONVEYANCE. AND WQ FACILITIES NO. 24-CATCH BASIN INSERT Maintenance Component Media Insert Defect or Problem Conditions When Maintenance ls Needed Visible Oil Vis ble oil sheen passing through media Results Expected When Maintenance is Performed Media inset replaced. Insert does not fit Flow gets into catch basin without going through AU flow goes through media. catch basin property me ia. Filter media plugged Filt l!r media plugged. Flow through filter media is normal. Oil absorbent media Me ia oil saturated. Oil absorbent media replaced. saturated Water saturated Ca ch basin insert is saturated with water, which Insert replaced. no anger has the capacity to absorb. Service fife exceeded Re ular interval replacement due to typical Media replaced at manufaciurer's ave rage life of media insert product, typically one recommended interval. mo th. Seasonal Wh 1m storms ocrur and during the wet season. Remove. clean and replace or install maintenance new insert after major storms, monthly during the wet season or at manufacturer's recommended interval. 2009 Surface Water Design Manual -Appendix A 11912009 120 A-35 APPENDIX A-GEOTECHNICAL REPORT 121 July 30, 2013 The Wendy's Company 1501 W. Mountainhead Parkway, Suite 601 Tempe, Arizona 85282 Attn: Ms. Valerie L. McCulloch Re: GEOTECHNICAL PLAN REVIEW New Wendy's Restaurant 10619 SE Carr Rd. Renton, Washington Terracon Project No. 82135007 Dear Ms. McCulloch: lrerracan The purpose of this letter is to provide a response to review comments provided by HG Kimura Architect, PLLC, dated February 13, 2013. Terracon has prepared a geotechnical engineering report for the project (Project No. 82135007, dated July 2, 2013). Comment: A geotechnical report for the site may be required. Information on the water table and soil permeability with recommendations of appropriate flow control BMP options with typical designs for the site from the geotechnical engineer shall be submitted with the application. Response: As previously stated, Terracon has prepared a geotechnical engineering report for the project. Our geotechnical report indicates that the water table, at the time of our exploration, was on the order of 8 to 10 feet below existing site grades (encountered in 3 borings). In addition, fines content of soils tested were on the order of 30 to 40 percent. Based on these two conditions, we are of the opinion that the site is not suitable for infiltration as a BMP. If other BMP's for flow control are considered by the design professionals and if they impact our geotechnical recommendations, Terracon should have the opportunity to review those designs. We appreciate the opportunity to be of service to you on this project. If you have any questions, please contact us. Office Manager <:--· ~----,---..... ~,/.da-= . .e--;-_) James M. Brisbine, P.E:~crz. Senior Geotechnical Engineer Terracon Consullanls. Inc. 2115 S. 56" SI., S1e. 405 Tacoma, Washington 98409 P 1253] 573 9939 F 1253] 573 9959 terracon.corn Geo t et.: 1111 1 i.: <1 I • ! 11vtro11111 e t1 I ,i I • Co 11 s Ir u ct I u II M ,l t er I t1 I '.i a I ,i c I I 1 \ 1 cs Geotechnical Engineering Report New Wendy's Restaurant 10619 SE Carr Road Renton, Washington July 2, 2013 Terracon Project No. 82135007 Prepared for: The Wendy's Company Tempe, Arizona Prepared by: Terracon Consultants, Inc. Tacoma, Washington July 2, 2013 The Wendy's Company 1501 W. Mountainhead Parkway Suite 601 Tempe, Arizona 85282 Attn: Ms. Valerie L. McCulloch P: (602) 466-9207 E: Valerie.Mcculloch@wendys.com Re: Geotechnical Engineering Report New Wendy's Restaurant 16330 Bothell Everett Highway Renton, Washington Terracon Project No. 82135007 Dear Ms. McCulloch: lrerracan Terracon Consultants, Inc. (Terracon) has completed the geotechnical engineering services for the above referenced project. These services were performed in general accordance with the Master Services Agreement (MSA) between The Wendy's Company and Terracon, dated January 31, 2013 and Terracon's Proposal No. PB2130017, dated March 6, 2013. This geotechnical engineering report presents the results of our subsurface exploration and provides geotechnical recommendations concerning earthwork and the design and construction of foundations, floor slabs, pavements, and utilities for the proposed project. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of further service, please contact us at (425) 771-3304. /, ames M. Brisbine, PE, LG Senior Project Geotechnical Engineer Terracon Consullants. Inc. 1115 S. 56" Street Suite 405. Tacoma, Washington 98409 P 1153) 573 9939 F [153) 573 9959 lerracon.com Geotech111cal a Env1ro11mr.ntill • Constr11ct1on M<1ter1nls a fi]r.1l1t1cs TABLE OF CONTENTS Page EXECUTIVE SUMMARY ............................................................................................................. i 1.0 INTRODUCTION ................................................................................................................. 1 2.0 PROJECT INFORMATION ................................................................................................. 1 2.1 Project Description .................................................................................................. 1 2.2 Site Location and Description .................................................................................. 2 3.0 SUBSURFACE CONDITIONS ............................................................................................ 2 3.1 Regional Geologic Conditions................................................. . ......................... 2 3.2 Surface Cond~ions .................................................................................................. 2 3.3 Subsurface Conditions ............................................................................................. 3 3.4 Groundwater. ........................................................................................................... 3 4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION ......................................... 4 4.1 Geotechnical Considerations .................................................................................. 4 4.2 Earthwork ................................................................................................................ 5 4.2.1 Site Preparation ....................................................................................... 5 4.2.2 Structural Fill ........................................................................................... 6 4.2.3 Compaction Requirements ...................................................................... 6 4.2.4 Grading and Drainage .............................................................................. 7 4.2.5 Construction Considerations ..................................................................... 7 4.3 Seismic Considerations.................................... . ............................................... 8 4.4 Foundations ............................................................................................................. 9 4.4.1 Design Recommendations ....................................................................... 9 4.4.2 Construction Considerations ................................................................... 10 4.4.3 Below-grade Drainage ............................................................................ 11 4.5 Floor Slabs ............................................................................................................ 11 4.5.1 Design Recommendations ...................................................................... 12 4.5.2 Construction Considerations ................................................................... 12 4.6 Pavements ............................................................................................................ 13 4.6.1 Design Considerations ............................................................................ 13 4.6.2 Estimates of Minimum Pavement Thickness ............................................ 13 4.6.3 Pavement Materials ................................................................................. 14 4.6.4 Pavement Drainage ................................................................................. 14 4.6.5 Pavement Maintenance ........................................................................... 14 5.0 GENERAL COMMENTS ................................................................................................... 15 Responsive • Resourceful • Reliable 125 TABLE OF CONTENTS-continued APPENDIX A-FIELD EXPLORATION Exhibit A-1 Site and Exploration Plan Exhibit A-2 Field Exploration Description Exhibits A-3 to A-8 Boring Logs B-1 to B-6 APPENDIX B -LABORATORY TESTING Exhibit B-1 Exhibit B-2 Exhibit B-3 Laboratory Testing Description Grain Size Distribution Organic Content APPENDIX C -SUPPORTING DOCUMENTS Exhibit C-1 Exhibit C-2 General Notes Unified Soil Classification Responsive • Resourceful • Reliable 126 Geotechnical Engineering Report New Wendy's Restaurant• Renton, Washington July 2, 2013 • Terracon Project No. 82135007 EXECUTIVE SUMMARY lrerracon A geotechnical exploration has been performed for the new Wendy's Restaurant located near the southwest corner of SE Carr Road and 108th Avenue SE in Renton, Washington. Terracon's geotechnical scope of work included the advancement of six borings to approximate depths of 6% to 16% feet below existing site grades, document review, laboratory testing, geotechnical engineering analysis, and preparation of this report. The site appears suitable for the proposed construction based upon geotechnical conditions encountered in the explorations and our current understanding of the proposed development. The following geotechnical considerations were identified: • Subsurface Conditions; Explorations disclosed existing silty sand fill with organics to depths of approximately 2% to 6% feet above a 1 to 4 foot thick layer of medium stiff to stiff silt. Below the fill and silt, medium dense silty sand was observed to 12 to 15% feet above very dense glacial till. Groundwater was observed in three of the borings perched above the glacial till at depths ranging from 8 to 1 OY, feet below the ground surface. • Structural Fill: Due to fines content, occasional organics, and in situ moisture levels, on-site existing fill and native soils are not suitable for reuse as structural fill. Imported soils should consist of Select Borrow or Common Borrow meeting the requirements of WSDOT section 9-03.14(2) and 9-03.14(3), respectively. • Foundatjons; Conventional shallow spread footings will provide adequate support for the proposed structure provided that existing fill below the footings is completely removed and the foundation subgrades are properly prepared. Footings bearing on silt encountered below the fill or structural fill above the silt should be designed for an allowable bearing capacity of 1,500 psf. An increased allowable bearing capacity of 2,500 psf may be used for footings bearing on at least 12 inches of structural fill if the compressible silt soils are completely removed. • • Floor Slabs; Concrete floor slabs may be supported by a capillary break layer above at least 12 inches of compacted structural fill above compacted existing fill soils. Seismic Design Considerations; The 2009 International Building Code, Table 1613.5.2 IBC seismic site classification for this site is C. This summary should be used in conjunction with the entire report for design purposes. It should be recognized that details were not included or fully developed in this section, and the report must be read in its entirety for a comprehensive understanding of the items contained herein. The section titled GENERAL COMMENTS should be read for an understanding of the report limitations. Responsive • Resourceful • Reliable i 127 GEOTECHNICAL ENGINEERING REPORT NEW WENDY'S RESTAURANT 10619 SE CARR ROAD RENTON, WASHINGTON Terracon Project No. B2135007 July 2, 2013 1.0 INTRODUCTION This report presents the results of our geotechnical engineering services performed for the proposed new Wendy's Restaurant to be located near the southwest corner of SE Carr Road and 108th Avenue SE in Renton, Washington. Our geotechnical engineering scope of work for this project included the advancement of six borings ranging in depth from approximately 6Yz to 16Yz feet below existing site grades. The purpose of these services is to provide information and geotechnical engineering recommendations relative to: • subsurface soil conditions • groundwater conditions • earthwork • foundation design and construction • floor slab design and construction • pavement design and construction • seismic considerations 2.0 PROJECT INFORMATION 2.1 Project Description ITEM DESCRIPTION Site layout See Appendix A, Exhibit A-1: Site and Exploration Plan Structure 3,520 square-foot one-story restaurant building Building construction Steel frame supported on conventional spread footings and slab on grade floors (assumed) Maximum loads Grading Columns: 60 kips (assumed) Walls: 2 kif (assumed) Slabs: 150 psf max (assumed) Cuts and fills of less than 2 feet (assumed) Responsive • Resourceful • Reliable 1 128 Geotechnical Engineering Report New Wendy's Restaurant • Renton, Washington July 2, 2013 • Terracon Project No. 82135007 lrerracon 2.2 Site Location and Description ITEM DESCRIPTION Location The site is located south of SE Carr Road and west of 1 oa'" Avenue SE. The site is a roughly rectangular parcel that measures approximately 0.85 acres. Section, Township, Range Adjacent site features Current ground cover Existing topography NE Y. of NW Y. of Section 32, T23N, R5E Developed retail/service properties to the east, west, and south. SE Carr Road to the north. Asphalt covered parking lot bordered by landscaped areas to the north and west and concrete retaining wall to the east. The site also contains a closed restaurant structure. Slopes gently up from north to south. Cast-in-place concrete retaining wall up to 8 feet tall along eastern border. Vegetated slope down to sidewalk and roadway on north and west site boundaries. 3.0 SUBSURFACE CONDITIONS 3.1 Regional Geologic Conditions The USGS Geologic Map of the Renton Quadrangle, Ktilg County, Washtilgton (GQ-405), indicates the entire project site is underlain by glacially consolidated Vashon ground moraine deposits (Q9,), mainly ablation till over lodgment till. The lodgment till soils are described as a compact, unsorted mixture of sand, silt, clay and gravel and are commonly referred to as hardpan. The lodgment till is nearly impermeable and relatively difficult to excavate, but relatively stable in cut slopes. The ablation till is described as similar, but much less compact and coherent. 3.2 Surface Conditions The site is currently developed with a small, single story structure previously occupied by a Shari's restaurant The ground surface on the lot slopes gently up from north to south and is covered with asphalt-concrete paving. The pavement section typically consisted of approximately 2 to 3 inches of asphalt-concrete over 3 to 4 inches of crushed rock base course at our boring locations. Ivy covered slopes extend down to 106'" Street on the west side of the site and down to SE Carr Road on the north side of the site. Responsive • Resourceful • Reliable 2 129 Geotechnical Engineering Report New Wendy's Restaurant • Renton, Washington July 2, 2013 • Terracon Project No. 62135007 3.3 Subsurface Conditions lrerracon Subsurface conditions presented in this report are based on the conditions encountered at the specific exploration locations. Variations in subsurface conditions may exist between the exploration locations and the nature and extent of variations may not become evident until construction. If variations then appear, it may be necessary to reevaluate the recommendations of this report. Due to the existing building, Tenracon was limited to where borings could be performed. However, we are of the opinion that adequate information was obtained for the purpose of this study. Below the asphalt-concrete surfacing, each of the borings disclosed a layer of possibly undocumented silty sand fill with organics to a depth of approximately 2Y:z to 6Y:z feet. Below the fill, 1 to 4 foot thick layer of medium stiff to stiff silt with variable sand content and occasional organics was encountered above medium dense silty sand with trace gravel. Very dense glacial till was observed below the medium dense silty sand at a depth of 12 to 15Y:z feet to the full exploration depths in borings B-1 and B-3. Laboratory tests were conducted on selected soil samples and the test results are presented in Appendix B. Laboratory test results indicate that both the native silty sand and silty sand fill soils have a fines content (that portion passing the #200 sieve) ranging from approximately 37% to 41 %. A test on the near surface fill material at the south end of the site indicated an organic content of over 6% by weight. Specific conditions encountered at each boring location are indicated on the individual boring logs. Stratification boundaries on the logs represent the approximate location of changes in soil types; in-situ, the transition between materials may be gradual. Details for each of the borings can be found on the boring logs included in Appendix A of this report. 3.4 Groundwater The borings were observed while drilling and after completion for the presence and level of groundwater. The water levels observed in the borings are noted on the attached boring logs, and are summarized below: Boring Number B-1 B-3 B-6 Depth to groundwater while drilling (ft) 8 9 1QY, Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff and other factors not evident at the time the explorations were performed. Therefore, Responsive • Resourceful • Reliable 3 130 Geotechnical Engineering Report New Wendy's Restaurant • Renton, Washington July 2, 2013 • Terracon Project No. B2135007 lrerracon groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. Additionally, perched groundwater may develop above low permeability layers, such as the glacial till observed at the bottom of borings 8-2 and 8-3. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project. 4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION 4.1 Geotechnical Considerations Based on our subsurface exploration program and analyses, the site appears suitable for the proposed construction with the building supported by conventional shallow spread footings bearing on native soils or properly compacted fill. Silty sand fill was observed in all explorations to a depth of up to 6% feet. Fill, especially undocumented fill, by nature can be highly variable and could very between sample locations. Therefore, it should be understood that there is a higher risk of differential settlement or non-uniform subgrade behavior when constructing on existing fill. This risk of unforeseen conditions cannot be eliminated without completely removing the existing fill, but can be reduced by performing additional testing and evaluation. Due to the risk of excessive settlements (both total and differential) resulting from the existing undocumented fill soils mantling the site, we recommend one of the following options for supporting the new building. • Overexcavation and Replacement· Removal of the fill and replacement with structural fill is a typical measure for mitigating possible unsuitable fill soils. We recommend complete removal of any fill soils below building footings and replacement with structural fill. For practical and economic reasons, removal and replacement of existing fill soils below floor slabs and pavements may be reduced to at least 12 inches, provided the owner is willing to accept some risk of variable and unpredictable settlements. • Aggregate Piers: As an alternative to overexcavation and replacement, aggregate piers could be installed below the building footings. Aggregate piers (one proprietary type is called Geopiers) require specialized equipment but result in much smaller import and export quantities. If the owner wishes to utilize aggregate piers for this site, we can provide supplemental information upon request. Geotechnical engineering recommendations for foundation systems, floor slabs, pavements, and other earth related phases of the project are outlined below. The recommendations contained in this report are based upon the results of data presented herein, engineering analyses, and our current understanding of the proposed project. ASTM and Washington State Department of Transportation (WSDOT) specification codes cited herein respectively refer to the current manual published by the American Society for Testing & Materials and the 2012 Responsive • Resourceful • Reliable 4 131 Geotechnical Engineering Report New Wendy's Restaurant • Renton, Washington July 2, 2013 • Terracon Project No. B2135007 lrerracan edition of the WSDOT Standard Spec,!ii:ations for Road, Bridge, and Mt1n1i:ipal Constrt1ction (Publication M41-10). 4.2 Earthwork The following sections present our recommendations for site preparation, subgrade preparation and placement of structural fills on the project. The recommendations presented for design and construction of earth-supported elements including foundations, slabs and pavements are contingent upon following the recommendations outlined in this section. Earthwork on the project should be observed and evaluated by Terracon. The evaluation of earthwork should include observation and testing of structural fill, subgrade preparation, foundation bearing soils, and other geotechnical conditions exposed during the construction of the project. 4.2. 1 Site Preparation Site stripping in the conventional sense will be limited to existing landscape areas. Stripping efforts should include removal of any vegetation, organic materials, and deleterious debris from areas slated for structural fill placement and in building and pavement locations. All elements of existing structures should be removed completely from the site. Excavations associated with removing existing site improvements should be backfilled with structural fill placed and compacted in accordance with the recommendations presented in this report. Existing underground utilities, such as storm sewer, sanitary sewer pipe, and water line that will not be used as part of the new development should either be removed completely or filled with Controlled Density Fill (GDF) conforming to WSDOT section 2-09.3(1)E, Backnl/ing In the event that existing utilities are abandoned in place, we recommend density testing of the trench backfill in order to verify that it is compacted to the density recommendations provided herein. The silty sand and silt soils encountered in the borings may be sensitive to disturbance from construction activity and increased moisture. If precipitation occurs prior to or during construction, the near-surface soils could increase in moisture content and become more susceptible to disturbance. Construction activity should be monitored, and should be curtailed if the construction activity is causing subgrade disturbance. A Terracon representative can help with monitoring and developing recommendations to aid in limiting subgrade disturbance. After building and pavement removal and excavation to subgrade elevation, proofrolling of pavement and building slab areas should be performed with heavy rubber tire construction equipment such as a fully loaded tandem-axle dump truck. A geotechnical engineer or his representative should observe proofrolling to aid in locating unstable subgrade materials. Proofrolling should be performed after a suitable period of dry weather to avoid degrading an otherwise acceptable subgrade and to reduce the amount of remedial work required. Unstable Responsive • Resourceful • Reliable 5 132 Geotechnical Engineering Report New Wendy's Restaurant • Renton, Washington July 2, 2013 • Terracon Project No. B2135007 lrerracon materials located should be stabilized as directed by the engineer based on conditions observed during construction. Replacement and densification in place are typical remediation methods. 4.2.2 Structural Fill All fill material placed in building, pavement, and non-landscaped areas should be placed in accordance with the recommendations herein for structural fill. The suitability of soils used for structural fill depends primarily on their grain-size distribution and moisture content when they are placed. As the fines content (that soil fraction passing the U.S. No. 200 Sieve) increases, soils become more sensitive to small changes in moisture content. Soils containing more than about 5 percent fines (by weight) may exhibit difficulty in compacting to a firm, unyielding condition when the moisture content is more than 2 percentage points above or below optimum. Optimum moisture content is the moisture at which the maximum dry density for the material is achieved in the laboratory following ASTM procedures. We understand that only minor cuts are planned for the site after removal of the existing structure and pavements. However, removal of the existing fill soils may generate large soil quantities during site grading. These moisture-sensitive soils include a significant percentage of organics and are therefore not considered acceptable for reuse as structural fill. Silt and sandy silt soils encountered at approximately 2Y:z to 6Y:z feet below the ground surface are extremely moisture-sensitive and may be difficult or impossible to compact to a firm, non-yielding condition if exposed to moisture. Disturbed site soils will likely need to be hauled off site for disposal if disturbed. The type of imported fill used at the site should depend on the weather conditions at the time of placement and the anticipated weather conditions until the fill subgrades are protected. All- weather fill should consist of Select Boffow meeting the requirements of WSDOT section 9- 03.14(2), with the modification of a maximum of 5 percent by weight passing the US No. 200 mesh sieve. Select Borrow is recommended for use in wet weather conditions, and for filling in wet site or trench conditions to reduce the risk of wet weather delays during the winter and spring months. Dry-weather fill can consist of Common Boffow, which is a lesser quality, more moisture-sensitive soil that can be compacted to a firm and non-yielding condition. Common B0trow should meet the requirements of WSDOT section 9-03.14(3) and only be used during dry conditions. The maximum particle size for both Select Boffow and Common Borrow may need to be reduced in certain areas, such as directly surrounding and above buried utilities. The use of other fill types should be reviewed and approved by Terracon. 4.2.3 Compaction Requirements Structural fill materials should be placed in horizontal lifts not exceeding about 12 inches in loose thickness. We recommend that each lift then be thoroughly compacted with a mechanical compactor to a uniform density of at least 95 percent, based on the modified Proctor test (ASTM D 1557). Where light compaction equipment is used, as is typical within a few feet of retaining walls and in utility trenches, the lift thickness may need to be reduced to achieve the desired degree of compaction. Soils removed which will be used as structural fill should be protected to Responsive • Resourceful • Reliable 6 133 Geotechnical Engineering Report New Wendy's Restaurant • Renton, Washington July 2, 2013 •Terracon Project No. 62135007 lrerracon aid in preventing an increase in moisture content due to rain and other factors. Moisture contents at the time of compaction should be within 2 percent of the optimum moisture content. 4.2.4 Grading and Drainage Adequate positive drainage should be provided during construction and maintained throughout the life of the development to prevent an increase in moisture content of the foundation, pavement and backfill materials. Surface water drainage should be controlled to prevent undermining of cut and fill slopes and structures during and after construction. Gutters and downspouts that drain water a minimum of 10 feet beyond the footprint of the proposed structures are recommended. This can be accomplished through the use of splash- blocks, downspout extensions, and flexible pipes that are designed to attach to the end of the downspout. Flexible pipe should only be used if it is daylighted in such a manner that it gravity- drains collected water. Alternatively, roof drains may be tied directly into the site storm system or terminated over paved surfaces; provided the pavements are sloped adequately away from the building to prevent water from infiltrating into soils supporting the foundations and floor slabs. Splash-blocks should also be considered below hose bibs and water spigots. 4.2.5 Construction Considerations It is anticipated that excavations for the proposed construction can be accomplished with conventional earthmoving equipment. Upon completion of filling and grading, care should be taken to maintain the subgrade moisture content prior to construction of floor slabs and pavements. Construction traffic over the completed subgrade should be avoided to the extent practical. The site should also be graded to prevent ponding of surface water on the prepared subgrades or in excavations. If the subgrade should become frozen, desiccated, saturated, or disturbed, the affected material should be removed or these materials should be scarified, moisture conditioned, and recompacted prior to floor slab and pavement construction and observed by Terracon. Surface water should not be allowed to pond on the site and soak into the soil during construction. Construction staging should provide drainage of surface water and precipitation away from the building and pavement areas. Any water that collects over or adjacent to construction areas should be promptly removed, along with any softened or disturbed soils. Surface water control in the form of sloping surfaces, drainage ditches and trenches, and sump pits and pumps will be important to avoid ponding and associated delays due to precipitation and seepage. Groundwater was encountered at 8 to 1 O'h feet in three of the borings during our exploration. Based on our understanding of the proposed development, we don't expect groundwater to significantly affect construction, except possibly for deeply buried utilities. If groundwater is encountered during construction, some form of temporary dewatering may be required. Conventional dewatering methods, such as pumping from ditches and sumps, should likely be Responsive • Resourceful • Reliable 7 13" Geotechnical Engineering Report New Wendy's Restaurant• Renton, Washington July 2, 2013 • Terracon Project No. B2135007 lferracan adequate for temporary removal of any groundwater encountered during excavation at the site. It should be noted that the groundwater conditions at the site are expected to vary over time depending on season and recent weather conditions. All temporary excavations should comply with applicable local, state and federal safety regulations, including the current Occupational Health and Safety Administration (OSHA) Excavation and Trench Safety Standards. The grading contractor, by contract, is usually responsible for designing and constructing stable, temporary excavations and should shore, slope or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. Construction site safety is the sole responsibility of the contractor who controls the means, methods and sequencing of construction operations. Under no circumstances shall the information provided herein be interpreted to mean that Terracon is assuming any responsibility for construction site safety or the contractor's activities; such responsibility shall neither be implied or inferred. Terracon should be retained during the construction phase of the project to observe earthwork operations and to perform necessary tests and observations during subgrade preparation, placement and compaction of structural fill, backfilling of excavations, and just prior to construction of foundations and floor slabs. 4.3 Seismic Considerations As part of our services, we evaluated the risk of liquefaction at this site. Based on our understanding of groundwater and geology at the site, it is our opinion that the risk of liquefaction at the site is low. The potential for seismic related settlement is also considered low. Based on our analyses, foundation bearing capacity failure is considered unlikely, and settlement of greater than 1 inch is considered unlikely during a design-level earthquake provided the soils in the building pad are prepared as recommended in this report. It is our opinion that no additional engineering geology investigations or geologic hazard evaluations are necessary relative to seismic hazards for this project. We reviewed the USGS Earthquake Hazards Program Quaternary Faults and Folds Database available online (http://earthquake.usqs.gov/regional/qfaults/usmap.php). The nearest fault to the project site is the Seattle fault zone approximately five miles north/northwest of the project site. According to this source, the fault age is in the less than 15,000 years category, has been mapped with west striking features, and is in the slip rate category of between 0.2 and 1.0 mm/year. Based on the information described above, we estimate that the risk associated with surface rupture at the site is low. Values provided below are based upon data from the 2002 USGS National Seismic Hazard Mapping Project. The table summarizes our recommended seismic design criteria. Responsive • Resourceful • Reliable 8 135 Geotechnical Engineering Report New Wendy's Restaurant • Renton, Washington July 2, 2013 • Terracon Project No. 62135007 DESCRIPTION . 2009 International Building Code Site Classification (IBC) 1 . Site Latitude Site Longitude S, Spectral Acceleration for a Short Period for Site Class B S1 Spectral Acceleration for a 1-Second Period for Site Class B Fa Site Coefficient for a Short Period F, Site Coefficient for a 1-Second Period lrerracon VALUE c' 47.4448° N ------ 122.1986° w 1.382g 0.472g 1.00 1.328 1. The 2009 International Building Code (IBC) indicates that the seismic site classification is based on the average soil and bedrock properties in the top 100 feet. The current scope does not include a 1 DO-foot soil profile determination. This seismic site class definition considers that soils encountered at depth in our borings continue below the termination depth. Additional exploration to deeper depths would be required to confirm the conditions below the current depth of exploration. 2. Site Class C applies to an average soil profile within the top 100 feet consisting predominantly of very dense soils. These soils are characterized by Standard Penetration Test blowcounts of greater than 50, a shear wave velocity of between 1,200 and 2,500 feet per second, and an undrained shear strength of greater than 2,000 pounds per square foot. 4.4 Foundations In our opinion, conventional spread footings will provide adequate support for the proposed building provided that the foundation subgrades are properly prepared. Foundation support for the proposed structures may be obtained from either undisturbed native soils or new structural fill placed in accordance with the recommendations in this report. Existing, possibly undocumented fill materials were encountered in our explorations within the proposed building area to depths of up to 6Yz feet below existing site grades. The following foundation design recommendations for the proposed structure are based on the assumption that (1 l all fill materials below the footings will be completely removed and replaced. or 121 aggregate piers wiU be instaUed below the footings. 4.4.1 Design Recommendations The allowable foundation bearing pressures apply to dead loads plus design live load conditions. The design bearing pressure may be increased by one-third when considering total loads that include wind or seismic conditions. The weight of the foundation concrete below grade may be neglected in dead load computations. Footings, foundations, and masonry walls should be reinforced as necessary to reduce the potential for distress caused by differential foundation movement. The use of joints at openings or other discontinuities in masonry walls is recommended. Responsive • Resourceful • Reliable 9 13t5 Geotechnical Engineering Report New Wendy's Restaurant • Renton, Washington July 2, 2013 • Terracon Project No. 82135007 DESCRIPTION Net allowable bearing pressure 1 Minimum dimensions Minimum embedment below finished grade for frost protection 2 Allowable passive pressure 3 Ultimate coefficient of sliding friction lrerracan Column Wall 1,500 psf 1,500 psf 24inches 16 inches 18 inches 18inches 300 pcf (triangular distribution) 040 1. The recommended net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation. Assumes any unsuitable fill or soft soils, if encountered, will be removed and replaced with structural fill. Based upon a Factor of Safety of 3. 2. Applies to perimeter footing and footings beneath unheated areas. Interior footings should bear a minimum of 12 inches below finished grade. Finished grade is the lowest adjacent grade for perimeter footings and floor level for interior footings. 3. Assumes that foundation backfill is compacted in accordance with the Earthwork section of this report. Based upon a Factor of Safety of 1.5. The above allowable bearing pressure recommendations assume footings for the proposed structure bear on native silt soils encountered below the existing fill or on structural fill placed above the silt soils. If the native silt soils observed to depths of up to 9'h feet below existing grades are removed, allowable bearing pressures may be increased to 2,500 psf for both column and wall footings bearing on at least 12 inches of structural fill placed above the native silty sands encountered below the silt. The lateral extent of existing fill and native silt removal and replacement for building footings should be two-thirds of the depth of excavation on all sides. As discussed in the Earthwork section of this report, due to the in situ moisture and high fines content, the native silt soils will not be suitable for reuse as structural fill and will need to be hauled off site for disposal. 4.4.2 Construction Considerations The base of all foundation excavations should be free of water and loose soil and rock prior to placing concrete, and should be compacted as recommended in this report. Concrete should be placed soon after excavating and compaction to reduce bearing soil disturbance. We recommend that Terracon be retained to observe and test the soil foundation bearing materials. If the soil conditions encountered differ from those presented in this report, supplemental recommendations will be required. If undocumented fill or unsuitable bearing soils are encountered in footing excavations, the excavations should be extended deeper to suitable soils. The footings could bear directly on these soils at the lower level or on lean concrete or compacted structural fill extending down to the suitable soils. If compacted structural fill is utilized, overexcavation below footings should extend laterally beyond all edges of the footings at least 8 inches per foot of overexcavation depth below footing base elevation. The overexcavation should then be backfilled up to the Responsive • Resourceful • Reliable 10 137 Geotechnical Engineering Report New Wendy's Restaurant • Renton, Washington July 2, 2013 • Terracon Project No. 92135007 lrerracon footing base elevation with structural fill placed in lifts of 12 inches or less in loose thickness and compacted to at least 95 percent of the material's maximum modified Proctor (ASTIM D-1557) dry density per the recommendations in the Earthwork section of this report. The overexcavation and backfill procedure is illustrated in the figures below. -1:-, D"'9n Footing Level Re<ommended . L.EAN CONCRETI Excavation leYel ..__ _..J.l'lo ___ ... --1-1 1- -'-1,1-I - Lean Concrete Backfill """"' Footing: level -STRUCTURAL D FILL ' -;--,-!_ Overexcavatlon / Backfill NOTE: Excavations in sketchn shown vertical for convenience. Excavations should b• llop9d as necessary for safety. 4.4.3 Below-grade Drainage In our opinion, the new building should be provided with a permanent footing drain system to reduce the risk of future moisture problems. Footing drains should consist of a minimum 4-inch- diameter, Schedule 40, rigid, perforated PVC pipe placed at the base of the footing with the perforations facing down. The pipe should be surrounded by a minimum of 6 inches of drain rock, conforming to WSDOT section 9-03.12(4) Gravel Backfill for Drains. A non-woven filter fabric, such as Mirafi 140N or equivalent, should envelope the drain rock. Footing drains should be directed toward appropriate storrnwater discharge facilities. Ideally, the drain invert would be installed at or slightly below the base of the perimeter footings. Roof downspouts, parking lot drains, and drains from any other runoff surfaces should not be tied into the perforated piping system of the foundation drains. Instead, the runoff water collected from such sources should be routed through a separate tightline piping system and sent to a municipal catch basin or other appropriate discharge location. 4.5 Floor Slabs As discussed in section 4.1 of this report, due to the presence of existing, possibly undocumented, fill soils within the proposed building pad, floor slabs for the proposed structure should be supported on at least 12 inches of new structural fill placed in accordance with the recommendations provided in this report. Existing fill soils that remain below the 12 inches of new structural fill should be further assessed during construction and recompacted as necessary to meet to the compaction recommendations in this report. Design recommendations for floor slabs are presented in the following sections. Responsive • Resourceful • Reliable 138 11 Geotechnical Engineering Report New Wendy's Restaurant• Renton, Washington July 2, 2013 • Terracon Project No. B2135007 lrerracon 4.5.1 Design Recommendations DESCRIPTION VALUE -----+------------------------ Interior floor system 1 Slab-on-grade concrete. ---------+---=---------- Floor slab subgrade Base course/capillary break' Minimum 12 inches of imported structural fill compacted in accordance with the Earthwork section of this report. 4-inch compacted layer of free draining, uniform gravel. 1. Floor slabs should be structurally independent of any building footings or walls to reduce floor slab cracking caused by differential movements between the slab and foundation. Narrower, turned- down slab-on-grade foundations may be utilized at the approval of the structural engineer. The slabs should be appropriately reinforced to support the proposed loads. 2. To provide a capillary break, the base course should consist of clean, free-draining, uniformly graded gravel, containing less than 5 percent fines, based on that soil fraction passing the US No. 4 sieve. Alternatively, material meeting the requirements of WSDOT section 9-03.9(3) Crushed Surfacing Top Course could be considered, with the modification of a maximum of 5 percent by weight passing the US No. 200 mesh sieve. Where appropriate, saw-cut control joints should be placed in the slab to help control the location and extent of cracking. For additional recommendations refer to the ACI Design Manual. Joints or any cracks in pavement areas that develop should be sealed with a water- proof, non-extruding compressible compound specifically recommended for heavy duty concrete pavement and wet environments. The use of a vapor retarder or barrier should be considered beneath concrete slab-on-grade floors that will be covered with wood, tile, carpet or other moisture-sensitive or impervious coverings, or when the slab will support equipment sensitive to moisture. When conditions warrant the use of a vapor retarder, the slab designer and slab contractor should refer to ACI 302 and ACI 360 for procedures and cautions regarding the use and placement of a vapor retarder/barrier. To avoid puncturing of the vapor barrier, construction equipment should not be allowed to drive over any vapor retarder material. 4.5.2 Construction Considerations On most project sites, the site grading is generally accomplished early in the construction phase. However as construction proceeds, the subgrade may be disturbed due to utility excavations, construction traffic, desiccation, rainfall, etc. As a result, the floor slab subgrade may not be suitable for placement of the capillary break and concrete and corrective action may be required. We recommend the area underlying the floor slab be rough graded and then thoroughly proofrolled prior to final grading and placement of capillary break material. Particular attention should be paid to high traffic areas that were rutted and disturbed earlier and to areas where backfilled trenches are located. Areas where unsuitable conditions are located should be repaired by removing and replacing the affected material with properly compacted structural fill. All floor slab subgrade areas should be moisture conditioned and properly compacted to the Responsive • Resourceful • Reliable 12 139 Geotechnical Engineering Report New Wendy's Restaurant • Renton, Washington July 2, 2013 • Terracon Project No. 82135007 lrerracan recommendations in this report immediately prior to placement of the capillary break and concrete. We recommend subgrades be maintained at the proper moisture condition until floor slabs are constructed. If the subgrade should become desiccated prior to construction of floor slabs, the affected material should be removed or the materials scarified, moistened, and recompacted. Upon completion of grading operations in the building areas, care should be taken to maintain the recommended subgrade moisture content and density prior to construction of the building floor slabs. 4.6 Pavements 4.6.1 Design Considerations We anticipate that traffic loads will be produced primarily by automobile traffic and occasional delivery and trash removal trucks. The thickness of pavements subjected to heavy truck traffic should be determined using expected traffic volumes, vehicle types, and vehicle loads and should be in accordance with local, city or county ordinances. Pavement performance is affected by its surroundings. In addition to providing preventive maintenance, the civil engineer should consider the following recommendations in the design and layout of pavements: • Final grade adjacent to parking lots and drives should slope down from pavement edges at a minimum 2%; • The subgrade and the pavement surface should have a minimum Y. inch per foot slope to promote proper surface drainage; • Install pavement drainage surrounding areas anticipated for frequent wetting (e.g., landscaping areas, etc.); • Install joint sealant and seal cracks immediately; • Seal all landscaped areas in, or adjacent to pavements to reduce moisture migration to subgrade soils, and; • Place compacted, low permeability backfill against the exterior side of curb and gutter 4.6.2 Estimates of Minimum Pavement Thickness Please note that the pavement section recommendations provided below do not consider heavy construction vehicle loading. If the pavements will be subjected to construction traffic, we recommend provisions be made during the pavement design to include an allowance for construction traffic or repairing the pavements and placing a new wearing surface near the end of construction should be anticipated. The light-duty pavement section alternatives are appropriate for areas that will be frequented largely by passenger vehicles. The heavy-duty pavement section would be appropriate for areas frequented by heavier delivery vehicles and garbage trucks. Responsive • Resourceful • Reliable 140 13 Geotechnical Engineering Report New Wendy's Restaurant • Renton, Washington July 2, 2013 • Terracon Project No. B2135007 lrerracon As a minimum, we recommend the following typical pavement sections be considered for asphalt concrete pavement areas. Material Minimum Thickness (inches) Standard-Duty Traffic Heavy-Duty Traffic Subgrade At least 1 foot of compacted existing fill or new structural fill Crushed Aggregate Base 6 I 6 ' Asphalt Concrete Pavement 2\1, 3y, Total Pavement Section BY, gy, 4.6.3 Pavement Materials Crushed aggregate base should conform to WSDOT section 9-03.9(3) Base Course and be compacted to a minimum of 95 percent of the material's modified Proctor (ASTM 0-1557, Method C) maximum dry density. Where base course thickness exceeds 8 inches, the material should be placed and compacted in two or more lifts of equal thickness. We recommend that the asphalt concrete conform to WSDOT sections 5-04 and 9-02.1 (4) for PG 58-22 or PG 64-22 Performance Graded Asphalt Binder. We also recommend using a mix with aggregate meeting the requirements presented in WSDOT sections 9-03.8(2) and 9-03.8(6) for a %-inch or %-inch gradation. Asphalt pavements should be compacted to a minimum of 92 percent of the Rice (theoretical maximum) density or 96 percent of Marshall (maximum laboratory) density. 4.6.4 Pavement Drainage Pavements should be sloped to provide rapid drainage of surface water. Water allowed to pond on or adjacent to the pavements could saturate the subgrade and contribute to premature pavement deterioration. In addition, the pavement subgrade should be graded to provide positive drainage within the crushed aggregate base section. 4.6.5 Pavement Maintenance It should be realized that asphalt concrete pavements (ACPs) are not maintenance-free. The pavement sections provided above represent our minimum recommendations for an average level of perfonmance for a 10-year design period. Thicker asphalt and base course would offer better long-term performance, but would cost more initially; thinner courses would be more susceptible to distress and failure. As such, pavement design can be considered a compromise between a high initial cost and low maintenance costs versus a low initial cost and higher maintenance costs. The pavement sections provided in this report represent minimum recommended thicknesses and, as such, periodic maintenance should be anticipated. Therefore preventive maintenance should be planned and provided for through an on-going pavement management program. Preventive maintenance activities are intended to slow the rate of pavement deterioration, and to Responsive • Resourceful • Reliable 141 14 Geotechnical Engineering Report New Wendy's Restaurant • Renton, Washington July 2, 2013 • Terracon Project No. 82135007 lrerracon preserve the pavement investment. Preventive maintenance consists of both localized maintenance (e.g., crack and joint sealing and patching) and global maintenance (e.g., surface sealing). Preventive maintenance is usually the first priority when implementing a planned pavement maintenance program and provides the highest return on investment for pavements. Prior to implementing any maintenance, additional engineering observation is recommended to determine the type and extent of preventive maintenance. Even with periodic maintenance, some movements and related cracking may still occur and repairs may be required. 5.0 GENERAL COMMENTS Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications. Terracon also should be retained to provide observation and testing services during grading, excavation, foundation construction and other earth-related construction phases of the project. The analysis and recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this report. This report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either express or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing. Responsive • Resourceful • Reliable 142 15 APPENDIX A FIELD EXPLORATION 143 LEGEND: SB-1 --POD -.. RMS """'"' RMS _ .. POD BORING NUMBER AND APPROXIMATE LOCATION ...,, ___ ... ._. __ z s 20 0510 ---· SCALI: IN FEET 20 _ ... B2135007 11enKDn i1--....:S:..:IT..:.;E:...:...;A::..:N:.:Dc...:EX=P-=L=-=O:..:.cRA:...:..:.T.:c:IO:..:N.::...:-PLA=N:..:.._--1 EXHIBIT -AS SHOWN ..... E,A1. -Juno 2013 Conoultlng -and - 2116Sl!tilllShlt,S.41:N5 T-,WA91M111 ....... .,,.. FAX. !253) m,.gag New Wendy's Restaurant 10619 SE Carr Road Renton, Washington A-1 Geotechnical Engineering Report New Wendy's Restaurant • Renton, Washington July 2, 2013 • Terracon Project No. B2135007 Field Exploration Description lferracon The subsurface exploration consisted of drilling and sampling 6 borings at the site to depths ranging from about 6% to 16% feet below existing grade. The boring locations were laid out by Terracon personnel. Distances from these locations to the reference features indicated on the attached diagram are approximate and were estimated. The locations of the borings should be considered accurate only to the degree implied by the means and methods used to define them. The borings were drilled with a truck-mounted rotary drill rig using hollow stem augers to advance the boreholes. Representative soil samples were obtained by the split-barrel sampling procedure. In the split-barrel sampling procedure, the number of blows required to advance a standard 2-inch O.D. split-barrel sampler the last 12 inches of the typical total 18-inch penetration by means of a 140-pound hammer with a free fall of 30 inches, is the standard penetration resistance value (N). These values are indicted on the borings logs at the depths of occurrence. This value is used to estimate the in-situ relative density of cohesionless soils and the consistency of cohesive soils. The sampling depths and penetration distance, plus the standard penetration resistance values, are shown on the boring logs. The samples were sealed and taken to the laboratory for testing and classification. A CME automatic SPT hammer was used to advance the split-barrel sampler in the borings performed on this site. A greater efficiency is typically achieved with the automatic hammer compared to the conventional safety hammer operated with a cathead and rope. Published correlations between the SPT values and soil properties are based on the lower efficiency cathead and rope method. This higher efficiency affects the standard penetration resistance blow count (N) value by increasing the penetration per hammer blow over what would obtained using the cathead and rope method. The effect of the automatic hammer's efficiency has been considered in the interpretation and analysis of the subsurface information for this report Field logs of each boring were prepared by the engineer on site. These logs included visual classifications of the materials encountered during drilling as well as the engineer's interpretation of the subsurface conditions between samples. Final boring logs included with this report represent an interpretation of the field logs and include modifications based on laboratory observation and tests of the samples obtained in the field. The enclosed boring logs indicate the vertical sequence of soils and materials encountered in each exploration. Where a soil contact was observed to be gradational, our logs indicate the average contact depth. The samples were classified in the laboratory based on visual observation, texture and plasticity. The descriptions of the soils indicated on the boring logs are in general accordance with the enclosed General Notes and the Unified Soil Classification System. Estimated group symbols according to the Unified Soil Classification System are given on the boring logs. A brief description of this classification system is included in Appendix C of this report. Responsive• Resourceful• Reliable Exhibit A-2 145 BORING LOG NO. B-1 P""e 1 of 1 PROJECT: New Wendy's Restaurant CLIENT: The Wendy's Company SITE: 10819 SE Carr Road Renton, Washington LOCATION See&hibitM ~I w a: 8 f w ~ ., :, 0.. t;;I!! ! I! ~ !:. I: > ~~ i a: i!!~ i ~ ii: a: i:: ~ w ciil ~ i!!w 0.. i5 ~~ i ~~ ffi ~ ! " Apprmdrnala &riace Elev. 100.5 (R.) +f-ii'! Ill a: a: w -" .. 2inchM _ T <Net 4 inches 1-.--.:• 1 .. ~, -·.: PLb -M.IY l6HQ (WI !race !J"BWI, daflc fPIY, loose to 0-.m dense, -.... moist -~ T •-' with sa,d n:1 °"""", dark brown, soft, wel -r--"I -X 2-2-3 SLJY l6HQ (SIii !race !J"BWI, broNn, loose, moist 16 N-5 S-1 18 -.. grades to -rpl'f n:I broNn, - ,'. 5-.. X 18 2-3-4 S-2 16 -N-7 39 .. •',: -.. .. -52. X ·. ·. grados to broNn, ...-12 -S-3 N-16 .. -.. 10-.. X 4-5-7 -14 N-12 S-4 ,' . ' 12.0 ..... -SLJY SAND ($NI trace !J"BWI, gray-brown, wry dense, moist (Glacial TiR) - - 15- X 18 18-28-42 S-5 -N-70 • _ ... _,,,, ,_,,_., 11.5- .................. rn..ilu. the ll'alWitim may be~-Hamner T ~ ~ IDfflllllC :5J" T Hammar EIIMlicl'1' l:illled er, ...,...:i Shari's finished floor ew.ation of 100.0. Act.atc::e11•1t Mllhod; See E>d'N'"1"'2 ""-"-- ,.,.,., ---See-Bb_of_ -and--(,any). Abad:.i•••• Mlthod: See-Cb __ d_and -.----"""'....-abble1iatiol ._ WA A lrerracon -_, 6/1"'2013 Bering"""-' 6/18'2013 52. 8' Perr:hed While Drilling kiri•'"" S,,1 DrilBr: EDI 21905 64th Ave, W, Suite 100 Mountlake Terrace, Washington -..,, 82136007 -""1. - BORING LOG NO. B-2 P""e 1 of 1 PROJECT: N-Wendy's Restaurant CLIENT: The Wendy's Company SITE: 10619 SE Carr Road Renton, Washington 8 LOCATION See E>Nbit A-2 .:! w % " w .. "' ? a. I-.. ! w -' ~ ~~ ffi~ .. I ;< ~ ~ :I: 0: ii: w w i~ I-I--' > w z .. ~ll! I 0 ~~ -' w Appro),ima &.tact Elev: 98 (A.)+/• i!j " .. ii w I ~8 "' 0 it' -· -· ,. 3 inches To,,et3inches """" 97.5+1· fLL • 31aIY MM) IN with organics, trace Q111'1&, dark br<Mn, loose, -.. moislto- -.. •' .. X -2-2-5 16 N,,7 S-1 -.. .. 5-.. IX 2-3-5 _:··.: '"' -14 N•8 S-2 18 91."'·' I §ftllY MJ (Nb) dark gray,,brown, soft, wet - -IX 0-1-1 14 Na-2 S-3 ---. - IIJX IHI! CINI d2l'k ~. loose, wet 10- .. Ix 14 1-2-4 5-4 -N=6 .. . . ·• - .. -. ,·.: . ,, .... -.. •', 15--.. IX 4-4-6 14 5-5 . ,--., r. -N•10 -, r_., 1u ,,_, lines araapp,OMII, ... Mtu, tt.tnnition n'l8'i begrai.111. Hl!rnms l )'Pa: AIADrn!ltic .:>r' I HarmNlr ~ baled on aMU'l18d Shari's finiafwd floor-.ation d 100.0. --.......... A.<! .. _ollilld--HolowSlom-... _ ... _.,_ -and--("""'' Aba,ido, ••• it Melhod: See_C .. _ol_and Soring&-------abbl edaliol ._ WATEal A lrerracon Boring Slarted: &'UV2013 Boring Compleled: 6/1Ql'a>13 No/Encountered °"" Rig: .... , Orilar: EDI 21905 64th Ave. W. SI.lie 100 MlunUake Terrace, wasn-----""'""No.: 12135007 -A-4. BORING LOG NO. B-3 Paae 1 of 1 PROJECT: New Wendy's Restaurant CLIENT: The Wendy's Company SITE: 10619 SE Carr Road Renton, Washington § LOCATION See E:obit A-2. .j~ w ~ 0: w ;,: " g .. ~ :;; ., ! w 1: ,:-~ ~ ~ .. ~ ..... if I!! !z t o:~ w w '":5 .. l ... > c., w i~ z l!!w l ~ ~::i ~ w Appn»imabt SUfa::e 8w. 99 (R) +/-I!! is I [;! w .. ,-··--,,_, .. 3 i-~a..3 iochM ,._,., ·'.: FLL • ¥JY MM) (IN) trace~. rp11, loose, wet - -.. .. -IX 3-3-5 6 S-1 .. .o = --MIY MIii (iN) trace~. mottled gray and brown, rnecium dense, ··.: wet 5-... ' ... IX 18 2-4-6 S-2 18 41 .. -Nz10 -.. . . -IX 3-5-6 • : • •• i;; ~= 16 5-3 17 N=11 .• . ¥,IX ftttr CINI 'Ill/, rnec1um dense, wet to salurated -_S,Z_ . . . . .. 10- ··. 'X 16 5-6-8 5-4 ... -N•14 -.. . . - -.. .. 1cc -~. 15-- !IL TV l\Hllll f!llll trace graw,1, dark r,ay, very dense, moist (Glacial Tit) X 14 17-37-50/5" s-s -·· -Nz50/5" _,,, r.,,.,..,..,"' ,,.., FNt .._ .. wa,-. n-eitu, thltnnition"-be~. -· .... Auklrnallc-.. -·~·- EIIMticl-. l:aed cw, -.med Sharl's ftnlslwd flaar ele\l8tiGn rA 100.0. --__ A-2 ... _of __ ----__ ... _of _ _ ...., __ [(any). Naab•••• Melhod: Soo-Cfor_of_ ..... --------~- A A lrerracan Soring stawled: 6/19'2013 -~ 6/1!!/2013 _S,Z_ 9' Pen:hed While Drilling Crill Rig,""' Drller: EDI 21905 64UiA11&. W, Suite 100 Mountlake Terrace, Washington Plojoct .... , 1121360ll' -"°· BORING LOG NO. B-4 P=e1of1 PROJECT: N-Wendy"s Restaurant CLIENT: The Wendy"s Company SITE: 10619 SE Carr Road Renton, Washington LOCATION Seo EnbitM -'"' "' 0: § ~ .. 7 " ? Iii~ 0. :. I!! ! i ~ > o:-~ ~< 1!!5 :, ~~ ~ :,: ~ "' z ... .... 0: iii w Oo, .. z ~ 0. ~~ ii iii!:! -' ;:~ w ---99(A.)+/• I!! i ~ I ii! ;: i!l a: w --· -~ 0. .5 2 inches fM/(J.5inchM ,AnCK fLL • M-IY SANQ (IN) trace organics and gravel, dark fPlt and brown, . .. medum-.wet . •:: IX . 4+7 16 Na13 S-1 20 37 .. . ·.·.: .•.. == 5-rx $IJY MHP (M trace ~. rpl'/, medium dense, moist 14 4-7.7 S-2 . Na14 . · .. _::... .. -··" 11or1ng Tenn/naledatas- llnea .. 44AOlii1.-. ll'Mttu, the tnr.ilion may be gracbll. lwnnwl~: -l9r.aliona baaed M -..ned Shari's linilhed lloor elNltion of 100.0. -----Seol!)rjbi(Mfot-dflad- _, ... _..b_d_ ,...........,-..-1,..,,,, Ab...lO.li•••' Method: Seo"-""'Cb__,d.,.,-end _____ .__ -w• A,•-lrerracon Bor1ng Slalted: 8'1!ill2013 Boong CmJpleled: 611&'2013 NotEncounlllnld Clil Rig: 8-61 Ork: EDI 21005 64th Ave. W, Si.ite 100 MounUake Tenace, WasRnntnn ~ No.: 82135007 -Ml BORING LOG NO. B-5 P=e 1 of1 PROJECT: New Wendy's Restaurant CLIENT: The Wendy's Company SITE: 10619 SE Carr Road Renton, Washington § LOCATION Seo E>hbt A..2 ~"' "' "' ~ w i1 "' i ':!~ 0. Inf!! !I w I:: >-"'-ii: ~ ~~ "' ~~ :j! j!!!i: ~ :,; i ~ ~ ~ffi w l! z ~ > ~ .. 0 ~II! w App,mimalll Stmce Elev. 101.5 (Ft.) +/. ~ l! 0 .. ~ II! ! w -· -· .. 2 inches I T-fNet 3.5 inches """K 1"1+1· . -fLL -SLJY MIii CINI trace~. dark <pt/, loose to meclum -. -.. moist - : : ?7 -MI CNY wilh sand and organics, trace gr.we!, dark brown, mec1um still, -)< 2-4-5 moist 16 N=9 S-1 - 5-i,am to brown IX 1-2-3 -4 Ns5 S-2 14 ---. _,,,, T-atU- .... approoitnall. h4ib.l, h lnnitim may be gracbll. Hllrnmer )'PII: -BIM!liorw baaed oo-.aned Sharf'• finiet'lld floor~ d 100.0. Mam,etMethcd ........... .._ SeoE>hbtA..2tor_ ...... _ ,_, Seo-Btor-o1--,. -and--(•""Yl- Abww:lo•• ., MICtm: Seo-Ctor_ol_and -------abtJmviaticn. -... ... lrerracon Boring Started: 611Ql2013 -~ .. ,9/2013 /1/«Encounlerod Oril Rig, ""' Criller: EDI 21905 64tt, Ave. W, &ite 100 Mountlake Terrace, Washington -No., 82135007 &,t;t;t A,.7 BORING LOG NO. B-6 P=e 1 of 1 PROJECT: New Wendy"s Restaurant CLIENT: The Wendy's Company SITE: 10619 SE Carr Road Renton, Washington LOCATION See Emi~t A-2 iil~ ~ -0: 8 ill ;., ~ i i ~~ ~ ~ 1:: ~ o:- ll ~ .. I!!~ ! w!;; I i!c ~~ ~ w ~j i~ ~ > w z .. .. 0 ~ w Appro,dmate SUfac:e Elev. 105.5 {A.).,. I!! i~ I " ~ ~ ~ w == .. .5 2 inches _TfMMJ.SinchN ,...., .. fLL -Sl,IY MIC! (Ml 1raoe gavel, dark rP"/, medum -. moist - -.. ·.·.: '" ,~= -X 14 7-7~ S-1 ¥.I CWz) wtth sand and organics, trace gravel, dark brcNm, stm, moist Na13 - 5- '" 90.= X 12 3-3-6 S-2 -Na9 M.lY 56Pll (IN) trace gavel and organics, dark 'PY, loose to mectun .. -.moist -. '. .. ,n .,.., X -12 2-5-7 S-3 -· . &IX ,,er (IN) trace f,TIIWI. ~. medium dense, wet Na12 . . - 10-'SL X -grades to saturated -14 Na10 5-4 11 < ~ 8orlng T.,,,,,,,_ at ff.5 Fftt 11,a .. app.CNlt.al&. n,eitu, the tnnition may be gradual. Hammar I ,'Pit: Al*3malic: M" I Hammer e...ixx. baaed on auml8d Shari'a liniahlld loor alr.etion cf 100.0. Ai:t.awww••• M9lhod: SeeE>no;iA-2fot_rJ .... _ _, ---See_.,.,_"'_ -and--( • .,,.). Ab&iCk»Wi ...rt Mattvxl: See-Cfot_rJ_and l!kJringl bm:klled with benkJnila chips upon complelion -· WA A lrerracan ~ -6110/2013 Boring C,ornplilted: 8119/2013 'SL 10. 5' While Drilfing Oril Alge El<!1 Orillllr:EOI 2190564th Ave. W, Suite 100 Mol.s'ltlake Terrace. Washington Project !\ti.: 82135007 -"" APPENDIX B LABORATORY TESTING 152 Geotechnical Engineering Report New Wendy's Restaurant• Renton, Washington July 2, 2013 • Terracon Project No. B2135007 Laboratory Testing llerracon As part of the testing program, all samples were examined in the laboratory by experienced personnel and classified in accordance with the attached General Notes and the Unified Soil Classification System based on the texture and plasticity of the soils. The group symbol for the Unified Soil Classification System is shown in the appropriate column on the boring logs and a brief description of the classification system is included with this report in the Appendix. At that time, the field descriptions were confirmed or modified as necessary and an applicable laboratory testing program was formulated to determine engineering properties of the subsurface materials. Laboratory tests were conducted on selected soil samples and the test results are presented in this appendix. The laboratory test results were used for the geotechnical engineering analyses, and the development of foundation and earthwork recommendations. Laboratory tests were performed in general accordance with the applicable ASTM, local or other accepted standards. Results of the laboratory tests are presented in this Appendix and on the boring logs. Selected soil samples obtained from the site were tested for the following engineering properties: • In-situ Water Content • Organic Content Responsive• Resourceful• Reliable • Grain Size Distribution Exhibit B-1 153 I U.S. SIEVE OPENING IN INCHES I 6 4 3 2 1.5 ! .,, 1/2 6 3 100 I 1\:- 95 -~ 90 85 80 75 70 : 65 I- 180 1:i 55 " ~ 50 ... 'z 45 w ~ 40 ~ : 35 30 25 20 : 15 10 5 0 100 10 I COBBLES I GRAVEL coarse I f,ne Boring ID Deptl • B-1 5.0 IJI 8-3 5.0 ... B-4 2.5 Borlna ID Deptl D,.. • B-1 5.0 25 IJI B-3 5.0 19 ... B-4 2.5 12.5 PROJECT: Now Wendy's -rant SITE: 10619 SE Carr Road Renton, Washington GRAIN SIZE DISTRIBUTION ASTMD422 U.S. SIEVE NUMBERS I HYDROMETER 4 6 s 10 14 1s 20 30 40 50 60 100140200 I I I I I I ~ : ----: : \ \ ~ : \'1 : : : : '\ : ~ : : : : : : : : 1 0.1 0.01 GRAIN SIZE IN MIWMETERS laase I SAND I SILT OR CLAY meclum I r ... uses Clanlflcatlon LL PL Pl SILTY SAND (SM), trace gavel SIL TY SAND (SM), trace gavel SIL TY SAND (SM), trace gavel o. 0,. D,. %Gravel %Sand %Silt 0.181 82 52.9 0.162 2.4 56.7 0.175 1.6 61.6 PROJECT NUMBER: 62135007 lrerracan CLIENT: The Wendy's Company 21905 64th Ave. W, Sutte 100 Mounuake Terrace, Washington EXHIBIT: B-2 0.001 I Cc Cu %Clay 38.9 40.9 36.8 - Project Name: New Wendy's Restaurant Project Number: B2135007 Client: The Wendy's Company llerracan Consulting Enginee~ & Scientists Date: Report of Determination Organic Content ASTM D29741 D2216 Sample: Location: Depth: Organic Content, percent: Molstura Content: Tntedby: BD Reviewed by: .JW Rnpectfully submitted, By Jeff Ward S·1 B-6 2.5' 6.44% 20.3% 6/21/2013 Exhibit B-3 155 APPENDIXC SUPPORTING DOCUMENTS 1S8 GENERAL NOTES DESCRIPTION OF SYMBOLS AND ADDAl!VIATIONS rn ~ 5L -lnlflllly (.., ---Allglr SplttS-, 1 -..--. (TJ Torvano 5-lfled Panocl of Tlmo I rn .J _y_ -..--Ill (b/1) -...... b_ C) w I $pKllled Pariocl of Tl-I- ~ Ill TOIi (blowa per-) z SholbJTube MlcnlCoro w ::::i .J Water levels indicated on Iha soil boring I-(PID) Phalo Ionization o.llc:tor" a.. D u Ill: logs are the levels measured in lhe 9 ~ w borehole at the times indicated. I-Groundwater level variations will occur !II (OYA) Organic v-AnolyDf Ill Ring Sampler -Coro i LL. over time. In low permeability soils, § 0 accurate determination of groundwater levels is not possible with short term water level observations. Grolllamplo NolllcaM•)' DMCRlf'DYI! SOIL Cl &Sl!flCATION Soil classification is based on the Unified Soll Classification System. Coarse Grained Soils have more lhan 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency. bQCATION ANP fl ffl'ATIQN NOJeS Unless otherwise noted, Latitude and Longitude are approximately determined using a hand-held GPS device. The accuracy of such devices is variable. Surface elevation data annotated with +/. indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the area. RB.ATM! DENSITY OF COARSE-GRAINED SOILS (Mote than 50% retained on No. 200 sieve.) Density delermined by -Penetration Resiotanoe Includes gravels, sands and sits. Ill DooolpllvoT.,. --or Ring--I --(-.,i --1'1. w I-Very Looso 0-3 0-6 ::c I-Looso 4.9 7 -18 C) z ::! Medium Dense 10 .29 19-58 I- Ill Dense 30-50 59 -98 Very Denso > 50 :! 99 Bfl tJ1Yf PB9P9ft11ANI Pf ltND MP f-P6Yfl Dncrtmbe JIOD(s) Q(erber: ce !MtrzDII Trace Wilh Modifier Ptoienfgf QrxW 1 p111 < 15 15 • 29 >30 Bl! tDYI P8APQRJ1QNI Of flNII Dncd..,,,, Jenn(1) ew ct Qf gf olw renew,eene, Dry ""9bC Trace With Modifier <5 5-12 > 12 CONIISlENCY 0, FINE-GRAINED SOILS (50% or more passing 1he No. 200 siovo.) Conslstoncy delermlnod by laboratory shNr strength testing, field visual-manual proc:o<kres or standard penetration resistance DooolpllvoTwn, (~ Very Soft Soft ModitJm.Stiff Stiff Very Stiff Hard u.-1111od c_.._ --onor Ring Slmplor N-V .... Slnngllt, Qu, 1111 --1'1. loss lhan 0.2S 0-1 <3 0.2S ID 0.50 2-4 3.4 0.50 ID 1.00 4-8 5.9 1.001<>2.00 8-15 10 -18 2.00ID 4.00 15-30 19-42 >4.00 > 30 >42 GftPN Fl TD rrn MY -.. Cobbles Gravel San<I Sill or Clay :r.m Non-plastic Low Medium High PedkfeNn aver 12 In. (300 mm) 12 in. to 3 in. (300mm to 75mm) 3 in. lo #4 sieve (75mm to 4.75 mm) #4 lo #200 sieve (4.75mm lo 0.075mm Passing #200 sieve (0.075mm) PbMJJC!ITY 'PICltPTON P!eefldbc pig 0 1 • 10 11 • 30 >30 lrerracan UNIFIED SOIL CLASSIFICATION SYSTEM -- Soll Cl-lftcatlon Criteria for Asalgnlng Group Symbols and Group Namn Ualng Laboratory Teats A Group Group Name 1 Symbol Cu ~4and 1 sCcs3E GW ~----- Gravels: iCleanGraveta: Well-graded gravel More than 50% of j Less than 5% fines c Cu< 4 and/or 1 >Cc> 3E GP Poorly graded gravel' coarse fraction retained i Gravels wl1h Fl"": Fines ciassify as ML or MH GM Silty gravel r.i;;;.1-1 Coaru Grained Solle: on No. 4 sieve i More than 12% fines c Fines classify as Cl or CH GC Clayey gravot '·0 ·" Mono than 50% retained Cu~ 6 and 1 sCcs3e SW Woll-graded sand' on No. 200 sieve Sands: ' Clean Sands: 50% or more of coarse Less than 5% fines 0 Cu<6and/or1 >Cc>3e SP Poorly graded sand' fraction passes No. 4 Sands with Fl"": Fines classify .. ML or MH SM Silty sand a,H.L sieve More than 12% fines 0 -Clayey sand o.H.i Fines classify as CL or CH SC Pl> 7 and plots on or above "A" line J CL Lean clay K,L.M SHIii and Chaya: Inorganic: Pl< 4 or plots below "A" Hno J ML SiltK,L,M Liquid limtt less than 50 Orpnic: Liquid limH -oven dried <0.75 OL Organic clay K,Cl<N Fino-Grained Solle: Liquid limtt • not dried Organic sil K.L.u.o 50% or more passes the Pl plots on or above ~A· line CH Fat clay ··•· No. 200 sieve lnorpnic: SHIii and Clilya: Pt plots below "A" lino MH Elastic S~t "" Liquid limH 50 or mono Orpnlc: Liquid limit -oven dried <0.75 OH Organic day K,1..-.r Liquid limtt -not dried Organic silt K.L ........ Highly orpnlc ooits: Primarily organic matter, dark in color, and organic odor PT Peat • Based on tho material passing the 3~nch (7!5-mm) sieve " If fines an, organic, add "with organic fines" to group name. ' If field sample contained cobbles or bouldera, or both, add "with cobbles or bouldera, or both" to group name. ' If soil contains a 15% gravel, add "with gravel" to group name. J If Attorberg limits plot in shaded an,a, soil is a CL-ML, siHy cloy. c Gravels with 5 to 12% fines requin, dual symbols: GW-OM well-graded gravot with sift, GW-OC wel1jradod gravel with clay. GP-OM poorly graded gravel wtth silt, GP-GC poorly graded gravel with clay. • If soil contains 15 to 29% plus No. 200. add "with sand" or "wtth gravel.• whichever is predominant ' If soil contains a 30% plus No. 200 predominantly sand, add "sandy" to group name. ' Sands with 5 to 12% fines require dual symbols: SW-SM well-graded sand with silt, SW-SC well-graded sand with day, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay • If soil contains ~ 30% plus No. 200, predominantly gravel, add e Cu a Dao/0,o Cc =-' (D,,) 010 X 0,0 "gravelly" to group name. " Pl a 4 and plots on or above "A" Une. 0 Pl < 4 or plots below "A" Hne. P Pl plots on or above "A" line. ' If m contains ~ 15% sand, add "wtth sand" to group name. o Pl plots below "A" lino. • If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM. 60 :· :::l:.:~=I:~=:~ --,.! .<"0 ////----[----.,~-/ V --1 50 !-of coaraa-gralned SOIis '.'/ ---v~·-~'-: ,(··r' . .:.""' Equation of .. A~ • line · ,,..~, r . Horizontal at Pl=4 lo LL=25.5. / ~ ./ 40 -then Pl=0.73 (LL-20) ,./, , ' ,O-/'---,,L-+-----+------1 ' Equation of ·u· -line ' / i' o : Vertical at LL=16 to P1=7, ,/ V 30 :-then Pl=0.9 ,(.L/L-8) ¥'--,,-_;,· -'-'--+,--/-J,,"-----+-----+------1 , ,.,,,. o" I/ i / oi.. ,,, 20 i / ,/// , /----,,L+---+-M-H-~~,-O-H-1-------+---I 10 ! I_,, 7~--~-~:.l,. ..... ~k--....,..r 4 ~ 0 ,. i ~, .... / ' ! ' 0 10 16 20 30 . MLorOL 40 50 60 70 LIQUID LIMIT (LL) lrerracon 80 90 100 110 Exhibit C-2 158 Form WA-5 (6/76) Commitment Face Page COMMITMENT FOR TITLE INSURANCE Issued by File No.: NC5-605666-WAI FIRST AMERICAN TI1l.E INSURANCE COMPANY Rrst American Title Insurance Company, herein called the Company, for valuable consideration, hereby commits to issue its policy or policies of title insurance, as identified In Schedule A. in favor of the proposed Insured named in Schedule A, as owner or mortgagor of the estate or interest covered hereby in the land described or , efen ed to in Schedule A, upon payment of the premiums and charges therefor; all subject to the provisions of Schedules A and B and to the Conditions and Stipulations hereof. This Commibnent shall be effective only when the identity of the proposed Insured and the amount of the policy or polldes committed for have been Inserted in Schedule A hereof by the Company, either at the time of the Issuance of the Commitment or by subsequent endorsement. This Commitment If preliminary to the Issuance of such policy or policies of title Insurance and all liability and obligations hereunder shall cease and terminate six (6) months after the effective date hereof or when the policy or policies oommitted for shall issue, whichever first occurs, provided that the failure to Issue such policy or policies is not the fault of the Company. This Commitment shall not be valid or binding until countasigned by an authorized officer or agent IN WITNESS WHEREOF, the Company has caused this oommitment to be signed and sealed, to become valid when countasigned by an authorized officer or agent of the Company, all in aaDl"dance with its By-Laws. This Commitment is elfedlve as of the date shown In Schedule A as •Effective Date.• First American Title Insurance Company ey: 41J of' ~w' President /7 Attest; IJ14-l ti-~ Secretary By: ~,. ~ Countersigned RECEIVED OCT 2 2 2013 c:,,rv OF RENTON -MJNING DIVISION Rrst Ametit:an Ti/Je Insurance Company Form WA-5 (6/76) Commitment Ale No.: Ncs-605666-WAl Page No. 1 First American Title Insurance Company National Commercial Services 818 Stewart Street, Suite 800, Seattle, WA 98101 (206)728-0400 -(800)526-7544 FAX (206)448-6348 To: Mike Cooper (206)615-3107 mcooper@ftrstam.com Republic Commercial Title Company, of Florida, LLC 3370 capital arc1e N.E., Suite c-1 Tallahassee, FL 32308 Attn: Stave Bolles SECOND REPORT SCHEDULE A 1. Commitment Dall!: August 1, 2013 at 7:30 A.M. 2. Policy or Policies to be issued: AMOUNT AL TA Standard Leasehold Owners $ To Follow $ Proposed Insured: Wendy's International, Inc. Linda Home (206)615-3057 lhome@firstam.com Ale No.: NCS-605666-WAl Your Ref No.: Wendy's PREMIUM TAX To Follow $ To Follow 3. The estate or interest In the land described on Page 2 herein is Fee Simple, and title thereto is at the elfecti11e date hereof vested in: Trimark-North Benson, LP, a Washington limited partnership 4. The land referred to In this Commlbnent is described as follows: The land I el'erred to in this report is desa1bed in Exhibit "A" attached hereto. Rrst American Tdfe Insurance Company Form WA-5 (6/76) C:Omrnitment LEGAL DESCRIPTION: EXHIBIT'A' File No.: Ncs-605666-WA! Page No. 2 A lRACT OF LAND LYING IN AND BEING A PORTION OF THE NORTHEAST QUAR1ER OF THE NORTHWEST QUAR1ER, SECTION 32, TOWNSHIP 23 N., RANGE 5 E., W-M., COUNTY OF KING, STA1E OF WASHINGTON, MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENONG AT THE NORTH QUAR1ER CORNER OF SECTION 32, lOWNSHIP 23 NORTH, RANGE 5 EAST, W.M. IN THE COUNTY OF KING, STA1E OF WASHINGlON; THENCE, SOUTH 01°26'34" WEST ALONG THE CEN1ERLINE OF 108TH AVE. S.E. A DISTANCE OF 74.98 FEET; NORTH 88°33'26" WEST A DISTANCE OF 55.78 FEET 10 THE WEST MARGIN OF 108TH AVE. S.E.; lHENCE NORTH 38°11'24" WEST, A DISTANCE OF 22.07 FEET; THENCE NORTH 15°54'58" E, A DISTANCE OF 5.71 FEET ro A POINT OF CURVATURE; THENCE, ON A CURVE 10 THE LEFT, HAVING A RADIUS OF 25.00 FEET, A CHORD BEARING OF NORTH 72°29'45" WEST, A CHORD DISTANCE OF 0.65 FEET, FOR AN ARC DISTANCE OF 0.65 ACRES; THENCE NORTH 74°40'26' EAST, A DISTANCE OF 54.78 FEET; THENCE SOUTH 86°50'18" WEST A DISTANCE OF 58.74 FEET TO A POINT OF CURVATURE; lHENCE ON A CURVE TO lHE LEFT, HAVING A RADIUS OF 1879.86 FEET, A CHORD BEARING OF SOUTH 86°40'39" WEST, A CHORD DISTANCE OF 10.54 FEET, FOR AN ARC DISTANCE OF 10.54 FEET TO A POINT OF A COMPOUND CURVE 10 THE LEFT; THENCE, ON SAID CURVE, HAVING A RADIUS OF 1879.86 FEET, A CHORD BEARING OF SOUTH 84°23'22" WEST, A CHORD DISTANCE OF 139.56 FEET, FOR AN ARC DISTANCE OF 139.60 FEET; THENCE SOlffii 01°24'30" WEST, A DISTANCE OF 20.26 FEET TO THE POINT OF BEGINNING; THENCE SOUTH 01°24'30" WEST, A DISTANCE OF 225.19 FEET; THENCE NORTH SS°33'26" WEST, A DISTANCE OF 151.86 FEET TO A POINT ON A CURVE; THENCE ON A CURVE TO THE RIGHT, HAVING A RADIUS OF 9.00 FEET, A CHORD BEARING OF NORTH 43035'29" WEST, A CHORD DISTANCE OF 12.72 FEET, FOR AN ARC DISTANCE OF 14.13 FEET; THENCE NORTH 01°22'27" EAST, A DISTANCE OF 128.90 FEET; lHENCE NORTH 17°26'31" WEST, A DISTANCE OF 52.06 FEETTO A POINTON THE SOUTHERLY RIGHT-OF-WAY UNE OF S.E. CARR ROAD, AN EXISllNG PUBl.lC RIGHT-OF-WAY; lHENCE ON SAID UNE, ON A CURVE TO THE RIGHT, HAVING A RADIUS OF 1859.86 FEET, A CHORD BEARING OF NORTH 79021'44" EAST, A CHORD DISTANCE OF 181.76 FEET TO THE POINT OF BEGINNING. Rrst American Tttfe Im;w-ance OJmpilny Form WA-5 (6/76) Commitment SCHEDULE B -SECTION 1 REQUIREMENTS Toe following are the Requirements to be complied with: File No.: NCS-605666-WA! Page No. 3 Item (A) Payment to or for the aa:ount of the Grantors or Mortgagors of the full ronsideratlon for the estate or interest to be insured. Item (B) Proper instrument(s) creating the estate or Interest to be Insured must be exeruted and duly filed for record. Item (q Pay us the premiums, fees and charges for the policy. Item (D) You must tell us in writing the name of anyone not referred to In this Commitment who will get an interest in the land or who will make a loan on the land. We may then make addltional requirements or exoeptions SCHEDULE B -SECTION 2 GENEBfU EXCEPTIONS Toe Policy or Pondes to be issued will contain Exceptions to the following unless the same are disposed of to the satisfaction of the Company. A. Taxes or assessments which are not shown as existing liens by the rerords of any taxing authority that levies taxes or assessments on real property or by the public records. B. Any facts, rights, interest, or daims which are not shown by the public records but which rould be ascertained by an inspection of said land or by making inquiry of person In possession thereof. C. Easements, daims of easement or ena.unbrances which are not shown by the public records. D. Discrepancies, ronflk:ts in boundary lines, shortage In area, encroachments, or any other facts which a rorrect survey would disdose, and which are not shown by public rerords. E. (1) Unpatenred mining daims; (2) reservations or exceptions In patents or in acts authorizing the issuance thel eof, (3) Water rights, claims or title to water; whether or not the matters excepted under (1), (2) or (3) are shown by the public records; (4) Indian Tribal Codes or Regulations, Indian Treaty or Aboriginal Rights, lnduding easements or equitable servitudes. F. Any lien, or right to a lien, for services, labor, materials or medical assistance theretofore or hereafter li.mished, imposed by law and not shown by the public records. G. Any service, installation, ronnedion, maintenance, construction, tap or reimbursement charges/costs for sewer, water, garbage or electricity. H. Defects, liens, enaimbrances, adverse daims or other matters, if any, created, first appearing in the public rem ds or attaching subsequent to the effective date hereof but prior to the date the proposed insured acquires of record for value the estate or interest or mortgages thereon rovered by this Commitment Rrst American TdJe ll1SlJTaf1Ce Company Fonn WA-5 (6/76) Commitment File No.: Ncs-605666-WAl Page No. 4 SCHEDULE B -SECTION 2 (continued} SPECIAL EXCEPTIONS 1. This item has been intentionally deleted. 2. General Taxes for the year 2013. Tax Account No.: Amount BIiied: Amount Paid: Amount Due: Assessed Land Value: Assessed Improvement Value: 322305-9063-05 $ 148,854.31 $ 74,427.16 $ 74,427.15 $ 3,390,600.00 $ 6,n3,600.oo 3. Facility Charges, if any, including but not limited to hook-up, or connectlon charges and latecomer charges for water or sewer facilities of cascade Sewer DistJict as disclosed by instrument recorded February 7, 1975 and May 5, 1981 under Recording Nos. 7502070239 and 8105050732. Said Instrument is correction of the instrument recorded August 22, 1972 under Reoording No. n08220595. 4. Reservations and exceptions, Including the terms and conditions thereof: Reserving: Minerals Reserved Sy: John Winston and aara Winston, husband and wife Recorded: October 4, 1912, March 31, 1913, August 2, 1913 and October 5, 1914 Recording Information: 829843, 858693, 880063 and 956710 5. Reservations and exceptions, including the terms and conditions thereof: Reserving: Minerals Rese/ved Sy: Oyde C. carr and Nellie E. carr, husband and wife Recorded: April 16, 1917 Recording Information: 1128141 6. Right to make necessary slopes for arts or fills upon said premises for carr Road (East Valley Road to S.H. 515) as granted by deed rea11ded October 29, 1964 under Recording No. 58052n. 7. Right to make necessary slopes for arts or fills upon said premises for carr Road as granted by deed reoorded September 21, 1966 under Recording No. 6085507. 8. Easement, including terms and provisions a>ntained therein: Rec:ording Information: May 5, 1970 under Recording No. 6646976 In Favor of: Cascade Sewer District, a municipal corporation For: Sewer with necessary appurtenances Affects: as desaibed therein Rrst American Tide Insurance Company Form WA-5 (6/76) Commitment File No.: NCS-605666-WA! Page No. 6 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. This item has been intentionally deleted. Easement, induding tenns and provisions rontained therein: Recording Infonnation: December 3, 1987 under Recording No. 8712031164 In Favor of: Petro Benson Associates, a Washington general partnership, its 51 icx:essors and assigns For: Affects: Ingress and egress, vehiOJlar aa:ess as described therein This item has been Intentionally deleted. Covenants, ronditions, restrictions and/or easements: Recorded: January 4, 1988 Recording No.: 8801040279 Covenants, ronditions, restrictions and/or easements: Reallded: January 4, 1988 Recording No.: 8801040280 Easement, including tenns and provisions rontained therein: Recording Information: May 16, 1988 under Recording No. 8805160601 In Favor of: Puget Sound Power &. Light Company, a Washington corporation For: Underground electric transmission and/or distribution system Affects: as desaibed therein Covenants, roncfrtions, resbictions and/or easements: Recorded: December 22, 1988 Recording No.: 8812221415 This item has been intentionally deleted. Toe tenns and provisions rontained in the document entitled "Party Wall Declaration" recorded June 12, 1990 as Recording No. 9006121125 of Offidal Records. This item has been intentionally deleted. This item has been Intentionally deleted. Easement, including tenns and provisions rontained therein: Recording Infonnation: November 14, 1994 under Recording No. 9411141174 In Favor of: Puget Sound Power &. Light Company, a Washington corporation For: Affects: An underground electric transmission and/or distribution system as described therein 32. Toe terms, provisions and easement(s) rontalned In the document entitled "Water Easement Agreement" recorded August 3, 1995 as Recording No. 9508031613 of Official Rerords. Rrst American Ti/Je Insurance Company Form WA-5 (6/76) Commitment File No.: Ncs-605666-WAl Page No. 7 33. The tenns, provisions and easement(s) contained in the document entitled "Agreement for Easement" recorded October 3, 2002 as Recording No. 20021003000635 of Official Records. 34. This item has been intentionally deleted. 35. Restrictions, conditions, dedications, notes, easements and provisions, if any, as contained and/or delineated on the face of the King c.ounty Boundary Line Adjusbnent No. L07l0040 recorded under Recording No. 20070822900006, In King County, Washington. 36. Survey by GeoOimensions, dated August 30, 2007, job no. 7320, discloses the following: 1. Concrete curbing extends over out property lines. 37. Covenants, conditions, restrictions and/or easements: Recorded: September 21, 2007 Recording No.: 20070921001927 38. A dorument entitled "Memorandum of Option Agreement and Right of Rrst Offer", executed by and between Trimaric:-North Benson, LP, a Washington limited partnership and Fred Meyer Stores, Inc., an Ohio corporation recorded September 21, 2007, as Instrument No. 20070921001928 of Official Records. 39. A Deed of Trust to seare an original indebtedness of $14,450,000.00 recorded September 21, 2007 as Document No.20070921001929 of Official Records. 40. Dated: September 21, 2007 Trustor: Trimari<.-North Benson, LP, a Washington limited partnership Trustee: Rrst American litle Insurance Company Beneficiary: Mortgage Bectronic Registration Systems, Inc., a Delaware stock corporation (Affects this and other property) A financing statement recorded October 1, 2007 as Recorders No. 20071001000448 of Official Records. Debtor: 5eaJred party: (Affects this and other property) Trirnark-North Benson, LP, a Washington limited partnership Mortgage Electronic Registration Systems, Inc., as nominee for Bank of America, NA A continuation statement was recorded August 10, 2012 as Recorders No. 20120810000903 of Official Records. 41. Terms and provisions of an unrecorded lease dated October 12, 2011, by and between Trimark- North Benson, LP, a Washington limlted partnership as lessor and 7-Beven, Inc. as lessee, as disclosed by a Memoi a11dum of Lease recorded December 5, 2011 as Recorders No. 20111205000001 of Official Records. (Affects this and other property) First Amerlci1n Title Insurance Company Form WA-5 (6/76) Commitment File No.: Ncs-605666-WAl Page No. 8 42. Subordination, Non-Disturbance and At!Dmment Agreement by and between 7-Eleven, Inc. and Wells Fargo Bank, NA, December 5, 2011 as document Recorders No. 20111205000002, and the terms and provisions thereof. 43. Wll:h respect to Trimark-North Benson, LP, a Washington limited partnership, we will require a full copy of the partnership agreement and any amendments, together with an affidavit signed by the general partner(s) stating that it is a true copy and that there have been no further amendments. other requirements may be made following the review of such documents. 44. Evidence of the authority of the officers of Wendy's, to exeaJte the forthcoming instrument, copies of the current Articles of Incorporation, By-Laws and certified copies of appropriate resolutions should be submitted prior 1D dosing. 45. Unrecorded leaseholds, if any, rights of vendors and serurlty agreement on personal property and rights of tenants, and seaJred parties to remove trade fixtures at the expiration of the term. Rrst American T!Ue Insurance Company Form WA-5 (6/76) Commitment INFORMATIONAL NOTES File No.: N(S-605666-WAl Page No. 9 A. Effectille January 1, 1997, and pursuant to amendment d Washington Slate Statutes relating to standardization of reoorded documents, the following format and oontent requirements must be met_ Failure to comply may result in rejection of the document by the recorder. B. Any sketch attached hereto is done so as a <DUrtesy only and is not part of any title rommltment or policy. It is fum:shed solely for the purpose d assisting in locating the premises and First American expressly disclaims any liability which may result from reliance made upon it C. 1he description can be abbreviated as suggested below if necessary to meet standardization requirements. 1he full text of the description must appear in the document(s) to be Insured. Ptn Sec 32, 23N, SE, WM; NW qtr APN: 322305-9063-05 D. A fee will be charged upon the cancellation of this Commibnent pursuant to the Washington Slate Insurance Code and the filed Rate Schedule of the Company. END Of SCHEDULE B Rrst American Tlt/e /nsuranre Company Form WA-5 (6/76) Ccxnmilment First Amerlt:an T1tle Insurance Company National Commerr:ia/ SerYlc:es COMMITMENT Conditions and Stipulations Fde No.: NCS-605666-WA! Page No. 10 1. The term •mortgage• when used herein shall include deed of trust, trust deed, or other security instrument 2. If the proposed Insured has or aaiuires actual knowledge of a defect, lien, ena.imbrance, adverse dalm or other matter affedlng the estate or interest or mortgage thereon covered by this COmmitment, other than those shown in Schedule B hereof, and shall fail to disclose such knowledge to the C.ompany in writing, the C.ompany shall be relieved from liability for any loss or damage resulting from any act or reliance hereon to the extent the C.ompany is prejudiced by failure to so disclose such knowledge-If the proposed Insured shall disclosure such knowledge to the C.ompany, or if the C.ompany otherwise acquires actual knowledge of any such defect, lien, ena.imbrance, adverse claim or other matter, the C.ompany at its option, may amend Schedule B of this C.ommltment aaxJR!ingly, but such amendment shaU not relieve the Company from liability previously incurred pinuant to paragraph 3 of these Conditions and stipulations. 3. Liability of the Company under this Commitment shaU be only to the named proposed Insured and such parties included under the definition of Insured in the form of Policy or Policies committed for, and only for actual loss incurred in reliance hereon in undertaking In good faith {a) to comply with the requiremeuts hereof, or {b) to eliminate exceptions shown in Schedule B, or { c) to aaiuJre or create the estate or interest or mortgage thereon covered by this Commitment In no event shaU such liability exceed the amount stated in Sdledule A for the Policy or Polldes oomrnltted for and such llablllty Is subject to the Insuring provisions, exduslon from coverage, and the Conditions and Stipulations of the form of Policy or Policies mmmltted for in favor of the Pl oposed Insured which are hereby incorporated by references, and are made a part of this Commitment except as expressly modified herein. 4. Any dalm of loss er damage, whether or not based on negligence, and which arises out of the status of the tltle to the estate or interest or the lien of the Insured mortgage covered hereby or any action asserting such claim, shall be restricted ID the provisions and Conditions and stipulations of this Commitment- First American Tide Insurance Company Form WA-5 (6/76) Commitment TIie First Am-.i Calpo,alion First American Title Insurance Company National Commerdal Services PRIVACY POUCY We Are Cormn-ID Safeguarding O : .. er - file No.: NCS-605666-WAl Page No. 11 In order ID better serve your needs ,_ and In tlie future, we may ask you ID provide us with certain Information. We understaoo that you may be mncemed about what we wll do with such id\:11116H1 pa,tlcularty any personal or financial Information. We agree Iii• you have a right ID know how we will .-tlie personal -you provide ID us. lhen,li,re, IDgelher with ...-parent a,mpany, The First American COipa atlon, we have adoptl!d Phls PrM1tY Poley ID ga,em tlie use and handling d your personal id'o,1-1. Applkablllty This Pi1Vacy Policy governs our use d the -whicli you provide ID US-II: does oot go,em tlie mann..-in whidl we may use lnfixmalioo we have obtained from any allier soura,, such as lrdiJrmallan obtained from a pubic reaird or from another persoo or entity. Frst Amer1can has also adoptl!d broader gu-..s that -cu use d personal lrdiJrmallan ,_dless d Its source. Fi-st American calls these guidelines its Fair Information values, a a,py of whidl can be -on oor -at wwwJir.;tam.ccm, Typesof- Dependlng upon which of our serw:ies you are .-.g, Ille types of nonpublic personal information that we may CDlled: inwde: • lld\:imation we receive firm you on applications, forms and in ether a.mmunlcations ID us, whether in writing, in person, by tElephone or any allier ms,s; • Inrorrram atxx,tyour tr..-with us, our -a,mpanles, or a2hers; and· • Information we recetve fun a consuner reporting agency. use of Jnfannalion We request irlfDnram firm you fur our own ~ bU5iness pu,poses and not fur tlie benefit of any nonafflllated party. Therefure, we wll not release your Information ID ... -pa,ties e,apt: (1) as .,. , fur us ID provide tlie product or seMCe you have requested of us; or (2) as pennltb!d by law. we ma,, i-, store such 1.ronna1i0i1 i-,. kadng the period aftEr whidl any CllSIDrner .-.st.Ip has ceaseci Such information may be used fur any -pupose, such as quality mmd etliJr1s or CU5blfner analysis. We ma, also provide al of Ille types of nonpublic personal lrdiJrmallan li!led -ID one or mo,e of DID" affillall!d arnpanies. Sudl -a,mpanles in<iJde flnandal ....-providers, such as title lnSureB, property and casualy i1Sun!IS, and lnlst and in.ei111NS.t advisory a,rnpanles, or ~ Involved In real esaate servia!s, such as a~ a,mpanles, home wanantr CIJinpanles, ...i estnM <Dupanies. Furtliennooe, we may also provide an the Information we CDllect, as -above, ID a,mpanles that perform na-.g services on ...-belialf, on belialf d cu affllated a,rnpanles, or ID allier ffnandal Institutions with whom we or Oll' affllab!d ampanies have joint 11alcetli,g agiee.11e11ts. Ew!n f you are no ""-our CllSIDrner, Oii" i'rMltY Poley wll a.ntlnue ID apply ID you. confidentiality and 5earrily We will use our best ellixls ID ensure that no unautllorl2ed pa,ties have access ID any d your i.:-0.matloo. We restJict aa:ess ID nonpublc persooal infomlatlon about you ID lhooe .-and er.Illes who need ID koow that Information ID provide producls or serw:ies ID you. We wll use our best eff0i1s ID-. and oversee our a1ij&,ees and agents ID ensure that your id'oi111atl0i1 wll be handled oespousibly and In acmrdance with Phls l'rMltY Polley and First ~'s Fair lntbrmatlon 11ab,s_ We currentlv ..,._ physical, elecbonic, and proa,dural safeguards that comply With federal regulations ID gtWd -nonpublic personol - C 2001 The First American CClpuatlOil -Al Rights Reserved Rrst American TJtle Insurance Company First American Title Form WA-5 (6/76) Ccmi111tme111t First American rdle Insurance Company Nalional Comtne,r:/al ~ COMMITMENT <:ondltlons and stipulations Ale No.: NCS-635979-WAl Page No. 12 1. TIie tenn •mangage• when used herein shaD indude deed of trust, trust deed, or other security instrument. 2-If the proposed Insured has or acquires actual knowledge of a defect, lien, encumbrance, adverse claim or other matter affecting the estate or interest or mortgage thereon covered by this Commitment, other than those shown in Schedule B hereof, and shall fail to <flSdose such knowledge to the Company in writing, the Company shaD be relieved from liability for any loss or damage resulting from any act or reliance hereon to the extent the Company is prejudiced by failure to so dlsdose such kno.Y1e it.le If the proposed Insured shall disclosure such knowledge to the Company, or if the Company olherwise aaiwes actual knowledge of any such defect, lien, encumbrance, adwrse claim or other matler, the Company at Its option, may amend Schedule B d this Convn1tment acx:ardlngly, but such amendment shaU not relieve the Company from liability previously incurred pwsuant to paragraph 3 of these Conditions and Stipulations. 3. Liability of the Company under this Commitment shaD be only to the named proposed Insured and such parties Included under the definition of Insured in the form of Policy or Policies committed for, and only for actual loss incurred in reliance hereon in undertaking in good faith (a) to comply wltll the requlremenls hereof, or (b) to eliminate exceptions shown in Schedule B, or (c). ID lKJll*e or aeate the estate or Interest or mo,tgage thereon awered by this Commitment. In no event shal such liability exceed the amount slated in Schedule A for the POiicy or Policies ax,.,lilled for and such lablllty Is subject to the Insuring provisions, exclusion from coverage, and the Conditions and Sllpulatians of the form of Policy or Policies committed for in mar of the p,oposed Insured which are hereby Incorporated by references, and are made a part of this Conmilment except as expressly modified herein. 4. Any claim d loss or damage, whether or not based on negligence, and which arises out of the status of the lille ID the estate or interest or the lien of the Insured mangage covered hereby or any action ass e ting such claim, shaD be resbicb!d to the provisions and Conditions and Sllpulatians of this Commitment Rrst American Tdle lnsurance Company First American Trtle First American Title Form WA-5 (6{76) COIM>ltmel1l "Ille flnt American Corpc..at10111 First American r111e Insurance Company National Commercial Servictls PRIVACY POUCY Ale No.: ~79-WAl Page No.13 In order to bett2r' serve YoUt needs now ....s m the~ we mav ask you to prtMde us wilh certain ilfo.1natio.L We m.dt!!ista.d lhat you mav be mncemed-what we wil do-sudl ,~ .... --any pmsonalor--. We agree that \'OIi have• r1ght1D ia-how we wil .-the pe,sooal --\'OIi ..-ID us. 1llerefare. -,hel"-°" -~. The -Amerlcon ~we,_ adopted this Privacy-ID-the 1R onl landlOlg ofyov, pe,sooal - This Privacy Poky gow:rns our use al the lnformati:)n which you i:rc,Yide to us. It does not gD'lt9'rl the mamer In which we may use inf"ormation we have obtained Imm any other source, such as ilila.11atiui1 obtained from a pubk: record or from another person or entity. First American has also adopted broader guidelines that govern cu use d persollill inf"onnation reg;wdes5 of Its source. Arst Amencan calls these guideines Is Fair L.-mn.alion Values. a Cl:IP¥' m which can be found .on ow website at www.firstam.mm. Typesol- • Informadon we receM! fra1I you on applcations, foon5 and In other Cl'.lll1IIUlica tD us, whether in writing. in person, by telephone or anv other means; • I11l.w11.atkn1 we rteelve from a const.mer reporting agency. Useoflld'oiwwwtlun We request donnamn from you for ou-own ~ business pgposes and not for the beneftt « any nonafflliated party. Therefore.. we wl not release your illi..wn.ation tD nonaffllated parties except: (1) as nec:essay for us tD pruw:le the product or 5efYice you hiwe requested af us; or (2) as permilled b\l low. We may,-....... sudl ,.-.... -.·-··~the period --.,,, ~ -has ceosed. Such ''°'"-' may be ilSl!d ror anr -.....,.. sudl as ~ CDl1lnJI -or~ -We may also ..-a1 of the types of nonpublic personill illonnano., lsred above to one or more c# our affllall!d companies. Sudl affllab,d amparies include ftnandal serw:e pn:widers,. sud1 as tlle insurers, property and casuaty inslnrs, and trust and ilwdl1ea acMsory cumpanes, or companies nvotved in real estate services, such as appratsaJ caml)lll lies, home warranty c:ornpanleS., iiHld esaow companies. FW1hermore. we mav also provide al the nurmation we CDlect, as desa1bed above, tD companies that perform mart:el*1g semc:es on OU' behaf, on behalf ti cu affllated mmparil!s. or to other financial lnstibJtions with wtmm we or otr affltated a,mpanles haw jolt martzting ay;eaalb'rts. FormerO 7 .-s Even 'I you are no longer our custDmer. OlJ' Privacy Poley wll mntinue tD apply to you. eo-...-,.-- We wil use our best efl'orl5 ID enstn: that no l.lliUhortzed parties have aazss to any al your dormaaon. We restrict access to nonpublic persona! inli..iiinatiou abcu you tD those nMculs and enllies who need ID knOw that lnfonnatlon to PRWide products or services to yuu. We wiB U5e our best etrorts ID train am CM!ISt!II!! cu enployees ..:I agents to ensan that .,a, i,w,1liiltb1 wtl be MIiied ,espo,ISiJII. alkl in acm.daia wfth this Privac.y _..., __ ..... "" .. -· v ...... We--~ -.... ___ a,mply_ - regulollons ID guard yov, --klo,n-. C 2001 The Flist American r.o,po,atiOn • Al RJghls Reserved First American Tllle Jnsmance Company First American Title First American Title 2. SP-Legal Description 01_20070822900006 ==:':'&.---· • -liuwi!lF- First American Title ·=--..==--=--=---·-·--::.-=· _}i'i:.-:.:=- LANO SUR'1/EYOR'S CERTiflCAlE 1--IM--T--_.__Y_BY __ _.. ... _,... ~ -'SfllfE -~ •-.nts. -~.-i.. z:.,,,,,t'p54( -- ~lC-3aal.... .!:.-··· First American Title · ..... First American Title • ™ ·---ft"' -I ..._ .. .!£._,µ., M!J/4. s.-32.... t....2J..,... ir..2.E.a& @----__________ .,,, .. ·-·-----·--------:-. nr=:-.:.:.."=-=""== _____ ...,_ First American Title .,:''" .. , · .. .,,. -... .;i.30 151 . . . - ' --"' "' --t;;;;>--1 First American Title j PACE ------------------ =::====·---·-·· ---·-----·--:-. ,::,r ______ _ --::::"=.-.:..:;:-·-- First American Title 3.Vesting_01_20070921001923 ' AfJBl 85PPPINF HID TO: Name Tmwti:-llartll .,_ ~ 406 ......... Rmil. 5ecDnd lb City/Stall! Pacft:. WA. 98047 Ann: Al Jl...i ooa.•fflle(•): L Spedlll Wana,ty Deed E2311866 mst:IIJ.,MMT JI . . . ,;.,,a:m:I ...,._a N ut <•> fllf DDooa __ .. Mll1ned er nnl,...a:1: Glwllm(•): 1. NIU llensOII U.C, a "F'ast•IIIU• 111..i lllrbay aa,.,.. 1STAII 20070921001923.:: NC' -Jo7t--,r Gia RN(•): ftlrt a.I led Lepl D~~d:p=llt•:i~:22!10DCllll6. Lot X and Y, KC BIA Ull'IJI040, 20u}ll)8>290QOD6 TIIX Pamil N1r111L 1r{s): A pallOn rl 322]05-9016-03; 322V 90630!i; 322305 90i5G3 [ X ) a.n4 t 7 legal desa ..... 1 is OIi page 3 al' doa rent 1 am recp r ig an en.e.yaq FM.staidad ,econlllig far an addlUolllll fee as prowled In RCW 36.18.010. l undeim,.d that Ille ,C111dlng pro I 41 lllqlllraWITS may mver up or olhemtse obsan-sat rl Ille at rllhe arlglnll cloculat. First American Trtle First American Title ' AFTER BCORDING UTllllN TO: Trimalt-Nordl Beman, L.P. 406 PJlinpon Jlaad. Second Floor Pacific, WA. 98047 AIIII: Al Jiwani SnclAL WARRANTY DEED nm GltANTOR. Pe1111 Beman LLC, a WNh"'-on 1imlled liabillty co,npany, for and in CCI! .d atwaof'Tcn Do1Jm (SJ0.00), iabwlpaid, was. bcpias, sells, CUOVC)S aad coufoms to Trimark-Nordi Beman, LP., aw---= limited~. Ille real - simeted in ICiag c-y, WMbiagton. DMn particalarly deecriNd on &hfflit A anw !w-it baelo, SUBJECT TO all lillls, elm,-wl I am of teal!d and to tbu1. d a co, dcacribed OD ulrbk B '"* I d hereto. The ar-, !«itself and .lilr ila •• , * in u-. ...... by these~ e:qllWI)' limit lb&, ccm:ual8 oflhia Deod of lbillC lm,:ia wLjli I Z _t, md vc1vdel all CCMll1aD ariaing arto arise by,, ry or olhw imp!" rion•, ,ad does henby-lhat apimt all per-. whc a-oer lawfidly clPimina « to claim l,y, dlroagb or under aid ~ 11111 oat adlenrile, it will flnvs ..-11111 defend the said dacribed n:al estate. DATED this .1,.L. day ofSq,!crnber, 2007. GRANTOR: First American TrUe First American Title ' STATE OP Wlllling!m COUNTYOF__..,I(....,~--- ) )a ) OD 11u I i ~ dayof Sq,lrmlNr, 2007, llcbeme .,..--Dy appeared .. (;]!;.<:!:::: ?i;.;.:.: ~= !'-*......,,.Jr" J_ ;1:c;; ~:.li oflhe iaalla.wll llD be a. ..... 'nllumay ICt ........ ef aid wwwpiii '""· irlhc-and pwpcwww dll:l'cin D'fflli nned, al CID Oli!ll llallld tbllt ..... W JIN . J to a:ecale aid inmmw 111111 dial lllewl llflhedia die cmpca•-' of aid Clll)Kllatiua.. In~ wbrmofl bavo beawww.da aet my bmd 111d affixed my official-1 lhe day _, ,-1inl above wriam. ,.,_y'\d ·t§· • o....,t..,.,.. I ==PUBit1f:ifiJf.:Uor W l°M'll'II, r:ni:fi:ag II i;! • 1 r L My 1111, • • expina ::.1,., I @ 2 First American Title First American Title 20070921001923.:: EXHJB1T'A' LNM.D 1•1WWW U1'S X NIO Y OF KING <XIUNJY IOIRWlY LINE ADJUSrMBfTNO. um.G040, MXXJRDING10 llfAT BOIM>MYI.H:AD1151MENTMi+cB,MliUST22,,,.,UNDER• IMUNG ll'J..11.iNP NHHH!&. lN IClllo OlllftY, 'MS&CICM. First American Title First American Title First American Title KIHIKIT-JI" Fldly 0ia,ges, r -,, Inducing 1M not limlled ID hook-up, or m•e:llan dwges and Wet ._.c:1wges for_.or_ facllles af Om:ade Sewel' Dlslrkt • lscloslld br lnstNnelll: 1ecuded Febnay 7, 1975 and May S. 1981 under Re.:udlng Na5. 7502mll239 and 81u5050J32. Slid lnslrument Is CDiedbi afthe instrument iea»ded August 22, 1972 under Reaada,g ND. Tb 62 IC iSS. R • au ons and e , t11b1S, Inducing the 1Bms and mdlb• thenlaf: P wk,g: Mlnerals Rese ved e,: lclln WlnslDn and Qn WlnslDn, husband and ..... Re.:uded: Omibel" 4, 1912, ~ 31, 1913, August 2, 1'13 and OcliDller 5, 1914 Re.:udlng r.m ... a11c1n: 1129843, 858693, 111111163 and 9!:i6710 R: 11 .alb• and e Ej4if 15, Inducing the tams and mdtlons thereaf: P wk,g: ltnerals p ved e,: Qwille C. Clln' and Nelle E. Clln', husband and ..... Re.:uded: Aprl 16, 1917 Reaaclng Ilmmalb.: 1128141 ~ ID make i'oiM I slopes for cuts or Ills upon said pen I for Clln' Road (East V*'t Road ID SJt. 515) a i,anlled by deed -ded Oc1iD11er 29, 1964 under r.ew.dug No. 5l(6Z},. ~ ID male lie B,Y slopes tbr cuts CII' Ills upcn said POI I for Clln' Road IS r,,anled br deed ,ecuded Sepliember 21, 1916 undilr Ra.uKl,,g ND. 6CNl5507. 5 ne.it, Inducing tenna and jliOl.lslc.i6 ...... ,ad thnin: r.ew.c1a111 Iimllllltiol.: May s. 1m under ra.u.c1a111 ND. ~76 In FtMir al'. Om:ade Sewer Dlslrfct, a Dilnc:lplll CDjiuiBIIOII For: Sew1rw111,.. ·vappw1Bances ldl'etts: Lat X ~ ID 111111a re y slopes for cuts or as upon said ,»a I for Raad (1'811,,,,_. 5.E.) a i,anled by deed ,ecuded May 3, 1972 under Pecudaiy No. 72ll5030DO Said lnslrument Is • ... eaad af ,ecu .. 111 no(s). 5!11116311. First American Title First American Tille Oweiails, mndlions, 1esbldbs .,.J/of ,ells. Randed: Seij 1 illls 19, 1'72 Aaxadllig No.: 71tSl!ll1Z17 QwaailS, CXMd:lons, 1estlldloi11 wwJ/« ,an: Aaxaded: NIMI ... 6, 1'72 Rec:u6111 No.: 7211llli0378 5 I~ induda1g liSn6 and IJIV' bl 16 QNui:Cd lhlnin: Aaxadihg JnbHlillbL f'tlnay 20, J.971 under lhAaxa...,.!11..._19 Na, '5CQ3'GSJ5 20010921001m.-:-:- Ill .._. «: IClng County w...r Dlllrlct No. 511, • ilUllclpal mp•"' For: Wlll!r ..... Affeds: I.at X Eaa ·~ 1ndudlng ll!rA1S and p.o:.bb ...... ailed ltcr9ln: Aaxadil,g lld'omiillluft: April 28, 1913 under Aaxa!ll.g No. 8304280629 In flMJr «: twade Sewer Dlstrk:t, a munldpal UN pc.alb, For: S--lllllins All'a:ls: Lat y nc --and .. o.bb• • 1 M I I I In Ille clDcuawlt endtSed Ag.-and o,, sa.t Ri!llllllg ID S--Dlsllltt Qw1W!Cllo11 a..ves, : l!ed Ill' and I ll -Rabat a 9et, and CIIP3+ s-a-Dlslrlct of IClng County, Y:1ssl' ;: Ml, ...... CXJ1,awall: 1, recuclad June 24, 19113 a llm1Jnls1t No. 8306240613 of Ollldll Jlmnl. El 1&.t. 1ndudlng liSn6 and p.o:.ISIClns CDllllllllsl therein: Aaxa!IIIII I,i1bi11iilllolL Al.-t 1, 1983 under llis:oldllig No. 831B110728 IClng County .......... LatY IIWlt ID malle , r slopes lilr a.ls or 1111; upon said .... I 1lar lOIIII ,._. 5.E. a oranllld 11¥ dllsl ,ecuded Jamay 4, 1984 under Raucli111 No. 840104074!1. FE• ....,, .. ,n,nt lndudlng 1IS'ltlS and PIO ill!lllS CD!lllllicd tllenlin: Pe.oi•.y lllaiualun: llNwy 4, 19114 under RauclN,g No. 8401040750 IClng County ... adaalbedllleisl e, s •.t. lndudlng 1IS'ltlS and p.o:.l!llm• awttlllicd therein: First American TiUe First American Tide 20070921001~.·-.· Remdll1g l11b111811ori: June 8, 1987 inler Ra:onling No. 8706080901 In "-d: Puget Sound l'IMel" a. Light Company, a tur 1hlr.gllw1 w.pcwatb1 Far: M inlergnxlnd eleclJlc dlstrlbullon syslBn M'ecls: Lat X Co1N1n1m, Widtb&, ieSbfdbiS arrd/at 111e111S. Ra:cwdal: M, 24, 1987 ReclDldlllg No.: l1U7240443 E 111111t,. lndullng ams and pm,ISlaliS Clllllllliled 1lleRlln: Rea;iidlllg Lm1hlliai1: Ocliam' 5, 1987 under Rau .. 111 No. 1710050424 In FaWlr d: Puget Sound ,,._. .. Ught Company, • t.V&al ... lCOiiXIBlk»i Far: tnlelground llecblc trbaians&mnfssll!J "'" and/or .......... .,... llll'ec:ls: • *'°Iba! IMIWI Rif#lt tr> ma1ae ·• r slopes lbr aa or Ills upon Slid jlldi .. for lll!iltl Place 5.E. and S.E. l80dl Sb8lt. pad 1:r deed :em:ded OdiDber 22, 1987 undlr ReclDldlllg No. 871Q220767, E netlt,. Including lllllmS and p.o.tslrl.s Cllillal..ecl then!in: Rea:lidlll!I hto,:lllllb~ Decalilla 3, 1987 under ReclDldrl!I No. 8712031164 In favllr d: Pl!lro llerlSIIII ... Wes, ll Wast•IIJlr><I general jMIIWship, Is SIM H'S and llSS9IS Far: Ins,ess and eg:ess, whlcular acress Affeds: Lat X CONlllui&, ndes, ea, p.o.lslanS Wiitlllned arrd/ot .,.ldlllld on the fam d the SU:wr .-da:I D&..eniba 29, 1987 Inter Reto,dll,g No. 871ZZ!l9040, In '«llume 59 d !U'lleY5, at page 21, In ICll,g Coullty, ~-.H:,:glan. eow.aa, C111.dliol&, ,esllfdb.s wr,J/« 111 :eds: Ra:uidild: la.nay 4, 19111 Ra:uidlllg ND.! 8801040279 ~ Wi......., 1estrlc:lla11& wwJ/« 1111111s. Aew,ded: llnuay ... 1911 Ra:u,dll,g No.: 8J040280 First American Title ? First American Title E 1,e,1t, Inducing ll!mls avl pn,,llicwa m.talill!CI therein: Ra.adll.y h.bn.allu,1. Madi 23, 19811 under Rewiclr.y No. 8M3230710 In FIWar d: Paca: ND.It est Bell T---• Ol!lll*IV l'or: Undelground --*1ltlall Ines a,d -- i,alllll cablnlt Nl'eds: Lot y E 116,t, Inducing 1BmS and pn,.llba tlllltall!CI lhlnln: 20070921001n,.:: Aeaadlng Imonnallon: Mllr 1&, 19118 undll" Reconllllg No. 8805160601 In F1Mlr d: l'llglt !ialnl "'-' • UgN: c.ami-nr, a tst SI_., awpcw Fhw, l'or: ~ eledrlc tn1111mlsslo.1 lllid/Ot dlslrllullon IY*DI Affec:ls: a 17 I 7 I t:helan OMoa,.ts, .......,.., 1esll"*-• air/JI« 111eaa111s, Ae fNI• D L 22,, 1988 llietiw$,g No.: 8112221415 Eat I.-, lncludlng ll!rml and pllJ lliW6 ...... ,id tbm*t: Raadll,g Wan SF +,: D t er n. 1.988 under •llmadng .......... Na. D12Z21416 Fer: --. .-and ,dlles Nl'ads: Lat y E:as&11td, lndudlng tmns and p,o.lslwa Willillill!CI lhen!in: Re lniJ 11.1,n, Pl ,. June 12, 1990 undll" Rauoclng No. 9006121123 In fw d: IClnf Coullly, ll palllml ILIII IMlla:: l'or: Fn llglillllg equlpnlllt and •• ..... ••IJMt' wl*les ID SlmCI! --Comer Afflds: ................ The lams and plO.lslai:S C01:tai11ed fll the doaiment enlilled "PaltJ Wei Dedaillllm1" ,_ded June 12, 1990 as Raxadll.g No. 9006121125 ~ Offlclll ReWids. El I Fett. lndudlng IBmS and piautsb.s Wlllilliled lhelein: llealidl,g bilialnllllall, Al.,at 2&, 1991 under Ra.adlug No. '""'&1&51 Ill "-" d: Ma llalml ,t.551 I 4 I W 11 ,gma geneql .......... 5-"SBwiellnes LatX First American Title First American Title i.-made IJI' Teaco Rellling and Marllletlng Inc., a D1*wwwe mpu,atlai1, le!sor, IO Pbllp G. Kane, Jr .. trusliBe undl!r a AISt Amended and P 1 Trust~-• dlllld • d 5epmll1bel 15, 1991, lmNe, t'ara 11111111 d30JIIIIS, and the COl&Wils 111d mudlfOIIIS as therein awlallred, as .. L WI I "' ....... ldln rl Lase dall!d Odir:lber 18, 19'1, 111d .-did Odir:lber 211, 1991 es doclmwlt no. 9110280751. (Aft'eds Lot No. Y) .._ made IJI' Philp G. Kane, Jr .. --under. Fht Al wended and n • • Trust Ag.wit dlllld • d Sep1&1iber 15, 19'1, llalr, IO Teaco PelWng ml Makelli.g Inc., a Oda •• W1pu,atlai1, lmNe, fOr a -d 22 ,,_., and the CUMWilS and WIMK 6 85 lhllnllll W .. :ecl. • "" h wed IJI' MeiHIHIIIMII d I.ease d#Bd Odir:lber 18, 1991, and 1..:aded Odl!ba' 21, 1991 • dDcmwt no. 9U02IIJ752. (Affects Lat No. Y) Lase made IJI' Pebv Benson Assc I# " • 'Naslili.gllan general ,abwsldp, lealr, to Texaco Rlllllnlng and Mllilelli,g Inc., a c• ... mpo.alb., ie.ee, rar a 11111m 11115 ,-rs, and the awallS and mdllol• M 1lllnlln UAitlll.ad, as 19 Leed by' MmiiOlliDIUft 1111.eme d#Bd ,.,... .. r 20, 1992, and ,«uded Apt 16, 19'2 as dDami!nl: no. 9204160519. Said lease, amang oliw tlalgll provides fur' a, aptiDn ID ,._ filr a pslod d 3 ........ lll!lms d 5 Y8lfS ach. (Aft'eds Lot No. Y) Right ID ffllllle re r slaplS filr aa or flls .,ii said · ji&I I filr 1'161 as g,anl9d IJI' deal 1..:adld llcMnibei 2, 1992 under Pa:adli.g No. 921102ml17. 20070921001 ~--=-=· First American Title First American nue Ell •It, lndUllnjj tams and P1U I I 4 Willlllnld thsdn: ll6tcadlng llbnllllan. ,..,,. ta 14, 1!IM llllder R.Raudlilll'l'lllllno,Y No. MW41174 In r--Ill: Pllgll: SDUIIII ,_.•Light Clanpali,, a 1-...J I GIP 41m For: M •• I pOUld dlclllc bam,eaa, ,nJ/or ........... AIJeds: Lat X TIie ams, PIU IIIW& and I 11(£) W l I I Ill ..... c1oa a1t 8lllllecl "¥IJlla' r aa Jo 1.-wwwded Augi4l 3, 1995 • ........ No. 95m031l13 ti Olllclll lla:IDnls. i-mde bJ P11bO flllmll LP~,._, 1D Slat's MliiWQ&iMlt O..po.alluii, an Q.gan-po.lM• • llllee, ba 11111111 <120 ,-s,andllaCIII' ll!iaild an ••llllnlln hied.• h •el bJ 11&:.caaodwn ti i-dllld _. 21, 1987. wl i«Dcled Oclabs U. 1997 B t I -ilD, 971111311138. TIie ll!mlS, pn,.bi •• 1111d ELil(I) wclbtlned Ill ..... ~allllled "Agpwamlt b E t:' z«uded OdlSlb!r 3, 2002 • Raudli,Y No. 2002100300063S fll Olllclll Rewcds. r neut. lndUllnjj -and [IIIIWllw• will*led 1l8'!ln: Raemclnjj bzbz-.: Aprtl 9, D7 under llemRll,y No. 20ll1HIIUIIZJ96 In ,_. ol: SIMe ti rwu er , Ol!pmllzamlt or Tl I 7 77 asdlS-.. Far. 111!4 mJ Cllllllndssll-n adlvlles .llffl!ds: as ._,lled ... Remrc:tla4 awadlbG, ct-I +4hwas. naleS, ""'5 and PN.I I .. r ..,, as .. I I 1 llldolar .. I f on Ille face • .. IIIRS aim, llDun1ay 1.-hi I 4 No. Ul7UIIMO se cled llllder 111ma•,y No. .IIIOAMZ/901('6, In King Olmr, W t I ; ~ 11¥ Gen71 ... dllld Au;111t JO, 'JDll7, jab no. 7330,+ei llef I Ta;: 1. a.a. z7E anrna .... -aut 11oparty 11nes. 20070921001923.; : First American Title ' , First American Title AIJlllli al lie JIDlllng CAlia&ICl!S and '"9datiof1s Mallas h ·-In lhe..,... obtai ..d by~ 20070921001923.ii i First American Title -~-- h:lt··, :~: ..... _ .. First American TIiie CASCADI ~"WEI. DJSTRICT J:JNG· COUii'", IWIHIIGTON IESO.wn.OII N();,. .. l k DSOI.UTION acc,pti.aa c:9ru.ia 1--.r facilities aall llaes 'r tk~ Di•trict for serYice aad. ••ie\oa· .-U _, ta,oaiat • hffk11p cPr1e la Un et·a•..---t u, H col· . J.KJ~-Uto...!!!ilu.~ •' .luo .. lilts....-17.a11NCUIII ie-::i"ild - llan £or ..-r--••nlce, allll cor- Hctl... a ~JP91rapld,;al nnr la ~ .. 1 •• :i.. .... 1 ... ~' llr .... lud.-llo. ·1,. t~· 1ot.r• ot c.o.b- siNlel't bu •a:c.1ar..t its polic.r of iapeslq: aad collec.ii•a )ook- 111" cia.TIH la 1:i. ... of --~_ ...... t! 1:C1 ~~,. -.-.,.. .... -,r-.- Hti•• .. .,.-)ea ·spethlly INaefltt:N 1ty aM _do -Y _Sabseqhatly ~t t.o faciUtiH coastnrct~ at )n'"iftte' ex,-e aN :Qf reill- . ~ . bu.nia& a porUoa of IIICJt -...1t--, cU:ra• ta tile persoa, fin n corperatioa paytq tJui cost 6f suclt sc.er fadlity; all in accord-· 1raplli.cal error in the 1 .. al •scriptioa c•.~~. i.a bsolatioD Jle, _2M w'1cl ,....,14 lie conecteli, -. _1HQl!FOIU!,· HIT USOLYII ~ 'CM haft of ~issloae~ of Cas- CM• s .. r tl•trict, Ii .. CllnllY, Wa.ski-,ua, as follows; SICTIOII 1. That tb severaa• sentc.e. u..:,;:..,. alllll facilities witlli• tu foll•ht .. sc-ria.l p~ situ.tN UI lbt Colulty, Waslunstoa, H accept.._· fer serrice a.ad. -~teuace: . , c-.c.taa at tH llortlll!Nst: .-c:otur-of Sec.ti~• ·32 1 'twulup U .... di;, ..... S East:, W.Jli.; U.UC. SlutMrl~ ala, die a.cU• the H5 f••t 9re or less U die s.tll •rs:la el tM 1.-G . .C.n .loK _.a1. NtaliHUN 111117%; a.-e b•terlt_•lnt'•ai• .,._. ....,u ef tu·1~ C. Can ..... ,s fe•t to · tM -::sr.iai of N&UaiJ19; -..._. --ly at ript ff U MU-_ .. U1'PA of tM J.5. Can 1.51 fat; tMace lu1nlr-au·-~1e1 t• saU 5autll ur1111 ef tlae J .c. bin :a.u·-u, · Ilia • _...., wt ...... Ifft 11•· of ._ Ian Qoor• UT .i UO -• llalf of $ -..,. ..... , Qooarter •f ia.e ~t flUrtk. el ·sat• J,ecU .. J2t-·. ·, dace. IIWtlill-rl.J .!J.-. P.W l!-•t:-ll•. te_· 1M W~ IISOUITUII m. AH C.rnctiJll, a.selvf:ioia No. 26~, •. -, .--~ • l· - ;. First American Title ,, t-,: First American Title ,=."'!_• . -... ..: _...,_ ..:: ...... :· .. r_1t11. d t.J:,e; 1.G·. ,Ciirr Aad;' fhonce •esterl7 aJ.ot\a Uii.4 Soat• ur1in Df the J .G. Carr · · IN:d. tD. __ t:be ~~ pet.at Of h&igla,. S2CTU1t: z .. PriOl' to tlle c.eaaecttoa fol" HV.-r Hn"i~e.hy Hf per_.a.oh, fin, or coTf!l• ~iOII •f-property wi~ia. ti!-ali!OY.e closC:rtltu •!•• i• ling COUaty, ·1rasb •qtoa~ tlere sllall be colitlctd· !roii such· · party seel:bt couec:u .. a tate·c-n C.Urae H --~pecU:l" ta =·-1ece:t011"°':r~•lrW", ··,s &·-pra,ord.ia'te-co""at;_i'-·c11it~1tt·1;iiifi'ti~I'. · .,·.,,- for wliiQ tlll• p&rty •pplyiq for serYtc:e or' .. is pn«leces~r• lulve Mt c .. 1:rtM1N. SEC?IGII :s. · Eac.ll jllff'MII, ·f1ra -•~ CHpontioa sob,ect to th -,.J .. at ,...._irff t.o N pet• IIMer S.Ctioa Z 1:-""f shall _pay· to ~ Dis- trict, prter to coaaactiO. to a~r facilities of ti.e·Dtstrict,· tlle ut&l of $17 .U for ~ lia.al froat foot e(iill pnperty OW'AN, leHff er otJlervtse ecc-,·tN H Hd for proportiN&te con• . . . . trilautioa to tile cest a,, u• 61$.H' of canst1'11Ctj.as -Apprex. HO'• W .ef· 1131'4 Pl. S.E. ·" (u. Mitbo M.H.J 10" uas .. oa• ·, carr ....i .lfprOX. 114 .. +W of 1131"4 Pl.S.E. To .. 9Pr:u. H4 1 • W, ef 103rd Pl.S.E. 10Stll Pl.S.E. (N. CSD -,M.H.) SECTlml 4. A copy of 'dt.b ~sobtion shall be recaried b t:U office •f th AIHlitor of U• Couty. WUhillatN., for tlae pa.rpo•e af &bin, loti:ee to ~11 •re9:_0At ua htve 1N11en •f tM Dln'e descriW real ,nper~r, nltJec:t :t• "late•caaers" cnaection fee. SICtJOI' s. la~lat:in. ... Z6't of tU Ca~ Sewer District. u .. C..ty1 Vasluqtn skoultl ~ ad tke .... Urea., is .-e-Jllle4 to c:afon llieuvt tit. .... . .ADqPDD_, ~ De INN. of CallissiANiffs of tbl · Casca.4e • ' -~ , • • • , j , _kwr But.rid, Iiq C:0..ty, ..... ¥• n a, roplar cipea PQU c '""'-he -f Ml• oa ... ~ u7.of .1 .... 17, 117$. , -11na m.,u1 -2-. _.;o. .• ci':l,· ·1" ~-· lilll1Ec:I": .Cet:'ric:UIII ': " .... lut.ia. .. , --. . ~ : f· ' ........ First American Title ~ .... • 1:1 ... 0-.... N C> ... 0 N O' "' ..... N .. .. 0 0 P. ... I i t ' l .. ,.,._ ·.~ First American TIUe -. . .-' ., .· ·--·f a£COIIIIED . _ :.sr .. ssHI ~.-. •wo1~-.. .•. , -1>en NIU . • l:IIUSIII DaS ~ ,. anwiN. 1• · p.1o:te.1 .101 -;,.tu ~-'/ - ' = First American Title 5. SP-Exceptions 03a_8105050732 .. --·-· C Cl) • First American Title ll£1lq TO: -SEO D!STI. . -SE 17itll t.ltl4. ;i.;: JiQl: 4 -., "' IIEJlfCII, 11A 911155 CISCl'E rm ~Ifta:C": UliG CGGarZr, ¥! -ao. 1454. ·91,0S,,,S a RE!CD F CA5NSi.. 4.00 -·"" ·22 . ,ud. Mffi..Na to tlla pcapertJ' 4eecr.i.liliec. ia ~t ••• at.1;.M;la;ed. 11.emto, wtu.ca is .... a ~ !Mn.JO: JP.! n:~roace tMretor a.. IPIF?EIS, it. .i..a U. policy 0£ c:a,cade SeMrar Di.suict. to raquire rei-hvnm t. for ny liw bll.i1t. by t:lw 4.istrict au/or bJ' .. in41ri4D&l .... -id. liae pro¥ides aeAUit. aad. NrYi.ce to adj..,...t: • ._rey, - :aiBBBAS, tJo-e D1atr1ct. Bllginee.r U-11 ca:apu.ted. th.a properties ~f1ted ud tile •&luea of ••id bnefit u .t.;1PliK to sa.14 pro;terties. i1iC*. '&&i:&fvitB, DB tt JICSOLYJ:D lrJ" UA: :aGani of camaasioaera wilereby die property deaeril:led in ~it •A• will be .....s. ia requ!.r.S w pay $1. 7. 2155 •t 150 feet of ae.,.m, per frm:i.t. foot." w.it:A • atUQ oer,r1ce 1&_,, c11or9e of ueo . .e. sacnos 2 · fllat. ao Hrrioe at.-11 :.... pRIVi.4eci to a..-.y o£ l:ile ~ ~ ia Zsb..Uti.t •4• prior to tu ..-n,oa A?Pl.ying" for Mn'ioa and ;taYi.111 tlla Giattiet the ~ ut:abliat..ef! cbar9Q t for all praprarty Mild i.,, \lie applioaa~ ~ ilea vitiaiA Bxhibi\. •,1.• .. ADOPZBD i.,-tile ao..n. of comm; ssicmar& of cue.,. s-r DhUi.c:t:, nar eo..ty, llulliagtaa., at • l'891ll.ar opea public aeeuag 'tJlu'eOf oa CM l&&a oq ~ Dr her, 1,a;. -JDI •. l4S4 -· -L.uiag ~Claaqea III.ID24 '""".C -~ Ob ~~~ ~mri ••• -... )' ~-.2:.~·· r2, Jl.,...J r 'II L I •1" ·~' 11.x iZ8l;Sl<A • • f o.· • -• 4'11'""' ict11eHilf·~ .a:; :.:t"I -·-... -.. :. ___ .. _ • First American Title _ _, .. I , -~ First American Title . .,_ -D:n&ICT 1.L.lJ • .__ M tli 1he ._di 7S f..C ef 1M SMICJI Wil t .. t oi Qa last ulf of LA& lat llalf of t11e • 'IC -1.f of ~-S.c-clwuc ~.:..-r e£ CM Jierta,iaa.t ,.artec ., Sile.UN. n. ......a., 23 -.:a. ...... , ~. v.a .. u u.c c...cr. MnsM at.ea; ::-·---·----·- , • --------····-. . .. ·-·· ---.. First American TiHe tr ,, __ _ tN: at:llu1$f . ...• ....... , •. , <\.•·.,:{, _ ... rs., l_...~-- ·-..:r swvrlla,.. i' -... --,~k,o ... 16. '"!~"~,~··::,~•-·,;_.,:~' ;: · . ..... ,.,, lto ,., ..., -~ ... -~'4' ....... ;.-"'!II fl!. u .. -·· ., .... , nto .. _,..~:Srtt~ ...,.~,.~~:-·: · -~~; ~· i • ..... ' • . -tltte<l lof -.._ .,;y; frtrw 1 tll' ~-ia•~flltlN'.~~ •t ,,., .......... ~ ., __ ~......._ ...... ---~·-ef ~-~-:~ ,a ti. -· ti,. Oi' ..,._tl• .... I ...... ..« tW oudi-Mii.ie:iiocHS . . . . _.. . .. ·.·· ,-. fty .u •• iNCOtdalloe:'!'t.cli _.. ,.......c·u-..-]5..9(.~ .. -. -. -Iii: I~ ....... by tr. Wri .r C':llaool~•l-rs ;;; . CncHa S..r •tHr.J~~' ~ ... CollMy, Va-I~ ff fOl l ... i -5ett i;e I • Tllet et. -IJ . aaa .. "' fa I Hle9 ~ facU It ia. With I• the . -. t: -fOIJWillf ~-.... ~y altNtd la Ill .. ·t::e.MJ.-Vllsltiagtoa,· .. aceept&41 for .. ...:1 .. ~ ~f;......., _,,. •• uw 11o,.-. -., -.1c .. n. ,-. u ...,... a..,e s ~,. W.11.1 ,--=a *-dierl,, ••-.-the._._.,,_ · I lne ,OS f .. t: ...-. o_r •-• 1M ,._ ~ •r,IR ol ths 1.· 1.-C1u'1' .._. u -.. 1811-.._1. 1'121 CIIINCll_'&stetty ............ Sorili Mr9hi of tllt 1. c. car, ._., ,s ,_ "' ille •-PDl•t of .... , .. ,,., theaca Solltherly •t ;,Jlfht -.1 .. to .. s.r s-t•-_,.._t,. of t.1i!a. I. C. Carr loa4 •so f-.c.; ,dtaam ira.cerly aM ,.,..11e1 to -..111 a..ila •"If• .t tta r .-.. ,. ·c.rr ~ &o u ltttenectlan wltll tfle Vint. llao "' •'-Eut• liali OIi U.. -liolf ., .,. lkirt-t -...,...,. of the llort-,,t "-a~r of Mi4 ~I• 32; .tt..c.:11orrt.rty al-, Nfd Vat 11• to t ... so.ct. •rsl11 ef dlll I. a.. Carr -'IN4; -. llncerly "!._ ... ,~ -11111,.,i. o, tlla 1. c. C:.,,,-loe<I ...... ·-,. ..... ., .... ,.,... . ~i:tlon z. Prior t9 ~-COMeA.f• tor Nlllt' NNlce Jar-~~ ,1,.. COl!pOr•ttoa o1 ,,,..."" •ah111 1: ... ...,. ,,..Ct',~ ~ .. i. K•"I CoiHtty, V.slliagc011. tlleN-datl lie col kcutl fra Mdl ,.~ ~iRI ~i4a a let:•~ ~ a., .-;a,ec.Ui_. •• S.C.t.i-.. J ... __., .. , ... :,ropot'tiONte CMt at dlsu··ict f;c.llltift ... r IAi-ch n..,..rty .,.1,-ifll. ' 1 I ;_ First American Title •.. ,.. ">. ·~ First American Title ,~,~Ice .. a •• pl"·~-.~-1-!;--.-~ .. ~:~~-.. -,---~~-~~·.:_~F_:-~~---·:. ~:'.;~-:-· w•-1. -....... ~!1"--l·:~ io,~,~(!'1' ·. ', =~: :.::: .. '.: ... ;~;1:.:~.;!!::!-t:~~~: ,,1.1, for -"-· "-''-< ef .11;;-,..;..'"" ....... ; .. ~ .. fiit ot..,.. .. --.1., .. 4, /-ir-~·--~:~rta.t~.;. u ~--~t- ot·C8HC1'11Ctl ... tllil fell ................. --&•1-·. s1 11 Lwtb; b 'II! -ts . 12" 675.111• cur~ ---11.e'<:'Vef · 18,,. Pl. S.l. 1-. ••,.. K.IW Afipra •....... + .v. oil IOJr<I Pl, S.£. 1011 138$.08' Carr a.4f =:"'• I'°"'+ II of tOSttt , , • s .. f; Pl. S.E. <•. cu -..11.•.> Scc.c1011 ... A _,,. .t t .. 11. rfl0111tl• t1M11 .. rnordd· hi ca. offrcs of the Au41tor of 11"9 _Coullty. lilnltf.,to.. ,_. tlNi ,_.,... of giving NDUce to •11 ,,.....1 _ __. fllbN"e ..._n of. t1l!li ...,. tlacrf'-4 rut pnip.rty sultJact to ... ......_ ..... --..ctl•·'f•. PASSP ••• -··· -· .. ., .... ~ "'-Ul-rs this !.]._ day ., Ao.pot, 1972. · First American Title First American TiUe ~ s N N .,, c:, N ...... ... ... N, 0 ., -,,.;: .,; , __ ,..,_ ,.;. --.. ,_"<' FflED_.for R.ecord 2tJte~ of- • fLj -tma·ialar .....,.,..:_ "· 0 B<)l< '6430 · . ---~ W~l"fC~.9EJ.l.o6 CH. t.~d::iZ~. C .. _. . -' ~ - ,' '•. ~~ _ .... _ -. PIH ~--l'I 4 13 j First American Title 7. SP-Exce lions 04 829843 NATIONAL COMMERCIAL SERVICES NOTICE OF MISSING DOCUMENT COUNTY: RECORDED DATE: King 10/04/1912 RECORDING INFORMATION: 829843 ORDER NO: EXCEPl10N NO.: 307295 6 Please be advised that the document listed above is missing from our plant. First American is attempting to obtain a legible copy of this document. It will be sent to all parties upon receipt. First American nue First American Title . . . Blank Page I of3 Chavez, LIiiana F-= Justin Bemilt [Juslinao,t,8Cl egal cam) Sent: Tuesday, Jui, 17, 2007 12:30 PM To: Chavez. Uana Sull:ja ct: RE: King County Dex:. Request (307295} c--·--~~--,-------~ FIW: 0-. LIiiana [mall11:llclia. @f.st.n1.m11] s..t: Tuesday, .Julf 17, 2007 11:30 AM Te: Juslin llemllt Subjed: RE: King County Doc. Request (307295) No piableml "-.Juslln Bemlt [maltD:.Ju,tinB@•ec:J Seat: Tuesday, .lul\t 17, 2007 10:59 AM To: 0-. tJiana S I J ct: RE: King County Doc. Request (307295) Ro prolllem. Sony I ,....'t allle to pt It to,._ l(Ulclrer •••• ,-0-. I.Ilana [mallll:lldia. cz@f.stan.com] Sent: Tuesdlly, lull' 17, 20D7 10:57 AM Te: .Juslin llemllt S 7 J ct RE: ICJng County Doc. Request (307295) Pleilse fa-.:1 Ille request ID Ille cFerlt ill: Ille Rsade's office. Thalk you SD much • your help! ,-Juslin llemllt [mallD:Justil:8@.-o f'9l)F com] Sent: Tuesdlly, .lul\t 17, 20ll7 10-.56 AM To: 0-. I.Ilana S IJ t RE: ICJng County Doc. Reqiiest (J072!l5) Rope. rD le I ~ -~ tab a look at It for-. "'-0-. Ulana [n It 1:adlau 191ia5toW,l.CIIIII] s..t: Moncla,, .lul\t 16, 2007 3:41 PM Te: .Juslin llemllt Subj t RE: ICJng County Doc. Request (307295) Is lhere a CDst dllfac.ace ahen ieqioesls are sent ID Ille Recolde's Office? First American Title First American Title Blank fnNlc Justin Bemlt [maillD:Justinll@All(l] Sent: M<Jndav, July 16, 'll107 3:10 PM To: Chavez, I.Ilana Subj ct, RE; King County Doc. Req11est (307295) Page2of3 llmm.-I doa't Wak _._ ner M1t with tlda Jmul of ....... bcre at ABC laoae9tly. That's latenstmc--lleeam wbma seanlabl& IUUler--..au'•_.,...,. J .u.J Bad a Catt_. a wi-toa. _ _._ Jweat to pall •P tlae 0..-_.-. Yla .......mm reels tbe .,._ didn't matcla ap.-J ....Wjaa nm Into ._. ....._ Ir,-IDm I -.Ill pus thfa l'etl.-oa to a Clerk -at tlle Reconer's otlloe? Ftvm: a-. IJlilna [mallio:llldlawezOfirsl] Sent: M<Jndav, July 16, 2007 2:57 PM To: Justin Bemlt Subj •. RE: King County Doc. Request (307295) HI Justin, 1129843, B58693, and 880063 are al r vatlon for rninaals 1esei\led by John W1nslDn and aara WIIISIDn. I apilcgiz.e for the last clix:uiiierit"; since I typed in the illC.Dllect inStrument no. The cmect instrument no. is ll28ljl 1eco111ed 4/16/1917, which is also a 1eseivalion for minems ieseM!d by Clyde C. Carr and Nellie E. t'.arr. Hope this helps. l1lanir you! Ulana ft'oa: Justin llemllt [mallu:JusllnllOAll(l] Seat: Monday, July 16, 'll107 2:09 PM To: 0-. I.Ilana Subject: RE: King County Doc. Request (307295) Bl I.Qhne Do you bappea to -aa7 aamu for tlut Gnator _./or Ona_ In &a)' oftlaeN Raconler .......,...? I Jut pt 1oack l'rom tlae Reccmlen ofllce _. wu _eu, o hl la locatlac aay or tlae 4 -..........,at&. Coa1d It N poaaillle tat tlaae -nsben are ID a dlil'enat C01Ult)'? Jullift s.nilt ABC Llgll lllYka. Ille. CowtR t di and llllriowal Dopt. pll. -7S7215 at 3151 flL 11111 1311717 -····- fnNlc 0-. Liliana [PWIIID:lkha. lllssta.n.com] ....._. At: Monday, July 16, 'll107 U.115 PM First American Title First American Title Blank PmllBd To: ABC F'z:rr:t Mail Con.ealic,,,: King County Doc. Request (307295) 51.dlj • King County Doc. Request (307295) Helo! Plase pm,tde arpes d the fdk.wing documenls ,_ded In King Counly: la,'04/19U 1129843 ~1/1913 858693 Cll/02/1913 880063 04/16/1917 307295 Thank you __, mudl! UlinaO- Arst American Tille Pacific lb1hu.oest Region Producllon Supervisor 11175 Azusa Q R.ancho Cuc:amanga, CA 97130 Ph: 909-477-5685 First American Title Page3 of3 First American Title Blank Chavez, LIiiana f,-: Chavez. Liliana Sent: Morldaf', .Illy 16, 2007 12:05 PM To:: 'w«oat: &eQal com' Cc: Eslrada, Nlm8i Sullj1cl: King Counly Doc. Reqll8II (3072115) Helo! Pleme provide a,pies vi the fcllDwing dDcumentS lecolded In King Olunty: 10/0'V1912 829843 03/31/1913 858693 08l02/1913 880063 04/16/1917 307295 Thalk you wry much! Ulana ChiM!z Filst Americiln Tille Padlic Nol1h s RegiDII Produclion Supervisor 11175 Azusa Q Rancho Cucaroiga, CA 97130 Ph: 909-4n-5685 First American Title Page 1 of I First American Title 8. SP-Exce !ions 04a 858693 First American TJtle bJsuraace Cnrnpaay NATIONAL COMMERCIAL SERVICES NOTICE OF MISSING DOCUMENT COUNTY: RECORDED DATE: King 03/31/1913 RECORDING INFORMATION: 858693 ORDER NO: EXCEPTION NO.: 307295 6a Please be advised that the document listed above is missing from our plant. First American is attempting to obtain a legible copy of this document. It will be sent to all parties upon receipt. First American Title First American Title .. Blank Page I of3 Chavez, Liliana From: Justin Bemill (JustinBOABCl,eg.coml Seat: Tuesday, July 17, 2007 12:30 PM To: ~ l.llana Sullject: RE: ICing County Doc. Peq,-(307295) clllrlpt-1------Tlaey wuea't llhle to-diem eltlt,er~ FNffl: 0-, I.Ilana [mallD:lildla.2*'-11.aim] Sent: Tuesday, July 17, 2007 11:30 AM To: Justin llemlt SUbjed:: RE: ICing County Doc. Request (307295) No 11Cllllend Fnn: Justin llemitt [mallD:Juslln&e '901'911 am] Sent: Tuesday, July 17, 2007 10:59 AM To: 0-. I.Ilana SUbj t RE: King County Doc. Request (307295) ll'o problem. 8oft7 I ..... 't aide to pt It to you quiclrer •••• Ftam: a-. LJlana [mallio:~] Sent: Tuesday, July 17, 20ll7 10:57 AM To: Jusllll llemll: Sdlj 75 RE: ICing County Doc. Request (307295) Please fonad the request ID the delt at Ille Rea:lnler's office. Thar* )'OU so much far your help! Frem: Justin llemllt [maao-.Juslitl801fKl 1'911 a,m) Sent: Tuesday, July 17, 2007 10:56 AM To:0-,l.liana Sizbj t RE: King County Doc. --(307295) ll'ope. rn .._...,,...,. u... tab a look at tt r. ae. ,-; a-, I.Ilana [11 7 Ilda. a.Ofirsta,1.a1111] Sent: MandaJ, July 16, "11»7 3:41 PM To: .Justin llemilt 5wjed: PE: King County Doc. Request (307295) Is there a cost dlllleiea ""-,aiuem aie sent ID Ille RecDider's Office? First American Title First American Title Blank Frwl: Justin Bemitt [maillD:JuslinB@.WO ega! am] s..t: Mondl\l, luly 16, '1JYJ7 3:10 PM To: 0-, Lllana e I jec:t: RE: King County Dot. Request (307295) Page 2of3 &mm... I doa"t tlllak wew .....,.. lleJt with tllia ldu of request lacre at ABC lloae8tly. Tllat'a iatereat1n1... Becan,e wllea uarchlnt; muter thaH Reccmlel'• IIIIIIIMft I did Blul a can ancl a -.a. But wllen 1-to pall ap the GnDtor ancl Gnmue ,ria micn,8Jm nela the names didn't matcla ap... I ......W jut nm Into ._. eada. 11,-u lib I -..w pus tlUII r~ OD to & aerk OYer at the a.-.ler'a Oftlce? Juati:a Frma: a-. Lllana [mallD:JilchallezOfil] Seat: Monday, July 16, '1!Xf7 2:57 PM To: Juslln Bemilt Subject: RE: King County Doc. Request (307295) HI Justin, ~ 8586931 and 880063 are aU R vatiu,1 far mil'le.als reserwd br John WlnslDn and Clara WinstDn. I for the last docuriieni; since I typed in the IIICIII ,a:t ln!;bument no. The correct instrument no. is 1128141 ra:uded 4/16/1917, which is also a l1!5elvation for nweals reserved br Clyde C. Carr and Nellie E. Carr. Hope this helps. Thank you! Ulana z=-: Justin Bemltt [maillD:JustinBOABO.eg] Sent: Mandar, July 16, '1JYJ7 2.119 PM To; 0.-. l.lianil SUZIJ I ct: RE: King County Doc. Request (307295) Bi tflfev " Do ,-11 llappea to llave...., aamea r.w the Gnator ... ,or Ckalatee la &aJ' oftlleae Recorder -..? I jDat pt llacli: from the Jtecorun ofllce ancl wu asno • • l\a1 la locatlae &aJ' of the 4 Roc,,...,<1:r 4ocumeab. CoaJ4 It" po fttle tllat tlae,e ........,... are la a dill'ereat couaty? ...-Bemilt IC Llgll Servlcas, Inc. Court 1181 ch and Rwieval Dept. ph. -73f.7295 at 3158 b.~ A¥ • r 11cm First American Title First American Title . Blank Poalled To: ABC Res ea ell Mall Cocwww satluA. King County Doc. Request (307295) Su11j1ct: King County Doc. Pfq!iest (307295) Helo! Please poo,,ide aiples a/ lhe folowing documenls IIICDlded In King Colfty: 10/04/1912 82!11143 03/31/1'13 1158693 oe,v2/l!ll3 III0063 04/16/1917 3117295 Tla,k you very mudl! Lllana Chavez Fust Anebn TIiie Pacillc ...... est Rl!glan Pnxludian s..c,ei •isor 11175 Azusa Q Rancho CU..-1KH,ga, CA 97130 Ph: ~-5615 First American Title Page 3 of3 First American Title 9. SP-Exce tions 04b 880063 First A.me, "icaB Tdle .bJsanmce D,mpa,u, NATIONAL COMMERCIAL SERVICES NOTICE OF MISSING DOCUMENT COUNTY: RECORDED DATE: King 08/02/1913 RECORDING INFORMATION: 880063 ORDER NO: EXCEPTION NO.: 307295 6b Please be advised that the document listed above is missing from our plant. First American is attempting to obtain a legible copy of this document. It will be sent to all parties upon receipt. First American Title First American Title . . Blank fflllll: Justin Bemill (~ Sem: Tunday, July 17, 2ot1712:30 PU To: a-, Ullana ScshJa l:I: RE: King Counl)' Doc. Request (3C17215) ,-: c:lliM'z, IJlwi [m e :lldla OG,st-n.mn] Sent: TIBdlrf, Julv 17, 7!¥1111:311 AM To: Justin llemllt s ~j • ' RE: King County Doc. Request (307295) No problem! ,-JustlR llemllt [lllllilll-.lustii:81MK1 f9II mm] Sent: Tuesdllr, .Julr 17, '1JXJ7 10".59 AM To: c:lliM'z, I.Ilana Su~ • RE: King County Doc. Request (307295) •• problem. Bony I wua't able to pt II: to you quialret •••• ,._ a-, I.Ilana [maib.:tluu Olloat.a,I.OIIIII] Seat: Tuesdlly, lull' 17, DT1 10:57 AM To: luslln llemllt S11P,J I i:t: RE: King County Doc. Request (307295) Pleme forward the request 1D the der1c at the Recorder's office. Thank you so much ... yaur help! fn,m: Justin llemilt (mallD:Justii:81..., egal CIIIII] Seat: Tuesdaw', lull' 17, '1JXJ7 lll:S6 AM To: 0-. Lliana 5 I J e RE: King County Doc. Request (307295) ..... rn .._,. -tllea tab a look at It .... -· ,._ a-. Uiana [maillr.liU .. stan..crm] Seat: ........ .Ju1r 1', DT1 3:41 PM To: Justin llemlll: 5111' e RE: King County Doc. Request (307295) First American Title Page I of3 • First American Title Blank '-n: Justin Bemitt [mallD".JustinB@A8Q.eg] Sent; Manday, My 16, '2IX11 3:10 PM To: 0-. I.Ilana SI It I ct: PE: King Counly Doc. Request (307295) Page 2 of3 Hmm... I doa't tlwu: -'ft .....-de1t witla ~ lmul of fttlaeat laere at ABC lloaeatly. That'• lntenatbae-·· --wlaea -ucldac _.... tboee ............,. anmhen I dhl fllul a Carr and a WIDstoa.. Bat when I -to ,..U ap tbe Graatnr _. Gnatee ..ta mtcrvmm reels tile names cllda't matell up.-I woaldjast ... lat. dead elUla. U,ou lib I eoald -thla re•11eat on to a Clerk over at tbe Reeorder'a Offlee? fnllll: a-. LIiiana [mailD-~.c:am] Smit: Monday, My 16, 2/XJ7 2:57 PM To: Justin Bemit Sulject: RE: King County Doc. Request (307295) HI Justin, ~3, and 880063 are al r wation ror neats 1eser wed by John WlnstDn and Clara WinslDn. I for lhe last iiocuineiit:" since I typed in lhe ~klliied instrument no. Toe oorrect instrument no. is 1128141 ,emnled 4/16/1917, whidl is also I reseMiliDn for n*1erals reserved by Clyde C. Carr and Nellie E. "tin. Hope tNs helps. Tbankyou! Ulana Frmn: Justin llemitt [mallD·)rst: eo•eo egal.c:amJ 5ml: Manday, My 16, "JIXJ7 2.119 PM Te: Ola¥ez, I.Jlana Subject: PE: King Counly Doc. Rel1iest (307295) Ht I.Diena 0.. 1011 happen to b&w 11117 -for tbe Gnator and/or --ba 11117 of tbesa Reconler PIUllben? I jut Col: NCk &om tloe Jte c anlen office aacl -11 C C CI gfd ID loc&tiac 11117 of the 4 a, c ordar ••-•ta. CaaW It lte I fhl• tlJat tlae9e IIPDlhn are la a difl'erent C01Ulty? -lllmllt ABC i.p: SIIVicN, Inc. Caurt ,-ci, and -Dlpl pll. II0-735-7295 al 3151 Ix. II0-5311 fJ7f7 fnllll: CJ-. LIiiana [maillll:llchilu 20ftsta11.c:am] ...... At: Manday, My 16, 7!XJ7 12.115 PM First American nue • First American Title .. Blank POllled To: NIJC Resea ch Mal C..Uwwwlal:lan: King c.ounty Doc. Request(307295) 5ullject: King County Dae. Request (307295) Helo! Please provide c.aples rl the fdk.wlng dDcumenls ,_ded In King County: 10/04/1,U 129943 ~l/1913 158693 08/02/1913 8800&3 CM(lf/1917 3117295 Thank you ,cy much! UllanaO- FirSt American Tille Padic Nclill at RegiOrl Production 5upet visCI 11175 Azusa Q Rancho c..ca,nonga. CA 97130 Ph: 909-477-5685 First American Title Page 3 of3 • First American Title 10. SP-Exce lions 04c 956710 , (J • ~ ~--1 S.Al.) " ( c, ""r .J'a]T s. 1917) ~- J& '!'. J:1llo!'im. lo\1117 !'lll>!io ln an,i r... Wi• 8'....., or --.tiiDb"ton. rMi4J.IIS a, a..,u •• 1n •aid at.ta a, si, ain P"ft 1 r. •ll. _,... ,,..-, ~;~ ~ •··~·.~:-<~ '.~ , ''. '·.,.r -Xi-.-.W.-· 95D/J.ui Joli: ~...:. fl az, ; jllls~ ~ ·• --••• Jolm --md C!l.oa -.-, 111• -.u., or Ol'1111•, -. , r,.. An4 in eun- iat4< .. ,1 .... or _ -__ J:lallu,a, ln -paMI, ---.,..,.,.., h ia.r n.naon. a be.oh- 1.~.., • or --1 .. Yul!.., Qa rou-.is -el-H&l •ehte: I ! ~• _ _. -~ or -_ _. -i..u ar -·--a.u at' ,11t --...,. r=t11 !c•a'l ~ -· ----Ill'ld:> or 8tc'1on -~ .... (32) '!'I Mp ---\bl'• ' ' .. '.!5) -. Nap nw (5) _, •· L, uoei,1 '1lll'1r -~ \lit -.•• •r '"" •llo.., ;-, ·"--1P9ft. "IIUob ia ... __ tor -.. • ... -.,. •d alff ao~a '9 •-•l ri.CAa ' ill lllo SR-N. E-toa.'84 ill -0oantr at JC1n&, --of 1'aalll.npcm. lhff11 ,111.. 12\b 11ar or ..... l912. ·r'1""' .. "' Jolin --(S61'l) ;B41r. -· ....... ' ......_. in., ot~n. ..--, ! >•• ( Seal) Q.. ~ ., <>r !U.11S 8 I . :r !. w. 5-11, • .. ~ Pul>Uo, do -I' eer\if:I, ,_ "" ai1e 12111 ,tor or 11o-. E--, ~912 ~ •!111•..C -.... • Jobll ft--en-. 11lneton, Ida wU'•, ~ • lo....,, ~ ~ IJe ,-.. iac1hl-1a Ola~SMd in, -wlla ---,&\hla 1-P.-. -• ·-1.&<\,-..o c::x:i jl,11& ~ aLSM4 -•aled --.. \llUr rroo an4 •al11nt""7 aa\ ...s 1-<t f"o!' t;he ueu ~ :,--~· --... u ....... Ill --.. ""bon4 -at~alal •oJ. 1lbia 121,11 ,tq or 11o--. A. D. 1912. ( ll ll I .. 1in1al Be.i) C ca ?i: · ,.., 10, 1916) B. W, H.-11 Hot_,. P1illlu 1n -f r \he 6' .. te or 'llaalli~,.n • .... .i.u,. ., -•:i. l'i le, fr,p re .... d a .,..q _ or in·-•, OS 5, 1914, •1; 59 a!. n l"'-11 1 I'. I(, K First American Title • First American Title 11. SP-Exceptions 05_1..,.,12=8-'---14,...,_1 ___________________ ... First American nt1e CfJSUl'IUJC/e Com.oaq NATIONAL COMMERCIAL SERVICES NOTICE OF MISSING DOCUMENT COUNTY: RECORDED DATE: King 04/16/1917 RECORDING INFORMATION: 1128141 ORDER NO: EXCEPTION NO.: 307295 7 Please be advised that the document listed above is missing from our plant. First American is attempting to obtain a legible copy of this document. It will be sent to all parties upon receipt. First American Title • First American Title . . Blank Chavez, Liliana fn,m: Justin Bemilt ( hill" IBOABCI ... cam) Sent: Tuesday, Juty 17, 2007 12:30 PM To: ~Ulana Sulljec:t: RE: King County Doc. Reciu-(307295) Fram: Chwez, Liiana [rnaillD:lllchavezOft's] Sent: Tuesday, July 17, '1:007 11:30 AH To: Justin Bemllt Snbj I RE: King Caunty Doc. Request (307295) No problem! "-Justin llemi!t [mallo:Ju.111 B0>80 egal I'm'] Sent: Tuesday, July 17, 2007 10:59 N4 To: Chwez, Llianll Sullj rt· RE: King Caunty Doc. Request (307295) Ro pn,lllem Borr)' I wua't able to get It to :,oa <tUicJrer--· "'-= Olavez, Liliana [malllD.llk:ha.eztiffostam.axn] Sent: Tuesday, July 17, 2007 10:57 N4 Te: Justin llemitt Subj rt RE: King County Doc. Request (307295) Please ~ the request ID the clerk at the Reaxder's afflce. Thank you so much for your help! f,-: Juslln llemllt [malllD•),e,,U sB0/\80egalCJllll] Sent: Tuesday, July 17, 2007 10:56 N4 Te: 0-, Llianll Sulsject: RE: King County Doc. Request (307295) lfope. ru 1laslcly bave --a -at it for me. Frw: Chwez, Llianll [mallD:lldlil. lfisstaa.aim] Sent: Manclilr, July 16, 2007 3:41 PM Ta: Justin ._.,._ Se IIJ I rt: RE: King County Doc. Request (307295) Is there a cost dilfeienc:e when request; are sent ID the Recmder's Olllc:e? First American Title Page I of3 • First American Title Blank ,-Justin Bernitt [malllr.lusllt•O lrPO ega! CDII] Seat: Mclndaf', Mt 16, '1JJJ7 3:10 PM To: Chavez, I.Jlana Sr 2 j $; RE: IClng County Doc. ......... (307295) Page2of3 a-. .. I lloa't thmk -• nw ult wltla tZUll kbMZ of-.-Mft at ABC llonestly. Tut's iatenatlal,. •• Born-wllea wralwlc ...._ tbMe .._.... -ton I till lbul a Cur Uld a 'Wiuua. Bat....., I-to ,.a ap t2ae a..-.. GnmN m wl u8lm reels the -dYa't matmll ap. •• I__...,_ ... lab> .... ..._ If,oa llta I COllld pus tlala -.aest -to a Clerk -at tile llacanler'• otlloe? - "'-= Chavez, I.Jlana [=ltr:lldlau ... -.mnJ s..t: Mclndaf', Mt 16, '1lJJ7 2:57 PM To: .Juslln Bernitt S t j ;t; RE: IClng County Doc. Recpll'Sl (307295) Hi Justin, 8291143 85116931 and 880063 are ill Reservallan for mileals l1!IIS1'l!d by Jahn Wlnsllln and Clara Ymsb:ln. I it J ~a rar Ille iist &ii.iiriiiiii, sinl:I! 11¥Ped in Ille •-,a:t i1slnlffll!l1t no. The anec:t instnanent no. is 1128141 ,e.aded 4/16/1917, which is also a Rl!Sl!MltiDn far Rilill!lals «-W!d by Ow,de C. Carr and Nellie E, c.r. Hope tills helps. Tlalk you! I.Ilana ,-Justin Bernitt [mallD:>.at BO Wl ega! mm] Sent: Mon«lar, Mt 16, D7 2:09 PM Te: Olawez, I.Jlana Sldtj I $: RE: IClng County Doc. R.equest (307295) Bl l,Ufene Do,-bappea to_..,._ for tu Gnator_./or Gn-la .. ,. oftlaae a-emler mamllen? I Jut p,t tuk ,._ the Jteeorun ofllce _. wu • , , ra1 la locattnc..,. or tu 4 Ro, Olior •• --C:..W it to• a I le tJat thne -•lHrn uo la a tiflenmt --,.? Jullln lllmllt ABC Legal Soni , Inc. Cowl R1111n:h 11111 Rllriwll Oopl. pll. -711-7215 Ill :1151 fl. • 1111111 "'-: Olawez, I.Jlana [mallD:lilcla, Olli-a.can] ,...._ M: Mon«lar, Mt 16, 1!X17 12.'Cl5 PM First American Title First American Title • Blank POllild To: NJC R J, Mail CII WWW Un: IClng County Doc. Request (307295) SUllject: King County Doc. Request (J072!15) Helo! Please provide c:apies a1 u.e rulk>wll,g c1aaanents ,emnled 1n King CountJ: lOJOt(1912 129843 03/31/1913 858693 Dl/02/1913 ll8D063 04/16(1917 307295 l1ank ygu _,. much! Llilna<liavez First Amerlciln 11lle Pacffic Nol II est "-!lkJi, l'!adl 1C11on Supervtsar 11175 Azusa a Rancho Cucainooga. CA 97130 Pit: 909-477-5685 First American Title Page 3 of3 RECEIPT EG00014938 BILLING CONTACT Howard Kimura HG Kimura Architect PO BOX 59415 RENTON, WA 98058 REFERENCE NUMBER FEE NAME LUA 13-001462 PLAN -Environmental Review PLAN -Modification PLAN -Site Plan Review -Admin Technology Fee Printed On: 10/22/2013 Prepared By: Rocale Timmons -----------r·,P City of, 1~_ -J Il I DIJ TRANSACTION TYPE Fee Payment Fee Payment Fee Payment Fee Payment Transaction Date: October 22, 2013 PAYMENT METHOD Credit Card Credit Card Credit Card Credit Card SUB TOTAL TOTAL AMOUNT PAID $1,000.00 $100.00 $1,000.00 $63.00 $2,163.00 $2,163.00 Page 1 of 1