Loading...
HomeMy WebLinkAboutCM_Construction Mitigation_180130INNOVA Architects Inc. (253) 572-4903 950 Pacific Avenue, Suite 450 Tacoma, WA 98402 Page 1 of 1 CONSTRUCTION MITIGATION DESCRIPTION January 30, 2018 Planning Division City of Renton 1055 South Grady Way Renton, WA 98057 Project Name: 601 Monster Road SW Building and Site Redevelopment Proposed Construction Dates: Construction and Demolition start summer of 2018. Building and site construction throughout 2018 calendar year and proposed completion Q1 2019. Hours and Days of Operation: Construction hours would traditionally be weekdays from 6am to 6pm. It may be possible some work may be performed on weekends to take advantage of favorable weather conditions. Measures to be Implemented to Minimize Dust, Traffic impacts, Erosion, Mud, Noise: TESC measures and watering of the site will be implemented to maintain a clean working site. Any work requiring impacts to traffic will utilize flaggers and approved traffic control means. The proposed measures to reduce or control the noise impacts will be to limit the hours of operation during the construction phase of the project. The site is located in an Industrial area and in no proximity to a residential neighborhood. Existing adjacent freeway traffic and facility operations create significantly more noise than this site will produce. Any Special Hours proposed for Construction or hauling: It may be possible some work may be performed on weekends to take advantage of favorable weather conditions. Preliminary Traffic Plan: For frontage improvement work, this effort will be defined by the general contractor and coordinated with the City of Renton.