Loading...
HomeMy WebLinkAboutReport 1+;ice .. F�!a� et4n F --MA N ���uaai■I o I� Al— z 0— LU w U) r LU IS HID AN �I I �II II I��� ��E� � � � � �� � � �: ........... Um J . . . . .. . .. . ....... . ............. . . .. . ............................... . ....................... ... ............... . ........... 2!% cu 0 Za LL M Z2 cm 2 LL LL LL 0 0 li I r' e3 � i u ~5 w gym« wy =o co .Z ¢D tiH �w W J L W r' e3 � ........... . Y w co .Z ¢D tiH �w W J L W cu U) cu CY) -r c 0 (Y cn Z 0 LU Y S OL 3N 7SgVI3N -- --7 77�3 k A P4 4w �4 e HARRINGTON AVE N� 1_J -,El 4F m 4* 0 00 IV wo ## 0 1 o �< wLij zo CITY OF RENTON DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT MEMORANDUM Date: April 30, 2014 To: City Clerk's Office From: Sabrina Mirante Subject: Land Use File Closeout Please complete the following information to facilitate project closeout and indexing by the City C'IP&'c C)ffirp- Project Name: Renton Highlands Library LUA (file) Number: LUA-13-001720, SA -A, V -H, CU -H, MOD Cross -References: AKA's: Project Manager: Rocale Timmons Acceptance Date: December 20, 2013 Applicant: Greg Smith Owner: Sunset Terrace Development Contact: Scott Mooney PID Number: 7227801085, 7227801055 ERC Determination: Date: Appeal Period Ends: Administrative Decision: Date: Appeal Period Ends: Public Hearing Date: February 18, 2014 Date Appealed to HEX: By Whom: HEX Decision: Approved with Conditions Date: March 4, 2014 Appeal Period Ends: March 18 2014 Date Appealed to Council: By Whom: Council Decision: Date: Mylar Recording Number: Project Description: The applicant, King County Library System (KCLS), is requesting Hearing Examiner Site Plan Review, a Hearing Examiner Conditional Use Permit, Civic Entry Orientation Variance, Lot Coverage Variance, and two parking modifications for the construction of a new 14,479 square foot public library. Location: 2701 Sunset Lane Comments: ERC Determination _T tomes: DNS - Determination of Non -Significance; DNS -M - Determination or Non -Significance -Mitigated; DS - Determination of Significance. DEPARTMENT OF COMMUNITY AND `- " City of ECONOMIC DEVELOPMENT Conditions for Plan LUA13-001724 Hearing Examiner Condition 1. The applicant shall submit a revised landscape plan depicting an increase in spacing for street trees along Sunset Lane NE or alternatively a different variety of tree and additional street trees along NE 10th St. The revised and detailed landscape plan shall be submitted to, and approved by, the Current Planning Project Manager prior to construction permit approval. 2. The applicant shall be required to provide temporary screening plan for mechanical equipment on the low roof, to the southwest, if the building permit for the abutting Sunset Terrace Development is not approved at the time of the Library building permit approval. A temporary screening plan shall be submitted to, and approved by, the Current Planning Project Manager prior to building permit approval. If at any time during the construction of the library, a building permit is approved for the abutting Sunset Terrace Development the screening plan can be revised to remove the temporary screening for mechanical equipment on the low roof, to the southwest. 3. The applicant shall be required to submit revised elevations depicting a temporary roof for the refuse and recyclable enclosure if a building permit for the abutting Sunset Terrace Development has not been approved . The revised elevations shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. If at any time during the construction of the library, a building permit is approved for the abutting Sunset Terrace Development the refuse and recycle enclosure elevations can be revised to remove the temporary roof. 4. The applicant shall be required to submit a revised site and landscape plan depicting a temporary three -foo - landscape planting strip, on 3 sides of the refuse and recycle enclosure if a building permit for the abutting Sunset Terrace Development has not been approved. The revised plans shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. If at any time during the construction c the library, a building permit is approved for the abutting Sunset Terrace Development the site and landscape plans can be revised to remove the temporary landscape planting strip around the refuse and recycle enclosure 5. The applicant shall submit a materials board subject to the approval of the Current Planning Project Manager prior to building permit approval. 6. The applicant shall be required to submit a comprehensive signage package which complies with the standards of Design District V. The signage package shall be submitted to and approved by the Current Planning project Manager prior to sign permit approval. 7. The applicant shall be required to provide a lighting plan that adequately provides for public safety without casting excessive glare on adjacent properties at the time of building permit review. The lighting plan shall be submitted to, and approved by, the Current Planning Project Manager prior to building permit approval. S. The applicant shall be required to submit a detailed landscape plan demonstrating compliance with the tree retention requirements of RMC 4-4-130. The detailed landscape plan shall be submitted to, and approved by, the Current Planning Project Manager prior to construction permit approval. 9. All earthwork implemented by the applicant, shall be consistent with the recommendations of the Page 1 of 2 geotechnical report, prepared by GeoTe onsultants, dated April 18, 2013. 10. The applicant shall submit a revised site plan depicting bicycle parking in conformance with RMC4-4- 080F.11. The revised site plan shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. Page 2 of 2 PLAN REVIEW COMMENTS (LUA'13 1720) City if 0"� `'r r PLAN ADDRESS: APPLICATION DATE: 1212012013 DESCRIPTION: The applicant, Icing County Library System (KCLS), is requesting Hearing Examiner Site Plan Review, a Hearing Examiner Conditional Use Permit, Civic Entry Orientation Variance, Lot Coverage Variance, and two parking modifications for the construction of a new 14,479 square foot public library- The project site consists a total of 16,000 square feet of Center Village (CV) zoned property. The site was formerly used as multi -family residential for the Renton Housing Authority. The applicant is proposing a total of 47 parking stalls of which 46 would be located within structured parking garage below the library facility. The parking would be accessed from Sunset Lane NE. The proposal includes site improvements designed to accommodate the future Sunset Terrace Redevelopment on the abutting property to the southwest, including: a shared ramp for access to structured parking, party wall, and stairs- The proposal Includes a single entry at the corner of NE 10th Stand Sunset Lane NE therefore the applicant is requesting a Variance from RMC4-2.120A, which requires a civic entry on all street frontages of the site. An additional Variance is being requested, from RMC 4-2-120A, in order to exceed the 75% lot coverage requirement to a proposed 930A lot coverage. The applicant is also proposing two parking modifications, from RMC 44-080, in order to decrease the minimum number of parking spaces required onsite from 60 to 47 stalls and the ability provide ADA parking stalls which do not conform to Van parking overhead clearance requirements. There are no critical areas located on site. Community Services Review Engineering Review Leslie Betlach Ph: 425-430-6619 email: LBetlach@rentonwa.gov Recommendations: Sunset Lane NE We would prefer to see the details along Sunset Lane NE regarding the design for the street trees. The construction of the sidewalk area should incorporate the use of a continuous soil bed for the entire sidewalk area or at least 8 -feet wide from the street edge. Construction of this area should utilize a product such as Silva Cells to increase the rooting area for the proposed trees (Silva Cells will also improve water quality). Each tree should be able to access 1,500 square feet of sail. Without accommodating tree rooting we believe the trees will not survive to maturity. Tree spacing – Nothofagus antertica is considered a tree that attains a large size overtime. The landscape plan shows these trees spaced 30 feet on -center. The spacing is too close and should be increased to at least 40 on -center or utilize a smaller tree - Street lights – there seems to be a clustering of street lights near the intersection with NE 10th Street. Trees are shown to be within 15 feet of street lights. We strongly advise that street tree spacing be revised to a minimum of 30 feet from street lights to prevent future conflicts. NE 10th Street There is a deficiency of street trees along NE 10 St Using the species selected, Styrax obassia, we would like to see at least two street trees along NE 10 St.—street trees should be no closer than 40 feet from the street intersections or 40 feet from a stop sign or other traffic control sign (plan does not provide enough details) A similar treatment using Silva Cells, should be Incorporated into the design along NE i 0th Street as above, If a landscape strip cannot be incorporated otherwise. The two Styrax obassia adjacent to the library are overcrowded with one another and too close to the building, which will cause problems in future years. We recommend using only one tree at this location and/or another tree species to be reviewed by the City. NE Sunset Boulevard There is a lack of street trees along NE Sunset Blvd. Remove existing sidewalk, install an 8 -foot wide landscape strip and install two large -maturing street trees along with groundcovar treatment (trf). If this is to be completed at a later date with the widening of Sunset Blvd., please utilize the aforementioned design considerations. General Comments – Landscape Plan None of the plans in the packet show any traffic control signs or signals (see comment above on street tree along NE 10th possibly blocking a stop sign). Street tree selection – the City shall approve the trees to be used In this project prior to being shipped from the nursery of origin. Irrigation plans are not included and need to be reviewed. Stormwater planter mix has not been identified. Jan illian Ph: 425-430-7216 email: jillian@rentonwa.gov Recommendations: EXISTING CONDITIONS WATER There is an existing 6 -inch cast iron water main In Sunset Lane NE, an 8 -inch cast iron water main in Harrington Ave NE and a new 12 -inch water main in Sunset Blvd NE. Available maximum fire flow from this system is 2,100 gpm. The project is located In the 565 pressure zone. The static pressure at ground elevation 338 is about 98 psi. SEWER Sewer service is provided by the City of Renton. There Is an 8 -inch sewer main in Harrington Ave NE, NE 10th Street and Sunset Blvd. STORM There are storm drainage improvements in NE 10th, Sunset Lane and Harrington Ave NE. May 28, 2014 Page 1 of 4 STREETS There are frontage imp ments in the area. CODE REQUIREMENTS WATER 1. The Fire Department has calculated preliminary Fre flow for this project to be 2,250 gpm, Extension of approximately 240 lineal feet of 12 -inch water line will be required to provide the necessary fire flow and water pressure demand to serve this site. The 12 -main will be required to be extended from the 12-lnch stub in NE 10th Street to the far property line in Sunset Lane NE. This will provide 2,800 gpm. One hydrant shall be located within 150 feet and two additional hydrants shall be located within 300 feet of the building. Final location of fire hydrants will be determined by the fire department. 2. New hydrants shall be installed per Renton's fire department standards to provide the required coverage. 3. Water system development fees will be based on the size of the domestic water, irrigation meter and fire service that will serve this proposed project. Based on the site plan provided, fee for a 2 -inch domestic meter is $20,179.00. Fee for a Grinch fire service is $16,418.00. It Is not Gear If an Irrigation meter will be needed. Credit will be given for existing water meters serving the site. This is payable prior to issuance of the construction permit_ 4. The development is subject to the City's Special Assessment District #41 for the Highlands Water Main Improvements project (ordinance No. 5462). The estimated assessment amount as of 10125/13 is $31,920.93. Maximum assessment is $39,795.61. 5. A separate utility permit and separate plans will be required for the Installation of all double detector check valve assembly for fire sprinkler system. DDCVA installations outside the building shall be in accordance with the City of Renton Standards. Fire service system development fees will he based on the size of the fire service line(s). See fee schedule attached. 6. Since the building will exceed 30 feet in height, a separate backflow device (DCVA) will need to be installed inline of the domestic water meter for the library. SANITARY SEWER 1. Sewer service is provided by the City of Renton. There is an 8 -inch sewer main in Harrington Ave NE, NE 10th Street and Sunset Blvd. A new 6 -inch side sewer will be required onsite. It is shown on the plans. 2. Sewer system development fees are based on the size of the new domestic water. Sewer fee based on a 2 -inch water meter Is $14,495.00. Credit will be given for existing water meters serving the site. This is payable prior to issuance of the construction permit. See fee schedule attached. 3. Applicant proposes underground parking. The building department will require floor drains and they will need to be connected to the sanitary sewer through an approved oillwater separator located outside the building, if feasible. Flows shall be directed through floor drains that are installed in accordance with the UPC to an exterior oivwater separator. SURFACE WATER 1. A drainage plan and drainage report dated December 16th, 2013 was submitted by Coughlin Porter Lunden. The report complies with the 2009 King County Surface Water Manual and the 2009 City of Renton Amendments to the KCSWM, Chapter 1 and 2. All core and special requirements are addressed in the report. This site falls within the Peak Rate Flow Control Standard, Existing Site Conditions. The proposed project is subject to Full Drainage Review. Based on the existing site condition, flow control is exempt as the new developed condition will not generate more than a 0.1-cfs increase from the existing condition. The engineer is proposing to collect the roof runoff with btoswales. 2. Surface Water System Development fees of $.448 per square foot of new impervious surface will apply. This is payable prior to issuance of the construction permit. Credit will be given for existing duplex. TRANSPORTATIONISTREET 1. All adjacent right-of-ways need to be fully improved in conformance to the current street standards as shown in the conceptual drawings in the Sunset Area Planned Action EIS. This will include dedication of additional right-of-way, Existing right-of-way width in NE 10th Street is 60 feet, 30 feet in Sunset Lane and 87 feel in Sunset Blvd NE. Improvements are as follows: Sunset Blvd NE - The new frontage improvements are to include an 8 foot planting strip and 12 foot multi -use sidewalk behind the existing curb. Additional right-of-way will be required to the back of the new sidewalk. Based on information included in the EIS, this dedication would be 12 feet. NE 10th Street - Frontage improvements for this street will require a pavement section of 16 feet from the ranterline, curb, gutter and a new 12 -foot sidewalk. This will require dedication of an additional two feet of right-of-way. Curb bulb outs are also to be included at the intersections of Sunset Blvd NE and Sunset Lane NE. It is shown on the plans. Sunset Lane NE- Frontage improvements will require a 12 -foot sidewalk along the development side, a new curb and 18 feet of pavement. The existing right-of-way width of 31 feet in this section of Sunset Lana will accommodate this level of Improvements. Based on the street Improvements shown in the EIS, angle parking will be allowed fronting the site, only until such time when the north side of Sunset Lane is widen and improved by the city. It is shown on the plans 2. Decorative LED street lighting will be required along Sunset Lane and NE 10th Street as required In RMC 44-0601. 3. Traffic impact fees for the library based on square footage of the building (not including parking garage) will be $63,270.00 based the 2013 rate. Fees are scheduled to increase in January, 2014. Impact fees for this project would Increase to $133,637.00. Fees will increase to $204,000.00 in January 2015. Impact fees are due at time of building permit issuance. 4. Paving and trench restoration will comply with the City's Trench Restoration and Overlay Requirements. GENERAL COMMENTS 1.Separate permits and fees for, water meters, side sewer connection and storm connection will be required, 2.AII construction utility permits for drainage and street improvements will require separate plan submittals. All utility plans shall oonform to the Renton Drafting Standards. A licensed Civil Engineer shall prepare the civil plans. 3.Rockeries or retaining walls greater than 4 feet In height will be require a separate building permit. Structural calculations and plans shall be submitted for review by a licensed engineer. Special Inspection is required. 4.A tree removal and tree retention/protection plan and a separate landscape plan shall be included with the civil plan submittal. Hearing Examiner Condition Created On: 0411D12014 May 28, 2014 Page 2 of 4 Fire Review • Building I . The applicant shall submit a re ' landscape plan depicting an increase in spacing for street trees along Sunset Lane NE or alternatively a different variety of tre additional street trees along NE 10th St. The revised ai hied landscape plan shall be submittod to, and approved by, the Current Planning Project Manager prior to construction perm, approval. 10. The applicant shall submit a revised site plan depicting bicycle parking in conformance with RMC441-080F.11. The revised site plan shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. 2. The applicant shall be required to provide temporary screening plan for mechanical equipment on the low roof, to the southwest, if the building permit for the abutting Sunset Terrace Development is not approved at the time of the Library building permit approval. A temporary screening plan shall be submitted to, and approved by, the Current Planning Project Manager prior to building permit approval. If at any time during the construction of the library, a building permit is approved for the abutting Sunset Terrace Development the screening plan can be revised to remove the temporary screening for mechanical equipment on the low roof, to the southwest. 3. The applicant shall be required to submit revised elevations depicting a temporary roof for the refuse and recyclable enclosure if a building permit for the abutting Sunset Terrace Development has not been approved. The revised elevations shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. If at any time during the construction of the library, a building permit is approved for the abutting Sunset Terrace Development the refuse and recycle enclosure elevations can be revised to remove the temporary roof. 4. The applicant shall be required to submit a revised site and landscape plan depicting a temporary three-foot landscape planting strip, on 3 sides of the refuse and recycle enclosure if a building permit for the abutting Sunset Terrace Development has not been approved. The revised plans shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. If at any time during the construction of the library, a building permit is approved for the abutting Sunset Terrace Development the site and landscape plans can be revised to remove the temporary landscape planting strip around the refuse and recycle enclosure. 5. The applicant shall submit a materials board subject to the approval of the Current Planning Project Manager prior to building permit approval. 6. The applicant shall be required to submit a comprehensive signage package which complies with the standards of Design District 'D'_ The signage package shall be submitted to and approved by the Current Planning project Manager prior to sign permit approval. 7. The applicant shall be required to provide a lighting plan that adequately provides for public safety without casting excessive glare on adjacent properties at the time of building permit review. The lighting plan shall be submitted to, and approved by, the Current Planning Project Manager prior to building permit approval, 8. The applicant shall be required to submit a detailed landscape plan demonstrating compliance with the tree retention requirements of RMC 4-4-130. The detailed landscape plan shall be submitted to, and approved by, the Current Planning Project Manager prior to construction permit approval. 9. All earthwork implemented by the applicant, shall be consistent with the recommendations of the geolechnicai report, prepared by GeoTech Consultants, dated April 18, 2013. Corey Thomas Ph: 425-430-7024 email: cthomas@rentonwa.gov Recommendations: Environmental Impact Comments: 1. Fire impact fees are applicable at the rate of $0.52 a square foot for commercial space. No charge for parking garage areas. This fee is paid at time of building permit issuance. Code Related Comments: 1 _ The preliminary fire flow is 2,250 gpm, Minimum fire hydrant spacing is one hydrant within 150 -feet and two within 300 -feet of each building. One hydrant is required within 50 -feet of the fire department connection. Final fire hydrant requirements are based on final fire flow calculation and final access road configuration. See water engineering department comments for more details. 2. Approved fire sprinkler and fire alar systems are required throughout the building. Separate plans and permits required by the fire department. Direct outside access is required to the fire sprinkler riser room. Fully addressable and full detection is required for the fire alarm system. 3. Fire department apparatus access roadways are required within f 50 -feet of all points on the building. Required turning radius are 25 -feat inside and 45 -feet outside. Roadways shall be a minimum of 20 -feet wide. Maximum grade on roadways is 15%. Roadways shall support a minimum of a 30 -ton vehicle and 322 -psi point loading. 4. An electronic site plan is required prior to occupancy for pre -fire planning purposes. 5. The building shall comply with the City of Renton Emergency Radio Coverage ordinance. Testing shall verify both incoming and outgoing minimum emergency radio signal coverage. If inadequate, the building shall be enhanced with amplification equipment in order to meet minimum coverage. Separate plans and permits are required for any proposed amplification systems. May 28, 2014 ^^ Page 3 of 4 6. City of Renton ordinance requires all assembly occupancies over 300 people to be equipped with an automated external defibrillator, Police Review Cyndie Parks Ph: 425.430-7521 email: sparks@rentonwa.gov Recommendations: 7 Police Calls for Service Estimated Annually CONSTRUCTION PHASE Theft from construction sites is one of the most commonly reported crimes in the City. To protect materials and equipment it is recommended that all materials and tools be locked up when not in use. The site should have security lighting, and any construction trailer or storage area should be completely fenced -in with portable chain-link fencing. The fence will provide both a physical and psychological barrier to any prospective criminal and will demonstrate that the area is private property. Construction trailers should be kept locked when not in use, and should be fitted with heavy-duty deadbolts with a minimum 1-112" throw when bolted. Glass windows in construction trailers should be shatter -resistant. Toolboxes and storage containers should be secured with heavy-duty padlocks and kept locked when not in use. "No Trespassing" signs should be posted on the property during the construction phase, These signs allow officers to provide a verbal warning to trespassers that should they be contacted on the property again, they could be cited andlor arrested. COMPLETED BUILDING All exterior doors should be made of solid metal or metal over wood, with heavy-duty deadbolt locks, latch guards or pry -resistant cylinders around the locks and peepholes_ If glass doors are used, they should be fitted with the hardware described above and additionally be equipped with a layer of security film. Security film can increase the strength of the glass significantly, greatly reducing the likelihood of breaking glass to gain entry. Access to the back of the buildings should be limited, preferably with security fencing, as these areas could be vulnerable to crime due to the lack of natural surveillance by passersby. It's not uncommon for businesses to experience theft andlor vandalism during the hours of darkness, and this area of Renton especially is very isolated and quiet following commuter hours. An auxiliary security service could be used to patrol the property during those times. It is important to direct all foot traffic into the main entrance of the building. Any alternative employee entrances should have coded access to prevent trespassing. All areas of this project need to have adequate lighting. This will assist in the deterrent of theft from motor vehicle (one of the most common occurring crimes), as well as provide safe pedestrian travel for customers utilizing the business. I have particular concerns about the structured parking garage below this facility. Public libraries tend to attract more loitering traffic then other commercial establishments, and having vehicles parked in an area that's not easily visible creates an environment that would support a higher -then -average property crime rate. Landscaping should be installed with the objective of allowing visibility— not too dense and not too high. Too much landscaping will make customers and employees feel isolated and will provide criminals with concealment to commit crimes such as burglary, theft, and malicious mischief (property destruction). It is key for a public facility to have appropriate lighting and signage. "No Trespassing" signs should be posted in conspicuous locations throughout the properly, Including antrances to the property and parking areas. Public libraries tend to attract transient activity and drug usage in the bathrooms. It's my recommendation that the public bathrooms be housed near the reception station so staff can keep an eye out for unwanted activity. Any public computer stations should be situated near the reception station so activity can be easily monitored by library staff. I recommend the developer have a Renton Police Crime Prevention Representative conduct a security survey of the premises once construction is complete. May 28, 2014 Page 4 of 4 2 3 4 5 6 7 S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 BEFORE THE HEARING EXAMINER FOR THE CITY OF RENTON RE: Renton Highlands Library FINAL DECISION Conditional Use, Site Plan, Variances and Modifications LUA 13-001720, CU -H, VAR, VAR, MOD Summary The King County Library System ( CLS), is requesting Hearing Examiner Site Plan Review, a Hearing Examiner Conditional Use Permit, Civic Entry Orientation Variance, Lot Coverage Variance, a parking modification, a refuse and recycle modification and reductions of ten foot side and front yard setbacks to zero feet for the construction of a new 14,479 square foot public library at the intersection of NE 10th St and NE Sunset Boulevard. The applications are approved subject to conditions. Testimony Rocale Timmons, Senior Planner, stated that the site is bordered by Sunset Ln NE, Sunset Blvd NE, and NE 10th Street. The proposed library will be 14,000sgft located on a 16,000sgft site in the CV Comprehensive Plan designation and zoning classification. The surrounding uses include multi- family residential, a gas station, and a Safeway store. There are two existing structures on site which will be demolished prior to construction of the library. The library will be accessed via Sunset Lane NE. The new library includes associated parking, landscaping, and infrastructure. The proposal includes 47 parking stalls. The proposed structure would have a height of 27ft at its tallest point. There will be 90 percent lot coverage. Aspects of the design were incorporated to accommodate a future mixed-use retail development on Sunset Lane. The applicant is requesting CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 site plan review, a conditional use permit, two variances, and two modifications. The proposal is the third of a collection for the Sunset Planned Action Area projects. An EIS for this proposal was created as part of ordinance 5610. No public or agency comments have been received to date. In regard to the site plan review, staff reviewed the proposal in relation to relevant Comprehensive Plan design policies. The project meets the intent of these policies if the conditions of approval are met. The proposal is compliant with all zoning regulations except refuse and recycling closure standards, minimum parking stalls, maximum building lot coverage standards, and building orientation for civic uses. The library is concentrated over the entire site, but the scale would be compatible with the low-rise, urban structure that surround, and are anticipated to surround, the site. The building massing on the side is broken up into three separate forms that house the entry, the large reading room, and support areas. The main entry includes a small plaza and large overhand which creates visibility from all abutting street. The landscape plan includes a planting plan with southern beech and snowbell trees. A recommendation is to increase the spacing of the southern beech trees along Sunset Lane NE to 30ft. In regard to the parking modification request, the applicant is proposing 47 spaces of which 46 are located in a below -grade parking garage. The additional space is a van -ADA parking -stall located in the right-of-way on NE 10th Street. The code requires the applicant to provide at least 58 spaces based on the square footage of the use. Additionally, the code requires ail parking spaces to be located on-site. The code allows the Administrator or reviewing official to grant modifications to the parking standards for individual cases. Staff believes the proposed parking spaces are sufficient for the use, and the proposed modification would not be injurious to other properties in the vicinity. In regard to the refuse and recycling modification, the applicant is proposing a 43ft deposit enclosure. The code requires a minimum 100ft enclosure, but it allows the Administrator or reviewing official to grand modifications in individual cases. Staff believes the modification meets the needs of the proposed use and would not be injurious to other properties in the vicinity. In regard to the entrance variance request, the applicant is proposing a single entry at the corner of Sunset Lane NE and NE l Oth Street. The code requires all civic uses within the CV zone to provide entrances on all abutting street frontages; however, this portion of code allows a grant of relief from the building orientation requirements of the CV -zone, providing the proposal meets certain criteria. Staff reviewed the proposal under these criteria and found that the variance is necessary due to the topography of the site. The proposed entry design provides high visibility along all three street frontages. If the variance is approved, staff feels it will not be detrimental to the public welfare and would not be a special privilege. In regard to the lot coverage variance request, the proposed building will have a footprint of approximately 14,479sgft on the 16,OOOsgft site. This results in 90 percent lot coverage. Lot coverages in the CV -zone are limited to 75 percent coverage if parking is provided within a structure on-site. The code allows a grant of relief from the lot coverage requirement if four criteria are met. The size of the subject parcel was defined as part of a lot -line adjustment, street vacation, and street dedication completed in 2013. The width of the vacation was constrained by the city in CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 2 2 4 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 order to provide the largest space possible for a future public park across Sunset Ln NE. Staff and consultants worked to issue a final EIS for the Sunset -area in 2011. The preferred alternative included mixed -income, mixed-use style oriented development. Public amenities were proposed to be integrated into the development such as the new library project. The library is required to be located in the general facility of the Sunset Planned Action Area. The approximate 2.5 acre public park would serve as open space for the subject site. Currently, there is a public street that bifurcates the public park, but this street would be vacated to create the larger park space. Staff has found that the public park space creates a larger net reduction in the effective lot coverage of the entire sub- area, and, in large part, this area should be viewed as a campus. If approved the variance would not be detrimental to the public welfare, would not be a grant of special privilege, and would be the minimum variance necessary. In regard to the conditional use permit, the proposed library is .5 miles southwest of the existing location. The new location is urban and central to the larger Sunset Plan Action Area. The proposed structure is compatible with scale and character of the existing and planned neighborhood. The greatest noise impacts will be during construction of the facility. Police and fire prevention staff indicated sufficient resources are available to support the project. The applicant is proposing extension of existing water and sewer mains. The applicant submitted a conceptual drainage plan and report which complies with the 2009 King County Surface Water Manual. Staff recommends approval of the site plan along with all other discretionary permit subject to 10 conditions of approval listed in the staff report. In regard to the lot coverage variance, Ms. Timmons noted that this has been the designated lot for the library in the Sunset Plan Action Area, and she is unsure if there are other lots in the area that can be used for the library. Staff reviewed the overall Sunset development area when making permit recommendations. The park serves as a means of reducing the overall lot coverage for the entire area. There are programmatic requirements that preclude the applicant from building upwards. In regard to the topography and access variance, there is a grade change along Sunset Ln NE in which the topography falls as you continue from the planned entrance down the road. Sunset Boulevard has a similar grade change. Applicant Testimony Greg Smith, Director of Facilities for King County Libraries, testified the library is designed to have one entrance for staffing reasons. It is difficult and requires lots of resources to monitor more than one entrance. Another entrance would require building stairs off of Sunset Boulevard. In regard to building multiple stories, it is difficult to have multi-level libraries for program purposes such as staffing and book layout. Scott Mooney, project architect, stated that, in regard to the library's location, this comer provides the most visibility for public function. Additionally, this location gives the library a strong connection to the open -space public park. Staff Rebuttal CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 3 2 R 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Ms. Timmons noted that staff has other procedural options if the variance is not granted. Exhibits Exhibits 1-14, identified at page 2 of the staff report, were admitted into the record during the hearing. The following exhibits were also admitted during the hearing: Exhibit 15 Hearing examiner email to Rocale Timmons dated Feb 17, 2014 Exhibit 16 Staff power point presentation Findings of Fact Procedural: I . Applicant. King County Library. 2. Hearing. The Examiner held a hearing on the subject application on February 18, 2014 in the City of Renton Council Chambers. 3. Project Description. The King County Library System (KCLS), is requesting Hearing Examiner Site Plan Review, a Hearing Examiner Conditional Use Permit, Civic Entry Orientation Variance, Lot Coverage Variance, a parking modification, a refuse and recycle modification and a reduction in side and front yard setbacks from ten feet to zero feet for the construction of a new 14,479 square foot public library at the intersection of NE 10`x' St and NE Sunset Boulevard. The project site consists of a total of 16,000 square feet of Center Village (CV) zoned property. The site was formerly used as multi -family residential for the Renton Housing Authority. The applicant is proposing a total of 47 parking stalls of which 46 would be located within a structured parking garage below the library facility. The parking would be accessed from Sunset Lane NE. The proposal includes site improvements designed to accommodate the future Sunset Terrace Redevelopment on the abutting property to the southwest, including a shared ramp for access to structured parking, party wall, and stairs. Of the two variances, one variance seeks to reduce the number of entry points to the library. The proposal includes a single entry at the corner of NE 10th St and Sunset Lane NE. RMC 4-2-120(A) requires a civic entry on all street frontages of the site, which in this case would be three. The other variance is being requested from RMC 4-2-120(A) in order to exceed the 75% lot coverage requirement to a proposed 90% lot coverage. CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 4 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Of the two modifications, one modification is to RMC 4-4-080 in order to decrease the minimum number of parking spaces required onsite from 60 to 47 stalls and the ability to provide an ADA parking stall off-site. The second modification is from RMC 4-4-090 in order to reduce the amount of the refuse and recycle deposit enclosure from 100 square feet to 43 square feet. RMC 4-4- 080(F)(1)(d) and RMC 4-4-090(F) allow modifications to the standards of RMC 4-4-080 and 4-4-090 respectively through the modification process. 4. Adequacy of Infrastructure/Public Services. The project will be served by adequate infrastructure and public services as follows: A. Water and Sewer Service. The City of Renton will provide both sewer and water to the project. B. Fire and Police. The project site will be served by the City of Renton fire and police departments. Fire and police department staff have determined that existing facilities are adequate to serve the development. The applicant will be required to pay fire impact fees. C. Drainage. A conceptual drainage plan and report stamped by a PE was submitted with the formal application (Exhibit 11). City staff have determined that the drainage plan complies with the new City of Renton Amendments to the 2009 King County Surface Water Design Manual. Since the project is exempt from flow control and water quality, the engineer is proposing to tight line the roof and footing drains to a new bioswale. D. Parks/Open Space. City development standards do not require any set -asides or mitigation for parks and open space for libraries. There is nothing in the record to suggest that the proposed library will create any demand for park or open space. E. Transportation. Traffic impacts are adequately mitigated by the proposal. Curiously, there is no analysis in the record of off-site traffic impacts. The project site is in a development area that has been subject to a planned action EIS. It is likely that off-site traffic impacts were addressed in that document, but the EIS was not submitted into the record. However, the proposal has been reviewed by the City's public works department, who found no need to recommend any off-site transportation mitigation. Further, the applicant will be paying $63,000 in traffic impact fees, which of course will be used to pay for the applicant's share of system -wide traffic improvements. From these factors it is concluded that off-site traffic impacts are adequately mitigated. Page 26 of the staff report goes into detail about the frontage improvements that will be required of the applicant at building permit review or that is planned to be constructed by CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 5 2 3 4 5 6 7 8 9 10 12 13 14 1.5 16 17 18 19 20 21 22 23 24 25 26 the City as part of a capital improvement project. All three frontages of the project area will be improved to City standards as a result of the proposal or planned capital improvement projects. The proposal will provide for safe vehicular and pedestrian access. The applicant is proposing to access the structured parking garage from Sunset Lane NE at the northwest side of the site on the abutting property. The shared access ramp is being designed to accommodate the future Sunset Terrace Development. The applicant is also proposing off-site street improvements along Sunset Lane NE and NE 10`h St which include 12 -foot wide sidewalks. The wide sidewalks would help to promote a walkable, pedestrian oriented, community and would provide linkages to the Sunset Blvd NE, the planned abutting Sunset Terrace Development, and the future City park across Sunset Lane NE. The sidewalk connections would be landscaped and would use a variety of pavings that would provide variation in the pedestrian experience. F. Parkin. As outlined at p. 10 of the staff report, the applicant proposes 47 parking stalls while applicable regulations require 58 stalls. The applicant also proposes to provide ADA parking along adjoining public right of way as opposed to on-site as required by applicable parking standards. The modifications requested by the applicant still result in adequate parking for the reasons outlined below. The proposed library project would be constructed over a single level of structured parking. The applicant contends that the parking needs for a library of this size is not expected to exceed the number of stalls within the proposed parking structure. The requested number of stalls is the maximum amount of stalls that can be utilized through a single level of structured parking beneath the library. The area of the garage is proposed to be used to the full extent of the building footprint. The applicant also contends that the height of the parking area was determined by the maximum recommended slope for vehicular access within the narrow configuration of the site boundary, resulting in a 7 -foot- 4 -inch clearance at the garage entry. While two ADA parking spaces are provided within the structured parking level neither would conform to the Van ADA parking overhead clearance requirement of 114 -inches. Public works staff have determined that the requested modification conforms to the intent and purpose of the parking regulations by providing sufficient on-site parking, and ADA accessible stalls, for the amount necessary for the new Renton Highlands Library. The CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 6 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 proposed modification would not be injurious to other properties in the vicinity and would not create adverse impacts to other properties in the vicinity. G. Bicycle Stalls. The proposal provides for adequate bicycle stalls. Per RMC 4-4- 080(F)(11) the number of bicycle parking spaces shall be 10% of the number of required off-street parking spaces. Based on the proposal which requires 58 vehicle parking stalls, 6 bicycle parking stalls are required to be provided. The applicant is proposing bicycle parking stalls within the plaza area. However, it is unclear the number of bicycle parking stalls that would be provided. The conditions of approval require the applicant to submit a revised site plan depicting bicycle parking in conformance with RMC4-4-080F.11. The revised site plan shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. H. Access and Internal Circulation. The proposal provides for safe and well integrated access and internal circulation. Access to the site is proposed via a single entry to the structured parking located on Sunset Lane NE. The shared access ramp is being designed to accommodate the future Sunset Terrace Development. The applicant is also proposing off- site street improvements along Sunset Lane NE and NE 10th St which include 12 -foot wide sidewalks. The wide sidewalks would help to promote a walkable, pedestrian oriented, community and would provide linkages to the Sunset Blvd NE, the planned abutting Sunset Terrace Development, and the future City park across Sunset Lane NE. Staff have determined that the proposal promotes safe and efficient circulation through the shared access point. I. Landscaping. As conditioned, the proposal provides for adequate landscaping. A conceptual landscape plan was submitted with the project application. The landscape plan includes a planting plan which contains 8 trees. The proposed tree species largely consist of southern beech and fragrant snowbell trees. The shrubs proposed largely consist of Oregon Grape and beach strawberry. The use of paving patterns, planting beds and site walls reinforce the architectural elements of the proposed structure. The landscape plan shows street trees spaced 30 feet on -center along Sunset Lane NE. The spacing is too close for the southern beech variety and should be increased to at least 40 feet on -center or the applicant should consider the use of a smaller tree. In addition, there is a deficiency of street trees along NE 10th St. As a condition of approval, the applicant submit a revised landscape plan depicting an increase in spacing for street trees along Sunset Lane NE, or alternatively, a different variety of tree and additional street trees along NE 10" St. The CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 7 2 3 4 5 6 7 S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 revised and detailed landscape plan shall be submitted to, and approved by, the Current Planning Project Manager prior to construction permit approval. J. Transit. The staff report notes that the proposal is accessible to transit and there is no evidence to the contrary. K. Refuse Enclosure. The applicant's request for a refuse enclosure smaller than that required by code will still provide for an adequate enclosure. The applicant contends that due to the library's program requirements, expected usage, and the applicant's past experience with libraries of this size, a refuse and recycling area of 100 square feet as required by RMC 4-4-090 is unusually large. The proposed 43 square feet of area provided was designed to accommodate 4 refuse bins which would be more than they would typically need. Staff concurs that the requested modification would meet all of the needs of the proposed use. In addition, the requested modification would lessen the visual impact of the enclosure on Sunset Lane NE temporarily and long term would decrease the encroachment on the shared vehicle access with the neighboring property to the west. The temporary trash enclosure for the building would be located at the northwest corner of the building along Sunset Lane NE adjacent to the parking entry and emergency staircase. The enclosure would be located within the permanent easement granted by the abutting property owner. The applicant is proposing to construct the enclosure with CMU block which would eventually be incorporated into, and enclosed by, the future development on the adjacent property. 5. Adverse Impacts. There are no significant adverse impacts associated with the project. Few adverse impacts are anticipated since the only critical area on site is an aquifer protection area, the proposal is a redevelopment of a fully developed parcel and adequate infrastructure serves the site as determined in Finding of Fact No. 4. Impacts are more specifically addressed as follows: A. Compatibility. There are no compatibility issues with the proposal. The library will be surrounded by a park, multi -family and commercial uses. None of these uses is incompatible with the relatively quiet proposed library use. At its highest point the building will be 27 feet, which presumably will not dwarf the surrounding multi -family buildings and commercial uses. Further, great care has been made in the design and landscaping of the proposal as detailed in the staff report, assuring aesthetic compatibility. Rather than adversely affect compatibility, the proposal will serve to enhance compatibility by providing a needed and relatively benign service to surrounding residents and users of the adjoining park. CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 8 2 3 4 5 6 7 S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 B. Lighting. As conditioned, there are no significant light or glare impacts associated with the proposal. The applicant is proposing lighting under the canopy at the building entry and decorative street lighting surrounding the site. However, a lighting plan was not provided with the application; therefore the conditions of approval require a lighting plan is provided that complies with the Design District standards and provides for public safety without casting excessive glare on adjacent properties. The lighting plan shall be submitted to, and approved by, the Current Planning Project Manager prior to building permit approval. C. Noise. Noise impacts are adequately mitigated. It is anticipated that most of the noise impacts would occur during the construction phase of the project. The applicant has submitted a Construction Mitigation Plan that provides measures to reduce construction impacts such as noise, control of dust, traffic controls, etc. In addition, the project would be required to comply with the City's noise ordinance regarding construction hours. There would be periodic noise impacts from traffic and activities that are normally associated with a library. However, the applicant is proposing to construct the building with sound insulation in order to achieve a day/night average interior noise level (Ldn) of 45 Ldn. D. Views. There are no significant view impacts associated with the proposal. There are territorial views to the west, but no large attractive natural features are on or near the site for which to maintain visual accessibility. The applicant has proposed to limit the height of the proposed structure to 27 feet and 0 inches which mitigates view impacts from surrounding properties. E. Screening. As designed and conditioned, aesthetically adverse features of the proposal area adequately screened from adjoining uses. The mechanical units on the low roof, to the southwest, are in the center of the roof area. The equipment would not be visible from the sidewalk and would be completely concealed upon the construction of the abutting Sunset Terrace Development (Exhibit 1.3). The rooftop equipment located on the northeast portion of the building would be concealed by a mechanical screen that is sized to ensure no visibility of the mechanical units. A condition of approval requires the applicant to provide a temporary screening plan for mechanical equipment on the low roof, to the southwest. The screening plan would only be required if the building permit for the abutting Sunset Terrace Development is not approved at the time of the Library building permit approval. A temporary screening plan shall be submitted to, and approved by, the Current Planning Project Manager prior to building permit review. If at any time during the construction of the library, a building permit is approved for the abutting Sunset Terrace Development the screening plan can be revised to remove the temporary screening for mechanical equipment on the low roof, to the southwest. The temporary trash enclosure for the building would be located at the northwest corner of the building along Sunset Lane NE adjacent to the parking entry and emergency staircase. The enclosure would be located within the permanent easement granted by the abutting property owner. The applicant is proposing to construct the enclosure with CMU block which would eventually be incorporated into, and enclosed by the future development on the adjacent property. CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 9 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 6. Necessity of Lot Covera-ge-Variance. Unique circumstances related to the location and surroundings of the project site justify the impervious surface variance. As previously mentioned, the project site is in the area subject to the Sunset Planned Action Ordinance, a detailed environmental analysis contemplating several public uses with a library and associated park serving as one of its central elements. There is no other site in the Planned Action Ordinance vicinity that can accommodate the library. The proposed site is not large enough to accommodate the space needed for a fully functioning library designed to serve the population of the Planned Action Ordinance service area while also complying with applicable lot coverage limitations. The applicant also generally testified that the program needs of the facility could not be met if the library were built as a two story structure. While the lack of any detail on this rational can leave on skeptical as to whether two stories would be significant impediment to the provision of library services, there is no evidence to the contrary in the record. More likely than not, the lot coverage requirements applicable in the CV zone would prevent the applicant from providing needed library services and, by extension, would thwart the objectives of the Planned Action Ordinance to provide for integrated public services and facilities in the Planned Action area. 7. Necessity of Public Entry Ordinance. Unique circumstances related to the location and surroundings of the project site justify the impervious surface variance. The proposal has three street frontages, which is unusual. As previously determined, the project site is within the study area of a Planned Action Ordinance with a library serving as an important component to the planning effort. As testified by the applicant, the library would not be able to operate in an economically viable manner if required to monitor three entrances. Consequently, the public entry requirements applicable to the project would thwart the objectives of the Planned Action Ordinance to provide for integrated public services and facilities in the Planned Action area. Conclusions of Law 1. Authority. RMC 4-2-060 authorizes libraries in the CV district as government facilities subject to hearing examiner conditional use review. RMC 4-8-080(G) classifies conditional use applications as Type III permits when hearing examiner review is required. RMC 4-9-200(B)(2) requires site plan review for all development in the CV zone. In the absence of the conditional use permit application, no hearing examiner review would be required for the site plan and it would be classified as a Type Il permit by RMC 4-8-080(G). RMC 4-8-080(G) classifies variances as Type III permits and modifications as Type I permits. All four of the aforementioned permits have been consolidated. RMC 4-8-080(C)(2) requires consolidated permits to each be processed under "the highest -number procedure". The conditional use and variance applications have the highest numbered review procedures, so all four permits must be processed as Type III applications. As Type III applications, RMC 4-8-080(G) grants the Examiner with the authority to hold a hearing and issue a final decision on them, subject to closed record appeal to the City Council. CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 10 2 3 4 5 6 7 8 9'' to 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 2. Zoning/Comprehensive Plan Designations. The subject property is zoned Center Village (CV) and the comprehensive plan land use designation is also CV. 3. Review Criteria. Conditional use criteria are governed by RMC 4-9-030(D). Site plan review standards are governed by RMC 4-9-200(E)(3). Variance criteria are governed by RMC 4-9- 250(B)(5). Modifications are governed by RMC 4-9-250(D)(2). All applicable criteria are quoted below in italics and applied through corresponding conclusions of law. Conditional Use The Administrator or designee or the Hearing Examiner shall consider, as applicable, the following factors for all applications: RMC 4-9-030(C)(1): Consistency with Plans and Regulations: The proposed use shall be compatible with the general goals, objectives, policies and standards of the Comprehensive Plan, the zoning regulations and any other plans, programs, maps or ordinances of the City of Renton. 4. The proposal is consistent with applicable comprehensive plan policies and zoning regulations as outlined in Findings 23(a) -(d) of the staff report. RMC 4-9-030(C)(2): Appropriate Location: The proposed location shall not result in the detrimental overconcentration of a particular use within the City or within the immediate area of the proposed use. The proposed location shall be suited for the proposed use. 5. An aerial photograph, Ex. 9, does not reveal any other libraries in the vicinity and no overconcentration of libraries is anticipated given the scarcity of public funding for those facilities. The proposed location is well suited for library services given its proximity to an adjoining park and multi -family development, as well as its central location in the Sunset Planned Action Area. RMC 4-9-030(C)(3): Effect on Adjacent Properties: The proposed use at the proposed location shall not result in substantial or undue adverse effects on adjacent property. 6. As determined in Finding of Fact No. 5 there are no adverse impacts associated with the proposal, so it will not result in substantial or undue adverse effects on adjacent property. RMC 4-9-030(C)(4): Compatibility: The proposed use shall be compatible with the scale and character of the neighborhood. 7. As determined in Finding of Fact No. 5,the proposal is compatible in scale and character with surrounding uses. RMC 4-9-030(0)(5): Parking: Adequate parking is, or will he made, available. CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 11 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 8. As determined in Conclusion of Law No. 4, the proposal provides for adequate parking. RMC 4-9-030(C)(6): Traffic: The use shall ensure safe movement for vehicles and pedestrians and shall mitigate potential effects on the surrounding area. 9. As determined in Finding of Fact No. 4, the proposal provides for safe and well integrated access and circulation. Also as determined in Finding of Fact No. 4, no off-site traffic mitigation is necessary. The criterion is met. RMC 4-9-030(C)(7): Noise, Light and Glare: Potential noise, light and glare impacts from the proposed use shall be evaluated and mitigated. 10. As determined in Finding of Fact No. 5, there are no significant adverse noise, light or glare impacts associated with the proposal. RMC 4-9-030(C)(8): Landscaping: Landscaping shall be provided in all areas not occupied by buildings, paving, or critical areas. Additional landscaping may be required to buffer adjacent properties from potentially adverse effects of the proposed use. 11. The site plans, Ex. 2 and 3, show that landscaping is provided in all areas no occupied by buildings, paving or critical areas. Site Plan RMC 4-9-200(E)(3): Criteria: The Administrator or designee must find a proposed project to be in compliance with the following: a. Compliance and Consistency: Conformance with plans, policies, regulations and approvals, including: i. Comprehensive Plan: The Comprehensive Plan, its elements, goals, objectives, and policies, especially those of the applicable land use designation; the Community Design Element; and any applicable adopted Neighborhood Plan; ii. Applicable land use regulations; iii. Relevant Planned Action Ordinance and Development Agreements; and iv. Design Regulations: Intent and guidelines of the design regulations located in RMC 4- 3-100. 12. The proposal is consistent with applicable comprehensive plan policies and zoning regulations as outlined in Findings 23(a) -(d) of the staff report, which is adopted by this reference as CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 12 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 if set forth in full, including the findings, conclusions and determination that reduction of front and side yard setbacks to zero feet meets applicable criteria. RMC 4-9-200(E)(3)(b): Off -Site Impacts: Mitigation of impacts to surrounding properties and uses, including: L Structures. Restricting overscale structures and overconcentration of development on a particular portion of the site; A Circulation: Providing desirable transitions and linkages between uses, streets, walkways and adjacent properties; iii. Loading and Storage Areas: Locating, designing and screening storage areas, utilities, rooftop equipment, loading areas, and refuse and recyclables to minimize views from surrounding properties; iv. Views: Recognizing the public benefit and desirability of maintaining visual accessibility to attractive natural features; v. Landscaping: Using landscaping to provide transitions between development and surrounding properties to reduce noise and glare, maintain privacy, and generally enhance the appearance of the project; and vi. Lighting: Designing and/or placing exterior lighting and glazing in order to avoid excessive brightness or glare to adjacent properties and streets. 13. As determined in Finding of Fact No. 5, the proposal is compatible in scale to surrounding uses and as previously determined in the conclusions of law, there is no overconcentration of libraries in the area. As determined in Finding of Fact No. 5, the proposal provides for a well - integrated and safe circulation system. As determined in Finding of Fact No. 5, all unaesthetic structural features will be screened as required. As determined in Finding of Fact No. 5, there are no significant adverse view impacts. As determined in Finding of Fact No.4, as conditioned the proposal will have adequate landscaping. As determined in Finding of Fact No. 5, as conditioned there are no significant adverse light impacts associated with the proposal. RMC 4-9-200(E)(3)(c): On -Site Impacts: Mitigation of impacts to the site, including: L Structure Placement: Provisions for privacy and noise reduction by building placement, spacing and orientation; ii. Structure Scale: Consideration of the scale of proposed structures in relation to natural characteristics, views and vistas, site amenities, sunlight, prevailing winds, and pedestrian and vehicle needs; CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 13 2 4 0 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 iii. Natural Features: Protection of the natural landscape by retaining existing vegetation and soils, using topography to reduce undue cutting and filling, and limiting impervious surfaces; and iv. Landscaping: Use of landscaping to soften the appearance of parking areas, to provide shade and privacy where needed, to define and enhance open spaces, and generally to enhance the appearance of the project. Landscaping also includes the design and protection ofplanting areas so that they are less susceptible to damage from vehicles or pedestrian movements. 14. As determined in Finding of Fact No. 5, the proposal is compatible with surrounding uses and no views of natural features are significantly compromised. As determined in Finding of Fact No. 4 the proposal will include adequate landscaping. The 12 foot sidewalks of the proposal and its proximity to an adjoining park and surrounding residential uses provides for excellent integration into surrounding site amenities and pedestrian and vehicle needs. As detailed in the staff report, the materials and architectural features of the proposal provide for noise reduction and compatibility as required by the criterion above. The library is not located close enough to any residential uses to create any privacy problems. RMC 4-9-200(E)(3)(d). Access and Circulation. Safe and efficient access and circulation for all users, including: i. Location and Consolidation: Providing access points on side streets or frontage streets rather than directly onto arterial streets and consolidation of ingress and egress points on the site and, when feasible, with adjacent properties; ii. Internal Circulation: Promoting safety and efficiency of the internal circulation system, including the location, design and dimensions of vehicular and pedestrian access points, drives, parking, turnarounds, walkways, bikeways, and emergency access ways; iii. Loading and Delivery: Separating loading and delivery areas from parking and pedestrian areas; iv. Transit and Bicycles: Providing transit, carpools and bicycle facilities and access; and v. Pedestrians: Providing safe and attractive pedestrian connections between parking areas, buildings, public sidewalks and adjacent properties. 15. The proposal provides for adequate and safe transportation facilities as required by the criterion above for the reasons identified in Finding of Fact No. 5. CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 14 1 2 3 4 5 6 7 8 9 10 11 12 13 I4 15 16 17 18 19 20 21 22 23 24 25 26 RMC 4-9-200(E)(3)(e): Open Space: Incorporating open spaces to serve as distinctive project focal points and to provide adequate areas for passive and active recreation by the occupants/users of the site. 16. The library will adjoining a public park, which will serve the open space needs of the proposal. RMC 4-9-200(E)(3)(f): Views and Public Access: When possible, providing view corridors to shorelines and Mt. Rainier, and incorporating -public access to shorelines. 17. There are no view corridors to shorelines or Mt. Rainier affected by the proposal. RMC 4-9-200(E)(3)(g): Natural Systems: Arranging project elements to protect existing natural systems where applicable. 18. There are no natural systems at the site or that would be affected by the proposal. RMC 4-9-200(E)(3)(h): Services and Infrastructure: Making available public services and facilities to accommodate the proposed use. 19. The project is served by adequate services and facilities as determined in Finding of Fact No. 4. RMC 4-9-200(E)(3)(i): Phasing: Including a detailed sequencing plan with development phases and estimated time frames, for phased projects. 20. The project is not phased. Variance RMC 4-9-250(B)(5)(a): That the applicant suffers practical difficulties and unnecessary hardship and the variance is necessary because of special circumstances applicable to subject property, including size, shape, topography, location or surroundings of the subject property, and the strict application of the Zoning Code is found to deprive subject property owner of rights and privileges enjoyed by other property owners in the vicinity and under identical zone classification; 21. The criterion is met for both the lot coverage and public entrance variance requests due to special circumstances pertaining to the location and surroundings of the property, for the reasons determined in Finding of Fact No. 6 and 7. RMC 4-9-250(B)(5)(b): That the granting of the variance will not be materially detrimental to the public welfare or injurious to the property or improvements in the vicinity and zone in which subject property is situated; CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 22. As determined in Finding of Fact No. 5, no significant adverse impacts will be created by the proposal, including impacts specifically created by the requested increase in lot coverage and reduction in number of public entrances. It is also noteworthy that the increase in lot coverage is more than compensated for by the extensive amount of pervious surface in the adjoining park. The reduction in the number of public entrances is compensated for by the prominent location of the proposed entrance at the corner of a street intersection. RMC 4-9-250(B)(5)(c): That approval shall not constitute a grant of special privilege inconsistent with the limitation upon uses of other properties in the vicinity and zone in which the subject property is situated; 23. There would be no special privilege involved in the approval of the variances due to the singularly unique characteristics of the proposal that make it distinguishable from any other type of development, i.e. its central role in a planned action, its integration with an adjoining park and the public nature of the proposed use. RMC 4-9-250(B)(5)(d): That the approval as determined by the Reviewing Official is a minimum variance that will accomplish the desired purpose. 24. As determined in Finding of Fact No. 6 and 7,the variances are necessary to viability of the proposed use. Modifications RMC 4-9-250(D)(2): Whenever there are practical difficulties involved in carrying out the provisions of this Title, the Department Administrator may grant modifications for individual cases provided he/she shall first find that a specific reason makes the strict letter of this Code impractical, that the intent and purpose of the governing land use designation of the Comprehensive Plan is met and that the modification is in conformity with the intent and purpose of this Code, and that such modification: a. Substantially implements the policy direction of the policies and objectives of the Comprehensive Plan Land Use Element and the Community Design Element and the proposed modification is the minimum adjustment necessary to implement these policies and objectives, - b. Will meet the objectives and safety, function, appearance, environmental protection and maintainability intended by the Code requirements, based upon sound engineering judgment; c. Will not be injurious to other property(les) in the vicinity; d. Conforms to the intent and purpose of the Code; CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 16 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 e. Can be shown to be justified and required for the use and situation intended; and Will not create adverse impacts to other property(ies) in the vicinity. 25. The requested refuse enclosure and parking modification requests meet the criterion above for the reasons outlined in Finding of Fact No. 5. DECISION All applicable permitting criteria are met as outlined in the Conclusions of Law above. As conditioned below, the site plan and conditional use permit are approved. In addition, the parking and refuse enclosure modification requests are approved and the variances to lot coverage and public entrance requirements are also approved. The requested reduction in front and side yard setbacks to zero is approved. The conditional use and site plan approvals are subject to the following conditions of approval: 1. The applicant shall submit a revised landscape plan depicting an increase in spacing for street trees along Sunset Lane NE or alternatively a different variety of tree and additional street trees along NE 10th St. The revised and detailed landscape plan shall be submitted to, and approved by, the Current Planning Project Manager prior to construction permit approval. 2. The applicant shall be required to provide temporary screening plan for mechanical equipment on the low roof, to the southwest, if the building permit for the abutting Sunset Terrace Development is not approved at the time of the Library building permit approval. A temporary screening plan shall be submitted to, and approved by, the Current Planning Project Manager prior to building permit approval. If at any time during the construction of the library, a building permit is approved for the abutting Sunset Terrace Development the screening plan can be revised to remove the temporary screening for mechanical equipment on the low roof, to the southwest. 3. The applicant shall be required to submit revised elevations depicting a temporary roof for the refuse and recyclable enclosure if a building permit for the abutting Sunset Terrace Development has not been approved. The revised elevations shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. If at any time during the construction of the library, a building permit is approved for the abutting Sunset Terrace Development the refuse and recycle enclosure elevations can be revised to remove the temporary roof. 4. The applicant shall be required to submit a revised site and landscape plan depicting a temporary three-foot landscape planting strip, on 3 sides of the refuse and recycle enclosure if a building permit for the abutting Sunset Terrace Development has not been approved. The revised plans shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. If at any time during the construction CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 17 2 93 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 of the library, a building permit is approved for the abutting Sunset Terrace Development the site and landscape plans can be revised to remove the temporary landscape planting strip around the refuse and recycle enclosure. S. The applicant shall submit a materials board subject to the approval of the Current Planning Project Manager prior to building permit approval. 6. The applicant shall be required to submit a comprehensive signage package which complies with the standards of Design District `D'. The signage package shall be submitted to and approved by the Current Planning project Manager prior to sign permit approval. 7. The applicant shall be required to provide a lighting plan that adequately provides for public safety without casting excessive glare on adjacent properties at the time of building permit review. The lighting plan shall be submitted to, and approved by, the Current Planning Project Manager prior to building permit approval. 8. The applicant shall be required to submit a detailed landscape plan demonstrating compliance with the tree retention requirements of RMC 4-4-130. The detailed landscape plan shall be submitted to, and approved by, the Current Planning Project Manager prior to construction permit approval. 9. All earthwork implemented by the applicant, shall be consistent with the recommendations of the geotechnical report, prepared by GeoTech Consultants, dated April 18, 2013. 10. The applicant shall submit a revised site plan depicting bicycle parking in conformance with RMC4-4-080F.11. The revised site plan shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. DATED this 4th day of March, 2014. Plu A. 01brmh1s City of Renton Hearing Examiner Appeal Right and Valuation Notices RMC 4-5-110(E)(9) provides that the final decision of the hearing examiner is subject to appeal to the Renton City Council. RMC 4-8-110(E)(9) requires appeals of the hearing examiner's decision to be filed within fourteen (14) calendar days from the date of the hearing examiner's decision. A CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 18 1 2 3 4 5 6 7 8' 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 request for reconsideration to the hearing e examiner may also be filed within this 14 day appeal period as identified in RMC 4-8-110(E)(8) and RMC 4-8-100(G)(4). A new fourteen (I4) day appeal period shall commence upon the issuance of the reconsideration. Additional information regarding the appeal process may be obtained from the City Clerk's Office, Renton City Hall — 7 1 floor, (425) 430-6510. Affected property owners may request a change in valuation for property tax purposes notwithstanding any program of revaluation. CONDITIONAL USE, SITE PLAN VARIANCE, MODIFICATION - 19 DEPARTMENT OF COMNiu,+IITY City of. February 18, 2014 ;t AND ECONOMIC DEVELOPMENT Owner: Sunset Terrace Development LLC; 2256 38th Place E; Bellevue, WA 98112 Applicant: King County Library System; Greg Smith; 960 Newport Way NW; Issaquah, WA 98027 Contact: THA Architecture; Scott Mooney; 133 SW Oak St; Portland, OR 97205 File Number: REPORT TO THE HEARING EXAMINER A. SUMMARY AND PURPOSE OF REQUEST HEARING DATE: February 18, 2014 Project Name: Renton Highlands Library Owner: Sunset Terrace Development LLC; 2256 38th Place E; Bellevue, WA 98112 Applicant: King County Library System; Greg Smith; 960 Newport Way NW; Issaquah, WA 98027 Contact: THA Architecture; Scott Mooney; 133 SW Oak St; Portland, OR 97205 File Number: LUA13-001720, SA -H, CU -H, VAR, VAR, MOD Project Manager: Rocale Timmons; Senior Planner Project Summary: The applicant, King County Library System (KCLS), is requesting Hearing Examiner Site Plan Review, a Hearing Examiner Conditional Use Permit, Civic Entry Orientation Variance, Lot Coverage Variance, a parking modification, and a refuse and recycle modfication for the construction of a new 14,479 square foot public library. The project site consists a total of 16,000 square feet of Center Village (CV) zoned property. The site was formerly used as multi -family residential for the Renton Housing Authority. The applicant is proposing a total of 47 parking stalls of which 46 would be located within a structured parking garage below the library facility. The parking would be accessed from Sunset Lane NE. The proposal includes site improvements designed to accommodate the future Sunset Terrace Redevelopment on the abutting property to the southwest, including a shared ramp for access to structured parking, party wall, and stairs. The proposal includes a single entry at the corner of NE 10th St and Sunset Lane NE, therefore the applicant is requesting a variance from RMC4-2-120A, which requires a civic entry on all street frontages of the site. An additional Variance is being requested from RMC 4-2-120A, in order to exceed the 75% lot coverage requirement to a proposed 90% lot coverage. The applicant is also proposing two modifications; one from RMC 4-4-080, in order to decrease the minimum number of parking spaces required onsite from 60 to 47 stalls and the ability to provide an ADA parking stall off site. The second modification is from RMC 4-4-090 in order to reduce the amount of the refuse and recycle deposit enclosure from 100 square feet to 43 square feet. The site is located in Zone 2 of the Aquifer Protection Area. There are no other critical areas located on Site. Project Location: 2701 Sunset Lane NE Site Area: 16,068 square feet Project Location Mop HEX Report 13-001720 (2).docx City of Renton Department of Com__.___ity & Economic Development Hearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001720, SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 2 of 29 B. EXHIBITS: Exhibit 1: HEX Report Exhibit 2: Site Plan Exhibit 3: Landscape Plan Exhibit 4: Floor plan Exhibit 5: Elevations Exhibit 6: SEPA "Planned Action" Memo Exhibit 7: Sunset Planned Action Area Map Exhibit 8: Proof of Notice of Application Mailing Exhibit 9: Aerial Photograph Exhibit 10: Geotechnical Report Exhibit 11: Drainage Report Exhibit 12: VAC13-001 Street Vacation Plan Exhibit 13: LUA13-001114 Lot Line Adjustment Plan Exhibit 14: Elevation Perspectives C. GENERAL INFORMATION: 1. Owner(s) of Record: Sunset Terrace Development LLC 2256 38th Place E Bellevue, WA 98112 2. Zoning Classification: Center Villiage (CV) 3. Comprehensive Plan Land Use Designation: Center Village (CV) 4. Existing Site Use: Multi -Family Residential S. Neighborhood Characteristics: a. North: Gas Station (CV zone) b. East: Safeway (CV zone) c. South: Multi -Family Residential (CV zone) d. West: Multi-Fomily Residential (CV zone) 6. Site Area: 16,068 square feet D. HISTORICAL/BACKGROUND: Action Land Use File No. Ordinance No. Date Comprehensive Plan N/A 5099 11/01/2004 Zoning N/A 5100 11/01/2004 Annexation N/A 1246 04/16/1946 Sunset Lane Street Vacation VAC13-001 5693 09/09/2013 LLA LUA13-001114 N/A 10/10/2013 HEX Report 13-001720 (2).docx City of Renton Department of Cam 'ty & Economic Development tearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001. , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 3 of 29 Sunset Area Planned Action EIS LUA10-052 N/A 06/06/2011 E PUBLIC SERVICES: 1. Existing Utilities a. Water: There is an existing 6 -inch cast iron water main in Sunset Lane NE, an 8 -inch cast iron water main in Harrington Ave NE and a new 12 -inch water main in Sunset Blvd NE. Available maximum fire flow from this system is 2,100 gpm. The project is located in the 565 pressure zone. The static pressure at ground elevation 338 is about 98 psi. b. Sewer: Sewer service is provided by the City of Renton. There is an 8 -inch sewer main in Harrington Ave NE, NE 10th St and Sunset Blvd NE. c. Surface/Storm Water: There are storm drainage improvements in NE 10", St, Sunset Lane NE and Harrington Ave NE. 2. Streets: There are existing street improvements along the frontages of the site. 3. Fire Protection: City of Renton Fire Department F. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE: 1. Chapter 2 Land Use Districts a. Section 4-2-020: Purpose and Intent of Zoning Districts b. Section 4-2-070: Zoning Use Table c. Section 4-2-12OA: Commercial Development Standards 2. Chapter 3 Environmental (Regulations a. Section 4-3-100: Urban Design Regulations 3. Chapter 4 Property Development Standards 4. Chapter 6 Streets and Utility Standards a. Section 4-6-060: Street Standards S. Chapter 9 Procedures and Review Criteria a. Section 4-9-030: Conditional Use Permit b. Section 4-9-200: Site Plan Review c. Section 4-9-250: Variances, Waivers, Modifications, and Alternates 6. Chapter 11 Definitions G. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN: 1. Land Use Element 2. Community Design Element H. FINDINGS OF FACT: 1. The applicant, King County Library System (KCLS), is requesting a Hearing Examiner Site Plan Review, Hearing Examiner Conditional Use Permit approval, two variances, and two modifications for the construction of the Renton Highlnds Library and associated parking, landscaping, and infrastructure improvements. HEX Report 13-001720 (2).docx City of Renton Department of Cam 'ty & Economic Development fearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001 , 5A -H, MOD, MOD VAR_, VAR, CU -H Report of February 18, 2014 Page 4 of 29 2. The proposal requires a Conditional Use Permit in order to establish the public library use on the proposed site. 3. The proposal is the third of a group of projects collectively known as the Sunset Area Planned Action and Environmental Impact Statement. impacts of the proposed project have been addressed in the Sunset Area Planned Action Ordinance No. 5610 (Exhibits 6 and 7). 4. Aspects of the project are being proposed in order to accommodate the future Sunset Terrace Mixed Use (Commercial and Residential) Development abutting the subject site (Exhibit 13). This includes a party wall, stairs, and a shared access ramp to stuctured parking. 5. The Planning Division of the City of Renton accepted the above master application for review on December 23, 2013 and determined complete on January 2, 2014. The project complies with the 120 - day review period. 6. The subject site is bordered by Sunset Blvd NE to the southeast, by Sunset Lane NE to the northwest, and NE 101h St to the northeast. 7. The property is located within the Center Village (CV) Comprehensive Plan land use designation, the Center Village (CV) zoning classification, and Design District 'D'. 8. The site currently contains two residential buildings, containing a total of 8 residential units, operated by the Renton Housing Authority. The buildings are proposed to be removed prior to construction. 9. The proposed structure would be 27 feet from finished floor elevation, at the tallest point of the reading room, the largest mass at the center of the structure (Exhibit 5). 10. The building's primary entrance would be located on the corner of NE 10th St and Sunset Lane NE and includes a small pedestrian plaza with a 10 -foot large canopy. 11. Small and large scale window openings occur on each street facade in addition to a mix of cladding materials, including terra-cotta tiles, wood siding, metal and concrete panels. The building roof lines vary through the use of different height parapets, varied cornice shapes, and overhangs at the entry (Exhibit 5). 12. The party wall along the western property line would eventually be covered by the neighboring development and is proposed to be minimally clad. 13. The applicant is proposing off-site improvements to two street frontages, including Sunset Lane NE and NE 10" St. 14. The applicant is not proposing improvements along Sunset Blvd NE as it is anticipated to be developed as part of the City's Transportation Capital Improvement Plan. 15. The site is located within Zone 2 of the Aquifer protection Area. There are no other critical areas located on site. 16. On site soil removal would be required to reach the bottom of excavation for the lower parking level. The approximate volume of cut would be 4,800 cubic yards. Existing site soils, in the approximate amount of 237 cubic yards, would be used as backfill necessary for portions of the site. 17. RMC 4-4-090 requires the applicant provide a minimum 100 square feet of refuse and recycle area based on the square footage of the use. The applicant is requesting a refuse and recycle modification, in order to vary from the standards, and decrease the amount of refuse and recycle deposit area standards required for the library use from 100 to 43 square feet. 18. RMC 4-4-080.F.10 requires the applicant limit the number of parking spaces based on the square footage of the use. The applicant is requesting a parking modification, in order to vary from the parking standards, and decrease the number of stalls required for the library use from 58 parking spaces HEX Report 13-001720 (2).docx City of Renton Department of Com 'ty & Economic Development tearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001 , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 5 of 29 allowance to 47 parking spaces. RMC 4-4-080 also requires that all parking be provided on site. The applicant is also requesting, as part of the parking modification, to site the required Van ADA parking stall within the NE 10`h St right-of-way. 19. Per RMC 4-2-120A the allowed lot coverage for properties within the CV zone is 65 percent of the total lot area or 75% if parking is provided within the building or within an on-site parking garage. The applicant is requesting a lot coverage variance, in order to vary from the lot coverage standards, and increase the lot coverage allowed for the library use from 75 percent to 90 percent. 20. Per RMC 4-2-120A commercial and civic uses are required to provide entry features on all sides of a building facing a public right-of-way or parking lot. The applicant is requesting a variance in order eliminate the need for entrances on Sunset Lane NE and Sunset Blvd NE and provide one entrance along the NE 10th St fa4ade. 21. No public or agency comments were received. 22. Representatives from various city departments have reviewed the application materials to identify and address issues raised by the proposed development. These comments are contained in the official file, and the essence of the comments has been incorporated into the appropriate sections of this report and the Departmental Recommendation at the end of this report. 23. The proposal requires Site Plan Review. The following table contains project elements intended to comoly with Site Plan Review decision criteria. as outlined in RMC 4-9-200.E: SITE PLAN REVIEW CRITERIA: a. COMPREHENSIVE PLAN COMPLIANCE AND CONSISTENCY: The site is designated Center Village on the Comprehensive Plan Land Use Map. The purpose of the CV designation is to provide an opportunity for redevelopment as close -in urban mixed-use residential and commercial areas that are pedestrian -oriented. These areas are anticipated to provide medium to high- density residential development and a wide range of commercial activities serving citywide and sub - regional markets. Policy LU -243. Encourage uses in Center Villages that serve a sub -regional or citywide market as well as the surrounding neighborhoods. Policy LU -244. Encourage more urban style design and intensity of development (e.g. ✓ building height, bulk, landscaping, and parking) within Center Villages than with land uses outside the Centers. J Policy LU -248. Provide community scale office and service uses. Policy CD -31. Neighborhoods, commercial areas, and centers should have human -scale +., features, such as pedestrian pathways and public spaces (e.g. parks or plazas) that have discernible edges, entries and borders. Policy CD -36. Developments within Commercial and Centers land use designations should have a combination of internal and external site design features, such as: 1) Public plazas; 2) Prominent architectural features; 3) Public access to natural features or views; 4) Distinctive focal features; HEX Report 13-001720 (2). docx City of Renton Department of Com 'ty & Economic Development fearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001 , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 6 of 29 HEX Report 13-001720 (2).docx S) Indication of the function as a gateway, if appropriate; 6) Structured parking; and 7) Other features meeting the spirit and intent of the land use designation. Policy CD -39. Ensure quality development by supporting site plans and plats that ✓ incorporate quality building, development, and landscaping standards that reflect unity of design and create a distinct sense of place. b. ZONING COMPLIANCE AND CONISTENCY: The subject site is classified Center Village (CV) on the City of Renton Zoning Map. The purpose of the CV zone is to provide an opportunity for concentrated mixed-use residential and commercial redevelopment designed to urban rather than suburban development standards that supports transit -oriented development and pedestrian activity. Use allowances promote commercial and retail development opportunities for residents to shop locally. RMC 4-2-120A provides development standards for development within the CV zoning classification. The following are applicable to the proposal: Lot Dimensions: Per RMC 4-2-120A the minimum lot size, in the CV zone, is 25,000 square feet. Not applicable. Lot Coverage: Per RMC 4-2-120A the allowed lot coverage is 55 percent of the total lot area or 75% if parking is provided within the building or within an on-site parking garage for proposals within the CV classification. The proposed building would have a footprint of 14,479 square feet on the 16,028 square foot site resulting in building lot coverage of approximately 90 percent. RMC 4-9-250 allows for a grant of relief from the lot coverage requirements of the CV zone through a variance if it is found by the Reviewing Official the applicant has demonstrated that the site development plan meets the following criteria: a. That the applicant suffers practical difficulties and unnecessary hardship and the variance is necessary because of special circumstances applicable to subject property, including size, shape, topography, location or surroundings of the subject property, and the strict application of the Zoning Code is found to deprive subject property owner of rights and privileges enjoyed by other property owners in the vicinity and under identical zone classification; b. That the granting of the variance will not be materially detrimental to the public welfare or injurious to the property or improvements in the vicinity and zone in which subject property is situated; c. That approval shall not constitute a grant of special privilege inconsistent with the limitation upon uses of other properties in the vicinity and zone in which the subject property is situated; d. That the approval is a minimum variance that will accomplish the desired purpose. The applicant contends that an approximate 14,500 square foot library program area was required in order to sufficiently serve the varied needs of the community. This program requirement would demand the lot coverage to exceed the recommended 75% for this site. The proposed footprint of the library would account for approximately 90% lot coverage. The remaining area would be occupied by a 990 square foot public plaza and 126 square foot stormwater planter. Staff concurs that the public library would offer a variety of services, and the minimum requirements are such that a smaller footprint on the subject site would not adequately serve the needs of the citizens of Renton and therefore suffers from practical difficulties and the variance is necessary due to the size and topography of the site. The size of the subject parcel was defined by a lot line HEX Report 13-001720 (2).docx City of Renton Department of Cam ity & Economic Development leoring Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001 , 5A -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 7 of 29 adjustment/street dedication (LUA13-001114) and street vacation (VAC13-001) completed in 2013 along Sunset Blvd NE and Sunset Lane NE respectively (Exhibits 12 and 13). In order to accommodate planned street improvements, along Sunset Blvd NE, a 12 -foot right-of-way dedication was taken as part of the RHA LLA (Exhibit 13). A 19 -foot wide street vacation (VAC13-001) of Sunset Lane NE was done in order increase the size of the subject parcel to offset some of the dedication required along Sunset Blvd NE (Exhibit 12). However, the width of the street vacation was restrained, by the City, in order to provide the largest space possible for the future public park across Sunset Lane NE which limits the size of the subject parcel. The subject site is across the street (Sunset Lane NE) from the future public park which would provide for ample open space to mitigate the open space lost as a result of the large footprint. The variance, if approved, would not be detrimental to the public welfare and would not constitute a grant of special privilege. Additionally, the variance is the minimum variance that would needed in order to accommodate the library use on the site. Therefore, staff recommends that the requested lot coverage variance be approved. Density: Per RMC 4-2-120A the allowed density range in the CV zoning classification is a minimum of 20 dwelling units per net acre (du/ac) up to a maximum of SO du/ac. Net density is calculated after public rights-of-way, private access easements, and critical areas are deducted from the gross acreage of the site. Not applicable. Setbacks: Per RMC 4-2-120A the CV zoning classification requires a minimum front yard setback, and side yard setback along -a -street, of 10 feet which may be reduced to zero feet during the site plan development review process, provided blank walls are not located within the reduced setback. There is a maximum front yard setback of 15 feet. The CV zone has no rear or side yard setback at this location. The following table contains setbacks for the proposed structure: East Front Yard West Side Yard North Side Yard Along -a- South Side Yard Along - Setback Setback Street Setback a -Street Setback 0 feet — 20 feet and 0 feet 0 feet and 1 -inch 0 feet and 1 -inch 11 inches The proposed structure has less than the 10 -foot required front yard and side yard along -a -street setbacks. The applicant is requesting a reduction in these setbacks down to 0 -feet through the Site Plan Review Process. RMC 4-2-120A states that the 10 foot setback requirement may be reduced to zero feet during the site plan development review process, provided blank walls are not located within the reduced setback. The applicant is requesting a reduction in setbacks due to the programmatic requirements of the library and size of the subject site. The size of the subject parcel was defined by the lot line adjustment/street dedication and street vacation completed in 2013 along Sunset Blvd NE and Sunset Lane NE respectively (Exhibits 12 and 13). The width of the street vacation was restrained by the City, in order to provide a largest space possible for the future public park across Sunset Lane NE which limited the size of the subject parcel. There would be no blank walls located within the reduced setback. The proposal includes a variety of building materials on all street facing fagades: concrete, aluminum, windows, and terra cotta panels. The terra cotta wall areas would be comprised of two shades of color and would reflect vertical banding. The concrete elements would display form tie patterns and panel jointing. The applicant is also proposing glazing, a large canopy, raised landscaped beds and pattern paving to enhance the pedestrian experience along the streetscape of HEX Report .13-001720 (2).docx City of Renton Department of Cam ty & Economic Development tearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001 , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 8 of 29 NE 10`h St. The building's massing is also broken up through the use of three separate articulated forms that house the entry, large reading room, and support areas. The building would step down at the east to create human scale at the main entry. The building would then step up to create a larger more impressive volume for the main reading room, and then steps down again at the west where it would abut the future Sunset Terrace Development project. Staff is supportive of the reduced front yard and side yard along -a -street setback requests from 10 to 0 feet. Building Orientation: per RMC 4-2-120A Commercial and civic uses shall provide entry features on all sides of a building facing a public right-of-way or parking lot. The applicant is proposing a single public entry at the corner of Sunset Lane NE and NE 10th Street and therefore does not comply with the civic entry requirement to provide entries on all sides of a building facing a public right of way. RMC 4-9-250 allows for a grant of relief from the building orientation requirements of the CV zone, for civic buildings, through a variance if it is found by the Reviewing Official the applicant has demonstrated that the site development plan meets the following criteria: a. That the applicant suffers practical difficulties and unnecessary hardship and the variance is necessary because of special circumstances applicable to subject property, including size, shape, topography, location or surroundings of the subject property, and the strict application of the Zoning Code is found to deprive subject property owner of rights and privileges enjoyed by other property owners in the vicinity and under identical zone classification; b. That the granting of the variance will not be materially detrimental to the public welfare or injurious to the property or improvements in the vicinity and zone in which subject property is situated; c. That approval shall not constitute a grant of special privilege inconsistent with the limitation upon uses of other properties in the vicinity and zone in which the subject property is situated; d. That the approval is a minimum variance that will accomplish the desired purpose. The applicant contends that due to the topography of the site, security requirements, and the expected staffing levels of the proposed library it would not be feasible to provide more than one main entry into the building. The applicant further contends that the entry design provides high visibility along all three street frontages. Staff concurs that applicant suffers from practical difficulties and the variance is necessary due to the size and topography of the site. The applicant's entry design provides high visibility along all three street frontages and addresses two sides of the building that are located along the public right-of- way. The entry is fully glazed on each side, of Sunset Lane NE and NE 10th St, and therefore is highly visible from both streets. In addition, the entry fronts a small pedestrian plaza that is covered by a large canopy that extends towards Sunset Blvd NE, giving the entry a visible presence along Sunset Blvd NE. The variance if approved would not be detrimental to the public welfare and would not constitute a grant of special privilege. Additionally, the variance is the minimum variance that would needed in order to accommodate the library use on the site. Therefore, staff recommends that the requested civic entry variance be approved. 1Landscaping:: Per RMC 4-4-070 ten feet of on-site landscaping is required along all public street frontages, with the exception of areas for required walkways and driveways or those projects with reduced setbacks. The proposed structure has less than the 10 -foot required front yard and side yard along -a -street setbacks. As a result, the applicant has proposed limited landscaping along the street frontages of HEX Report 13-001720 (2).docx City of Renton Department of Corry ity & Economic Development Hearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001 , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 9 of 29 the site. Within the reduce setbacks the applicant is proposing planting beds and a triangular stormwater planter. Staff is recommending approval of the requested modification to the front yard building setback (see finding above under setback discussion). The proposal complies with the on- site landscaping requirement per RMC 4-4-070. A conceptual landscape plan was submitted with the project application. The landscape plan includes a planting plan which contains 8 trees. The proposed tree species largely consist of southern beech and fragrant snowbell trees. The shrubs proposed largely consist of Oregon Grape and beach strawberry. The use of paving patterns, planting beds and site walls reinforce the architectural elements of the proposed structure. The landscape plan shows street trees spaced 30 feet on -center along Sunset Lane NE. The spacing is too close for the southern beech variety and should be increased to at least 40 feet on -center or the applicant should consider the use of a smaller tree. In addition, there is a deficiency of street trees along NE 101h St. Staff recommends, as a condition of approval, the applicant submit a revised landscape plan depicting an increase in spacing for street trees along Sunset Lane NE, or alternatively, a different variety of tree and additional street trees along NE 101h St. The revised and detailed landscape plan shall be submitted to, and approved by, the Current Planning Project Manager prior to construction permit approval. Building Height: Per RMC4-2-120A building height is restricted to 50 feet except 60 feet for mixed use (commercial and residential) in the some building. The height of the proposed structure would be 27 feet and 0 -inches at the highest point of the grand reading room's flat roof. The proposal complies with the height requirement of the zone. Screening: The mechanical units on the low roof, to the southwest, are in the center of the roof area. The equipment would not be visible from the sidewalk and would be completely concealed upon the construction of the abutting Sunset Terrace Development (Exhibit 13). The rooftop equipment located on the northeast portion of the building would be concealed by a mechanical screen that is sized to ensure no visibility of the mechanical units. Staff recommends, as condition of approval, the applicant be required to provide temporary screening plan for mechanical equipment on the low roof, to the southwest. The screening plan would only be required if the building permit for the abutting Sunset Terrace Development is not approved at the time of the Library building permit approval. A temporary screening plan shall be submitted to, and approved by, the Current Planning Project Manager prior to building permit review. If at any time during the construction of the library, a building permit is approved for the abutting Sunset Terrace Development the screening plan can be revised to remove the temporary screening for mechanical equipment on the low roof, to the southwest. The temporary trash enclosure for the building would be located at the northwest corner of the building along Sunset Lane NE adjacent to the parking entry and emergency staircase. The enclosure would be located within the permanent easement granted by the abutting property owner. The applicant is proposing to construct the enclosure with CMU block which would eventually be incorporated into, and enclosed by the future development on the adjacent property. Parking: The parking regulations, RMC 4-4-080, require a specific number of off-street parking stalls be provided based on the square footage of the use. The following ratios would be applicable to the site: Use Square Footage of Use Ratio Required S aces Library 14,479 Min: 4 spaces / 1,000SF 58 Based on the use, 58 parking spaces would be required in order to meet code. The applicant proposed to provide a total of 47 spaces (46 stalls within structured parking and one Van ADA stall HEX Report .13-001720 (2).docx City of Renton Department of Com ity & Economic Development searing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001 , SA -H, MOIL, MOA VAR, VAR, CU -H Report of February 18, 2014 Page 10 of 29 within the NE 10"' St right-of-way). Therefore, the applicant is requesting a parking modification to reduce the minimum number of stalls from 58 to 47 parking stalls. RMC 4-4-080 also requires that all parking be provided on site. Therefore, the applicant is requesting as part of the parking modification the ability to site the required Van ADA parking stall within the NE 10th St right-of-way. Section 4-4-080. F.10.d allows the Administrator to grant modifications from the parking standards for individual cases, provided the modification meets the following criteria (pursuant to RMC 4-9- 250.0.2): a. Will meet the objectives and safety, function, appearance, environmental protection and maintainability intended by the Code requirements, based upon sound engineering judgment; and b. Will not be injurious to other property(ies) in the vicinity; and c. Conform to the intent and purpose of the Code; and d. Can be shown to be justified and required for the use and situation intended, and e. Will not create adverse impacts to other property(ies) in the vicinity. The proposed library project would be constructed over a single level of structured parking. The applicant contends that the parking needs for a library of this size is not expected to exceed the number of stalls within the proposed parking structure. The requested number of stalls is the maximum amount of stalls that can be utilized through a single level of structured parking beneath the library. The area of the garage is proposed to be used to the full extent of the building footprint. The applicant also contends that the height of the parking area was determined by the maximum recommended slope for vehicular access within the narrow configuration of the site boundary, resulting in a 7 -foot- 4 -inch clearance at the garage entry. While two ADA parking spaces are provided within the structured parking level neither would conform to the Van ADA parking overhead clearance requirement of 114 -inches. The requested modification conforms to the intent and purpose of the parking regulations by providing sufficient on-site parking, and ADA accessible stalls, for the amount necessary for the new Renton Highlands Library. The proposed modification would not be injurious to other properties in the vicinity and would not create adverse impacts to other properties in the vicinity. Staff supports a modification to reduce the minimum number of parking spaces and the allowance of the Van ADA parking space off site within the NE 10th St right-of-way. Proposed parking conforms to the minimum requirements for drive aisle and parking stall dimensions and the provision of ADA accessible parking stalls. Refuse and Recyclables: Per RMC 4-4-090 for office, educational, and institutional developments require a minimum of 2 square feet per every 1,000 square feet of building gross floor area shall be provided for recyclable deposit areas and a minimum of 4 square feet per 1,000 square feet of building gross floor area shall be provided for refuse deposit areas with a total minimum area of 100 square feet. The proposed facility would require a minimum 100 square foot refuse and recycle deposit area for the 14,500 square foot facility (90 SF = 2 x [14,500/1,000 SF) + 4 x [14,500/1,000 SF3?. The applicant has proposed a 43 square foot deposit area. Therefore, the applicant is requesting a refuse and recycle modification to reduce the minimum area for the refuse and recycle deposit area from 100 to 43 square feet. Section 4-4-080.F.10.d allows the Administrator to grant modifications from the refuse and recycle HEX Report 13-001720 (2).docx City of Renton Department of Com ity & Economic Development iearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001 , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 11 of 29 standards for individual cases, provided the modification meets the following criteria (pursuant to RMC 4-9-250_Q.2): a. Will meet the objectives and safety, function, appearance, environmental protection and maintainability intended by the Code requirements, based upon sound engineering judgment; and b. Will not be injurious to other property(ies) in the vicinity, and c. Conform to the intent and purpose of the Code, and d. Can be shown to be justified and required for the use and situation intended; and e. Will not create adverse impacts to other property(ies) in the vicinity. The applicant contends that due to the library's program requirements, expected usage, and the applicant's past experience with libraries of this size, a refuse and recycling area of 100 square feet is unusually large. The proposed 43 square feet of area provided was designed to accommodate 4 refuse bins which would be more than they would typically need. Staff concurs that the requested modification would meet all of the needs of the proposed use. In addition, the requested modification would lessen the visual impact of the enclosure on Sunset Lane NE temporarily and long term would decrease the encroachment on the shared vehicle access with the neighboring property to the west. Therefore, staff supports a modification to reduce the minimum 100 square feet of refuse and recyclable deposit area to 43 square feet. The temporary trash enclosure for the building would be located at the northwest corner of the building along Sunset Lane NE adjacent to the parking entry and emergency staircase. The enclosure would be located within the permanent easement granted by the abutting property owner. The applicant is proposing to construct the enclosure with CMU block which would eventually be incorporated into, and enclosed by, the future development on the adjacent property. Signs: The applicant did not submit a signage package for the proposed library and therefore could not be reviewed at this time. The applicant would be required to comply with the signage requirements outlined in RMC 4-4-100 at the time of sign application. Critical Areas: The site is located in Zone 2 of the Aquifer Protection Area. There are no other critical areas located on-site. fI�EGt+4F1�N� CLirll' The Atte 40 locateda€ OIgr Oftck ��4' Ta ensare: ihat br�xldll�g a loctte,dr� rlrxa meets �aad aider bucfirrgs sir tfi�r'e'rspl`he of,Relator can 6e reolred f�ry�r jalglariienslty urban elavxronr»ent, sn $rrsiness �er�jrx+r#�rlr frvn ..000*0-0f way, acid ta+ecr�ure pedstrlart achvtly.ragglzout the distr%c Staff [orrmerr A der�ostrbtert in file table below i# i5 our recornmer�dat%n that the"pre�,p�osal meets the intenir, of tl`le Design Reguiatrarrs an the basis of Individual' merit if all conditions of app�rnival ore Met. i. SiTE DESIGN AND BUILDING LOCATION: Intent. To ensure that buildings are located in relation to streets and other buildings so that the Vision of the City of Renton can be realized for a high-density urban environment, so that businesses enjoy visibility from public rights-of-way; and to encourage pedestrian activity. 1. Building Location and Orientation: Intent: To ensure visibility of businesses and to establish active, lively uses along sidewalks and pedestrian pathways. To organize buildings for pedestrian use and so that natural light is available to other structures and open space. To ensure an appropriate transition between buildings, parking areas, and other land uses; and increase privacy for residential uses. HEX Report 13-001720 (2).docx City of Renton Department of Cam 'ty & Economic Development fearing Examiner Recommendation RENTON HIGHLANDS LiBRARY LUA13-001 , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2414 Page 12 of 29 Guidelines: Developments shall enhance the mutual relationship of buildings with each other, as well as with the roads, open space, and pedestrian amenities while working to create a pedestrian oriented environment. Lots shall be configured to encourage variety and so that natural light is available to buildings and open space. The privacy of individuals in residential uses shall be provided for. Standard: The availability of natural light (both direct and reflected) and direct sun exposure to nearby buildings and open space (except parking areas) shall be considered when siting structures. '/ Standard: Buildings shall be oriented to the street with clear connections to the sidewalk. V/ Standard: The front entry of a building shall be oriented to the street or a landscaped pedestrian -only courtyard. Standard. Buildings with residential uses located at the street level shall be set back from the sidewalk a minimum of ten feet (10') and feature substantial landscaping between the N/A sidewalk and the building or have the ground floor residential uses raised above street level for residents privacy or have the ground floor residential uses raised above street level for residents' privacy. 2. Building Entries: Intent: To make building entrances convenient to locate and easy to access, and ensure that building entries further the pedestrian nature of the fronting sidewalk and the urban character of the district. Guidelines: Primary entries shall face the street, serve as a focal point, and allow space for social interaction. All entries shall include features that make them easily identifiable while reflecting the architectural character of the building. The primary entry shall be the most visually prominent entry. Pedestrian access to the building from the sidewalk, parking lots, and/or other areas shall be provided and shall enhance the overall quality of the pedestrian experience on the site. Standard: A primary entrance of each building shall be located on the facode facing a street, Ile shall be prominent, visible from the street, connected by a walkway to the public sidewalk, and include human -scale elements. Standard. A primary entrance of each building shall be made visibly prominent by incorporating architectural features such as a facade overhang, trellis, large entry doors, and/or ornamental lighting. Standard Building entries from a street shall be clearly marked with canopies, architectural elements, ornamental lighting, or landscaping and include weather protection at least four and one-half feet (4-1/2') wide (illustration below). Buildings that are taller than thirty feet (30') in height shall also ensure that the weather protection is proportional to the distance above ground level. N/A Standard: Building entries from a parking lot shall be subordinate to those related to the street. Standard: Features such as entries, lobbies, and display windows shall be oriented to a street 'r or pedestrian -oriented space, otherwise, screening or decorative features should be incorporated. Standard. Multiple buildings on the some site shall direct views to building entries by N/A providing a continuous network of pedestrian paths and open spaces that incorporate landscaping. Standard. Ground floor residential units that are directly accessible from the street shall N/A include entries from front yards to provide transition space from the street or entries from an open space such as a courtyard or garden that is accessible from the street. 3. Transition to Surrounding Development: Intent. To shape redevelopment projects so that the character and value of Renton's long-established, existing neighborhoods are preserved. Guidelines: Careful siting and design treatment shall be used to achieve a compatible transition where HEX Report 13-001720 (2).docx City of Renton Department of Com 'ty & Economic Development leoring Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-00.1 , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 13 of 29 new buildings differ from surrounding development in terms of building height, bulk and scale. Standard. At least one of the following design elements shall be considered to promote a transition to surrounding uses: (a) Building proportions, including step -backs on upper levels, (b) Building articulation to divide a larger architectural element into smaller increments, or V (c) Roof lines, roof pitches, and roof shapes designed to reduce apparent bulk and transition with existing development. Additionally, the Administrator of the Department of Community and Economic Development or designee may require increased setbacks at the side or rear of a building in order to reduce the bulk and scale of larger buildings and/or so that sunlight reaches adjacent and/or abutting yards. 4. Service Element Location and Design: Intent: To reduce the potential negative impacts of service elements (i.e., waste receptacles, loading docks) by locating service and loading areas away from high-volume pedestrian areas, and screening them from view in high visibility areas. Guidelines: Service elements shall be concentrated and located so that impacts to pedestrians and other abutting uses are minimized. The impacts of service elements shall be mitigated with landscaping and an enclosure with fencing that is made of quality materials. Standard: Service elements shall be located and designed to minimize the impacts on the d pedestrian environment and adjacent uses. Service elements shall be concentrated and located where they are accessible to service vehicles and convenient for tenant use. Standard. In addition to standard enclosure requirements, garbage, recycling collection, and utility areas shall be enclosed on all sides, including the roof and screened around their perimeter by a wall or fence and have self-closing doors. Staff Comment: The temporary trash enclosure for the building would be located at the northwest corner of the building along Sunset Lane NE adjacent to the parking entry and emergency staircase. The enclosure would be located within the permanent easement granted by the abutting property owner. The applicant is proposing to construct the enclosure with CMU block which is expected to eventually be incorporated into, and Partial Compliance enclosed by the future development on the abutting property. The applicant's submittals with did not include elevations depicting a temporary roof for the refuse and recyclable Standard enclosure. Therefore, staff recommends as a condition of approval, the applicant be required to submit revised elevations depicting a temporary roof for the refuse and recyclable enclosure if a building permit for the abutting Sunset Terrace Development has not been approved. The revised elevations shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. If at any time during the construction of the library, a building permit is approved for the abutting Sunset Terrace Development the refuse and recycle enclosure elevations can be revised to remove the temporary roof. If this condition of approval is met the proposal would satisfy this standard. ,f Standard. Service enclosures shall be made of masonry, ornamental metal or wood, or some combination of the three (3). Standard: if the service area is adjacent to a street, pathway, or pedestrian -oriented space, a Not landscaped planting strip, minimum 3 feet wide, shall be located on 3 sides of such facility. Compliant .Staff Comment: The applicant's submittals did not include a site or landscape plan, depicting With a temporary three-foot wide landscape planting strip, on 3 sides of the proposed enclosure. Standard Therefore, staff recommends as a condition of approval, the applicant be required to submit a revised site and landscape plan depicting a temporary three-foot landscape planting strip, HEX Report 13-001720 (2).docx City of Renton Deportment of Cam ty & Economic Development fearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001 , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 14 of 29 HEX Report 13-001720 (2)_docx on 3 sides of the refuse and recycle enclosure if a building permit for the abutting Sunset Terrace Development has not been approved. The revised plans shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. If at any time during the construction of the library, a building permit is approved for the abutting Sunset Terrace Development the site and landscape pians can be revised to remove the temporary landscape planting strip around the refuse and recycle enclosure. If this condition of approval is met the proposal would satisfy this standard_ 5. Gateways: intent. To distinguish gateways as primary entrances to districts or to the City, special design features and architectural elements at gateways should be provided. While gateways should be distinctive within the context of the district they should also be compatible with the district in form and scale. Guidelines: Development that occurs at gateways should be distinguished with features that visually indicate to both pedestrians and vehicular traffic the uniqueness and prominence of their locations in the City. Examples of these types of features include monuments, public art and public plazas. N/A Standard: Developments located at district gateways shall be marked with visually prominent features. N/A Standard Gateway elements shall be oriented toward and scaled for both pedestrians and vehicles. Standard: Visual prominence shall be distinguished by two (2) or more of the following: 1) Public art,- rt;2) 2)Special landscape treatment; N/A 3) Open space/plaza; 4) Landmark building form; 5) Special paving, unique pedestrian scale lighting, or bollards; b) Prominent architectural features (trellis, arbor, pergola, or gazebo), !Neighborhood or district entry identification (commercial signs do not qualify). R. PARKING AND VEHICULAR ACCESS: Intent: To provide safe, convenient access to the Urban Center and the Center Village, incorporate various modes of transportation; including. public mass transit, in order to reduce traffic_ volumes and other impacts from vehicles; ensure sufficient parking is provided, while encouraging creativity in reducing the impacts of parking areas; . allow an active pedestrian environment by maintaining contiguous street frontages, without parking lot siting along sidewalks and building facades, minimize the visual impact of parking lots and use access streets and parking to maintain an urban edge to the district. 1. Surface Parking: Intent: To maintain active pedestrian environments along streets by placing parking lots primarily in back of buildings. Guidelines: Surface parking shall be located and designed so as to reduce the visual impact of the parking area and associated vehicles. Large areas of surface parking shall also be designed to accommodate future infill development. Standard: Parking shall be located so that no surface parking is located between a building N/A and the front property line, or the building and side property line, on the street side of a corner lot. N/A Standard: Parking shall be located so that it is screened from surrounding streets by buildings, landscaping, and/or gateway features as dictated by location. 2. Structured Parking Garages: Intent: To promote more efficient use of land needed for vehicle parking; encourage the use of structured parking, physically and visually integrate parking garages with other uses; and reduce the overall impact of parking garages. Guidelines: Parking garages shall not dominate the streetscope; they shall be designed to be complementary with adjacent and abutting buildings. They shall be sited to complement, not HEX Report 13-001720 (2)_docx City of Renton Department of Cam ity & Economic Development -fearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-00I , SA -H, MOD, MOL} VAR, VAR, CU -H Report of February 18, 2014 Page 15 of 29 subordinate, pedestrian entries_ Similar forms, materials, and/or details to the primary building(s)should be used to enhance garages. Standard: Parking structures shall provide space for ground floor commercial uses along street frontages at a minimum of seventy five percent (75%) of the building frontage width. Standard. The entire facade must feature a pedestrian -oriented facade. The Administrator of the Department of Community and Economic Development may approve parking structures that do not feature a pedestrian orientation in limited circumstances. If allowed, the structure shall be set back at least six feet (6) from the sidewalk and feature substantial landscaping. This landscaping shall include a combination of evergreen and deciduous trees, shrubs, and ground cover. This setback shall be increased to ten feet (10) when abutting a primary arterial and/or minor arterial. Standard: Public facing facades shall be articulated by arches, lintels, masonry trim, or other architectural elements and/or materials. ✓ Standard: The entry to the parking garage shall be located away from the primary street, to either the side or rear of the building. Standard. Parking garages at grade shall include screening or be enclosed from view with N/A treatment such as walls, decorative grilles, trellis with landscaping, or a combination of treatments. Standard. The Administrator of the Department of Community and Economic Development or designee may allow a reduced setback where the applicant can successfully demonstrate that the landscaped area and/or other design treatment meets the intent of these standards and guidelines. Possible treatments to reduce the setback include landscaping components plus one or more of the following integrated with the architectural design of the building: (a) Ornamental grillwork (other than vertical bars); (b) Decorative artwork; (c) Display windows; (d) Brick, tile, or stone; (e) Pre -cast decorative panels; (f) Vine -covered trellis; (g) Raised landscaping beds with decorative materials; or (h)Other treatments that meet the intent of this standard... 3. Vehicular Access: Intent: To maintain a contiguous and uninterrupted sidewalk by minimizing, consolidating, and/or eliminating vehicular access off streets. Guidelines. Vehicular access to parking garages and parking lots shall not impede or interrupt pedestrian mobility. The impacts of curb cuts to pedestrian access on sidewalks shall be minimized. Standard: Access to parking lots and garages shall be from alleys, when available. if not available, access shall occur at side streets. ,/ Standard: The number of driveways and curb cuts shall be minimized, so that pedestrian circulation along the sidewalk is minimally impeded. W. PEDESTRIAN ENVIRONMENT. Intent: To enhance the urban character of development in the Urban Center and the Center Village by creating pedestrian networks and by providing strong links from streets and drives to building entrances; make the pedestrian environment safer and more convenient, comfortable, and pleasant to walk between businesses, on sidewalks, to and from access points, and through parking lots; and promote the use of multi -modal and public transportation systems in order to reduce other vehicular traffic. 1. Pedestrian Circulation: intent: To create a network of linkages for pedestrians to improve safety and convenience and enhance the pedestrian environment. Guidelines: The pedestrian environment shall be given priority and importance in the design of projects. HEX Report 13-001720 (2).docx City of Renton Department of Corry ity & Economic Development -leoring Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-O01 , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 16 of 29 Sidewalks and/or pathways shall be provided and shall provide safe access to buildings from parking areas. Providing pedestrian connections to abutting properties is an important aspect of connectivity and encourages pedestrian activity and shall be considered. Pathways shall be easily identifiable to pedestrians and drivers. Standard: A pedestrian circulation system of pathways that are clearly delineated and connect buildings, open space, and parking areas with the sidewalk system and abutting properties shall be provided. (a) Pathways shall be located so that there are clear sight lines, to increase safety. (b) Pathways shall be an all-weather or permeable walking surface, unless the applicant can demonstrate that the proposed surface is appropriate for the anticipated number of users and complementary to the design of the development. Standard. Pathways within parking areas shall be provided and differentiated by material or N/A texture (i.e., raised walkway, stamped concrete, or pavers) from abutting paving materials. Permeable materials are encouraged. The pathways shall be perpendicular to the applicable building facade and no greater than one hundred fifty feet (150') apart. Standard: Sidewalks and pathways along the facades of buildings shall be of sufficient width to accommodate anticipated numbers of users. Specifically_ (a) Sidewalks and pathways along the facades of mixed use and retail buildings 100 or more feet in width (measured along the facade) shall provide sidewalks at least 12 feet in width. The walkway shall include an 8 foot minimum unobstructed walking surface. (b) Interior pathways shall be provided and shall vary in width to establish a hierarchy. The widths shall be based on the intended number of users; to be no smaller than five feet (5') and no greater than twelve feet (12'). (c) For all other interior pathways, the proposed walkway shall be of sufficient width to accommodate the anticipated number of users. N/A Standard: Mid -block connections between buildings shall be provided. 2. Pedestrian Amenities: intent: To create attractive spaces that unify the building and street environments and are inviting and comfortable for pedestrians; and provide publicly accessible areas that function for a variety of activities, at all times of the year, and under typical seasonal weather conditions. Guidelines: The pedestrian environment shall be given priority and importance in the design of projects. Amenities that encourage pedestrian use and enhance the pedestrian experience shall be included. ,/ Standard: Architectural elements that incorporate plants, particularly at building entrances, in publicly accessible spaces and at facades along streets, shall be provided. Standard: Amenities such as outdoor group seating, benches, transit shelters, fountains, and public art shall be provided. (a) Site furniture shall be made of durable, vandal- and weather -resistant materials that do not retain rainwater and can be reasonably maintained over an extended period of time. (b) Site furniture and amenities shall not impede or block pedestrian access to public spaces or building entrances. Not Standard: Pedestrian overhead weather protection in the form of awnings, marquees, Compliant canopies, or building overhangs shall be provided. These elements shall be a minimum of With 4.5 feet wide along at least seventy 75 percent of the length of the building facade facing Standard but the street, a maximum height of 15 feet above the ground elevation, and no lower than 8 compliant feet above ground level. with the intent and Staff Comment: The applicant is not proposing overhead weather protection along Sunset guideline Lane NE and Sunset Blvd NE. The proposal does include off-site street improvements along Sunset Lane NE and NE 10th St which include 12 -foot wide sidewalks. The wide sidewalks HEX Report 13-001720 (2).docx City of Renton Department of Com ty & Economic Development fearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001 , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 17 of 29 HEX Report 13-001720 (2).docx would help to promote a walkable, pedestrian oriented, community and would provide linkages to Sunset Blvd NE, the planned abutting Sunset Terrace Development, and the future City park across Sunset Lane NE. The sidewalk connections would be landscaped and would use a variety of pavings that would provide variation in the pedestrian experience. Additionally, the applicant is proposing a large overhang which protects both the main entry and service entry to the Library along NE 10th St. The entry would be highly visible and would contain a small plaza adjacent to the future park area. The applicant has created attractive spaces along the streetscape through the use of building architectural features, such as glazing, that work to unify the building and street environments where there are no canopies. The proposal is inviting and comfortable for pedestrians and provides publicly accessible areas that function for a variety of activities, at all times of the year, and under typical seasonal weather conditions. iv. RECREATiON A REAS AND cUMMQN OPEN SpAm Intent: To ensure that areas for both passive and active recreation are available to residents, workers, and .visitors and that these areas are of sufficient size for the intended activity and in convenient locations. To create usable and inviting open space that is accessible to the public; and to promote pedestrian activity on streets particularly at street corners. Guidelines: Developments located at street intersections should provide pedestrian -oriented space at the street corner to emphasize pedestrian activity (illustration below). Recreation and common open space areas are integral aspects of quality development that encourage pedestrians and users. These areas shall be provided in an amount that is adequate to be functional and usable; they shall also be landscaped and located so that they are appealing to users and pedestrians N/A Standard: All mixed use residential and attached housing developments of ten (10) or more dwelling units shall provide common opens space and/or recreation areas. N/A Standard: Amount of common space or recreation area to be provided: at minimum fifty (50) square feet per unit. Standard. The location, layout, and proposed type of common space or recreation area shall N/A be subject to approval by the Administrator of the Department of Community and Economic Development or designee. Standard: At least one of the following shall be provided in each open space and/or recreation area (the Administrator of the Department of Community and Economic Development or designee may require more than one of the following elements for developments having more than one hundred (100) units): (a) Courtyards, plazas, or multi-purpose open spaces; (b) Upper level common decks, patios, terraces, or roof gardens/pea-patches. Such spaces above the street level must feature views or amenities that are unique to N/A the site and are provided as an asset to the development; (c) Pedestrian corridors dedicated to passive recreation and separate from the public street system; (d) Recreation facilities including, but not limited to, tennis/sports courts, swimming pools, exercise areas, game rooms, or other similar facilities; or (e) Children's play spaces that are centrally located near a majority of dwelling units and visible from surrounding units. They shall also be located away from hazardous areas such as garbage dumpsters, drainage facilities, and parking areas. Standard. All buildings and developments with over thirty thousand (30,000) square feet of N/A nonresidential uses (excludes parking garage floorplate areas) shall provide pedestrian - oriented space. N/A Standard: The pedestrian -oriented space for buildings and developments with over thirty thousand (30,000) square feet of nonresidential uses shall include all of the following: HEX Report 13-001720 (2).docx City of Renton Department of Com 'ty & Economic Development fearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001_ , SA -H, MOD, MOD VAR, YAR, CU -H Report of February 18, 2014 T Page 18 of 29 HEX Report 13-001720 (2).docx (a) Visual and pedestrian access (including barrier free access) to the abutting structures from the public right-of-way or a nonvehicular courtyard; and (b) Paved walking surfaces of either concrete or approved unit paving; and (c) On-site or building -mounted lighting providing at least four (4) fact -candles (average) on the ground, and (d) At least three (3) lineal feet of seating area (bench, ledge, etc.) or one individual seat per sixty (60) square feet of plaza area or open space. Standard. The following areas shall not count as pedestrian -oriented space for buildings and developments with over thirty thousand (30,000) square feet of nonresidential uses: (a) The minimum required walkway. However, where walkways are widened or enhanced beyond minimum requirements, the area may count as pedestrian - N/A oriented space if the Administrator of the iJepartment of Community and Economic Development or designee determines such space meets the definition of pedestrian -oriented space. (b) Areas that abut landscaped parking lots, chain link fences, blank walls, and/or dumpsters or service areas. N/A Standard. Outdoor storage (shopping carts, potting soil bags, firewood, etc.) is prohibited within pedestrian -oriented space. v. BUILDING ARCHITECTURAL DESIGN: Intent: To encourage building design that is. unique and urban in character, comfortable on a human scale, and uses appropriate building materials that are suitable for the Pacific Northwest climate. To discourage franchise retail architecture. 1. Building Character and Massing: intent: To ensure that buildings are not bland and visually appear to be at a human scale; and ensure that all sides of a building, that can be seen by the public, are visually interesting. Guidelines: Building facades shall be modulated and/or articulated to reduce the apparent size of buildings, break up long blank walls, add visual interest and enhance the character of the neighborhood. Articulation, modulation, and their intervals should create a sense of scale important to residential buildings. Standard: All building facades shall include modulation or articulation at intervals of no more than forty feet (40'). f Standard. Modulations shall be a minimum of two feet (2') deep, sixteen feet (16') in height, and eight feet (8') in width. Standard: Buildings greater than one hundred sixty feet (160) in length shall provide a variety of modulations and articulations to reduce the apparent bulk and scale of the facade; N/A or provide an additional special feature such as a clock tower, courtyard, fountain, or public gathering area. 2. Ground -Level Details: Intent: To ensure that buildings are visually interesting and reinforce the intended human -scale character of the pedestrian environment, and ensure that all sides of a building within near or distant public view have visual interest. Guidelines: The use of material variations such as colors, brick, shingles, stucco, and horizontal wood siding is encouraged. The primary building entrance should be made visibly prominent by incorporating architectural features such as a facade overhang, trellis, large entry doors, and/or ornamental lighting (illustration below). Detail features should also be used, to include things such as decorative entry paving, street furniture (benches, etc.), and/or public art. Standard: Human -scaled elements such as a lighting fixture, trellis, or other landscape '/ feature shall be provided along the facade's ground floor. Doesn't depict human scaled elements. HEX Report 13-001720 (2).docx City of Renton Department of Com 'ty & Economic Development leoring Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001 , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 19 of 29 HEX Report 1 3-001 72 0 (2).docx Standard. On any facade visible to the public, transparent windows and/or doors are / required to comprise at least 50 percent of the portion of the ground floor facade that is between 4 feet and & feet above ground (as measured on the true elevation). An acortes Standard: Upper portions of building facades shall have clear windows with visibility into and out of the building. However, screening may be applied to provide shade and energy efficiency. The minimum amount of light transmittance for windows shall be 50 percent. Standard: Display windows shall be designed for frequent change of merchandise, rather than permanent displays. Standard. Where windows or storefronts occur, they must principally contain clear glazing. ve Standard: Tinted and dark gloss, highly reflective (mirror -type) glass and film are prohibited. Standard: Untreated blank walls visible from public streets, sidewalks, or interior pedestrian pathways are prohibited. A wall (including building facades and retaining walls) is considered a blank wall if: (a) it is a ground floor wall or portion of a ground floor wall over 6 feet in height, has N/A a horizontal length greater than 15 feet), and does not include a window, door, building modulation or other architectural detailing; or (e) Any portion of a ground floor wall has a surface area of 400 square feet or greater and does not include a window, door, building modulation or other architectural detailing. Standard. If blank walls are required or unavoidable, blank walls shall be treated with one or more of the following: (a) A planting bed at least five feet in width containing trees, shrubs, evergreen ground cover, or vines adjacent to the blank wall, N/A (b) Trellis or other vine supports with evergreen climbing vines, (c) Architectural detailing such as reveals, contrasting materials, or other special detailing that meets the intent of this standard, (d) Artwork, such as bas-relief sculpture, mural, or similar, or (e) Seating area with special paving and seasonal planting. 3. Building Roof Lines. Intent: To ensure that roof forms provide distinctive profiles and interest consistent with an urban project and contribute to the visual continuity of the district. Guidelines: Building roof lines shall be varied and include architectural elements to add visual interest to the building. Standard: Buildings shall use at least one of the following elements to create varied and interesting roof profiles: (a) Extended parapets, (b) Feature elements projecting above parapets; V, (c) Projected cornices, (d) Pitched or sloped roofs (e) Buildings containing predominantly residential uses shall have pitched roofs with a minimum slope of one to four (1:4) and shall have dormers or interesting roof forms that break up the massiveness of an uninterrupted sloping roof. 4. Building Materials: Intent: To ensure high standards of quality and effective maintenance over time; encourage the use of materials that reduces the visual bulk of large buildings; and encourage the use of materials that add visual interest to the neighborhood. Guidelines: Building materials are an important and integral part of the architectural design of a building that is attractive and of high quality. Material variation shall be used to create visual appeal and HEX Report 1 3-001 72 0 (2).docx City of Renton Department of Cam ty & Economic Development fearing Examiner Recommendation RENTON HIGHLANDS LiBRARY LUA13-001 , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 20 of 29 eliminate monotony of facades. This shall occur on all facades in a consistent manner. High quality materials shall be used. if materials like concrete or block walls are used they shall be enhanced to create variation and enhance their visual appeal. Standard: All sides of buildings visible from a street, pathway, parking area, or open space shall be finished on all sides with the some building materials, detailing, and color scheme, or Partial Compliance if different, with materials of the some quality. with Staff Comment: It appears the proposal would use high quality building materials. However, Standard in order to ensure that quality materials are used staff recommends the applicant submit a materials board subject to the approval of the Current Planning Project Manager prior to building permit approval. Standard: All buildings shall use material variations such as colors, brick or metal banding, patterns or textural changes. Partial Standard: Materials shall be durable, high quality, and consistent with more traditional Compliance urban development, such as brick, integrally colored concrete masonry, pre finished metal, with stone, steel, glass and cast -in-place concrete. Standard Staff Comment: See Condition above. N/A Standard: if concrete is used, walls shall be enhanced by techniques such as texturing, reveals, and/or coloring with a concrete coating or admixture. Standard: if concrete block walls are used, they shall be enhanced with integral calor, N/A textured blocks and colored mortar, decorative bond pattern and/or shall incorporate other masonry materials. Standard: All buildings shall use material variations such as colors, brick or metal banding, patterns, or textural changes. Mi'',+ci1RiL Intent: To provide a means of identifying and advertising businesses, provide directional assistance; encourage signs that are both clear and of appropriate scale for the project, encourage quality signage that contributes to the character of the Urban Center and the Center Village, and create color and interest_ Guidelines: Front -lit, ground -mounted monument signs are the preferred type of freestanding sign. Blade type signs, proportional to the building facade on which they are mounted, are encouraged on pedestrian -oriented streets. Alteration of trademarks notwithstanding, corporate signage should not be garish in color nor overly lit, although creative design, strong accent colors, and interesting surface materials and lighting techniques are encouraged. Standard: Entry signs shall be limited to the name of the larger development. Unknown at Staff Comment: Signage has not yet been designed for the proposed project. The applicant this time would be required to submit a comprehensive signage package which complies with the standards of Design District V. The signage package shall be submitted to and approved by the Current Planning Manager prior to sign permit approval. Unknown at Standard: Corporate logos and signs shall be sized appropriately for their location. this time Staff Comment: See condition above. NSA Standard: In mixed use and multi -use buildings, signage shall be coordinated with the overall building design. Standard: Freestanding ground -related monument signs, with the exception of primary entry Unknown at this time signs, shall be limited to ive eet 5' above finished rade including support structure. g f f (� f g g pp Staff Comment: See condition above. Standard: Freestanding signs shall include decorative landscaping (ground cover and/or Unknown at shrubs) to provide seasonal interest in the area surrounding the sign. Alternately, signage this time may incorporate stone, brick, or other decorative materials as approved by the Director. Staff Comment: See condition above_ HEX Report 13-001720 (2)_docx City of Renton Department of Com ity & Economic Development Tearing Examiner Recommendation RENTON HIGHLANDS LIBRARY _ _ LUA13-001 , SA -H, MOD, MOD VAR, YAR, CU -H Report of February 18, 2014 T Page 21 of 29 HEX Report 13-001720 (2).docx Standard: All of the following are prohibited.- rohibited.a. a.Pole signs, b. Roof signs, and Unknown at c. Back -lit signs with letters or graphics on a plastic sheet (can signs or illuminated this time cabinet signs). Exceptions: Back -lit logo signs less than ten (.10) square feet are permitted as area signs with only the individual letters back -lit (see illustration, subsection G8 of this Section). Staff Comment: See condition above. G. LIGHTING: Intent: To ensure safety and security, provide adequate lighting levels in pedestrian areas such as plazas, pedestrian walkways, parking areas, building entries, and other public places, and increase the visual attractiveness of the area at all times of the day and night. Guidelines: Lighting that improves pedestrian safety and also that creates visual interest in the building and site during the evening hours shall be provided. Standard: Pedestrian -scale lighting shall be provided at primary and secondary building entrances. Examples include sconces on building facades, awnings with down -lighting and decorative street lighting_ Staff Comment: The applicant is proposing lighting under the canopy at the building entry Partial and decorative street lighting surrounding the site. However, a lighting plan was not Compliance provided with the application; therefore staff recommends a condition of approval that a With Standard lighting plan is provided that complies with the Design District standards. Staff recommends, as a condition of approval, the applicant be required to provide a lighting plan that adequately provides for public safety without casting excessive glare on adjacent properties at the time of building permit review. The lighting plan shall be submitted to, and approved by, the Current Planning Project Manager prior to building permit approval. If this condition of approval is met the proposal would satisfy this standard. Standard: Corporate logos and signs shall be sired appropriately for their location. Standard. Accent lighting shall also be provided on building facades (such as sconces) and/or to illuminate other key elements of the site such as gateways, specimen trees, other significant landscaping, water features, and/or artwork. Standard: Downlighting shall be used in all cases to assure safe pedestrian and vehicular movement, unless alternative pedestrian scale lighting has been approved administratively or is specifically listed as exempt from provisions located in RMC 4-4-075, Lighting, Exterior On -Site (i.e., signage, governmental flags, temporary holiday or decorative lighting, right -of - way -lighting, etc.). d. PLANNED ACTION ORDINANCE AND DEVELOPMENT AGREEMENT COMPLIANCE AND CONISTENCY: ✓ The proposal is located within the Sunset Planned Action area identified in Exhibit 7. ✓ The proposed uses and activities are consistent with those described in the Planned Action EIS and Planned Action Qualifications. ✓ The proposal is within the Planned Action thresholds and other criteria of the Planned Action Qualifications. ./ The proposal is consistent with the City of Renton Comprehensive Plan and applicable zoning regulations ✓ The proposal's significant adverse environmental impacts have been identified in the Planned Action EIS. The proposal's impacts have been mitigated by application of the measures identified in HEX Report 13-001720 (2).docx City of Renton Department of Cam ity & Economic Development -fearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-00: , 5A-H, MOD, MOD VAR, VAR, CU-H Report of February 18, 2014 Page 22 of 29 HEX Report 13-001720 (2).docx Attachment B of Ordinance #5614, and other applicable City regulations, together with any modifications or variances or special permits that may be required. The proposal complies with all applicable local, state and/or federal laws and regulations, and the Environmental Review Committee determines that these constitute adequate mitigation. The proposal is not an essential public facility as defined by RCW.36.70A.204(1). e. OFF SITE IMPACTS: Structures: Restricting overscale structures and overconcentration of development on a particular portion of the site. Due to the narrow configuration of the site and the desire to utilize all ground level surface area for the City's Library program the lot has a building coverage of approximately 90%. While the proposed structure is concentrated over the entire site, the scale and bulk of the library would be compatible with the low-rise urban structures that surround the site currently and the anticipated mid -rise structures envisioned for the Sunset Area Planned Action (Exhibit 7). The scale and bulk of the building is also reduced through the use of differing materials on the building facades, building articulation and modulation and differing roof profiles. The building massing is broken up into three separate articulated forms that house the entry, large reading room, and support areas. The building would step down at the east to create human scale at the main entry. The building would then step up to create a larger more impressive volume for the main reading room, and then steps down again at the west where it would abut the future Sunset Terrace Development project. The applicant is also proposing storefront glazing, covering canopies, raised landscaped beds and street furniture which enhance the pedestrian experience. Circulation: Providing desirable transitions and linkages between uses, streets, walkways and adjacent properties. The applicant is proposing to access the structured parking garage from Sunset Lane NE at the northwest side of the site on the abutting property. The shared access ramp is being designed to accommodate the future Sunset Terrace Development. The applicant is also proposing off-site street improvements along Sunset Lane NE and NE 10th St which include 12 -foot wide sidewalks. The wide sidewalks would help to promote a walkable, pedestrian oriented, community and would provide linkages to the Sunset Blvd NE, the planned abutting Sunset Terrace Development, and the future City park across Sunset Lane NE. The sidewalk connections would be landscaped and would use a variety of pavings that would provide variation in the pedestrian experience. Loading and Storage Areas: Locating, designing and screening storage areas, utilities, rooftop equipment, loading areas, and refuse and recyclables to minimize views from surrounding properties. See Screening discussion under Findings Section 23.b Views: Recognizing the public benefit and desirability of maintaining visual accessibility to attractive natural features. There are territorial views to the west, but no large attractive natural features are on or near the site for which to maintain visual accessibility. The applicant has proposed to limit the height of the proposed structure to 27 feet and 0 inches which mitigates view impacts from surrounding properties. Landscaping: Using landscaping to provide transitions between development and surrounding properties to reduce noise and glare, maintain privacy, and generally enhance the appearance of the project. HEX Report 13-001720 (2).docx City of Renton Department of Com ity & Economic Development fearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001 , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 23 of 29 See Landscaping discussion under Findings Section 23.b. Lighting: Designing and/or placing exterior lighting and glazing in order to avoid excessive brightness or glare to adjacent properties and streets. The applicant is proposing lighting under the canopy at the building entry and decorative street lighting surrounding the site. However, a lighting plan was not provided with the application; therefore staff recommended that a lighting plan be provided at the time of building permit review. f. ON-SITE IMPACTS: Structure Placement: Provisions for privacy and noise reduction by building placement spacing and orientation. The building has an orientation to all three street frontages (NE 101h St, Sunset Lane NE, and NE Sunset Blvd). The structure includes large windows on either side of the large reading area that provides a civic presence on Sunset Blvd NE and Sunset Lane NE. The main entry would be located at the corner of NE 10th St and Sunset Lane and includes a small plaza and large 10 -foot overhang in order create visibility from NE Sunset Blvd in addition to NE 10th St and Sunset Lane NE. It is anticipated that most of the noise impacts would occur during the construction phase of the project. The applicant has submitted a Construction Mitigation Plan that provides measures to reduce construction impacts such as noise, control of dust, traffic controls, etc. In addition, the project would be required to comply with the City's noise ordinance regarding construction hours. There would be periodic noise impacts from traffic and activities that are normally associated with a library. However, the applicant is proposing to construct the building with sound insulation in order to achieve a day/night average interior noise level (Ldn) of 45 Ldn. Structure Scale: Consideration of the scale of proposed structures in relation to natural characteristics, views and vistas, site amenities, sunlight, prevailing winds, and pedestrian and vehicle needs. The scale and bulk of the building is reduced through the use of differing materials on the building facades, building articulation and modulation and differing roof profiles. The building massing is broken up into three separate articulated forms that house the entry, large reading room, and support areas. The building would step down at the east to create human scale at the main entry. The building would then step up to create a larger more impressive volume for the main reading room, and then steps down again at the west where it would abut the future Sunset Terrace Development project. The full civic scale of the proposed library is more prominently visible from Sunset Lane NE and NE Sunset Blvd NE. The proposed building is designed appropriately to allow adequate light and air circulation to the buildings and the site. The design of the structures would not result in excessive shading of the property. In addition, there is ample area surrounding the building to provide normal airflow. Natural Features: Protection of the natural landscape by retaining existing vegetation and soils, using topography to reduce undue cutting and filling, and limiting impervious surfaces. The site contains 7 trees of which all 7 trees are proposed for removal. RMC 4-4-130 requires that 5 percent of the trees on site be retained. Of the 7 trees, 1 tree is required to be retained at the 5 percent retention rate. When the required number of protected trees cannot be retained, new trees, with a two-inch caliper or greater, shall be planted. The replacement rate shall be twelve caliper inches of new trees to replace each protected tree removed. The applicant is proposing S new trees to replace the protected tree. However, it is unclear the size (caliper) of the trees proposed; therefore staff was unable to confirm compliance with the tree retention requirements of HEX Report 13-001710 (2).docx City of Renton Department of Com ity & Economic Development Bearing Examiner Recommendation RENTON HIGHLANDS LIBRARY _ _ LUA13-001 , 5A -H, MOD, MOD VAR, VAR, £U -H Report of February 18, 2014 Page 24 of 29 the code. Staff recommends, as a condition of approval, the applicant be required to submit a detailed landscape plan demonstrating compliance with the tree retention requirements of RMC 4-4- 130. The detailed landscape plan shall be submitted to, and approved by, the Current Planning Project Manager prior to construction permit approval. The applicant provided a geotechnical report, prepared by GeoTech consultants, dated April 18, 2013 (Exhibit 10). The topography of the site is relatively flat, sloping downward to the south. A short slope exists on the northern side of the property adjacent to NE 10`h St and an approximately 4-5 foot tall concrete retaining wall runs along the eastern side of the site where there is an existing elevation difference between Sunset Blvd NE and the subject site. The subsurface conditions were explored through the drilling of test borings at a maximum depth of 26.5 feet. Approximately 3-4.5 feet of loose fill was encountered beneath the existing ground surface. Underlying the fill was a thin layer of loose to medium dense sand, with dense to very dense, slightly silty to silty sand with gravel that extended to a depth of about 15 feet. Native soil was encountered below 15 feet to approximately 26.5 feet below grade. No groundwater or wet soil conditions were observed during initial test borings and it is likely that the seasonal high groundwater table lies below the 26.5 foot depth of the borings done in the field. The existing site consists of 9,104 square feet of impervious surface, approximately 57%. Fallowing development, impervious surface coverage would be approximately 15,290 square feet or 95%. On site soil removal would be required to reach the bottom of excavation for the lower parking level. The approximate volume of cut would be 4,800 cubic yards. Existing site soils, in the approximate amount of 237 cubic yards, would be used as backfill necessary for portions of the site. The provided geotechnical report recommended measures to be implemented by the applicant to address the proposal's potential impact to soils and related conditions. Staff recommends, as a condition of approval that all earthwork implemented by the applicant be consistent with the recommendations of the geotechnical report, prepared by GeoTech Consultants, dated April 18, 2013. Landscaping: Use of landscaping to soften the appearance of parking areas, to provide shade and privacy where needed, to define and enhance open spaces, and generally to enhance the appearance of the project. Landscaping also includes the design and protection of planting areas so that they are less susceptible to damage from vehicles or pedestrian movements. See discussion under Findings Section 23.b, Landscaping g. ACCESS: Location and Consolidation: Providing access paints on side streets or frontage streets rather than directly onto arterial streets and consolidation of ingress and egress points on the site and, when feasible, with adjacent properties. Access to the site is proposed via a single entry to the structured parking located on Sunset Lane NE. The shared access ramp is being designed to accommodate the future Sunset Terrace Development. The applicant is also proposing off-site street improvements along Sunset Lane NE and NE 10th St which include 12 -foot wide sidewalks. The wide sidewalks would help to promote a walkable, pedestrian oriented, community and would provide linkages to the Sunset Blvd NE, the planned abutting Sunset Terrace Development, and the future City park across Sunset Lane NE. The proposal promotes safe and efficient circulation through the shared access point. Internal Circulation: Promoting safety and efficiency of the internal circulation system, including the location, design and dimensions of vehicular and pedestrian access points, drives, parking, turnarounds, walkways, bikeways, and emergency access ways. HEX Report 1 3-001 720 (2).docx City of Renton department of Com 'ty & Economic Development fearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001 , 5A -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 25 of 29 See Location and Consolidation discussion above_ Loading and Delivery: Separating loading and delivery areas from parking and pedestrian areas. Not applicable as there are no loading or delivery areas. Transit and Bicycles: Providing transit, carpools and bicycle facilities and access. Per RMC 4-4-080F.11 0.5 bicycle the number of bicycle parking spaces shall be 10% of the number of required off-street parking spaces. Based on the proposal which requires 58 vehicle parking stalls, 6 bicycle parking stalls are required to be provided. The applicant is proposing bicycle parking stalls, within the plaza area. However, it is unclear the number of bicycle parking stalls that would be provided. Staff recommends, as a condition of approval, the applicant submit a revised site plan depicting bicycle parking in conformance with RMC4-4-080F.11. The revised site plan shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. Pedestrians: Providing safe and attractive pedestrian connections between parking areas, buildings, public sidewalks and adjacent properties. The applicant is also proposing off-site street improvements along Sunset Lane NE and NE 10th St which include 12 -foot wide sidewalks. The wide sidewalks would help to promote a walkable, pedestrian oriented, community and would provide linkages to the Sunset Blvd NE, the planned abutting Sunset Terrace Development, and the future City park across Sunset Lane NE. The sidewalk connections would be landscaped and would use a variety of pavings that would provide variation in the pedestrian experience. Additionally, the applicant is proposing a large overhang which protects both the main entry and service entry to the Library along NE 10th St. The entry would be highly visible and would contain a small plaza adjacent to the future park area. h. OPEN SPACE: Incorporating open spaces to serve as distinctive project focal points and to provide adequate areas for passive and active recreation by the occupants/users of the site. The applicant has incorporated an entry plaza, located on the east side of the structure near the primary entrance. This entry plaza serves as a distinctive focal point. The plaza is proposed to incorporate hardscape and landscaping to allow for passive recreation activities. In addition, the proposed library would allow for visual access to the future City park, planned across Sunset lane NE, via the building's windows. The future (approximate) three acre City park would provide both active and passive recreation opportunities for users of the library. L VIEWS AND PUBLIC ACCESS: When possible, providing view corridors to shorelines and Mt. Rainier, and incorporating public access to shorelines. The proposed structure would not block view corridors to shorelines or Mt. Rainier. The public access requirement is not applicable as the site is not adjacent to a shoreline. j. NATURAL SYSTEMS: Arranging project elements to protect existing natural systems where applicable. There are no natural systems located on site with the exception of drainage flows. See Drainage discussion under Findings Section 23.k. k. SERVICES AND INFRASTRUCTURE: Making available public services and facilities to accommodate the proposed use. Police and Fire: Police and Fire Prevention staff indicated that sufficient resources exist to furnish services to the proposed development; if the applicant provides Code required improvements and fees. The applicant would be required to pay an appropriate Fire Impact Fee. Currently this fee is HEX Report 13-001720 (2).docx City of Renton Department of Com ity & Economic Development fearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001 , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 26 of 29 assessed at $0.52 per square foot of new building area. Parks and Recreation: Not Applicable Water and Sewer: The site is served by the City of Renton for all utilities. The preliminary fire flow requirement per the Fire Marshal's office is 2,250 gallons per minute (gpm). A 12 -inch main would be required to be extended from the 12 -inch stub in NE 101h St to the far property line in Sunset Lane NE. One hydrant is required to be located within 150 feet of the building and two additional hydrants and would be required to be located within 300 feet of the building. Final location of fire hydrants will be determined by the fire department. There is an 8 -inch sewer main in Harrington Ave NE, NE 101h St and Sunset Blvd NE. A new 6 -inch side sewer will be required onsite and is shown on the proposed plans. The building department would require floor drains, for the underground parking, and they will need to be connected to the sanitary sewer through an approved oil/water separator located outside the building, if feasible. Flows would be required to be directed through floor drains that are installed in accordance with the UPC to an exterior oil/water separator. Drainage: The project is required to comply with the new City of Renton Amendments to the 2009 King County Surface Water Design Manual. A conceptual drainage plan and report stamped by a PE was submitted with the formal application (Exhibit 11), and per the report the project is complying with the 2009 King County Surface Water Design Manual. Since the project is exempt from flow control and water quality, the engineer is proposing to tightline the roof and footing drains to a new bioswale. Transportation: The applicant is proposing to access the structured parking garage from Sunset Lane NE at the northwest side of the site on the abutting property. All adjacent right-of-ways need to be fully improved in conformance to the current street standards as shown in the conceptual drawings in the Sunset Area Planned Action EIS (Exhibit 6). This would include dedication of additional right-of-way. The existing right-of-way width in NE 10th St is 60 feet, 30 feet in Sunset Lane NE and 87 feet in Sunset Blvd NE. Improvements are as follows: Sunset Blvd NE - The new frontage improvements, to be constructed by the City as part of a CIP, would include an 8 foot planting strip and 12 foot multi -use sidewalk behind the existing curb. The applicant is proposing lawn in the place of the soon to be constructed right of way. NE 10th St - Frontage improvements for this street would require a pavement section of 16 feet from the centerline, curb, gutter and a new 12 -foot sidewalk. This would require a dedication of an additional two feet of right-of-way. Curb bulb outs are also to be included at the intersections of Sunset Blvd NE and Sunset Lane NE as depicted on the proposed plans. Sunset Lane NE- Frontage improvements would require a 12 -foot sidewalk along the development side, a new curb and 18 feet of pavement. The existing right-of-way width of 31 feet in this section of Sunset Lane would accommodate this level of improvements. Based on the street improvements shown in the EIS, angle parking would be allowed fronting the site. However, the parking would be provided at the time when the north side of Sunset Lane NE is widened and improved by the City for the future park. Traffic impact fees for the proposed library would be based on square footage of the building (not including parking garage). The applicant submitted a building permit on December 17, 2013 in order to vest to 2013 Impact fees (1313006601). The fees would be estimated at $63,270.00 based the 2013 rate. Impact fees are due at time of building permit issuance. Schools: N/A HEX Report 13-001720 (2).docx City of Renton Department of Con ity & Economic Development Hearing Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA_13-00: , SA -H, MOD, MOD VAR, VAR, CU -H Report of February 18, 2014 Page 27 of 29 1. PHASING: The applicant is not requesting any additional phasing. 24. The proposal requires a Conditional Use Permit in order to establish the public library use on the proposed site. The following table contains project elements intended to comply with Conditional Use Permit decision criteria, as outlined in RMC 4-9-030.D. CONDITIONAL USE PERMIT CRITERIA: a. CONSISTENCY WITH PLANS AND REGULATIONS: See discussion under Findings Section 14.a -d b. APPROPRIATE LOCATION: The proposed location would replace the existing location for the Renton Highlands Public Library, at 2902 NE 12th St. The proposed library location is about a half a mile southwest of the existing location_ The new location is urban and central to the Sunset Planned Action Area. The area is accessible to transit. The aerial photograph (Exhibit 9) does not reveal any over - concentration of library facilities in the vicinity and in general libraries are not overly concentrated in the City as a whole given that the libraries are designed to serve the immediate service areas of the City. c. EFFECT ON ADJACENT PROPERTIES: The proposed project is compatible with the scale and character of the existing and planned neighborhood. The scale and bulk of the library would be compatible with the low-rise urban structures that surround the site currently and the anticipated mid -rise structures envisioned for the Sunset Area Planned Action (Exhibit 7). The scale and bulk of the building is also reduced through the use of differing materials on the building facades, building articulation and modulation and differing roof profiles. The building massing is broken up into three separate articulated forms that house the entry, large reading room, and support areas. The building would step down at the east to create human scale at the main entry. The building would then step up to create a larger more impressive volume for the main reading room, and then steps down again at the west where it would abut the future Sunset Terrace Development project. The applicant is also proposing storefront glazing, covering canopies, raised landscaped beds and street furniture which enhance the pedestrian experience. d. COMPATIBILTY: See Effect on Adjacent properties discussion above. e. PARKING: See Parking discussion under Findings Section 23.b f. TRAFFIC: See Access discussion under Findings Section 23.g g. NOISE, LIGHT, AND GLARE: It is anticipated that the most significant noise impacts would occur during the construction phase of the project. The applicant has submitted a Construction Mitigation Plan that provides measures to reduce construction impacts such as noise, control of dust, traffic controls, etc. In addition, the project would be required to comply with the City's noise ordinance regarding construction hours. There would be periodic noise impacts from traffic and activities that are normally associated with a library. However, the applicant is proposing to construct the building with sound insulation or other means in order to achieve a day/night average interior noise level (Ldn) of 45 Ldn. Exterior onsite lighting, including security lighting, would be regulated by code. Compliance with this code (RMC 4-4-075) ensures that all building lights are directed onto the building or the ground and cannot trespass beyond the property lines. h. LANDSCAPING: See Landscaping discussion under Findings Section 23.b. HEX Report 1 3-001 720 (2).docx City of Renton Department of Com ity & Economic Development searing Examiner Recommendation RENTON HIGHLANDS LIBRARY _ LUA13-001 , SA -H, MOD_,_ MOD VAR, VAR, CU -H Report of February 18, 2014 Page 28 of 29 1. CONCLUSIONS: 1. The proposal complies with the Site Plan Review Criteria if all conditions of approval are met. 2. The proposal complies with the Conditional Use Permit Review Criteria if all conditions of approval are met. 3. The proposal complies with the Variance Review Criteria for the civic entry variance request if all conditions of approval are met. 4. The proposal complies with the Variance Review Criteria for the lot coverage variance request if all conditions of approval are met. S. The proposal complies with the Modification Review Criteria for the parking modification request if all conditions of approval are met. 6. The proposal complies with the Modification Review Criteria for the refuse and recycle modification request if all conditions of approval are met. 7. The proposal is compliant and consistent with City of Renton plans, policies, regulations and approvals. S. Staff does not anticipate any adverse impacts on surrounding properties and uses as long as the conditions of approval are complied with. 9. The proposed library use is anticipated to be compatible with existing and future surrounding uses as permitted in the CV zoning classification. 10. The scale, height and bulk of the proposed buildings are appropriate for the site. 11. Safe and efficient access and circulation has been provided for all users. 12. The proposed plaza space serves as distinctive project focal points and provides adequate area for passive and active recreation by the users of the proposed facility. 13. There are adequate public services and facilities to accommodate the proposed use. 14. The proposed location is suited for the proposed use. 15. Adequate parking for the proposed use has been provided. 16. The proposed use would not result in a substantial or undue adverse effect on adjacent properties. The construction of a new Highlands Library which would replace the older structures currently on site and would result in an overall improvement of the visual environment_ 17. The proposed development would not generate any long term harmful or unhealthy conditions. Potential noise, light and glare impacts from the proposed use have been evaluated and mitigated if all conditions of approval are complied with. 18. Landscaping has been provided in all areas not occupied by buildings or paving. 19. The proposed structure would not block view corridors and allows for view corridors through the building to the planned City park across Sunset Lane NE. J. RECOMMENDATIONS: Staff recommends approval of the Site Plan, Conditional Use Permit, Civic Entry Variance, Lot Coverage Variance, Refuse and Recycle Modification and Parking Modification for the Renton Highlands Library, File No. LUA13-001720, SA -H, CU -H, MOD, MOD VAR, VAR as depicted in Exhibits 2 through 5, subject to the following conditions: 1. The applicant shall submit a revised landscape plan depicting an increase in spacing for street trees along Sunset Lane NE or alternatively a different variety of tree and additional street trees along NE HEX Report 13-001720 (2).docx City of Renton Department of Cam ity & Economic Development -leoring Examiner Recommendation RENTON HIGHLANDS LIBRARY LUA13-001 ., SA -H, MOD, MOR VAR, YAR, CU -H_ Report of February 18, 2014 Page 29 of 29 10th 5t. The revised and detailed landscape plan shall be submitted to, and approved by, the Current Planning Project Manager prior to construction permit approval. 2. The applicant shall be required to provide temporary screening plan for mechanical equipment on the low roof, to the southwest, if the building permit for the abutting Sunset Terrace Development is not approved at the time of the Library building permit approval. A temporary screening plan shall be submitted to, and approved by, the Current Planning Project Manager prior to building permit approval. If at any time during the construction of the library, a building permit is approved for the abutting Sunset Terrace Development the screening plan can be revised to remove the temporary screening for mechanical equipment on the low roof, to the southwest_ 3. The applicant shall be required to submit revised elevations depicting a temporary roof for the refuse and recyclable enclosure if a building permit for the abutting Sunset Terrace Development has not been approved. The revised elevations shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. If at any time during the construction of the library, a building permit is approved for the abutting Sunset Terrace Development the refuse and recycle enclosure elevations can be revised to remove the temporary roof. 4. The applicant shall be required to submit a revised site and landscape plan depicting a temporary three-foot landscape planting strip, on 3 sides of the refuse and recycle enclosure if a building permit for the abutting Sunset Terrace Development has not been approved. The revised plans shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. If at any time during the construction of the library, a building permit is approved for the abutting Sunset Terrace Development the site and landscape plans can be revised to remove the temporary landscape planting strip around the refuse and recycle enclosure. 5. The applicant shall submit a materials board subject to the approval of the Current Planning Project Manager prior to building permit approval. 6. The applicant shall be required to submit a comprehensive signage package which complies with the standards of Design District V. The signage package shall be submitted to and approved by the Current Planning project Manager prior to sign permit approval. 7. The applicant shall be required to provide a lighting plan that adequately provides for public safety without casting excessive glare on adjacent properties at the time of building permit review. The lighting plan shall be submitted to, and approved by, the Current Planning Project Manager prior to building permit approval. 8. The applicant shall be required to submit a detailed landscape plan demonstrating compliance with the tree retention requirements of RMC 4-4-130. The detailed landscape plan shall be submitted to, and approved by, the Current Planning Project Manager prior to construction permit approval. 9. All earthwork implemented by the applicant, shall be consistent with the recommendations of the geotechnical report, prepared by GeoTech Consultants, dated April 18, 2013. 10. The applicant shall submit a revised site plan depicting bicycle parking in conformance with RMC4-4- 080F.11. The revised site plan shall be submitted to and approved by the Current Planning Project Manager prior to building permit approval. HEX Report 13-001720 (2).docx I ) 0 _j cn 7C) c: > LU m Lli U) Z 0 [L�u 0 4-0 a (2) ry r. 9 V r N W H x W J UI llf c a z 0 z a .- a T ]z D U 0 ry z d W EL Q V U) z cD LU H AI gg . If j gg F� ��fliS7lrH, ...... .......- x{47 41 3g Se 0 IS HiM 3N �` � F NHLLYd 91M'Id�I111M N'Jrrl .w,�vr ua�to 1oil T � f. rrirr, I i 'r � f .i., I ih nr' �' r• — - - - -- r. 9 V r N W H x W J UI llf c a z 0 z a .- a T ]z D U 0 ry z d W EL Q V U) z cD LU H F� ��fliS7lrH, PM hlPON 1oil r. 9 V r N W H x W J UI llf c a z 0 z a .- a T ]z D U 0 ry z d W EL Q V U) z cD LU H w o� .i H H m H x W L I r LU CU LO H zR ■T� Z i w 0 CU 0 A --j �y: it �— . 1 lzjlh b w W I z �o �b a� C: II L ti c W CoCff LULU zR 0 ZwT� z Lu, 0 C L.L U) Z Q 0 W W uj J W J, H m H X W a� C: II L ti c W CoCff LULU zR 0 ZwT� z Lu, 0 C L.L U) Z Q 0 W W uj J W J, H m H X W � % a § « ; IF -- -- ...-- \ x�> �< � � 9 \ ■ ■ # DEPARTMENT OF COMMUNITY �`ry°f ' AND ECONOMIC DEVELOPMENT e 0 ENVIRONMENTAL REVIEW COMMITTEE MEMO APPLICATION NUMBER: LUA13-001720, SA -H, CU -H, VAR, VAR, MOD APPLICANT: King County Library System PROJECT NAME: Renton Highlands Library DESCRIPTION OF PROPOSAL: The applicant, King County Library System (KCLS), is requesting Hearing Examiner Site Plan Review, a Hearing Examiner Conditional Use Permit, Civic Entry Orientation Variance, Lot Coverage Variance, and two parking modifications for the construction of a new 14,479 square foot public library. The project site consists a total of 16,000 square feet of Center Village (CV) zoned property. The site was formerly used as multi -family residential for the Renton Housing Authority. The applicant is proposing a total of 47 parking stalls of which 46 would be located within structured parking garage below the library facility. The parking would be accessed from Sunset Lane NE. The proposal includes site improvements designed to accommodate the future Sunset Terrace Redevelopment on the abutting property to the southwest, including: a shared ramp for access to structured parking, party wall, and stairs. The proposal includes a single entry at the corner of NE 10th St and Sunset Lane NE therefore the applicant is requesting a Variance from RMC4-2-120A, which requires a civic entry on all street frontages of the site. An additional Variance is being requested, from RMC 4-2-120A, in order to exceed the 75% lot coverage requirement to a proposed 93% lot coverage. The applicant is also proposing two parking modifications, from RMC 4-4-080, in order to decrease the minimum number of parking spaces required onsite from 60 to 47 stalls and the ability provide ADA parking stalls which do not conform to Van parking overhead clearance requirements. There are no critical areas located on site. LOCATION OF PROPOSAL: 2701 Sunset Lane NE LEAD AGENCY/RESPONSIBLE ENTITY: City of Renton Environmental Review Committee Department of Community & Economic Development Upon determination by the City's Environmental Review Committee that the, proposal meets the criteria outlined in the Planned Action Ordinance (Ordinance #5610) and qualifies as a planned action, the proposal shall not require a SEPA threshold determination, preparation of an EIS, or be subject to further review pursuant to SEPA. The City's Environmental Review Committee designates the proposal as a "planned action", pursuant to RCQ 43.210.030, as it meets all of the following conditions: ✓ I The proposal is located within the Sunset Planned Action Area. ✓ The proposed uses and activities are consistent with those described in the Planned Action EIS and Planned Action Qualifications. ✓ The proposal is within the Planned Action thresholds and other criteria of the Planned Action Qualifications. EXHIBIT 6 City of Renton Department of Community & Economic Development Renton Highlands Library February 10, 2014 Environmental Review Committee Memo E_UA13-001720, 5A -H, CU -H, VAR, VAR, MOD Page 2 of 2 ✓ The proposal is consistent with the City of Renton Comprehensive Plan and applicable zoning regulations. ✓ The proposal's significant adverse environmental impacts have been identified in the Planned Action EIS. ✓ The proposal's impacts have been mitigated by application of the measures identified in Attachment B of Ordinance #5160, and other applicable City regulations, together with any modifications or variances or special permits that may be required. ✓ The proposal complies with all applicable local, state and/or federal laws and regulations, and the Environmental Review Committee determines that these constitute adequate mitigation. ✓ The proposal is not an essential public facility as defined by RCW.36.70A.200(l). SIGNATURES: Gregg zAr4rrPik Administrator Dae Mark Peterson, Administra r Date Public Works Department Fire & Emergency Services r y YZ-f i p l 7- � - -11 Q Terry Higashiyama, Administrator Date C.E. Vincent, Administrator Date Community Services Department Department of Community & Economic Development ICF Figure 7 Sunset Area Planned Action/EIS Study Area "1-;:,;,1 C", City of Renton Sunset ElS EXHIBIT 7 (Signature of Sender): STATE OF WASHINGTON } ) SS COUNTY OF KING } I certify that I know or have satisfactory evidence that L; s c_ Me, L 1 signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and purposes mentioned in the instrument. Dated: a c7 I L4 Notary (Print): My appointment expires: ry Public in and for the State of Washington Renton Highlands Library LUA13-001720, SA -H, MOD, VAR, CU -H EXHIBIT 8 7227801025 7227801029 7227900090 RENTON HIGHLANDS ASSOCIATES SAFEWAY INC STORE 0366 PIACENTINI LOUISE ATTN NORM LARABEE C/O COMPREHENSIVE PROP TAX C/O BELMAR PROPERTIES INC 8801 202ND PL SW 1371 OAKLAND BLVD 5TE 200 2001 6TH AVE #2300 EDMONDS, WA 98124 WALNUT CREEK, CA 94596 SEATTLE, WA 9812.1 7227801026 7227801205 6377300000 SAFEWAY INC: STORE #0366 GRETER HIGHLANDS LTD PRTSHP SCHUTZ_CORALEE K 2725 NE SUNSET BLVD C/O MORRIS PIHA MGMT GROUP 1100 HARRINGTON AVE NE #311 RENTON, WA 98056 P 0 BOX 53290 RENTON, WA 98056 BELLEVUE, WA 98015 7227801201 7227801295 7227801290 YADAV & GILL LLC RENTON HOUSING AUTH DAO EMILIE 2800 NE SUNSET BLVD PO BOX 2316 PO BOX 40462 RENTON, WA 98056 RENTON, WA 98056 BELLEVUE, WA 98005 7227801285 637730D000 6377300000 MACKENZIE GREGORY S AKLILU GEBREYESUS WALTER GARY J 1127 HARRINGTON AVE NE 1100 HARRINGTON AVE NE #312 1100 HARRINGTON AVE NE #104 RENTON, WA 98056 RENTON, WA 98056 RENTON, WA 98056 637730DDD0 6377300000 63773000DO MULLER RONALD D BOSTON DEBORAH I DUNLAP HENRY 1100 HARRINGTON AVE NE UNIT 205 2856 TANZANITE TER 1100 HARRINGTON AVE NE #302 RENTON, WA 98056 KISSIMMEE, FL 34758 RENTON, WA 98056 6377300000 6377300000 6377300000 BOSTON RACHE LAM NATHAN YAN-CHUEN GARCIA MEGAN 571D 37TH ST SE 7453 NEWCASTLE GOLF CLUB RD 1100 HARRINGTON AVE NE #101 AUBURN, WA 98092 NEWCASTLE, WA 98059 RENTON, WA 98056 6377300000 6377300000 63773DO000 WEBB FRANCIS & MARGARET DOWD KERRI DEAN LARRY JOEL PO BOX 3011 4660 NE 3RD CT #J-4 1100 HARRINGTON AVE NE #105 RENTON, WA 98056 RENTON, WA 98059 RENTON, WA 98056 6377300000 6377300000 6377300000 ELLIOTT JOHN DRINKWINE KAREN J BANASKY KARL V 1100 HARRINGTON AVE NE #201 1100 HARRINGTON AVE NE #308 1100 HARRINGTON AVE NE #204 RENTON, WA 98056 RENTON, WA 98056 RENTON, WA 98056 637730000D 6377390000 6377300000 HILL DONNA LEE UNDERWOOD BARBARA J MANN HOLLY 1100 HARRINGTON AVE NE #306 1100 HARRINGTON AVE NE APT304 1100 HARRINGTON AVE NE #305 RENTON, WA 98056 RENTON, WA 98056 RENTON, WA 98056 6377300000 6377300000 6377300000 BANASKY HOWARD BRAUN ERIKA KERNER NICOLE 1100 HARRINGTON AVE NE #106 5716 108TH ST SW 1834 216TH PL NE RENTON, WA 98056 LAKEWOOD, WA 98499 SAMMAMISH, WA 98074 6377300000 6377300000 6377300000 MORINA BROOKE A+LONI CRAVEN LARRY D BELCHER CHARLES JR 1100 HARRINGTON AVE NE 4310 P 0 BOX 251 1100 HARRINGTON AVE NE UNIT 206 RENTON, WA 98056 RENTON, WA 98057 RENTON, WA 98056 6377300000 YOUNG JOHN H 5508 5 CLOVERDALE 5T SEATTLE, WA 98118 LUA13-001720 Renton Highlands Library Notes None CC �1 4 0 32 64 Feer !G S_ 1984_ W e b_M arcator_Auxil is ry_S phe re City of on 1 inane & IT Division Legend City and County Boundary Otrrer City cr Renton Addresses Parcels EXHIBIT 9 Information Technology - GIS Tr is i nap is a i, ser genera:_d srdtic ; Wpul frog. an Intsriel mapcicg site arid is ru re'aienne only. — ila :a -y ers rr 'p 21 u i t us nrap :r ur may u. tte RentoriMapSupport@Rentonwa.gov ricxumtc rr: n o rrr re, c r nn n 211112014 THIS MAP IS NOT 10 BE USED FOR NAVIGATION r OE0TECH CONSULTANTS, INC. Colpitts Development Company 2256 — 38th Place East Seattle, Washington 98112 Attention: Judith C. Nielsen 13256 Northeast 20th Street, Suite 16 Bellevue, Washington 98005 (425)747-5618 FAX (425)747-8561 April 18, 2013 via email. coldevco@gmail.com Subject: Transmittal Letter -- Geotechnical Engineering Study Proposed Mixed -Use Development Northwest Corner of Sunset Boulevard Northeast and Harrington Avenue Northeast Renton, Washington Dear Ms. Nielsen: We are pleased to present this geotechnlcal engineering report for the proposed mixed-use development to be constructed in Renton, Washington. The scope of our services consisted of exploring site surface and subsurface conditions, and then developing this report to provide recommendations for general earthwork and design criteria for foundations, retaining walls, pavements, and temporary shoring. This work was authorized by your acceptance of our proposal, P-8569, dated March 18, 2013. The attached report contains a discussion of the study and our recommendations. Please contact us if there are any questions regarding this report, or for further assistance during the design and construction phases of this project. cc: Veer Architecture — Kent Smutny via email kent@veerarchitecture.com JLH/MRM: jyb Respectfully submitted, GEOTECH CONSULTANTS, INC. 0 el Jason L. Hinds Geotechnical Engineer EXHIBIT 10 GEOTECH CONSULTANTS, INC. EXHIBIT 11 ENGINEERING REPORT Technical Information Report Renton Highlands Library Site Plan Review December 1601, 2013 PREPARED FOR: King County Library System %0 Newport Way NW Issaquah, WA 98027 (425) 369-3200 PREPARED THROUGH: THA Architecture 733 SW Oak Street Portland, OR 97205 Phone: (503) 227-1254 Contact: Scott Mooney PREPARED BY: COUGH LINPORTERLUN DEEN 413 Pine Street, Suite 300 Seattle, Washington 98101 P: 206/343-0460 Contact: Bart Balko, P.E.I"' '- ORDINANCE NO. 5693 I _, �J laLU • �o `T l / PARCEL # \�pFT { / 72278011085 I 1 rPARCEL# ti 722780105Y PARCEL # 722760108 1 � PARCEL # PARCEL 7227801055 72278010551 PARCEL # 1 AREA OF RIGHT-OF-WAY 7227801055 TO BE VACATED r l oyA 1 ° CATI100 'O�1 AREA MHIBIT r� �1 v -0" AP EX D' 25' 50' 100' . (]) P RHA - STREET VACATION Project Number 1317 s chem a to RENTON, WA 04/15/2013 wvwkshaP VACATION AREA MAP EXHIBIT EXHIBIT B 5 EXHIBIT 12 S bA Fq 0 - -i a � " � oz U w N N :S) i J M W _ /� Q V ? w Z 3 Z ¢ w J ff w 0 wt rl H H 2 x W � Tj'f . 1 L11I s � � � i $ a� �q _ y' � ', .; �� ��. � �. S �..� � � �� � �� �- �: _.y+. z � � ,..: I'''� , «, p F= r.'S �� i kF �� .. � �'::, ��' Denis Law Mayor April 10, 2014 Scott Mooney THA Architecture 733 SW Oak Street Portland, OR 97205 City af0000", Department of Community and Economic Development C.E."Chip"Vincent, Administrator SUBJECT: Renton Highlands Library/ EUA13-001720 Dear Mr. Mooney: This letter is to inform you that the appeal period ended March 18, 2014 for the Hearing Examiner's Decision.' No appeals were filed, therefore, this decision is final and application for the appropriately required permits may proceed. The advisory notes listed in the Hearing Examiner's Report and Decision dated March 4,' 2014 must be adhered to during construction and up to final inspection. Furthermore, the Conditional Use Permit, Variance and Site Development Plan Review decisions will expire two (2) years from the date of decision. if you are unable to finalize the development within the two-year time -frame, a single two (2) year extension may be requested in writing, pursuant to RMC 4 -9 -200 -(Site Plan) and 'RMC 4-9-030 (Conditional Use). Pursuant to RMC 4-9-250B..18, a. one year extension may be requested in writing for the variance. In regards to the vesting of the above referenced project, please be aware that as long as the development of the project conforms to the approved plans and building permits are submitted within the relevant time limits, the zoning regulations in effect at the time of the original approval shall continue to apply: However, all construction shall conform to the International Building Code and Uniform Fire Code regulations in force at the' time of building permit application: If you have any questions regarding the report and decision issued for this site pian development proposal, please call me at (425)430-7219, Sincerely, Roc a Timmons Senior Planner cc Sunset Terrace Development LLC / owner(s) Greg Smith, KCLS / Applicant Renton City Hall . 1055 South Grady Way Renton, Washington 98057 rentonwa.gov N DEPARTMENT OF COMMUNITY D ofton AND ECONOMIC DEVELOPMENT aalkity ..:- ENVIRONMENTAL REVIEW COMMITTEE MEMO APPLICATION NUMBER: LUA13-001720, SA -H, CU -H, VAR, VAR, MOD APPLICANT: King County Library System PROJECT NAME: Renton Highlands Library DESCRIPTION OF PROPOSAL: The applicant, King County Library System (KCLS), is requesting Hearing Examiner Site Plan Review, a Hearing Examiner Conditional Use Permit, Civic Entry Orientation Variance, Lot Coverage Variance, and two parking modifications for the construction of a new 14,479 square foot public library. The project site consists a total of 16,000 square feet of Center Village (CV) zoned property. The site was formerly used as multi -family residential for the Renton Housing Authority. The applicant is proposing a total of 47 parking stalls of which 46 would be located within structured parking garage below the library facility. The parking would be accessed from Sunset Lane NE. The proposal includes site improvements designed to accommodate the future Sunset Terrace Redevelopment on the abutting property to the southwest, including: a shared ramp for access to structured parking, party wall, and stairs. The proposal includes a single entry at the corner of NE 10th St and Sunset Lane NE therefore the applicant is requesting a Variance from RMC4-2-120A, which requires a civic entry on all street frontages of the site. An additional Variance is being requested, from RMC 4-2-120A, in order to exceed the 75% lot coverage requirement to a proposed 93% lot coverage. The applicant is also proposing two parking modifications, from RMC 4-4-080, in order to decrease the minimum number of parking spaces required onsite from 60 to 47 stalls and the ability provide ADA parking stalls which do not conform to Van parking overhead clearance requirements. There are no critical areas located on site. LOCATION OF PROPOSAL: 2701 Sunset Lane NE LEAD AGENCY/RESPONSIBLE ENTITY: City of Renton Environmental Review Committee Department of Community & Economic Development Upon determination by the City's Environmental Review Committee that the proposal meets the criteria outlined in the Planned Action Ordinance (Ordinance #5610) and qualifies as a planned action, the proposal shall not require a SEPA threshold determination, preparation of an EIS, or be subject to further review pursuant to SEPA. The City's Environmental Review Committee designates the proposal as a "planned action", pursuant to RCQ 43.210.030, as it meets all of the following conditions: The proposal is located within the Sunset Planned Action Area. ✓ The proposed uses and activities are consistent with those described in the Planned Action EIS and Planned Action Qualifications. ✓ The proposal is within the Planned Action thresholds and other criteria of the Planned Action Qualifications. City of Renton Department of Community & Economic Development Renton Highlands Library February 10, 2014 Environmental Review Committee Memo LUA13-001720, SA -H, CU -H, VAR, VAR, MOD Page 2 of 2 SIGNATURES: ell" zj�o))q Gregg Zi erra6n, Administrator Dae Mark Peterson, Administra r Date Public Works Department L4� , i�r— — Terry Higashiyama, Administrator Community Services Department Fire & Emergency Services 2� Date C.E. Vincent, Administrator Date Department of Community & Economic Development The proposal is consistent with the City of Renton Comprehensive Pian and applicable zoning regulations. The proposal's significant adverse environmental impacts have been identified in the Planned Action EIS. ✓ The proposal's impacts have been mitigated by application of the measures identified in Attachment B of Ordinance #5160, and other applicable City regulations, together with any modifications or variances or special permits that may be required. ✓ The proposal complies with all applicable local, state and/or federal laws and regulations, and the Environmental Review Committee determines that these constitute adequate mitigation. +� The proposal is not an essential public facility as defined by RCW.36.70A.200(1). SIGNATURES: ell" zj�o))q Gregg Zi erra6n, Administrator Dae Mark Peterson, Administra r Date Public Works Department L4� , i�r— — Terry Higashiyama, Administrator Community Services Department Fire & Emergency Services 2� Date C.E. Vincent, Administrator Date Department of Community & Economic Development o o v o o = .- -r .il u- �, y d 7 E e- y y G Q u L o 7a d ❑_�� w�¢� m g� co.o c zZ �. P,d'Z'" u}m-o N..., �.p � Ya 3 � ° ❑p� }� o`er o ° c� c v R v� W W WZU, enw o m m,c ry �'C .. °� c a 0.. ��.C'o 3 acl UxGd Wiz- c foo aW•oy� °�bws �'p= ya' o c 3 Cc, a�c_o o FUQ d�rv75 E roG p -,5 c o O jZ O 8� oo^ �� c 8 L U 3 ❑ Cn�'�b' zmzWO.0Y^c_s7CS�°'Cors Uz," �a y2,o �aW 7rzl F�P4 3 � 'cc�.z drfl �] O Vv7 tai ° Y ti x q G •. Z CIO �g� 'b "Ca �,,� � w .•+ CC 'y N G �+ CCS � °,U`°�� 0.4 �L 0 m r, i U w L� 0 U O O kn G CC O CC r:: o. O O h� C9 P" o z uj E �p Z CIO �g� 'b "Ca �,,� � O Ln .•+ CC 'y N G �+ CCS � °,U`°�� G a' O p m W W bGA w• " r+�l bO'DA co cd+ G O cd 0 G O th 7Om � : bA O W as O j O p O .�.+ G O =4� oU� �•Irl, anU �"�rH 0 �H 0.4 �L 0 m r, i U w L� 0 U O O kn G CC O CC r:: o. O O h� -- City ofr- RY NOTICE OF APPLICATION A Master Ap pllcatlon has It... fled a Ad accepted with the Department Of Community S rco mlc beaelOpment(CEDI- Planning D10,10n of the Chy of Renton, The following briefly dCscrlbes the appllotico and the necessary Public Ap"Ovals. DATE OF NOTICE OF APPLICATION: January 2, 2014 PROJECT NAME/NUMBER: Renton Highlands Library/LUA13-001720,5A-H, MOD, VAR,CU-H PROIECT DESCRIPTION: the applicant, King County Lbrary System fxCL5L Is requesting Hearing Examiner Site Plan Review, a Hearing Examiner Condilian it Use Permit, Civic Entry OrlentaUon Variance, Lot Coverage varrance, and two parking modificatiaris for the construction of a new 14,479 square foot public library. The protect She conajats a sola! Of 16,ODD square feet Of Center village ICY) tuned Property, The site was formerly used ac mit-lamlfy residential for the Renton Housing below rty. the applicant Is proposing a total of 47 Pariing stalls of whleh 46 would be located within strurtured parking garage below rhe library facility. The parking would be accessed from Sunset Lane NE. The proposal includes site imProaemrnti designed m accommadale the future Sunset Terrace Redevelopment on the abutting property to thea shared ramp for southwest, Including; access to structured parking, party wall, and stairs. The proposal Includes a single entry at the comert, ld10th St and Sunset Lane NE therefore the applicantis requesting a variance From RMC4-2-120A, which requires a d Ic entry on all street Frontages Cl he ante. An additional Variance Is beiryg requested, from RMC 4-2-120A, In Older l0a%teed the 75% lot -11- rest hement to a propnaed 93% lot coverage, The applicant Ia also proposing two parking modlRradons, from RMC a4-080, in order to denrase the minimum number of panting spaces required onsite from 6o 10 47 stalls and the ability provide AOA parking stalls which conform[O Van Pirldna overhead clearance requirements. There are no crilirar areas located an site. do not PROJECT LOCATION: 2701 Sunset Lane PU BUC APPROVALS; Hearing Examiner APPLICANT/PROJECT CONTACT PERSON: Scott Mooney, TNA Architecture/ 733 SW Oak Street, Portland, OR 97205/ email; smaoney@thaarchi[eclure.com PUBLIC HEARING; £VWSJI S2SJ➢C iS lentativel <rh d r ar Renton Hearne Examin A e• •• +nrs,s r h M. in Renton Council Chambers on the 7th Oder of Renton Clty Hall. Comments on the above applEdatlon must be submitted in writing to Rocale Timmons, Senior Planner, Department of Community & Economic Development, 1055 SOutb Grady Way, Renton, WA 98057, by 5:00 P.M. on Jsnmry 16, 2014, This matter Is also tentativefy scheduled for a public hearing on February 11, Zola, at 10c00AM, Council Chambers, Seventh Floo(, Renton City hall, 1055 south Grady way, Renton. If you are interested in i tlend'rng the hearing, please Coo l the Planning Division to ensure that the heafing has not been rescheduled at 1425) 43p -72g2, if comments cannot be Submitted in wrirho by the dale Indicated above, you may still appear at the hearing and present your comments on the proposal beftre rhe Hearing Examiner, If you have questlnns about this OfOpesaL or wish [0 be made a party OI record and receive addltinnal 'nfumalian by mail, please tartan the Prajert Manager. Anyone who s.dol written cummenu OFrecord and olf be no will automatically become a party w[ihed of any decision an this proiett. PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION DATE OF APPLICATION: December 23, 2013 NOTICE OF COMPLETE APPUCATION: January 2, 2014 [t you would pke to be made a party of record r0 rrcelve further inlorma[lort on this ro to: Gry of Ren(on, CED, planning Dlvislon, 1e55 South Grady Way, Renton, WA 98057. posed project, wmpiele this torte and rr[um fife Name/No.; Renton Highlands Library/ LUA13-0p172d, SA -H, MOD, VAR, LU.H NAME: MAILING ADDRESS: C!ry/5ra[e/21p; err eou,�us un CERTIFICATION Sit lam, hereby certify that copies of the above document were posted in _ conspicuous places or nearby the described property on s Date: Signed: STATE OF WASHINGTON ) ) SS COUNTY OF KING } I certify that I know or have satisfactory evidence that ; signed this instrument and acknowledged it to be his/her/their free and voluntary uses and purposes mentioned in the instrument. Dated: Ok'141%ki C-5 IATA CO", Notary Pubric ib and for the Sate of Washington Notary (Print): � oLk) My appointment expires: t u c s� fr;5: T E €.€:< ..`ts. €.EE I:a6 e� .Ri:i°'E, 'li .._,-{---: IF.E . "'m�!°0E ..::::.. .` t kPART�1Y&C lllR�_Si�Ps<t:P.:.E:'.�. ;E 6 .............................r.. m..,X:¢rF ........^........EFS"PE...EE::€,€F . €'_ ...F, t {f €= ............F&L..rFIfI.{€EF EEEp ��...�_............ ..........rF r.< .t. q ...-......................... [6j ................................ 1 E� .m .. : .. .. .................. r.€ r P lr:§I`.E AFFiD�11FIT?t= 1C -; i All�lll ::.. :... : ,, ..,-.... 11 ..................................._..... �T � .r. .E::F F. ttF F.E.. K.:,..'. € ... . .............._.............E.. ..... ereEL._eEE E .. , :<: ._.............._...............er. a �.`.r�.§_:-PE[.......<........ `.............................,....,...........-..••••••.....•.�'•..`.s:sx..^c. #" ......................_.,............E. r:: F,. e r ...._...........-....-...................._....... .'r € t.Fk<tEt<. E..'t «:.'"m.: tet[t..:.".::^.:::.:.::.... .:�:.. .. € .a. _.. w....r E€fi�t On the 2nd day of January, 2014, 1 deposited in the mails of the United States, a sealed envelope containing Acceptance documents. This information was sent to: { ��Gt7�� .. •.,. '4.._s� .:dFiwe F.,E.x a Cf C '.: $` tE.' ._.,......-•__- ,FFE. ■fW F��� ..................... .....�._. .�--- .FFG .}E�a-_.-.:.-. .. ....... '. >.....< .-...,... ... _._..:: Scott Mooney, THA Architecture Contact Sunset Terrace Development LLC Owner Greg Smith, King County Library System Applicant See attached 300' surrounding property owners (Signature of Sender): STATE OF WASHINGTON ) ) SS COUNTY OF KING ) I certify that I know or have satisfactory evidence that I{ i s t- M e- L i re �-v signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and purposes mentioned in the instrument. Dated: N Notary (Print): My appointment expires: Public in and for the State of Washington U Renton Highlands Library LUA13-001720, SA -H, MOD, VAR, CU -H 7227801025 7227801029 7227900090 RENTON HIGHLANDS ASSOCIATES SAFEWAY INC STORE 07366 PIACENTINI LOUISE ATTN NORM LARABEE C/O COMPREHENSIVE PROP TAX C/O BELMAR PROPERTIES INC 8801 202ND PL SW 1371 OAKLAND BLVD STE 200 2001 6TH AVE #2300 EDMONDS, WA 98124 WALNUT CREEK, CA 94596 SEATTLE, WA 98121 7227801026 7227801205 6377300000 SAFEWAY INC: STORE #0366 GRETER HIGHLANDS LTD PRTSHP SCHUTZ_CORALEE K 2725 NE SUNSET BLVD C/O MORRIS PIHA MGMT GROUP 1100 HARRINGTON AVE NE #311 RENTON, WA 98056 P 0 BOX 53290 RENTON, WA 98056 BELLEVUE, WA 98015 7227801201 7227801295 7227801290 YADAV & GILL LLC RENTON HOUSING AUTH DAO EMILIE 2800 NE SUNSET BLVD PO BOX 2316 PO BOX 40462 RENTON, WA 98056 RENTON, WA 98056 BELLEVUE, WA 98005 7227801285 6377300000 6377300000 MACKENZIE GREGORY S AKLILU GEBREYESUS WALTER GARY J 1127 HARRINGTON AVE NE 1100 HARRINGTON AVE NE #312 1100 HARRINGTON AVE NE #104 RENTON, WA 98056 RENTON, WA 98056 RENTON, WA 98056 6377300000 6377300000 6377300000 MULLER RONALD D BOSTON DEBORAH I DUNLAP HENRY 1100 HARRINGTON AVE NE UNIT 205 2856 TANZANITE TER 1100 HARRINGTON AVE NE #302 RENTON, WA 98056 KISSIMMEE, FL 34758 RENTON, WA 98056 6377300000 6377300000 6377300000 BOSTON RACHE LAM NATHAN YAN-CHUEN GARCIA MEGAN 5710 37TH ST SE 7453 NEWCASTLE GOLF CLUB RD 1100 HARRINGTON AVE NE #101 AUBURN, WA 98092 NEWCASTLE, WA 98059 RENTON, WA 98056 6377300000 6377300000 6377300000 WEBB FRANCIS & MARGARET DOWD KERRI DEAN LARRY JOEL PO BOX 3011 4660 NE 3RD CT #J-4 1100 HARRINGTON AVE NE #105 RENTON, WA 98056 RENTON, WA 98059 RENTON, WA 98056 6377300000 6377300000 6377300000 ELLIOTTJOHN DRINKWINE KAREN J BANASKY KARL V 1100 HARRINGTON AVE NE #201 1100 HARRINGTON AVE NE #308 1100 HARRINGTON AVE NE #204 RENTON, WA 98056 RENTON, WA 98056 RENTON, WA 98056 6377300000 6377300000 6377300000 HILL DONNA LEE UNDERWOOD BARBARA J MANN HOLLY 1100 HARRINGTON AVE NE #306 1100 HARRINGTON AVE NE APT304 1100 HARRINGTON AVE NE #305 RENTON, WA 98056 RENTON, WA 98056 RENTON, WA 98056 6377300000 6377300000 6377300000 BANASKY HOWARD BRAUN ERIKA KERNER NICOLE 1100 HARRINGTON AVE NE #106 5716 108TH ST SW 1834 216TH PL NE RENTON, WA 98056 LAKEWOOD, WA 98499 SAMMAMISH, WA 98074 6377300000 6377300000 6377300000 MORINA BROOKE A+LONI CRAVEN LARRY D BELCHER CHARLES JR 1100 HARRINGTON AVE NE #310 P 0 BOX 251 1100 HARRINGTON AVE NE UNIT 206 RENTON, WA 98056 RENTON, WA 98057 RENTON, WA 98056 6377300000 YOUNG JOHN H 5508 5 CLOVERDALE ST SEATTLE, WA 98118 Denis Law r City Of,,! Mayor, - oc Department of Community and Economic Development January 2, 2014 C_E."Chip"Vincent, Administrator Scott Mooney THA Architecture 733 SW Oak Street Portland, OR 97205 Subject: Notice of Complete Application Renton Highlands Library, LUA13-001720, SA -M, MOD, VAR, CU -H Dear Mr. Mooney: The Planning Division of the City of Renton has determined that the subject application. is complete according to submittal. requirements and, therefore, is accepted for review. In addition, this matter is tentatively scheduled for a Public Hearing on February 11, 2014 at 10:00 AM, Council Chambers, Seventh Floor, Renton City Hall, 1055 South Grady Way, Renton. The applicant or representative(s) of the applicant are required to be present'at the public hearing. A copy of the staff report will be mailed to you prior to .the scheduled hearing. Please contact me at (425) 430-7219 if you have any questions. Sincerely, Roc e Timmons Senior Planner cc: Sunset Terrace Development LLC/Owner(s) Greg Smith, King County Library System / Applicant Renton City Hail 1055 south Grady Way. • Renton, Washington 98057 • rentonwa.gov 1-1 77, Denis Law- City 0f, - Ma or Department of Community and Economic Development January 2, 2014 C.E."Chip"Vincent, Administrator Scott Mooney THA Architecture . . 733 SW Oak Street Portland, OR 97205 Subject: Notice of Complete Application Renton Highlands Library, LUA13-001720, SA -H, MOD, VAR, CU -H Dear Mr. Mooney: The Planning Division of the City of Renton has determined that the subject application is complete according to submittal. requirements and, therefore, is accepted for review. In addition, this matter is tentatively scheduled for a Public Hearing on February 11,. 2014 at 10:00 AM, Council Chambers, Seventh Floor, Renton City Hall, 1055 South Grady Way, Renton. The applicant or representative(s) of the applicant are required to be present at the public hearing. A copy of the staff report will be mailed to you prior to the scheduled hearing. Please contact me at (425) 430-7219 if you have any questions. Sincerely, ' Roc e Timmons Senior Planner ce Sunset Terrace Development LLC / Owner(s) Greg Smith, King County Library System / Applicant Renton City Hall-.1055South GradyWay • Renton, Washington 98057 • rentonwa.gov City 7 ; r J A �-- r i r . �. _ J NOTICE OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) — Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: January 2, 2014 PROJECT NAME/NUMBER: Renton Highlands Library/ LUA13-001720, SA -H, MOD, VAR, CU -H PROJECT DESCRIPTION: The applicant, King County Library System (KCLS), is requesting Hearing Examiner Site Plan Review, a Hearing Examiner Conditional Use Permit, Civic Entry Orientation Variance, Lot Coverage variance, and two parking modifications for the construction of a new 14,479 square foot public library. The project site consists a total of 16,000 square feet of Center Village (CV) zoned property. The site was formerly used as multi -family residential for the Renton Housing Authority. The applicant is proposing a total of 47 parking stalls of which 46 would be located within structured parking garage below the library facility. The parking would be accessed from Sunset Lane NE. The proposal includes site improvements designed to accommodate the future Sunset Terrace Redevelopment on the abutting property to the southwest, including: a shared ramp for access to structured parking, party wall, and stairs. The proposal includes a single entry at the corner of NE 10th St and Sunset Lane N£ therefore the applicant is requesting a Variance from RMC4-2-120A, which requires a civic entry on all street frontages of the site. An additional Variance is being requested, from RMC 4-2-120A, in order to exceed the 75% lot coverage requirement to a proposed 93% lot coverage. The applicant is also proposing two parking modifications, from RMC 4-4-080, in order to decrease the minimum number of parking spaces required onsite from 60 to 47 stalls and the ability provide ADA parking stats which do not conform to Van parking overhead clearance requirements. There are no critical areas located on site. PROJECT LOCATION: PUBLIC APPROVALS: 2701 Sunset Lane Hearing Examiner APPLICANT/PROJECT CONTACT PERSON: Scott Mooney, THA Architecture / 733 SW Oak Street, Portland, OR 97205 / email: smooney@thaarchitecture.com PUBLIC HEARING: Public hearing is tentatively scheduled for February 11, 2014 before the Renton Hearing Examiner at 10:OOAM, in Renton Council Chambers on the 7th floor of Renton City Hall. Comments on the above application must be submitted in writing to Rocale Timmons, Senior Planner, Department of Community & Economic Development, 1055 South Grady Way, Renton, WA 98057, by 5:00 p.m. on January 16, 2014. This matter is also tentatively scheduled for a public hearing on February 11, 2014, at 10:00AM, Council Chambers, Seventh Floor, Renton City Hail, 1055 South Grady Way, Renton. If you are interested in attending the hearing, please contact the Planning Division to ensure that the hearing has not been rescheduled at {425) 430-7282. If comments cannot be submitted in writing by the date indicated above, you may still appear at the hearing and present your comments on the proposal before the Hearing Examiner. If you have questions about this proposal, or wish to he made a party of record and receive additional information by mail, please contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION DATE OF APPLICATION: December 23, 2013 NOTICE OF COMPLETE APPLICATION: January 2, 2014 If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CEO, Planning Division, 1055 South Grady Way, Renton, WA 98057. File Name / No.: Renton Highlands Library / LUA13-001720, SA -H, MOD, VAR, CU -H NAME: MAILING ADDRESS: TELEPHONE NO.: City/State/Zip: �lty Of NOTICE OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)— Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals - DATE OF NOTICE OF APPLICATION: January 2, 2014 PROJECT NAME/NUMBER: Renton Highlands Library / LUA13-001720, 5A -H, MOD, VAR, CU -H PROJECT DESCRIPTION: The applicant, King County Library System (KCLS), is requesting Hearing Examiner Site Plan Review, a Hearing Examiner Conditional Use Permit, Civic Entry Orientation Variance, Lot Coverage Variance, and two parking modifications for the construction of a new 14,479 square foot public library. The project site consists a total of 16,000 square feet of Center Village ACV) zoned property. The site was formerly used as multi -family residential for the Renton Housing Authority. The applicant is proposing a total of 47 parking stalls of which 46 would be located within structured parking garage below the library facility. The parking would be accessed from Sunset Lane NE. The proposal includes site improvements designed to accommodate the future Sunset Terrace Redevelopment on the abutting property to the southwest, including: a shared ramp for access to structured parking, party wall, and stairs. The proposal includes a single entry at the corner of NE 10th St and Sunset lane NE therefore the applicant is requesting a Variance from RMC4-2-120A, which requires a civic entry on all street frontages of the site. An additionak Variance is being requested, from RMC 4-2-170A, in order to exceed the 75% lot coverage requirement to a proposed 93% lot coverage. The applicant is also proposing two parking modifications, from RMC 4-4-080, in order to decrease the minimum number of parking spaces required onsite from 60 to 47 stalls and the ability provide ADA parking stalls which do not conform to Van parking overhead clearance requirements. There are no critical areas located on site. PROJECT LOCATION: 2701 Sunset Lane PUBLIC APPROVALS: Hearing Examiner APPLICANT/PROJECT CONTACT PERSON: Scott Mooney, THA Architecture / 733 SW Oak Street, Portland, OR 97205 / email: smooney@thaarchitecture,com PUBLIC HEARING: Public hearing is tentatively scheduled for February 11, 2014 before the Renton Hearing Examiner at 10:OOAM, in Renton Council Chambers on the 7th floor of Renton City Hall. Comments on the above application must be submitted In writing to Rocale Timmons, Senior Planner, Department of Community & Economic Development, 1055 South Grady Way, Renton, WA 98057, by 5:00 p.m. on January 16, 2014, This matter is also tentatively scheduled for a public hearing on February 11, 2014, at 10:00AM, Council Chambers, Seventh Floor, Renton City Hall, 1055 South Grady Way, Renton. If you are interested in attending the hearing, please contact the Planning Division to ensure that the hearing has not been rescheduled at (425) 430-7282. If comments cannot be submitted in writing by the date indicated above, you may still appear at the hearing and present your comments on the proposal before the Hearing Examiner. If you have questions about this proposal, or wish to be made a party of record and receive additional information by mail, please contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION DATE OF APPLICATION: December 23, 2013 NOTICE OF COMPLETE APPLICATION: January2, 2014 If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED, Planning Division, 1055 South Grady Way, Renton, WA 98057. File Name / No.: Renton Highlands Library/ LUA13-001720, SA -H, MOD, VAR, CU -H NAME: MAIMG ADDRESS: TELEPHONE NO.: City/state/Zip: City of Fenton PROPERTY OWNER(S) NAME:' 5UN5el- —u -p- U D18VEWNEAJIF�G ADDRESS: TZ -154 A,;T CITY: ,5,-\iue t W rN- ZIP: 91111 TELEPHONE NUMBER:. APPLICANT (if other than owner) NAME: &-CF � m f i -H COMPANY (if applicable): K IIJ&- e O UAi` i V �- l 5 puk`F`- 6yrc m ADDRESS: W �C vJPOAT WAY AbAl CITY: 1�6ASLVAH, ZIP: �V0 TELEPHONE NUMBER: �� Cj -36' E. CONTACT PERSON NAME:0 �`�1Q4tiJ �1 COMPANY (if appncable)-:T ADDRESS: ' l'y7� 5W OAL 5T CITY:ZIP: 9-11, 05 TELEPHONE NUMBER AND EMAIL ADDRESS: PROJECT" INFORMATION PROJECT OR DEVELOPMENT NAME: PROJECTfADDRESS(S)ILOCATION AND ZIP CODE: -2-770) S ViV�C-71,..A kje, P c�jw Yv>k qfo5; KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S)- 2,-1 7,D) 0tF2 Z-7101055 EXISTING LAND USE(S): PROPOSED LAND USE(S): EXISTING COMPREHENSIVE PLAN MAP DESIGNATION! CV PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION (if applicable) EXISTINGZDNING: �NJ I V PROPOSED ZONING (if applicable}:. S IT E AREA (I n sq ua re feet): 1606'K 6F SQUARE FOOTAGE OF PUBLIC ROMWAYS TO BE DEDICATED: SQUARE FOOTAGE OF PRIVATE ACCESS EASEMENTS - PROPOSED RESIOENTiAL DENSITY IN UNITS PER NIET ACRE (if appllcable) AIA NUMBER OF PROPOSED LOTS (f applicable) AJA- NUMBER OF NEW DWELLING UNITS (If applicable): AJ A- I1.1C>rl lUa�alFvims=l'carp]a es4��if-iic[p Handauls,AY anningtmastcrapp.dae - l - 0009 PROJECT INFORMA NUMBER OF EXISTING DWELLING UNITS (if applicable): AIA SQUARE FOOTAGE OF PROPOSED RESIDENTIAL BUILDINGS Of applicable): 1 1 +I SQUARE FOOTAGE OF EXISTING1 RESIDENTIAL BUILDINGS TO REMAIN (if applicable): � ] SQUARE FOOTAGE OF PROPOSED NON-RESIDENTIAL BUILDINGS (if applicable): MA SQUARE FOOTAGE: OF EXISTING NoN-RESIDENTIAL BUILDINGS TO REMAIN (if applicable): NET FLOOR AREA ON N014-RESIDEI%TIAL BUIt.DINGS (if ap licaE�fe); AM NUNIBI R OF EMPLOYEES TO BE EMPLOYED BY THE NEW PROJECT (if appllmble): ,�iA TION continued PPROJECTVALIUE'E LOCATED IN ANY TYPE OF MENTALLY CRITICAL AREA, PLEASE INCLUDE SQUARE FOOTAGE" (N applicable): Ej AQUIFIER PROTECTION AREA ONE L3 AQUIFIER PROTECTION AREA TWO ❑ FLOW HAZARD AREA -sq. fk. d GEdLOGiG HAZARD sq. ft. Ie, HA13FTAT CONSERVATION sq. ft. q SHORELINE STREAMS & LAKES sq. ft. ❑ WETLANDS Sq•ft. LEGAL DESCRIPTION OF PROPERTY A -UI l c N159 .(Attach Je al description on se :crate sheet.with the following infarmatl,&n included} SITUATE IN THE A W - — QUARTER OF SE=CTION L, TOWNSHIP 231J, RANGE !� f , iN THE CITY OF RENTON, KJN.G COUNTY, WASHINGTON TYPE OF APPLICATION & FEES List all land use applications being applied for, 1. ZoOo tT 2. r, (11.", .�. fir, r� 4. $ j Staff will calculate applicable. fees and postage'. AFFIDAVIT OF OWNERSHIP i, (Print tdamels) J LA -p-% Z -5€t -j _..._.� deBare under penalty of perlury urrdcr the laws of the Stale of WastiingtQn that.I am ease, check one) _ the curfentntivner of iheGrop=rly imrolved in this appl[cation af�[_ the, aulfiarized representa5ve to act G� . for a corporation (please attars proof of autiiariration) and that the, foregaing statements and answers herein anntained and the Information herewith arc In all r+rspeC.fe true and correct to the best of my knowledge and belief. I certify Shat I, know or have satisfactory evidence that 7hW 1 Pf E= I L'2 62"l sigrietl Ws instrument and a0knawedpe It to be WaJherltheir free and Voluntary a rt fol the uses end purposes mentioned in the inatNnient ( rgnatnre pwnerlRapresentatiwe} State (Signature of Ownarllleprasehlativej Notary (Nina) MyapprAntmentexphesi /' �d /(=,. H:1C is171i7atali ornts-Tenp]ateslSraf I{clp HandoutslYla;ln3nglmualCrup�:doa '27 OCd09 LEGAL DESCRIPTION OF PROPERTY A -UI l c N159 .(Attach Je al description on se :crate sheet.with the following infarmatl,&n included} SITUATE IN THE A W - — QUARTER OF SE=CTION L, TOWNSHIP 231J, RANGE !� f , iN THE CITY OF RENTON, KJN.G COUNTY, WASHINGTON TYPE OF APPLICATION & FEES List all land use applications being applied for, 1. ZoOo tT 2. r, (11.", .�. fir, r� 4. $ j Staff will calculate applicable. fees and postage'. AFFIDAVIT OF OWNERSHIP i, (Print tdamels) J LA -p-% Z -5€t -j _..._.� deBare under penalty of perlury urrdcr the laws of the Stale of WastiingtQn that.I am ease, check one) _ the curfentntivner of iheGrop=rly imrolved in this appl[cation af�[_ the, aulfiarized representa5ve to act G� . for a corporation (please attars proof of autiiariration) and that the, foregaing statements and answers herein anntained and the Information herewith arc In all r+rspeC.fe true and correct to the best of my knowledge and belief. I certify Shat I, know or have satisfactory evidence that 7hW 1 Pf E= I L'2 62"l sigrietl Ws instrument and a0knawedpe It to be WaJherltheir free and Voluntary a rt fol the uses end purposes mentioned in the inatNnient ( rgnatnre pwnerlRapresentatiwe} State (Signature of Ownarllleprasehlativej Notary (Nina) MyapprAntmentexphesi /' �d /(=,. H:1C is171i7atali ornts-Tenp]ateslSraf I{clp HandoutslYla;ln3nglmualCrup�:doa '27 OCd09 z7Lz--7/V -202 PLANNING DIVISION WAIVER OF SUBMITTAL REQUIREMENTS FOR LAND USE APPLICATIONS At �t Calculatuns j Lo. Construction Mitigation Description 2ANID4 Density Worksheet 4 .Drainage Report 2 Environmental ChCCkliSt 4 Existing Easements (Recorded Copy) 4 Floor Plans,3AN04 I ON` Grading Plan, Conceptual Habitat Data Report 4 1 N I— .Irrigation Plan 4 Er -.-diplir Landscape Plan, Conceptual '' Ape; V Legal Description 4 r Mailing Labels for Property Owners 4 Master Application Form 4 'fit- r': e Neighborhood Detail Map 4 This requirement may be waived by: 1. Property Services Section PROJECT NAME: 2. Public Works Plan Review Section 3. Building Section DATE: 4. Planning Section O'.1WEB\PWDEVSERVAForfns\PlanilitiglwaivwofSUbii7iMkeqs,xAs 42108 PLANNING DIVISION WAIVER OF SUBMITTAL REQUIREMENTS FOR LAND USE APPLICATIONS This requirement may be waived by: 1. Property Services Section PROJECT NAME: 2. Public Works Plan Review Section 3. Building Section DATE:` 4. Planning Section n-1vvR*PV0%DFV,%rRWnrrnM PlanrtindlvmWerosubni itLdrcqs xl* 02108 jR E ;3 Parking, Lot Coverage & Landscaping Analysis 4 7777... Plat Name Reservation PreapplIcation Meeting Summary 4 Rehabilitation Plan 4 Site Plan AND 4 Stream or Lake Study, Supplemental 4 K q.J H _q Street Profiles T. M T; Topography Maps Tree Cutting/Land Clearing flan Utilities Plan, Generalized wo; 4 Wetlands Mitigation Plan, Preliminary,, -A Wireless: Applicant Agreement Statement AMD 3 InVOntUrY Of FXiSft SlteS 2,1140 3 Lease Agreement, Draft 2 A14D 3 Map of Existing Site Conditions 2AND3 Map of View Area 2 AND 3 PhatosimUlatiOrS 2 AND 3 This requirement may be waived by: 1. Property Services Section PROJECT NAME: 2. Public Works Plan Review Section 3. Building Section DATE:` 4. Planning Section n-1vvR*PV0%DFV,%rRWnrrnM PlanrtindlvmWerosubni itLdrcqs xl* 02108 PREAPPLICATION MEETING FOR HIGHLANDS LIBRARY PRE 13-001435 CITY OF RENTON Department of Community & Economic Development Planning Division October 31, 2013 Contact Information: Planner: Roca le Timmons, 425.430.7219 Public Works Plan Reviewer: Jars Illian, 425.430.7219 Fire Prevention Reviewer: Corey Thomas, 425.430.7024 Building Department Reviewer: Craig Burnell, 425.430.7290 Please retain this packet throughout the course of your project as a reference. Consider giving copies of it to any engineers, architects, and contractors who work on the project. You will need to submit a copy of this packet when you apply for land use and/or environmental permits. Pre-screening: When you have the project application ready for submittal, call and schedule an appointment with the project manager to have it pre-screened before making all of the required copies. The pre -application meeting is Informal and non-binding. The comments provided on the proposal are based on the codes and policies in effect at the time of review. The applicant is cautioned that the development regulations are regularly amended and the proposal will be formally reviewed under the regulations in effect at the time of project submittal. The information contained in this summary is subject to modification and/or concurrence by official decision -makers (e.g., Hearing Examiner, Planning Director, Development Services Director, Department of Community & Economic Development Administrator, Public Works Administrator and City Council). ct or DEPARTMENT OF COMMUNITY `� 2 AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: October 29, 2013 TO: Rocale Timmons, Planner FROM: Jan illian, Plan Review PA SUBJECT: Renton Highlands Library 2723 » Sunset Lane NE Pit€13-001435 NOTE: The applicant is cautioned that information contained in this summary is preliminary and non- binding and may be subject to modification and/or concurrence by official city decision -makers. Review comments may also need to he revised based on site planning and other design changes required by City staff or made by the applicant. I have completed a preliminary review for the above -referenced proposal. The following comments are based on the pre -application submittal made to the city of Renton by the applicant. Water 1. There is an existing 12 -inch water stub in NE 10'h Street. Available maximum fire flow from this system is 2,800 gpm_ The project is located in the 565 pressure zone. The static pressure at ground elevation 338 is about 98 psi. 2. The Fre Department has calculated preliminary fire flaw for this project to be 2,250 gpm. Extension of approximately 240 lineal feet of 12 -inch waterline will be required to provide the necessary fire flow and water pressure demand to serve this site. The 12 -main will be required to be extended from the 12 - inch stub in NE 10"`Street to the far property line in Sunset Lane NE. This will provide 2,800 gpm. One hydrant shall be located within 150 feet and two additional hydrants shall be located within 300 feet of the building_ Final location of fire hydrants will be determined by the Fire department. 3. Water system development fees will be based on the size of the domestic water, irrigation meter, and fire service that will serve this proposed project. Based on the site plan provided, fee for a 2 -inch domestic meter is $20,179.00. Fee for a 6 -inch fire service is $16,418.00. it is not clear if an irrigation meter will be needed. Credit will be given for existing water meters serving the site. This is payable prior to issuance of the construction permit. 4. The development is subject to the City's Special Assessment District #41 for the Highlands Water Main Improvements project (ordinance No- 5462). The estimated assessment amount as of October 25, 2013, is $33,920.93. Maxirnurn assessment is $39,795.61. Renton Highlands Library f12gE 3 of 3 October 29. 2013 Trans ortation Street 1. All adjacent right-of-ways need to he fully improved in conformance to the current street standards as shown in the conceptual' drawings in the Sunset Area Planned Action E15. This will include dedication of additional right-of-way. Existing right-of-way width in NE 10"' Street is 60 feet, 30 feet in Sunset Lane and 87 feet in Sunset Blvd NE. Improvements are as follows: Sunset Blvd NE - The new frontage improvements are to include an 8 -foot planting strip and 12 -foot multi -use sidewalk behind the existing curb. Additional right-of-way will be required to the back of the new sidewalk. The exact dedication required cannot be accurately determined without survey information showing the location of the existing curb. Based on rough information included in the EIS, this dedication could he 12 feet or more. NE 10th Street - Frontage improvements for this street will require a pavement section cf 18 feet from the centerline, curb, gutter, and a new 12 -foot sidewalk. This will require dedication of an additional two feet of right-of-way. Curb bulb outs are also to be included at the intersections of Sunset Blvd N E and Sunset Lane NE. Sunset lane NE- Frontage improvements will require a 12 -foot sidewalk along the development side, a new curb and 18 feet of pavement. The existing right-of-way width of 31 feet In this section of Sunset Lane will accommodate this level of improvements. Based on the street improvements shown in the E15, angle parking will be allowed fronting the site, only untll such time when the north side of Sunset Lane is widened and improved by the city. 2. Decorative LED street lighting will be required along Sunset Lane and NE 10"' Street as required in RMC 4-40601. 3. Traffic impact fees for the library based on square footage of the building (not including parking garage) will be $63,270.00 based on the 2013 rate. Fees are scheduled to increase in January 2014. Impact fees for this project would increase to $1.33,637.00- Fees will increase to $204,000.00 in January 2015. Impact fees are due at time of building permit issuance. General Comments 1. Alf construction utility permits for drainage and street improvements will require separate plan submittals, All utility plans shall conform to the Renton Drafting Standards. Plans shall be prepared by a licensed Professional Engineer. 2_ When the utility plans are complete, please submit three (3) copies of the drawings, two (2) copies of the drainage report, permit application, an iterniied cost of construction estimate, and application fee at the counter on the sixth floor. - I• .'\CED`Planning�Corrent PTanning\PREAPP5113-001435.Rocalc\Plan Review Comment-, PRE13-001435-doc Highlands Library Page 2 of 6 Dftober 31, 2D13 The proposed library use would be required to obtain a Hearing Examiner Conditional Use Permit. Minimum Lot Size, Width and Depth — There are no minimum requirements for lot width or depth within the CV zone at this location. A minimum lot size requirement, of 25,000 square feet, is required. However, the minimum lot size requirement would not be applicable to the proposal. Lot Coverage —The CV zone allows a maximum lot coverage of 65% which can be increased to 75% if parking is provided within the structure. Information regarding the footprint of the proposed structure was not provided with the submittal materials, therefore staff was not able to calculate the number lot coverage of the proposal. A lot coverage analysis meeting the requirements in RMC 4-8-120D.12, shall be submitted at the time of formal land use application. Setbacks — Setbacks are the distance between the building and the property line or any private access easement. Setback requirements in the CV zone are as follows: 10 -foot minimum for the front yard setback which can be reduced to zero through the site plan review process if no blank walls are provided within the reduced setback; a 15 foot maximum front yard setback; and a 10 foot minimum side -yard along a street setback which can also be reduced to zero if no blank walls are provided within the setback. The proposal does not comply with the minimum setback requirements of the code. The applicant would be required to request a Setback Modification as part of the formal Site Plan Review. Staff would be in support of such a request due to the narrow configuration of the site and recent right-of-way dedications to construct street improvements which conform to the Cltlr+s street standards. Building Orientation — Commercial and civic uses shall provide entry features on all sides of a building facing a public right-of-way or parking lot. The subject site is bordered by public right- of-way on three sides and therefore would be required to provide entry features on the north, south, and east sides of the structure. The proposal includes a single entrance along the eastern fagade. The applicant, would be required to request an Administrative Variance in order to provide the single entrance. Staff would he in support of such a request in that the operation of the public library use prohibits more than one entrance. Building Height —The maximum building height that would be allowed in the CV zone is 50 feet. Based on the conceptual elevations provided the proposed structure would comply with the height requirements of the zone. Screening— Screening must be provided for all surface -mounted and roof top utility and mechanical equipment. The site plan application will need to include elevations and details for the proposed methods of screening. Refuse and RecGfine Areas— Refuse and recycling areas need to meet the requirements of RMC 4-4-090, "Refuse and Recyclables Standards" (enclosed). for office, educational, and Institutional developments a minimum of 2 square feet per every 1,000 square feet of building gross floor area shall be provided for recyclable deposit areas and a minimum of 4 square feet per 1,000 square feet of building gross floor area shall be provided for refuse deposit areas with a total minimum area of 100 square feet. hAcedlplanning\current planning\preapps\13-001435.rocaie113-001435 (cv highlands library)_doc Highiands Library Page 4 of f October 31, 2013 Access — Driveway widths are limited by the driveway standards, in RMC 4-40801. Pedestrian Access — A pedestrian connection shall be provided from all public entrances to the street, in order to provide direct, clear and separate pedestrian walks from sidewalks to building entries and internally from buildings to abutting properties. It appears the proposal provides adequate pedestrian connections to public spaces and streets. Building _.Desis gn Standards -- Compliance with Urban Design Regulations, District "A; is required. See the attached checklist and Renton Municipol Cade section 4-3-100. The followJng bullets are a few of the standards outlined In the regulations. 1. A primary entrance of each building shall be located on the facade facing a street, shall be prominent, visible from the street, connected by a walkway to the public sidewalk, and include human -scale elements. 2. Facades shall be articulated and vehicular entrances to nonresidential or mixed use parking structures shall be articulated by arches, lintels, masonry trim, or other- architectural therarchitectural elements and/or materials. 3. Pedestrian pathways within parking lots or parking modules shall be differentiated by material or texture from abutting paving materials. 4. Site furniture shall be provided and shall be made of durable, vandal- and weather - resistant materials that do not retain rainwater and can be reasonably maintained over an extended period of time. Amount of common space or recreation area to be provided is minirnurn fifty (50) square feet per unit. b- All building facades shall include modulation or articulation at intervals of no more than forty feet (40'). 7. Human -scaled elements such as a lighting fixture, trellis, or other landscape feature shall he provided along the facade's ground floor. 8. Lighting shall also be provided on building facades (such as sconces) and/or to illuminate other key elements of the site such as specimen trees, other significant landscaping, water features, and/or a rtwor€c. Environmental Review When a project is proposed as part of a planned action, environmental review consists of verifying that the proposal meets the requirements of the planned action ordinance. No additional determination is required as the procedural aspects of SEPA have already been completed. Land Use Permit Requirements The proposal would require Hearing Examiner Conditional Use Permit, Administrative Site Plan Review, an Administrative Variance for a single entrance, and a Parking Modification. The purpose of the Site -Plan process is the detailed arrangement of project elements so as to be compatible with the physical characteristics of a site and with the surrounding area. An addlCona€ purpose of Site Plan is to ensure quality development consistent with City goals and policies_ General review criteria includes the following: h_\ced\planninglcurrent planning\preapps\13.00143S.rocale\l3-001.435 (ry highlands library).doc Highlands Library Page 6 of 6 October 31, 2013 Expiration: Upon site plan approval, the site plan approval is valid for two years with a possible two-year extension. The short plat approval is valid for two years with a possible ane -year extension. h:\ced\planning\current planning\preapps\13-ODIA35.rocale\13-001435 (cv highlands iibrary).duc THA December 17, 2013 City of Renton Planning Division Attention: Rocale Timmons 1055 South Grady Way Renton WA, 98057 PROJECT NARRATIVE Project Name, Size, and Location of Site The Renton Highlands Library project site is bounded by N.E. Sunset Boulevard (State Highway 900) to the Southeast, by Sunset Lane to the Northwest and by N.E. 10th Street to the Northeast. The site is approximately 16,000 square feet (.37 acres) and is adjacent to the existing Sunset Terrace housing project. A one story public library with associated structured parking is proposed for the site. The building will be 14,479 square feet and will be a part of the King County Library System. There will be 47 parking spaces that will be accommodated in 15200 square feet of below grade structured parking and an accessible at grade van parking space in a pull out adjacent to the entry on NE 10'x' Street. Zoning Designation of the Site and Adjacent Properties The site is located in the Renton Highlands area in the Center Village zone (CV). The property is also subject to the Design District 'D' standards (per RMC 4-3-100). Current Use of the Site and any Existing Improvements Currently there are two residential buildings on site that are operated by the Renton Housing Authority containing a total of 8 Units. These buildings will be removed prior to the start of construction. Special Site Features There are no existing special site features or critical areas on the project site. No wetlands, water bodies, or steep slopes are present. Statement addressing soil type and drainage conditions Existing soils on site have been described by the project geotechnical engineer to include brown, rusted sand with gravel, moist loose till an top of light gray, silty sand with gravel that is fine to medium grained, moist and very dense. The existing site drainage consists of existing area drains and catch basins which convey water directly offsite into the surrounding streets and city owned conveyance systems. Proposed Use of the Property and Scope of the Proposed Development A one story public library with associated structured parking is proposed for the site. The building will be 14479 square feet and will be a part of the King County Library System. There will be 46 parking spaces that will be accommodated on one level of below grade structured parking with a single at -grade ADA Van Parking spot adjacent to the front entry. The parking will be accessed from Sunset Lane on the Northwest side of the site. Aspects of the project are being designed to accommodate the future Sunset Terrace Development to the immediate southwest of the project site. This includes a party wall, stairs, and a shared ramp that access the structured parking area. The project will also include new sidewalks and street improvements along NE 90th Street and Sunset Lane. Proposed Off-site Improvements The project proposes offsite improvements to two street frontages, including Sunset Lane NE and NE 10th Street. New curb, gutter and 12 -foot wide sidewalks are propose for both frontages, complying with the City's neighborhood plans for this area. Wide sidewalks will help promote a walkable, pedestrian oriented community. An offsite water main extension is proposed in Sunset Lane NE and NE 10th Street which will improve the available fire flow in the area. Two fire hydrants are also proposed. A new curb inlet catch basin is proposed along NE 10th Street to assist with drainage along the new curb alignment. Total Estimated Construction Cost and Estimated Fair Market Value of the Proposed Project Total estimated construction cost for the project is 6,395,000. Fair Market Value of the project is 6,395,000. Estimated Quantities and Type of Materials Involved in Proposed Fill or Excavation On site soil removal will be required to reach the bottom of excavation for the lower parking level. The approximate volume of cut is 4,800 cubic yards. Minor backfill will be necessary for portions of the site. Existing site soils will be utilized for backfill if possible, though if required imported soil will be obtained from an approved source. The approximate volume of fill is 237 cubic yards. THA Number Type and Size of Trees to be Removed There will be no existing trees on site when construction of the library commences. An earlier phase of construction involving site demolition and clearing will occur under a separate permit by a separate developer. For reference, there will be seven (7) mature trees removed as part of the early demolition and clearing. Explanation of any Land to be Dedicated to the City The property will be owned by the City of Renton and will house a public library that will be owned by the King County Library System. Any Proposed Job Shacks, Sales Trailers, and Or Model Homes The property will likely house a job trailer over the course of the construction process. As it is design -bid -build, it is difficult for this to be determined until a contractor has been selected. Any Proposed Modifications for a Project within 100'of a Wetland or Stream. No modifications needed. ":Il December 16, 2013 City of Renton Planning Division Attention: Rocale Timmons 1055 South Grady Way Renton WA, 98057 Rezone, Variance, Modification, or Conditional Use Justification Current Requirement: For a 15000 sf Library (categorized as Cultural Facility) with a parking ratio minimax of 4 spaces11000 sf, the minimax requirement is 60 spaces. Modification Request: The Renton Highlands Library project is a library built over a single level of structured parking. Due to the narrow configuration of the site and the desire to utilize all ground level surface area for Library program, the project contains 45 spaces in the structured parking and a single ADA Van accessible parking space at the Ground Level along NE 10th Street. It is our opinion that this number of spaces is adequate for a public library of this size. In addition, the garage access resides in a permanent easement and will eventually provide access to an additional 112 spaces that will be included in the construction of the neighboring development. A) Substantially implements the policy direction of the policies and objectives of the Comprehensive Plan Land Use Element and the Community Design Element and the proposed modification is the minimum adjustment necessary to implement these policies and objectives; This modification maximizes the amount of parking that can be utilized through a single level of structured parking beneath the library, using the full exent of the building footprint for community and public use. B) Will meet the objectives and safety, function, appearance, environmental protection and maintainability intended by the Code requirements, based upon sound engineering judgment; This modification with meet all of the aforementioned needs. C). Will not be injurious to other property(ies) in the vicinity; THA The ramp to the structured parking resides on a permanent access easement that will also serve additional structured parking in the neighboring development. D) Conforms to the intent and purpose of the Code; The current parking count maximizes what is available on the site without forfeiting the functional and civic requirements of the public library. E) Can be shown to be justified and required for the use and situation intended, and The parking requirements for a library of this size is not expected to exceed the number of spots that have been designed as a part of the parking structure. Fj Will not create adverse impacts to other property(ies) in the vicinity. As previously described, the entry to this structured parking will also provide future access to structured parking in the neighboring development. THA December 16, 2013 City of Renton Planning Division Attention: Rocale Timmons 1055 South Grady Way Renton WA, 98057 Rezone, Variance, Modification, or Conditional Use Justification Current Requirement: In office, educational and institutional developments, a minimum of two (2) square feet per every one thousand (1,000) square feet of building gross floor area shall be provided for recyclables deposit areas and a minimum of four (4) square feet per one thousand (1,000) square feet of building gross floor area shall be provided for refuse deposit areas. A total minimum area of one hundred (100) square feet shall be provided for recycling and refuse deposit areas. Modification Request: Due to the library's program requirements, expected usage, and the owner's past experience with libraries of this size, a recycling and refuse area of 100 sf is unusually large for a project of this type. The current 43 sf area provided is design to accommodate (4) 3'x3' refuse bins, which is more than typically needed for a library of this size. A) Substantially implements the policy direction of the policies and objectives of the Comprehensive Plan Land Use Element and the Community Design Element and the proposed modification is the minimum adjustment necessary to implement these policies and objectives, This modification lessens the visual impact of the trash enclosure by sizing it according to the project's specific needs. 8) Will meet the objectives and safety, function, appearance, environmental protection and maintainability intended by the Code requirements, based upon sound engineering judgment,- This udgment, This modification with meet all of the aforementioned needs. c. Will not be injurious to other property(ies) in the vicinity; THA This trash enclosure is located in a permanent easement on the adjacent property and will therefore decrease the amount of neighboring property needed for Library building services. d. Conforms to the intent and purpose of the Code; The trash enclosure will fully accommodate and exceed the functional waste and recycling demands of the project. e. Can be shown to be justified and required for the use and situation intended; and A larger trash enclosure would not be programmatically required and would also encroach upon the shared vehicle access and library egress that is the primary purpose of the permantent easement on the neighboring property. f. Will not create adverse impacts to other property(ies) in the vicinity. As previously described, this modification will mitigate the amount of neighboring property that will occupied by this basic building service. THA December 17, 2013 City of Renton Planning Division Attention: Rocale Timmons 1055 South Grady Way Renton WA, 98057 Rezone, Variance, Modification, or Conditional Use Justification Current Requirement: Where accessible parking spaces are required for vans, the vertical clearance shall not be less than 114 inches at the parking space and along at least one vehicle access route to such spaces from site entrances and exits. Variance Request: The Renton Highlands Library project is a library built over a single level of structured parking. The height of the parking area was determined by the maximum recommended slope for vehicular access within the narrow configuration of the site boundary, resulting in a 7'-4" clearance at the garage entry. 2 accessible parking spaces are provided at the parking level but neither conform to the van parking overhead clearance requirement of 114" clear due to the aforementioned site constraint. An additional ADA parallel parking space will be provided at ground level off of NE 1 Oth Street adjacent to the main entry to accommodate the van parking overhead clearance requirement. A) That the applicant suffers practical difficulties and unnecessary hardship and the variance is necessary because of special circumstances applicable to subject property. Due to the aforementioned site constraints of the property, including the narrow configuration of the site boundary and unique site topography van parking cannot be accommodated in the structured parking area. Instead, ADA Accessible Van parking will be provided at grade. 8) That the granting of the variance will not be materially detrimental to the public welfare or injurious to the property or improvements in the vicinity and zone in which subject property is situated. This variance will not be detrimental to the public welfare or the surrounding vicinity. THA C) That approval shall not constitute a grant of special privilege inconsistent with the limitation upon uses of other properties in the vicinity and zone in which the subject property is situated. Accessible street parking is common within the City of Renton. D) That the approval is a minimum variance that will accomplish the desired purpose. All other parking will be accommodated by the structured parking beneath the building. December 16, 2013 City of Renton Planning Division Attention: Rocale Timmons 1055 South Grady Way Renton WA, 98057 Rezone, Variance, Modification, or Conditional Use Justification Current Requirement: Commercial and civic uses shall provide entry features on all sides of a building facing a public right-of-way or parking lot. Variance Request: Due to the topography of the site, security requirements and the expected staffing levels of the Renton Highlands Library, it is not feasible to provide more than one main entry into the building. To provide high visibility and address at least 2 sides of the building that are located along the public right-of-way, the entry is located on the corner of Sunset Lane and NE 10th. It is fully glazed on each side and therefore highly visible from both streets. It also fronts a small plaza that is covered by a large canopy that extends toward Sunset Boulevard, giving the main entry a visible presence at the 3rd adjacent public right-of-way. A) That the applicant suffers practical difficulties and unnecessary hardship and the variance is necessary ,because of special circumstances applicable to subject property. The topography of the site is such that only one primary accessible entry could be realistically incorporated into the building design. B) That the granting of the variance will not be materially detrimental to the public welfare or injurious to the property or improvements in the vicinity and zone in which subject property is situated. This variance will not be detrimental to the public welfare or the surrounding vicinity. C) That approval shall not constitute a grant of special privilege inconsistent with the limitation upon uses of other properties in the vicinity and zone in which the subject property is situated. THA The significant presence of the entry is consistent with the intent of the current requirement and should not set a negative precedent for similar development. D) That the approval is a minimum variance that will accomplish the desired purpose. The entrance has a large canopy and entry plaza along NE 'I Oth that is a highly visible entry feature that can be seen from both Sunset Lane and Sunset Boulevard. THA December 16, 2013 City of Renton Planning Division Attention: Rocale Timmons 1055 South Grady Way Renton WA, 98057 Rezone, Variance, Modification, or Conditional Use Justification Current Requirement: Lot Coverage — The CV zone allows a maximum lot coverage of 65% which can be increased to 75% if parking is provided within the structure. Variance Justificiation: The footprint of the proposed Renton Highlands Library accounts for a 93% lot coverage. The remaining area is occupied by a 990sf public plaza and a 126 sf stormwater planter. As a public library offering a variety of services, the minimum program requirements are such that a smaller footprint would not adequately serve the needs of the citizens of Renton. In addition to serving the typical library function of being a repository for a diverse selection of publicly available books, the project also contains a 1000sf Community Room for meetings and presentations. There are also 3 separate individual study rooms for public use. Also, the library is being built across the street from a future public park which will provide ample open space and easily compensate for any open space lost as a result of the expanded library footprint. Where the building does step back from extent of the lot line, it provides a generous plaza at the main entry that opens out to the park and extends to the Northeast in order to be visible from all 3 arterials that surround the site. A) That the applicant suffers practical difficulties and unnecessary hardship and the variance is necessary because of special circumstances applicable to subject property. A 15000 sf program area was required in order to sufficiently serve the varied needs of the Renton Community, which requires the lot coverage to exceed the recommended 75%. B) That the granting of the variance will not be materially detrimental to the public welfare or injurious to the property or improvements in the vicinity and zone in which subject property is situated. THA This variance will not be detrimental to the public welfare or the surrounding vicinity. C) That approval shall not constitute a grant of special privilege inconsistent with the limitation upon uses of other properties in the vicinity and zone in which the subject property is situated. This library will abut a mixed use development to the southwest, which is of a similar lot coverage and of a much larger scale overall. D) That the approval is a minimum variance that will accomplish the desired purpose. While the lot coverage exceeds the recommended 75%, there will be structured parking below and the majority of the remaining footprint will be given over to a public plaza adjacent to a significant open space in the form of a public park. THA December 16, 2013 City of Renton Planning Division Attention: Rocale Timmons 1055 South Grady Way Renton WA, 98057 Construction Mitigation Description Construction for the Renton Highlands Library is slated to begin in the early summer of 2014 and conclude in the late summer of the following year. The project construction will conform to the following requirements: RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development Services Division. The Development Services Division reserves the right to rescind the approved extended haul hours at any time if complaints are received. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where no further construction work will occur within ninety (90) days. Alternative measures such as mulch, sodding, or plastic covering as specified in the current King County Surface Water Management Design Manual as adopted by the City of Renton may be proposed between the dates of November 1st and March 31st of each year. The Development Services Division's approval of this work is required prior to final inspection and approval of the permit. Commercial, multi -family, new single-family and other nonresidential construction activities shall be restricted to the hours between seven o'clock (7:00) a.m. and eight o'clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o'clock (9:00) a.m. and eight o'clock (8:00) p.m. No work shall be permitted on Sundays. Hauling and transportation routes will vary depending upon the road improvements that are being conducted along NE 10th and Sunset Lane. Design District V Checklist A: Site Design and Building Location 1: Site Design and Street Pattern NA 2: Building Location and Orientation The project is designed to address all 3 major streets that bound the property. It has large windows on either side of the large reading room that provide a civic presence and open out onto the major arterial of Sunset Boulevard to the SE and the location of a future public park across from Sunset Lane to the NW. The main entry is on the corner of NE 10th and Sunset Lane and includes a small plaza and generous overhang that create a visible and welcoming presence which can be seen from all 3 surrounding arterials. 3: Building Entries The main entry is on the corner of NE 10th and Sunset Lane and includes a small plaza and generous (10) foot overhang that create a visible and welcoming presence which can be seen from all 3 surrounding arterials. There will be an adjacent stormwater planter and low site wall along NE 10th to mitigate the change in elevation and provide smaller scale site elements to lead you to the main entry from Sunset Boulevard. 4: Transition to Surrounding Development The building massing is broken up into 3 separate articulated forms that house the entry, large reading room, and support areas. The building steps down at the east to create a more human scale at main entry, steps up to create a larger more impressive volume for the main reading room, and then steps down again at the west where it will abut a future adjacent development. b: Service Element Location and Design The trash enclosure for the building is located at the NW corner along Sunset Lane, adjacent to the structured parking entry and emergency egress stair, west of the Property Line on a permanent easement that has been granted by the neighboring property owner. It will be constructed of CMU and will eventually be incorporated into and enclosed by future development on the adjacent property. 6: Gateways The entry to the library and the facade a long NE 10th will support an essential connection between Sunset Boulevard and a future city park. This connection will include a 12' Sidewalk, landscaping, a stormwater planter, and a small plaza that is distinguished by unique paving and a generous overhang. B: Parking and Vehicular Access 1: Location of Parking All parking is located in structured parking beneath the library, with the exception of a single ADA Van Parking location at the ground level in a pull -in along NE 10th Street. 2: Design of Surface Parking: NA 3: Structured Parking Garages: The structured parking will be located below grade and will be entered on Sunset Lane through an easement located on the the adjacent property, therefore creating minimal impact on the street presence of the library. 4: Vehicular Access: The single entry to the structured parking is located on the secondary arterial Sunset Lane and will be visible from the right of way. C: Pedestrian Environment 1: Pathways Through Parking Lots: NA 2: Pedestrian Circulation: New 12' wide sidewalks on Sunset Lane and NE 10th will provide generous connections between Sunset Boulevard and the future park and future development. These connections will be elevated from the road and landscaped, with stormwater planters, small scale site walls, and a variety of pavings to express the building entry and provide variation in the pedestrian experience. The entry will be highly visible and will contain a small plaza adjacent to the future park area. Per the contract provided as a part of Item 8 (Draft Legal Documents), improvements along Sunset Boulevard will be performed by Colpitts Development at a later date. 3: Pedestrian Amenities: A large overhang protects both the main entry and service entry to the library along NE 10th Street. Bike racks are located at grade in the entry plaza under the overhang and also adjacent to the stair within the basement level. Art screens will be suspended in front of the large windows at the main reading room that open out to pedestrian sidewalks along Sunset Lane and Sunset Boulevard. A stormwater planter, small scale site wall, and a variety of pavings along NE 10th will express the building entry and provide variation in the pedestrian experience. D: Landscaping/Recreation Areas/Common Open Space 1: Landscaping The Renton Highlands Library landscape and paving layout plan defines pedestrian movement toward the main plaza and library entry while incorporating multiple vegetated layers. Paving patterns, planting beds, and site walls reinforce architectural elements and anchor the vertical intersection of building and ground plane. Aesthetic elements of interest weave through the landscape, from the triangular stormwater planter nestled against the Northeast corner of the building, to the dry creek bed meandering through the planting zones. As requested by the Dept. of Community and Economic Development, 12` sidewalks run along Sunset Lane and NE 1 oth St., which will lead pedestrians to the future park/open space. Unique street trees have been chosen to run along Sunset Lane (Nothofagus antartica — Southern Beech), while small-scale, fragrant flowering trees were chosen for the corner of NE 10th St. and Sunset Blvd. (Styrax obassia — Fragrant Snowbell). 2: Recreational Areas and Common Open Space The project is providing a 990 SF open space adjacent to the main entry on the corner of Sunset Lane and NE 10th Street across from the location of the future public park. All facades facing pedestrian streets have generous openings and will provide site lighting that will average a minimum of 4 foot-candles on the ground. E: Building Architectural Design 1: Building Character and Massing The primary facades of the building along the 3 arterials feature frequent scale and massing variation in the building form that provide interest while still maintaining a distinctly civic presence. Regular and pedestrian height window openings occur and large and small scales along the length of each side (excluding the party wall) in addition to a mix of cladding materials including terra-cotta tile, wood siding, and metal and concrete panel. The building massing is broken down into 2 16' tall bars at the entry and west property line and a larger 25' tall grand reading room at the heart of the building that visual connects Sunset Boulevard to the future park across the street from Sunset Lane. 2: Ground Level Detail A low base clad in richly colored concrete panel along Sunset Boulevard and Sunset Lane will provide a minimal plinth upon which the terra-cotta facade and curtain wall will sit. This warmly colored terra-cotta will provide a repeating but dynamic pedestrian scale pattern that will be interrupted intermittently by punch window openings. The facade itself will recess 3' at the large reading room in the center of the building and will become a expanse of curtain wall glazing that will visual connect the activity at the street to interior experience of the library. At the entry, there will be a large recess with panelized wood siding and floor to ceiling glass beneath the generous canopy that reaches out to NE 10th and Sunset Lane. Unique paving will be used for the entry plaza area and a rain garden will also be installed at the corner of Sunset Boulevard and NE 10th Street. The party wall along the west property will eventually be covered by the neighbor development and therefore will be minimally clad with and have a series of reveals to proportionally break down the scale of the wall. Lighting fixtures will be provided continuously around the perimeter of the building. 3: Building Roof Lines The large mass of the project will be expressed with a distinct and contemporary 'cornice' that will extend over the large window and wrap down the sides of the opening to the top of the lower building forms. These lower forms will each have clean and contemporary parapets that are consistent with the character of the rest of the building. 4: Building Materials The project will use a rich combination of synthetic wood siding, richly colored terra- cotta tiles, and curtain wall, with limited used of richly colored concrete panel at the base and durable zinc panel at the large roof and entry canopy. The mechanical units on the low roof to the southwest are in the center of the roof area, not visible from the adjacent sidewalk and soon to be concealed from the southwest by the future multistory neighboring development. The mechanical units on the northeast are concealed by a mechanical screen that is sized to ensure no visibility of the mechanical units from a 150' distance in each direction. F: Signage 1: Signage for the project will be wall mounted and located at the main entry and on the NE portion of the Sunset Boulevard facade. It will be backlit at the entry and of reasonable scale. G: Lighting 1: There will be generous lighting under the canopy at the building entry and also decorative street lighting surrounding the site to provide safe and even distribution. October 17, 2013 City of Renton Planning Division Attention: Laureen Nicolay 1055 South Grady Way Renton WA, 98057 Landscape Analysis, Lot Coverage, and Parking Analysis Total Square Footage of Site and Footprint of All Buildings Total square footage of the site = 16,068 sf Footprint of building = 14,479 sf Total Square Footage of Existing and Proposed Impervious Area Total square footage of existing impervious area = 9,099 sf proposed impervious areas = 15,563 sf Square Footage of Each Individual Building Total Square Footage of Library = 14,479 sf Total Square Footage of Structured Parking = 15,200 sf Percentage of Lot Covered by Buildings or Structure Percentage of lot covered by building = 96.9% sf Number of Parking Spaces Required by City Code Based on the requirement of 4 spaces per 1000 sf, City Code requires 60 spaces. Due to site constraints, only 46 spots are currently included in the project. A modification request for the parking space requirement has been submitted as a part of the Site Plan Review Submittal. Number and Dimensions of Standard, Compact, and ADA Accessible Spaces Provided Standard Parking Spaces: 22 Total, 16'x8'4" min dimension THA Compact Parking Spaces: 21 Total, 13'x7'6" min dimension ADA Parking Spaces: 3 Total, 20'x8'4" min dimension Square Footage of Parking Lot Landscaping (Perimeter and Inferior) Structured parking is located beneath the building and therefore does not include landscaping. OEOTECH CONSULTANTS, INC, Colpitts Development Company 2256 — 38th Place East Seattle, Washington 98112 Attention: Judith C. Nielsen 13256 Northeast 20th Street, Suite 16 Bellevue, Washington 98005 (425) 747-5618 FAX(425)747-8561 April 18, 2013 JN 13096 via email: coldevco@gmaii.com Subject: Transmittal Letter — Geotechnical Engineering Study Proposed Mixed -Use Development Northwest Corner of Sunset Boulevard Northeast and Harrington Avenue Northeast Renton, Washington Dear Ms. Nielsen: We are pleased to present this geotechnical engineering report for the proposed mixed-use development to be constructed in Renton, Washington. The scope of our services consisted of exploring site surface and subsurface conditions, and then developing this report to provide recommendations for general earthwork and design criteria for foundations, retaining walls, pavements, and temporary shoring. This work was authorized by your acceptance of our proposal, P-8569, dated March 18, 2013. The attached report contains a discussion of the study and our recommendations. Please contact us if there are any questions regarding this report, or for further assistance during the design and construction phases of this project. cc: Veer Architecture — Kent Smutny via email kept@veerarchitecture.com JLH/MRM: jyb Respectfully submitted, GEOTECH CONSULTANTS, INC. Jason L. Hinds Geotechnical Engineer GEOTECH CONSULTANTS, INC, GEOTECHNICAL ENGINEERING STUDY Proposed Mixed -Use Development Northwest Corner of Sunset Boulevard NE and Harrington Ave NE Renton, Washington This report presents the findings and recommendations of our geotechnical engineering study for the site of the proposed mixed-use development to be located in Renton. We were provided with preliminary plans and a topographic survey. Veer Architecture developed the plans, which are dated September 18, 2012. The site survey was created by Site Survey & Mapping and is dated April 29, 2011. Based on these plans, we understand that the existing four apartment buildings located at the site will be removed and replaced with a large mixed-use building. The southern approximate two-thirds of the new building, will include five stories of residential units over two levels of parking and commercial space, and a parking garage beneath. the finish floor elevation for lower garage level will be approximately 323.5 feet. The northern portion of the building will include a one-story library over one level of below -grade parking having a floor slab elevation of 333.5 feet. We anticipate the construction of the below -grade parking structure will require cuts of up to about 15 feet on the southern side of the project 10 feet on the northern side. These cuts will be near property lines and temporary shoring will likely be needed. If the scope of the project changes from what we have described above, we should be provided with revised plans in order to determine if modifications to the recommendations and conclusions of this report are warranted. SITE CONDITIONS SURFACE The Vicinity Map, Plate 1, illustrates the general location of the site in Renton. The irregularly- shaped property is located on the northwestern corner of the intersection of Sunset Boulevard Northeast and Harrington Avenue Northeast. The site is bordered to the north and west by Northeast 10th Street and Sunset Lane Northeast, respectively. The subject site is currently developed with four separate apartment buildings spaced evenly across the site. From south to north, these buildings are addressed 968 Harrington Avenue Northeast, then 2711, 2717 and 2723 Sunset Lane Northeast. An asphalt basketball court is located in the northeastern corner of the property. The areas surrounding the apartment buildings are mostly covered with grass lawn, concrete sidewalks, and landscaping beds. The site is relatively flat and sloped only gently down to the south. The adjacent Northeast 10th Street and Sunset Boulevard Northeast are higher than the site and appear to have been created by filling 3 to 5 feet above the original ground surface. A short steep slope exists on the northern side of the property below NE 10th Street and an approximately 4- to 5 -foot tall concrete retaining wall runs along the eastern side of the site where the sidewalk and Sunset Boulevard Northeast are higher than the subject property. There are no steep slopes on, or near, the surrounding property. The surrounding properties contain single- and multi -family or commercial developments. GEOTECH CONSULTANTS, INC. Colpitts Development Co. April 18, 2013 SUBSURFACE JN 13096 Page 2 The subsurface conditions were explored by drilling six test borings at the approximate locations shown on the Site Exploration Plan, Plate 2. Our exploration program was based on the proposed construction, anticipated subsurface conditions and those encountered during exploration, and the scope of work outlined in our proposal. The borings were drilled on March 26, 2013 using a track -mounted, hollow -stem auger drill. Samples were taken at 5 -foot intervals with a standard penetration sampler. This split -spoon sampler, which has a 2 -inch outside diameter, is driven into the soil with a 140 -pound hammer falling 30 inches. The number of blows required to advance the sampler a given distance is an indication of the soil density or consistency. A geotechnical engineer from our staff observed the drilling process, logged the test borings, and obtained representative samples of the soil encountered. The Test Boring Logs are attached as Plates 3 through 8. . Soil Conditions The test borings conducted for this study encountered similar soils beneath the existing surface of the site. Generally, 3 to 4.5 feet of loose fill was encountered beneath the existing ground surface. The uppermost few inches of Boring 6 was asphalt pavement for the northeastern parking lot. Underlying this fill was a thin layer of loose to medium -dense sand, with dense to very dense, slightly silt to silty sand with gravel that extended to a depth of approximately 15 feet. This native soil became clean (only trace to negligible silt) soil below this depth, extending to the bottom of the borings. No obstructions were revealed by our explorations. However, debris, buried utilities, and old foundation and slab elements are commonly encountered on sites that have had previous development. Groundwater Conditions No groundwater or wet soil conditions were observed in our test borings. The test borings were left open for only a short time period. Considering that the borings were drilled following the fall and winter rainy month, it Is likely that the seasonal high groundwater table lies below the maximum 26.5 -foot depth of our borings. It should be noted that groundwater levels vary seasonally with rainfall and other factors. The stratification lines on the logs represent the approximate boundaries between soil types at the exploration locations. The actual transition between soil types may be gradual, and subsurface conditions can vary between exploration locations. The logs provide specific subsurface information only at the locations tested. The relative densities and moisture descriptions indicated on the test boring logs are interpretive descriptions based on the conditions observed during drilling. GEOTECH CONSULTANTS, INC. Colpltts Development C . JN 13096 April 18, 2013 Page 3 CONCLUSIONS AND RECOMMENDATIONS GENERAL THIS SECTION CONTAINS A SUMMARY OF OUR STUDY AND FINDINGS FOR THE PURPOSES OF A GENERAL OVERVIEW ONLY. MORE SPECIFIC RECOMMENDATIONS AND CONCLUSIONS ARE CONTAINED IN THE REMAINDER OF THIS REPORT. ANY PARTY RELYING ON THIS REPORT SHOULD READ THE ENTIRE DOCUMENT. The test borings conducted for this study encountered medium -dense to dense native sand and silty sand soils beneath a thin layer of loose fill at the site. Based on the preliminary building plans, the foundation of the new building will be about 10 to 13 feet beneath the existing ground surface. The competent native soils at that excavation depth are well suited for foundation support of the new building. The new building may be constructed on a conventional foundation system bearing on the dense native sand soils. Oftentimes, footing subgrade soils can be disturbed to a depth of several inches during excavation by the teeth on a backhoe bucket. It will be necessary for any such loosened or disturbed soils to be removed prior to pouring concrete. Excavating footings with a smooth bucket can help to reduce the amount of subgrade disturbance. The excavations required to construct the below grade -parking structure will extend 10 to 15 feet below the existing grade, and there are streets and surface improvements close to the property lines that need to be considered. Based on our investigation, the site soils can safely be excavated at temporary slopes of 1:1 (Horizontal:Vertical) or flatter, but such temporary sloped cuts should generally not extend closer than 5 feet to traveled streets, existing retaining walls and footings, or other settlement -sensitive elements. As a result, based on the current plans the cuts for the parking garage cannot be made safely within property lines. It may be possible, however, to obtain temporary easements from the City to allow some of the cuts to temporarily cross property lines. If temporary excavation easements are not feasible, excavation shoring will be needed. Considering the excavation depths and encountered soil conditions, cantilevered soldier pile shoring or soil nail shoring would likely be the most economical for the project. The installation of tiebacks or soil nails would require easements to be obtained to allow them to cross property lines. Also, the presence of underground utilities on adjacent sites should be closely evaluated when considering utilizing anchors or nails. Cantilevered soldier pile shoring could be installed entirely within the subject property without the need for obtaining easements. Further recommendations for the design and construction of temporary shoring can be found in the Excavation Showing section of this report. Our explorations encountered sand and slightly silty to silty sand beneath the surface of the site, and the seasonal high water table appears to be at least 10 feet below the planned excavation. Considering their density, the cleaner sands below the base of the excavation have only a limited infiltration potential, and infiltration of stormwater is not recommended in the siltier soils above the level of the basement garages, due to the low permeability of the silty sand and to prevent causing seepage problems in the below -grade spaces. An appropriate infiltration rate for the dense, cleaner sands below the bottom of the excavation would be 0.5 inches/hour. This is lower than the recommended long-term infiltration rate given for sand in the Washington Department of Ecology's (WDOE) Stormweter Management Manual, but takes into account the dense to very dense nature of the sand. Storm detention/retention facilities and other utilities are often installed below, or near, structures. The walls of storm vaults must be designed as either cantilever or restrained retaining walls, as appropriate. Wall pressures for the expected soil conditions are presented in the Permanent Foundation and Retaining Walls section of this report. it is important that the portion of the GEOTECH CONSULTANTS, INC. Colprtts Development Co. A 13096 Aprli 18, 2013 Page 4 structure above the permanent detained water level be backfilled with free -draining soil, as recommended for retaining walls. Should drainage not be provided, the walls must be designed for hydrostatic forces acting on the outside of the structure. The backfill for all underground structures must be compacted in lifts according to the criteria of this report. Trenches for underground structures and utilities should not cross a line extending downwards from a new or existing footing at an inclination of 1:1 (H:V). We should be consulted if this excavation zone will be exceeded for installation of storm facilities or other utilities. The erosion control measures needed during the site development will depend heavily on the weather conditions that are encountered, The majority of the erosion control measures will be needed only during the initial demolition and clearing of the site. While this work is underway, a silt fence will likely be needed around the downslope sides of any cleared areas, Rocked construction access roads should be extended into the site to reduce the amount of soil or mud carried off the property by trucks and equipment. Cut slopes and soil stockpiles should be covered with plastic during wet weather. The ground surface should be graded to prevent silty water from flowing off of the site. Following the beginning of excavation, the majority of the erosion control measures will need to focus on avoiding off-site tracking of soil or mud by trucks and equipment. The drainage and/or waterproofing recommendations presented in this report are intended only to prevent active seepage from flowing through concrete walls or slabs. Even in the absence of active seepage into and beneath structures, water vapor can migrate through walls, slabs, and floors from the surrounding soil, and can even be transmitted from slabs and foundation walls due to the concrete curing process. Water vapor also results from occupant uses, such as cooking and bathing. Excessive water vapor trapped within structures can result in a variety of undesirable conditions, including, but not limited to, moisture problems with flooring systems, excessively moist air within occupied areas, and the growth of molds, fungi, and other biological organisms that may be harmful to the health of the occupants. The designer or architect must consider the potential vapor sources and likely occupant uses, and provide sufficient ventilation, either passive or mechanical, to prevent a build up of excessive water vapor within the planned structure. Geotech Consultants, Inc. should be allowed to review the final development plans to verify that the recommendations presented in this report are adequately addressed in the design. Such a plan review would be additional work beyond the current scope of work for this study, and it may include revisions to our recommendations to accommodate site, development, and geotechnical constraints that become more evident during the review process. We recommend including this report, in its entirety, in the project contract documents. This report should also be provided to any future property owners so they will be aware of our findings and recommendations. SEISMIC CONSIDERATIONS In accordance with the International Building Code (IBC), the site soil profile within 100 feet of the ground surface is best represented by Site Class Type D (Stiff Site Class). As noted in the USGS website, the mapped spectral acceleration value for a 0.2 second (SS) and 1.0 second period (Sl) equals 1.438 and 0.49g, respectively. The site soils that will support the building are not susceptible to seismic liquefaction because of their dense nature and the absence of near -surface groundwater. GEOTECH CONSULTANTS, INC. Colpitts Development C April 18, 2013 CONVENTIONAL FOUNDATIONS JN 13096 Page 5 The proposed structure can be supported on conventional continuous and spread footings bearing on undisturbed, dense or very dense native sand, or on compacted structural fill placed above this native soil. We recommend that continuous and individual spread footings have minimum widths of 16 and 24 inches, respectively, Exterior footings should also be bottomed at least 18 inches below the lowest adjacent finish ground surface for protection against frost and erosion. The local building codes should be reviewed to determine if different footing widths or embedment depths are required. Footing subgrades must be cleaned of loose or disturbed soil prior to pouring concrete. Depending upon site and equipment constraints, this may require removing the disturbed soil by hand. The following allowable bearing pressures are appropriate for footings constructed according to the above recommendations: Where: (1) psf Is pounds per square foot. A one-third increase in this these design bearing pressures may be used when considering short- term wind or seismic loads. For the above design criteria, it is anticipated that the total post - construction settlement of footings founded on competent native soil, or on structural fill up to 5 feet in thickness, will be less than one inch, with differential settlements on the order of one -half-inch in a distance of 50 feet along a continuous footing with a uniform load. Lateral loads due to wind or seismic forces may be resisted by friction between the foundation and the bearing soil, or by passive earth pressure acting on the vertical, embedded portions of the foundation. For the latter condition, the foundation must be either poured directly against relatively level, undisturbed soil or be surrounded by level, well -compacted fill. We recommend using the following ultimate values for the foundation's resistance to lateral loading: Coefficient of Friction 0,45 Passive Earth Pressure 350 pcf Where: (1) pcf is pounds per cubic foot, and (il) passive earth pressure Is computed using the equivalent fluid density. We recommend maintaining a safety factor of at least 1.5 for the foundation's resistance to lateral loading, when using the above ultimate values. GE07ECH CONSULTANTS, INC. Placed directly on competent, native soil beneath 7 feet below 6,000 psf existing grades Supported on structural fill placed above competent, native 2,500 psf soil Where: (1) psf Is pounds per square foot. A one-third increase in this these design bearing pressures may be used when considering short- term wind or seismic loads. For the above design criteria, it is anticipated that the total post - construction settlement of footings founded on competent native soil, or on structural fill up to 5 feet in thickness, will be less than one inch, with differential settlements on the order of one -half-inch in a distance of 50 feet along a continuous footing with a uniform load. Lateral loads due to wind or seismic forces may be resisted by friction between the foundation and the bearing soil, or by passive earth pressure acting on the vertical, embedded portions of the foundation. For the latter condition, the foundation must be either poured directly against relatively level, undisturbed soil or be surrounded by level, well -compacted fill. We recommend using the following ultimate values for the foundation's resistance to lateral loading: Coefficient of Friction 0,45 Passive Earth Pressure 350 pcf Where: (1) pcf is pounds per cubic foot, and (il) passive earth pressure Is computed using the equivalent fluid density. We recommend maintaining a safety factor of at least 1.5 for the foundation's resistance to lateral loading, when using the above ultimate values. GE07ECH CONSULTANTS, INC. Colpltts Development Co, April 18, 2013 PERMANENT FOUNDATION AND RETAINING WALLS JN 13096 Page 6 Retaining walls backfilled on only one side should be designed to resist the lateral earth pressures imposed by the soil they retain. The following recommended parameters are for walls that restrain level backfill: = EAMIMMM Active Earth Pressure * 35 pcf Passive Earth Pressure 350 pcf Coefficient of Friction 0.45 Soil Unit Weight 125 pcf Where: (i) pcf Is pounds per cubic foot, and (ii) active and passive earth pressures are computed using the equivalent fluid pressures. * For a restrained wall that cannot deflect at least 0.002 times Its height, a uniform lateral pressure equal to 10 psf times the helght of the wall should be added to the above active equivalent fluid pressure. The values given above are to be used to design only permanent foundation and retaining walls that are to be backfilled, such as conventional walls constructed of reinforced concrete or masonry. It is not appropriate to use the above earth pressures and soil unit weight to back -calculate soil strength parameters for design of other types of retaining walls, such as soldier pile, reinforced earth, modular or soil nail walls. We can assist with design of these types of walls, if desired. The values for friction and passive resistance are ultimate values and do not include a safety factor. We recommend a safety factor of at least 1.5 for overturning and sliding, when using the above values to design the walls. Restrained wall soil parameters should be utilized for a distance of 1.5 times the wall height from corners or bends in the walls. This is intended to reduce the amount of cracking that can occur where a wall is restrained by a corner. The design values given above do not include the effects of any hydrostatic pressures behind the walls and assume that no surcharges, such as those caused by slopes, vehicles, or adjacent foundations will be exerted on the walls. If these conditions exist, those pressures should be added to the above lateral soil pressures. Where sloping backfill is desired behind the walls, we will need to be given the wall dimensions and the slope of the backfill in order to provide the appropriate design earth pressures. The surcharge due to traffic loads behind a wall can typically be accounted for by adding a uniform pressure equal to 2 feet multiplied by the above active fluid density. Heavy construction equipment should not be operated behind retaining and foundation walls within a distance equal to the height of a wall, unless the walls are designed for the additional lateral pressures resulting from the equipment. Wall Pressures Due to Seismic Forces The surcharge wall loads that could be imposed by the design earthquake can be modeled by adding a uniform lateral pressure to the above -recommended active pressure. The recommended surcharge pressure is 8H pounds per square foot (psf), where H is the design retention height of the wall. Using this increased pressure, the safety factor against sliding and overturning can be reduced to 1.2 for the seismic analysis. GEOTErCH CONSULTANTS, INC. Colpitts Development C JN 13096 April 18, 2013 Page 7 Retaining Wall Backfill and Waterproofing Backfill placed behind retaining or foundation walls should be coarse, free -draining structural fill containing no organics. This backfill should contain no more than 5 percent silt or clay particles and have no gravel greater than 4 inches in diameter. The percentage of particles passing the No. 4 sieve should be between 25 and 70 percent. If free -draining soils are not used as backfill, a minimum 12 -inch width of free -draining gravel should be placed against the backfilled retaining walls. The gravel "chimney" should be hydraulically connected to the foundation drain system. Free -draining backfill or gravel should be used for the entire width of the backfill where seepage is encountered. For increased protection, drainage composites should be placed along cut slope faces, and the walls should be backfilled entirely with free -draining soil. The purpose of these backfill requirements is to ensure that the design criteria for a retaining wall are not exceeded because of a build-up of hydrostatic pressure behind the wall. The top 12 to 18 inches of the backfill should consist of a compacted, relatively impermeable soil or topsoil, or the surface should be paved. The ground surface must also slope away from backfilled walls to reduce the potential for surface water to percolate into the backfill. The subgrade soils for pervious surfaces, such as pavers or permeable pavements must also slope away from walls It is critical that the wall backfill be placed in lifts and be properly compacted, in order for the above -recommended design earth pressures to be appropriate. The wall design criteria assume that the backfill will be well -compacted in lifts no thicker than 12 inches. The compaction of backfill near the walls should be accomplished with hand -operated equipment to prevent the walls from being overloaded by the higher soil forces that occur during compaction. The section entitled General Earthwork and Structural Fill contains additional recommendations regarding the placement and compaction of structural fill behind retaining and foundation walls. The above recommendations are not intended to waterproof below -grade walls, or to prevent the formation of mold, mildew or fungi in interior spaces. Over time, the performance of subsurface drainage systems can degrade, subsurface groundwater flow patterns can change, and utilities can break or develop leaks. Therefore, waterproofing should be provided where future seepage through the walls is not acceptable. This typically includes limiting cold -joints and wall penetrations, and using bentonite panels or membranes on the outside of the walls. There are a variety of different waterproofing materials and systems, which should be installed by an experienced contractor familiar with the anticipated construction and subsurface conditions. Applying a thin coat of asphalt emulsion to the outside face of a wall is not considered waterproofing, and will only help to reduce moisture generated from water vapor or capillary action from seeping through the concrete. As with any project, adequate ventilation of basement and crawl space areas is important to prevent a build up of water vapor that is commonly transmitted through concrete walls from the surrounding soil, even when seepage is not present. This is appropriate even when waterproofing is applied to the outside of foundation and retaining walls. We recommend that you contact a specialty consultant if detailed recommendations or specifications related to waterproofing design, or minimizing the potential for infestations of mold and mildew are desired. GEOTECH CONSULTANTS, INC. Colpitts Development Co. JN 13096 April 18, 2013 Page 8 SLABS -ON -GRADE The lowest parking garage floors can be constructed as slabs -on -grade atop firm native soils, or on structural fill. The subgrade soil must be in a firm, non -yielding condition at the time of slab construction or underslab fill placement. Any soft areas encountered should be excavated and replaced with select, imported structural fill. Even where the exposed soils appear dry, water vapor will tend to naturally migrate upward through the soil to the new constructed space above it. This can affect moisture -sensitive flooring, cause imperfections or damage to the slab, or simply allow excessive water vapor into the space above the slab. All interior slabs -on -grade should be underlain by a capillary break or drainage layer consisting of a minimum 4 -inch thickness of gravel or crushed rock that has a fines content (percent passing the No. 200 sieve) of less than 3 percent and a sand content (percent passing the No. 4 sieve) of no more than 10 percent. As noted by the American Concrete Institute (ACI) in the Guides for Concrete Floor and Slab Structures, proper moisture protection is desirable immediately below any on -grade slab that will be covered by tile, wood, carpet, impermeable floor coverings, or any moisture -sensitive equipment or products. ACI also notes that vapor retarders, such as 6 -mil plastic sheeting, have been used in the past, but are now recommending a minimum 10-mll thickness. A vapor retarder is defined as a material with a permeance of less than 0.3 perms, as determined by ASTM E 96. It is possible that concrete admixtures may meet this specification, although the manufacturers of the admixtures should be consulted. Where vapor retarders are used under slabs, their edges should overlap by at least 6 inches and be sealed with adhesive tape. The sheeting should extend to the foundation walls for maximum vapor protection. If no potential for vapor passage through the slab is desired, a vapor barrier should be used. A vapor barrier, as defined by ACI, is a product with a water transmission rate of 0.01 perms when tested In accordance with ASTM E 96. Reinforced membranes having sealed overlaps can meet this requirement. EXCA VA TIONS AND SLOPES Excavation slopes should not exceed the limits specified in local, state, and national government safety regulations. Temporary cuts to a depth of about 4 feet may be attempted vertically in unsaturated soil, if there are no indications of slope instability. However, vertical cuts should not be made near property boundaries, or existing utilities and structures. Based upon Washington Administrative Code (WAC) 296, Part N, the soil at the subject site would generally be classified as Type B. Therefore, temporary cut slopes greater than 4 feet in height should not be excavated at an inclination steeper than 1;1 (Horizontal:Vertical), extending continuously between the top and the bottom of a cut. Other considerations for temporary cuts are presented in the General section. The above -recommended temporary slope inclination is based on the conditions exposed in our explorations, and on what has been successful at other sites with similar soil conditions. it is possible that variations in soil and groundwater conditions will require modifications to the inclination at which temporary slopes can stand. Temporary cuts are those that will remain unsupported for a relatively short duration to allow for the construction of foundations, retaining walls, or utilities. Temporary cut slopes should be protected with plastic sheeting during wet weather. It is also important that surface water be directed away from temporary slope cuts. The cut slopes should also be backfilled or retained as soon as possible to reduce the potential for instability. Please note that sand or loose soil can cave suddenly and without warning. Excavation, GEOTECH CONSULTANTS, INC. Colpitts Development C . JN 13096 April 18, 2013 Page 9 foundation, and utility contractors should be made especially aware of this potential danger. These recommendations may need to be modified if the area near the potential cuts has been disturbed in the past by utility installation, or if settlement -sensitive utilities are located nearby. All permanent cuts into native soil should be inclined no steeper than 2:1 (H:V). Water should not be allowed to flow uncontrolled over the top of any temporary or permanent slope. All permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve the stability of the surficial layer of soil. TEMPORARY SHORING A variety of shoring systems are feasible for use at this site. This section presents design considerations for cantilevered soldier pile walls and for nailed walls. Since the most suitable choice Is primarily dependent on a number of factors under the contractor's control, we suggest that the contractor work closely with the structural engineer during the shoring design. As discussed above, the sensitivity of adjacent utilities must be considered in the design to reduce the risk of causing settlement of these adjacent elements. Regardless of the system used, all shoring systems will deflect in toward the excavation. Therefore, there is always a risk of noticeable settlement occurring on the ground behind the shoring wall. These risks are reduced, but not entirely eliminated, by using more rigid shoring systems, such as soldier piles. Cantilevered Soldier Piles Soldier pile walls would be constructed after making planned cut slopes, and prior to commencing the mass excavation, by setting steel H -beams in a drilled hole and grouting the space between the beam and the soil with concrete for the entire height of the drilled hole. Groundwater seepage was not encountered in our borings, which extended to a depth of at least 10 feet below the planned excavation. Even so, due to the loose condition of the uppermost soils, the contractor should be prepared to case the holes or use the slurry method if caving soil is encountered, Excessive ground loss in the drilled holes must be avoided to reduce the potential for settlement on adjacent properties. If water is present in a hole at the time the soldier pile is poured, concrete must be tremied to the bottom of the hole. As excavation proceeds downward, the space between the piles should be lagged with timber, and any voids behind the timbers should be filled with pea gravel, or a slurry comprised of sand and fly ash. Treated lagging is usually required for permanent walls, while untreated lagging can often be utilized for temporary shoring walls. Temporary vertical cuts will be necessary between the soldier piles for the lagging placement. The prompt and careful installation of lagging is important, particularly in loose or caving soil, to maintain the integrity of the excavation and provide safer working conditions. Additionally, care must be taken by the excavator to remove no more soil between the soldier piles than is necessary to install the lagging. Caving or overexcavation during lagging placement could result in loss of ground on neighboring properties. Timber lagging -should be designed for an applied lateral pressure of 30 percent of the design wall pressure, if the pile spacing is less than three pile diameters. For larger pile spacings, the lagging should be designed for 50 percent of the design load. GEoTECH CONSULTANTS, INC. Colpitts Development Co. April 18, 2013 JN 13096 Page 10 If permanent building walls are to be constructed against the shoring walls, drainage should be provided by attaching a geotextile drainage composite with a solid plastic backing, similar to Miradrain 6000, to the entire face of the lagging, prior to placing waterproofing and pouring the foundation wall. These drainage composites should be hydraulically connected to the foundation drainage system through weep holes placed in the foundation walls. Soldier Pile Wall Design Temporary soldier pile shoring that is cantilevered and that has a level backslope, should be designed for an active soil pressure equal to that pressure exerted by an equivalent fluid with a unit weight of 35 pounds per cubic foot (pcf). Traffic surcharges can typically be accounted for by increasing the effective height of the shoring wall by 2 feet. Slopes above the shoring walls will exert additional surcharge pressures. These surcharge pressures will vary, depending on the configuration of the cut slope and shoring wall. We can provide recommendations regarding slope surcharge pressures when the preliminary shoring design is completed. It is important that the shoring design provides sufficient working room to drill and install the soldier piles, without needing to make unsafe, excessively steep temporary cuts. Cut slopes should be planned to intersect the backside of the drilled holes, not the back of the lagging. Lateral movement of the soldier piles below the excavation level will be resisted by an ultimate passive soil pressure equal to that pressure exerted by a fluid with a density of 450 pcf. No safety factor is included in the given value. We recommend using a safety factor of 1.2 for temporary conditions or 1.5 for permanent conditions. This soil pressure is valid only for a level excavation in front of the soldier pile; it acts on two times the grouted pile diameter. Cut slopes made in front of shoring walls significantly decrease the passive resistance. This includes temporary cuts necessary to install internal braces or rakers. The minimum embedment below the floor of the excavation for cantilever soldier piles should be equal to the height of the "stick-up." Plate 10 attached to this report illustrates basic soldier pile design details. Soil Nallin� Soil nailing is a shoring system where closely spaced, tieback anchors (nails) are grouted into drilled holes in the cut face as the excavation proceeds, thereby reinforcing the cut face. More anchors are required for this system than for conventional systems, but steel soldier piles and timber lagging are eliminated. The anchored or nailed system essentially operates as a reinforced soil wall or a gravity wall, with the nails tying the soil mass together. We recommend that an allowable adhesion value of 1,250 pounds per square foot (psf) be used for the design of the soil nails. The process begins by making a 4- to 5 -foot vertical cut in the shoring area followed immediately by the placement of anchors. The cut face is then covered with a wire mesh, and shotcrete is placed over the mesh and soil face. Generally, no temporary, unsupported excavations for soil -nail walls should be allowed to stand longer than 12 hours without the acceptance of the geotechnical engineer. Once the shotcrete has hardened, the excavation again proceeds and the nails are placed. A geotextile drainage composite must be placed GEOTECH CONSULTANTS, INC. Colpitts Development C April 18, 2013 JN 13096 Page 11 over the face of the cut prior to shotcreting to prevent buildup of hydrostatic pressures behind the shotcrete facing. As the excavation progresses downward, the drainage composite strips are extended, until reaching the base of the excavation, where weep holes are placed through the shotcrete to be tied into an underslab footing drain. Because soil nails are passive elements (they are not pre -stressed as tiebacks are), soil -nail walls will typically deflect more than a soldier -pile wall. This involves more risk of causing damage to adjoining utilities, streets, and other on -grade elements. The shoring designer should provide an estimate of the lateral deflection that is anticipated for the soil nail wall. Caving of loose or granular soils, or in zones of seepage, can require that the shoring contractor modify their installation techniques. This can increase the cost and time necessary to install the nailed wall. We recommend that the shoring contractor be consulted regarding potential difficulties and modifications that can occur during the construction of a soil -nailed wall. This adhesion value should be substantiated by load -testing at least two anchors in each soil type to at least 200 percent of their design capacity, prior to installing production anchors. During shoring construction, at least 5 percent of the production anchors should be proof -tested to 130 percent of the design anchor capacity. The shoring designer will likely utilize one of several commercially available computer programs to design the nailed walls. We recommend that the following soil strength parameters be used in the nail wall design: Consideration of the loose condition of the near -surface soils and the presence of utilities must be considered in the design and construction of the system. Surcharges from adjacent existing structures and roads must be included in the design. Excavation and Shorin_a Monitorinrx As with any shoring system, there is a potential risk of greater -than -anticipated movement of the shoring and the ground outside of the excavation. This can translate into noticeable damage of surrounding on -grade elements, such as foundations and slabs. Therefore, we recommend making an extensive photographic and visual survey of the project vicinity, prior to demolition activities, Installing shoring or commencing excavation, This documents the condition of buildings, pavements, and utilities in the immediate vicinity of the site in order to avoid, and protect the owner from, unsubstantiated damage claims by surrounding property owners. Additionally, the shoring walls should be monitored during construction to detect soil movements. To monitor their performance, we recommend establishing a series of survey reference points to measure any horizontal deflections of the shoring system. Control points should be established at a distance well away from the walls and slopes, and deflections from GEOTECH CONSULTANTS, INC. Colpitts Development Co. April 18, 2013 J N 13096 Page 12 the reference points should be measured throughout construction by survey methods. At least 10 percent of soldier piles should be monitored by taking readings at the top of the pile. Additionally, benchmarks installed on the surrounding buildings should be monitored for at least vertical movement. We suggest taking the readings at least once a week, until it is established that no deflections are occurring. The initial readings for this monitoring should be taken before starting any demolition or excavation on the site. DRAINAGE CONSIDERATIONS We anticipate that permanent foundation walls may be constructed against the shoring walls. Where this occurs, a plastic -backed drainage composite, such as Miradrain, Battledrain, or similar, should be placed against the entire surface of the shoring prior to pouring the foundation wall. Weep pipes located no more than 6 feet on -center should be connected to the drainage composite and poured into the foundation walls or the perimeter footing. A footing drain installed along the inside of the perimeter footing will be used to collect and carry the water discharged by the weep pipes to the storm system. Isolated zones of moisture or seepage can still reach the permanent wall where groundwater finds leaks or joints in the drainage composite. This is often an acceptable risk in unoccupied below -grade spaces, such as parking garages. However, formal waterproofing is typically necessary in areas where wet conditions at the face of the permanent wall will not be tolerable. If this is a concern, the permanent drainage and waterproofing system should be designed by a specialty consultant familiar with the expected subsurface conditions and proposed construction. Footing drains placed inside the building or behind backfilled walls should consist of 4 -inch, perforated PVC pipe surrounded by at least 6 inches of 1 -inch -minus, washed rock wrapped in a non -woven, geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar material). At its highest point, a perforated pipe invert should be at least 6 inches below the level of a crawl space or the bottom of a floor slab, and it should be sloped slightly for drainage. Plate 9 presents typical considerations for footing drains to be installed for both backfilled retaining walls and walls built against shoring. All roof and surface water drains must be kept separate from the foundation drain system. If the structure includes an elevator, it may be necessary to provide special drainage or waterproofing measures for the elevator pit. If no seepage into the elevator pit is acceptable, it will be necessary to provide a footing drain and free -draining wall backfill, and the walls should be waterproofed. If the footing drain will be too low to connect to the storm drainage system, then it will likely be necessary to install a pumped sump to discharge the collected water. Alternatively, the elevator pit could be designed to be entirely waterproof; this would include designing the pit structure to resist hydrostatic uplift pressures. As a minimum, a vapor retarder, as defined in the Slabs -On -Grade section, should be provided in any crawl space area to limit the transmission of water vapor from the underlying soils. Also, an outlet drain is recommended for all crawl spaces to prevent a build up of any water that may bypass the footing drains. No groundwater was observed during our field work. If seepage is encountered in an excavation, it should be drained from the site by directing it through drainage ditches, perforated pipe, or French drains, or by pumping it from sumps interconnected by shallow connector trenches at the bottom of the excavation. GEOTECH CONSULTANTS, INC. Colpitts Development C JN 13096 April 18, 2013 Page 13 The excavation and site should be graded so that surface water is directed off the site and away from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. Final site grading in areas adjacent to buildings should slope away at least 2 percent, except where the area is paved. Surface drains should be provided where necessary to prevent ponding of water behind foundation or retaining walls. The subgrade soils beneath pervious surfaces must also slope away from foundations and walls. GENERAL EARTHWORK AND STRUCTURAL, FILL All building and pavement areas should be stripped of surface vegetation, topsoil, organic soil, and other deleterious material. It is important that existing foundations be removed before site development. The stripped or removed materials should not be mixed with any materials to be used as structural fill, but they could be used in non-structural areas, such as landscape beds. Structural fill is defined as any fill, including utility backfill, placed under, or close to, a building, behind permanent retaining or foundation walls, or in other areas where the underlying soil needs to support loads. All structural fill should be placed in horizontal lifts with a moisture content at, or near, the optimum moisture content. The optimum moisture content is that moisture content that results in the greatest compacted dry density. The moisture content of fill is very important and must be closely controlled during the filling and compaction process. The allowable thickness of the fill lift will depend on the material type selected, the compaction equipment used, and the number of passes made to compact the lift. The loose lift thickness should not exceed 12 inches. We recommend testing the fill as it is placed. If the fill is not sufficiently compacted, it can be recompacted before another lift is placed. This eliminates the need to remove the fill to achieve the required compaction. The following table presents recommended relative compactions for structural fill: Beneath footings, slabs 95% or walkways Filled slopes and behind 90% retaining walls 95% for upper 12 inches of Beneath pavements subgrade; 90% below that level Where: Minimum Relative Compaction is the ratio, expressed In percentages, of the compacted dry density to the maximum dry density, as determined in accordance with ASTM Test Designation D 1557-91 (Modified Proctor). Structural fill that will be placed in wet weather should consist of a coarse, granular soil with a silt or clay content of no more than 5 percent. The percentage of particles passing the No. 200 sieve should be measured from that portion of soil passing the three -quarter -inch sieve. GEOTECH CONSULTANTS, INC. Colprtts Development Co. April 18, 2013 LIMITATIONS JN 13096 Page 14 The conclusions and recommendations contained in this report are based on site conditions as they existed at the time of our exploration and assume that the soil and groundwater conditions encountered in the test borings are representative of subsurface conditions on the site. If the subsurface conditions encountered during construction are significantly different from those observed in our explorations, we should be advised at once so that we can review these conditions and reconsider our recommendations where necessary. Unanticipated conditions are commonly encountered on construction sites and cannot be fully anticipated by merely taking samples in test borings. Subsurface conditions can also vary between exploration locations. Such unexpected conditions frequently require making additional expenditures to attain a properly constructed project. It is recommended that the owner consider providing a contingency fund to accommodate such potential extra costs and risks. This is a standard recommendation for all projects. This report has been prepared for the exclusive use of Colpitts Development, and its representatives, for specific application to this project and site. Our conclusions and recommendations are professional opinions derived in accordance with current standards of practice within the scope of our services and within budget and time constraints. No warranty is expressed or implied. The scope of our services does not include services related to construction safety precautions, and our recommendations are not intended to direct the contractor's methods, techniques, sequences, or procedures, except as specifically described in our report for consideration in design. Our services also do not include assessing or minimizing the potential for biological hazards, such as mold, bacteria, mildew and fungi in either the existing or proposed site development. ADDITIONAL SERVICES In addition to reviewing the final plans, Geotech Consultants, Inc. should be retained to provide geotechnical consultation, testing, and observation services during construction. This is to confirm that subsurface conditions are consistent with those indicated by our exploration, to evaluate whether earthwork and foundation construction activities comply with the general intent of the recommendations presented in this report, and to provide suggestions for design changes in the event subsurface conditions differ from those anticipated prior to the start of construction. However, our work would not include the supervision or direction of the actual work of the contractor and its employees or agents. Also, job and site safety, and dimensional measurements, will be the responsibility of the contractor. During the construction phase, we will provide geotechnical observation and testing services when requested by you or your representatives, Please be aware that we can only document site work we actually observe. It is still the responsibility of your contractor or on-site construction team to verify that our recommendations are being followed, whether we are present at the site or not. GEOTECH CONSULTANTS, INC. Colpltts Development C JN 13096 April 18, 2013 Page 15 The following plates are attached to complete this report: Plate 1 Vicinity Map Plate 2 Site Exploration Plan Plates 3 - 8 Test Boring Logs Plate 9 Typical Footing Drain Details Plate 10 Soldier Pile Shoring Detail ° We appreciate the opportunity to be of service on this project. If you have any questions, or if we may be of further service, please do not hesitate to contact us. JLHIMRM: jyb Respectfully submitted, GEOTECH CONSULTANTS, INC. �e Jason L. Hinds Geotechnical Engineer Marc R. McGinnis,. Principal GEOTECH CONSULTANTS, INC. GEOTECH CONSULTANTS, INC. (Source: Microsoft Streets and Trips, 2004) VICINITY MAP NWC of Sunset Blvd NE and Harrington Ave NE Renton, Washington Job No: Date: Plate: 13096 April 2012 1 1 1 ' Al 0 wo APPROXIMATE" , BORING LOCATION ' = (Source. ToAog+'aFhic Survey, Site Survey and Mapping, Inc, 2071) SITE EXPLORATION PLAN G EOTECH NWC of Sunset Blvd NE and Harrington Ave NE CONSULTANTS, INC. Renton, Washington Job No: Date: Plate: 13096 April 2012 1 No Scale 2 10 95 20 25 30 �" e ��yet 5 no,,- �e e��r o`�� P- "\off eiF -Z ���� BORING 1 Description GEOTECH CONSULTANTS, INC. TEST BORING LOG NWC of Sunset Blvd NE and Harrington Ave NE Renton, Washington Joh Date: Logged by: Plate: 13096 April 2013 1 JLH I 3 Brown sand with gravel, moist, loose (FILL) FILL SP Light brown to orange -brown, rusted SAND with gravel, fine to medium 4 q i:, grained moist, loose Light gray, slightly silty to silty SAND with gravel, fine to medium grained, moist, medium dense -becomes dense 50 2 SP SM 39 3slightly more silt Brown sand with trace gravels, fine to medium grained, moist, dense 28 4 SP .". 55 5 -becomes very dense * Test boring was terminated on March 26, 2093 at 26.5 feet. * No groundwater was encountered during drilling. * Blow counts corrected to account for auto -hammer efficiency. GEOTECH CONSULTANTS, INC. TEST BORING LOG NWC of Sunset Blvd NE and Harrington Ave NE Renton, Washington Joh Date: Logged by: Plate: 13096 April 2013 1 JLH I 3 5 10 15 20 25 .30 BORING 2 Description Blow counts corrected to account Tor auto-nammer efficiency. GEOTECH CONSULTANTS, iNC. TEST BORING LOG NWC of Sunset Blvd NE and Harrington Ave NE Renton, Washington Job Date. Logged by. plate: 13096 April 2013 1 JLH 1 4 Brown sand with gravel, fine to medium grained, moist, loose (FILL) FILL 24 SP Light brown, rusted SAND with gravel, fine to medium grained, moist, medium dense I� Light gray, dense, slightly silty to silty SAND with gravel, fine to medium grained, moist, dense 40 2 SP ,I SM 72 3 -increasing gravels, over; Brown SAND, tine to medium grained, moist, very dense 72 4' , .SIP ; 69 5 * 'fest boring was terminated on March 26, 2013 at 26.6 feet. * No groundwater was encountered during drilling. Blow counts corrected to account Tor auto-nammer efficiency. GEOTECH CONSULTANTS, iNC. TEST BORING LOG NWC of Sunset Blvd NE and Harrington Ave NE Renton, Washington Job Date. Logged by. plate: 13096 April 2013 1 JLH 1 4 10 15 20 25 30 BORING 3 Description GEOTECH CONSULTANTS, INC. TEST BORING LOG NWC of Sunset Blvd NE and Harrington Ave NE Renton, Washington Job Date: Logged by. plate; 13096 Light brown SAND with gravel, very moist, loose (FILL) 1 JLH I :5:1 FILL Brown SAND with gravel, tine to medium grained, moist, medium dense 37 1 _.. Light gray, slightly silty to silty SAND with gravel, fine to medium grained, moist, dense 44 2 SP . SM 68 3 -large gravels encountered in drilling Light brown to light gray, slightly silty SAND, fine to medium grained, moist, very dense 69 4 i 5P' 68 5 * Test boring was terminated on March 26, 2013 at 26.5 feet. * No groundwater was encountered during drilling. * Blow counts corrected to account for auto -hammer efficiencv. GEOTECH CONSULTANTS, INC. TEST BORING LOG NWC of Sunset Blvd NE and Harrington Ave NE Renton, Washington Job Date: Logged by. plate; 13096 1 April 2013 1 JLH I :5:1 MI 15 20 25 30 5ctt°o��`Qo �G5 BORING 4 Description GEOTECH CONSULTAN'T'S, INC, TEST BORING LOG NWC of Sunset Blvd NE and Harrington Ave NE Renton, Washington JobDate: Logged by: plate: 13096 April 2013 JLH I 6 FILL Brown, rusted sand with gravel, moist, loose (FILL) 22 1 1 SP Light brown with some rusting, SAND with gravel, fine to medium grained moist, medium dense Light gray, slightly silty to silty SAND with gravel, fine to medium grained, moist, dense 56* Z *blows overstated due to driving on rock 's SP SM ' _becomes very dense 1211 3 11" 57 4 Light gray SAND, fine to medium grained, moist, very dense S :. 44 5 * Test boring was terminated on March 26, 2013 at 26.5 feet. * No groundwater was encountered during drilling. * Rlnw d-minfe rnrrarfarl fn arrnimf fnr mifn,.hammar affir_ianr_v GEOTECH CONSULTAN'T'S, INC, TEST BORING LOG NWC of Sunset Blvd NE and Harrington Ave NE Renton, Washington JobDate: Logged by: plate: 13096 April 2013 JLH I 6 10 15 20 25 30 X. z' �o�etaoe��`e C05 BORING 5 Description GEOTECH CONSULTANTS, INC. TEST BORING LOG NWC of Sunset Blvd NE and Harrington Ave NE Renton, Washington Job Date: Logged by. Plate: 13096 April 2013 1 JLH I 7 FILL Brown, rusted sand with gravel, moist, loose (FILL) SP Light brown with some rusting, SAND with gravel, fine to medium grained moist, medium dense 53 1 _ Light gray, slightly silty to silty SAND with gravel, fine to medium grained, moist, very dense 60 2 -Very dense, increasing gravels SP SM 64 3 Light gray SAND, fine to medium grained, moist, very dense SP 60 4 * Test boring was terminated on March 26, 2013 at 21.5 feet. * No groundwater was encountered during drilling. * Blow counts corrected to account for auto -hammer efficiency. GEOTECH CONSULTANTS, INC. TEST BORING LOG NWC of Sunset Blvd NE and Harrington Ave NE Renton, Washington Job Date: Logged by. Plate: 13096 April 2013 1 JLH I 7 10 15 20 P-bi 30 BORING 6 Description GEOTECH CONSULTANTS, INC. TEST BORING LOG NWC of Sunset Blvd NE and Harrington Ave NE Renton, Washington Job Date: Loggedby: plate: 13096 April 2013 1 JLH & FILL Brown, rusted sand with gravel, moist, loose (FILL) Light brown SAND with trace silt, fine to medium grained, moist, medium dense 21 1 -becomes dense 57 2 -becomes more coarse grained with gravels, very dense SP 50 3 less gravels, fine to medium grained 50 4 * Test boring was terminated on March 26, 2013 at 21.5 feet. * No groundwater was encountered during drilling. * Blow counts corrected to account for auto -hammer efficiency. GEOTECH CONSULTANTS, INC. TEST BORING LOG NWC of Sunset Blvd NE and Harrington Ave NE Renton, Washington Job Date: Loggedby: plate: 13096 April 2013 1 JLH & Slope backfill away from foundation, Provide surface drains where necessary. Backfill (See text for requirements) Nonwoven Geotextile Washed Rack Filter Fabric {7I8" min. size}) 4" Tightline Roof Drain (Do not connect to Footing drain) Possible Slab 4" Perforated Hard PVC Pipe (Invert at least 6 Inches below slab or crawl space. Slope to draln to appropriate outfall. Place holes downward.) NOTES: (1) In crawl spaces, provide an outlet drain to prevent buildup of water that bypasses the perimeter footing drains. (2) Refer to report text for additional drainage, waterproofing, and slab considerations. Vapor Retarder/Barrier and Capillary Break/Drainage layer (Refer to Report text) A Footing Drain for Backfilled_ Retaining Wall Vapor retarder --y Non -woven fitter fabric Treated lagging Drainage composite Soldier pile faterproofing--,,_,' / Foundation wall & Footing Slab Washed rock or pea gravel • 4" perforated PVC drain (holes turned downward) 2" PVC weep pipe at B' centers (Pour Into footing or wall below slab) Attach weep pipe to drainage composite. Pierce waterproofing and plastic backing of drainage composite. Note - Refer to the report for additional considerations related to drainage and waterproofing. Footing Drain for Shoring GEOTECH CONSULTANTS, INC. FOOTING DRAIN DETAILS NWC of Sunset Blvd NE and Harrington Ave NE Renton, Washington Job No: Date: Plate: lk96 1 April 2012 1 9 H Lowest Excavation Elevation (Assumed to be Level) D (min. =H) Ground Su 460(0) (psf) Passive Pressure Notes: MI -11 (Psfl Active Pressure Surcharge Pressure from traffic or cut slopes as applicable. (1) The report should be referenced for specifics regarding design and installation. (2) Active pressures act over the pile spacing to the lowest excavation level. (3) Passive pressures act over twice the grouted soldier pile diameter or the pile spacing, whichever is smaller. (4) It is assumed that no hydrostatic pressures act on the back of the shoring walls. (5) Cut slopes or adjacent structures positioned above or behind shoring will exert additional pressures on the shoring wall. GEOTECH CONSULTANTS, INC. SOLDIER PILE SHORING DETAIL NWC of Sunset Blvd NE and Harrington Ave NE Renton, Washington Job No: Date: Plate: 13096 April 2012 1 10 .Adm. C CL 01 LLI VJ U LU '. • r r� .� r ♦ 41r '% r r r, J H,a rr i nrlL' 1-1 .:.-; e �= G? -P65 L A xF E -0 L— � C C CL A CU LD L15 7 Z w 0 Q LL 0 o y n � nj II t> zz LU0 0 a uj 0) 0 z 0 a U LU 0 O z m �m W Li Z p 0, W ,o Wo T: 4z Qcn 3 F N N W O 4 000 0 `0 W CIry W Renton TREE RETENTION WORKSHEET 1. Total number of trees over 6" in diameter' on project site: 1. trees 2. Deductions: Certain trees are excluded from the retention calculation; Trees that are dead, diseased or dangerous2 trees Trees in proposed public streets trees Trees in proposed private access ease mentsltracts trees Trees in critical areas3 and buffers trees Total number of excluded trees: 2. trees 3. Subtract line 2 from line 11: 3. + trees 4. Next, to determine the number of trees that must be retained 4, multiply line 3 by: 0.3 in zones RC, R-1, R-4, or R-8 0.1 in all other residential zones 0.05 in all commercial and industrial zones 4. trees 5. List the number of 6" or larger trees that you are proposing to retain 4: 5.a, trees 6. Subtract line 5 from line 4 for trees to be replaced: 6. trees (If line 6 is less than zero, stop here. No replacement trees are requlred)_ 7. Multiply line 6 by 12" for number of required replacement inches: 7. !420-� inches 8. Proposed size of trees to meet additional planting requirement: ry (Minimum 2" caliper trees required) 8. L+ inches per tree 9. Divide line 7 by line 8 for number of replacement trews: (if remainder is .5 or greater, round up to the next whole number) 9.trees ' Measured at chest height. z. Dead, diseased or dangerous trees must be certified as such by a forester, registered landscape architect, or certified arborist, and approved by the City. Critical Areas, such as wetlands, streams, floodplains and protected slopes, are defined in Section 4-3-450 of the Renton Munidoal Code ARMC). 4. Count only those trees to be retained outside of critical areas and buffers. A The City may require modification of the tree retention plan to ensure retention of the maximum number of trees per RMC 4-4-134Ii7a Inches of street trees, inches of trees added to critical areaslbuffers, and inches of trees retained on site that are less than 6" but are greater than 2" can be used to meet the tree replacement requirement. H:Division/F'omntrfateRetcntionWorkshcct 11/07 I "i First An 1Can First American Title Insurance Company 818 Ste 1 St, Ste 800 Seattle 38101 Phn - ( __,. 28-0400 (800)826-7718 Fax - ESCROW COMPANY INFORMATION: Escrow Officer/Closer: CANDY VO cvo@firstam.com First American Title Insurance Company 818 Stewart St, Ste 804, Seattle, WA 98101 Phone: (206)728-0400 - Fax: (866)859-0431 King County Title Team Two 818 Stewart St, Ste. 800, Seattle, WA 98101 Fax No. (866) 561-3729 Kelly Cornwall Curtis Goodman Peter Child (206) 336-0725 Municipality Title Officer (206) 336-0726 kcornwallOfirstam.com (206) 615-3069 pchild0firstam.com cgoodman@firstam.com Kathy 3 Turner (206) 336-0724 kturnerOfirstam.com PLEASE SEND ALL RECORDING PACKAGES TO 818 STEWART ST, STE. 800, SEATTLE, WA 98101. To: City of Renton Legal Department 100 South 2nd Street Renton, WA 98055 Attn: Stephanie Rary Re: Property Address: 2723 Sunset Lane NE, Renton, WA 98056 First American Title File No.: 4201-2163982 Your Ref No.: Sunset Terrace Development LLC Form No, 1068-2 Commitment No.: 4201-2163482 , ALTA Plain Language Commitme Page 2 of 11 t COMMITMENT FOR TITLE INSURANCE Issued by FIRSTAMERICAN TITLE INSURANCE COMPANY Agreement to Issue Policy We agree to issue a policy to you according to the terms of this Commitment. When we show the policy amount and your name as the proposed insured in Schedule A, this Commitment becomes effective as of the Commitment Date shown in Schedule A. If the Requirements shown in this Commitment have not been met within six months after the Commitment Date, our obligation under this Commitment will end. Also, our obligation under this Commitment will end when the Policy is issued and then our obligation to you will be under the Policy. Our obligation under this Commitment is limited by the following: The Provisions in Schedule A. The Requirements in Schedule B -I. The General Exceptions and Exceptions in Schedule B -II. The Conditions. This Commitment is not valid without Schedule A and Section I and II of Schedule B. FirstAmerican Tide Insurance Company "i &40um Curtis Goodman, Title Officer FirstArnerican Title Form No. 1068-2 Commitment No.; 4201-2163982 ALTA Plain Language Commitment Page 3 of 11 SCHEDULE A 1. Commitment Date: November 26, 2013 at 7:30 A.M. 2. Policy or Policies to be issued: AMOUNT PREMIUM TAX Short Term Rate Standard Owner's Policy $ 382,460.53 $ 1,084.00 $ 102.98 Proposed Insured: City of Renton, a Washington municipal corporation, a Washington corporation 3. (A) The estate or interest in the land described in this Commitment is: Fee Simple (B) Title to said estate or interest at the date hereof is vested in: COLPITTS SUNSET, LLC, A WASHINGTON LIMITED LIABILITY COMPANY 4. The land referred to in this Commitment is described as follows: Real property in the County of King, State of Washington, described as follows: The land referred to in this report is described in Exhibit A attached hereto. First American Title Form No. 1068-2 Commitment No.: 4201-2163982 ALTA Plain Language Commitme Page 4 of 11 SCHEDULE B SECTION I REQUIREMENTS The following requirements must be met: (A) Pay the agreed amounts for the interest in the land and/or the mortgage to be insured. (B) Pay us the premiums, fees and charges for the policy. (C) Documents satisfactory to us creating the interest in the land and/or the mortgage to be insured must be signed, delivered and recorded: (D) You must tell us in writing the name of anyone not referred to in this Commitment who will get an interest in the land or who will make a loan on the land. We may then make additional requirements or exceptions. (E) Releases(s) or Reconveyance(s) of Item(s): (F) Other: (G) You must give us the following information: 1. Any off record leases, surveys, etc. 2. Statement(s) of Identity, all parties. 3. Other: SCHEDULE B SECTION II GENERAL EXCEPTIONS PART ONE: A. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records. B. Any facts, rights, interests, or claims which are not shown by the public records but which could be ascertained by an inspection of said land or by making inquiry of persons in possession thereof. C. Easements, claims of easement or encumbrances which are not shown by the public records. D. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any other facts which a correct survey would disclose, and which are not shown by the public records. E. (A) Unpatented mining claims; (B) Reservations or exceptions in patents or in Acts authorizing the issuance thereof; (C) Water rights, claims or title to water; whether or not the matters excepted under (A), (B) or (C) are shown by the public records; (D) Indian Tribal Codes or Regulations, Indian Treaty or Aboriginal Rights, including easements or equitable servitudes. F. Any lien, or right to a lien, for services, labor or materials or medical assistance heretofore or hereafter furnished, imposed by law and not shown by the public records, G. Any service, installation, connection, maintenance, construction, tap or reimbursement charges/costs for sewer, water, garbage or electricity. H. Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in the public records or attaching subsequent to the effective date hereof, but prior to the date the proposed insured acquires of record for value the escrow or interest or mortgage(s) thereon covered by this Commitment. First American True Form No. 1068-2 ALTA Plain Language Commitment SCHEDULE B SECTION II EXCEPTIONS PART TWO: Commitment No.: 4201-2163982 Page 5 of 11 Any policy we issue will have the following exceptions unless they are taken care of to our satisfaction. The printed exceptions and exclusions from the coverage of the policy or policies are available from the office which issued this Commitment. Copies of the policy forms should be read. Lien of the Real Estate Excise Sales Tax and Surcharge upon any sale of said premises, if unpaid. As of the date herein, the excise tax rate for the City of Renton is at 1.7811/o. Levy/Area Code: 2100 The taxes for the current year reflect an exemption as allowed under RCW 84.36. Any curtailment of the exemption may result in an additional amount being due for the current year and for any re -assessment of land and improvement values. Affects: Portion of said premises and other property included within Tax Lot 722780-1055-07 Taxes for Lot Line Adjustment have not yet been segregated. 3. Deed of Trust and the terms and conditions thereof. Grantor/Trustor: Colpitts Sunset, LLC, a Washington limited liability company Grantee/ Beneficiary: ICAP B1, LLC, a Washington limited liability company Trustee: First American Title Insurance Company Amount: $1,302,000.00 Recorded: November 01, 2013 Recording Information: 20131101000589 Affects said land and other property 4. Evidence of the authority of the individual(s) to execute the forthcoming document for Colpitts Sunset, LLC, copies of the current operating agreement should be submitted prior to closing. 5. The right, title or interest of Sunset Terrace Development LLC, as disclosed by Application for Title Insurance. 6. Unrecorded leaseholds, if any, rights of vendors and security agreement on personal property and rights of tenants, and secured parties to remove trade fixtures at the expiration of the term. 7. The terms and provisions contained in the document entitled "Declaration of Trust of the Housing Authority of the City of Renton, Washington" Recorded: June 05, 1959 Recording No.: 5040742 Document(s) declaring modifications thereof recorded December 16, 1971 as Recorders No. 7112160147 of Official Records. A Partial Release and Amendment to Declaration of Trust was recorded as recording number 20131101000587 FirstAmerican Tide Form No. 1068-2 Commitment No.; 4201-2163982 ALTA Plain Language Comm itme Page 6 of 11 8. The terms and provisions contained in the document entitled "Declaration of Trust of the Housing Authority of the City of Renton, Washington" Recorded: August 06, 1990 Recording No.: 9008061288 9. The terms and provisions contained in the document entitled "Right of Entry Agreement" Recorded: August 13, 1993 Recording No.: 9308130258 10. The terms and provisions contained in the document entitled "MDU Broadband Services Agreement, Memorandum of Easement" Recorded: December 05, 2000 Recording No.: 20001205000834 11. The terms and provisions contained in the document entitled "City of Renton, Washington, Ordinance No. 5462, Establishing a Special Assessment District for the Highlands Water Main Improvements Project and Providing for the Collection of Special Assessments upon Certain Properties Receiving Benefits from the Improvements" Recorded: August 04, 2009 Recording No.: 20090804000500 12. Right to cut, remove, and dispose of any and all brush, trees and other vegetation in the easement area. Grantee shall also have the right to control, on a continuing basis and by any prudent and reasonable means, the establishment and growth of brush, trees or other vegetation in the Easement Area, as granted by instrument recorded under Recording No. 20130801002023. 13. Terms, covenants, conditions and restrictions as contained in recorded Lot Line Adjustment (Boundary Line Revisions): Recorded: October 02, 2013 Recording Information: 20131002900011 First American Title Form No. 1068-2 ALTA Plain Language Commitment INFORMATIONAL NOTES Commitment No.: 4201-2163982 Page 7 of it A. Potential charges, for the King County Sewage Treatment Capacity Charge, as authorized under RCW 35.58 and King County Code 28.84.050. Said charges could apply for any property that connected to the King County Sewer Service area on or after February 1, 1990. Note: Properties located in Snohomish County may be subject to the King County Sewage Treatment Capacity Charges. B. Effective January 1, 1997, and pursuant to amendment of Washington State Statutes relating to standardization of recorded documents, certain format and content requirements must be met (refer to RCW 65.04.045). Failure to comply may result in rejection of the document by the recorder or additional fees being charged, subject to the Auditor's discretion. C. Any sketch attached hereto is done so as a courtesy only and is not part of any title commitment or policy. It is furnished solely for the purpose of assisting in locating the premises and First American expressly disclaims any liability which may result from reliance made upon it. D. The description can be abbreviated as suggested below if necessary to meet standardization requirements. The full text of the description must appear in the document(s) to be insured. LOT B, THE CITY OF RENTON LLA NO. LUA13-001114, REC. 20131002900011, KING COUNTY APN: 722780-1055-07 APN: 722780-1085-01 E. The following deeds affecting the property herein described have been recorded within 36 months of the effective date of this commitment: 20131101000588 F. Special taxes for the year 2013, which have been paid. Tax Account No.: 722780-1085-01 Code Area: 2100 Amount: $ 7.43 Assessed Land Value: $ 0.00 Assessed Improvement Value: $ 0.00 Affects: Remainder of said premises and other property The taxes for the current year reflect an exemption. Any curtailment of the exemption may result in an additional amount being due for the current year and for any re -assessment of land and improvement values. Taxes for Lot Line Adjustment have not yet been segregated. Property Address: 2723 Sunset Lane NE, Renton, WA 98056 NOTE: The forthcoming Mortgagee's Policy will be the ALTA 2006 Policy unless otherwise noted on Schedule A herein. NOTE: We find no judgments or Federal tax liens against the vestee herein, unless otherwise shown as a numbered exception above. FrrstAmerlcan Title Farm No. 1068-2 ALTA Plain Language Commitme Commitment No,; 4201-2163982 Page 8 of 11 NOTE: A FEE WILL BE CHARGED UPON THE CANCELLATION OF THIS COMMITMENT PURSUANT TO WASHINGTON STATE INSURANCE CODE AND THE FILED RATE SCHEDULE OF THIS COMPANY. First American Title Farm No. 1068-2 ALTA Plain Language Commitment CONDITIONS Commitment No.; 4201-2163982 Page 9 of 11 1. DEFINITIONS (a)"Mortgage" means mortgage, deed of trust or other security instrument. (b)"Public Records" means title records that give constructive notice of matters affecting the title according to the state law where the land is located. 2. LATER DEFECTS The Exceptions in Schedule B - Section II may be amended to show any defects, liens or encumbrances that appear for the first time in the public records or are created or attached between the Commitment Date and the date on which all of the Requirements (a) and (c) of Schedule B - Section I are met. We shall have no liability to you because of this amendment. 3. EXISTING DEFECTS If any defects, liens or encumbrances existing at Commitment Date are not shown in Schedule B, we may amend Schedule B to show them. If we do amend Schedule B to show these defects, liens or encumbrances, we shall be liable to you according to Paragraph 4 below unless you knew of this information and did not tell us about it in writing. 4. LIMITATION OF OUR LIABILITY Our only obligation is to issue to you the Policy referred to in this Commitment, when you have met its Requirements. If we have any liability to you for any loss you incur because of an error in this Commitment, our liability will be limited to your actual loss caused by your relying on this Commitment when you acted in good faith to; comply with the Requirements shown in Schedule B - Section I or eliminate with our written consent any Exceptions shown in Schedule B - Section II. We shall not be liable for more than the Policy Amount shown in Schedule A of this Commitment and our liability is subject to the terms of the Policy form to be issued to you. 5. CLAIMS MUST BE BASED ON THIS COMMITMENT Any claim, whether or not based on negligence, which you may have against us concerning the title to the land must be based on this commitment and is subject to its terms. cc: City of Renton cc: Sunset Terrace Development LLC First American Title Form No. 1068-2 ALTA Plain Language Commitme ,KS ' .t ,'t i' First American .5�I• j` First American ride Commitment Il 4201-2163982 Page 10 of 11 FirstAmerkan Tide Insurance Company 818 Stewart St, Ste 800 Seattle, WA 98101 Phn -(206)728-0400 (800)826-7718 Fax - Privacy Information We Are Committed to Safeguarding Customer Information In order to better serve your needs now and in the future, we may ask you to provide us with certain information. We understand that you may be concerned about what we will do with such information - particularly any personal or financial information. We agree that you have a right to know how we will utilize the personal information you provide to us. Therefore, together with our subsidiaries we have adopted this Privacy Policy to govern the use and handling of your personal information. Applicability This Privacy Policy governs our use of the information that you provide to us. It does not govern the manner In which we may use information we have obtained from any other source, such as Information obtained from a public record or from another person or entity. First American has also adopted broader guidelines that govern our use of personal information regardless of its source. First American calls these guidelines its Fair Information Values. Types of Information Depending upon which of our services you are utilizing, the types of nonpublic personal information that we may collect include: • Information we receive from you on applications, forms and in other communications to us, whether in writing, in person, by telephone or any other means; • Information about your transactions with us, our affiliated companies, or others; and + Information we receive from a consumer reporting agency. Use of Information We request information from you for our own legitimate business purposes and not for the benefit of any nonaffiliated party. Therefore, we will not release your informaten to nonaffiliated parties except: (1) as necessary for us to provide the product or service you have requested of us; or (2) as permitted by law. We may, however, store such information indefinitely, including the period after which any customer relationship has ceased. Such information may be used for any internal purpose, such as quality control efforts or customer analysis. We may also provide all of the types of nonpublic personal information listed above to one or more of our affiliated companies. Such affiliated companies include financial service providers, such as title insurers, property and casualty insurers, and trust and investment advisory companies, or companies involved in real estate services, such as appraisal companies, home warranty companies and escrow companies. Furthermore, we may also provide all the information we collect, as described above, to companies that perform marketing services on our behalf, on behalf of our affiliated ccimpames or to other financial institutions with whom we or our affiliated companies have joint marketing agreements. Former Customers Even If you are no longer our customer, our Privacy Policy will continue to apply to you. Confidentiality and Security We will use our best efforts to ensure that no unauthorized parties have access to any of your Information. We restrict access to nonpublic personal Information about you to those individuals and entities who meed to know that information to provide products or services to you. We will use our best efforts to train and oversee our employees and agents to ensure that your information will be handled responsibly and in accordance with this Privacy Policy and First American's Fair Information Values. We currently maintain physical, electronic, and procedural safeguards that comply with federal regulations to guard your nonpublic personal information. Information Obtained Through Our Web Site First American Financial Corporation is sensitive to privacy issues on the Internet. We bdieve it is important you know how we treat the information about you we receive on the Internet, In general, you can visit First American or its affiliates' Web sites on the World Wide Web without telling us who you are or revealing any information about yourself. Our Web servers collect the domain names, not the e-mail addresses, of visitors. This information is aggregated to measure the number of visits, average time spent on the site, pages viewed and similar Information, First American uses this Information to measure the use of our site and to develop ideas to improve the content of our site. There are t'mes, however, when we may need information from you, such as your name and email address. When informador is needed, we will use our best efforts to let you know at the time of collection how we will use the personal information. Usually, the personal information we collect is used only by us to respond to your inquiry, process an order or allow you to access specific amount/profiie information. If you choose to share any personal information with us, we will only use it in accordance with the policies outlined above. Business Relationships First American Financial Corporation's site and its affiliates' sites may contain links to other Web sites. While we try to link only to sites that share our high standards and respect for privacy, we are not responsible for the content or the privacy practices employed by other sites, Cookies Some of First American's Web sites may make use of "cookie" technology to measure site activity arid to customize in Formation to your personal tastes. A cookie is an element of data that a Web site can send to your browser, which may then store the cookie on your hard drive. FirstArn.cofn uses stored cookies. The goal of this technology Is to better serve you when visiting our site, save you time when you are here and to provide you with a more meaningful and productive Web site experience, Fair Information Values Fairness We consider consumer expectations about their privacy in all our businesses. We only offer products and services that assure a favorable balance between consumer benefits and consumer privacy. Public Record We believe that an open public record creates significant value for society, enhances consumer choice and creates consumer opportunity. We actively support an open public record and emphasize its importance and contribution to our economy. Use We believe we should behave responsibly when we use information about a consumer in our business. We will obey the laws governing the collection, use and dissemination of data. Accuracy We will take reasonable steps to help assure the accuracy of the data we milect, use and disseminate. Where possible, we will take reasonable steps to correct inaccurate information. When, as with the public record, we cannot correct inaccurate information, we will take all reasonable steps to assist consumers in identifying the source of the erroneous data so that the consumer can secure the required corrections, Education We endeavor to educate the users of our products and services, our employees and others in our industry about the importance of consumer privacy. We will instruct our employees on our fair information values and on the responsible collection and use of data. We will encourage others in our industry to collect and use information in a responsible manner. Security We will maintain appropriate facilities and systems to protect against unauthorized access to and corruption of the data we maintain. Form 50 -PRIVACY (811/09) Page 1 of 1 Privacy Information (2001-2010 First American Financial Corporation) First American Tide Form No. 1068-2 Commitment No.! 4201-2163982 ALTA Plain Language Commitment Page 11 of 11 FIRST AMERICAN TITLE INSURANCE COMPANY Exhibit "A" Vested Owner: COLPITTS SUNSET, LLC, A WASHINGTON LIMITED LIABILITY COMPANY Real property in the County of King, State of Washington, described as follows: LOT B OF THE CITY OF RENTON LOT LINE ADJUSTMENT NO. LUA13-001114, AS RECORDED IN VOLUME 302 OF SURVEYS, PAGES 162 & 163 UNDER RECORDING NUMBER 20131002900011, RECORDS OF KING COUNTY, WASHINGTON. Tax Parcel Number: 722780-1055-07 and 722780-1085-01 Situs Address: 2723 Sunset Lane NE, Renton, WA 98056 FirstAmawan Title EXHIBIT A Legal Description of Phase I Property THAT PORTION OF BLOCK 35 OF THE CORRECTED PLAT OF RENTON HIGHLANDS NO. 2, AS RECORDED IN VOLUME 57 OF PLATS, PAGES 92-98, INCLUSIVE, RECORDS OF KING COUNTY, WASHINGTON, LESS ROAD, LYING SOUTHEASTERLY OF THE SOUTHEASTERLY RIGHT OF WAY MARGIN OF SUNSET LANE NE AND NORTHEASTERLY OF THE NORTHEASTERLY RIGHT OF WAY MARGIN OF HARRINGTON AVE NE, PER CITY OF RENTON STREET VACATION ORDINANCE NO. 5693, EFFECTIVE SEPTEMBER 18,2013; ALL SITUATE 1N THE NORTHWEST QUARTER OF SECTION 9, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M, IN THE CITY OF RENTON, KING COUNTY, WASHINGTON. (TAX PARCEL NO. 7227801055) THAT PORTION OF BLOCK 35A OF THE CORRECTED PLAT OF RENTON HIGHLANDS NO. 2 AS RECORDED IN VOLUME 57 OF PLATS, PAGES 92-98 INCLUSIVE, RECORDS OF KING COUNTY, WASHINGTON, LESS ROADS, LYING SOUTHEASTERLY OF THE SOUTHEASTERLY RIGHT OF WAY MARGIN OF SUNSET LANE NE PER CITY OF RENTON STREET VACATION ORDINANCE NO. 5693, EFFECTIVE SEPTEMBER 18, 2013; ALL SITUATE IN THE NORTHWEST QUARTER OF SECTION 9, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M. IN THE CITY OF RENTON, KING COUNTY, WASHINGTON. (TAX PARCEL NO. 7227801085) -21- RECEIPT EGO0017129 BILLING CONTACT Scott Mooney THA Architecture Inc. �'city of, s Transaction Date: December 20, 2013 REFERENCE NUMBER FEE NAME TRANSACTION PAYMENT AMOUNT PAID TYPE METHOD LUA13-001720 PLAN - HE Conditional Use Fee Payment >eck 42740 $2,000.00 $300.00 $946.00 $2,400.00 $171.00 PLAN - Modification Fee Payment heck #2740 PLAN - Site Pian Review - Admin Fee Payment heck #2740 PLAN - Variance Fee Payment heck #2740 Technology Fee Fee Payment heck #2740 SUB TOTAL $5,817.00 LUA13-001720 PLAN - Site Plan Review - Admin Fee Payment heck #2742 $54.00 SUBTOTAL $54-00 TOTAL $5,871-00 Printed On: 12!2012013 Prepared By: Rocale Timmons Page 1 of 1