HomeMy WebLinkAboutROWP21-0004 _ Final Completion Letter 08-23-2024 / August 26, 2024 Brandon Anderson DR Horton 11241 Slater Avenue NE, Suite 200 Kirkland, WA 98033 RE: Completion of Roadways and/or Drainage Facilities Project Name: Skyhorse ROW – Storm Pipe Installation Parent Record No.: ROWP21-0004 Inspection Record No.: LUIS22-0010 Site Location: SE 132nd St. Dear Mr. Anderson: The King County Department of Local Services (DLS), Permitting Division is satisfied that the conditions and requirements for the constructed road and/or drainage improvements for the above project are completed. Final Construction Approval was issued on 08-23-2024. This project is located in Section NW 13, Township 23, Range 05, E.W.M., King County, State of Washington. The Final Corrected Plan Mylars for this project have been forwarded to the County Road Engineer, DLS Road Services Division, for permanent record keeping. These improvements are shown on plan and profile number P - 4509. This step in the process verifies the terms and provisions of the following financial guarantees have been satisfied: FING23-0066 for Restoration A copy of this letter will be forwarded to the Financial Guarantee Management Unit for processing release of these guarantees. Pursuant to King County Code 27A.30.090(a), a maintenance and defect guarantee has been posted to ensure that all newly constructed public roadways and/or drainage facilities are maintained by the developer for a period of two years from the date of final construction approval. In addition, this guarantee assures that any defects or failures in workmanship, materials, design, and/or function of the constructed roadways and/or drainage facilities are corrected by the developer during this two-year period. For more information regarding maintenance and defect requirements for drainage facilities, please contact Andrew McDonald, Water and Land Resources Division, at 206-477-4768. For more information regarding maintenance and defect requirements for roadways, please contact Chris Treichel, Road Services Division, at 206-477-3639. If you have questions about this letter, please contact Scott Smith, Development Engineer at 206-477-3785. If you have questions regarding the release of any financial guarantee, please contact the Financial Guarantee Management Unit at FGMU.DPER@kingcounty.gov. Sincerely, Ramon Locsin, for Scott Smith, P.E. Development Engineer cc: Cindy Torkelson, Project Program Manager II, Roads Services Division, DLS Janel London, Managing Engineer, Roads Services Division, DLS Chris Treichel, Senior Engineer, Roads Services Division, DLS Joe Amann, Engineer III, Roads Services Division, DLS David Rada, Engineer II, Roads Services Division, DLS Wes Chin, Supervising Engineer, Water and Land Resources Division, Department of Natural Resources and Parks (DNRP) Andrew McDonald, Senior Engineer, Water and Land Resources Division, DNRP Jess Eakens, Engineer II, Water and Land Resources Division, DNRP Financial Guarantee Management Unit, Permitting Division, DLS Inspector Name, Engineer II, Permitting Division, DLS Any Additional cc