HomeMy WebLinkAboutMFP24004237.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP24004237
IVR Number: 24004237
Permit Information
Permit Name: Verizon - MCI
Address/Location:08/21/2024Application Date:7231500840Parcel Number: 1025 S 3RD ST
Permit Type:09/04/2024Issue Date:Franchise
Permit Work Class:09/04/2025Expiration Date:Minor Utility
Job Number: 1024204Franchise Type:Telephone
Description: Verizon Business MCI Metro Project consists of deep excavation in order to repair damaged conduit. Restoration per
City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Joe Parker
Waeco Construction
17350 Tye St Se
Monroe, WA 98272
B: (360) 464-9464
C: (253) 315-3326
ApplicantX
Verizon Wireless 3245 158th Ave SE
Bellevue, WA 98008
B: (253) 218-9017Contact
Wade Edelbrock
Waeco Construction LLC
18543 Cascade View Dr SE
Monroe, WA 98272
B: (360) 794-7785
C: (206) 423-7074
Contractor
Business License Number: 37230Construction Contractor: WAECOCL930LF
SCOTT CHRISTENSON
VERIZON BUSINESS
11311 NE 120 St
Kirkland, WA 98034
B: (425) 626-6046
C: (425) 471-1079
Emergency
Contact
CHILDREN'S HOME SOCIETY OF PO BOX 15190
SEATTLE , WA 98115
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
x
x
x
x
x
x
MARC - S 3RD ST REPAIR DESIGN / 1024204
1025 S. 3RD ST RENTON, WA 98036
WAECO CONSTRUCTION
JOSEPH PARKER 253-315-3326
17350 TYE ST SE MONROE, WA 98272
PROJECT CONSIST OF STAGING AREA FOR DEEP EXCAVATION IN ORDER TO REPAIR
DAMAGED CONDUIT.
9am 3pm8/12/24 8/13/24MondayFriday
Scott Warlick CED 9/4/2024
MFP24004237
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Joseph Parker
7/10/24
RURAL ROADS & URBAN ARTERIALSRURAL ROADSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRURAL ROADS & URBAN ARTERIALS350'±500'±100'±200'±(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATEINTERCHANGE RAMPS, AT-GRADE INTERSECTIONS ANDDRIVEWAYS(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TOFIT ROADWAY CONDITIONSSIGN SPACING = X (FEET)35/40 MPH45/55 MPH25 MPH OR LESS25/30 MPHCHANNELIZATION DEVICE SPACING (FEET)35/4525/3050MPHTAPER403020406080TANGENT253035404550556065645570495425360305250200155LENGTH (FEET)SPEED (MPH)LONGITUDINAL BUFFER SPACE = BBUFFER DATA150251051151253530165180205225245402702953204545049554050500550600101112LANEWIDTH(FEET)MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED (MPH)NOTES:1.ALL SIGNS ARE 36" - 36" ACROSS.2.AN ASTERISK (*) DENOTES X, L, OR B DISTANCES AND ARE NOT SHOWN TO SCALE.3.CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS.4.STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN.5.FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED.6.IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'.7.SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURB.8.NO PARK SIGNS ARE TO BE PUT UP 72 HOURS PRIOR TO CONSTRUCTION.LEGENDTRAFFIC CONTROLPLANTRAFFIC CONESTEMP SIGN LOCATIONWORK VEHICLEWORK AREATRAFFIC CONTROL PLANHOURS OF TCP: 9AM-3PMDESCRIPTION: REPAIR DAMAGE FIBERLINE.SCALE: 1"=40'40'030'20'10'1ENGINEERING FIRM: WAECO ENGINEERINGDRAWING FILE PATH: V:\ENGINEERING\BUILT\1024204_RENTON_S 3RD ST REPAIR_20240624\CAD DATA\1024204_REPAIR_TCP.DWG 7/9/2024 10:57 AMSHEET #PROJECT NUMBER: XXCLIENT FIRM: VERIZONPERMIT NUMBER: XXOF3WAECO INTERNAL PROJECT NUMBER: 1024204
24 HOUR CONTACT1025 S. 3RD. ST.,RENTON, WA 98036WAECO SUPERVISORSCOTT CHRISTENSONJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM425.471.1079SCOTT.CHRISTENSON@VERIZON.COMORIGINALREV #0REVIEWEDAS-BUILTDATE06/28/2024TECHENGMKIJJPTLFJJP--------------------7/9/24----PROPRIETARY - NOT FOR DISTRIBUTIONPLAN VIEWSCALE: 1" = 40'12'12'10'10'10'10'12'12'12'12'
X
*
X*X*X*HOUSER WAY S (25 MPH)MAIN AVE S(25 MPH)RENTON AVE S (25MPH)X*X*X*ROADWORKAHEADW20-120'S 3RD ST (25 MPH)S 3RD ST (25 MPH)PARCEL# 7231501270ADDRESS-911 S 3RD STPARCEL# 7231501270ADDRESS: 911 S 3RD STW20-3ROADCLOSEDAHEADW20-2aDETOURAHEADW20-3ROADCLOSEDAHEADW20-2aDETOURAHEADROADWORKAHEADW20-1X*R3-2ONLYR3-5R12'12'RIGHT TURN ONLY SIGNONLYR3-5RR3-2NO LEFT TURN SIGNX*MFP24004237
TRAFFIC DETOURROUTE2ENGINEERING FIRM: WAECO ENGINEERINGDRAWING FILE PATH: V:\ENGINEERING\BUILT\1024204_RENTON_S 3RD ST REPAIR_20240624\CAD DATA\1024204_REPAIR_TCP.DWG 7/9/2024 10:57 AMSHEET #PROJECT NUMBER: XXCLIENT FIRM: VERIZONPERMIT NUMBER: XXOF2WAECO INTERNAL PROJECT NUMBER: 1024204
24 HOUR CONTACT1025 S. 3RD. ST.,RENTON, WA 98036WAECO SUPERVISORSCOTT CHRISTENSONJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM425.471.1079SCOTT.CHRISTENSON@VERIZON.COMORIGINALREV #0REVIEWEDAS-BUILTDATE06/28/2024TECHENGMKIJJPTLFJJP--------------------7/9/24----PROPRIETARY - NOT FOR DISTRIBUTIONPLAN VIEWSCALE: NO SCALEDETOUR LEGENDSTART DETOUR - CLOCKWISESTART DETOUR - COUNTER CLOCKWISEDETOURM4-9RM4-9LDETOURM4-9LDETOURM4-9LDETOURDETOURM4-9RDETOURM4-9RDETOURM4-9RDETOURM4-9RM4-9LDETOURTYPE III BARRICADETYPE
II
I
B
ARR
ICA
DE
MFP24004237
ADDRESS: 1025 S. 3RD. ST., RENTON, WA 98036PROJECT NAME: MARC- S 3RD ST REPAIR DESIGNVERIZONSCOTT CHRISTENSONVZB ENGINEERSCOTT.CHRISTENSON@VERIZON.COM(425)471-1079WAECO ENGINEERINGJOSEPH PARKERENGINEERING MANAGERJPARKER@WAECOENG.COM(253) 315-33261COVER SHEET2LEGEND3GENERAL NOTES4DESIGN PLAN VIEW5RESTORATON PLANS6 SITE PHOTOGRAPHSPROJECT CONSITS OF DEEP EXCAVATION INORDER TO REPAIR DAMAGE CONDUIT.VICINITY MAPNOT TO SCALECOVER SHEETCONTACTSSHEET INDEXSCOPE OF WORKSITE LOCATIONNOT TO SCALE1ENGINEERING FIRM: WAECO ENGINEERINGDRAWING FILE PATH: V:\ENGINEERING\BUILT\1024204_RENTON_S 3RD ST REPAIR_20240624\CAD DATA\1024204_REPAIR_PLANS.DWG 7/10/2024 8:15 AMSHEET #PROJECT NUMBER: XXVERIZON ENGINEERCLIENT FIRM: VERIZONPERMIT NUMBER: XX1025 S. 3RD. ST.,RENTON, WA 98036WAECO ENGINEERSCOTT CHRISTENSONJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM425.471.1079SCOTT.CHRISTENSON@VERIZON.COMKnow what's below.Call before you dig.ROF6WAECO INTERNAL PROJECT NUMBER: 1024204 ORIGINALREV #0REVIEWEDAS-BUILTDATE06/28/2024TECHENGMKIJJP--------TLFJJP------------7/10/24----PROPRIETARY - NOT FOR DISTRIBUTIONSHEET 4MFP24004237
LEGENDMST4 PORTUTILITY RISERUTILITY POLEPOLE ANCHOR/DOWN GUYMANHOLEHANDHOLEPEDESTALPULLBOXFIBER DISTRIBUTION PANELGROUND BONDUTILITY BREAK/CONTINUATIONUTILITY ENDMISCELLANEOUS UTILITYUTILITY STRUCTURECATCH BASINFIRE HYDRANTSTREET LIGHT POSTSTREET LIGHTTRAFFIC ARM/STOP LIGHTTREEHEDGERUTILITY RISERUTILITY POLEPOLE ANCHOR/DOWN GUYMANHOLEHANDHOLEPEDESTALPULLBOXFIBER DISTRIBUTION PANELDOWN GUY ON EXISTING ANCHORMULTIPORT SERVICE TERMINALUTILITY POTHOLEBORE PITRDRAWING SYMBOL LEGENDPROPOSED SYMBOLSEXISTING SYMBOLS2ENGINEERING FIRM: WAECO ENGINEERINGDRAWING FILE PATH: V:\ENGINEERING\BUILT\1024204_RENTON_S 3RD ST REPAIR_20240624\CAD DATA\1024204_REPAIR_PLANS.DWG 7/10/2024 8:15 AMSHEET #PROJECT NUMBER: XXVERIZON ENGINEERCLIENT FIRM: VERIZONPERMIT NUMBER: XX1025 S. 3RD. ST.,RENTON, WA 98036WAECO ENGINEERSCOTT CHRISTENSONJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM425.471.1079SCOTT.CHRISTENSON@VERIZON.COMKnow what's below.Call before you dig.ROF6WAECO INTERNAL PROJECT NUMBER: 1024204 ORIGINALREV #0REVIEWEDAS-BUILTDATE06/28/2024TECHENGMKIJJP--------TLFJJP------------7/10/24----PROPRIETARY - NOT FOR DISTRIBUTION#1+00AERIAL FIBER W/ STRANDAERIAL FIBER (ADSS)AERIAL FIBER W/ OVERLASHFIBER THROUGH EXISTING CONDUITCONDUITSTRANDPROPOSED LINETYPESEXISTING LINETYPESAERIAL FIBERCONDUITSTRANDRIGHT OF WAYPARCEL BOUNDARYCURBEDGE OF PAVEMENT - ROADFENCE WOOD/METALGAS PIPEWATER PIPETELEPHONE LINEELECTRICAL LINESANITARY SEWER (SS)STORM DRAIN PIPECABLE TV LINESTEAM PIPEOIL PIPEUNKNOWN UTILITYFIBER OPTIC LINETELECOMMUNICATIONSSTATIONING LINELINETYPE LEGENDIDENTIFICATION LABELSXXXCONSTRUCTION/RESTORATION CALLOUTUTILITY POLE SEQUENCE CALLOUTPHOTO MARKERFIBER STORAGE LOOPFIBER STORAGE LOOPWITH SPLICE POINTEXISTING SPLICE POINTWITH NEW TAILPOWER RECLOSERFIBER LENGTH ON SHEETFIBER LENGTH STRUCTURE TO STRUCTUREXSEQ #:X'SEQ #:X'SEQ #:X'EHSEXTRA HIGH STRENGTHHDPEHIGH DENSITY POLYETHYLENE(H)HORIZONTALHHHANDHOLEJBJUNCTION BOXMHMANHOLEMPMILE POSTMSTMULTIPORT SERVICE TERMINALPVCPOLY VINYL CHLORIDERGSRIGID GALVANIZED STEEL CONDUITROW RIGHT OF WAYSTA.STATIONSTRSTRUCTURE(V)VERTICALPD-##PEDESTAL NUMBERVT-##VAULT NUMBERUP-##UTILITY POLE NUMBER###FFIBER CABLE THREAD COUNTABBREVIATIONSEXISTING SIDEWALKCONCRETE RESTORATIONASPHALT RESTORATIONASPHALT OVER PCC RESTORATIONLANDSCAPE RESTORATIONHATCH PATTERN LEGEND(XXX')(XXX' STR-STR)RECLOSER #:XXXXMFP24004237
GENERAL NOTESGENERAL NOTES:THE LOCATIONS OF UTILITIES SHOWN ON THESE DRAWING ARE ONLY APPROXIMATE. WAECO ENGINEERING HEREBY DISCLAIMS ANY RESPONSIBILITY TOTHIRD PARTIES FOR THE ACCURACY OF THIS INFORMATION. PERSONS WORKING IN THE AREA COVERED BY THIS DRAWING MUST CONTACT THESTATEWIDE CALL-BEFORE-YOU-DIG SYSTEM TO ASCERTAIN THE LOCATION OF UNDERGROUND UTILITIES PRIOR TO PERFORMING ANY EXCAVATION.1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEED SITE WORK STANDARDS AND THESTANDARDS AND SPECIFICATIONS SET FORTH IN THE JURISDICTION REGULATIONS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERETHERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE HIGHER QUALITY STANDARD SHALLAPPLY. ALL WORK WITHIN THE PUBLIC R.O.W. OR EASEMENTS MAY REQUIRE INSPECTION AND APPROVAL BY THE JURISDICTION INSPECTOR.INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO BE PROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER.2.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES, AS SHOWN ON THESE PLANS, ISBASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TOBE RELIED UPON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST 48 HOURS BEFOREANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY PERTINENT LOCATIONS ANDELEVATIONS, ESPECIALLY AT THE CONNECTION POINTS AND AT POTENTIAL UTILITY CONFLICTS. IT SHALL BE THE RESPONSIBILITY OF THECONTRACTOR TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLE AGENCIES. THE CONTRACTOR SHALLNOTIFY THE JURISDICTION INSPECTOR AT LEAST 48 HOURS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY OR CONSTRUCTION ON ANYAND ALL PUBLIC IMPROVEMENTS IF REQUIRED.4.THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE JURISDICTION AND ALL UTILITY COMPANIES WITH REGARD TO RELOCATIONS ORADJUSTMENTS OF EXISTING UTILITIES DURING CONSTRUCTION, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION, AND WITH AMINIMUM DISRUPTION OF SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANYUTILITY SERVICE.5.THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS ANDSPECIFICATIONS, AND ONE (1) COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALL TIMES.6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO: EXCAVATION, TRENCHING, SHORING,TRAFFIC CONTROL, AND SECURITY.7.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HIS SUBCONTRACTORS, OR OTHER AFFECTEDPARTIES WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THEENGINEER IMMEDIATELY.8. ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATEDOTHERWISE.9. FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE JURISDICTION, THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL ANDPHASING PLAN IN ACCORDANCE WITH M.U.T.C.D. FOR APPROVAL. PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THERIGHT-OF-WAY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY SAIDPLANS. PRIOR TO INSTALLATION A PRECONSTRUCTION CONFERENCE SHALL BE HELD WITH JURISDICTION.10. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDEDIMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BE PROVIDED, INSTALLED, CONSTRUCTED, REMOVED OR RELOCATED UNLESSSPECIFICALLY NOTED OTHERWISE.11. PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE AND CLEAR OF ALL CONSTRUCTION DEBRISAND DIRT TRACKED FROM THE SITE.12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORD DRAWINGS KEPT AT THE CONSTRUCTIONSITE AND AVAILABLE TO THE JURISDICTION INSPECTOR AT ALL TIMES.13. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. FOR ADDITIONAL INFORMATION CONTACT THEENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS.14. ALL TEMPORARY EROSION AND SEDIMENT CONTROL (T.E.S.C.) MEASURES SHALL BE INSTALLED AT THE LIMITS OF CONSTRUCTION PRIOR TO GROUNDDISTURBING ACTIVITY. ALL T.E.S.C. MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME AS THE ENTIREDISTURBED AREAS ARE STABILIZED WITH HARD SURFACE OR LANDSCAPING.15. ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE JURISDICTION ENGINEERING DEPARTMENT STANDARDDETAILS AND SPECIFICATIONS.16. ALL CONSTRUCTION OPERATIONS, INCLUDING THE WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR RUNNING OF TRUCKS, EARTH MOVINGEQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED EQUIPMENT SHALL GENERALLY BE LIMITED TO THE TIME PERIOD APPROVEDBY THE JURISDICTION.3ENGINEERING FIRM: WAECO ENGINEERINGDRAWING FILE PATH: V:\ENGINEERING\BUILT\1024204_RENTON_S 3RD ST REPAIR_20240624\CAD DATA\1024204_REPAIR_PLANS.DWG 7/10/2024 8:15 AMSHEET #PROJECT NUMBER: XXVERIZON ENGINEERCLIENT FIRM: VERIZONPERMIT NUMBER: XX1025 S. 3RD. ST.,RENTON, WA 98036WAECO ENGINEERSCOTT CHRISTENSONJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM425.471.1079SCOTT.CHRISTENSON@VERIZON.COMKnow what's below.Call before you dig.ROF6WAECO INTERNAL PROJECT NUMBER: 1024204 ORIGINALREV #0REVIEWEDAS-BUILTDATE06/28/2024TECHENGMKIJJP--------TLFJJP------------7/10/24----PROPRIETARY - NOT FOR DISTRIBUTIONMFP24004237
PARCEL# 7231500910ADDRESS: 1000 S 3RD ST
HHDESIGNPLAN VIEWSCALE: 1"=40'40'030'20'10'4ENGINEERING FIRM: WAECO ENGINEERINGDRAWING FILE PATH: V:\ENGINEERING\BUILT\1024204_RENTON_S 3RD ST REPAIR_20240624\CAD DATA\1024204_REPAIR_PLANS.DWG 7/10/2024 8:15 AMSHEET #PROJECT NUMBER: XXVERIZON ENGINEERCLIENT FIRM: VERIZONPERMIT NUMBER: XX1025 S. 3RD. ST.,RENTON, WA 98036WAECO ENGINEERSCOTT CHRISTENSONJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM425.471.1079SCOTT.CHRISTENSON@VERIZON.COMKnow what's below.Call before you dig.ROF6WAECO INTERNAL PROJECT NUMBER: 1024140 ORIGINALREV #0REVIEWEDAS-BUILTDATE06/28/2024TECHENGMKIJJP--------TLFJJP------------7/10/24----PROPRIETARY - NOT FOR DISTRIBUTIONPLAN VIEWSCALE: 1" = 40'1CONSTRUCTION NOTESSYMBOL CORRESPONDS TO PHOTO LOCATIONS AND ORIENTATION.#1DIG AND INTERCEPT EXISTING MCI CONDUIT,REMOVE DAMAGED SECTION AND REPAIR.PARCEL# 7231500900ADDRESS2: 26 MAIN AVE SPARCEL# 7231500915ADDRESS: 35 MILL AVE S
1RENTON
AVE
SCEDAR R
IVER
TRA
IL
WALKS 3RD STHOUSER WAY S
MILL AVE S
MFP24004237RESTORATION PER CITY OF RENTON STANDARDS
24'32'16'5ENGINEERING FIRM: WAECO ENGINEERINGDRAWING FILE PATH: V:\ENGINEERING\BUILT\1024204_RENTON_S 3RD ST REPAIR_20240624\CAD DATA\1024204_REPAIR_PLANS.DWG 7/10/2024 8:15 AMSHEET #PROJECT NUMBER: XXVERIZON ENGINEERCLIENT FIRM: VERIZONPERMIT NUMBER: XX1025 S. 3RD. ST.,RENTON, WA 98036WAECO ENGINEERSCOTT CHRISTENSONJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM425.471.1079SCOTT.CHRISTENSON@VERIZON.COMKnow what's below.Call before you dig.ROF6WAECO INTERNAL PROJECT NUMBER: 1024140 ORIGINALREV #0REVIEWEDAS-BUILTDATE06/28/2024TECHENGMKIJJP--------TLFJJP------------7/10/24----PROPRIETARY - NOT FOR DISTRIBUTIONPLAN VIEWSCALE: 1" = 20'ARESTORATIONPLAN VIEWSCALE: 1"=40'40'030'20'10'PARCEL# 7231500915ADDRESS: 35 MILL AVE S
RESTORATION NOTESSYMBOL CORRESPONDS TO PHOTO LOCATIONS AND ORIENTATION.#ARESTORE SECTION OF ASPHALT TO CITY OFRENTON STANDARDSS 3RD STHOUSER WAY
SCEDAR R
IVER
TRA
IL
WALKRENTON A
VE
SMFP24004237
SITEPHOTOGRAPHS1FACING SOUTH, ON MILL AVE S & HOUSER WAY6ENGINEERING FIRM: WAECO ENGINEERINGDRAWING FILE PATH: V:\ENGINEERING\BUILT\1024204_RENTON_S 3RD ST REPAIR_20240624\CAD DATA\1024204_REPAIR_PLANS.DWG 7/10/2024 8:16 AMSHEET #PROJECT NUMBER: XXVERIZON ENGINEERCLIENT FIRM: VERIZONPERMIT NUMBER: XX1025 S. 3RD. ST.,RENTON, WA 98036WAECO ENGINEERSCOTT CHRISTENSONJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM425.471.1079SCOTT.CHRISTENSON@VERIZON.COMKnow what's below.Call before you dig.ROF6WAECO INTERNAL PROJECT NUMBER: 1024140 ORIGINALREV #0REVIEWEDAS-BUILTDATE06/28/2024TECHENGMKIJJP--------TLFJJP------------7/10/24----PROPRIETARY - NOT FOR DISTRIBUTION1CONSTRUCTION NOTESSYMBOL CORRESPONDS TO PHOTO LOCATIONS AND ORIENTATION.#1DIG AND INTERCEPT EXISTING MCI CONDUIT,REMOVE DAMAGED SECTION AND REPAIR.MFP24004237