Loading...
HomeMy WebLinkAboutRS_Traffic Report_171211 TENW Transportation Engineering NorthWest Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th Street, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 MEMORANDUM DATE: December 11, 2017 TO: Rohini Nair City of Renton FROM: Jeff Schramm / Amy Wasserman TENW SUBJECT: Traffic Scoping Memo for DCT Industrial at Monster Rd PRE17-000418 TENW Project No. 5585 This memorandum summarizes the preliminary traffic information for the proposed DCT Industrial Monster Road project located at 601 Monster Road SW in Renton, WA for the purpose of establishing a scope of work for the traffic study. This memo includes a project description, project trip generation estimate, preliminary project trip distribution, and trip assignment estimates. We are requesting your approval of this information and confirmation that a traffic impact analysis will not be required for this project. Project Description The proposed project is located at 601 Monster Road SW in Renton, WA as shown in the Attachment A vicinity map. The proposed project would consist of up to 166,000 square foot (SF) of building area for light industrial use. The existing site includes a 143,862 SF light industrial building that would be removed with the proposed project. Vehicular access to the site would be provided via three full-access driveways on Monster Road SW and also via a full-access driveway on the shared access road on the western edge of the project site. A preliminary site plan is included in Attachment B. Trip Generation The trip generation estimate for the proposed DCT Industrial Monster Road project was based on methodology documented in the Institute of Transportation Engineers (ITE) Trip Generation Manual 10th edition for LUC 110 (Light Industrial). The net new trip generation was calculated by subtracting the trips from the light industrial building to be removed from the trips generated by the proposed DCT Monster Road project. The resulting net new weekday daily, AM peak hour, and PM peak hour trip generation estimates for the proposed project are summarized in Table 1. Detailed trip generation calculations are included in Attachment C. Table 1. Trip Generation Summary Net New Trips Generated Time Period In Out Total Weekday Daily 42 42 84 Weekday AM Peak Hour 6 1 7 Weekday PM Peak Hour 1 4 5 Traffic Scoping Memo DCT Industrial Monster Road TENW December 11, 2017 Page 2 As shown in Table 1, the proposed DCT Industrial Monster Road light industrial building is estimated to generate 84 net new weekday daily trips with 7 net new trips occurring during the weekday AM peak hour (6 in, 1 out) and 5 net new trips occurring during the weekday PM peak hour (1 in, 4 out). Next Steps The proposed DCT Monster Road project would generate less than 20 net new trips during the weekday AM and PM peak hours. Therefore, based on the CityÊs guidelines, no additional traffic analysis is required for this development. We look forward to your approval of our trip generation estimates and consensus that no additional traffic analysis is necessary. If you have any questions regarding the information presented in this memo, please call Jeff Schramm at (425) 250-0581 or schramm@tenw.com. cc: Ben Brodsky, DCT Industrial Attachments: A. Project Site Vicinity B. Preliminary Site Plan C. Trip Generation Calculation Traffic Scoping Memo DCT Industrial Monster Road ATTACHMENT A Vicinity Map Traffic Scoping Memo DCT Industrial Monster Road ATTACHMENT B Preliminary Site Plan Traffic Scoping Memo DCT Industrial Monster Road ATTACHMENT C Detailed Trip Generation Calculations ITE Land Use Units 1 LUC 2 In Out Trip Rate In Out Total DAILY Proposed Use: Light Industrial 166,000 GFA 110 50%50%EQN 344 343 687 Less Existing Use: Light Industrial 143,862 GFA 110 50%50%EQN -302 -301 -603 Net New Daily Trips = 42 42 84 AM PEAK HOUR Proposed Use: Light Industrial 166,000 GFA 110 88%12%EQN 57 8 65 Less Existing Use: Light Industrial 143,862 GFA 110 88%12%EQN -51 -7 -58 Net New AM Peak Hour Trips = 6 1 7 PM PEAK HOUR Proposed Use: Light Industrial 166,000 GFA 110 13%87%EQN 7 45 52 Less Existing Use: Light Industrial 143,862 GFA 110 13%87%EQN -6 -41 -47 Net New PM Peak Hour Trips = 1 4 5 Notes: 2. Land Use Code and trip rate equations based on ITE Trip Generation Manual, 10th Edition, 2017. 1. GFA = Gross Floor Area. DCT Monster Road Trip Generation Summary Directional Distribution Trips Generated