Loading...
HomeMy WebLinkAboutReport 1• CITY OF RENTO:Jt DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT MEMORANDUM Date: April 7, 2016 To: City Clerk's Office From: Jenny Cisneros Subject: Land Use File Closeout Please complete the following information to facilitate project closeout and indexing by the City Clerk's Office Project Name: 1-405 SR 167 Direct Connect Project Supplemental Borings LUA {file) Number: LUA16-000095 V-H Cross-References: AKA's: Project Manager: Vicki Grover Acceptance Date: February 8, 2016 Applicant: Linda Cooley, WSDOT Owner: WSDOT Contact: Linda Cooley, WSDOT PID Number: ERC Determination: Date: Anneal Period Ends: Emergency Administrative Approved with Conditions Date: February 9, 2016 Decision: Appeal Period Ends: Februarv 23. 2016 Public Hearing Date: Date Appealed to HEX: By Whom: HEX Decision: Date: Anneal Period Ends: Date Appealed to Council: By Whom: Council Decision: Date: Mylar Recording Number: Project Description: Location: 1-405/SR-167 -Vicinity of Shattuck Ave S. & S. 14th Street Vicinity Comments: ERC Determination Types: DNS -Determination of Non-Significance; DNS-M -Determination of Non-Significance-Mitigated; DS -Determination of Significance. DEPARTMENT OF corvluNITY AND ECONOMIC DEVELOPMENT -----~'itentOll ® A. ADMINISTRATIVE REPORT & DECISION -EMERGENCY DECISION: REPORT DATE: Project Name : Owner: Applicant: Contact: File Number: Project Manager: Project Summary: Project Location: 0APPROVED ~ APPROVED SUBJECT TO CONDITIONS D DENIED February 8, 2016 1-405/SR-167 Direct Connector Project -Supplemental Borings Washington State Department of Transportation (WSDOT) Linda Cooley, NWR Design Build Office, 600 108th Avenue NE, Suite 405, Bellevue, WA 98004 Same as Applicant; 425-456-8586, 206-769-7481 LUA16-000095, V-A Vicki Grover, Civil Engineer Ill The applicant is requesting a variance from RMC 8-7-2 (Noise Regulations, Maximum Environmental Noise Levels) in order to conduct construction work at night in areas with residential uses . Geotechnical exploration is needed to aid WSDOT's design build contractor in the design of the 1-405/SR-167 Direct Connector Project. Six supplemental boring locations are proposed and all lie within the paved areas of the states' highway. Only one boring will require night time work. Borings 2, 3, 4, 5 and 6 will proceed as daytime work. The work time frame proposed is February thru April of 2016 for 2 non- consecutive nights. The night time work shall be achieved between 10:00 PM and 4:30 AM . The contractor would like to begin work the week of February 15, 2016 . The equipment to be used will include a drill rig, passenger van and a support vehicle. The drilling operation generates approximately 88 dBA of noise with some brief elevated spikes when the drill is penetrating resistant soil layers . 1-405/SR-167 -Vicinity of Shattuck Ave S. & S. 14th Street Project Location Map Noise Variance Admin Report City of Renton Department of C-unity & Economic Development 1-405/SR-167 DIRECT CONNE~ROJECT SUPPLEMENTAL SOIL BORINGS Administrative Report & Decision LUA16-000095 February 8, 2016 Page 2 of 5 ! s. EXHIBITS: The following exhibits were entered into the record: Exhibit 1: Staff Report, dated February 8, 2016 Exhibit 2: Email(s) from the Applicant requesting the variance on February 4, 2016 Exhibit 3: Submittal Documents C. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE: 1. Chapter 7 Noise Level Regulations a. Section 8-7-8: Variances and Appeals I D. FINDINGS OF FACT (FOF}: 1. The Planning Division of the City of Renton accepted the above master application for review on February 8, 2016 and determined the application complete on February 8, 2016. The Administrator of Community and Economic Development Department will waive the public comment period of 14 days for this specific variance request. 2. The project site is located at 1-405/SR-167 -Vicinity of Shattuck Ave S. & S. 14th Street 3. The project site is currently developed with asphalt (roadway prism) in the state right-of-way. 4. Access to the site would be provided via road access and may require a lane closure. 5. The applicant is proposing to begin construction on February 15, 2016 and end on April 30, 2016. 6. Per RMC 8-7-8, the applicant notified the two residences living within a 300 ft. radius of soil boring #1 on February 8, 2016. Any complaints within the Renton city limits shall be summarized and reported to the City's project manager, Vicki Grover, VGrover@rentonwa.gov within 5 days of the complaint. Staff recommends the applicant comply with this requirement as a condition of approval. Variance Analysis: The decision maker, in passing upon an application for a variance, shall consider all technical evaluations, all relevant factors and standards specified in other sections of this Chapter, and in addition thereto shall consider the following, none of which is mandatory for the granting of the variance: Compliance· Variance Criteria .and Analysis a. That the applicant suffers practical difficulties and unnecessary hardship and the variance is necessary because of special circumstances applicable to the applicant's property or project, and that the strict application of this Chapter will deprive the subject property .,,-owner or applicant of rights and privileges enjoyed by others . Sta[[ Comment: Conducting the work at night will limit disruption to the transport of people goods and services. WSDOT has indicted that safety for drivers and construction workers improves when work is conducted at night. Permitted noise levels would be exceeded during construction, in the area where the work is occurring. b . That the granting of the variance will not be materially detrimental to the public health, .,,-welfare or safety, or unduly injurious to the property or improvements in the vicinity of the location for which this variance is sought. 1-405/SR-167 Direct Connector Project Supplemental Soil Borings City of Renton Department of C 1-405/SR-167 DIRECT CDNNE February 8, 2016 unity & Economic Development ROJECT SUPPLEMENTAL SOIL BORINGS Administrative Report & Decision LUA16-000095 Page 3 of 5 ,/ ,/ ,/ Staff Comment: Noise impacts would occur during nighttime hours and would be perceptible at times during construction. However, the noise would occur during 2 non-consecutive nights over the course of approximately 2.5 months. The improvements to the roadway would ultimately increase public health, safety and welfare. Therefore, staff believes that the noise impacts would be of a limited duration and intensity, and would not be materially detrimental to the public health, welfare, or safety. Property and/or improvements in the area would not be unduly damaged as the work would be limited to the public right-of-way, and the noise generated would not damage property or improvements. c. That the approval is a minimum variance that will accomplish the desired purpose. Staff Comment: Staff believes that the request is the minimum needed to accomplish the necessary investigation for the design of the Direct Connector Project. d. That the variance contains such conditions deemed to be necessary to limit the impact of the variance on the residence or property owners impacted by the variance. The variance approval may be subject to conditions including, but not limited to, the following: a. Implementation of a noise monitoring program; b. Maximum noise levels; c. Limitation on types of equipment and use of particular equipment; d. Limitation on back-up beepers for equipment; e. Required use of noise shields or barriers; f. Restrictions to specific times and days; g. Specific requirements for documentation of compliance with the noise variance conditions; h. Specific requirements for notification to nearby residents; i. Required cash security to pay for inspection services to verify compliance; j. Required access to the project by the City to verify compliance with the noise variance conditions; k. Specific program to allow for temporary hotel vouchers to effected residents; I. Requirements for written verification that all workers understand the noise variance conditions for the project; and m. Provision allowing the City to immediately revoke the variance approval if the variance conditions are violated. Staff Comment: Staff believes that the request is the minimum needed to accomplish the necessary investigation for the design of the Direct Connector Project. e. The importance of the services provided by the facility creating the noise and the other impacts caused to the public safety, health and welfare balanced against the harm to be 1-405/SR-167 Direct Connector Project Supplemental Soil Borings City of Renton Department of C 1-405/SR-167 DIRECT CONNE February 8, 2016 unity & Economic Development ROJECT SUPPLEMENTAL SOIL BORINGS Administrative Report & Decision LUA16-00009S Page 4 of 5 suffered by residents or property owners receiving the increased noise permitted under this variance. Sta[[ Comment: Staff believes that the request is the minimum needed to accomplish the necessary investigation for the design of the Direct Connector Project. f. The availability of practicable alternative locations or methods for the proposed use which ,/ will generate the noise. Sta[[ Comment: Staff believes that the request is the minimum needed to accomplish the necessary investigation for the design of the Direct Connector Project. g. The extent by which the prescribed noise limitations will be exceeded by the variance and the extent and duration of the variance. ,/ Sta[[ Comment: Staff believes that the request is the minimum needed to accomplish the necessary investigation for the design of the Direct Connector Project. I E. CONCLUSIONS 1. The subject site is located on the south side of 1-405 within state right-of-way, adjacent to Shattuck Ave Sand S 141h Street and between the north bound and south bound lanes. 2. The requested variance meets the seven criteria to be considered in making a decision on a variance request as specified in RMC 8-7-8 if all conditions of approval are met. The analysis of the proposal according to variance criteria is found in the body of the Staff Report. i F. DECISION: The 1-405/SR-167 Direct Connector Supplemental Borings Project Noise Variance, File No. LUA16-000095, as depicted in Exhibit 1, is approved and is subject to the following conditions: 1. Any complaints within the Renton city limits will be summarized and reported to the City's project manager, Vicki Grover, VGrover@rentonwa.gov within 5 days of the complaint. DATE OF DECISION ON LAND USE ACTION: SIGNATURE: C.E. "Chip" Vincent, CED Administrator Date TRANSMITTED this 9th day of February, 2016 to the Owner/Applicant/Contact: Owner: Washington State Deportment of Transportation (WSDOT) 600 108'" Avenue NE, Suite 405 Bellevue, WA 98004 Applicant: Linda Cooley, NWR Design Build Office, 600 108'" Avenue NE, Suite 405 Bellevue, WA 98004 1-405/SR-167 Direct Connector Project Supplemental Soil Borings Contact: Linda Cooley, NWR Design Build Office, 600 108'" Avenue NE, Suite 405 Bellevue, WA 98004 City of Renton Deportment of Co 1-405/SR-167 DIRECT CONNEC~ February 8, 2016 unity & Economic Development ROJECT SUPPLEMENTAL SOIL BORINGS TRANSMITTED this 9" day of February, 2016 to the following: Jennifer Henning, Planning Director Brianne Bonnwarth, Development Engineering Manager Jon Conklin, Development Services Vanessa Dolbee, Current Planning Manager Anjela St. John, Fire Marshal I K. NOISE VARIANCE APPEALS Administrative Report & Decision LUA16-000095 Page 5 of 5 The administrative land use decision will becomes final with the date and signature of Community and Economic Development Administrators signature. APPEAL: This administrative land use decision will become final if not appealed in writing to the City Council on or before 5:00 PM on February 23, 2016. An appeal of the decision must be filed within the 14-day appeal period (RCW 43.21.C.075(3); WAC 197-11-680), together with the required fee to the City Council, City of Renton, 1055 South Grady Way, Renton, WA 98057. RMC 4-8-110.B governs appeals to the City Council and additional information regarding the appeal process may be obtained from the City Clerk's Office, (425) 430- 6510. 1-405/SR-167 Direct Connector Project Supplemental Soil Borings Vicki Grover From: Sent: To: Cooley, Linda <CooleyL@wsdot.wa.gov> Tuesday, February 09, 2016 11:38 AM Vicki Grover Cc: Subject: Chip Vincent; Jennifer T. Henning; Vanessa Dolbee; Maloney, Carla A.; Hodgson, Lisa FOLLOWING UP-WSDOTs Boring Hole Noise Variance Request Hello Vicki, We really appreciate your help to expedite this approval to help us meet our very tight schedule. Late yesterday we delivered the fee payment, a completed master application, and notified the two residences within 300' of the drilling location. As noted in the Notice of Nighttime Work flyer, WSDOT anticipates performing this work the night of Monday, February 15, 2016. Work is anticipated to be complete by 5 a.m. on Tuesday, February 16, 2016. This work may require an additional night during the week of February 15th. Should we expect to receive a written administrative approval from the City? Thanks much. Linda Cooley Environmental WSDOT NWR Design Build Office 600 108th Avnue NE Suite 405 Bellevue, WA 98004 425-456-8586 206-769-7481 -----Original Message----- From: Vicki Grover [mailto:VGrover@Rentonwa.gov] Sent: Friday, February 05, 2016 1:04 PM To: Cooley, Linda Cc: Clark Close; Chip Vincent; Jennifer T. Henning; Vanessa Dolbee; Maloney, Carla A.; Hodgson, Lisa; ross.fenton-consultant@i405.wsdot.wa.gov 1 • • ~ ::c t-1 g:, ~ N Subject: RE: WSDOTs Boring Hole Noise Variance Request Linda, I have spoken with Chip Vincent, CED Director, and he has agreed that we can proceed under "emergency" administrative approval for this noise variance and waive the public comment period. This puts the City in an unfavorable position but we can work with WSDOT to meet their schedule. However, in the future we would like to request that more notice be given for these types of construction activities within the City of Renton. Thank you and please proceed with the Master Application and the fee payment. Let me know if you have additional question. Vicki Grover, P .E. Civil Engineer Ill Plan Review Section City of Renton 1055 -S. Grady Way 6th floor Renton, WA 98057 Phone: (425) 430-7291 E-mail: vgrover@rentonwa.gov -----Original Message----- From: Cooley, Linda [mailto:Cooleyl@wsdot.wa.gov] Sent: Friday, February 05, 2016 10:34 AM To: Vicki Grover Cc: Clark Close; Chip Vincent; JenniferT. Henning; Vanessa Dolbee; Maloney, Carla A.; Hodgson, Lisa; ross.fenton-consultant@i405.wsdot.wa.gov Subject: RE: WSDOTs Boring Hole Noise Variance Request Vicki, Thank you for the quick follow up. This change will impose a considerable hardship upon WSDOT and its contract proposal process because the work is already scheduled. 2 • • We understand that boreholes B2, B3, B4 & BS are exempt from the variance process because of their location, and we've moved B6 has moved off of the pavement where it can now be done as daytime work. This leaves borehole Bl where only approximately two residences, within 300 feet, remain after WSDOT's property acquisitions along S 14th Street. The commercial properties north of 1-405 are about 375' away from the bore hole. Additionally, the 88 dBA generated by the drill rig generates little more noise than a heavy truck (80-85 decibels). Our project manager, Lisa Hodgson and I would like to schedule a meeting with the City early Monday to discuss options of how we can resolve this issue and maintain our project schedule. WSDOT has reduced the number and locations of bore holes to every extent possible to mitigate night time noise within the City. Please respond as soon as you can to help us resolve this request. Thank you. Sincerely, Linda Cooley 206-769-7481 (today) 3 • • From: Vicki Grover [VGrover@Rentonwa.gov] Sent: Friday, February 05, 2016 9:29 AM To: Cooley, Linda; Escude, Laura Cc: Clark Close; Chip Vincent; Jennifer T. Henning; Vanessa Dolbee Subject: RE: WSDOTs Boring Hole Noise Variance Request Hi Linda, Please come into City Hall to the 6th floor for payment. You will need to fill out the attached form and bring it in with you when you pay. The City will need to have a 14 day comment period prior to beginning the work. I know you want to start work next week and you can at your own risk. I thought we could get by with a 7 day notice period ~ut it needs to be 14 days. I apologize for any inconvenience this may cause. Vicki Grover, P.E. • Civil Engineer Ill Plan Review Section City of Renton 1055 -5. Grady Way 6th floor Renton, WA 98057 Phone: (425) 430-7291 E-mail: vgrover@rentonwa.gov<mailto:vgrover@rentonwa.gov> From: Cooley, Linda [mailto:CooleyL@wsdot.wa.gov] Sent: Thursday, February 04, 2016 4:25 PM To: Vicki Grover; Escude, Laura Cc: Clark Close; Chip Vincent; Jennifer T. Henning; Vanessa Dolbee Subject: RE: WSDOTs Boring Hole Noise Variance Request Vicki, Thank you for the quick response. We will move forward with getting the noise variance as you note below. • The borings locations have changed slightly, B6 has moved off of 1-405 so it can be done during the day. Only Bl will require night time work. Borings 2,3,4, 5 and 6 will proceed either as exempted or as daytime work. We will have a notification for your review tomorrow and a check or credit card payment for the fees by Monday. Please forward instructions for processing the payment. Thank you. Sincerely, 4 Linda Cooley Environmental WSDOT NWR Design Build Office 600 108th Avnue NE Suite 405 Bellevue, WA 98004 425-456-8586 206-769-7481 From: Vicki Grover [mailto:VGrover@Rentonwa.gov] Sent: Thursday, February 04, 2016 1:53 PM To: Escude, Laura; Cooley, Linda Cc: Clark Close; Chip Vincent; Jennifer T. Henning; Vanessa Dolbee Subject: RE: WSDOTs Boring Hole Noise Variance Request Laura & Linda, Please see below. Let me know if you have any questions or comments. Per RMC Chapter 7, 8-7-8 Variances & Appeal: Variance requests for two (2) days or less in duration, the variance decision shall be made by the Administrator {Chip Vincent) following the public notice process. The fee for the administrative variances is $1,200.00 plus a 3% technology fee for a total of $1,236.00. WSDOT shall conduct the mailings for bore holes Bl & B6; this will be for a 300 ft. radius and shall target all residential properties. Bore holes B2, B3, B4 & BS are exempt from the variance process because the 300 ft. radius does not include residential properties. The public notice shall be forwarded to the City for review and approval. The public notice shall be mailed out to the residential properties affected, 7 days prior to the start of the soil borings. Brief Project Description: Additional geotechnical exploration is needed to aid WSDOT in the design of the 1-405/SR-167 Direct Connector Project. Six supplemental boring locations are proposed and all lie within the paved areas of the states' highway. See the attached exhibit sheets (3) provided by WSDOT for the boring locations. The work time frame proposed is February thru April of 2016 for 2 non-consecutive nights. The night time work shall be achieved between 10:00 PM and 4:30 AM. The contractor would like to begin work the week of February 15, 2016. The equipment to be used will include a drill rig, passenger van and a support vehicle. The drilling operation generates approximately 88 dBA of noise with some brief elevated spikes when the drill is penetrating resistant soil layers. 5 • • Vicki Grover, P.E. Civil Engineer Ill Plan Review Section City of Renton 1055 -5. Grady Way 6th floor Renton, WA 98057 Phone: (425) 430-7291 E-mail: vgrover@rentonwa.gov<mailto:vgrover@rentonwa.gov> • • 6 Vicki Grover From: Sent: To: Thomas, Robert A <ThomasR@wsdot.wa.gov> Monday, February 08, 2016 2:01 PM Vicki Grover WSDOT Boring Hole Noise Variance Request Subject: Attachments: 2016_0208_Supplemental_Boreholes_Locations.pdf; WSDOT _Supp_Borings_Noise_ Variance_Narrative.docx; WSDOT _Supp _Bori ngs_Noise_ V ariance_App.docx Importance: High Vicki -Attached are the materials I'm planning to deliver along with our payment. Can you take a quick look and let me know if I've missed anything? Rob Thomas Biologist/Environmental Coordinator Washington State Department of Transportation thomasr@wsdot.wa.gov {425) 456-8556 {direct) (360) 990-6903 (mobile) 1 • • Vicki Grover From: Sent: To: Emily Mannetti <emannetti@HNTB.com> Monday, February 08, 2016 12:19 PM Vicki Grover Cc: Subject: Cooley, Linda (CooleyL@wsdot.wa.gov); HodgsoL@wsdot.wa.gov; Fenton, Ross (Consultant) (FentonR@consultant.wsdot.wa.gov) 1-405 Nighttime work flyer Attachments: Drilling_Flyer _2_5 _16_ v2 .docx Importance: High • Hi Vicki, Given that the noise variance application was waived, we intend to deliver notification of work to the two residences that are within 300 feet. We plan to deliver the notice this afternoon -one week ahead of the work. I've attached the flyer for your review. Please let me know if you have any questions, comments or concerns regarding this approach as soon as you are able. Thanks very much, Emily Emily Mannetti 1-405 Corridor Communications 425-450-2729 I mannete@consultant.wsdot.wa.gov W5DOT on the Web: Facebook, Twitter. Flickr. YouTube This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. If you are NOT the intended recipient and receive this communication, please delete this message and any attachments. 1 • • DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT EXHIBIT 3 • Rentoii® . Planning Division LAND USE PERMIT MASTER APPLICATION PROPERTY OWNER(S) PROJECT INFORMATION PROJECT OR DEVELOPMENT NAME: NAME: Washington State Department of Transportation 1-405/SR 167 -Direct Connector Project - Supplemental Borings PROJECT/ADDRESS(S)/LOCATION AND ZIP CODE: ADDRESS: 600 108th Ave NE, Suite 405 SR 167/1-405 Interchange : 98057 and 98055 CITY: ZIP: Bellevue 98004 TELEPHONE NUMBER: 425-456-8586 KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S): N/A APPLICANT (if other than owner) NAME: EXISTING LAND USE(S ): State transporation facility COMPANY (if applicable): PROPOSED LAND USE(S): No Change proposed EXISTING COMPREHENSIVE PLAN MAP DESIGNATION: ADDRESS: RLD PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION CITY.: ZIP: (if applicable) No change proposed TELEPHONE NUMBER: EXISTING ZONING: R1 CONTACT PERSON PROPOSED ZONING (if applicable): No change proposed SITE AREA (in square feet): Approximately 600square NAME: feet Linda Coolev SQUARE FOOTAGE OF PUBLIC ROADWAYS TO BE COMPANY (if applicable): WSDOT DEDICATED~ 0 % ~ SQUARE FOOTAGE OF PRIVATE ACCESS EASEMENTS: ADDRESS: 600 108th Ave NE No private easements needed. PROPOSED RESIDENTIAL DENSITY IN UNITS PER NET CITY: ZIP: ACRE (if applicable) N/A Bellevue 98004 TELEPHONE NUMBER AND EMAIL ADDRESS: NUMBER OF PROPOSED LOTS (if applicable) N/A ' • 1 C:\Users\thomasr\AppData\local\Microsoft\Wir:idows\Temporary Internet Files\Content.Outlook\AGGFWH06\masterapp.doc Rev:08/2015 • DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT 1425-456-8586 lcooley@wsd~t.wa.gov • • ---------Rentoil 0 NUMBER OF NEW D_WELLING UNITS (if applicable): N/A 2 C:\Users\thomasr\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\AGGFWH06\masterapp.doc Rev:08/2015 • • • • PROJECT INFORMATION (continued) ~-->-C...C..--------'-------------'-, NUMBER OF EXISTING DWELLING UNITS (if applicable): PROJECT VALUE: None Approximately $10,000 SQUARE FOOTAGE OF PROPOSED RESIDENTIAL BUILDINGS (if applicable): N/A · IS THE SITE LOCATED IN ANY TYPE OF ENVIRONMENTALLY CRITICAL AREA, PLEASE INCLUDE SQUARE FOOTAGE (if applicable): SQUARE FOOTAGE OF EXISTING RESIDENTIAL BUILDINGS TO REMAIN (if applicable): N/A SQUARE FOOTAGE OF PROPOSED NON-RESIDENTIAL BUILDINGS (if applicable): N/A SQUARE FOOTAGE OF EXISTING NON-RESIDENTIAL BUILDINGS TO REMAIN (if applicable): N/A NET FLOOR AREA ON NON-RESIDENTIAL BUILDINGS (if applicable): N/A NUMBER OF EMPLOYEES TO BE EMPLOYED BY THE NEW PROJECT (if applicable): N/A 0 AQUIFIER PROTECTION AREA ONE 0 AQUIFIER PROTECTION AREA TWO D FLOOD HAZARD AREA D GEOLOGIC HAZARD D HABITAT CONSERVATION D SHORELINE STREAMS & LAKES D WETLANDS LEGAL DESCRIPTION OF PROPERTY __ sq.ft. __ sq.ft. __ sq.ft. __ sq.ft. __ sq.ft. (Attach leaal descriotion on seoarate sheet with the followina information included\ SITUATE IN THE NE and NW QUARTER OF SECTION 19 and20 Respectively, TOWNSHIP 23N, RANGE ' --5E, IN THE CITY OF RENTON, KING COUNTY, WASHINGTON AFFIDAVIT OF OWNERSHIP ~ol,, i"ho""•':. · I, (Print Name/s) __ , declare under penalty of perjury under the laws of the State of Washington that I am (please check one) D the current owner of the property involved in this application or IZ'.J the authorized representative to act for a corporation (please attach proof of authorization) and that the foregoing statements and answers herein contained and the information herewith are in all respects true and correct to the best of my knowledge and belief. 1-/3/1 t Date Signature of Owner/Representative Date STATE OF WASHINGTON ) ) ss COUNTY OF KING ) I certify that I know or have satisfactory evidence that J~olo Th oruM signed this instrument and acknowledge it to be his/her/their free and voluntary act for the uses and purpose mentioned in the instrument. Datea ,,11 111111 11, ,,,,,, 1}~1118 ,,,,,,. ,, !8> ~ ......... co.,. ,,,. J' ~-·'.\\\QU flpj~·-.. ~.,.'I;, ~ ~ ..... ~ i"cl' •• -.,,.~ ... _.~ ·"'~ ·S,-. le:. "''~RV \ ~ ::e:',a: \\\:J ~ : -Q, : .,,.<IF"" : -= : ~ : = ,: ' Pun•'1 ,._,f!: -\ v-,-.--~ •• R)/A; ~ ~ .,. .. 4p 'I; .. !b ~ ~ >..i;;-~ll 2~.~--:.;.~ $' 3 ,,. .,,, ......... ~ .... ,, ,,,,,, OF ,ei .. ,,,,,, C:\Users\thomalNA!f~tll\\~Local\M1crosoft\W1ndows\Temporary Internet Files\Content.Outlook\AGGFWH06\masterapp.doc Notary (Print): 1 My appointment expires: A,,01 Rev:08/2015 • • WSDOT 1-405/SR 167 Direct Connector Project -Supplemental Borings Project Narrative: The Washington State Department of Transportation (WSDOT) is proposing to conduct soil investigations in 6 locations in and around the 1-405/SR 167 interchange. The proposed work is expected to take one to two days and occur in mid-February, and includes one or two overnight shifts. A small drill rig will be deployed which will cause minimal ground disturbance in each drilling location. Four of the six locations are grassy or otherwise vegetated roadside areas. Disturbed ground in these areas will be covered with wood straw mulch or another erosion control BMP. The remaining two locations involve drilling through roadway surfaces. These areas will be permanently stabilized at the completion of drilling. All of the work occurs on WSDOT right of way, and no sensitive areas will be disturbed as a result. The work within the roadway will involve the temporary closure of one travel lane and traffic control will be in place throughout this work. Plan sheets depicting the boring locations are attached. Also attached is a flyer, which WSDOT will distribute to affected residents prior to the commencement of work. Washington S e Department of Transportation 1-405 Direct Connector Project NOTICE OF NIGHTIIME WORK The Washington State Department of Transportation (WSDOT) will be conducting nighttime construction work on February 15, 2016. The work will allow WSDOT crews to perform soil investigation a long the SR 167 a nd I-405 corridor. In o rd e r to perform soil investigation along the SR 167 and 1-405 corridor, WSDOT anticipates dril ling in one location that may impact noi se levels at nearby residences. That boring location is s hown on the map be low. WSDOT anticipates performing this work the night of Monday, February 15, 2016. Work is anticipated to be complete by 5 a .m. on Tuesday, February 16, 2016 . This work may require an additional ni ght durin g the week of February 15th . Work will occur in side the I -405 right of way. Construction equipment used during thi s time will include, but is not limited to, generators, light plants , drilling rigs and trucks. Nearby residents can expect similar noi se levels to the existing I-405 and SR 167 background traffic noi se with some hi g her than normal peak noi se levels while the drilling equipment is in use. Why work at night? Crews will work at night to finish the boring quickl y and minimize daytime impacts to thi s key commute and freight route. Contact Us If you encounter problems during thi s work, please call the project hotline at 425-456-8585 . More Information You may visit our website at www.wsdot.wa.gov/Pro jects/I405/SR 167ICDirectConnector/ or contact Craig Smil ey, 1-405 Communication, at 425-456-8624 or s mil eyc2@consultant.wsdo t.w a.gov. e e e SUPPLEMENTAL BORING LOCATIONS 1-405/SR167 DIRECT CONNECTOR SHEET 1 of 3 02/08/2016 -- e h U) z 0 -.... <C ~ 0 0 0 .... ..J 0 w c., z z z QM -o~ '° 0:: 0 ~ 0 .... N C) 0 N m w .... -co ~w C) ..J -w N <C C :C C) .... ...... "' '° z ~ w ~ :Ii "' -.,, w C) ..J • I fl. - fl. :::, U) e e e e SUPPLEMENTAL BORING LOCATIONS 1-405/SR167 DIRECT CONNECTOR SHEET 3 of 3 02/08/2016 RECEIPT EG00049596 • ··' BILLING CONTACT LINDA COOLEY Washington State Department ofTransportation 600 108th Ave NE Bellevue, WA 98004 REFERENCE NUMBER FEE NAME LUA 16-000095 PLAN -Variance Technology Fee Printed On: February 10, 2016 Prepared By: Vicki Grover Renton® 1055 S Grady Way, Renton, WA 98057 TRANSACTION TYPE Fee Payment Fee Payment Transaction Date: February 08, 2016 PAYMENT METHOD Credit Card Credit Card SUB TOTAL TOTAL AMOUNT PAID $1,200.00 $36.00 $1,236.00 $1,236.00 Page 1 of 1