Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
REPORT 01
February 3, 2017 Luke Randles PACLAND 1505 Westlake Ave N, Ste 305 Seattle, WA 98117 SUBJECT: "Off Hold" Notice Denis Law Mayor Community & Economic Development C. E. "Chip" Vincent, Administrator Renton Firestone on 1081h/ LUA16-000782, ECF, CU-A ,SA-A, MOD Dear Mr. Randles: Thank you for submitting the additional materials requested in the November 9, 2016 letter from the City. Your project has been taken off hold and the City will continue review of the Renton Firestone project. The Conditional Use Permit and Site Plan Review application has been rescheduled for Environmental Review Committee review on February 27, 2017. If you have any questions, please contact me at (425) 430-6593 or mherrera@rentonwa.gov Matthew Herrera, AICP Senior Planner cc: Real Property Investors/ Owner(s) Luke Randles, Pacland / Applicant Jerry Sammons, John and Karen Snarski, Mark Sandler, Zoe Mattson/ Party(ies) of Record 1055 South Grady Way, Renton, WA 98057 • rentonwa.gov Denis Law Mayor November 9, 2016 Community & Economic Development C. E. "Chip" Vincent, Administrator Luke Randles PACLAND 1505 Westlake Ave N, Ste 305 Seattle, WA 98117 SUBJECT: "On Hold" Notice Renton Firestone on 108th, LUA16-000782, ECF, CU-A, SA-A, MOD (4) Dear Mr. Randles: The Planning Division of the City of Renton accepted the above master application for review on October 17, 2016. During our review, staff has determined that additional information is necessary in order to proceed further. The following information will need to be submitted before February 7, 2016 so that we may continue the review of the above subject application: 1. Stormwater -The provided Technical Information Report (TIR) is incomplete and includes information for the CarMax project. A completed TIR and associated drainage plans (if revisions are needed) must be resubmitted. 2. Setbacks -The front yard for the subject property is along the 108th Ave SE frontage. After right-of-way dedication along 108th Ave SE, the building is shown on the site plan to be setback between 15-feet on the southwest corner of the building and taper to an approximate 13.6 feet setback at the northwest corner resulting in an encroachment into the 15-foot setback for portions of the building (RMC 4-4-120A). Revised site, landscape, and civil plans must be resubmitted that show compliance with the 15-foot minimum setback. 3. Landscaping -The required street frontage landscaping between the building and the sidewalk is shown within the dedicated ROW. Required street frontage landscaping (trees, shrubs, and groundcover) must be provided onsite and not in the area of dedicated ROW (RMC 4-4-070F.l}. The remaining undeveloped dedicated ROW between the subject property and the sidewalk shall be landscaped with shrubs and groundcover (RMC 4-4- 070F.2). The required perimeter landscaping screen between the surface parking lot and dedicated ROW line along 108th Ave SE is approximately 8.5-feet and does not comply with the 10- foot width minimum as shrub planting is located within the dedicated ROW. The parking area must be setback 10-feet from dedicated ROW and contain perimeter lot landscaping within the 10-feet that meet the planting requirements of RMC 4-4-070H.4. 1055 South Grady Way, Renton, WA 98057 • rentonwa.gov Internal parking lot landscaping is separated by more than SO-feet and does not meet RMC 4-4-070 4. Building Design -The following design comments reflect the Urban Design Regulations for the subject property's Design District 'D' overlay, Conditional Use Permit decision criteria, and comments provided at the preapplication meeting. Revised elevations reflecting these . comments must be resubmitted. a) Roof profile -The building elevations provide limited transition treatments with regard to the neighboring R-8 zone and single-family residential uses. As mentioned at the preapplication meeting, transition to the neighboring zone is an important aspect of review for the design regulations and CUP criteria. Staff identified the use of pitched roof instead flat roof profiles during the preapplication meeting to meet this requirement. (RMC 4-3-lOOE.1.'Transition to Surrounding Development'). b) Transparency -There is insufficient transparency on facades visible to the public. At least SO-percent transparent windows and/or doors for the fa~ade between 4-feet and 8-feet above ground (RMC 4-4-lOOES 'Ground Level Details'). More glazing is needed and a calculation provided to verify compliance must be provided on the revised elevation sheet(s). c) Building materials -The abundance of CMU and EIFS exterior cladding does not provide an attractive and high quality material variation that is warranted for a commercial development in close proximity to a residential zone (RMC 4-3-lOOE.S Building Materials). The facades should maintain a prominent brick exterior that provides banding and patterns with smaller sections of EIFS treatments to provide material variation. CMU exteriors should be removed altogether with the exception of banding. d) Modulation -The building provides no apparent modulations to break up the bulk of the north, west, and south facades. Modulations are needed meeting the requirements of RMC 4-4-lOOE.S 'Building Character and Massing' e) Canopies -Weather protection must be at least 4.S-feet wide as it extends from the building. Weather protection must also be provided along 7S-percent of the length of the fa~ade facing the street. The canopies shown do not meet these minimum dimensions. f) South elevation -The south elevation is visible from 1081h Ave SE and must be treated. Modulations, clerestory glazing in-lieu of ground-level glazing, brick banding, and landscaping will provide the necessary treatments for the 'back of house' fa~ade. 5. Tree Retention -The proposed site plan removes all onsite trees with the exception of a single tree on the southeast portion of the property. The City received two timely comment letters concerning the removal of the trees along the eastern border resulting in the loss of ® a buffer to the commercial zone. The mature vegetation along the eastern property extends to properties to the south and provides a buffer and transition to the adjacent single-family ~ ~. 1055 South Grady Way, Renton, WA 98057 • rentonwa.gov neighborhood from commercial activity along lOS'h Ave SE. The development proposal requires a Conditional Use Permit, and as such, the proposal must meet decisional criteria that include: (1) appropriate location; (2) the effect on adjacent properties; (3) compatibility; and (4) noise, light, and glare (RMC 4-9-030D). The removal of the mature vegetation and reducing the width of this buffer that has provided a transition to the single- family neighborhood for decades does not meet these conditional use criteria. A revised site plan that addresses these concerns will be required. 6. Vehicle Connection -RMC 4-2-120A requires a vehicle connection site-to-site vehicle access ways, where topographically feasible, to allow a smooth flow of traffic across abutting CA lots without the need to use a street. Access may comprise the aisle between rows of parking stalls, but is not allowed between a building and a public street. The topography is likely not feasible to the south, but it is to the north. A revised site plan that provides this connection with the development, not in the future, will be required. At this time, your project has been placed "on hold" pending receipt of the requested information. Please contact me at (425) 430-6593 or mherrera@rentonwa.gov if you have any questions and/or when you are ready to schedule a resubmittal intake. appointment. Sincerely, Matthew Herrera, AICP Senior Planner cc Real Property Investors/ Owner(s) Zoe Mattson, Luke Randles, Jerry Sammons, John and Karen Snarski, Mark Sandler/ Party(ies) of Record Ann Fowler1 Civil Engineer JI 1055 South Grady Way, Renton, WA 98057 • rentonwa.gov ® CITY OF RENTON DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT -PLANNING DIVISION AFFIDAVIT OF SERVICE BY MAILING On the 17th day of October, 2016, I deposited in the mails of the United States, a sealed envelope containing Notice of Application and Acceptance documents. This information was sent to: Agencies Luke Randles, Pacland Real Property Investors 300' Surrounding Properties (Signature of Sender): STATE OF WASHINGTON COUNTY OF KING See Attached Applicant/Contact Owner See Attached I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct, I know or have satisfactory evidence that Sabrina Mirante signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and purposes mentioned in the instrument. Dated: _..=Ocschwt=""----'-1 :i-_.,_,_...,2,.,.oc,.( ,..& j Renton Firestone on 108'h LUA16-000782, ECF, CU-H, SA-A, MOD, MOD, MOD, MOD template -affidavit of service by mailing Dept. of Ecology** Environmental Review Section PO Box 47703 Olympia, WA 98504-7703 WSDOT Northwest Region* Attn: Ramin Paz.ooki King Area Dev. Serv., MS-240 PO Box 330310 Seattle, WA 98133-9710 US Army Corp. of Engineers* Seattle District Office Attn: SEPA Reviewer PO Box C-3755 Seattle, WA 98124 Boyd Powers*** Depart. of Natural Resources PO Box 47015 Olympia, WA 98504-7015 KC Dev. & Environmental Serv. Attn: SEPA Section 35030 SE Douglas St. #210 Snoqualmie, WA 98065 Metro Transit Senior Environmental Planner Gary Kriedt 201 South Jackson Street KSC-TR-0431 Seattle, WA 98104-3856 Seattle Public Utilities Jalaine Madura, Attn: SEPA Responsible Official 700 Fifth Avenue, Suite 4900 PO Box 34018 Seattle, WA 98124-4018 AGENCY (DOE) LETTER MAILING (ERC DETERMINATIONS) Dept. of Ecology** Attn: Misty Blair PO Box 47703 Olympia, WA 98504-7703 Duwamish Tribal Office* 4717 W Marginal Way SW Seattle, WA 98106-1514 KC Wastewater Treatment Division* Environmental Planning Supervisor Ms. Shirley Marroquin 201 S. Jackson ST, MS KSC-NR-050 Seattle, WA 98104-385S WDFW -Larry Fisher* 1775 12th Ave. NW Suite 201 Issaquah, WA 98027 City of Newcastle Attn: Tim McHarg Director of Community Development 12835 Newcastle Way, Ste 200 Newcastle, WA 98056 Puget Sound Energy Wendy Weiker, Community Svcs. Mgr. 355 110th Ave NE Mailstop EST llW Bellevue, WA 98004 Puget Sound Energy Doug Corbin, Municipal liaison Mgr. 6905 South 228" St Kent, WA 98032 Muckleshoot Indian Tribe Fisheries Dept.** Attn: Karen Walter or SEPA Reviewer 39015 -172nd Avenue SE Auburn, WA 98092 Muckleshoot Cultural Resources Program ** Attn: Laura Murphy 39015 172nd Avenue SE Auburn, WA 98092-9763 Muckleshoot Cultural Resources Program** Attn: Erin Slaten 39015172nd Avenue SE Auburn, WA 98092-9763 Office of Archaeology & Historic Preservation* Attn: Gretchen Kaehler PO Box 48343 Olympia, WA 98504-8343 City of Kent Attn: Charlene Anderson, AlCP, ECD 220 Fourth Avenue South Kent, WA 98032-5895 City of Tukwila Jack Pace, Responsible Official 6200 Southcenter Blvd. Tukwila, WA 98188 *Note: If the Notice of Application states that it is an "Optional DNS", the marked agencies and cities will need to be sent a copy of the Environmental Checklist, Site Plan PMT, and the Notice of Application. """Department of Ecology is emailed a copy of the Environmental Checklist, Site Plan PMT, & Notice to the following email address: sepaunit(Wecy.wa,_g_o_v ** Karen Walter, Laura Murphy and Erin Slaten with the Muckleshoot Indian Tribe Fisheries Dept. are emailed a copy of the Environmental Checklist, Site Plan PMT, & Notice to the following email addresses: KWaiter@muckleshoot.nsn.u_::. / L~!J r a.mu rphy@muckleshoot.nsn.us L er in. s I ate ~@_en uck les hoot. ns n. u::, ***Department of Natural Resources is emailed a copy of the Environmental Checklist, Site Plan PMT, & Notice the following email address: ]ep~_centcr@dnr.wa.gov template -affidavit of service by mailing Real Property Investors 2618 2nd Ave Seattle, WA 98121 Luke Randles Pacland 1505 Westlake Ave N, 305 Seattle, WA 98117 1116100020 3223059065 3223059175 ARTERITANO JULIA M+BATES RO TRIMARK NORTH BENSON LP AJF LLC 2627 EASTLAKE AVE E 406 ELLINGSON RD 2ND FL 1422 EDINGER AVE #150 SEATILE, WA 98102 PACIFIC, WA 98047 TUSTIN, WA 92780 3223059330 3223059330 3223059119 NWR REALTY LLC NWR REALTY LLC MCDONALDS CORP 046/0138 18815 139TH AVE NE 18815 139TH AVE NE PO BOX 182571 WOODINVILLE, WA 98072 WOODINVILLE, WA 98072 COLUMBUS, OH 43218 3223059087 3223059054 3223059330 VOLK ROBERT DAVIES DESIMONE TRUST WEN DYS NWR REAL TY LLC 1440 ORLANDO RD 1201 3RD AVE #5010 18815 139TH AVE NE SAN MARINO, CA 91108 SEATILE, WA 98101 WOODINVILLE, WA 98072 3223059090 3223059087 3223059104 KHADRA $AMIR VOLK ROBERT DAVIES PRUZAN BUILDING COMPANY LL 524 DOUGLAS ST 1440 ORLANDO RD PO BOX 9386 WENATCHEE, WA 98801 SAN MARINO, CA 91108 SEATILE, WA 98109 3223059330 3223059090 3223059330 NWR REALTY LLC KHADRA SAMIR NWR REALTY LLC 18815 139TH AVE NE 524 DOUGLAS ST 18815 139TH AVE NE WOODINVILLE, WA 98072 WENATCHEE, WA 98801 WOODINVILLE, WA 98072 3223059120 3223059201 3223059201 OREILLY AUTO ENTERPRISES MAEHREN MARCIAL MAEHREN MARCIAL PO BOX 06116 P O BOX 494303 P O BOX 494303 CHICAGO, IL 60606 REDDING, CA 96049 REDDING, CA 96049 3223059063 3223059063 3223059063 CURRENT TENANT CURRENT TENANT CURRENT TENANT 17625 108th Ave SE 17615 108th Ave SE Suite A 17701108th Ave SE Suite 219 Renton, WA 98055 Renton, WA 98055 Renton, WA 98055 3223059063 3223059063 3223059063 CURRENT TENANT CURRENT TENANT CURRENT TENANT 10561 SE Carr Rd 10725 SE Carr Rd 10703 SE Carr Rd Renton, WA 98055 Renton, WA 98055 Renton, WA 98055 3223059063 3223059063 3223059063 CURRENT TENANT CURRENT TENANT CURRENT TENANT 10721 SE Carr Rd 17705 108th Ave SE 17615 108th Ave SE Renton, WA 98055 Renton, WA 98055 Renton, WA 98055 3223059063 3223059063 3223059063 CURRENT TENANT CURRENT TENANT CURRENT TENANT 10619 SE Carr Rd 17701108th Ave SE 17615 108th Ave SE Suite B Renton, WA 98055 Renton, WA 98055 Renton, WA 98055 3223059063 3223059063 3223059063 CURRENT TENANT CURRENT TENANT CURRENT TENANT 17615 108th Ave SE Suite C 10555 SE Carr Rd 17711108th Ave SE Renton, WA 98055 Renton, WA 98055 Renton, WA 98055 3223059063 3223059063 3223059063 CURRENT TENANT CURRENT TENANT CURRENT TENANT 10551 SE Carr Rd 17633 108th Ave SE 10715 SE Carr Rd Renton, WA 98055 Renton, WA 98055 Renton, WA 98055 3223059063 3223059063 3223059063 CURRENT TENANT CURRENT TENANT CURRENT TENANT 17707 108th Ave SE 17701108th Ave SE Suite 504 10713 SE Carr Rd Renton, WA 98055 Renton, WA 98055 Renton, WA 98055 3223059063 3223059063 3223059063 CURRENT TENANT CURRENT TENANT CURRENT TENANT 10707 SE Carr Rd 17709 108th Ave SE 10727 SE Carr Rd Renton, WA 98055 Renton, WA 98055 Renton, WA 98055 3223059063 3223059063 3223059063 CURRENT TENANT CURRENT TENANT CURRENT TENANT 10719 SE Carr Rd 17621108th Ave SE 17637 108th Ave SE Renton, WA 98055 Renton, WA 98055 Renton, WA 98055 3223059063 3223059016 3223059016 CURRENT TENANT FRED MEYER STORES I NC CURRENT TENANT 17629 108th Ave SE 1014 VINE ST 7TH FLOOR 17801108th Ave SE Suite A Renton, WA 98055 CINCINNATI, OH 45202 Renton, WA 98055 3223059016 1116100070 5438000240 FRED MEYER STORES INC STILL DOUGLAS B ARUNGA MARCIA TATE 1014 VINE ST 7TH FLOOR 17804 109TH AVE SE 17653 110TH AV SE CINCINNATI, OH 45202 RENTON, WA 98055 RENTON, WA 98055 5438000300 1116100100 1116100040 LWAI KEI NIERENBERG ELLIS+KATHY RANOS RICARTE L & ESTRELLIT 17835 110TH AVE SE 35 N SHORE DR 17646109TH AVE SE RENTON, WA 98055 ORONDO, WA 98843 RENTON, WA 98055 5438000270 1116100110 1116100050 TOM WING M+BARBARA K ARLINT JAMES M+MELINDA J MATISON ZOE E 18728 137TH CT SE 17834109TH AVE SE 17654109TH AVE SE RENTON, WA 98058 RENTON, WA 98055 RENTON, WA 98055 5438000280 3223059105 1116100080 FROST KEVIN+MARLENE BILC FLORENTINA SNARSKI JOHNNIE+KAREN 17819 110TH AVE SE 17655 109TH AV SE 17810 109TH AV SE RENTON, WA 98055 RENTON, WA 98005 RENTON, WA 98055 5438000250 MARTINEZ SARAH 17659 110TH AVE SE RENTON, WA 98055 5438000260 JOHNSON ROBERTA PO BOX 58893 RENTON, WA 98058 1116100030 STROHSCHEIN DONALD & JULIE 14715 SE 145TH PL RENTON, WA 98059 5438000290 SAMMONSJ W 17827 110TH AVE SE RENTON, WA 98055 5438000310 LEEPER CLIFFORD S+JOSHUA L 17843 110TH AVE SE RENTON, WA 98055 1116100060 MATTSON ERIC M+DAVID H 17660 109TH AVE SE RENTON, WA 98055 1116100090 TERRY JASON+ TRACY K 17818 109TH AV SE RENTON, WA 98055 3223059334 GOUNDER PARAMASEVAN+CHRISTI 17661109TH AVE SE RENTON, WA 98055 5438000230 MURTHI RAM+USHA+JASON J MUR 17645 110TH AVE SE RENTON, WA 98055 1116100120 WILMORE DARRY AND LATHROPE 17844109TH AVE SE RENTON, WA 98055 ~ CITYOF ~. ---"~Re11ton u, NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE (DNS) A MilSter Application ha• been filed and ac<:epted with the Department of Community & Economic Development [CED)-Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: October 17, 2016 LAND USE NUMBER: LUA16-000782, ECF, CU-A, SA-A, MOO, MOO, MOD, MOO PROJECT NAME: Renton Fi,estone at 108th PROJECT DESCRIPTION: The ilpplicant IS requesting Admin11trat;ve Site Plan Review, Administrati'le Cona1t1onal U$e Permit, and E:nvironmemal Review of a proposed 7,700 square foot building to accommodate a new vehicle service and repair business. Associoted improvements include surface parking fer 24 vehkles, stormwater detention vault. and landscaping. The existing restaur.;mt will be removed. Access to the site will remain in appro,irnately the same location '" the former restaurant along the 108th A~e SE frontage. The applicant also requests taur 141 modifications to code requ1rements related to frontage improvements along 108th SE and 109 Ave SE, ~arbage and recycling enclosure requirements, and loading space standards. The subject property 1s appro,imately 0.87 acres wllh no critical areas mapped on-S<te. PROJECT LOCATION: 17808 108" Ave SE OPTIONAL DETERMINATION OF NON"SIGNIFlCANCE (DN5): As the Le.id Agency, the City of Henton has determined that s1gn1ficant environmental impacts are u~ljkely to result from the proposed pro1e~t TherEfon', as permitted under the RCW 43.ZlC.110, the City of Rwton is us,ng the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed ONS are integrated into a single comment period. There will be no comm~nt period following the issuance of the Threshold Determination of Non-Significance (DNS). This may ~ tt.e only opponunity to co,nment on the environmental impacts of the proeosal A 14-day appeal period will follow the ossuance of the ONS PERM\TAPPLICATION DATE: NOTICE OF COMPLETE APPLICATION; APPLICANT/PROJECT CONTACT PERSON: October 6, 2016 October 17, 2016 Luke Randle,, Pad and/ 1505 Westlake Ave N., Ste 305/ Seattle, WA 911117 { 206-522-9510/ \randles@patland.com Permits/Review Requested: Other Permits which may be required, Requested Studies: location where appllcatlon may be rev le wed: Environmental (SEPA) Review, Administrative Site Plan and Conditional Use, Modification, Buildlni: Permit, Construction Permit, Fire Permit, Sign Permit Arbcrist Report. Drainage Report, Geotechnlcal Report, Landscape Analysis Traffic Impact Study, Department of Communify & Economic Development (CED)-Planning Division, SiJCth Floor Renton City Hall, 1055 South Grady WifV, Renton, WA 99057 If you would 1,ke to be made a party of record to receive further information on this proposed project, compl~te this form and return to: (ily of Renton, CED -Planning Division, 1055 So. Grady Way, Kenton, WA 98057. Name/F;le No.; Renton Firestone on 108" / LUA16·DD0782, ECF, CU-A, SA-A, MOD, MOD, MOD, MOD ~ ~--~ .. __...Renton® ONSISTENCY OVERV!EW: oning/Land Use: invlronmental Document., that !valuate the Proposed Project: Development Resulations Used foe Project Mitigation: The subject Site is desi~nated COMP-CMU on the (ity of Renton comprehensive Land Use Mop and Des,gn-0, CA on the City's zoning Map Environmental (5EPA) Checklist The project will be subject to the City's SEPA ordinance RMC Title IV Chapters 2, 3, 4, 6, 8, 9, and 11 and other applicable codes and reEulat1ons as appropriate. Camm~nt., on the above applicatian must be submitted · · I Planning Division, 1055 South Grady Way Rent WA 98 ,n bwnt ng to Matthew Herrera, Senior Planner, CED _ about this proposal, or wish to be made a ~arty :;~cord a o:7, Y_S:OOdPM_ on Octo.ber 31, 2016. If you have quernons Manager. Arryone who submits written commems will aut:mra~~:~le :/1t1onal not1frcat1on by mail, contact !he .Project any decision on this project A copy of the iubsequent threshold det~rm,~:~;n"it:v~do:lereuc;~~ :nqdu::;1 be not,fied of CONTACT PERSON: Matthew Herrera, Senior Planner; Tel: (425) 430·6593· Eml: mherrera@rentonwa.gov ' PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION CERTIFICATION I, ~ 5--1~ e , ~ , hereby certify tli_at copies of the above document were po5ted in _l__ conspicuous places or re;~by-~h~~escrib 1 1. 1 \ /~-,,/··-/ \0 , \ 1 i_ 'l.o \ '-" Slg1I~_::-__ ._.__~~~==-..:.: __ · -::_-=:,:,;.'l_,,.,...~=-,......--:.-=:-_--_-___ _ Date: STATE OF WASHINGTON ss COUNTY OF KING I certify that I know or have satisfactory evidence that M r1)&',,,e 11 , \-\e&:~P.tl signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses ;i,rid purposes mentioned in the instrument. -.... ' '•t ,c c,\..L y,::,: '•1 1 ~t~_,,~w~'~ :a.D\\,. ---,i. >I< ,, "" ,. I -: O OJ: ~'~ \A\ ~ _,,. ="' ~ .. _ ~i ~ z -,,. -'1': .., ,. II\'/ --VI:_:: -.. :.C. ,t::;, \,II ~ -;;: -I :;:: -a • ... ,,,~ .,,,,,. / ~ t V •i ~ 1-~ t ~ •L,c. I :: 'l '~'<917 ~ : /; OA ..... · ..... 0~ : 1, ..... ~ I\~\\\\\,......, ~ .::-- 11,,, 1 ~SHlNG ,.._.:::- 11111"""'''' Notary (Print): My appointment expires: ECONOMIC DEVELOPMENT RETURN TO DEVELOPMENT SERVICES CJiA';;f _----.-v---ci-n ,,..Ren ton® <S~ ~ ~ -) Lll.,re ;, IL,._ Plan Number: Site Address: LUA16-000782 17808 108TH AVE SE Plan Review Routing Slip Tr,~ fel,~17~ ny -Ile ' n,~ ,,.,,,.. a I I 0,-"'1 I ' ,.., 'f'7, ~1 ) Name: Firestone at 108th SE Description: The applicant is requesting Administrative Site Plan Review, Administrative Conditional Use Permit, and Environmental Review of a proposed 7,700 square foot building to accommodate a new vehicle service and repair business. Associated improvements include surface parking for 24 vehicles, stormwater detention vault, and landscaping. The existing restaurant will be removed. Access to the site will remain in approximately the same location as the former restaurant along the 108th Ave SE frontage. The applicant also requests four (4) modifications to code requirements related to frontage improvements along 108th SE and 109 Ave SE, garbage and recycling enclosure requirements, and loading space standards. The subject property is approximately 0.87 acres with no critical areas mapped on-site. Review Type: Date Assigned: Planning Review-Version 1 10/17/2016 Date Due: 10/31/2016 Project Manager: Matt Herrera Environmental Impact Earth Animals Air Environmental Health Water Energy/Natural Resources Plants Housing Land/Shoreline Use Aesthetics Where to enter your comments: Manage My Reviews Which types of comments should be entered: Light/GI a re Historic/Cultural Preservation Recreation Airport Envi ronmenta I Utilities 10,000 Feet Transportation 14,000 Feet Public Service Recommendation -Comments that impact the project including any of the Enivornmental Impacts above. Correction -Corrections to the project that need to be made before the review can be completed and /or requesting submittal of additional documentation and/or resubmittal of existing documentation. What statuses should be used: Reviewed -I have reviewed the project and have no comments. Reviewed with Comments -I have reviewed the project and and 1 have comments entered in Recommendations. Correction/Resubmit -I have reviewed the project and the applicant needs to submit and/or resubmit documentation and I have added Signature of Director or Authorized Representative Date Leslie Betlach ·--------Ren ton Plan Number: Site Address: LUA16-000782 17808 108TH AVE SE Plan Review Routing Slip Name: Firestone at 108th SE Description: The applicant is requesting Administrative Site Plan Review, Administrative Conditional Use Permit, and Environmental Review of a proposed 7,700 square foot building to accommodate a new vehicle service and repair business. Associated improvements include surface parking for 24 vehicles, stormwater detention vault, and landscaping. The existing restaurant will be removed. Access to the site will remain in approximately the same location as the former restaurant along the 108th Ave SE frontage. The applicant also requests four (4) modifications to code requirements related to frontage improvements along 108th SE and 109 Ave SE, garbage and recycling enclosure requirements, and loading space standards. The subject property is approximately 0.87 acres with no critical areas mapped on-site. Review Type: Date Assigned: Community Services Review-Version 1 10/17/2016 Date Due: 10/31/2016 Project Manager: Matt Herrera Environmental Impact Earth Animals Air Envi ronmenta I Hea Ith Water Energy/Natural Resources Plants Housing Land/Shoreline Use Aesthetics Where to enter your comments: Manage My Reviews Which types of comments should be entered: Light/Glare Historic/Cultural Preservation Recreation Airport Environmental Utilities 10,000 Feet Transportation 14,000 Feet Public Service Recommendation -Comments that impact the project including any of the Enivornmental Impacts above. Correction -Corrections to the project that need to be made before the review can be completed and/or requesting submittal of additional documentation and/or resubmittal of existing documentation. What statuses should be used: Reviewed -I have reviewed the project and have no comments. Reviewed with Comments -I have reviewed the project and and I have comments entered in Recommendations. Correction/Resubmit -I have reviewed the project and the applicant needs to submit and/or resubmit documentation and I have added 'th_ T ra,/~ ard 8/J:"/..__, /f7J~v 11vf47 ~c;/;'~ 23-~cJ.__ 5' ~ ~ ~aYJ'l?cad /108'#7 !,JK.:S~- (? (1)0'-r :5lw--ff/ P7-If-/()o7_,) lo · o?4-ZC>/(e Signature of Director or Authorized Representative Date Terry Flatley ___ _,_Renton o Plan Review Routing Slip Plan Number: Site Address: LUA16-000782 17808 108TH AVE SE Name: Firestone at 108th SE Description: The applicant is requesting Administrative Site Plan Review, Administrative Conditional Use Permit, and Environmental Review of a proposed 7,700 square foot building to accommodate a new vehicle service and repair business. Associated improvements include surface parking for 24 vehicles, stormwater detention vault and landscaping. The existing restaurant will be removed. Access to the site will remain in approximately the same location as the former restaurant along the 108th Ave SE frontage. The applicant also requests four (4) modifications to code requirements related to frontage improvements along 108th SE and 109 Ave SE, garbage and recycling enclosure requirements, and loading space standards. The subject property is approximately 0.87 acres with no critical areas mapped on-site. Review Type: Date Assigned: Community Services Review-Version 1 10/17/2016 Date Due: 10/31/2016 Project Manager: Matt Herrera Environmental Impact Earth Animals Air Environmental Health Water Energy/Natural Resources Plants Housing Land/Shoreline Use Aesthetics Where to enter your comments: Manage My Reviews Which types of comments should be entered: Light/GI a re Historic/Cultural Preservation Recreation Airport Environmental Utilities 10,000 Feet Transportation 14,000 Feet Public Service Recommendation -Comments that impact the project including any of the Enivarnmental Impacts above. !;_orrection -Corrections to the project that need to be made before the review can be completed and /or requesting submittal of additional documentation and/or resubmittal of existing documentation. What statuses should be used: Reviewed -I have reviewed the project and have no comments. Reviewed with Ccmments -I have reviewed the project and and I have comments entered in Recommendations. Correction/Resubmit -/ have reviewed the project and the applicant needs to submit and/or resubmit documentation and I have added Existing Trees/vegetation -approximately a dozen trees were removed from this site previously along the north property line and possible shrubbery. Pinus nigra (Austrian pines) -should be spaced 30 feet on-center, current spacing is too close for this species. Frontage along 108th -include an 8-foot wide planting strip and sidewalk and two street trees; modify existing plan by not including additional trees east of sidewalk. Frontage along 109 Ave SE -include an 8-foot wide plantings strip with sidewalk; install two shade trees in planting strip along with other plantings or turf. Signature of Director or Authorized Representative Date Denis Law Mayor Community & Economic Development C. E. "Chip" Vincent, Administrator October 17, 2016 Luke Randles PACLAND 1505 Westlake Ave N, Ste 305 Seattle, WA 98117 Subject: Notice of Complete Application Renton Firestone on 108th, LUA16-000782, ECF, CU-A, SA-A, MOD, MOD,MOD Dear Mr. Randles: The Planning Division of the City of Renton has determined that the subject application is complete according to submittal requirements and, therefore, is accepted for review. It is tentatively scheduled for consideration by the Environmental Review Committee on November 14, 2016. Prior to that review, you will be notified if any additional information is required to continue processing your application. Please contact me at (425) 430-7246 if you have any questions. Sincerely, I .. / I .. /' / Matthew Herrera Senior Planner cc: Real Property Investors/ Owner{s} 1055 South Grady Way, Renton, WA 98057, rentonwa.gov r RentOil NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE (DNS) A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) -Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE DF NOTICE OF APPLICATION: October 17, 2016 LAND USE NUMBER: LUA16-000782, ECF, CU-A, SA-A, MOD, MOD, MOD, MOD PROJECT NAME: Renton Firestone at 108th PROJECT DESCRIPTION: The applicant is requesting Administrative Site Plan Review, Administrative Conditional Use Permit, and Environmental Review of a proposed 7,700 square foot building to accommodate a new vehicle service and repair business. Associated improvements include surface parking for 24 vehicles, stormwater detention vault, and landscaping. The existing restaurant will be removed. Access to the site will remain in approximately the same location as the former restaurant along the 108th Ave SE frontage. The applicant also requests four (4) modifications to code requirements related to frontage improvements along 108th SE and 109 Ave SE, garbage and recycling enclosure requirements, and loading space standards. The subject property is approximately 0.87 acres with no critical areas mapped on-site. PROJECT LOCATION: 17808 1081h Ave SE OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNSJ: As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS. PERMIT APPLICATION DATE: NOTICE OF COMPLETE APPLICATION: October 6, 2016 October 17, 2016 APPLICANT/PROJECT CONTACT PERSON: Luke Randles, Pacland/ 1505 Westlake Ave N., Ste 305/ Seattle, WA 98117 / 206-522-9510/ lrandles@pacland.eom Permits/Review Requested: Other Permits which may be required: Requested Studies: Location where application may be reviewed: Environmental (SEPAJ Review, Administrative Site Plan and Conditional Use, Modifications Building Permit. Construction Permit, Fire Permit, Sign Permit Arborist Report, Drainage Report, Geotechnical Report, Landscape Analysis Traffic Impact Study, Department of Community & Economic Development (CED) -Planning Division, Sixth Floor Renton City Hall, 1055 South Grady Way, Renton, WA 98057 If you would like to be made a party of record ta receive further information on this proposed project, complete this form and return to: City of Renton, CED -Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: Renton Firestone on 108tn / LUA16-000782, ECF, CU-A, SA-A, MOD, MOD, MOD, MOD NAME:----------------------------------- MAILING ADDRESS: _________________ City/State/Zip:----------- TELEPHONE NO.: --------------- CONSISTENCY OVERVIEW: Zoning/Land Use: Environmental Documents that Evaluate the Proposed Project: Development Regulations Used For Project Mitigation: Renroll The subject site is designated COMP-CMU on the City of Renton Comprehensive Land Use Map and Design-D, CA on the City's Zoning Map. Environmental (SEPA) Checklist The project will be subject to the City's SEPA ordinance RMC Title IV Chapters 2, 3, 4, 6, 8, 9, and 11 and other applicable codes and regulations as appropriate. Comments on the above application must be submitted in writing to Matthew Herrera, Senior Planner, CED - Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on October 31, 2016. Jf you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request. CONTACT PERSON: Matthew Herrera, Senior Planner; Tel: (425) 430-6593; Eml: mherrera@rentonwa.gov I PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION I , i • ,z,.,: ~...,,__-~~ @/0$'!- ~ ~ _,J~ Pi'.tn,~·~ / jf • Firestone vs. 109th ave s.e. to Save Green Belt Our neighborhood along 109th ave. S.E. is very concerned about the impact Firestone will bring to our residential street. The businesses along 108th. Were stopped from funeling traffic onto 109th. for this very reason and is on record somewhere, we just need to find it, and we will. No one is happy at all to lose the green belt to more asphalt, noise and possible traffic and garbage on our street. You will be hearing from other concerned neighbors. A committee was formed in the late 60s when MacDonald's was one of the 1st. Businesses, and will be formed again if necessary to stop the intrusion. C / ;,') ·~ ') ~ Q :::-) C - .\.. :J C ~ ·~ .~ .~ Q_ ' >- J / ,- ~ ~ vJ -,,) ·~ J.- 'l) >-- .'r '.') -r J lJ r ,,- -t --\- d ~ .;:::_ . ..:.- -:- :- ~ .,) ,..J r-v \.;l .J ./ c"' v J') /)<"i -j Cf ~ ,v - ~ <r r -~ -;) + 'J v r vi v -+ lJJ ,- ~) 0 .. ---, u rY .e---' DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT _ ___.,,,._.Ren ton® Planning Division LAND USE PERMIT MASTER APPLICATION I PROPERTY OWNER(S) NAME: Real Property Investors, LLC ADDRESS: 2618 2nd Ave. I : CITY Seattle WA ZIP: 98121 ~ELEPHONE N~MBER: (206) 321-7239 APPLICANT (if other than owner) NAME: Luke Randles ! COMPANY (if applicable) PACLAND ADDRESS 1505 Westlake Ave. N, Suite 305 i CITY Seattle, WA f-· ZIP:98117 TELEPHONE NUMBER: (206) 522-9510 CONTACT PERSON I NAME: Luke Ran.dies -------------------------- 1 • COMPANY (if applicable) PACLAND I . - I ADDRESS: 1505 Westlake Ave. N, Suite 305 CITY: Seattle, WA ZIP: 98117 TELEPHONE NUMBER AND EMAIL ADDRESS: (206) 522-9510 lrandles@pacland.com I 1 PROJECT INFORMATION I PROJECT OR DEVELOPMENT NAME: Renton Firestone PROJECT/AODRESS(S)/LOCATION AND ZIP CODE· 17808 108th Ave. SE Renton. WA 98055 L I KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S): 3223059104 ! ' I EXISTING LAND USE(S): J Restaurant ------------------------------- PROPOSED LAND USE(S): Auto Retail/Service ----·· EXISTING COMPREHENSIVE PLAN MAP DESIGNATION: Commercial Mixed Use PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION (if applicable) NIA -------------------------------- EXISTING ZONING: 1 CA -Commercial Arterial PROPOSED ZONING (if applicable): NIA . --------- j SITE AREA (in square feet): 38,232 ; SQUARE FOOTAGE OF PUBLIC ROADWAYS TO BE DEDICATED: 2,706 ------- SQUARE FOOTAGE OF PRIVATE ACCESS EASEMENTS: 540 PROPOSED RESIDENTIAL DENSITY IN UNITS PER NET ACRE (if applicable) N/A NUMBER OF PROPOSED LOTS (if applicable) N/A -~ I NUMBER OF NEW DWELLING UNITS (if applicable): :N/A H :\CE D\Data\Forms-Templates\SeJf-Hel p Ha ndouts\Plan ning\Master Application .doc Rev:08/2015 PROJECT INFORMATION continued --------------------~ ~--~----~-----------~ I PROJECT VALUE: NUMBER OF EXISTING DWELLING UNITS (if applicable): N/A I SQUARE FOOTAGE OF PROPOSED RESIDENTIAL ! BUILDINGS (if applicable): NIA I SQUARE FOOTAGE OF EXISTING RESIDENTIAL I BUILDINGS TO REMAIN (if applicable): NIA ' r--·'""'-·-·· ----- SQUARE FOOTAGE OF PROPOSED NON-RESIDENTIAL BUILDINGS (if applicable): l, lOO ·1 SQUARE FOOTAGE OF EXISTING NON-RESIDENTIAL BUILDINGS TO REMAIN (11 applicable): 0 I ---------------- 1 NET FLOOR AREA ON NON-RESIDENTIAL BUILDINGS (if applicable): 7 335 $1,745,000 IS THE SITE LOCATED IN ANY TYPE OF ENVIRONMENTALLY CRITICAL AREA, PLEASE INCLUDE SQUARE FOOTAGE (if applicable): D AQUIFIER PROTECTION AREA ONE D AQUIFIER PROTECTION AREA TWO D FLOOD HAZARD AREA ll GEOLOGIC HAZARD D HABITAT CONSERVATION sq_ ft. sq_ ft. sq. ft. i NUMBER OF EMPLOYEES TO BE EMPLOYED BY THE NEW I f PROJECT (if applicable) 16 ::J J SHORELINE STREAMS & LAKES WETLANDS -------- I ~ --- I LEGAL DESCRIPTION OF PROPERTY (Attach legal description on separate sheet with the following information included) SITUATE IN THE NE QUARTER OF SECTION~, TOWNSHIP~-RANGE _5_, IN THE CITY OF RENTON, KING COUNTY, WASHINGTON AFFIDAVIT OF OWNERSHIP I, (Print Name/s) E ·. °'-/\ l,,"-J O " · , declare under penalty of perjury under the laws of the State of Washington that lam (please check one)' the current owner of the property involved in this application or0the authorized representative to act for a corporation (please attach proof of authorization) and that the foregoing statements and answers herein contained and the information herewith are in all respects true and correct to the best of my knowledge and belief j} ti ( -· [-2~00',·,"' Y[ C ,:Yv-'•"-----Cl~I /~j_' _vt~/~i_l-~_ Signature of Owner/Represe~tive Date Signature of Owner/Representative Date STATE OF WASHINGTON ) ) ss COUNTY OF KING ) I certify that I know or have satisfactory evidence that Cva.V\ vuavi& signed this instrument and admowledge it to be his/her/their free and voluntary act for the uses and purpose mentioned in the instrument -~ (p,<__ l3 Suer~ _______ --~ Notary Public in and for the State of Washington 2 H :\CED\Data \Forms-Tern plates\Self-Hel p Handouts \Pia nning\Master Application. doc Rev: 08/2015 I • DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT -------Renton® WAIVER OF SUBMITTAL REQUIREMENTS FOR LAND USE APPLICATIONS Planning Division 1055 South Grady Way-Renton, WA 98057 Phone: 425-430-7200 I www.rentonwa.gov LAND USE PERMIT SUBMITIAL REQUIREMENTS: WAIVED MODIFIED BY: BY: Arborist Report 4 Biological Assessment 4 .A -\ Calculations 1 Colored Maps for Display 4 - Construction Mitigation Description ,AND 4 Deed of Right-of-Way Dedication 1 ' Density Worksheet 4 ~ Drainage Control Plan 2 Drainage Report, Elevations, Architectural 3 AND, Environmental Checklist 4 Existing Covenants (Recorded Copy) 1AND4 Existing Easements (Recorded Copy) 1AN04 . .,. Flood Hazard Data, "IVI\ Floor Plans 3AND4 Geotechnical Report, AND 3 Grading Elevations & Plan, Conceptual 2 Grading Elevations & Plan, Detailed, . Habitat Data Report, ~ Improvement Deferral 2 Irrigation Plan 4 COMMENTS: DATE: __ '.3---1-\+:=so:::.....+\--''Zc:>"""":...,lc,,~!<---------- 1 H: \CED\Data \Fo rms-T em plates\Self-H el p Ha ndouts\P la n n in g\ Waive rsu bm itta I reqs. docx Rev: 08/2015 ' ...., ' LAND USE PERMIT SUBMITTAL REQUIREMENTS: WAIVED MODIFIED COMMENTS: BY: BY: King County Assessor's Map Indicating Site 4 Landscape Plan, Conceptual• Landscape Plan, Detailed 4 Legal Description 4 •• Letter of Understanding of Geological Risk 4 y ........ ' Map of Existing Site Conditions, Master Application Form 4 Monument Cards (one per monument) 1 Neighborhood Detail Map 4 / Overall Plat Plan 4 -;I I Parking, Lot Coverage & Landscaping Analysis 4 "' Plan Reductions (PMTs) 4 1~1W ' Post Office Approval 2 -. \~ Plat Name Reservation 4 Plat Plan 4 Preapplication Meeting Summary 4 Public Works Approval Letter, Rehabilitation Plan 4 Screening Detail 4 Shoreline Tracking Worksheet, Site Plan 2 AND 4 Stream or Lake Study, Standard, r1 - Stream or Lake Study, Supplemental 4 Stream or Lake Mitigation Plan 4 Street Profiles 2 Title Report or Plat Certificate 1AN0, Topography Map, Traffic Study 2 Tree Cutting/Land Clearing Plan 4 Urban Design Regulations Analysis 4 Utilities Plan, Generalized 2 Wetlands Mitigation Plan, Final 4 Wetlands Mitigation Plan, Preliminary 4 2 H :\CED\Data \Forms-T emplates\Self-H el p Ha ndouts\P la n ning\ Waive rsu bm itta lreqs.docx Rev:08/2015 ' ' • LAND USE PERMIT SUBMITIAL REQUIREMENTS: Wetlands Report/Delineation 4 Wireless: Applicant Agreement Statement 2 AND 3 Inventory of Existing Sites 2 AND i Lease Agreement, Draft 2 AND, Map of Existing Site Conditions 2ANDJ Map of View Area 2ANDJ Photosimulations 2 AND 3 This Requirement may be waived by: 1. Property Services 2 Development Engineering Plan Review 3 Building 4 Planning WAIVED MODIFIED B'f'.: BY: ,,,, . . 3 H :\CED\Data \Form s-T emplates\Self-Hel p Ha ndo uts\Pla n n i ng\ Waiversu bm itta I re qs.docx COMMENTS: Rev: 08/2015 September 30, 2016 City of Renton 1055 S. Grady Way Renton, WA 98057 Subject: Renton Firestone Project Narrative 1505 WESTLAKE AVE. N SUITE 305 SEATTLE, WA 98109 .522.9510 F 206.522.8344 WWW.PACLAND.COM The purpose of this letter is to outline the development and operation of a proposed Firestone store to be constructed at 17808 1081h Ave SE. The parcel is a total of 0.88 AC in area. Permits Required • City of Renton SEPA Determination • City of Renton Site Plan Review • City of Renton Building Permit • City of Renton Construction Permit • City of Renton Demolition Permit • City of Renton Clearing and Grading Permit • City of Renton Conditional Use Permit • Site Layout The site is within the Commercial Arterial (CA) District. The site is bordered by Jiffy Lube to the north, ;a vacant commercial building to the south, and a residential zone to the east. The site is currently developed as a 2,542 square foot Skippers restaurant and associated parking lot, sidewalks, landscaping, storm drainage, and utilities. The proposed development proposes to demolish the existing structures and perform site improvements. No wetlands, water bodies, steep slopes, or other critical areas are present on the site. Soils A geotechnical report was completed on the site by Professional Service Industries, Inc. (PSI) on June 1, 2016. The field testing revealed that on-site soils typically consist of loose to medium dense silty sands fill soils over medium dense to very dense glacial till soils. No groundwater was encountered at the boring locations during the time of field investigation, although small amounts of perched water was observed in two of the borings. Proposed Development Real Property Investors, LLC. is requesting a Site Development Plan approval. The proposed development consists of the construction of a Firestone Store service building with associated access service bays, parking lot, and landscaped areas. The use of the proposed development will be automotive vehicle service and repair. Per City of Renton Municipal Code 4-2-060, this use is allowed in the CA zone if an Administrative Conditional Use permit is obtained. Access The site has a single vehicular access point from 108'h Ave SE. This access point is a right turn in/right turn out access only. Public Improvements Rights-of-way on both 108'h Ave. SE and 1091h Ave. SE will be completed to meet the street standards for Principal Arterial Streets and Residential Access Streets, respectively. The dedication widths will be 9.0' for 108'h Ave. SE and 11.5' for 109'h Ave. SE. Although frontage improvements of half-street paving, curb, planting strip, and sidewalk have been identified, a "fee in lieu" of required frontage improvements is requested pursuant to RMC 4-9-060.9, due to the fact that there are no similar improvements in the vicinity, and there is no likelihood that improvements will be needed or required in the next five (5) years. Construction Cost The total estimated construction cost estimate for the proposed design is $1,745,000. Excavation The total amount of cut being done on the proposed site is approximately 2,910 cubic yards. Approximately 100 cubic yards of that soil will be used for fill. The net export anticipated for the site is approximately 2,810 cubic yards. Landscaping A Tree Retention Plan was created to demonstrate the significant trees on site (6-inch diameter and larger). Trees on the north, east, and south side of the parcel will be removed to accommodate the proposed clearing and grading that needs to be done on site. Approximately 27 mature trees will need to be removed on this site. The types are as follows: • 23 Coniferous trees • 4 Deciduous trees See the Tree Retention Plan for more details about which trees will be removed and which will be retained. Landscape islands will be incorporated into the proposed parking lot. Based on the amount of parking provided, a minimum of 360 square feet of interior landscaping is required. The proposed site plan contains 540 sf of interior landscaping and 10,190 sf of exterior landscaping. Proposed landscaping also incorporates shrubs and bushes. Parking Existing parking stalls on the Skipper's Restaurant site are 9'xl6.5' and 9'x18.5'. The new parking stalls will be 9'x18', with an additional two-foot overhang included to meet required 9'x20' parking stall dimension. The City of Renton requires 2.5 stalls/1000 sf of net floor area. Based on the building square footage, 19 parking stalls are required. The proposed plan identifies 24 parking stalls. Per RMC 4-4-080, a 25% increase may be granted provided quantitative support of the increase is provided. At-grade loading doors will be located on the east side of the building. A modification is requested with regards to the clear distance in front of the doors. Loading vehicles will be aligned parallel to the building rather than perpendicular, as outlined in RMC 04-04-080.J.5. Setbacks Within the Commercial Arterial (CA) zone for the site, the maximum front yard setback is 15 feet. The proposed Firestone will meet this criterion. The maximum buffer between a residential zoned street and commercial lot is 13.5'. To meet these requirements, 11.5' of the east side and 9' west side of the lot are dedicated to public access. Environment within Vicinity 2 This project is not within 100 feet of a stream or wetland or within 200 feet of any major river or lake. No part of the project proposes infrastructure above 35 feet average grade level. 3 PREAPPLICATION MEETING FOR Firestone Complete Auto Care 17808 108th Ave SE PRElG-000342 CITY OF RENTON Department of Community & Economic Development Planning Division May 19, 2016 Contact Information: Planner: Matthew Herrera, 425.430.6593 Public Works Plan Reviewer: Ann Fowler, 425.430.7382 Fire Prevention Reviewer: Corey Thomas, 425.430.7024 Building Department Reviewer: Craig Burnell, 425.430.7290 Please retain this packet throughout the course of your project as a reference. Consider giving copies of it to any engineers, architects, and contractors who work on the project. You will need to submit a copy of this packet when you apply for land use and/or environmental permits. Pre-screening: When you have the project application ready for submittal, call and schedule an appointment with the project manager to have it pre-screened before making all of the required copies. The pre-application meeting is informal and non-binding. The comments provided on the proposal are based on the codes and policies in effect at the time of review. The applicant is cautioned that the development regulations are regularly amended and the proposal will be formally reviewed under the regulations in effect at the time of project submittal. The information contained in this summary is subject to modification and/or concurrence by official decision-makers (e.g., Hearing Examiner, Planning Director, Development Services Director, Department of Community & Economic Development Administrator, Public Works Administrator and City Council). Fire & Emergency Ser Department es DATE: TO: FROM: SUBJECT: MEMORANDUM 5/12/2016 12:00:00AM Matt Herrera, Senior Planner Corey Thomas, Plan Review/Inspector (Firestone on 108th Ave SE Preapplication) PRE16-000342 Ci Ly of 1. The preliminary tire flow is 2,500 gpm. A minimum of three tire hydrants are required. One within 150 -feet and two within 300-feet of the proposed building. Exis!jng hydrants appear adequate. One new hydrant is required within SO-feet of the tire department connec~ A water availability certificate isrequ)red from Soos Creek Water District. 2. Fire impact fees are applicable at the rate of $0.61 a square foot for commercial space. This fee is paid at time of building permit issuance. 3. Approved tire sprinkler and tire alarm systems are required throughout the building. Separate plans and permits required by the tire department. Direct outside access is required to the tire sprinkler riser room. Full addressable and full detection is required for the tire alarm system. An annual tire permit is required for high piled combustible stock. 4. Fire department apparatus access roadways are required within 150-feet of all points on the building. Required turning radius are 25-feet inside and 45-feet outside. Roadways shall be a minimum of 20-feet wide. Maximum grade on roadways is 15%. Roadways shall support a minimum of a 30-ton vehicle and 75-psi point loading. 5. An electronic site plan is required prior to occupancy for pre-tire planning purposes. Page 1 of 1 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT -------Renton 0 MEMORANDUM DATE: May 19, 2016 TO: FROM: Matthew Herrera, Planner Ann Fowler, Plan Review Firestone On 108" SUBJECT: 17808 108'h Ave SE PRE16-000342 NOTE: The applicant is cautioned that information contained in this summary is preliminary and non- binding and may be subject to modification and/or concurrence by official City decision-makers. Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. . I have completed a preliminary review for the above-referenced proposal located at parcel(s) 3223059104. The following comments are based on the pre-application submittal made to the City of Renton by the applicant. WATER 1. Water Service is provided by Soos Creek Water and Sewer District. 2. A water availability certificate will be required to be submitted to the City as part of the building permit application. The water availability certificate should include the information that the fireflow requirement of the Renton Fire Department for this project is available. 3. Approved water plans from Soos Creek should be provided during utility construction permit review. SEWER 1. Sewer Service is provided by Soos Creek Water and Sewer District. 2. A sewer availability certificate will be required to be submitted to the City as part of the building permit application. 3. Approved sewer plans from Soos Creek should be provided during utility construction permit review. SURFACE WATER 1. There is an existing 24-inch stormwater main located in lOS'h Ave SE. 2. There is an existing 12-inch stormwater main located in 109'h Ave SE. Firestone On 108th -PRE16-000342 May 19, 2016 Page 2 of 3 • 3. There is a private storm drainage pipe connected to the s1:orm systems in 108" Ave SE and 109•h Ave SE crossing the subject site. 4. A drainage report complying with the City adopted 2009 King County Surface Water Manual and City Amendments will be required. Based on the City's flow control map, the site falls within the Flow Control Duration Standard area matching Forested Site Conditions and is within the Black River Drainage Basin. Refer to Figure 1.1.2.A -Flow chart to determine the type of drainage review required in the City of Renton 2009 Surface Water Design Manual Amendment. 5. The project may be required to provide a flqw control BMP, if there is a net increase in impervious area on the project site. 6. vrcoristruction Stormwater Permit from Department of Ecology is required if clearing and grading of the site exceeds one acre. 7. A geotechnical report for the site is required. Information on the water table and soil permeability, with recommendations of appropriate flow control BMP options with typical designs for the site from the geotechnical engineer, shall be submitted with the application. 8. Surface water system development fee is $S?94 per square foot of new impervious surface. This is payable prior to issuance of the construction permit. TRANSPORTATION 1. The proposed development fronts 1081h Ave SE (SR 515) along the west property line(s). 1081h Ave SE (SR 515) is classified as a Principal Arterial Road. Existing right-of-way (ROW) width is approximately 95 feet. To meet the City's complete street standards for Principal Arterial streets, minimum ROW is 113 feet . .Qgdicatioo qf_ 9 feet of ROW fronting the site will be required. Per City code 4-6-060, half street improvements shall include a pavement width of 76 'feet (38 feet from centerline), a 0.5-foot curb, an 8-foot planting strip, an 8-foot sidewalk, street trees and storm drainage improvements. 2. The proposed development fronts 1091h Ave SE along the east property line(s). 109th Ave SE is classified as a Residential Access Road. Existing right-of-way (ROW) width is approximately 30 feet. To meet the City's complete street standards for Residential Access streets, minimum ROW is 53 feet. Dedication of 11.5 feet of ROW fronting the site will be required. Per City code 4-6- 060, half street improvements shall include a pavement width of 26 feet (13 feet from centerline), a 0.5-foot curb, an 8-foot planting strip, an S-foot sidewalk, street trees and storm -~ drainage improvements. 3. Refer to City code 4-4-080 regarding driveway regulations. a. A minimum separation of 5 feet is required between driveway and the property line. b. Maximum driveway slopes shall not exceed 15%. Driveways exceeding 8% shall provide slotted drains. c. The maximum driveway width shall not exceed thirty feet (30'). 4. Parking lot construction shall be in accordance with City code 4-4-80G. -'-5. Street lighting is required. 6. A traffic imr>a anal sis is required when the estimated vehicular traffic generated from a proposed development ceeds 20 vehicles per hour in either the AM (6:00 -9:00) or PM (3:00 -6:00) peak periods. Traffic study guidelines are included with the pre-application packet. The analysis must include a discussion on traffic circulation to and from the site and onsite traffic circulation. The study shall include trip generation and trip distribution for the project for both AM and PM peak hours. Firestone On 108th -PRElG-000342 May 19, 2016 Page 3 of 3 7. Payment of the transportation impact fee is applicable on the construction of the development at the time of application for the building permit. The transportation impact fee that is current at the time of building permit application will be levied, payable at building permit issue. GENERAL COMMENTS 1. All construction or service utility permits for _prainage. and street improvements will require separate plan submittals. All utility plans shall conform to the Renton Drafting Standards. Plans shall be prepared by a licensed Civil Engineer. 2. When utility plans are complete, please submit four (4) copies of the drawings, two (2) copies of the drainage Fe~ori, one /1) complete electronic submittal /drawings and drainage report!. the p;,:mit application, an itemized cost of construction estim~ and application fee at the counter on the sixth floor. - 3. Fees quoted in this document reflect the fees applicable in the year 2016 only and will be assessed based on the fee that is current at the time of the permit application. 4. All utilities serving the site are required to be undergrounded. DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ~------Renton 0 DATE: TO: FROM: SUBJECT: MEMORANDUM May 19, 2016 Pre-Application File No. 16-000342 Matthew Herrera, Senior Planner Firestone at 1081h 17808 1081h Ave SE General: We have completed a preliminary review of the pre-application for the above- referenced development proposal. The following comments on development and permitting issues are based on the pre-application submittals made to the City of Renton by the applicant and the codes in effect on the date of review. The applicant is cautioned that information contained in this summary may be subject to modification and/or concurrence by official decision-makers (e.g., Hearing Examiner, Community & Economic Development Administrator, Public Works Administrator, Planning Director, Development Services Director, and City Council). Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. The applicant is encouraged to review all applicable sections of the Renton Municipal Code. The Development Regulations are available for purchase for $50.00 plus tax from the Finance Division on the first floor of City Hall or online at www.rentonwa.gov. Project Proposal: The subject property is located at 17808 1081h Ave SE. The project site totals 38,234 square feet (.087 acres) in area and is located within the Commercial Arterial (CA) zoning classification. The pre-application packet indicates that the proposal is to fully redevelop the site into a 7,700 square foot Firestone vehicle service and repair with showroom, eight vehicle bays, and inventory space. The proposal includes 28 parking spaces. Access to the site is proposed via the existing curb cut along 108'h Ave SE. There appear to be no critical areas on site. Current Use: The subject parcel contains 2,200 square feet fast food restaurant. The existing structure will be removed. Development Standards: The project would be subject to RMC 4-2-120A, "Development Standards for Commercial Zoning Designations" effective at the time of complete application (noted as "CA standards" herein). Vehicle service and repair uses ore allowed within the CA zone with on approved Administrative Conditional Use Permit, provided all operations ore conducted entirely within an enclosed structure. The property is also located within the Urban Design District 'D' overlay, and therefore subject to additional design elements. Proposals should have unique, identifiable design treatment in terms of landscaping, building design and orientation, signage, and street furniture. H:\CED\Planning\Current Planning\PREAPPS\2016 Preapps\PRE16-000342\16-000342(CA Firestone Benson Urban Design D).docx Firestone at 108'h Page 2 of7 May 19, 2016 Minimum Lot Size, Width and Depth -There are no minimum requirements for lot size, lot width or depth within the CA zone at this location. Lot Coverage -The CA zone allows a maximum building coverage of 65 percent. Setbacks -Setbacks are the distance between the building and the property line or any private access easement. Setback requirements in the CA zone are as follows: 15 feet minimum for the front yard but may be reduced to zero feet through the Site Plan Review process provided blank walls are not located within the reduced setback; a 20 foCJJ_rD,ciximum front yard setback; and no rear or side yard setbacks with the exception of the. portion ab;tting the residential zoned property on the northeast, which requires a 15 foot setback.-fhe-structufe appears to be setback nearly 60-feet from the existing sidewalk. The maximum setback may be modified by the Reviewing Official through the site development pion review process if the applicant con demonstrate that the site development plan meets the following criteria: a. Orients development to the pedestrian through such measures as providing pedestrian walkways beyond those required by the Renton Municipal Code (RMC}, encouraging pedestrian amenities and supporting alternatives to single occupant vehicle /SOV} transportation; and b. Creates o low scale streetscape through such measures as fostering distinctive architecture and mitigating the visual dominance of extensive and unbroken parking along the street front; and c. Promotes safety and visibility through such measures as discouraging the creation of hidden spaces, minimizing conflict between pedestrian and traffic and ensuring adequate setbacks to accommodate required parking and/or access that could not be provided otherwise. The proposal does not appear to comply with the above mentioned criteria. Therefore, staff would likely not be supportive of an increase in the maximum setback to the extent proposed. Gross Floor Area -There is no maximum gross floor area for commercial uses within the CA zone. Building Height -The maximum building height that would be allowed in the CA zone is 50 feet for commercial only structures. No height issues were found with your submittal. Screening -Screening must be provided for all surface-mounted and roof top utility and mechanical equipment. The site plan application will need to include elevations and details for the proposed methods of screening. See RMC 4-4-095 for utility and mechanical equipment screening options. Refuse and Recycling Areas -Refuse and recycling areas shall meet the requirements of RMC 4- 4-090, "Refuse and Recyclables Standards." For commercial developments a minimum of 5 square feet per every 1,000 square feet of building gross floor area shall be provided for recyclable deposit areas and a minimum of 10 square feet per 1,000 square feet of building gross floor area shall be provided for refuse deposit areas with a total minimum area of 100 square feet. Outdoor refuse and recyclables deposit areas and collection points shall not be located within any required setback or landscJpe areas and shall not be located within fifty feet (oO') of J lot zoned residential, except by approval through the site development plan review precess. The applicant would be required to submit a site plan depicting a refuse and recyclable area compliant with RMC 4-4-090 at the time of Site Plan Application. See Urban Design Regulations comment section for additional garbage enclosure requirements. Firestone at 108th Page 3 of7 May 19, 2016 Landscaping-All portions of the development area not covered by structures, required parking, access, circulation or service areas, must be landscaped with native, drought-resistant vegetative cover. The development standards require that all pervious areas within the property boundaries be landscaped. The minimum on-site landscape width required along street frontages is 10 feet, except for walkways and driveways. A 15 foot wide partially sight- obscuring landscape visual barrier or 10 foot wide fully sight obscuring landscaped visual barrier is required along the rear property line and abutting the residential parcel on the northeast portion of the property. The site plan does nat identify the required landscaping on the northeast corner abutting the residential property. Surface parking lots with 15 to 50 stalls shall provide an additional 15 square feet of landscaping for eaciµJar-k,ng stall. There shall also be no more than 50 feet between parking stalls and an interior 'parking lot landscape area. The site plan does show any space for internal lot landscaping. Perimeter parking lot landscaping shall be at least 10 feet in width as measured from the street right-of-way. Trees shall be two inches in diameter at breast height at an average minimum rate of one tree per thirty lineal feet of street frontage. Shrubs at the minimum rate of one per twenty square feet of landscaped area. Up to fifty 50 percent of shrubs may be deciduous. Please refer to landscape regulations (RMC 4-4-070) for additional general and specific landscape requirements. A landscape plan shall be submitted at the time of application for Site Plan Review. Tree Preservation -If significant trees (greater than 6-inch caliper or 8-caliper inches for alders and cottonwoods) are proposed to be removed, a tree inventory and a tree retention plan along with an arborist report, tree retention plan and tree retention worksheet shall be provided with the formal land use application as defined in RMC 4-8-120. The tree retention plan must show preservation of at least 10% of significant trees, and indicate how proposed building footprints would be sited to accommodate preservation of significant trees that would be retained (RMC 4- 4-130Hl.a). When the required number of protected trees cannot be retained, replacement trees, with at least a two-inch (2") caliper or an evergreen at least six feet (6') tall, shall be planted at a rate of twelve (12) caliper inches of new trees to replace each protected tree removed. The Administrator may authorize the planting of replacement trees on the site if it can be demonstrated to the Administrator's satisfaction that an insufficient number of trees can be retained. Significant trees shall be retained in the following priority order: Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees on slopes greater than 20%; significant trees adjacent to critical areas and their associated buffers; and significant trees over 60' in height or greater than 18" caliper. Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other significant native evergreen or deciduous trees; and other significant non-native trees. Priority Three: Alders and cottonwoods shall be retained when all other trees have been evaluated for retention and are not able to be retained, unless the alders and/ or cottonwoods are used as part of an approved enhancement project within a critical area or its buffer. Firestone at 108th Page4 of7 May 19, 2016 The Administrator may require independent review of any land use application that involves tree removal and land clearing at the City's discretion. A formal tree retention plan would be reviewed at the time of Building Permit application. Parking -The minimum and maximum number of parking spaces is 2.5 per 1,000 square feet of net floor area. Assuming the 7,700 square foot facility is inclusive of net floor area as defined by RMC 4-11-060, the site would require 19 spaces. The submittal materials indicate a total of 28 surface parking spaces would be provided on site. The proposal exceeds the maximum surface parking requirements. A 25 percent reduction or increase from the minimum or maximum number of parking spaces may be granted for nonresidential uses through site plan review if the applicant can justify the modification to the satisfaction of the Administrator. Justification might include, but is not limited to, quantitative information such as sales receipts, documentation of customer frequency, and parking standards of nearby cities. Modifications beyond 25 percent must be requested via the formal modification process [RMC 4-9-250D) The proposal would also be required to provide bicycle parking based on 10 percent of the required number of parking stalls for commercial uses. See RMC 4-4-0BOFllb for bicycle parking standards. Surface parking is not permitted between the building and street. See Urban Design Regulations comment section. Surface parking stalls must be a minimum of 9 feet x 20 feet, compact dimensions of SY, feet x 16 feet, and parallel stall dimensions of 9 feet x 23 feet; compact surface parking spaces shall not account for more than 30 percent of the spaces in the surface parking lots. Minimum width of drive aisles for 90 degree parking is 24-feet. Parking dimensions and minimum aisle width appear to comply. ADA accessible stalls must be a minimum of 8 feet in width by 20 feet in length, with an adjacent access aisle of 8 feet in width for van accessible spaces. The appropriate amount of ADA accessible stalls based on the total number of spaces must be provided. Vehicle Access and Loading: Driveways shall not be closer than 5-feet to any property line. Driveway widths are limited to 40 percent of the street frontage and not exceed 30-feet. See RMC 4-4-080! for complete driveway standards. Buildings which utilize ground level service or loading doors shall provide a minimum of 45-feet of clear maneuvering area in front of each door. The garbage enclosure is located within this clear zone area on the submitted site plan and therefore out of compliance. onnectian shall also be provided for site-to-site vehicle access ways, where topogrophically asible, to allow a smooth flow of traffic across abutting CA parcels without the need to use a eet. Signage -Only one freestanding business sign (restricted to monument/ground signs only) is permitted per street frontage, however pole signs are not permitted within the CA zone. Each sign shall not exceed an area greater than one and one-half square feet for each lineal foot of property frontage that is occupied by the business. In no case shall the sign exceed a total of 300 square feet (150 square feet per face). The ground/monument sign is limited to 5 feet in height. In addition to the permitted freestanding sign, wall signs with a copy area not exceeding Firestone at 108th Page 5 of7 May 19, 2016 20% of the fa<;ade, to which it is applied, are also permitted. See RMC 4-4-100 for additional sign requirements. Urban Design Regulations: The subject property is within the Urban Design District 'D' and compliance with District D Urban Design Regulations is required RMC 4-3-100. In general the regulations encourage building design that is unique and urban in character, comfortable on a human scale, and uses appropriate building materials that are suitable for the Pacific Northwest climate and to discourage franchise retail architecture. If you are unable to meet the prescriptive standards of the code the applicant would be required to demonstrate compliance with the intent and guidelines of the respective section that includes the standard. The following bullets provide some of the design elements needed with your proposal. • Buildings shall be oriented to the street with clear connections to the sidewalk. • The primary entrance of the building shall be located on the facade facing the street, shall be prominent, visible from the street, connected by a walkway to the public sidewalk, and include human-scale elements. The primary entrance shall be made visibly prominent by incorporating architectural features such as a facade overhang, trellis, large entry doors, and/or ornamental lighting • Building entries from a street shall be clearly marked with canopies, architectural elements, ornamental lighting, or landscaping and include weather protection at least four and one-half feet (4-1/2') wide. • Building entries from a parking lot shall be subordinate to those related to the street. • Parking shall be located so that no surface parking is located between a building and the front property line. • A pedestrian circulation system of pathways that are clearly delineated and connect the buildings and parking area with the city sidewalk system. Pathways within parking areas shall be provided and differentiated 2','_ material or ~~e (i.e., raised walkway, stamped concrete, or pavers) from abutting ·paving materials. • Architectural elements that incorporate plants, outdoor seating, and weather protection in publicly accessible spaces and at facades along streets shall be provided. • Roof lines, roof pitches, and roof shapes designed to transition with existing development and adjacent single family residential properties. • All building facades shall include modulation or articulation at intervals of no more than forty feet (40'). Modulations shall be a minimum of two feet (2') deep, sixteen feet (16') in height, and eight feet (8') in width. • On any facade visible to the public, transparent windows and/or doors are required to comprise at least fifty percent (50%) of the portion of the ground floor facade that is between four feet (4') and eight feet [8') above ground (as measured on the true elevation). • Blank walls visible from the street or interior pedestrian areas must be treated with foundation landscaping or architectural detailing. ( Environmental Review: The proposed building is in excess of 4,000 square feet and therefore \__exceeds the categorical exemption threshold for minor new construction. Firestone at 108th Page 6 of 7 May 19, 2016 The proposed project would be subject to Washington State Environmental Policy Act {SEPA) Therefore, an environmental checklist is a submittal requirement. An environmental determination will be made by the Renton Environmental Review Committee. This determination is subject to appeal by either the project proponent, by a citizen of the community, or another entity having standing for an appeal. Permit Requirements: In addition to environmental review the following land use permits would be required: (1) Administrative Conditional Use Permit; and (2) Administrative Site Plan Review. The proposal will require an Administrative Conditional Use Permit. Conditional Use Permits allow for review of certain uses with special characteristics that may not generally be appropriate within a zoning district, but may be permitted subject to conditions and mitigation measures that protect public health, safety and welfare and ensure compatibility with other uses in the district. Decisional criteria for the conditional use permit are itemized in RMC 4-9- 0300. It is the applicant's responsibility to identify how the proposal meets the decisional criteria. The proposal would require Administrative Site Plan Approval. The purpose of the site plan review process is to analyze the detailed arrangement of project elements to mitigate negative impacts where necessary to ensure project compatibility with the physical characteristics of a site and with the surrounding area. Site plan review ensures quality development consistent with City goals and policies. Site plan review analyzes elements including, but not limited to, site layout, building orientation and design, pedestrian and vehicular environment, landscaping, natural features of the site, screening and buffering, parking and loading facilities, and illumination to ensure compatibility with potential future development. The applicant will also be subject to Design Review as part of the Site Plan Review and a Design Checklist shall be completed and submitted as part of the application materials (see attached). There may be other approvals (modifications, variances, etc.) required depending on the scope of the proposal. All applications can be reviewed concurrently in an estimated time frame of 9- 8.weeks once a complete application is accepted. The Conditional Use Permit application fee is $1,000. The Site Plan Review application fee is $1,500. The application fee for SEPA Review (Environmental Checklist) is $1,000. The application fee for the parking modification is $150. There is an additional 3% technology fee at the time of land use application for a grand total of $3,759.50. Detailed information regarding the land use application submittal is provided in the attached handouts. In addition to the required land use permits, separate construction, building and sign permits would be required. The review of these permits may occur concurrently with the review of the land use permits, but cannot be issued prior to the completion of any appeal periods. Public Information Sign: The applicant is required to install a proposed land use action sign on the subject property per the specifications provided in the accompanied public information sign handout. The applicant is solely responsible for the construction, installation, maintenance, removal, and any costs associated with the sign. Neighborhood Meeting: Projects in excess of 10 million dollars require the applicant to conduct an independent neighborhood meeting and provide a public outreach sign. Please contact me for further information should the project exceed the 10 million dollar threshold. Firestone at 1081h Page7of7 May 19, 2016 Impact Fees: In addition to the applicable building and construction fees, the following impact fees would be required prior to the issuance of building permits: • A Fire impact fee currently assessed at $0.61 per square foot of commercial space • A Transportation impact fee will be based on the ITE manual Next Steps: When the formal application materials are complete, the applicant is strongly encouraged to have one copy of the application materials pre-screened at the 6th floor front counter prior to submitting the complete application package. Please contact Matthew Herrera, Senior Planner at 425-430-6593 or mherrera@rentonwa.gov to schedule an appointment. Expiration: The conditional use permit the site plan approval is valid for two years with a possible two-year extension. Firestone@108th Preapplication 64 0 32 64 WGS_ 1984_Web_Merca tur_A ux iliary_Sphe re Feet Informatio n Technology -GIS Rento nMapSupport@ Ren tonw a.g ov 05/18/2016 T his map i s a user gener ated static out pu t from a n l nte.met rrappinA site and is for reference only . Dala layers that appe a r on th is map may o r may net be accurat e, current, o r oth e rw i se reliable. THIS MAP I S NOT TO BE USED FOR NAV IG ATION Legend Ci ty a nd County Boundary Ott1er C: 1 C ;1y o1 Re1ton A d dresses Parcels Z on ing m R C-Resource Conse rvati on R l Residen~al 1 d u/ac R4-Residenti al 4 du/ac R6 Res1dent1al -6 DU/A C R8-Res1deniial 6 du/a c R 10-Rcsidcntial 10 du/ac R1 4-Residential 14 du/ac ·,'J"; RMF-Resid c n ~al M ulti-F am ly II RMH-Re sidcnt at M anufactu red Home s CN -Corn rnercial Ne ig hborhood II CV-Cen ter V illage II C A -Commcrc 1al A rtP.nal II UC -Urba1 Cente r II CO-Ce nter Oow ntO"Nn C OR ·Comme,cial Office/Reside ntia! 13 c;o.c:om11e roa1 O ffi ce IL+!ndustria • Light ~:·,":.:: I M.lndustnal • Medium ~;:.:: II IH -lndusln al • Heavy Ove rlay Districts Au:o Mall A A utc Ma ll B [] e m ployment Area Val•ey (.;-~ City C ente r S ign Regulat ion Area ,~ [2J Urban Design District A (SJ U• ban Design Distnct 8 Notes Co mmercia A rte rial (CA ) and Urban Design D ist ric t D 0 CityofRenfQfl ~> Fi n a n ce & IT Division October 6, 2016 City of Renton 1055 S. Grady Way Renton, WA 98057 1505 WESTLAKE AVE. N SUITE 305 SEATILE, WA 98109 522.9510 F 205.522.8344 WWW PACLANO COM Subject: Renton Firestone Refuse Enclosure Vertical Clearance Modification The project is requesting to Renton Municipal Code (RMC) 4-4-090.C.9. Requirement RMC 4-4-090.C.9 states that "the gate opening for any separate building or other roofed structure used primarily as a refuse or recyclables deposit area/collection point shall have a vertical clearance of at least fifteen feet (15')." Modification The project has proposed a refuse enclosure having a height of 8'. Per communication with the City of Renton Planning Department, the City's waste management services do not require the 15' vertical clearance to adequately collect refuse. Furthermore, incorporating the full 15' clear height for the trash enclosure would be much costlier and undesirable from a visual standpoint. Criteria Compliance a. The intent of the vertical clearance requirement is to ensure that waste management services are able to access the refuse enclosure for pickup. Since they are able to do so without the 15' vertical clearance, the modification will continue to meet the intent of the code. b. The modification will not result in any undue negative impacts to safety, function, appearance, or environmental protection and maintainability. c. The modification will not be injurious to other properties in the vicinity, as all refuse pickup will be performed on the subject property. d. Since waste management services will still be able to access the enclosure and perform refuse pickup adequately, the proposed design will continue to meet the intent of the code. e. Due to the added expense and visual impacts associated with the full 15' vertical clearance, the reduced height is justified for the enclosure. f. The modification will not create adverse impacts to other properties in the vicinity, as all refuse pickup will be performed on the subject property. October 6, 2016 City of Renton 1055 S. Grady Way Renton, WA 98057 1505 WESTLAKE AVE N SUITE 305 SEATILE, WA 98109 Subject: Renton Firestone Loading Clear Area Modification -,.522.9510 F 206.522.8344 WWW.PACIJ-\ND.COM The project is requesting a modification to Renton Municipal Code (RMC) 4-4-080.J.5, which requires 45' clear area perpendicular to the loading door. Requirement Per RMC 4-4-080.J.5, "buildings which utilize ground level service or loading doors shall provide a minimum of forty five feet (45') of clear maneuvering area in front of each door." Modification Loading for the proposed development will be performed by delivery trucks backing up to the loading doors in the north-south direction (parallel to the building). As such, the need for a 45' clear area perpendicular to the door is not applicable. A large maneuvering area is incorporated to provide delivery trucks adequate room to make the necessary turning movements. Criteria Compliance a. The purpose of the loading clear area requirement is to ensure that adequate space is provided to perform loading operations. Due to the manner in which the proposed deliveries are to be made, the modification will continue to meet the intent of the code. b. The modification will not result in any undue negative impacts to safety, function, appearance, or environmental protection and maintainability. c. The modification will not be injurious to other properties in the vicinity, as all loading operations will be performed on the subject property. d. As stated above, adequate clear space will be provided in the north-south directions, allowing loading to be performed effectively and thus meeting the intent of the code. e. Due to the manner in which loading is proposed, a 45' clear space perpendicular to the building is not appropriate. Instead, this area will be utilized to provide space for a trash enclosure and parking. f. The modification will not create adverse impacts to other properties in the vicinity, as all loading operations will be performed on the subject property. October 6, 2016 City of Renton 1055 S. Grady Way Renton, WA 98057 1505 WESTLAKE AVE. N SUITE 305 SEAITLE, WA 98109 ).522.9510 F 206.522.8344 WWW.PACLAND.COM Subject: Renton Firestone Frontage Improvement Modification -109'0 Ave. SE The project is requesting a fee in lieu of required frontage improvement installation pursuant to RMC 4- 9-060 for the frontage along 109'h Ave. SE. Requirement Per RMC4-6-060, the proposed commercial development requires associated public street improvements along project frontages. These improvements, as outlined in RMC 4-6-060 and stated in the project pre- application meeting requirements, include 13' half-street paving, 0.5' curb, 8' planting strip, 5' sidewalk, street trees, and storm drainage improvements along 109'h Ave. SE. Modification Pursuant to RMC 4-9-060.9, the project proposes to pay a fee in lieu of the required street improvements. As outlined in RMC 4-9-060.9.c, the City may accept a fee in lieu of street improvements if "there are no similar improvements in the vicinity and there is no likelihood that the improvements will be needed or required in the next five (5) years". This is the case for the frontage along 1091h Ave. SE. There are no existing frontage improvements along 109'h Ave. SE. Criteria Compliance a. Due to the lack of existing improvements similar to the required street improvements along the 109'h Ave. SE frontage, the project's proposal to pay a fee in lieu of the required frontage improvements is appropriate as outlined in RMC 4-9-060. b. The modification will not result in any undue negative impacts to safety, function, appearance, or environmental protection and maintainability. c. The modification will not be injurious to other properties in the vicinity, as the frontage will remain in its existing condition. d. As described above, the fee in lieu of frontage improvements is allowed under the Renton Municipal Code, and meets the intent and purposes of the code. e. Based on the existing frontage improvements, fee in lieu of frontage improvements is appropriate, as there are no similar existing improvements in the vicinity. f. The modification will not create adverse impacts to other properties in the vicinity, as the frontage will remain in its existing condition. September 30, 2016 City of Renton 1055 S. Grady Way Renton, WA 98057 Subject: Renton Firestone Conditional Use 1505 WESTLAKE AVE. N :iuin 305 SEATTLE, WA 98109 6.522.9510 f 206.522.8344 WWW.PAClAND COM The project is requesting approval of a conditional use pursuant to RMC 4-2-060 to allow vehicle service and repair within a Commercial Arterial (CA) zone. Consistency with Plans and Regulations Per RMC 4-2-080.2, the City of Renton has the following requirements associated with the proposed use of Vehicle Service and Repair in a CA zone. 2. All operations shall be conducted entirely within an enclosed structure. a. Vehicles shall only be held on the property while being serviced and shall have an active repair or service invoice that shall be made available to the City upon the City's request. b. Vehicle storage before or after service shall not be allowed. Vehicles held on the site shall be subject to the screening and landscaping provisions in RMC 4-4-120, Storage Lots -Outside, unless enclosed within a building. c. Vehicle holding areas shall count toward the maximum lot coverage standard of the zone. d. Any overnight vehicle parking accessory to this use shall not be located in the front setback or in a side setback along a street. Additionally, in the CN or CV Zone, this use shall be associated with a gas station. The proposed Firestone Complete Auto Care development complies with the Conditional Use requirements stated above. Vehicle service/repair will be performed within the building, and will not be stored on the site before or after service. As such, the proposed use is appropriate for the CA zoning designation of the property. Appropriate Location The proposed use is located in a zone (CA) that allows for the stated conditional use. The proposed use will not result in adverse effects on adjacent properties. Effect on Adjacent Properties The proposed use will not result in adverse effects on adjacent properties. Compatibility The proposed development is similar in size and scale to other properties in the area, and is in keeping with the character of the overall neighborhood. Parking Adequate on-site parking is available for the development. Additional parking will be provided above the stated maximum parking pursuant to RMC 4-4-080.F.10.c. Traffic Site access will remain right-in/right-out only, as is present in the current site condition. Per a trip generation memo prepared by Transportation Engineering Northwest (TENW), the total overall traffic generated by the development will actually decrease when compared with the existing restaurant use. • Noise, Light, and Glare Noise, light, and glare generated by the development are anticipated to be within normal levels, and will not adversely affect adjacent properties. landscaping Landscaping will be provided as required by the Renton Municipal Code. Perimeter and parking lot landscaping will be provided, with an additional buffer provided adjacent to the residential property to the northeast. Conclusion The proposed use of vehicle service and repair is allowed as a conditional use in the Commercial Arterial zone under the Renton Municipal Code, and is not anticipated to have undue adverse effects on adjacent properties or the neighborhood as a whole. Therefore, the proposed use is appropriate. 2 September 30, 2016 City of Renton 1055 S. Grady Way Renton, WA 98057 1505 WESTLAKE AVE. N SUITE 305 SEATILE, WA 98109 , "06.522.9510 F 206.522.8344 WWW.PACLAND.COM Subject: Firestone Complete Autocore -Renton, WA -Construction Mitigation Description The purpose of this letter is to outline the construction mitigation and operations associated with the proposed Firestone Complete Autocare. Proposed Development The subject property is approximately 0.88 acres and is located at 17808 108'h Ave SE in Renton, Washington. The site is within the Commercial Arterial (CA) District. The proposed development consists of the construction of a Firestone automobile tire and service center with associated access drives and service bays. Hours of Operation Store management will set operating hours closer to the opening date; however, the local Firestones are typically open to the public Monday through Friday from 7:00 a.m. to 7:00 p.m., Saturdays from 7:00 a.m. to 6:00 pm, and Sundays from 8:00 a.m. to 6:00 p.m. Deliveries Delivery of vehicular parts and supplies are made on-site and typically require the presence of associates to receive the delivery. Delivery vehicles will enter the main access of 108'h Ave SE and travel to the loading zone to the east side of the building. Employees will unload the delivery vehicles through the door nearest to the loading zone. Proposed Construction The construction for the proposed Firestone store in Renton, WA is estimated to start during Summer of 2017 be completed during Fall of 2017. Construction Hours All site improvements and construction activities will occur between the hours of 7:00 a.m. and 8:00 p.m., Monday through Friday, and 9:00 a.m. and 8:00 p.m. on Saturdays and Sundays. Construction Mitigation Measures Firestone will implement construction best management practices, including the following, to reduce construction noise: • Locate stationary construction equipment as far from adjacent occupied buildings as possible. • Select routes for movement of construction related vehicles and equipment so that noise sensitive areas, including outdoor recreation areas, are avoided as much as possible. • All construction equipment will meet Department of Motor Vehicle (DMV) noise standards and shall be equipped with muffling devices. • Prior to construction, the applicant will post on the site the allowable hours of construction activity. Firestone will implement the following mitigation measures during all construction phases to reduce impacts associated with construction dust to the extent feasible, as determined by the City Engineer. • Water all active construction areas up to twice daily. • Cover all trucks hauling soil, sand, and other loose materials to or from the Project Area. • Pave, apply water up to three times daily, or apply (non-toxic) soil stabilizers on all unpaved access roads, parking areas and staging areas at construction sites. • Sweep (with water sweepers) if visible soil material is carried onto adjacent public streets. • Hydroseed or apply (non-toxic) soil stabilizers to inactive construction areas (previously graded areas inactive for ten days or more). • Enclose, cover, water up to twice daily or apply (non-toxic) soil binders to exposed stockpiles (dirt, sand, etc.). • Limit traffic speeds on unpaved roads to 15 mph. • Install sandbags or other erosion control measures to prevent silt runoff to public roadways. • Replant vegetation in distributed areas as quickly as possible. Firestone will develop and provide a construction access plan to be reviewed and approved by the city Engineer. This plan will include, at a minimum, the following construction traffic management strategies for each phase of development: • A set of comprehensive traffic control measures, including the scheduling of major truck trips and deliveries to avoid peak traffic hours, detour signs and flag persons if required, lane closure procedures, signs, cones for drivers, and designated construction access routes. • Provisions for parking spaces for all construction workers for each phase of constructions. • The location of construction staging areas for materials, equipment, and vehicles. • The identification of haul routes for the movement of construction vehicles that would minimize impacts on vehicular traffic, circulation, and safety; and a provision for monitoring surface streets used for haul routes so that any damage and debris attributable to the haul tracks can be identified and corrected. 2 RIGHT-OF-WAY DEDICATION GRANTOR'S PROPERTY THE REAL PROPERTY (HEREINAFTER CALLED "TOTAL PROPERTY") IN WHICH THE RIGHT- OF-WAY IS TO BE DEDICATED IS LEGALLY DESCRIBED AS FOLLOWS: THE SOUTH 132 FEET OF THE NORTH SIX-TENTHS OF THAT PORTION OF THE WEST HALF OF THE WEST HALF OF THE NORTHWEST QUARTER OF THE NORTHEAST QUARTER OF SECTION 32, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., IN KING COUNTY, WASHINGTON, LYING SOUTH OF THE NORTH 30 FEET THEREOF; EXCEPT THAT PORTION LYING WESTERLY OF A LINE BEGINNING OPPOSITE HIGHWAY ENGINEER'S STATION 315 + 81 AND 40 FEET EASTERLY OF THE CENTERLINE OF HIGHWAY SR 515, RENTON VICINITY; (SOUTHEAST 196TH STREET TO CARR ROAD); THENCE NORTHERLY IN A STRAIGHT LINE TO A POINT OPPOSITE HIGHWAY ENGINEER'S STATION 318 + 41 AND 45 FEET EASTERLY OF SAID CENTERLINE, AND END OF SAID LINE AS CONVEYED TO THE STATE OF WASHINGTON BY DEEDS RECORDED AUGUST 02, 1972, UNDER RECORDING NOS. 7208020358 AND 7207110553, IN KING COUNTY, WASHINGTON. THE TAX PARCEL NUMBER OF THE TOTAL PROPERTY IS 3223059104. RIGHT-OF-WAY DEDICATION AREA THE RIGHT-OF-WAY DEDICATION AREA, LOCATED WITHIN A PORTION OF THE TOTAL PROPERTY, IS LEGALLY DESCRIBED AS FOLLOWS: THOSE PORTIONS OF SECTION 32, TOWNSHIP 23 N, RANGE 5 EAST, W.M., IN PIERCE COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: A 9.0'-WJDE STRIP OF LAND ALONG THE WESTERN PROPERTY LINE; TOGETHER WITH AN 11.5'-WIDE STRIP OF LAND ALONG THE EASTERN PROPERTY LINE. ~TENW Transportation Engineering Northwest MEMORANDUM DATE: TO: September 26, 2016 Ann Fowler City of Renton Public Works Plan Reviewer FROM: Chris Forster, P .E. TENW SUBJECT: Renton Firestone -Trip Generation PREl 6-000342 TENW Project No. 5313 This memorandum summarizes the preliminary traffic information for the proposed Firestone Complete Auto Care project located at 17808 I OS 1h Ave SE in Renton, Washington. This memo includes a project description and trip generation estimate. We are requesting your review and approval of this information and confirmation that a traffic impact analysis will not be required for this project. Project Description The Renton Firestone site is located an the east side of l 08 1h Ave SE 117808 l 08 1h Ave SE, see site vicinity map in Attachment AJ. The existing site includes a fast-food restaurant with drive-through window (Skippers) totaling 2,200 square feet, which would be removed. The proposed Firestone Complete Auto Care project would include up to 7,700 square feet of 'ire soles/auto care use. Access lo the Firestone project is proposed to be provided via one right-in, right-out only driveway on I 08 1h Ave SE in approximately the same location as the existing driveway lo Skippers. A preliminary site plan is provided in Attachment 8. The project is expected to be occupied in 2017. Trip Generation The trip generation estimates for the proposed Firestone project were based on methodology in the Institute of Transportation Engineers (ITEJ Trip Genera/ion Manual, 9th edition, for Tire Store (LUC 848) and Fast-Faoo Restaurant with Drive-Through Window (LUC 934). The net new trip generation was calculated by subtracting the trips from the restaurant to be removed from the trips generated by the proposed Firestone. The resulting net new weekday daily, AM and PM peak hour trips ore summarized in Table I. A detailed trip generation estimate is included in Attachment C. Table 1 Renton Firestone Trip Generation Summary TriQs Generated Time Period In Out Total Weekday Daily -203 -204 -407 Weekday AM Peak Hour 10 6 16 Weekday PM Peak Hour -9 -4 -13 frcnsportotion P1cnr~ing I Design I lroffic Impact & Opeiotion) 11400 SE s·s Street Suite 200, Bellevue. WA 98004 J Office 1425) 889-6747 Renton Firestone -Trip Generation As shown in Table l, the proposed Firestone project is estimated to result in a net reduction in weekday daily trips [-407 trips) wilh 16 net new trips occurring during the weekday AM peak hour [IO enlering, 6 exiting). and a net reduction of net new trips [-13 trips) occurring during the weekday PM peak hour (-9 entering, -4 exiting). As a conservative assumption, no credit was token for trips from the existing reslauronl during the AM peak hour as the current restaurant (Skippers) opens after 9 AM. Next Steps The proposed Renlon Firestone project would generate less than 20 net new trips during the weekday AM and PM peak hours. Therefore, based on the Ci!y's guidelines, no additional traffic analysis is required for !his development. We look forvvard to your review and approval of our !rip generation estimates and consensus that no additional traffic analysis is necessary. If you have any questions, please feel free to contact me at [206) 498-5897 or forster@terr-.v ccrn. cc: Luke Randals, P.E., Pacland Attachments ~TENW September 26, 2016 Page 2 Re n ton Fires tone -Tri p Gen e ro tio n Attachment A: Site V icini t y Renton Firestone -Trip Gen e ration Attachment B: Preliminary Site Pla n (!) NOTTOsu.tf Renton Firestone -Trip Generation ATTACHMENT C Renton Firestone Trip Generation ITE Directional Selit Trios Generoted Lond Use Units 1 LUC 2 In Out Trip Rate In Out Total DAILY I Proposed Use: Tire Store 7,700 sf 848 50% 50% 24.87 95 96 191 Possby 3 28% -26 -27 -53 69 69 138 Less Existing Use: Fast-Food Restaurant with Drive-Through Window 2,200 sf 934 50% 50% 496.12 545 546 1.091 Passby 3 50% -273 -273 -546 272 273 545 TOTAL NET NEW DAILY TRIP GENERATION -203 -204 .407 AM PEAK. HOUR I Proposed Use: Tire Store 7,700 sf 848 63% 37% 2.89 14 8 22 Passby J 28% -4 -2 -6 ID 6 16 Less Existing Use: Fast-Food Restaurant with Drive-Through Window 4 2.200 sf 934 51% 49% 0.00 0 0 0 Possby J 49% 0 0 0 0 D 0 TOTAL NET NEW AM PEAK. HOUR TRIP GENERATION 10 ' 16 PM PEAK HOUR I Proposed Use: Tire Store 7,700 sf 848 43% 57% 4.15 14 18 32 Passby ' 28% -4 -5 -9 10 13 23 Less Exisffng Use: Fast-Food Restaurant with Drive-Through Window 2,200 sf 934 52% 48% 32.65 37 35 72 Passby ' 50% -18 -18 -36 19 17 36 TOTAL NET NEW PM PEAK HOUR TRIP GENERATION ., -4 -13 Notes: 1 sfGFA 2 Institute of Transportation Engineers, Trip Generation Manual, 9th Edition, 2012 Land Use Codes. 3 Passby percent based on studies documented in the ITE Trip Generation Handbook, 3rd Edition. August 2014. Daily is average of AM and PM. 4 Restaurant was conservative!" assumed to not be O'"'en durin" the AM "'eak hour and therefore nenerate no trios. DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT --------Ren ton E> ENVIRONMENTAL CHECKLIST Planning Division 1055 South Grady Way-Renton, WA 98057 Phone: 425-430-7200 I www.rentonwa.gov PURPOSE OF CHECKLIST: Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. INSTRUCTIONS FOR APPLICANTS: This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use "not applicable" or "does not apply" only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision-making process. The checklist questions apply to all parts of your proposal. even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. INSTRUCTIONS FOR LEAD AGENCIES: Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. USE OF CHECKLIST FOR NONPROJECT PROPOSALS: For non project proposals (such as ordinances, regulations, plans and programs), complete the applicable parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS I part DI. Please completely answer all questions that apply and note that the words "project," "applicant," and "property or site" should be read as "proposal," "proponent," and "affected geographic 1 H; \CE D\Data\Forms-T em plates\Self-Help Handouts\Plan n ing\envchecklist.doc Rev: 08/2016 area," respectively. The lead agency may exclude (for non-projects) questions in Part B - Environmental Elements -that do not contribute meaningfully to the analysis of the proposal. A. BACKGROUND 1. Na me of proposed project, if applicable: Renton Firestone 2. Name of applicant: PACLAND 3. Address and phone number of applicant and contact person: Bill Fortunato, P.E. 1505 Westlake Ave. N. Suite 305 Seattle, WA 98109 (206) 522-9510 4. Date checklist prepared: September 26, 2016 5. Agency requesting checklist: City of Renton 6. Proposed timing or schedule (including phasing, if applicable): This project includes construction of a new Firestone and deconstruction of an old Skippers. Project access and infrastructure will be constructed upon permit issuance. Estimated Construction Start: Summer 2017 Estimated Project Completion: Fall 2017 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. There are currently no plans for further additions or expansion. 2 H :\CE D\Data \Forms-T em plates\Self-H el pH a ndouts\PI a nn ing\envcheckl ist.doc Rev: 08/2016 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. • Tree Retention Plan • Geotechnical Report; prepared by Zipper Geo Associates • Storm Drainage Report 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. None. 10. List any government approvals or permits that will be needed for your proposal, if known. City of Renton SEPA Determination, City of Renton Site Plan Review, City of Renton Building Permit, City of Renton Demolition Permit, City of Renton Construction Permit, and City of Renton Clearing and Grading Permit. 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) The site is currently developed as the Skipper's Seafood and Chowder House, which has a building footprint of 2,552 square feet, with associated parking and landscaping. The entire lot is approximately 0.88 acres in size. This project proposes to demolish the existing restaurant and redevelop the site to become a Firestone Complete Auto Care. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. The property is located at 17808 108'" Ave SE in Renton, Washington. The site is bordered by 108" Ave SE/WA 515 to the west, Jiffy Lube to the north, a vacant commercial building to the south, and a residential zone to the east. NE Quarter of Section 32, Township 23, Range 05. 3 H :\CED\Data \Forms-T em plates\Self-H el p Ha ndouts\Pla nning\envcheckl ist.doc Rev: 08/2016 8. ENVIRONMENTAL ELEMENTS 1. EARTH a. General description of the site (check or circle one):@olling, hilly, steep slopes, mountainous, other _____ _ Flat area from the west side of parcel until edge of building. Fairly steep slope northeast corner of building edge of parking lot. Steep slopes on the far east side of the parcel. b. What is the steepest slope on the site(approximate percent slope)? 30% c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. Zipper Geo Associates' geotechnical report revealed that the site contains unweathered glacial till consisting of dense sandy loam with gravel. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. There is no known history of unstable soils in the immediate vicinity. e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. The proposed Firestone will cover more surface area than the old Skippers. The site will have to be graded to accommodate for the extension in footprint to the east side of the site. There will approximately be 2720 cubic yards of cut done at the site. 120 cubic yards of this will be used as fill, 2600 cubic yards will be exported. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. Temporary erosion could occur prior to site stabilization. However, temporary erosion control BMP measures will be implemented to minimize short term construction impacts in accordance with the City of Renton and Department of Ecology Standards. 4 H :\CED\Data \Forms-T em plates\Self-H el pH a ndouts\PI a nning\envcheckl ist.doc Rev: 08/2016 g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? About 70% of the site will be covered with impervious surfaces. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: 2. AIR Minimal potential for erosion exists on the site. Non-impervious areas will be landscaped to mitigate the potential for erosion by precipitation or wind. a. What types of emissions to the air would result from the proposal during construction, operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. Oust emissions along with vehicle emissions will occur during construction and maintenance of the site. The normal operation of Firestone will also create emissions due to its accommodation of automobiles. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. We are not aware of any off-site sources of emissions or odors that will affect our proposal. c. Proposed measures to reduce or control emissions or other impacts to air, if any: Watering will be used to control dust emissions during construction. Remaining exposed soils will be landscaped to minimize dust emissions or wind erosion. 3. WATER a. Surface Water: s H :\CED\Data \Forms-T em pl ates\Self-Help Handouts\Plann i ng\envch eck!ist. doc Rev: 08/2016 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. No. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. N/A 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. N/A 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. The proposal does not lie within a floodplain. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No discharge of waste materials to surface waters is expected as part of this proposal. b. Ground Water: 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. Groundwater will not be withdrawn from a well for drinking water or any other purposes. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals ... ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the 6 H :\CE D\Data \Forms-T emplates\Self-Help Handouts\P! a nning\envcheckl ist. doc Rev: 08/2016 number of animals or humans the system(s) are expected to serve. No groundwater will be discharged into the ground for any use in this project. c. Water runoff (including stormwater): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Runoff will result from rainfall and will be collected in on-site catch basins, and conveyed by pipe to a water quality structure and to a stormwater detention vault prior to being discharged to the existing storm system. 2) Could waste materials enter ground or surface waters? If so, generally describe. Not anticipated. 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. Yes, the proposal affects the drainage pattern of the current site. In general, the drainage still functions the same way as the existing site. Water drains from east to west and is collected into catch basins. The proposed site has a flatter slope from the east property line to the west side. East of the property line has a much steeper slope which will affect the drainage. d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: A detention vault will be constructed to provide flow control for for surface, and runoff water generated by the development. 4. PLANTS a. Check the types of vegetation found on the site: _x_deciduous tree: alder, maple, aspen, other _x_evergreen tree: fir, cedar, pine, other __ shrubs _x_grass __ pasture __ crop or grain __ orchards, vineyards or other permanent crops. __ wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other 7 H :\CED\Data \Forms-T emplates\Self-H el p Han douts\Plan n ing\envcheck!ist.doc Rev: 08/2016 __ water plants: water lily, eelgrass, milfoil, other __ other types of vegetation b. What kind and amount of vegetation will be removed or altered? 27 trees along the northern, eastern, and southern property lines will be removed. These trees include deciduous, coniferous, and cedar breeds. c. List threatened and endangered species known to be on or near the site. We are not aware of any threatened or endangered plant species on or near the site. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: The developed site will be landscaped in accordance with the requirements of the Renton Municipal Code, as well as with the recommendations from the City of Renton Planning department. Native plants will be used where possible to enhance vegetation on the site. e. List all noxious weeds and invasive species known to be on or near the site. There are no known noxious weeds and invasive species on or near the site. 5. ANIMALS a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: Birds: hawk, heron, eagle,~, other:------------ Mammals: deer, bear, elk, beaver, other: -~N~o~n~e=kn~o~w~n~-~------ Fish: bass, salmon, trout, herring, shellfish, other~N~o~n~e~k~n~o~w~n~·----- b. List any threatened and endangered species known to be on or near the site. None known. c. Is the site part of a migration route? If so, explain. The State of Washington is part of the Pacific Flyway. Birds that inhabit the area vary seasonally. 8 H :\CE D\Data \Forms-T emplates\Self-H e!p Ha ndouts\P!a nn ing\envcheckl ist.doc Rev, 08/2016 d. Proposed measures to preserve or enhance wildlife, if any: None. e. List any invasive animal species known to be on or nearthe site. We are not aware of any invasive animal species known to be on or near the site. 6. ENERGY AND NATURAL RESOURCES a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Natural gas will be used for heating, electric power will be used for lighting and other energy needs. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No impact anticipated. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: The project will utilize energy conservation features to the extent required by the Washington Energy Code. 7. ENVIRONMENTALHEALTH a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste that could occur as a result of th is proposal? If so, describe. Risks of fire, chemicals, and hazardous waste spills associated with automotive maintenance and service are possible during normal operations. 1) Describe any known or possible contamination at the site from present or past uses. We are not aware of any contamination at the site from past uses. 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. We are not aware of any existing hazardous chemicals/conditions that might affect project development. 9 H :\CE D\Data \Forms-Te m plates\Se!f-Help Handouts\Pla nning\envcheck!ist.doc Rev: 08/2016 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. Risks of fire, chemicals, and hazardous waste spills associated with automotive maintenance and service are possible during normal operations. 4) Describe special emergency services that might be required. No special emergency services are required. 5) Proposed measures to reduce or control environmental health hazards, if any: An oil/water separator wlll be installed to reduce environmental health hazards. A storm water treatment facility is being installed to treat stormwater runoff. b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? This project is located adjacent to the arterial 1ogth Ave SE which will have a heavy volume of cars and be the primary source of noise to the project. However, this noise is not expected to adversely affect the project. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. Short term noise will be created by the construction equipment used during the construction phase of this project. Noise will be created in the long term basis due to the inflow of automobiles entering Firestone 3) Proposed measures to reduce or control noise impacts, if any: None are proposed. 8. LAND AND SHORELINE USE a. What is the current use of the site and adjacent properties? Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. The current use of the site is a Skippers restaurant. The property is bordered to the east by the roadway. It is bordered to the north and south by other commercial retail. Adjacent to the west is an arterial. The insertion of this project will not affect any of these adjacent properties. b. Has the project site been used as working farmlands or working forest lands? If so, describe. How much agricultural or forest land of long-term commercial significance will 10 H :\CED\Data \Forms-T em plates\Self-Help Handouts\P!an n i ng\e nvchecklist. doc Rev, 08/2016 be converted to other uses as a result of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or non-forest use? We are not aware of this site being used as working farmlands or working forest lands. 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: N/A c. Describe any structures on the site. There is a 2,552 sf Skippers currently on the site. d. Will any structures be demolished? If so, what? The Skippers will be demolished. e. What is the current zoning classification of the site? Commercial Arterial f. What is the current comprehensive plan designation of the site? The current zoning is CMU (Commercial Mixed Use). g. If applicable, what is the current shoreline master program designation of the site? N/A h. Has any part of the site been classified as a critical area by the city or county? If so, specify. No. i. Approximately how many people would reside or work in the completed project? 16. j. Approximately how many people would the completed project displace? 20-30 Employees k. Proposed measures to avoid or reduce displacement impacts, if any: There are no proposed measures to avoid displacement impacts. 11 H :\CED\Data \Forms-T em plates\Self-Help Handouts\Plann i ng\envchecklist.doc Rev,08/2016 I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: Project is consistent with zoning requirements. m. Proposed measures to reduce or control impacts to agricultural and forest lands of long- term commercial significance, if any: This project should not affect any agricultural or forest lands of long term commercial significance. 9. HOUSING a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. There are no housing units being provided. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. No housing units will be eliminated. c. Proposed measures to reduce or control housing impacts, if any: N/A 10. AESTHETICS a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? 29'. b. What views in the immediate vicinity would be altered or obstructed? There are no views in the immediate vicinity that will be altered or obstructed. c. Proposed measures to reduce or control aesthetic impacts, if any: There are no aesthetic impacts of the proposed structure. 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? 12 H :\CED\Data \Forms-T em plates\Self-He Ip Han do uts\P lann i ng\envcheckl ist.doc Rev: 08/2016 The parking lot will be lit mostly at night. Vehicles will be entering and exiting the site, so vehicle headlights may introduce more light at night. b. Could light or glare from the finished project be a safety hazard or interfere with views? Project lighting will be designed to reduce glare while creating a safe level of lighting. c. What existing off-site sources of light or glare may affect your proposal? Streetlights and surrounding businesses will create light and may light up our site. d. Proposed measures to reduce or control light and glare impacts, if any: There are no necessary measures to control light produced on our site. 12. RECREATION a. What designated and informal recreational opportunities are in the immediate vicinity? None. b. Would the proposed project displace any existing recreational uses? If so, describe. No. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: There are no necessary measures to control the impacts on recreation from our site. 13. HISTORIC AND CULTURAL PRESERVATION a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers? If so, specifically describe. None known. b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. None known. 13 H :\CE D\Data \Forms-Templates \Self-Help Ha ndouts\Plan n ing\envcheckl ist.doc Rev:08/2016 c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. City of Renton GIS. d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. N/A. 14. TRANSPORTATION a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. Access to the site is provided by 108'" Ave SE/WA 515 from the west side of the site (right-in/right-out access). Entrances will be shown on the site plan. b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop? This site is served by a King County Metro Transit route that runs from Kent to downtown Renton. This bus line runs along 108'" Ave SE which is adjacent to the project site. c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate? The completed project will have 24 parking stalls. This is a decrease from the existing site which has 41 parking stalls. d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). We will provide the city a fee in lieu of any required frontage improvements required. e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. No. f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and non-passenger vehicles). What data or 14 H :\CE D\Data \Forms-T em plates\Self-Help Handouts\P)a n n ing\envchecklist.doc Rev: 08/2016 transportation models were used to make these estimates? The overall trips generated by the development will actually decrease when compared to the existing condition. A slight increase totaling 16 trips would be observed in the AM Peak Hour. g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. This project will not be affected by or interfere with the movement of agricultural and forest products on the nearby streets. h. Proposed measures to reduce or control transportation impacts, if any: No significant transportation impacts are produced by this project, therefore there are no proposed measures to reduce the impacts. 15. PUBLIC SERVICES a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. The project will have requirements for fire, police, and medical services typically associated with commercial development. b. Proposed measures to reduce or control direct impacts on public services, if any. The project will be designed per the current building code, fire code and National Fire Protection Association guidelines. 16. UTILITIES a. Circle utilities currently available at the site: ~ ~ ~ ~ ~ ~ septic system, other ----------------- 15 H :\CED\Data \Forms-Templates \Self-Help Handouts\Plan n ing\envcheckl ist.doc Rev: 08/2016 b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Existing utilities (power, water, gas, sewer, communications) will be utilized as feasible. New storm drainage and other utility appurtenances will be installed to support the new development. C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Proponent Signature: d <?)~ Name of Signee (printed): .....=L::="'e.e~=..--'&'-""'-'M-"'!?ecle.,t...,,:S,_ ___________ _ Position and Agency/Organization: 5e,J,e,e. t;;'i\x,to.Jinfl{, Pl/:?l.AiJO Date Submitted: lo;qs~ 01, j 16 H :\CE D\Data \Forms-Tern pl ates\Self-H el p Handouts\Plann ing\envchecklist. doc Rev:08/2016 D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (IT IS NOT NECESSARY to use these sheets for project actions.) Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in general terms 1. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise? Proposed measures to avoid or reduce such increases are: 2. How would the proposal be likely to affect plants, animals, fish, or marine life? Proposed measures to protect or conserve plants, animals, fish, or marine life are: 3. How would the proposal be likely to deplete energy or natural resources? Proposed measures to protect or conserve energy and natural resources are: 17 H :\CE D\Data \Forms-T em plates\Self-Help Handouts\Pla nn i ng\e nvc hecklist. doc Rev:08/2016 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? Proposed measures to protect such resources or to avoid or reduce impacts are: 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? Proposed measures to avoid or reduce shoreline and land use impacts are: 6. How would the proposal be likely to increase demands on transportation or public services and utilities? Proposed measures to reduce or respond to such demand(s) are: 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment. 20 H :\CE D\Data \Forms-T em plates\Self-Help Handouts\Plann ing\envchecklist.doc Rev: 08/2016 Firestone Complete Auto Care 17808 108th Ave SE Renton, Washington, 98055 Technical Information Report Commercial Redevelopment :.i .c:! '. _. :"·~-··-/ __ ,._,. ':·. ·-. '\' ~ i' "l.. __ 1505 Westlake Ave. N Suite 305 Seattle, WA98109 :;:;-:·,-, :.-;, r; i :·'"i "t 1.·\ ·: ~-·. ·.::.-r. ·:. ··.'·-'~>. T 206.522.9510 F 206.522.8344 www.poclond.com Prepared By: Luke Randles, P.E. Reviewed By: Bill Fortunato, P.E. September 2016 Firestone Complete Auto Care Technical Information Report Renton, Washington ' Section Table of Contents Page Executive Summary ..................................................................................................................................... 2 Section 1-Project Overview ...................................................................................................................... 4 Figure 1 -TIR Worksheet (KCSWDM 2009) ..................................................................................... 4 Site Location ............................................................................................................................................... 9 Drainage Basins, Subbasins, and Site Characteristics ................................................................ 10 Soils ............................................................................................................................................................. 11 Section 2-Conditions and Requirements Summary ...................................................................... 13 Section 3-Off-Site Analysis ..................................................................................................................... 17 Upstream Analysis .................................................................................................................................. 17 Downstream Analysis ............................................................................................................................ 17 Conclusion ................................................................................................................................................. 18 Section 4-Flow Control and Water Quality Facility Analysis and Design ............................... 19 Hydrologic Analysis ............................................................................................................................... 19 Existing Site Hydrology ........................................................................................................................ 19 Developed Site Hydrology .................................................................................................................. 20 Flow Control Analysis ............................................................................................................................ 20 Water Quality System ............................................................................................................................ 21 New PGIS Areas ....................................................................................................................................... 21 Section 5-Conveyance System Analysis and Design ..................................................................... 23 Conveyance ............................................................................................................................................... 23 100-Year Flood/Overflow Condition ............................................................................................... 23 Appendices: A -Exhibits B-Plans C -Design Calculations D -Operations and Maintenance Manual E -Bond Quantities Worksheet F -Department of Ecology Construction Stormwater General Permit Coverage Letter PACLAND Project #10439013 Page 1 Firestone Complete Auto Care Technical Information Report Renton, Washington Executive Summary Site Location: The property is located at 17808 108'h Ave SE in Renton, Washington. The site is bordered by 1081h Ave SE/WA 515 to the west, Jiffy Lube to the north, a vacant commercial building to the south, and a 109th Ave SE to the east. The site is currently developed as the Skipper's Seafood and Chowder House, which has a building footprint of 2,552 square feet, with associated parking and landscaping. The entire lot is approximately 0.88 acres in size. This project proposes to demolish the existing restaurant and parking lot, then redevelop the site to become a Firestone Complete Auto Care. The project site lies within the Lower Green River Subwatershed, which is part of the Green/Duwamish Watershed. It is in the City of Renton Black River drainage basin. The project site is located in the City of Renton Commercial Mixed Use Overlay District (Community Planning area). The property is zoned CA (commercial arterial). Design Criteria: The City of Renton uses the King County Surface Water Management Design Manual (KCSWDM), 2009 Edition, as adopted by the City of Renton and the City of Renton Amendments to the King County Surface Water Design Manual, dated February 2010. The existing site is developed and primarily impervious with the exception of landscape islands and an undeveloped piece of land between the parking lot and 109th Ave SE. The overall impervious area will increase about 3,590 SF due to this project, which will require additional detention. Additional water quality treatment will be provided to meet the requirements of Core Requirement #8 as the project will increase the pollution generating impervious surface by more than 5,000 SF. Table 1 Jurisdictional Requirements Peak Runoff Control: Peak Rate Flow Control Standard Matchinq Existinq Site Conditions 2-vear: Match existinq site conditions 10-vear: Match existinq site conditions 100-vear: Match existinq site conditions Water Quality: Enhanced Basic WQ Treatment Preceding detention 60% of the developed 2-year peak flow rate Downstream of detention The full 2-year release rate from detention facility PACLAND Project #10439013 Page 2 Firestone Complete Auto Care Technical Information Report Renton, Washington Proposed Drainage System: This project proposes to utilize a detention vault for storage and modular wetland for water quality treatment. The proposed grading will send water from the Northeast corner of the site toward the West side of the site. There is currently a storm pipe that runs west from 109th Ave SE toward the building. The proposed pipe will move north toward the Northeast corner of the site. This pipe will convey water toward the existing water structures on the Northwest corner. Stormwater will also collect into catch basins along the valley on the east and north side of the building and then be conveyed to the Northwest corner of the site to the Modular Wetland for water quality treatment. Then the water will be sent to the detention vault for storage. Then the water will travel to the existing storm structures in the Northwest corner of the site. Conclusion: The proposed stormwater management system for this project has been designed in accordance with regulatory criteria described above and is consistent with sound engineering practice. The site has been analyzed to determine the requirements for detention and water quality treatment, and no significant adverse impacts to the stormwater management system are expected as a result of the proposed development. PACLAND Project #10439013 Page 3 Firestone Complete Auto Care Technical Information Report Renton, Washington Section 1-Project Overview Figure 1 -TIR Worksheet (KCSWDM 2009) TECHNICAL INFORMATION REPORT (TIR) WORKSHEET ?art 1 PROJECT OWNER AND PROJE:CT ENGINEER PrcJect Dw·ner Bill Fortunato Poone (206)522-9510 Acl:jress 1505 Westlake Ave. N., Suite 305 Seattle. WA 98109 P•ojecL Engineer Luke Randles Comp..,ry PACLAND Poooe (206)522-9510 I Part 3 TYPE or PERM/-:-APPLICATION I I Q Laruuse Services 1 S11bd1v1son f S.,ort Sl.·bd · UPU i ]] Bu ldmg Scr,,iccs I ~~F l Cur-m1:ncal l SF< !I Cleanns and Gm::ling :J Right-or-1,1\'ay Use Doth~ Par". 5 PLA\I AND REPORT lNFORMAT:ON Technical Information Report Type of Dmionge Rr::v,cw ~,· '7"aractcd \,:;ircie). ~eS:e Da'.e (inc 1.cP. rev.s1on date~l: Part 6 ADJUSTME!\IT APPROVALS I Pc1rt J Pl~OJEc r LOCAT10N AND DESCRIPTION Pro,ect Narre Renton Firestone ODES ;:le,:rmilli --------- Loc::1llon Tm.,.nSP p ~2~3~N~--- Hange _S~E~---- Scoto<1 32 (NE 114) Site Adc'res~ 17808 108th Ave SE Renton, WA 98055 Part4 OTHER REVIEWS ANO PERWTS D DFWHPA D ~ lo :o : [.J cm= 404 08:: :)am S;:ifdy FEM,\ Floo,"Jpt.sw'I COE VVetlw1<ls Othw __ _ 0 Sh:irelir.e M;:in;:igP.MC-nl Q S1n.r.tural Rocke",':\lc1ult1 __ _ 0 ESA Sectio'1 7 Site Improvement Plan (Engr. Plans) T~·pe (cir:;Je orei ~,: ;\.bdifid ~1Site Date (in:::lude rev1sicn datcsl: Date of F,ral Type (circle o'le): S:an:ford / Complex I Prei'lpphcat:on :' E:,,:pcri~cr:al i B:an..;:e! ! Dcscnp\·on: (incl,idc conditons 1n ll,~ Section 2; l I D;ito of/1pprov:;i1: ---------------------------~_J -,1 :rn,lJ PACLAND Project #10439013 Page4 Firestone Complete Auto Care Technical Information Report Renton, Washington PACLAND ;'.I\,; <·•.Jl ;'.JY. ',\_\\111:,-(iltJ:\ SI .{I \r I ~~.\ll 1~ :Jr ",If·'.'\\!\'-.''.'\'... TECHNICAL INFORMATION REPORT (TIR) WORKSHEET -------·-------------~ P.i"l 7 ~.'ONITORlf'..G REO:JIREM.E.NTS ------------------------------1 CP.s;c-it::~ -------Mor l:.:·irJ R!:ct.ired: $1.)r: D,11e· ComplFCI r.-n 0,'l~fr: Pml8 5i IL COMMU\;ITY AN:) DRAINAGE SA.SIN I Cc<nrr.trity P:lr.n · Benson Community Planning Are-a I ~:Jc;;1al Oislncl. O·,cla','s: ~C~o~m~m=•r~c~i•~'~M~i~••~d~U~s~•----------------- 1 Dr,Jir;Jg,;:-B~~n ~rty of Ren1on Stack River Drainage Basin I S:orr-,\·.":I~ R.P:'.J'.ltf~r-1"!.r,t!'; .S:.!Y :If Rerr..::n Ame'Td-1'.~r.~s lo the 2C-)£, Kir:9 CD..1IT. .. Surface W;i:!er Desic, M~'Tl.l.ll ~cl.I~ g ONS' TE:. AND ADJACENT SENS,TiVE A~EAS 0 Ri·,•?r:Str.,,..;;.m D Lo~C 0 -~·:ct:.i11d-.; ----------0 ::ios.ed f:<:rr(:$si,:,n ________ _ LJ F,tc:-iq: .1 n 0 o:rw l.J St~.:·i;: Slop1J 15'\ le 25% ;ratt1:Js w~t c' sillJ ::J F•r,~ion H.~7.1r.::: --------- :J L::ird:;"iCe H:u."'.rd 0 Ct>.i M1ru_. H.i,:-JrJ ------- 0 Sc1:;···-11c H£1.?<.,r•.:: --------- -~ I -------------U H.ih·!:~t r-01ec:i.:w _______ _ 0 -___ -__ -___ --__ -____ J ~--------------~--- P::i't 'C SOil S ---------------------------------- S-:::1-l:fp! AldArw::,:):? Gr,11,1r:a-ly ~~ncy lo-'ln :J H19h G•r.1nc:,\'.'o!i"!r T,"lh ~ -.wi:r.i1• 5 fee::, :J Oher 3toi:-!:!s Ol'1 is% D S:; !J $[)ur;:;c /1(.;u k•r ~ :;e,ep$:S:ir ngs --------------------------------; IJ :(![l'I ' Project #10439013 Page 5 Firestone Complete Auto Care Technical Information Report Renton, Washington PACLAND TECHNICAL INFORMATION REPORT (TIR) WORKSHEET ?a•I 11 DRAINAGE DESIGN UMrTATIONS REFERENCE f.El Cc,:e, 2 -Offs1tB Analysis D Sensitive.'CriticA Areas lfil SEPA LJ O!her- 0 _________ _ D AOditiOflol Sheets Attac:ied LIMITATIOr-i .' SITE CONSTRAINT ~-------------------------------------------------~ Part 12 TIR SUM:V.ARY SHEET ferovlde one TIR Surnma~· Sheet per Thf~oid Disehart;~ Areo) -Threshold Discharge Area: fr,ame or descrio:ion) Core Requirements {all 8 apply) Discha•ce cJt Natural Location Number of N;:itu~al D1sch_a_r9...e_~~cat1ons: TBD Offsite Analy:;is l~vel: '2)/2/3 dated: ----·F;,_.., Control Level: (i)1213 or Exernp1:cn Number - 'ind. :acilitv summarv sheet) Small Sile BMPs Co:weyan::;e System Spll containment located at· Erosion and SE!d1rr:ent Control ESC S1:e Supervisor: TSO Cont'lct Phone A~er Hours Prone: rv1Min1cmmcc and Operation Respons b1hty: ~I Publ,c If Private, Ma1nlenan,.e Loo Rec;ulrt?::!-Yes .I No Fi1anc1al Guarartees and Provided' ~.,-N8 L1abilitv -------Water Quality Type: Basic ! Sens. Lake , Ennanced 8asicrn i Bog (include facility summary sheet} or Exemphon No. Landscaoe r>.fanaqerr.ent P~n: Yes ,(Ne) Special Requirements (as apDlicable) Arca Specific Drainage Requirements Floo::lplainiFluod..vay Delincat1on Fbod Protection Facilities Type: COA ,I SDO i MDP .' BP i L.'vlP ,' Shared Fae. Name· Type· Ma1ar .1 Mmor i Exemption ,~ 10D-year Base Flood El(w<1tion (or range) Datvm· Describe: ·- 1 None -- Source Cu11lrul ------~-~~-~-------------------, Describe landuse: Commercial (c:cirnm !industrial landuse) Descnbe any structural controls· Not required 3 Project #10439013 Page 6 Firestone Complete Auto Care Technical Information Report Renton, Washington PACLAND TECHNICAL INFORMATION REPORT (TIR) WORKSHEET -------------------------~----- 0.1 Conlrcl High-use Sil~· Yes ~ Treatmc:?'11 BMP: -------------- Maintenance Agreeme"lt' Yes (&) ------------------'w""'.lt-'-' """h;,ocemc,? ___________________ ___j Other Draina e Structures Ces-::rit::e Part 13 EROSION AND SEDIMENT CONTROL REQU~.l~R-~E~M"'E'-'N-'-T"S ___________ ______, I MINIMUM ESC HEOUIHEMENTS r..-1lNIMUM ESC REQUl~EMENTS DL:RING CONSTRUCTION ::El Cover Measures ~ Penrr.eter Pro'..ection ~ T rat'ic Area Stabilization fLI Sediment Retention fl1 Swfac:.e Waler C(11lection D ·Jew-atering Cor!ml 0 ::lu~I Ctmtrnl 0 i=Tow Cont:ol I ~ Stab,li2:F:,::~~:=,~~TION iKJ Remove and ~estcre Tcmpcrary ESC Faali!ies !!J Cle.in ard Rer:,ovc Ail S.lt and Debns, Ensure Operation of Pemianent Faciiiries 0 Flag LJm1ts at SAO and open spa::e preservation areas D Olhe• --------- LPa114 STORMWATER FACILITY DESCRIPTIONS (Note: lndude Facility Summarv and Skelchl --1 ! ' I Flow Con:rol Tvnc,·Descri~tion Water Qua:itv TVl)eiDescrinhon ! 00 Dc!ention D Biofl[trabon I D lnfilt·alio'l D Wetpocl U Reg.ona! Faciliti fil Media Frllralior. I ~ Shared Facility ' 0 Oil Contd ]) Flow Conlml D Spill Con:ro! BMPs i / 0 Flow Control 3.MPs LJ Ole.er I I I j O Other i I I ----I 200'/ .'11:rbn~ \\':1l~1 lk~i,:r. \LJ1:11.1I !. ,j 20IJ1.I • Project #10439013 Page 7 Firestone Complete Auto Care Technical Information Report Renton, Washington J-..:J'.\"(i coc-..r1·. W:\.-;IJlN{;l()".;_ S("l{;:.H"I W.\nR Dl.S[G\" \[.!\.\"l .. -\L TECHNICAL INFORMATION REPORT (TIR) WORKSHEET : Part 15 EASEMENTS/TRACTS Prtrt 16 STRUCTURAL ANALYSIS '------------------------------------------' ::J Drainage Easement O Cast in Place Vault :J Covenant O Relain:ng Wall 0 Native Grovi.it.h Protectio'l. Co•Jena'1t O Rccke!)';, 4· High 0 Tract D Structural on S:cep Slo.:ie D Otno, D O:hc, Part 17 SIGNATURE OF PROFESSIONAL ENGINEER I. or a civi'. engineer unde· my super.iis.ion, have visi:C'd the site. Ac:ual site comMions as obs.erved were in::orpcrateC into lnis wor'<shcct and the attached Tectm:caJ Information Report. To the best o~ my <nm,•.1edge the inforT1atlon provided here is accurate. S'G(}(.'d-V'c'k . - 5 PACLAND Project #10439013 Page 8 Firestone Complete Auto Ca re Technical Information Report Renton, Washingt on Site Location • Figur e 2 -Site Location Location : 17808 1081h Ave SE, Renton, WA 98055 Sect ion/Township/Range: NE Quarte r of Sect ion 32, Township 23, Range 05 Parcel/Tax Lot(s): 3223059104 Size: 0.88 acres City, County, State: Ren t on, Ki ng County, Was hi ngton Govern i ng Agency: City of Renton Des ign Criteria: 2009 King Co u nty Surface Wa t e r Des ign Manual (KCSWD M ), and t he City of Renton Amendm ents to the KCSWDM (February 2010) PACLAND Project #10439013 Page 9 Firestone Complete Auto Care Tec hnical Information Report Renton, Washington Drainage Basins, Subbasins, and Site Characteristics Drainage Basin The project site is located i n the Lowe r Green River Subwatershed, which is part of the Green/Duwamish Watershed. It is i n the City of Renton Black Rive r dra inage bas in. Existing Subbasins The design of the ex isting si te used a single bas i n with an area of 0.88 acres. Th e southeast portion of the site of th e highest in elevation at 410'. Th e area gradua ll y sloped west until the finished floo r of the building about 402'. The northeast side of th e site starts at an elevation of 408' and slopes downwa rd toward the west side of the site where it has an elevation of 400'. This whole subbasin crea tes a drainage system that allows water to flow from east to west. The Northwest corner of the site has a catch basin that conveyed water into the mun icipal stormwater system. There is another discharge at the Southwest corner of the site due to the val ley that runs east to west along the southern part of t h e si t e. Proposed Subbasins The proposed storm drainage system will be composed of the same approximate subbasins as th e existi ng. See Appendix A Exh ibi t B-Pr oposed Subbasin, detai l ing the proposed subbasins. As shown in Table 2 -Site A r eas, the impervious area is decreasing as a result of thi s development. Additional landscaping and a reduction i n bui ld i ng sq u are footage wi ll allow for an i ncrease in pervious areas . The areas below ar e based on the 12.28 acre project site since we are not proposing changes to the bypass, offsite wetland mitigation area , offsite areas, or t he a r ea of Lots 4 an d 6 of t he Northern Railroad BSP No. 014-92. Table 2 -Site Areas Existing Area (SF) Proposed Area (SF) Surface Roof 2552 7700 Landscaping 15,228 11,095 (Pervi ous) Pavement 18,085 13,141 (PGIS) Wo o d Deck 522 0 Concrete 1,756 6 ,171 Total 38,107 38,107 Site Characteri stics The property is located at 17808 108th Ave SE in Renton, Washington. Th e site is bordered by 103th Ave SE/WA 515 to the west, Jiffy Lube to t h e north, a vacant commercia l bu ilding to the south, and a 1091h Ave SE to the east. The site is currently developed as the Skipper's Seafood and Chowder House, which has a bui l ding footprint of 2,552 square feet, with associated parking PAC LAN D Proj ect #10439013 Page 10 Firestone Complete Auto Care Technical Infor mation Report Renton , Wash ington and land scapi ng. The entire lo t is approximate ly 0.88 acres in size. Thi s project proposes to demolish the existing restaurant an d parking l ot, the n redevelop the site to become a Firestone Complete Auto Care. The proposed project will in clude t he const ru ction of an approxi mate ly 7,700 SF Firestone Compl ete Autocare building. The overal l paved area wi ll be approximately 0.30 AC. The change i n i mpervious surfaces (roof and pavement) i s about 0 .10 AC, t herefore the pollution generated by i mpervious surface will be increased. Water quality treatm ent will be provided for an area equiva lent to the pollution generati ng impervious surface on site. Soils Websoil Su rvey Figure 3 -Site Soils (USDA Web Soil Survey Map) The site is mapped as A ld erwood grave ll y sandy loam Oto 8 percent slopes (AgB) and A lderwood gravelly sandy loam 8 to 15 percent slopes (Ag() according to the USDA Natural Resource Conservation Service, Web Soi l Survey for King County Area, Wash i ngton. Geotechnical Report The following i nformation was gathered from a report created by Zi ppe r Geo Associates, LLC. on August 29, 2016. 4 feet deep under the surface, ZGA's in fi ltra t ion test recorded that the soi l observed was glacial ti l l with medium dense, li ght brown w ith some oxidation, sandy loam with gravel. Underneath this so il was u nwea thered g l acia l t ill consist i ng of dense, tan, sandy loam with gravel. The b ottom of the infiltration test was at 8 fe et. The report showed dense, tan, unweathered glacia l till at this depth. PACLAND Project #10439013 Page 11 Firestone Complete Auto Care Technical Information Report Renton, Washington No groundwater was observed during the infiltration test. There were also no signs that the seasonal groundwater may be higher than when observed. ZGA performed a single small-scale Pilot Infiltration Test per standard of the Storm Water Manual. The results of the test were that the infiltration test was approximately 0.21 inches/hour. According to Table 3.7 in the City of Renton's Amendments to the King County Storm Water Design Manual, a correction factor of 4 must be used to derive the design infiltration rate from the observed short term infiltration rate. After applying this correction factor, the site has a design infiltration rate of 0.05 in/hr. PACLAND Project #10439013 Page 12 Firestone Complete Auto Care Technical Information Report Renton, Washington Section 2-Conditions and Requirements As required by the 2009 King County Surface Water Design Manual (KCSWDM) and City of Renton Amendment, this project is subject to a full drainage review. Therefore, the storm drainage design for this project is required to comply with all eight (8) Core Requirements, and six (6) Special Requirements. The requirements have been met as follows: Core Requirement #1: Discharge at Natural Location All surface and storm water runoff from a project must be discharged at the natural location so as not to be diverted onto or away from downstream properties. The manner in which runoff is discharged from the project site must not create a significant adverse impact to downhill properties or drainage systems. Response: Onsite runoff will be collected, conveyed and, when necessary, treated. All onsite runoff is subsequently conveyed to the City of Renton storm water system. The city system discharges northwest of the site into Panther Creek. No downstream impacts are anticipated as a result of the proposed improvements as the impervious area will remain approximately the same. Core Requirement #2: Off-site Analysis All proposed projects must submit an offsite analysis report that assesses potential offsite drainage and water quality impacts associated with development of the project site and propose appropriate mitigation of those impacts. The initial permit submittal shall include, at minimum, a Level 2 downstream analysis. Response: See Section 3 of this report for a complete off-site analysis. A Level 2 downstream analysis will be submitted upon civil plan submittal. Core Requirement #3: Flow Control All proposed projects, including redevelopment projects, must provide onsite flow control facilities or flow control BMPs or both to mitigate the impacts of storm and surface runoff generated by new impervious surface, new pervious surface, and replaced impervious surface targeted for flow mitigation. Response: (Waiting on KCRTS) Per the exceptions listed in section 1.2.3.1-A of the City of Renton Amendment to the KCSWDM the project is exempt from flow control requirements as it doesn't increase the 100-year peak flow and is not expected to significantly impact a critical area, or cause severe flooding or erosion problems. The proposed 12.28 acre site generates 4.84 cfs, a 0.17 cfs decrease in the 100-year peak flow rate from the existing site conditions. Therefore, additional flow control facilities, beyond the existing storm water ponds and flow control structure, are not proposed as part of this project. A PACLAND Project #10439013 Page 13 Firestone Complete Auto Care Technical Information Report Renton, Washington detailed summary and analysis of the existing and proposed conditions is provided in Section 4 of this report. Core Requirement #4: Conveyance System All engineered conveyance system elements for proposed projects must be analyzed, designed, and constructed to provide a minimum level of protection against overtopping, flooding, erosion, and structural failure. Response: Portions of the existing conveyance system will be reused as port of this project with additional conveyance added ta accommodate the new building configuration and site layout. The proposed conveyance system hos been designed to convey the 100-yeor peak flow. Core Requirement #5: Erosion and Sediment Control All proposed projects that will clear, grade, or otherwise disturb the site must provide erosion and sediment controls to prevent, to the maximum extent practicable, the transport of sediment from the project site to downstream drainage facilities, water resources, and adjacent properties. Both temporary and permanent ESC measures shall be implemented. Response: Erosion and sediment control requirements will be an integral part of the project construction documents. These measures will include methods to reduce erosion of onsite site soils and to prevent sediments from inadvertently leaving the project site. Additionally, the ESC measures will prevent sediment-laden discharge from entering the wetland or existing stormwoter water quality or flow control facilities. Core Requirement #6: Maintenance and Operations Maintenance and operation of all drainage facilities is the responsibility of the property owner, except those facilities for which the City of Renton assumes maintenance and operation, and must be maintained and operated in accordance with King County or other maintenance standards as approved by the City of Renton. Response: An Operations and Maintenance Manual is included in this report-see Section 10. Core Requirement #7: Financial Guarantees and Liability In accordance with RMC 4-6-030J, RDSD shall require all persons constructing any surface water facilities (including flow control/water quality facilities, conveyance systems, erosion control, and road drainage), to post with the City of Renton a bond, assignment of funds or certified check. The applicant must also maintain liability insurance. Response: See Section 9-Bond Quantities, Facility Summaries, and Declaration of Covenant. The Site Improvement Bond Quantity Worksheet and Declarations of Covenants will be submitted upon approval of the Building Permit plans. PACLAND Project #10439013 Page 14 Firestone Complete Auto Care Technical Information Report Renton, Washington Core Requirement #8: Water Quality All proposed projects, including redevelopment projects, must provide water quality (WQ) facilities to treat the runoff from those new and replaced pollution-generating impervious surfaces and new pollution-generating pervious surfaces targeted for treatment. Response: The proposed project improvements will decrease the pollution generating impervious surface (PGIS) by 0.11 AC The site currently hos accommodation for 0.42 AC of PGIS. Enhanced Basic Treatment is required if more than 50% of the runoff that drains to the proposed treatment facility is from commercial land use. Additional Enhanced Basic Water Quality treatment will be provided for the increase in impervious surfaces on site. Additionally, on oil/water separator, which will discharge to the sanitary sewer system, will be provided for discharges from the building. A detailed summary and analysis of the water quality basin and design is provided in Section 4 of this report. Special Requirement #1: Other Adopted Area-Specific Requirements The City of Renton may apply requirements for controlling drainage on an area-specific basis. Potential other adopted area-specific requirements may include: Master Drainage Plans, Basin Plans, Stormwater Compliance Plans, etc. Response: The project site is within Washington State Water Resource Inventory Area 9: Green/Duwomish and Centro/ Puget Sound Watershed Salmon Habitat Recovery. However, the proposed project will hove no effect on any salmon habitats. The project site does not lie within any City of Renton Moster Drainage or Basin Plans. Special Requirement #2: Flood Hazard Area Delineation If a proposed project contains or is adjacent to a flood hazard area as determined by the Renton Department of Storm Drainage, the project must determine those components that are applicable and delineate them on the project's site improvement plans and recorded maps. Response: The project site does not lie within or adjacent to a City of Renton Flood Hazard Area (determined by FEMA FIRM Panel 53033C0979F dated Moy 16, 1995) and therefore does not need to apply the provisions of this requirement. Special Requirement #3: Flood Protection Facilities Proper analysis, design, and construction are necessary to protect against the potentially catastrophic consequences if flood protection facilities such as levees and revetments should fail. Response: The proposed project will not rely on an existing flood protection facility, or modify or construct a new flood protection facility. Special Requirement #4: Source Control PACLAND Project #10439013 Page 15 Firestone Complete Auto Care Technical Information Report Renton, Washington If a proposed project requires a commercial building or commercial site development permit then the water quality source controls applicable to the proposed project shall be applied in accordance with the King County Starmwater Pollution Prevention Manual and Renton Municipal Code N. Response: Water quality source controls will be applied in accordance with the KCSWDM and Renton Municipal Cade IV. A pollution prevention plan has been included in section 8 of this report. Special Requirement #5: Oil Control Projects proposing to develop or redevelop a high-use site must provide oil control in addition to other water quality controls required. Response: High use sites area defined as a commercial or industrial site that (1) hos on expected average doily traffic count equal ta or greater than 100 vehicles/1,000 SF of grass building area: (2) is subject ta petroleum storage in excess of 1,500 go/Ions per year; (3) is subject ta use, storage, or maintenance of a fleet of 25 or more diesel vehicles. The proposed development does not exceed any of these thresholds, and is therefore not required to provide oil contra/. Special Requirement #6: Aquifer Protection Area If a proposed project is located within the Aquifer Protection Area as identified in the RMC 4-3- 050, this special requirement requires the project to determine those components that are applicable and delineate them on the project's site improvement plans. Response: The project is not located within an Aquifer Protection Area, and therefore this requirement does not apply. PACLAND Project #10439013 Page 16 Firestone Comp lete Auto Ca re Technica l I nfo r mation Report Renton, Washington Section 3-Off-Site Analysis Upstream Analysis The m u nicipa l sto rm sys t em co min g fro m 109th Ave SE ties into t he exist ing private sto rm system on the East side of the site. There is m i ni ma l tri b utary area attributes water to t h e site. Stormwater run off fl ows from t he near by reside nt ial streets and i s guided by curbs in to ca t ch bas i ns before it reaches t his site. Downstream Analysis After the ru noff passes thro ug h t he existin g stormwater d etention/treatm en t facil ities, runoff ente rs th e m uni ci pa l st orm wa t er sys t em at 108th Ave SE . After cross i ng over 108th Ave SE, the syste m travels northwest ab out 2500 f eet un t il d ischa rge i nto Pa nthe r Cree k. As discussed ea rli e r i n t he report, t he storm runoff leaves t he site at t he northwest corn e r and enters i nto th e Re nton Municipa l st o rm sys t em . The sys t e m ru ns undern eath t he Fr ed Meyer strip m all and across SE Carr Rd until f eed i ng into Pa nt her Creek. A map of the downstream ana lys is can be see n in Fi gu re 4. Figure 4 -Downstream Area (Renton COR Maps) PACLAND Proj ect #10439013 Page 17 Firestone Complete Auto Care Technical Information Report Renton, Washington Conclusion The existing downstream stormwater facilities have been analyzed and after discussions with the City Engineer, as long as the project site does not increase the overall impervious area from its existing conditions, it is expected that there will be no adverse impacts to the downstream facilities because the developed peak flow rate leaving the developed site will be less than the existing peak flow rate. See Section 4 for further explanation. PACLAND Project #10439013 Page 18 Firestone Complete Auto Care Technical Information Report Renton, Washington Section 4-Flow Control and Water Quality Facility Analysis The City of Renton Amendment to the KCSWDM applies flow control standards based on geographic areas as determined by the Flow Control Application Map. The project site lies within a Conservation Flow Control Area. This requires a level 2 downstream analysis. This area requires peak runoff control within the Flow Control Duration Standard Matching Existing Site Conditions area such that it matches the flow duration of predeveloped rates for the existing site conditions over the range of flows extending from 50% of 2-year up to the full SO-year flow. This matches the flow duration of predeveloped rates for the existing site conditions over the range of flows extending from 50% of 2-year up to the full SO-year flow. Hydrologic Analysis The existing and proposed site conditions were evaluated using both the King County Runoff Time Series (KCRTS) The detailed KCRTS output has been included in Appendix C -Design Calculations. The historic 1-hour duration in the Sea-Tac rainfall region (location scale factor ST-1.0) was used to model runoff in KCRTS. Existing Site Hydrology The existing site includes a storm drainage system designed to collect storm water at strategically placed catch basins throughout the site. The storm water is then conveyed through underground pipes to the northwest corner of the site where it ties into the Renton Municipal System. The municipal stormwater system routes to a discharge point of Panther Creek across SE Carr Rd. The existing detention basin was designed to release flows at or below the pre- developed rates for the 2, 10, and 100 year storms. The pre-developed conditions and existing peak runoff rates for the project site area are shown in Tables 4 and 5 below. Existing peak runoff rates were determined using the King County Runoff Time Series modeling software and the calculations can be found in Appendix C. Table 4 Pre-Developed (Existing) Conditions Area Condition 7.94 AC Pavement (PGIS) 2.74 AC Landscape/Wetland 1.42 AC Roof Table 5 Existina Peak Runoff Rate Event l Rate (cfs) PACLAND Project #10439013 Page 19 Firestone Complete Auto Care Technical Information Report Renton, Washington 2-vear 2.54 10-vear 3.03 100-vear 5.01 Developed Site Hydrology The proposed project will have similar hydrology to the existing site. It is anticipated that the existing systems (conveyance, detention, and treatment) will be utilized as the overall site hydrology and division of subbasins will remain approximately the same. The amount of pervious area is increasing due to a reduction in building size and additional landscaping, however the site PGIS will be increased as a result of the decrease in building size. The post- developed conditions and un-detained peak runoff rates for the entire attributed basin area (12.28 acres) are shown in Tables 6 and 7 below. Developed peak runoff rates were determined using the King County Runoff Time Series modeling software and the calculations can be found in Appendix C. Table 6 Post-Developed Conditions Area Condition 8.22 AC Pavement (PGIS) 3.60 AC Landscape/Wetland 046 AC Roof Table 7 Developed Peak Runoff Rate Event Rate (cfs) 2-vear 2.43 10-year 2.91 100-year 4.84 Flow Control Analysis The post developed 100-year peak runoff rate for the overall site decreases by 0.17 cfs from the existing condition. Because the project is located in the Peak Rate Flow Control Standard area and does not increase its developed 100-year peak runoff rate, any additional flow control facility requirement is waived for this project. The existing flow control facilities consist of the following structures inside of a 54-inch diameter catch basin manhole; a 1-inch diameter orifice with an outlet elevation of 10.87, a 3.5-inch diameter orifice with an outlet elevation of 15.00, a 6-inch diameter elbow with an outlet elevation of 15.50, and a 15-inch diameter restrictor with an overflow elevation of 16.50. The control structure discharges to a 15-inch storm drain pipe before connecting into the Renton PACLAND Project #10439013 Page 20 Firestone Complete Auto Care Technical Information Report Renton, Washington Municipal storm system. See Appendix B for the Act III Theater Drainage Report, which includes illustrations and calculations for the existing flow control system. Water Quality System The proposed redevelopment includes demolition of the existing theater; construction of the sales, service, car wash, and presentation buildings, reconfigurations of landscape islands and repaving of the existing parking area. The roofs of the proposed buildings will be considered non pollution-generating impervious surfaces (NPGIS). While the overall impervious area of the site will be reduced as part of this project, the amount of pollution-generating impervious surfaces (PGIS) will be increasing since the existing building footprint will be replaced with new PGIS. There are two existing grass-lined biofiltration swales which discharge to three water quality ponds in series. The swales and water quality ponds were sized for the existing impervious area, as detailed by the drainage report by Horton Davis and Associates. The project will add 0.28 AC of new PGIS. This is more than 5,000 SF of new PGIS; therefore additional water quality treatment will be provided. Two Modular Wetland Stormwater Biofiltration Systems are proposed to meet the Enhanced Basic Water requirement in King County Surface Water Design Manual. The Enhanced basic treatment will be provided for the increased PGIS. New PG/5 Areas The new PGIS is a result of the revisions to the site layout and the reduced building size. It isn't possible to collect the exact area of new PGIS however the majority of the new PGIS, located within the existing building footprint, will be treated. There are two Water Quality Basins within the proposed vehicle storage area and will be greater in size than the increase in the new PGIS. The total area in the proposed Water Quality Basins is 1.14 AC. Exhibit 3 -Water Quality Basin in Appendix A depicts the area to be treated. Tables 8 and 9, below, contain the developed conditions of each treatment basins as well as the water quality design flow rate (60% of the developed 2-year peak flow rate). This water quality design flow rate was provided to Modular Wetlands in order for them to size the proposed treatment facilities. Sizing criteria and design of the Modular Wetlands structures is provided in Appendix C. Table 8 Water Quality Basins Basin Area Condition A 0.68 AC Pavement (PGIS) OAC Landscape/Wetland OAC Roof B 0.46 AC Pavement (PGIS) OAC Landscape/Wetland PACLAND Project #10439013 Page 21 Firestone Complete Auto Care Technical Information Report Renton, Washington OAC Roof Table 9 Water Quality Flow Rates and Facilitv Sizinq Basin Event Rate (cfs) MWS-L-4-8-V MWS-L-4-6-V (Structure 21) (Structure 26) Treatment Flow Treatment Flow Rate (cfs) Rate (cfs) A 2-year 0.17 60% of 2-year 0.10 0.102 B 2-year 0.12 60% of 2-year 0.07 0.07 PACLAND Project #10439013 Page 22 Firestone Complete Auto Care Technical Information Report Renton, Washington Section 5-Conveyance System Analysis and Design Conveyance Per the 2009 King County Surface Water Design Manual, Section 4.2.1.2, the on-site stormwater conveyance can be calculated based on gravity flow analysis of the piping network. Peak run-off associated with and up to a 25-year storm event has been determined to be adequate. Uniform flow analysis utilizing Manning's equation, shown below, was employed with a Manning's Roughness Coefficient (n) of 0.012. Manning's equation -Q= IA?( xAxR 2i3xS 112 With: Q = Flow (CFS) n = Manning's Roughness Coefficient (0.012) A = Flow Area (SF) R = Hydraulic Radius= Area /Wetted Perimeter (LF) S = Slope of the pipe (ft/ft) Based on the revised basin areas and existing pipe sizes, the existing conveyance system is adequate for the 25-year storm event. All new conveyance pipes will also be designed to convey the 25-year storm event. Additionally, the overflow from a 100-year storm event will not create or aggravate a severe flooding problem or severe erosion problem. See Appendix C for conveyance design calculations. 100-Year Flood/Overflow Condition Review of the current FEMA FIRM maps (Panels 0978F, 0979 F) indicates that the project site lies within the Zone X, which is determined to be outside of the 100-year flood plain. If the existing storm system were to experience a major storm event, the stormwater detention area would overflow in to the rear access drive, and along the road westerly towards Lind Ave SW. The stormwater system for this project has been designed to address the storm events in accordance with design criteria described previously. In the event of a larger storm, it is unlikely that the system would fail. Based on a review of the site and immediate surroundings, the overflow of the stormwater conveyance system would allow surface water to sheet flow to the public storm system in Lind Avenue. PACLAND Project #10439013 Page 23 Firestone Complete Auto Care Technical Information Report Renton, Washington Section 6-Special Reports and Studies The following Special Reports and Studies were used or have been completed for this project: • Drainage Calculations for Act Ill Theaters, City of Renton, Washington-dated August 8, 1996 by Horton Dennis & Associates Inc. • Report for Detailed Wetland Mitigation Plan, presented to Act Ill Theaters, City of Renton, Washington-dated September 16, 1996 by W & H Pacific. • Wetland Study-dated approximately December 1991 by David Evans and Associates, Inc. • Geotechnical Investigation-by Zipper Geo Associates • FEMA FIRM Panels 0978F and 0979F dated May 16, 1995 • Wetland Study -by H & S Consultants PACLAND Project #10439013 Page 24 Firestone Complete Auto Care Technical Information Report Renton, Washington Section 7-Other Permits The following governmental approvals or permits will likely be required for this project: • City of Renton SEPA Determination • City of Renton Site Plan Review • City of Renton Building Permit • City of Renton Construction Permit • City of Renton Demolition Permit • Washington State Department of Ecology, NO! Coverage under the NPDES Permit. A copy of the Permit Coverage Letter is provided in Appendix F. These permits will require approval by the City of Renton Planning Division or the Department of Ecology. PACLAND Project #10439013 Page 25 Firestone Complete Auto Care Technical Information Report Renton, Washington Section 8-CSWPPP Analysis and Design All erosion and sediment control measures shall be governed by the requirements of the City of Renton and the Washington State Department of Ecology. A temporary erosion and sedimentation control plan will be prepared to assist the contractor in complying with these requirements. The Erosion and Sediment Control (ESC) plan will be included with the construction plans. 1. Erosion Risk Assessment The degree of erosion risk on the proposed project site is minimal. The following factors contribute to a low degree of erosion risk: • Slope across the site is minimal. Runoff will not travel at high velocities across the site and, therefore, will not cause noticeable erosion impacts. • The site consists primarily of impervious surfaces. 2. Construction Sequence and Procedure The proposed development will include an erosion/sedimentation control plan designed to prevent sediment-laden run-off from leaving the site during construction. The erosion potential of the site is influenced by four major factors: soil characteristics, vegetative cover, topography, and climate. Erosion/sedimentation control is achieved by a combination of structural measures, cover measures, and construction practices that are tailored to fit the specific site. Prior to the start of any grading activity upon the site, all erosion control measures, including stabilized construction entrances, shall be installed in accordance with the construction documents. The best construction practice will be employed to properly clear and grade the site and to schedule construction activities. The planned construction sequence for the construction of the site is as follows: 1. Attend a pre-construction meeting with the City of Renton. 2. Install temporary erosion control features. 3. Demolish existing structure(s). 4. Clear and grub expansion area. 5. Grade site. 6. Construct buildings. 7. Pave site and install landscaping. 8. Remove temporary erosion control features once site is fully stabilized. 3. Trapping Sediment PACLAND Project #10439013 Page 26 Firestone Complete Auto Care Technical Information Report Renton, Washington Structural control measures will be used to reduce erosion and retain sediment on the construction site. The control measures will be selected to fit specific site and seasonal conditions. The following structural items will be used to control erosion and sedimentation processes: • Stabilized construction entrances • Filter fabric fences • Catch Basin Inlet Sediment Protection • Proper Cover measures Weekly inspection of the erosion control measures will be required during construction. Any sediment buildup shall be removed and disposed of off-site. A stabilized construction entrance will be installed at the site entrance to avoid vehicle tracking off mud off-site. The entrances are a minimum requirement and may be supplemented if tracking of mud onto public streets becomes excessive. In the event that mud is tracked off site, it shall be swept up and disposed of off site on a daily basis. Depending on the amount of tracked mud, a vehicle road sweeper may be required. Because vegetative cover is the most important form of erosion control, construction practices must adhere to stringent cover requirements. More specifically, the contractor will not be allowed to leave soils open for more than 14 days and, in some cases, immediate seeding will be required. 4. Wet Season TESC Operating Plan Work between October 1'' and April 30'h must adhere to the Wet Season Special Provisions noted in the 2009 KCSWDM. PACLAND Project #10439013 Page 27 Firestone Complete Auto Care Technical Information Report Renton, Washington Section 9-Bond Quantities, Facility Summaries, and Declaration of Covenant The following items will be submitted upon application for the civil permits: • Declaration of Covenant for Privately Maintained Flow Control BMPs • Declaration of Covenant for Privately Maintained Flow Control and WQ Facilities See Appendix E for a copy of the Bond Quantities Worksheet PACLAND Project #10439013 Page 28 Firestone Complete Auto Care Technical Information Report Renton, Washington Section 10-Operations and Maintenance Manual A manual detailing the operations and maintenance for all privately-maintained flow control and water quality facilities has been prepared and can be found in Appendix D. This manual will also include Appendix A of the KCSWDM (Maintenance Requirements for Flow Control, Conveyance, and WQ Facilities). PACLAND Project #10439013 Page 29 Firestone Complete Auto Care Technical Information Report Renton, Washington Appendix A -Exhibits PACLAND Project #10507003 Firestone Complete Auto Care Technical Information Report Renton, Washington EXHIBIT A-EXISTING SUBBASIN PACLAND Project #10507003 Firestone Complete Auto Care Technical Information Report Renton, Washington ~ Cl) WON E77YA 3 -~ llll~ = ,,,, ~ 1!111 · -:~ 9::i 11111 11=1 i \C -... (!) I ::1~ ~~ I / 1, ... ::,,.;;: ! :t.,:;;: . "' I~ r ~ .;,', ~~ LIJ ! • ~ I 11 i ' § ._'1.:1 "' ~ a.;;:; :t§:t~ ~ 0 O>-: !.!~~~ ~~~~ ct: u ~ I!> •O c:f 'II: ~ii:~ QI: ~ I::: Q:: ~ ~!~~ c§ " ii: "'i!: ~~I:.. ~ i;;:; !:) IQ ct:: ~i!;;i ~ 'II: I:!: ;;j !I!!:) )... it (I)~ "" !2 §:! "'i ..... ~~ ~ 8 "'~le ~ .. ... l!!l!:!i:3~ ....... ~ ~ !:) ~ QI: 5 ....... e =t i!: Qt ~ <r.i ~~..: "" Ll.i ~ !i ij ~ Cir) ~ PACLAND Project #10507003 Firestone Complete Auto Care Technical Information Report Renton, Washington EXHIBIT B -PROPOSED SUBBASIN PACLAND Project #10507003 " )> n s;: z 0 :a' 2. rt) ::i " e-' 0 V, 0 '-.J 0 0 w 1.t4AC J~'~ SITED/SC'=\ ) / . I f a . :_ / . N.T.S. TOTAL BASIN AREA = 12.28AC NOTE: CONSTRUCTION ANO FUTURE FLOW ROUTES WILL MATCH EXISTING FLOW ROUTES THROUGH THE STORM SYSTEM. THE FLOW ROUTE JS SHOWN BY THE ARROWS ON THE PLAN. ( . / ~~ I ~ -·O _: __ ,.----71 ~, I OFFS/TE BABIN I CffllfTE BABIN I -.-.dut _a:,,,,·m :ft: ) .. ~ ' ---~----. ----~ ~ , . . ·. . ..... . /I " SW 41ST ST i lo I.., I~ I~ I;; I w I 3751 E. VALLEY ROAD, RENTON WA-PROPOSED SUBBASIN "' '" ~ ~ 0 :, rt) n 0 3 l:l rt) ~ rt) )> C ~ 0 n a, '" ;,< n :r :, n a, :, -0 3 a, ""· 0 :, :;o "' l:l 0 ;::i :;o "' :, ~ 0 -" :a:: a, ~ :r :;;· lO ~ 0 :, Firestone Complete Auto Care Technical Information Report Renton, Washington Appendix C -Design Calculations PACLAND Project #10507003 Firestone Complete Auto Care Technical Information Report Renton, Washington PRE-DEVELOPED CONDITIONS KCRTS Command CREATE a new Time Series Production of Runoff Time Series Project location Sea-Tac Computing Series Carmax Pre-Developed TSF Regional Scale Factor 1.00 Data Type Reduced Creating Hourly Time Series File loading Time Series File C :,KC_SWDM,KC_DATA"5TTG60R Till Grass 2 74 acres Scaling Yr: 8 Loading Time Series File C ·,KC_SWDM,KC_DATA'5T11160R Vet land 0.18 acres Adding Yr: 8 loading Time Series File: C:,KC_SWDM,KC_DATA'5TEI60R Impervious 9.36 acres Adding Yr: 8 ---------- Total Area 12.28 acres Peak Discharge: 5.01 CFS at 6:00 on Jan 9 in Year 8 .rnf 8 rnf 8 rnf 8 Storing Time Series File:Carmax Pre-Developed.TSF 8 Ti~e Series Computed PRE-DEVELOPED PEAK FLOW RATES Flow Frequency Analysis Time Series File:carmax pre-developed.tsf Project location:Sea-Tac ---Annual Peak Flow Rates--------Flow Frequency Analysis------- Flow Rate Rank Time of Peak -Peaks Rank Return Prob (CFS) (CFS) Period 2.54 6 2/09/01 2: 00 5.01 1 100.00 0. 990 2 .13 8 l/05/02 16 :00 3.47 2 25.00 0 . 960 3 .03 3 2/27/03 7 :00 3 .03 3 10.00 0. 900 2 .38 7 8/26/04 2 :00 2 .85 4 5.00 0 .800 2 .85 4 10/28/04 16: 00 2 .68 5 3.00 0 .667 2 .68 5 l/18/06 16 :00 2 .54 6 2 00 0 .500 3 .47 2 10/26/06 0 :00 2 .38 7 1 .30 0 .231 5 01 1 l/09/08 6 :00 2 .13 8 1. 10 0. 091 Computed Peaks 4. 50 50 .00 0. 980 PACLAND Project #10507003 Firestone Complete Auto Care Technical Information Report Renton, Washington DEVELOPED CONDITIONS KCRTS Co,aaand CREATE a new Time Series Production of Runoff Time Series Project Location Sea-Tac Computing Series Renton CarMax Developed.TSF Regional Scale Factor 1.00 Data Type Reduced Creating Hourly Tiae Series File loading Tiae Series File:C:,KC_SVDM,KC_DATA"5TTG60R.rnf Till Grass 3.42 acres Scaling Yr: 8 Loading Tiae Series File C:,KC_SVDM,KC_DATA,STV160R.rnf ietland 0.18 acres Adding Yr: 8 Loading Ti•e Series File C:,KC_SVDM,KC_DATA,STEI60R.rnf Iapervious 8.68 acres Adding Yr: 8 Total Area: 12.28 acres 9 in Year 8 Peak Discharge: 4.84 CFS at 6:00 on Jan Storing Tiae Series File:Renton CarMax Developed.TSF Ti•e Series Co•puted DEVELOPED PEAK FLOW RATES Flow Frequency Analysis -----~---~---------~-~------ Tiae Series File:renton caraax developed. tsf Project location:Sea-Tac ---Annual Peak Flow Rates~ ~--Flow Frequency Analysis-~-~ Flow Rate Rank Ti•e of Peak --Peaks Rank Return Prob (CFS) (CFS) Period 2. 43 6 2/09/01 2:00 4.84 1 100.00 0.990 2.01 8 l/05/02 16:00 3.24 2 25.00 0. 960 2.91 3 2/27/03 7:00 2.91 3 10. 00 0.900 2.23 7 8/26/04 2:00 2.67 4 5 .00 0.800 2.67 4 10/28/04 16:00 2.56 5 3 .00 0.667 2.56 5 1/18/06 16:00 2.43 6 2 00 0.500 3.24 2 10/26/06 0:00 2.23 7 1 .30 0.231 4.84 1 l/09/08 6:00 2.01 8 1. 10 0.091 Computed Peaks 4.30 50. 00 0.980 PACLAND Project #10507003 8 8 8 8 Firestone Complete Auto Care Technical Information Report Renton, Washington WATER QUALITY BASIN A CONDITIONS KCRTS Com.mand CREATE a new Time Series Production of Runoff Time Series Project Location Sea-Tac Coaputing Series Renton CarMax VQ Basin A.TSF Regional Scale Factor 1.00 Data Type Reduced :reating Hourly Time Series File Loading Tiae Series File:C:,KC_SIJDM,KC_DATA'5TEI60R.rnf Iapervious 0. 68 acres Scaling Yr: 8 Total Area 0.68 acres Peak Discharge: 0.321 CFS at 6:00 on Jan 9 in Year 8 8 Storing Tiae Series File:Renton CarMax VQ Basin A.TSF 8 Tiae Series Coaputed WATER QUALITY BASIN A PEAK FLOW RATES Flow Frequency Analysis Time Series File:renton carmax vq basin a. tsf Project Location:Sea-Tac ~-Annual Peak Flow Rates~-~~Flow Frequency Analysis~----- Flov Rate Rank Time of Peak --Peaks Rank Return Prob (CFS) (CFS) Period 0.165 7 2/09/01 2:00 0.321 1 100.00 0 .990 0 .145 8 l/05/02 16:00 0.247 2 25.00 0 . 960 0.201 3 12/08/02 18:00 0.201 3 10.00 0. 900 0.169 6 8/26/04 2:00 0.201 4 5.00 0 .800 0.201 4 10/28/04 16: 00 0.176 5 3.00 0.667 0.176 5 l/18/06 16: 00 0.169 6 2.00 0.500 0.247 2 10/26/06 0:00 0.165 7 1. 30 0.231 0. 321 1 l/09/08 6:00 0 .145 8 1.10 0. 091 Computed Peaks 0. 296 50.00 0.980 PACLAND Project #10507003 Firestone Complete Auto Care Technical Information Report Renton, Washington MODULAR WETLANDS SIZING CRITERIA FOR STRUCTURE 21 PACLAND MODULAR WETLANDS August 11, 2016 Subject: 3833 -Carmax Auto Superstore To Whom It May Concern, The MWS Linear will be sized in accordance wh:h the TAPE GULD approval for the Modular Wetland cartridges are sized at a loading rate of less than 2.10 gpm/ sq ft. Design, sizing. and loading have been reviewed and approved by a Modular Wetland Representative and is ready for final approval. Shown below are the cakulations for this Project: MWS-L-4-8-V Required Treatmer.t Flow Rate= MWS Treatment Capacity = Pre-filter Cartridges included= Surface Area per Cartridge= Loading rate [Prefilter Cartridge] MWS Wetland Surface Area= loading rate [Wetland Media) 0.1 cfs 0.102 cfsor 45.78 gpmat 3.0' HGL 1 25.6 sf 45.8 gpm/ 25.6 sf= 46.0 sf 45.8 gpm/ 46.0 sf= 1.8 gpm/sf 1.0 gpm/sf tf you have any questions please feel free to contact us at your convenience. Sincerely, Saul Llanes Stormwater Engineer Modular Wetland System, Inc. Project #10507003 Firestone Complete Auto Care Technical Information Report Renton, Washington WATER QUALITY BASIN B CONDITIONS !<CRTS Command CREATE a new Time Series Production of Runoff Time Series Project Location Sea-Tac Computing Series Renton CarMax WQ Basin B.TSF Regional Scale Factor 1.00 Data Type Reduced Creating Hourly Time Series File Loading Time Series File:C ,1<c_SiDM,1<C_DATA'5TEI60R.rnf 8 Iapervious 0.46 acres Scaling Yr: 8 Total Area : 0.46 acres Peak Discharge: 0. 217 CFS at 6: 00 on Jan 9 in Year 8 Storing Tiae Series File:Renton CarMax VQ Basin B.TSF 8 Ti•e Series Co•puted. WATER QUALITY BASIN B PEAK FLOW RATES Flow Frequency Analysis -------------------------------------------------------- Time Series File:renton carmax vq basin b. tsf Project Location:Sea-Tac ---Annual Peak Flov Rates~ -~--Flow Frequency Analysis~----- Flow Rate Rank Ti•.e of Peak --Peaks Rank Return Prob (CFS) (CFS) Period 0 .111 7 2/09/01 2:00 0.217 1 100.00 0.990 0.098 8 l/05/02 16: 00 0.167 2 25.00 0. 960 0.136 3 12/08/02 18:00 0.136 3 10.00 0.900 0. 115 6 8/26/04 2:00 0.136 4 5.00 0.800 0. 136 4 10/28/04 16: 00 0 .119 5 3.00 0.667 0 .119 5 l/18/06 16:00 0 .115 6 2.00 0.500 0.167 2 10/26/06 0:00 0 .111 7 1.30 0.231 0.217 1 l/09/08 6:00 0 .098 8 1.10 0.091 :omputed Peaks 0 .200 50.00 0.980 PACLAND Project #10507003 Firestone Complete Auto Care Technical Information Report Renton, Washington MODULAR WETLANDS SIZING CRITERIA FOR STRUCTURE 26 PACLAND il MODULAR WETLANDS August 11, 2016 Subject: 3833 -Carmax Auto Superstore To Whom It May Concern, The MWS Linear will be sized in accordance with the TAPE GULD approval for the Modular Wetland cartridges are sized at a loading rate of less than 2.10 gpm/ sq ft. Design, sizing, and loading have been reviewed and approved by a Modular Wetland Representative and is ready for final approval. Shown below are the calculations for this Project: MWS-L-4-6.33-V Required Treatment Flow Rate= MWS Treatment Capacity = Pre-filter Cartridges included= Surface Area per Cartridge= Loading rate [Prefilter Cartridge) MWS Wetland Surface Area= Loading rate [Wetland Media) 0.07 cfs 0.07 cfs or 31.42 gpm at 3.2' HGL 0.5 25.6 sf 31.4 gpm / 12.8 sf= 3D.8 sf 31.4 gpm / 3D.8 sf= 2.5 gpm/sf 1.0 gpm/sf If you have any questions please feel free to contact us at your convenience. Sincerely. Saul Llanes Stormwater Engineer Modular Wetland System, Inc. Project #10507003 Firestone Complete Auto Care Technical Information Report Conveyance Design Calculations Manning's equation: 1.49/ Q= In xAxR2;3xs112 With: Q = Flow (CFS) n = Manning's Roughness Coefficient (0.012) A = Flow Area (SF) Renton, Washington R = Hydraulic Radius = Area /Wetted Perimeter (LF) S = Slope of the pipe (ft/ft) 12" Pipe @ 0.5% slope: 1.49/ Q= In xAxR 213 xSli2 = 1.00 CFS PACLAND n = 0.012 A = 0.771 (SF) R = 0.286 @ 95% full S = 0.005 Project #10507003 Firestone Complete Auto Care Technical Information Report Renton, Washington Appendix D -Operations and Maintenance Manual PACLAND Project #10507003 Firestone Complete Auto Care Technical Information Report Renton, Washington Maintain Stormwater Facilities The owner or operator of the project shall be responsible for maintaining the stormwater facilities in accordance with local requirements. Proper maintenance is important for adequate functioning of the stormwater facilities. The following maintenance program is recommended for this project: King County Surface Water Design Manual NO. 5 -CATCH BASINS AND MANHOLES ~ Def•c.t 0, Pfoblem Cond9bcltl When ~n.Jnee 15 NffMd RHults £11:pttcted Whan c--M~-..nu ii P.,.,onn.td ·-·--- Stru:.~.Jte Scjl"l".e'II Se~ ,m:eec,s: ~C"i of Im! datY.ti !'n:r,, •;tu: SUT1~ of c~::" b3sm c~Llns NJ b.:.t::.m :.l !:'lo ;:;itch t=n to tt,c n\•cn ol 1t,,c ~oncn:. l<l'A'C':la! prpc ,r.to c,; oJI of the: c~lcl>: b;isir. or ~ '"'dtm !i !N'.tic!. of ff'K: nW\'.l!':: c.t ttc bNl::$1 ppe IO!= or ~ .:t :tie ::.arch t~n Trin"l~c:ftt,t.'! T,am a~~ =l'mc,,'!: !f.Jt"l ),; tLOC roo: .,,,;::,i No iras~ O" ~b-i'I b,~'"1 o· r, loc:;:sted ,.,..,.,~le-l't ir, f.ont ,;ft,'!' c:,lct-tllt"..m ;:11;f,,:rw*•1 b>:Jc-.nq o:-MJ'l:!1'1Ct!' \'J OiX""llf'~ Cf is t:+e<kir>:1 C:,p.ltCit.,. o' ti">e =l,';"'1 t>-,51'1 ':31.ch tl-"''1 t,y JrQf-e !Niri , (f\ Jr~,,J-. f.l ~.;,(lfr;. fl d').;i Cir.{.'l h-li51'l ~Tl~ '1:t.n: .. 011;!~ ':. ':rill' di>ptl'I "'r(,"11 t"l'1 b~-.sim cl ri~r 11'.l ,r,,.,,,,r: tt... N,-. tr~s.h or c~..., n tt.,;, u:c"'I ~n !,·,"'"'"°: P'P"' t<ll-J Cf 0.)191 ~ h~!iffi ~C'llC 3r1""31s ct v~1:::ri !l'at 1:ould 9!!r,C'·~" No C(.'IIC .1r,n11l'!: « ... ege-.. nm, o~ :"lat c:~ c:ai..r.;.e ccmpl~n:!l; cr~r:ius. :::ire'!:enl W!tl'!1r c...11i;t ~11'5/r g~=lc.;: rnclt~c: o .. ~(*it~ ,JI !},.<tfO!l'J<' t:"l(~etlri2 1 u.1:r,c to,:i! i•• N,) ,;,04·1,J11i:)t'> 111i•1't"l! wl1id ""''.o,Jlj "')l.Ut!'!:'. ~Urw:~ ,:r %l)t,«t ?1~ {1f~t!<.l>'r;;i ,,.,, n!l-'!.'o:bo1,.,,,.:1t,1"rl'!I. 0:al'l"\:I~ lo lr:.11".c COT't.:r d~ra;rc c,~r,ds 'J'():"C tJ<.1n ~·~ lr:ch ll~ r;,,:amc <'-~VCf'I witn cut .lrrl."o• t~ ~'\ti o.1rt;1, f.>Coe Mlto !he !:;lft<'ll (If ~1c.tttic1 Tq;i 1l&b hb ho'.:-!!= l:ff'2e< ~utll 2 ~~l'A't" r10::ht"!> or T,;,ip "$1ti'.1 i'!I fre'!' r:l .'lolt"!I· :tl'd cuo:h. awJI~ ·o1roirl"· !'!a-1 Y. net- i:::,~c n~ -=-t:og tus.tt o,,, t.;)p S..;io, 1 c l.Ql:.V~o.,r ,..,f MC<lfl ::"l.1f'l ~-. nc:n of 1twr, i:rwn111 fr,--.rr, Fr=c ,:; $it;.ng ~ulo'l O'l mi: si;:iti ,,., lop f,\AC c-.,~:,nw:,ll:,t:f Cr111:t<, wder I.N!r-•,; ,n:;11 a,i;: IQ-,~, th.,, "3 l~L C,:,\ct, b11!1ff" ~ Y.'lllr-d nn;l "''= ,ar,i' eo,•d?"~ er' s!;41 p;:r,td,:-s ,:,r,.'!'fn.i cliSti:h ?.'l'\.ICILtSly '!i:°'-l'IC' ?>;e.1r :.>ir::1..igt-cn,d,..,: :;r m:ank-'1:rn::~ ~t!:-::ir. fld;~:. th:lt c..1lC" b:t~il'! ,:s un'!:CYr.d Cr¥kJ; ~.:!;:, tl"IAr. Y, ·n~ ...-ic ciY1g,.,r ttia,, 11c-"Jt l\i,) t<~d:; r.·,(lr~ n~n ;,<fY.!'11"1>..~at al t11t-1c,111 r;J &!'If ,.,M11:,)un~ ~&-" ~ ;,,,y Jii,·,ic~ric~ :h"' J(lir1I ,'l:f ,,,J,..-.,,-..,11.,1 pi;)+, ,,t ~(.d P,91'ik.lo1, l<'l'll~(rlg ~t(h 01\:6111 Jl>tW;Jh tTB(:k~ Scttl.cnent• C.Y.::'1 b:uw, h;z~ ~C!'"Jltd TO<c tl".an 1 rnc:h "Jr ti..n. 81H1r. ,'"C!!ll:tt:cd r,t r.cp;aim:I to 61:lsqr, m:..a:urur..cirt ro'~lcd M~I! t'"la-. ;J inc"lll"S out d .:ilg1'1neri: ~1M'!dMl1~ D:J11!'l:t!.1':'d PO'!' 10,rW!I Clsd,') w,d{"f tht)f', ',.-;-i"!r;h .SI t"'tt: ,oJnl ,f, 1.11'"! Nu uach trrJf':' thar; \~i'1tl· -..i¢,;:, at ,n,,:,t,"u,-,1!J'!t -a1i:c-r.-,;ir ani• ~'lid"!'<'JC'! rJf ,,-,l '-"rk<nr-.:::i :he pinl Qf ir'>t-t'oulh:!l ~ipc~ !'I~ ,..1:11,.:h 03,s,r. !fl !,"le, .<.1r1I of the 1Ho:ot•01.1l11!I .~~ ~1·.f.o1mn;irts. ;;tn,:1 An'/ ~_.,£Sar,:• f./ c.a,..,...,n.,;m!s. u Nl...ihon 'fo,1d· v.r.-n*1s. ram.."11111:c, ar.o d!ij>.:!Hd ct p-,lt.f!i,."lr. ~$. c.1. 9'1fi0UNI r..r.n<:NIIF< ',,UITW!li o· floiilllrl: 'lf.CUt'.ir,g IC! a~l~tli:. ri;qt.J.r.>."">m. StXw~ to1Y1rol 8MPi;. ,1rp\.i<rr.,.nt..-1'.1 ,r ;ll'.9"'>f.H.:II" N::: <'Xl'ltAA'ir.a11ts Qf't!ff!f"'II O'hl:"' r'l!Vl II <j,.1r'~t~ ')1 ftr'IJ ln:el"WJt:l P;:,e S~rr,(!'l'lt Sedrico! (ah~ 20':, O" r,,ete of tne ooe Jr:jet_•:;utl,ftl PPlt~ dc.11 :if ~::t,mer.l :!CC\.n'.u..:stl!lt'; 1' r.:):<;.h >YJC dt<lf>~ lrjS,11 ~ ~bl!> t((J.l'l1lJa1t<O r1 i1•lt-".'CVl~t '-•J lf!l~h I.J' (h:<tfS·n po~..,.!> ;)QI!'"!> in·d~s floa~l1:1 ,irf,C[ 11(,'J-"'~Jillabh:,s I D.trNt!_;O:f Cr.:idls Ytd«-tn.:in '.-,. mcf-.d ~c ,on! al !ht't No c,ack.:. mo«l' th.:lr •,,; l'1Ct .... ,co ;:it tnel•oJllt;t p11=,es or ;any 11"1d0Mt:c of ~i c"tcn1Y,1 :11"'" ;o1nt of me !f"fM•O.tllct oii:e. ~ the 1on1~ ri tt,c 1nltt.'!lt.~1 ppc:s. PACLAND Project #10507003 Firestone Complete Auto Care Technical Information Report Renton, Washington NO. 5 -CATCH BASINS AND MANHOLES Maintenance D•fect or Problem Condition When Maintenance is Ntt~d Results Expected When Com~onenl Maintenance Is PerfOfTDed Metal Gralo'S Unsafe 7.ite otioning Grate with opening wider than !, inch Grate Otl8nl'"l9 rneels d<?~i9n (C<.1tt:h Bc1sim;\ :sli!tldiirds --- Trash and detr"is Trash anc dt:bris that is blocking more than 2•)% Grat~ fre,;. of ltas.ti and debris. oz gra:e s,.irfac..e-. foo!note lo guid.;;tme"SI for ct1s;:iosal Oarr<1gc<! or mi:s:.in9 Grate rni::;sm!J 1Jr broken member,;.:; I of lhe gr;.ile. Gr.ile 1:; in plas:e ;ind ne~ls de:s19n Any OFHtn structure r9quira,5 urg111nl sl.anrlwds. maintenance. Manr~lt'! co .. tor.'L1d co,,er,ltd nut,,, pt.."lo, Cuwir."111.! 1,s M,:ssmg or only po1t,ally ,r, plaet:: Cuwit.'htl prolec~s opi,n,n!l IQ Any open :i;\nlctun;1 r11quir11:s; Uf!illi'!Ot Mfuciuft:. malnlananc.e. tnck,og ~han,!1.-,, Mechan.s.m camwt he openoffi by OM, MechaJ"ns.m opens Y<1l!l proper lools. NOi ','JClr'loog mamtenance peri<':N'I .,.r:h proper tools Bolts cenMt be seated. SeV-lacking ca\•er.'lid does Mt won<. CO¥eto"d ~1 lo One l'ajr,nt'~ person ~I rr::moYr:: Cuw~r.'lid can he ~'TlQ'le<:I .lnd Rerrcwt> covt:r,'lld a:'let applying ao lb~ ul 1,t. ren'lstalled b}· or,~ mamknanct! P""°" NO. 6-CONVEYANCE PIPES AND DITCHES M3inten.1mce Oefec1 or Problem Conditions When Maintenance is Needed Restilts E•peded Whr:-t'I C,;i,mp,;i,nc-nt Maintananc• Is ParfonrnJd P,:)es Sed.,11"'-ent & de,bns Accumula\ed sediment or debns that e)lcefills. Water flows free)' l'1raugh pipes acc:umulatior 20% of the d1ametH of me pip,:. Vr-9d.-,l1;;,nlmr:i:s 1/e\j'::!t.:ilirm:rwls rr;;:,t re.1(icr:: lree m<iven~nl of \\'atr:r nn,,.,.!. fri::e'y hnJugh pipes wat~r thi"u1,19h pip11s Cont3minants and Any ev1d.;;-nce of conlammants or pollution such Ma:enals r.;;-ir,.;;,ved and d1spos-ed of pollvtivn as oil. gasoline, concrete slurries or paint. according to applicable regulations Source c:vntrol BMPs imp!emE11led if ;:approprialo No ronl.:irn1nal'IIS p,esenl olti{'!, ltt0n ft suflace oil !ilm Damage to pro:ectivc Protr-c:ti ... e coating is damaged: rust or corrosion P·,pe rep.aired Of replaced. cvating or corro'iivn is weakening the structu'BI integr.ty or any par. of "'" Dsrnag~ A"rf d~t that decreases the !:1"6s;:;; s.eciJon Area of P,pe repaired ur replaced p,.pe by more 1han XI~ or 1s determined ta haw weakened stn.iaural 1nt,egrity of th-e prpe. Dilch8:i Tr.i:;h .and detnis Tr.ish ;:md oebns e,:o:ce,eds 1 cubic !ool per 1.000 Tr<Jsh .:in<;! Oebn:s ci9,.:irl1"d from $qu;,,re !eel ,::;1 (!it,;:h ,i'J:nd :;..:::,pe:s d•1che.s Sed1rr-rnt Accumulat,';<:I sediment Iha\ exceeds 20% of the DitC!l deaneddlush,';<:1 of all sed,-nent acc.umulatio~ d::'sign ,depth. and debns so trat it malches design. Nox~us weetls Any nm:ioos Of nuigance veget.illun which muy No1o:iovs .'In<! nuisariee veg!'.!la111)n COr'1$til.,ile a hatard lo Counly pe~Qf'lm~l or thi: r,e.l"'l()Vt-d Ar:cording to appl11;.ahle public r~ula11oos.. No danger of no:,uou!! ... egela1ion ....+wre County personnel er the public might normally tie. Cont;:1min,i1.nls .ind Any i::·,.iclence o! cont~1r111nant:;: rv pollution :.1,1ch M,:1:en.ads reiroved and d,spos-efl of pl)ll;Jl(QI') .:i.s IJII, gt,$1.lhne, con<::rele slumt,S or paint :i<:coro,ng lo llPPhC.'.101~ rr.gu1atifln!S Soutce oontmt BMP-s 1mplerne-nled 1f appropriate. Na contaminants p<es.ent other lhan a surla.c.e 01l 1ilm_ Vcgcl.a~on V,;gcti!lion lhi;t! rcaiu,:;c,; rrec m,ovcmcrit of w;,lcr Water nowi; fro!;:) lruough dilt::hcs throogh dildii::s Erosicn damag;; to lv:i'f eroS!On obser.rea oo a ditch slop,e-. Slopes are not erodmg slopes R;:,tli. lininy ov1 Qr One 1.,-iyet or 1e$S o! n:ick; ,exists ~Dove nt1!ivr; so,:I Rep!ar:e ror;ks to Ce.Si[jn .s1andards pl,1ce ar mif..s.,ng (If ate-a 5 square feet or more any e1<pose-d nat,ve Applicable) SOIi PACLAND Project #10507003 Firestone Complete Auto Care Technical Information Report Renton, Washington NO. 9 -FENCING M3intenanee ~rec\ or Problem Conditions When Malnlen;ance i!i Needed ~esulls Expected When Compr;;i,nqnt Mo1intliln~nc111 iJ. Pi;irfQtmliild S11e Erosion or rioles Eros,on or holes morn than 4 1'101es h,gh and 12-Na access under Lhe fence. undH fenv.c 18 inc.hes .,,id-e permitting ac.co:ss tmougn an opening unde~ a fence '.','uo,.1 ~u~~1$ Eb;1rds M,!>,s1n9 or dam;:i~Jed Mi:c;.~,ng ur bro'(en or1::u<!s, pust ()..;I u' pl\iml:;i b~· No gaps ,~ t~nc;:t! rJv~ ln 1r11:<s1nf1 {1r ard Cross ME,mber~ parts. more :h.1.n 6 lf">dles or cress: m~mbers brakM bmken boMds, pMt _plumb t:'.'l •1,1thm 1 'h inches. cross membe.•s sourd. Weakened by rotting Ary pa 1. showin<, structural delerioration due lo All parts o' fence am struc~uraltt or inM;r;b; rotting or in~ dilmi\gc sound Damaged or fail-HI Concre1~ c, metal attachmems del-e-noratea or Posl foundal1on capabl-e af post foundation unablse to si..ipport posts. supporting po,sts eve-n in strong wind. M~t;)I Pr;,!;tS.. Rr,11$ 0:)m,'tgt:=d paib Po$! ou~ or plumb m()le tt:~n 6 md1es P0$1 pb,u'rtb ti) v.11ti,fl , :'i 11'11::tu~s. at'd Fan,1r: Top ra IS CEnt l1lOR tha..'1 6 Inches. Top rail "TI!€ of bends gr.eat@r than 1 inch. My pa1 at fence {mc!udlng pas.1.100 r-,:ds. 3r'ld Fenee-is 3bgtled and meets des19n labnc) mare than 1 foot out of design alignment standards. iftssir,g or loose: tensiO""I 'hlrii:. T ensiori wire i11 place and holding fabrc. Df,te,,oraled paint or Part 0< parts l'\at hav~ a r..isting or :!i:C8br"IQ Siruct:uralty ad~quale posis or parts. protectrve coabng condlbon that has atected stfuct •. uaJ ade,quacy with a unrform protect1v-e-coatmg Openings in fabric Ooenings in ~aP"ic are .sUW that an 8-inch Fabric me:sh openings within 50~{ of d1<;1mclcr b-111 couki ~it !hrou!Jh 9nd Sile PACLAND Project #10507003 Firestone Complete Auto Care Technical Information Report Renton, Washington NO. 10-GA TES/BOLLARDS/ACCESS BARRIERS M..:ilnteNim:e-Defee, or Proble-m Co00ition5 Wh~n Malnt1m:mce i5-Ne~de,d R~:u,13 Exp,C'cl~d Wh,c,n CtJrnp::ionimt M;untu1il.JICll 1Si Perfarm•d O',ai,· Link F~1,;;h!i D-:.lli'<a1;1':'<l ,._., ,,,,:,-:,-,1,1 r,16-s,1"1 9-:11':' ~[~-; rl ~l.i¥~ Oat"" "rl:'"11l";c'I:, B.-okcn or ::n1!.!.J'IS: .'.llnl_?C~ !.Leh th.:JI g.ilc c,m,cJ; Hinge:. 1rtacl il'lC. ul:lc.;l. G.1tc-.5 b!! C;J!';l'/GFC'lC<f ;m:I dv...c:'l b)' .i m;11n:r.r;incc wr.<t:rng 1rc:r.l/. p..~r~:ir G-:111! I~ Vlll 'Jr plHrb !rt'.Jr~ (h!:lfl £ i1•,.t,,,,.~ <:l'IC C~lt:' ,=, ~lv,111~ a-n! ·~":f.l"..:dl r1~11~ (•11111 4 ':it.:'-1:01 ~ d""~'Tl 1,iii711~r•l r,1.;c.Jr,g :.trctcru:r b,.·u. :.trc:lchoer tl.:i-111!; .1rd tic~ S1rt:lr./'.oer ~.1r. b.ind:. . .:l'1C: 11<':!'. m pl;tr.A Lo-.:k.ir>'~ 1'"1!!1.+ .• wi!:11n L~JC~l'I~ :lot·.,cie ·ri~"J;i•i!J ro-f,Jrctio-1ing :ir dO!'"S l;;c~ing 1r<t>t:h1!1'1i~·r1 ~.n~r,'l!lt'.~ ::k~~ rQI k,J, q11le n:il hr~ '.:i ::,I p11tl~. OJl"''Jrlg ·:if <:jl:ll~. Dr.~1ng;. n f,,inrc GpAnin;:is ir ";ibm: ;M"A s..11:h ~.,..: ;m !!-ncr ~~r.c. m~ cpann~!. .....,f1h1r. !,!:'\ ,;if d.HIT.-:ttAr b.lf C<JLIC 111 lh.<.1.JGh gr,tj $,.74:1. B~ Gal~ ~w.a;i~ ~ rr1i~?-rr-,1 C1,;i!1!1 l"d• dt"!'!I rQI !IWn:,1 oi;:e, IT d~.I. ~ Cr.i!l!I Nr ~"''irt;IS fu1:,, OOffi 2111:l ::•os5 t;~· n~!'r.g !JI" i-:; ~r! lo·~ho:,~ it d;;c-5 .,c,: i;rt!','!""Tl dO"~:i ~nlj l)ft!\1~15 ·,e'li::1-!! ~ss. •,e,i::: ~ .!,CCess. l oc.k1ng n11r.l"..;im,;rn l or.kl'IQ dh'olr:'-,y-u;.s;.1ng rn-(l.1rct,Mtng or tm.cs;. l =-:r.l..1n9 1To.1r.h.;.'lr;-n pr .. w.in:f. :1G>,3s;.r(illu.1..9;it.:i r>.:it 11r~ ;!) .;,.I pa.tis OpB'll'lQ -Of 9.it>J St.pµortµ~t Sui;p:irl p::,s\ 0JC'5 m:l ncicl c-oz t.!i· up_ Ct.i!l!I b.u l!ed up i::re·~tir:,g ,,.et,de ·:fo.rn~,ged .:1ct!!!l!I ir.t':I f.:1ciit<1 6r.Al.;fC:; D.;.n·~:10:<1 G~ m1;s.1>::1 6,..--il.;.n.1 t.<r.Ju::t'l. m1',,s;.t1g do...i; rnl nt ,nto =51.1pp,::ir, No tl(:(:I;:;.';. ~f ni.)1,:;<JZEl:d ~·oi;ih<J4S ':!) 1-...~10: 0r "h'l!_>,I btc,l,,>:1n or 11i;,o;.l"lg g~t r'1(> ~ii!Cii(~· Does n:it lo::-o1, L:id:111:; ;J!;~ernl::l'.,' or led<. :'lli!i"!:ng ,;ir c:arY11::t tie No acce~s far rnaloriz:eo \'!!heh:~ ~J .111.?.<:ht!d It Jo~ boll.uc: n pl.!r::e. 9el :n\c. fadU.l 8(1,.1t..11;,:s, DislM:Jl.'(1 Bo1vle.:.rs :'ll)I; •)~€11":l:1 t,::i J:•"€'-.'ilf't 'l'()1Cfll~C •:~hu;:~ Ne.. ac(.~s; ~<ir ff~)1e<1z0:d ~·0:r.1Jes 1~ 8'~'.,<., !)~t ,r)11) ~!lCill)· C:1n:urwcr:ec M:::tori:::ed Yehde!. gon;a ,ro.1rd or between l'fo .:icc~s br rnaloriz"t!d ;,•chd~ tJ bJLIDers. 9cl .n1c ~.:ic1ltJ1 PACLAND Project #10507003 Firestone Complete Auto Care Technical Information Report Renton, Washington --------------------------------------------------··---- NO. 11 -GROUNDS (LANDSCAPING) M~inter>-ance Ddec! or Proble-m CortdJti<ms When Maintenance is N,eede-d Resul3 E~p-:cled When CQmJ]oil1!nt M.:unt11n~nc.11 as Performed 5i1i:-TrW,r;o'1i!1tc<" lvi'! ff~':11• :)1:,J -Jo;ot;re;, · .. h(h i;:c~>;;<t'C 1 (t~i~ li>'JI T1tJ':!Ji tlr'!11,)a;,l;n; cloJiare~~ 11,:im sr:~ D:'l '.0::0 S:.jl'<II~ fl:"';'l )h":-1-<j ,:!l;QJ[ t",ll.<1111.J lh~ i:1·1uJ.ir·t ,;( ~-1:1~·1 ii '"oukl l;:s~:o lo fil JP?T-:" ':$li:l'ld.:!rd ':i1Ce ol!in: g;:irti,,:p! r..-!!rd. 1·19:or~r.:il u,~re Yl:::;uld be no v~ar e--.· d:-r= r:I dUiTpin;i N<"IJ{i-.111:; ',~h'\i:1:e; An)' nn,:~-.,1:. ,-.. flhl!i..:m:-.H ',i<':Ji.·.::i11c.n .,,...11,_., M;1y Nr,11r~.1s .virt nu1!..;m::.i '•W:Jht;ll1t:n rMlc,11t1;~'t/ .-h~.-1rd In C::..::itJnl'/ ~r,;.-.rlr.;.1 er 11..1 u.moow.l ~=-~rdh'19 1c ~r.f'l'u;~~ pJNI~ h.,')i.;lijl;l(J'lf, No (l~"l!Nf {II n~~ICt..t;. ~:l°"'"..ali(>(T ffl'"1'E-C(1J1'.:,· til:"(IV1f1,;,.. vf lh+::! pwl,:: ""i!lhl rx,rrnSily t~ Cant.:irrm,;rnt~ ilrd Ni~· e .. 1cer,cc-::f o::mt.:irrmilrt~ Jr i:olLr.,Jr ~ctr Mi!ter.:J~ ~0\-'Cc .Jrd c11:;;i:,:i,:;ec :if llcilLtO!l il~ :JI!, !;".il:.::l!'lc c:::r.::-c1c 51LTTJC:;; a piliril .ilt:t::ir:lmg 10 ilpplca::ili? rcgul.itJO'l:.. S;u.n:c -::,:u:t·n BUP5. rnplcmC"llcd rf .:.r.pT.or..ila N."l conto1111m~1:i; Pfa<~IT. citlar th.Ir. ii :.L.rl.:.[.a ol ~-11""1 Gr.:i".,.'!;r t:•J·1 r:<XJ\'~r '3nt':l-':I 'J' 1:ir :a.mkc<>~r t!)ir:~;I" 1, ird1e" ir G-.b~ Of !;lt:VIC0'J1'!:'I lrQ ... ~:f t~J ;:!I 1-tei;,ih':. he1W,1 ro g-'='31~ r.h::in fi 1r,,:hes I ri::ia,; .;i•1t:! Stm1b;. H;a1;irj Mr trnA-::tr lmt, .:'II .ii lrAiA; d1m1t1.aa ;a,; I' ;a,•f"lg ;a Nr.. .,~;ard lraRr.. 11 fd: . .111;, p..1IA'lh'1[ h'l t~I ,'I'll'! (..;11.;;,;. r-u.p;crty c...::i.rr~Jk ().t o-,,~H..,.11 hur~i~,· :,r"". A ha.taird 11-idl!'ffllfll!d by .t. qu-3lifil!d arbof'ist mui;t be re-rnov,ed :is soon H poi.~iblo. D.z:1ir4;1e,-J L:ri1L~o, ;:,l!.rl'!I ~Jrln!~!l r:f !lht..b!l !NI ~·e !li;li! Qt Tri!-:,. l!tf"ld 5/-n..b5 WC'! le~':1-t-·1m1 !:'% b-0\et· .... hd1 :ir"er:I rm:::rl!" ~·1<!:'"1 2.5~ r:/ tht" lct:,I oflol11I fai~;i:e -,..ilh !l;t=lil o-brrJ'-en fol;:,;i~ ::f ~,e '.~'!!! 01 !:l'lrut:-litrt:t!I;. 1 r.;,,:;!;...::.r !.hr,1!-£;. lh.;;,1 h.;1,•,1 b.iihn bla,.n :1,l'.,.n ::r Nr, til!'.:•W~ d:,,.,n ._..._]0<-:;:il1r.n r.-( ~n..-.r.kr;d t;•,;:,.• l.1)~f.kl';d v,--.r,....,9A1.ahr:,/1, Trl';.;ir,u Shn.1ti~ rr1;..:i (t 1"1.J,1r~· Tr~e-s--:ir !:'.hrubs-·Ahdi ~n: nt:J. ;::u:-:-1:1u.1te-·,· Tree ;:;r :;t-.rLb i'I p.:,c~ .:!'JC :;u_:ipo-ted ar :!te le.311ir9 'C/Fe! C:1L'Sir9 e:-p~:iLTi:-.;,:l~r.;;31i:ly s1.+11:urte:i: de.d «- of lhe r:::o~~-d~a:;ed tre,ei!; remo...-ed. PACLAND Project #10507003 Firestone Complete Auto Care Technical Information Report NO. 18 -STORMWA TER WETlAND JIA...]1111111~1:: Co~nt Dd'•u::t 01 Prul.rltrn A·r, ruri.~u:, :.i· •"1H;,11ilt1U!I .w:,,ihr.i:.r 11"1~!1 -u, ,::-1~J0.ilt-J ~~¥iJ ;o C:•~"tt ·:,('r~rn•:!!l ,~r ,~~ FIi~{ i: 1----------i--------------1 ,::cuLwn mrh. w,~ DChilQo- f":rH,,.1.r:r.r1:l-::r1K !,,rf 'il\1:W.11:H .:( u:rl':.111111"1'1!1 :r =~:l.fJ:ir: •11:J1 .Ja;.ot.,;;;w:o't-c.,:c-·cr,i~ ~~rnc-s :"Cilfll {-'..,"<'1 :,r 1;1mrrl;1t.H· t-.<:-d,-. I~ l"a:"'*'" r 1,0 ~~r. >---------+---------+------------------• '.:tY-'.:t:,i:ie-s :I D.r, +;:,:.1~-1 ,-,:J~ f:!,irm 1"i'wri'III :·ttrrn ,._,, ~.,.,~n:e .:( ro,:,,en: roes t I.:.:, 1y 1s i'IC.fQ "'" H O:Altl 1:t l1-t11m, ,:,r iotrr/ -1'•,,:Hn:Jrt .:f •'-'w i:~•-~ 14 fi:u;t1 run, ,:f bN-'"' ~1.:i r,:dc•11 r'l}I..!~. c,t ::ntil'"~,......:-rf T~· U' :,:w 51-...{l1""4 ff Lli,4 '. !lo!'""' •1l1t.r."11t L"·~. u· Em.,.Jn<rr~nr 1-•N-""lJLII :S,1.111'N:w <.:II n1,,-.1lb~ i_:~::timen; N'~:.u-u°Hl..:ri •'.'irl.L :,:,,l .. or~MY,I -r~ ;f·~t~, !tl'~le~ ,r~g-,y OI C..1,..,.1"'.i. Ot<..,..r, Cf : .. U:Hk 11:P'I 1c r1:t H J:,y,· n~1rtK4 .tn:: H ,u,: .. "~, ~, l"mrfO'~ 'MI4 n•ll'IA!r!Jfl:C ~•:"J•t', II 7(~S .:)'(• rn! ;f l--r,,o:o1I !,1 -:tlm 11..--. :W' .-m::-(tn-C"T'f'!M: 1"(.(:~' (V IJ' •"f:( !llt1~(J~•1 lll'JT, ,1(..(<:;,V., ,:A m\'lrr!"n:"f"'r.>". T~~· :t,,:. n-~I rt-"1/':i tq ~ '"-(J•l!':i f'·a-:H:1 fl:st-a:}" :T.iH' J rrl-HI : .... f'l';1 y,f1,.,r. r.tlltM •:I ·j.}ff~QI: I~ $.Jill p•<:~C·'l (I' ·,..,.t1~·1.• IJ,L-,,·! I~ p:i:'!'UI~ 1:;.r.7:)""lr11~j "-~r,"! ,:,.rlfl".1'1)!','.;::n ;,;l,~1nwJ t:11 .ll rn'!(;:d·~I~ SJ-f:w t.~rr i::.ll•I .:..( i.1 ~i.l"'. ~ff11 ,~f 'Wfl!:i.l'._...,.,.,,. m..i hl:i. ~81~d .f r,;t-e~ !.:::•-,-tt1tt4 th>!, r:1~fJ"'l ~~~~,1-on i\:µ ,_{ t,,,,1111 rtJI •_ufu•m r..n.: h,·,"l s~...-~-, :,.~i:~ rn1.1 i.,1~n~ 11 ;;io:n;-t t:(ry)Jrr, th.;_ •HJ;,t,"t~ 2·!ol ·~N.!'j• :J' :i.,.lltuu·I /,]:..r..i~H •:1 (~J ~•;,;. jj nchoe-s ~.:~;t~n: .,_~Q)rti.,~le:1 !-'!f'.1 m'!'f"'I t4 ;,J ,ev.~~i:t~ I•~~ ';f' 111~ M'~-:.u-ulolh.m 1Y,"WJH•JI! t!11:~i.;11~>..! µ.;~1:J 1.h1;Ali. :~11 Li ,., lj .YT';,,;,!' r:1 .. ~ . k.µ:i,:;....l.:~.I ~i.lY:.( l:"1'-:l-:1,:;..: ~<!'l';\;~i:o.,~·1 •"•l'r,,*r i.,., ... r ·~A""l;,in,"! ~i:1; Lret '5''J!Jti~·:l'[1:;f".lj :i::"S .-.:;I'¥,:~ •!Yi!''M <lw•f.:.11~'1! . ('.l'I I r.o"'I ".(:I :~;,r *'·'.'Ii"· -\-:,,r :ti!"'~ : :1 m:rlh• ~f ']"(: fNI u• -.11.ln!l pl.in~ :..t,: O;:.{ SUl\1~1',1. Renton, Washington Ru,u11, E.:p.r.:ld When MillntCfliN,0:(:-[1, P<rl'ki,,Jntod f•~sto .Jn:t d&.ns r,:i,rr<J•"l!j tr,:m lw:ll<,"H~ },L...:. u...:.;. .;.11:J 11u :..:i,~~'" "•1;1"'...il,~11 r,:,,-r!J•~:I .Jt;Q;r,jr~ }:• L'l.:iJ•~:.,t~,:, rtt:1-1L-1b:111 ,"111: :iuJ:NI u 1 rmu:1u •"(:')'~l;nc,,· .-.;ri::: :::'.0 :ur,:y pc-·so"(J~ ;r 'l'H J:H:ir. ~~111 rri-nul~ 11 .. t..1,1li.r u :.i ••111:,,-.11 1•·t! ,::.i1p:-u :I ~: 'o)"d ll;l TO ~l'.IDI•:~~: ri:::7. ~~r):.-i~ . £1:1r:.t1 c:rlm f,;•.rf~ 11111=1.timwl...: ( ~c:i·u~o'.t~. '\.,:, ro~,..i1WrN"1~ l'F""!:#ttl ·::-,lhH' :h;,r,. 11.r...,.,. n.l t',m Linn), Ill =.,-::.i.113:,:,,.•u Tl1:M'tf::I In .t l't.!-;,ttr •"1 ;,t!,m-< m....-6 ,r,:t~~ R:4t-4 r~ ~,r,,:.,,ed c, dt-U-:o'f'!'d ;:.4 ,j :l.•ltll •::f bNT:": IHOl,lrHl Tre~ ,:o rm r1~,d~-·~o•rr 11-t11fi:·11-....n:M -:-f m••t.ttnut:.M iXh,h::s. tl~,r::"~ •lK.:i i:~::: 1nr9 ~rr~,r:n"'" t'i';.r.,Q"l(.~{H'Ci! ,.,·.:;:,1:;,u·c-:. If ~~·.;.~o., f!;.-:t:;..::,.n-n:::i,:::n,::~,mp.,~i:t'S'(:11"!'. I" l!W:Y.-~(! d~• ... 1t1,Jll._""1 :IJu:,_4:j l:lil CQ..,S:U~ t:, Tl!!•J~I~ -;.,:0--C-~ ,I M'~U·1 T~-1,,1• ;,jaw ·~k.:fh f<itSILl'Y'! I::. ~w:;,~11 ;:tn-~n~•:11~. t' Y-tf'('rfa!!'tr, I! 1,,;.~m'i:w'i. .11 IL"<111n,,d i.:~;: 111·..;i,-..,1e !;h:,;.,.i.; t,~ r.:,:'15oJV.-:t to C'l!-1,nu·I!' ,.,.. ;Jot-cu nt •ltH :01n,1111•nl T:.p u1 t:w", wr.:.,,.!.I fl-" 1:i thcio',11 f'l"!'-ir.>C,," !:~~ ~n1 5'•:.r,:,9,:, ,;:t:,n~~""-' r-o;: )M:i!fNII: t:~::lffl'!'nl .;:1'!';.oil"'(';i ,;1r: to ~!.1-71'";, ~1:J i:.:-Nv--1tnJ :J., µt•-. 1"1:t}"r r,,.ln l'lffl N"; ~.:!l~.l 1,:· m-:nj·..:,; r:I 1r,;: ,c;.· .::, wl!f.l:..td i:;.lanlli ,lf{' 1-------------'f--------------------~ ~-0n.i-,r9 "k;,i ... m "?t ·:, ,~. ~u 4 l'i'ic:rc~,1'°·1 A l)l'IA m.,t~ r11">H=-,: rr-.N' l"•l'.I•" lhl'r J,:,•s:; nl lhf' .,.,,):.ti' ::..411'.:,rn -..r,.~J a !-.!: tC:'YAl~>::! 1------+------------f VL•~c:,u,:11,:,:::;;:-. dru::i i'.lf u,c,·.~.:~~, 1.0.:iil.ilH.;, U' rzy: n11:-cl1:lJ ,;-n~n.-J =1~1ctr:t1 sr,,::i;:it~-,l•~n! ~-------~--------~------------------· PACLAND Project #10507003 >'J:;u1 rrl'lt, :Hl"HT'•~ 111•111"t, In lhPI I.lie :..,n"!'i:~ [,.:Ju· t:: Foil r.:. ,,~ . M~i.'t( m .'._;'°~'".;11~ L~~ fi~Ew-.10··1.i:.:w...:.. I F1oll'I~ 1l •tll.i.11£1 ,:cl1 ~f>i'!\1:,~ .:a··.d TY'4 n1~rl~n'"") Mlh Y1C1:.'1~ t.m:.h'.'11 Firestone Complete Auto Care Technical Information Report Renton, Washington NO, 24-CATCH BASIN INSERT Mainu,l'l.anel!-Defl'.tt:t or Problem Conditions When Maintenance ls Needed Results Expected When Compq11ent Maintenance is Performed Media Insert Visible 01! Visible oil sheen passing through medra Media insel replaced Insert does not fit Flow gets into ca1ch basJn without going through All flow goes through media. catch basin propNly mod1a. FiUB-r media plugged F1Jter media plugged Flow lhrough filter media is normal. Oil absorbenl media Media oil saturated. Or! absorbent m&dia replaced. s-aturated Water saturated Catch basin insert ls saturated with water, which Insert replaced. no longer has the cap.icily to absorb. Service life exceeded Regular interval replacement due to t~cal Media rnplacl'!d a1 manufaclurer"s a'lerage life of media Insert product, typicaNy one recommended interv~I. month. Seasonal When storms occur and during the wet season. Remove, clean and replac;e or install maintenance new ms.ert after major storms. monthly dunng the wet season oc at manufacturers recorrvnended in1er,,oal. PACLAND Project #10507003 n L MODULAR WETLANDS Inspection Guidelines for Modular Wetland System -Linear Inspection Summary o Inspect Pre-Treatment, Biofiltration and Discharge Chambers -average inspection interval is 6 to 12 months. • (15 minute average inspection time). o NOTE: Pollutant loading varies greatly from site to site and no two sites are the same. Therefore, the first year requires inspection monthly during the wet season and every other month during the dry season in order to observe and record the amount of pollutant loading the system is receiving. System Diagram Access to separation chamber and pre-filter cartridges lndrv1dual Media Filters Pre-filter Cartridge 1 Vertical Underdrain Manifold 2 . 1 · Pre-treatment Chamber .2, Biofiltration Chamber OioMedioGREEN Flow Control Riser www.modularwetlands.com 3 Outlet Pipe MODULAR Inspection Overview WETLANDS As with all stormwater BMPs inspection and maintenance on the MWS Linear is necessary. Stormwater regulations require that all BMPs be inspected and maintained to ensure they are operating as designed to allow for effective pollutant removal and provide protection to receiving water bodies. It is recommended that inspections be performed multiple times during the first year to assess the site specific loading conditions. This is recommended because pollutant loading and pollutant characteristics can vary greatly from site to site. Variables such as nearby soil erosion or construction sites, winter sanding on roads, amount of daily traffic and land use can increase pollutant loading on the system. The first year of inspections can be used to set inspection and maintenance intervals for subsequent years to ensure appropriate maintenance is provided. Without appropriate maintenance a BMP will exceed its storage capacity which can negatively affect its continued performance in removing and retaining captured pollutants. Inspection Equipment Following is a list of equipment to allow for simple and effective inspection of the MWS Linear: • Modular Wetland Inspection Form • Flashlight • Manhole hook or appropriate tools to remove access hatches and covers • Appropriate traffic control signage and procedures • Measuring pole and/or tape measure. • Protective clothing and eye protection. • 7/16" open or closed ended wrench. • Large permanent black marker (initial inspections only-first year) • Note: entering a confined space requires appropriate safety and certification. It is generally not required for routine inspections of the system. ~I/ www.modularwetlands.com "T" _ . L • __ I T _ { _ ", -I.. MODULAR WETLANDS Inspection Steps The core to any successful stormwater BMP maintenance program is routine inspections. The inspection steps required on the MWS Linear are quick and easy. As mentioned above the first year should be seen as the maintenance interval establishment phase. During the first year more frequent inspections should occur in order to gather loading data and maintenance requirements for that specific site. This information can be used to establish a base for long term inspection and maintenance interval requirements. The MWS Linear can be inspected though visual observation without entry into the system. All necessary pre-inspection steps must be carried out before inspection occurs, especially traffic control and other safety measures to protect the inspector and near-by pedestrians from any dangers associated with an open access hatch or manhole. Once these access covers have been safely opened the inspection process can proceed: • Prepare the inspection form by writing in the necessary information including project name, location, date & time, unit number and other info (see inspection form). • Observe the inside of the system through the access hatches. If minimal light is available and vision into the unit is impaired utilize a flashlight to see inside the system and all of its chambers. • Look for any out of the ordinary obstructions in the inflow pipe, pre-treatment chamber, biofiltration chamber, discharge chamber or outflow pipe. Write down any observations on the inspection form. • Through observation and/or digital photographs estimate the amount of trash, debris and sediment accumulated in the pre-treatment chamber. Utilizing a tape measure or measuring stick estimate the amount of trash, debris and sediment in this chamber. Record this depth on the inspection form. -.modularwetlands.com 1_ MODULAR WETLANDS Inspection Steps The core to any successful storm water BMP maintenance program is routine inspections. The inspection steps required on the MWS Linear are quick and easy. As mentioned above the first year should be seen as the maintenance interval establishment phase. During the first year more frequent inspections should occur in order to gather loading data and maintenance requirements for that specific site. This information can be used to establish a base for long term inspection and maintenance interval requirements. The MWS Linear can be inspected though visual observation without entry into the system. All necessary pre-inspection steps must be carried out before inspection occurs, especially traffic control and other safety measures to protect the inspector and near-by pedestrians from any dangers associated with an open access hatch or manhole. Once these access covers have been safely opened the inspection process can proceed: • Prepare the inspection form by writing in the necessary information including project name, location, date & time, unit number and other info (see inspection form). • Observe the inside of the system through the access hatches. If minimal light is available and vision into the unit is impaired utilize a flashlight to see inside the system and all of its chambers. • Look for any out of the ordinary obstructions in the inflow pipe, pre-treatment chamber, biofiltration chamber, discharge chamber or outflow pipe. Write down any observations on the inspection form. • Through observation and/or digital photographs estimate the amount of trash, debris and sediment accumulated in the pre-treatment chamber. Utilizing a tape measure or measuring stick estimate the amount of trash, debris and sediment in this chamber. Record this depth on the inspection form. -.modularwetlands.com MODULAR WETLANDS • NOTE: During the first few storms the water level in the outflow chamber should be observed and a 6" long horizontal watermark line drawn (using a large permanent marker) at the water level i n the discharge chamber while the system is operating at 100% capacity. The diagram below illustrates where a li ne should be drawn . This line is a referen ce point for future inspections of the system: , Us ing a permanent marker draw a 6 inch long horizontal line, as s hown, at the ,..~ higher water level in the MWS Linear discharge chamber. • Water level in the discharge chamber is a function of flow rate and pipe size. Observation of water level during the first few months of operation can be used as a benchmark level for future inspections. The initial mark and all future observations shall be made when system is at 100% capacity (water level at maximum level in pre-treatment chamber). If future water levels are below this mark when system is at 100% capacity this is an indicator that maintenance to the pre-filter cartridges may be needed . • Finalize inspection report for analysis by the maintenance manager to determine if maintenance is required. www.modularwetlands.com lL .. MODULAR W ETL A NDS Maintenance Indicators Based upon observations made during inspection . mai ntenance of the system may be required based on the following indicators : • Missing or damaged internal components or cartridges. • Obstructions in the system or its inlet or outlet . • Excessive accumulation of floatables in the pre-treatment chamber in which the length and width of the chamber is fully impacted more than 18". • Excessi ve accumulation of sediment in the pre-treatment chamber of more than 6" in depth. www.modularwetlands.com 1- M OD UL A R W ETLA NDS • Excessive accumulation of sediment on the BioMedi aGREEN media housed within the pre- filter cartridges. The following chart shows photos of the condition of the BioMediaGREEN conta i ned within the pre-filter cartridges. When media i s more than 85% clogged replacement is required . New BioMeci aGREEN 0 % • Overgrown vegetation. --Percent Clogged --100% Exhaisted BioMeciaGREEN • Water level in discharge chamber during 100% operating capacity (pre-treatment chamber water level at max height) is lower than the watermark by 20%. www.modularwetlands.com MODULAI'. WETLANDS Inspection Notes 1. Following maintenance and/or inspection, it is recommended the maintenance operator prepare a maintenance/inspection record. The record should include any maintenance activities performed, amount and description of debris collected, and condition of the system and its various filter mechanisms. 2. The owner should keep maintenance/inspection record(s) for a minimum of five years from the date of maintenance. These records should be made available to the governing municipality for inspection upon request at any time. 3. Transport all debris, trash, organics and sediments to approved facility for disposal in accordance with local and state requirements. 4. Entry into chambers may require confined space training based on state and local regulations. 5. No fertilizer shall be used in the Biofiltration Chamber. 6. Irrigation should be provided as recommended by manufacturer and/or landscape architect. Amount of irrigation required is dependent on plant species. Some plants may not require irrigation after initial establishment. -.modularwetlands.com MODULAR WETLANDS Inspection Notes 1. Following maintenance and/or inspection, it is recommended the maintenance operator prepare a maintenance/inspection record. The record should include any maintenance activities performed, amount and description of debris collected, and condition of the system and its various filter mechanisms. 2. The owner should keep maintenance/inspection record(s) for a minimum offive years from the date of maintenance. These records should be made available to the governing municipality for inspection upon request at any time. 3. Transport all debris, trash, organics and sediments to approved facility for disposal in accordance with local and state requirements. 4. Entry into chambers may require confined space training based on state and local regulations. 5. No fertilizer shall be used in the Biofiltration Chamber. 6. Irrigation should be provided as recommended by manufacturer and/or landscape architect. Amount of irrigation required is dependent on plant species. Some plants may not require irrigation after initial establishment. -w.modularwetlands.com !!; Maintenance Guidelines for Modular Wetland System -Linear Maintenance Summary MODU L AR WE TL ANDS o Re move Se dimen t from Pre-Trea tm e nt C ha mber -ave rag e mainte nan ce interval is 12 to 2 4 mo nth s. ( 10 m inute average seMce time). o R epl ace P re-Filte r Ca rtridg e Media -averag e main tenance inte rval 12 to 24 months . • ( 10-15 minute per cartridge average service time). o Trim Vege tati on -average ma intenance inte rval is 6 to 12 mo nth s. • ( Service time varies). System Diagram Access to se parati on c ham be r and pre-filter c artrid ge Curb Inlet Pre-fi lter Cartr idge 1 Vert ical Underd rain Man ifo ld GioMed ioGREEN '. 1 · Pre-treatment Chamber .. ~ .... '. 2 : Biofiltration Chamber ... ...,,,.· :~) Discharge Chamber 2 www.modularwetlands.com r r..\_.Lf"'\l 'IV I I VjCl._l TT .LV.JV/VVJ MODULAP. Maintenance Overview WETLANDS The time has come to maintain your Modular Wetland System Linear (MWS Linear). To ensure successful and efficient maintenance on the system we recommend the following. The MWS Linear can be maintained by removing the access hatches over the systems various chambers. All necessary pre-maintenance steps must be carried out before maintenance occurs, especially traffic control and other safety measures to protect the in spector and near-by pedestrians from any dangers associated with an open access hatch or manhole. Once traffic control has been set up per local and state regulations and access covers have been safely opened the maintenance process can begin. It should be noted that some maintenance activities require confined space entry. All confined space requirements must be strictly followed before entry into the system. In addition the following is recommended: • Prepare the maintenance form by writing in the necessary infonnation including project name, location, date & time , unit number and other info (see maintenance form). • Set up all appropriate safety and cleaning equipment. • Ensure traffic control is set up and properly positioned. • Prepare a pre-checks (OSHA, safety, confined space entry) are performed. Maintenance Equipment Following is a li st of equipment required for maintena nce of the MWS Linear: • Modular Wetland Maintenance Form • Manhole hook or appropriate tools to access hatches and covers • Protective clothing, flashlight and eye protection. • 7/16" open or c losed ended wrench. • Vacuum assisted tru ck with pressure washer. • Replacement BioMediaGREEN for Pre-Filter Cartridges if required (order from manufacturer). r::1 -/. di ~ www.modularwetlands.com M ODU L A R W ETLANDS Maintenance Steps 1. Pre-treatment Chamber (bottom of charro er ) A. Remove access hatch or manhole cover over pre-treatment chamber and position vacuum truck accordingly. B. \/vith a pressure washer spray down pollutants accumulated on walls and pre-filter cartridges . C. Vacuum out Pre-Treatment Chamber and remove all accumulated pollutants including trash , debris and sedimen ts. Be sure to vacuum the floor until pervious pavers are visible and clean. D. If Pre-Filter Cartridges require media replacement move onto step 2. If not. replace access hatch or manhole cover. Removal of a ccess hatch to gain acce ss below. Insert ion o f vacuu m hose into separation chamber. R emo va l of trasll, se diment and debris. F ully c leaned separation cha mb er. www.modularwetlands.com MODU L AR WETLANDS 2. Pre-Filte r Cartridg es (attached to wall of pre-treatment chamber) A. Afte r fi n ish in g step 1 en te r pre-treatment cham ber. B . U nscrew th e two bolts holding the lid on each ca rtridge filter a nd re move lid . . .=:=== ------,,__ -I .. ; . . ,..,. -.-,...: if\ .._,e,.-~~ t-c-.. J , P re -fil le r ca rtridges w ith tops on. Inside cartridges showing me dia filters ready for repla cement. C . Pla ce the vacuum h ose over each individual media filter to s uck out filter media . V acuu ming out of me d ia filters . D. Once filter m e dia has bee n sucked use a pressure washe r to spray down in side of th e cartridge and it's contain ing med ia cages. Remove cleaned media cages and pla ce to the side . Once removed the vacuum hose can be inserted into the cartridge to vacuum out any remai ning material near the bottom of the cartridge. www.modularwetlands.com MOD UL AR WETLANDS E. Reinstall media cages and fill with new media from manufacturer or outside supplier. Manufacturer will provide specification of media and sources to purchase. Utilize the manufacture provided refilling trey and place on top of cartridge . Fill trey with new bulk media and shake down into place. Using your hands slightly compact media into each filter cage. Once cages are full removed refilling trey and replace cartridge top ensuring bolts are properly tightened . Refillin g trey for m edia replacement. Refilling trey on cartridge wi th bulk medi a . F . Exit pre-treatment chamber. Replace access hatch or manhole cover. 3. Biofiltration Chamber (middle vegetated chamber) A . In general, the biofiltration chamber is maintenance free with the exception of maintaining the vegetation . Using standard gardening tools properly trim back the vegetation to healthy levels. The MWS Linear utilizes vegetation similar to surrounding landscape areas therefore trim vegetation to match surrounding vegetation . If any plants have died replace plants with new ones: www.modularwetlands.com ~ MODULAR WETLANDS Inspection Notes 1. Following maintenance and/or inspection, it is recommended the maintenance operator prepare a maintenancefinspection record. The record should include any maintenance activities performed, amount and description of debris collected, and condition of the system and its various filter mechanisms. 2. The owner should keep maintenance/inspection record(s) for a minimum of five years from the date of maintenance. These records should be made available to the governing municipality for inspection upon request at any time. 3. Transport all debris, trash, organics and sediments to approved facility for disposal in accordance with local and state requirements. 4. Entry into chambers may require confined space training based on state and local regulations. 5. No fertilizer shall be used in the Biofiltration Chamber. 6. Irrigation should be provided as recommended by manufacturer and/or landscape architect. Amount of irrigation required is dependent on plant species. Some plants may not require irrigation after initial establishment. www.modularwetlands.com Inspection Form D Modular Wetland System, Inc. P. 760.433-7640 F. 760-433-3176 E. lnfo@modularwetlands.com www.modularwetlands.com 1_ MODULA~ WETLANDS Inspection Report Modular Wetlands System I\ ~: M O I) <) I "-fl. \VETL/--.>·1DS Project Name For Office Use Only Project Address '"" (lipCttle) (ReYlewed By) Owner /Management Company '""'' Office personnel to tOrll)le!e seciicn to Contact Phone ( I -the lell Inspector Name --------------------Date Time ______ AM I PM Type of !nspectmn O Routine D Follow Up D Complamt D Storm Storm Event in Last 72-hours? D No D Yes \Neath er Condition Addibonal Notes Inspection Checklist Modular Wetland System Type (Curb. Grate or UG Vautt): Size (22', 14' or etc.): Structural Integrity: Yes No Comments Damage to pre-treatment access cover (manhole cover/grate) or cannot be opened using normal lrftmg pressure? Damage to d1sctiarge chamber access mver (manhole aiver/grate) or cannot be opened usmg normal lifting pressure? Does the MWS unit show signs of structural detenorat1on (cracks io the waR. damage to trame)? Is ttie inletlounet prpe or drain down pipe damaged or otherwse not functioning property? Working Condition: Is there evidence of illicit discharge or excessive oil, grease, or other automobile fluids entering and clogging th unit? Is there standing water in inappropriate areas after a dry period? Is the filter insert (If applicable) at capacity ancttor is there an accumulabon of debnsltrash on the shelf system? Does the depth of sediment/trash/ti ebris suggest a blockage of the mflrm pipe. bypass or cartridge fitter'? If yes De,c:th. specify which one in the comments section. Note depth of accurrulation in m pre-treatment chamber Chan-tier: Does the cartridge filter media need replacement in pre-treatment chamber andfor discharge chamber? Any signs of improper functioning in the discharge chamber? Note issues in comments section. Other Inspection Items: Is there an acOJ mulabon of sed1rrenb'l:rash/deb ris in the wetland rredia (if applicable)? ls it evident that the plants are alive and healthy (if applicable)? Please note Plant Information below Is there a sepbc or foul odor comng from inside the system? Waste: Yes No Recommended Malntenam:::e Plant Information Sediment /Silt/ Clay No Cleaning Needed Damaae to Plants Trash/ Bags/ Bottles Schedule Maintenance as Planned Plant Rei:: la cement Green Waste/ Leaves/ Follage Needs lmrred1ate Maintenance Plant Trimm1no Additional Notes 2972 San Lws Rey Road, Oceanside, CA 92058 P (760) 433-7640 F (7BO) 433-3176 Maintenance Report •!liW •o -~ Modular Wetland System, Inc. P. 760.433-7640 F. 760-433-3176 E. lnfo@modularwetlands.com -.modularwetlands.com MODULAR WETLANDS Firestone Complete Auto Care Technical Information Report Renton, Washington Cleaning and Maintenance Report Modular Wetlands System -1_ WETLANDS Project Name ------------------------------------Fer Office Use Oliy Project Address -----------------------------------'===~------< (Cl!rl ilJpC<Xle) ~B)) Owner /Mana,;iement C001pany _______________________________ •,,.,,--------~ l(l...llJ Contact------------------- lnspecti:rName ----------------- Twe of lnspedioo D Routine 0 Follow Up D ecrnp1aint Site GPS Coordinates Marufacturer / Trash Map# of Insert Description/ Sizing Accunl..latioo Lat '1/NS Catch Basins Loner MWS Sedimentation Basin Media Filter Condition Plant Condition Drain Down Media Condition Discharge Chamber Condition Drain Down Pipe Condition Inlet and Outlet Pipe Condition Comments Phooe I Date I I ___ _ Time Oelb pt,rstfflll la ctlffl~ sadbllo ..... AM/PM ------ D Stoon storm Event in Last T.2-hours? D No D Yes Add/ti c.nal Naes Coo:lition of Media Opefatiooal Per Fdi&ge Sediment Total Debris 25/50/75/100 Marufactures' Aw.mUatia, AcoJmulation AcOJmulation \will be chMged Specifications @75%) (lfnot. Why?) 2972 San Luis Rey Road, O:::eanside, CA 92058 P. 7&1.433.7640 F. 760.433.3176 Firestone Complete Auto Care Technical Information Report Renton, Washington Appendix E -Bond Quantities Worksheet PACLAND Project #10507003 WASHINGTON FORESTRY CONSULTANTS, INC. FORESTRY AND VEGETATION MANAGEMENT SPECIALISTS w F C I 360/943-1723 FAX 360/943-4128 1919 Yelm Hwy SE, Suite C Olympia, WA 98501 Prepared for: PACLAND -Tree Protection Plan- RENTON FIRESTONE 17808 108'" Ave. SE Renton, WA Prepared by: Washington Forestry Consultants, Inc. Date: September 23, 2016 Introduction The project proponent is planning to build a new Firestone auto care center on 0.88 acres at 17808 108'h Ave. SE in Renton, WA. The proponent has retained WFCI to: • Evaluate and inventory all trees on the site pursuant to the requirements of the City of Renton Tree Protection Ordinance. • Make recommendations for retention of significant trees, along with required protection and cultural measures. Observations Methodology In accordance with Renton Municipal Code 4-4-130, WFCI has evaluated all significant trees on site. This includes cottonwood and red alder trees 8 inches diameter at breast height (DBH) and larger, and all other trees 6 inches DBH and larger, and assessed their potential to be incorporated into the new project. Trees were numbered on a map, but not marked in the field. The tree evaluation phase used methodology developed by Nelda Matheny and Dr. James Clark in their 1998 publication Trees and Development: A Technical Guide to Preservation of Trees during Land Development. URBAN/RURAL FORESTRY • TREE APPRAISAL • HAZARD TREE ANALYSIS RIGHT-OF-WAYS• VEGETATION MANAGEMENT• ENVIRONMENTAL STUDIES• CONTRACT FORESTERS Member of International Society of Arboriculturs and Society of American Foresters Page 2 -Renton Firestone --Tree Protection Plan Site Description The site has an existing restaurant, with associated parking lot surrounding the building. The eastern portion of the lot includes a grass lawn and trees. There are 26 native and planted trees on site. Overall, tree quality is very poor to fair. The trees on site range between approximately 15 and 40 years old. The site is generally flat, except a short treed slope along the southern boundary exist. Soil Description According to the USDA Web Soil Survey there is one soil type on this parcel (see soils map below). Alderwood gravelly sandy loam, a moderately deep, moderately well drained soil found on glacial till plains. It is formed in ablation till overlying basal till. A weakly cemented hardpan is at a depth of 20 to 40 inches. Permeability is moderately rapid above the hardpan and very slow in the pan. Available water capacity is low. The effective rooting depth for trees is 20-40 inches. A perched seasonal high water table is at a depth of 18-36 inches from November to March. The potential for windthrow of trees is moderate under normal conditions. New trees require irrigation for establishment. In areas where grading brings the hardpan nearer to the surface, the hardpan must be fractured under new trees to provide soil volume for root development and to improve drainage around the tree. Washington Forestry Consultants, Inc. 2 Page 3 -Renton Firestone --Tree Protection Plan Tree Conditions The project area consists of one conifer forest cover type with scattered deciduous trees. An inventory of the trees was conducted to determine the composition and health of the forest. Type I. --The majority of the trees in this type are Scotch pine (Pinus sylvestris). Other species include Sitka spruce (Picea sitchensis), grand fir (Abies grandis), and red alder (A/nus rubra). There is also one Douglas-fir (Pseudotsuga menziesii), one Alaska yellow cedar (Chamaecyparis nootkatensis), and one flowering plum (Prunus spp.). There are a total of 26 significant trees in this type, ranging in diameter from 6 to 26 inches DBH. Seventeen (17) of the trees were classified as sound, healthy, long-term trees in the dominant and co-dominant crown class. The other nine trees are not long-term trees due to structural defects and/or poor health. Table 1 Summary of Significant Trees in Type I # of Trees in Species DBH Total# of # of Healthy Poor Composition of Snecies Ran1>e (in.) Trees Trees Health* Stand Alaska Yell ow 16-17 I I 0 3.85% Cedar Douglas-fir 20 I I 0 3.85% Flowering 6 I 0 I 3.85% Plum Grand Fir 12-13 2 2 0 7.7% Red Alder 8-24 3 0 3 11.55% Scotch Pine 10-17 11 6 5 42.3% Sitka Spruce 10-26 7 7 0 26.9% Total 6-26 26 17 9 100% *Dead, diseased, or hazardous. Off-Site Impacts There is one 16-inch DBH red alder tree just north of the parcel boundary that is m poor condition. Tree removal on this parcel will not impact this tree. Discussion Potential for Tree Retention There are 9 trees that were evaluated as unhealthy. Therefore 17 significant trees in Type I are available for retention. From the site plan provided, it appears that I tree can be saved. The remaining 25 trees will need to be removed due to construction, and retaining wall installation. The proposed 'save' trees are illustrated on the aerial photo in Attachment #1. A detailed list of all trees ( over 6 inches DBH) by species, DBH, condition, root protection zone (RPZ), save/remove potential, and retention availability is provided in Attachment #3. Washington Forestry Consultants, inc. 3 Page 4 -Renton Firestone --Tree Protection Plan Tree Density Calculations Title 4-4-130 of the Renton Municipal Code requires that a minimum of I 0% of all healthy significant trees in buildable areas be retained on the project in a 'commercial' zone. The following is a summary of the required and planned tree retention: Total Project Area Critical Areas and Buffers Buildablc Area Total Number of Trees on Site Trees Excluded from Retention Calculation: Trees that are Dead, Diseased, or Dangerous Number of Healthy, Significant Trees in Buildable Area: Required Tree Retention ('Protected Trees'): I 0% of healthy significant trees in buildable area: Planned Tree Retention Shortfall of Required Tree Retention 0.88 acres 0 acres 0.88 acres 26 trees 9 trees 17 trees 2 trees I tree 1 tree There are 17 healthy significant trees in the buildable area of the site. At least 2 of these trees need to be retained to meet the I 0% requirement of the City of Renton Code. These trees are considered 'Protected Trees'. The proposed plan retains I tree which is below the minimum retention requirement. Therefore replacement trees will be required for the one 'protected' tree to be removed. The Renton Municipal Code requires that "replacement trees, with at least a two-inch (2") caliper or an evergreen at least six feet (6') tall, shall be planted at a rate of twelve (12) caliper inches of new trees to replace each protected tree removed. See the Tree Retention Worksheet in Attachment #4. Replacement Trees Required Number of Landscaping Trees to Count Toward Replacement Requirement (50% of total requirement) Total Tree Replacement Necessary 6 3 3 Up to fifty percent (50%) of trees required pursuant to RMC 4-4-070, Landscaping, may contribute to replacement trees." Therefore, at least three 2-inch caliper deciduous trees or three 6 ft. tall conifers will need to be planted in addition to the Landscaping requirements.The landscape plan (prepared by others) should incorporate native conifer trees along with deciduous accent and shade trees to provide a mix of color, texture, and size. Washington Forestry Consultants, Inc. 4 Page 5 -Renton Firestone --Tree Protection Plan Recommendations Tree Protection Measures Trees to be saved must be protected during construction by six foot high chain link fencing (Attachment #7), located at the edge of the critical root zone (CRZ). Placards shall be placed on the fencing every 50 feet indicating the words, "NO TRESPASSING -Protected Trees". The individual CRZ are a radius of one foot for each one inch of DBH (6 feet minimum), unless otherwise delineated by WFCI (see Attachment #3). Tree protection fences should be placed around the edge of the critical root zone (CRZ). The fence should be erected after logging but prior to the start of clearing. The fences should be maintained until the start of the landscape installation. There should be no equipment activity (including rototilling) within the critical root zone. No irrigation lines, trenches, or other utilities should be installed within the CRZ. Cuts or fills should impact no more than 20% ofa tree's root system. If topsoil is added to the root zone ofa protected tree, the depth should not exceed 2 inches of a sandy loam or loamy fine sand topsoil and should not cover more than 20% of the root system. If roots are encountered outside the CRZ during construction, they should be cut cleanly with a saw and covered immediately with moist soil. Noxious vegetation within the critical root zone should be removed by hand. If a proposed save-tree must be impacted by grading or fills, then the tree should be re-evaluated by WFCI to determine if the tree can be saved with mitigating measures, or if the tree should be removed. Pruning and Thinning All individual trees to be saved near or within developed areas should have their crowns raised to provide a minimum of 8 feet of ground clearance over sidewalks and landscape areas, 15 feet over parking lots or streets, and at least 10 feet of building clearance. All pruning should be done according to the ANSI A300 standards for Eroper pruning, and be completed by an International Society of Arboriculture Certified Arborist , or be supervised by a Certified Arborist®. Conclusions and Timeline for Activity I. One tree is proposed to be retained on the site in the buildable area. 2. The final, approved tree protection plan map should be included in the construction drawings for bid and construction of the project and should be labeled as such. 3. Contact WFCI to attend pre-job conference and discuss tree protection issues with contractors. WFCI can verify all trees to be saved and/or removed are adequately marked for retention. 4. Complete necessary hazard tree removals and invasive plant removals from the tree protection areas. No equipment should enter the tree protection areas during logging. Washington Forestry Consultants, Inc. 5 Page 6 -Renton Firestone --Tree Protection Plan 5. Install tree protection fences along the 'limits of construction'. The fences should be located at the limits of construction or 5 feet outside of the dripline of the save tree or as otherwise specified by WFCI. Maintain fences throughout construction. 6. Complete clearing of the project. 7. Do not excavate stumps within 10' of trees to be saved. These should be individually evaluated by WFCI to determine the method ofremoval. 8. Complete all necessary pruning on save trees or stand edges to provide at least 8' of ground clearance near sidewalks and trails, and 15' above all driveways or access roads. 9. Complete grading and construction of the project. Summary The City of Renton Municipal Code requires 2 of the 17 significant trees be retained on the buildable area of the site. This plan retains I tree, which is I short of the minimum tree retention requirement. Therefore, at least 6 two inch caliper deciduous trees or 6 six foot tall conifers need to be planted as replacement trees to meet the minimum density requirements. Credit for 3 of these trees can be taken from trees planted as a requirement of the landscaping code. Please give me a call if you have further questions. Respectfully submitted, J!/~>n.L~ Galen M. Wright, ACF, ASCA ISA Bd. Certified Master Arborist PN-129BU Forester No. 44 !SA Tree Risk Assessor Qualified attachments Washington Forestry Consultants, Inc. Ben MacColl, ISA, SAF ISA Certified Arborist® -Certified No. PN-7972A Professional Forester 6 Page 7 -R enton Firestone --Tree Protection Plan Attachment #1: Aerial Photo of Firestone Site with Forest Cover Types (King County Parcel Viewer 2.0) ---Approximate Site Boundary C!) Planned Save Trees X Planned Removal s Washington Forestry Consultants, inc:. 7 Page 8 -Renton Firestone --Tree Protection Plan Attachment #2: Current Site Conditions/Tree Survey l\1ap (1) & Si te Plan with Approximate Tree Locations (2) C urrent Site Conditions/Tree S urvey Map !>lA::,.e:: .M'):;.,,1~_r :,, i.\ ~Pt\:! ' I !I c ...,...., ~ ::...:£.: 4*25 1f24 <~> I .£.• J S ite Plan with A pproximate Tree Locations 0 GRAPH IC SC ALF. noww t i , • Call before yo~ di L t .. , ~~ r ;:11 \.,/ 1 J Wushing1on Foresu y Cunsultunls. Inc. 8 Page 9 -Renton Firestone --Tree Protection Plan Attachment #3: Inventory list of project area trees Crown Root Savable Tree to be Tree DBH Radius Protection based on Saved in # Snecies (in) Condition (ft) Radius (ft) Tree Health? Project? 1 Scotch Pine 10 Fair 12 6 Yes No 2 Scotch Pine 12 Poor 12 6 Yes No 3 Scotch Pine 12 Poor 12 6 Yes No 4 Scotch Pine 12 Fair 10 6 Yes No 5 Scotch Pine 10 Fair 10 6 Yes No 6 Scotch Pine 10 Poor 10 6 No No 7 Scotch Pine 14 Fair 10 6 Yes No 8 Scotch Pine 12 Poor 10 6 Yes No 9 Scotch Pine 17 Poor 12 10 Yes No 10 Sitka Spruce 18 Fair 15 12 Yes No Alaska 11 Yellow Cedar 17,16 Fair 10 12 Yes No 12 Grand Fir 13 Fair 10 12 Yes No 13 Grand Fir 12 Fair 10 8 Yes Yes Flowering 14 Plum 6 Verv Poor 5 4 No No 15 Sitka Soruce 13 Fair 15 10 Yes No 16 Sitka S nruce 15 Fair 12 10 Yes No 17 Sitka Snruce 16 Fair 12 10 Yes No 18 Red Alder 24 Verv Poor 15 16 No No 19 Sitka Soruce 10 Fair 10 10 Yes No 20 Red Alder 14 Verv Poor 12 10 No No 21 Sitka Snruce 14 Fair 10 12 Yes No 22 Sitka Snruce 26 Fair 15 14 Yes No 23 Douglas-fir 20 Good 18 15 Yes No 24 Scotch Pinc 13 Fair 12 4 Yes No 25 Scotch Pine 14 Fair 10 4 Yes No 26 Red Alder 8 Poor 8 6 No No Washington Forestry Consultants, Inc. 9 Page IO -Renton Firestone --Tree Protection Plan Attachment #4: Tree Retention Worksheet DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ------Renton® 1. 2. 3. 4. 5. 6. 7. 8. TREE RETENTION WORKSHEET Plannlng Division 1055 South Grady Way-Rento.'i, WA 9805 J Phone: 425-430-7200 I www.rentonwa.gov Total number of trees over 6" diameter\ or alder or cottonwood trees at least 8" in diameter on project slte Deductions: Certain trees are excluded from the retention calculation: Trees that are daneerous2 Trees in proposed public streets Trees in proposed private access easements/tracts Trees in critical areas 3 and buffers Total number of excluded trees: Subtract line 2 from line 1: 26 9 9 17 Next, to determine the number of trees that must be retained 4, multiply line 3 by: 0.3 in zones RC, R-1, R-4, R-6 or R-8 0.2 in all other residential zones 0.1 in all commercial and industrial zones 2 Ust the number of 6" in diameter, or alder or cottonwood trees over 8" in diameter that you are proposing5 to retain 4: Subtract line 5 from line 4 for trees to be replaced: (If line 6 is lero or less, stop here. No replacement trees are required) Multiply line 6 by 12" for number of required replacement inches: 12 Proposed size of trees to meet additional planting requirement: trees trees trees trees trees trees trees trees trees trees inches !Minimum 2" cali12er trees regulred for re121acement 1 otherwise enter OJ 2 inches per tree 9. Divide line 7 by line 8 for number of replacementtrees 6 : (If remainder is .5 or greater, mu,,d upto t~e next whole r;umber) 6 trees 1 Measured at 4.5' above grade. 1 A tree certified, in a written report, as dead, terminally diseased, damaged, or otherwJse dan~erous :o persons or property by a licensed landscape architect, or certified arborist, and approved by the City. 3 Critical areas, such as wetlands, streams, floodplains and protected slopes, are defined in RMC 4-3-DSO. 4 Count only those trees to be retained outside of critical areas and buffers. ' The Oty may require modtficat1on of the :ree retention plan to ensure retention of Lh1= maximum number of trees per RMC 4-4-l3DH7a. 6 When the required number of protected trees cannot be retained, replacement trees, with at leas;: a two-inch (2"} caliper or an evergreen at least >ix fee: I 6') tall, shall be planted. See RMC 4-4-13D.H. L e.(U} for prohibited types of replacement trees. 1 H: \Cl:D\Data\Fom,s-l emplate-s\Self-Help Hardouts\Plannirig\T ree Retention Workshc'et.doc,r D&/2015 Washington Forestry Consultants, Inc. 10 Page 11 -Renton Firestone --Tree Protection Plan Attachment #5. Individual Tree Rating Key for Tree Condition RATING SYMBOL DEFINITION Very Good VG • Balanced crown that is characteristic of the species • Nonna\ lateral and terminal branch gro\vth rates for the species and soil type • Stem sound, normal bark vigor • No root problems • No insect or disease problems • Long-term, attractive tree Good G • Crown lacking symmetry but nearly balanced • Normal lateral and terminal branch growth rates for the species and soil type • Minor twig die hack O.K . • Stem sound, normal bark vigor • No root problems • No or minor insect or disease problems -insignificant • Long-term tree Fair F • Crovm lacking symmetry due to branch loss • Slow lateral and terminal branch growth rates for the species and soil type • Minor and major twig dieback -starting to decline • Stem partly unsound, slow diameter growth and low bark vigor • Minor root problems • Minor insect or disease problems • Short-term tree I 0-30 years Poor p • Major branch loss -unsymmetrical crown • Greatly reduced growth • Several structurally import dead or branch scaffold branches • Stem has bark loss and significant decay with poor bark vigor • Root damage • Insect or disease problems -remedy required • Short-term tree 1-10 vears Very Poor VP • Lacking adequate live crown for survival and growth • Severe decline • Minor and major twig dieback • Stem unsound, bark sloughing, previous stem or large branch failures, very poor bark vigor • Severe root problems or disease • No or minor insect or disease problems • Mortality expected within the next few years Dead DEAD • Dead Washington Forestry Consultants, inc. II Page 12 -Renton Firestone --Tree Protection Plan Cultural Care Needs: ABBRV. ACTIVITY DESCRIPTION cc Crown Pruning of dead, dying, diseased, damaged, or defective branches over l/2 inch in Clean in!! diameter -includes removal of dead tops CT Crown Pruning of branches described in crown cleaning, plus thinning ofup to 20% of the Thinning live branches over y; inch diameter. Branch should be I /3 to V, the diameter of the lateral branch. Thinning should be well distributed throughout crown of tree, and should release healthy, lone-term branches. RC Crown Reduction of the crown of a tree by pruning to lateral branches. Generally used to Reduction remove declining branches or to lighten end weight on long branches. CR Crown Pruning of lower branches to remove deadwood or to provide ground or building Raisin!! clearances. RMV Remove Remove tree due to decline or hazardous conditions that cannot be mitigated by prunmg. RS Remove Remove basal sprouts from stem of tree. Snrouts Ren Reolace Tree is small -is in decline or dead. Replace with suitable tree species. HT Hazard Tree Tree is hazardous and cannot be mitigated by pruning. Recommendation is to remove tree. None No Work No work necessary at this time. Washington Forestry Consultants, Inc. 12 Page 13 -Renton Firestone --Tree Protection Plan Attachment #6: Description of Tree Evaluation Methodology The evaluation of the tree condition on this site included the visual assessment of: l. Live-crown ratio, 2. Lateral and terminal branch grmvth rates, 3. Presence of dieback in minor and major scaffold branches and twigs, 4. Foliage color, 5. Stem soundness and other structural defects, 6. Visual root collar examination, 7. Presence of insect or disease problems. 8. Windfirmness if tree removal will expose this tree to failure. In cases where signs of internal defect or disease were suspected, a core sample was taken to look for stain, decay, and diameter grmvth rates. Also, root collars were exposed to look for the presence of root disease. In all cases, the overall appearance of the tree was considered relative to its ability to add value to either an individual lot or the entire subdivision. Also, the scale of the tree and its proximity to both proposed and existing houses was considered. Lastly, the potential for incorporation into the project design is evaluated, as well as potential site plan modifications that may allow otherwise removed tree(s) to be both saved and protected in the development. Trees that are preserved in a development must be carefully selected to make sure that they can survive construction impacts, adapt to a new environment, and perform well in the landscape. Healthy, vigorous trees arc better able to tolerate impacts such as root injury, changes in soils moisture regimes, and soil compaction than are low vigor trees. Structural characteristics are also important in assessing suitability. Trees with significant decay and other structural defects that cannot be treated are likely to fail. Such trees should not be preserved in areas where damage to people or property could occur. Trees that have developed in a forest stand are adapted to the close, dense conditions found in such stands. When surrounding trees are removed during clearing and grading, the remaining trees are exposed to extremes in wind, temperature, solar radiation, which causes sunscald, and other influences. Young, vigorous trees with well-developed crowns are best able to adapt to these changing site conditions. Washington Forestry Consultants, Inc. [3 Page 14 -Renton Firestone --Tree Protection Plan Attachment #7: Glossary of Forestry and Arboricultural Terminology DBH: Diameter at Breast Height (measured 4.5 ft. above the ground line on the high side of the tree). Caliper: In the City of Renton -Caliper is referring to diameter measurement at DBH. Live Crown Ratio: Ratio oflive foliage on the stem of the tree. Example: A 100' tall tree with 40 feet oflive crown would have a 40% live crown ratio. Conifers with less than 30% live crown ratio are generally not considered to be long-term trees in forestry. Crown: Portion of a trees stem covered by live foliage. Crown Position: Position of the crown with respect to other trees in the stand. Dominant Crown Position: Receives light from above and from the sides. Codominant Crown Position: Receives light from above and some from the sides. Intermediate Crown Position: Receives little light from above and none from the sides. Trees tend to be slender with poor live crown ratios. Suppressed Crown Position: Receives no light from above and none from the sides. Trees tend to be slender with poor live crown ratios. Washington Forestry Consultants, Inc. 14 Page 15 Renton Firestone --Tree Protection Plan Attachment #8: Tree Protection Fence Detail ANOiOR POSTS SHOULD BE MIN [MUM 6' T All. 'T-BAR' PENCE POSTS t------8 fT. MAX. ------, ANCHCR POSTS UUST BE INST AU.CD TO A DEPTH Of" NO L.£SS THAN 1 /3 Of THE TOTAL H£IGHT ~ POST. Temporary Chain Link on Driven Posts lHE TREE PROTECTION FrNCE SHOULD BE J.iAlNTAlN(D THROUGHOUT THE CONSTRUCTION ANO GRAOrNC. AND NOT TO 8£ REM0\'£0 UNTIL F1NAL LAJ.IOSCAPING [S IN PROGRESS. AT NO TIME SHAU E:OUJPMENT DH~R tN TO TI-IE ROOT PMTECTION ZONE {RPZ). AU. 8RUSH CLEANUP WITHIN TH( RPZ SHOULD SE COUPLDtD BY HANO TO PREVENT DlsnJRBANCE OF N,HTVE CROOND COVERS NO CUTS OR FIU.5. tJTll.JTY TRENCHING, M00IF1CAnONs TO ORAINAC£. OR CONCRETE RlSE WAT£R SHOULD IMPACT THE RPZ. NO \lr'IRES, CA8L£S. OR OlHE:R 0(V]C£$ SHOULD BE A TTACHEI) TO PROTECTC TREES DURING CONSTRUCTION. IF IMPACTS UUST OCCUR WITHIN Ti-IE RPZ. CCf,4TACT v.FCI PRIOR TO TI-IE OPERAnONs TO OETEF!J.l[NE TH( PROPER PROCEDURE TO PROTECT THE TRtE'S: HEAL TH. Washington Forestry Consultants, Inc. 15 Page 16 -Renton Firestone --Tree Protection Plan Attachment #9: Assumptions and Limiting Conditions 1) Any legal description provided to the Washington Forestry Consultants, Jnc. is assumed to be correct. Any titles and ownership's to any property are assumed to be good and marketable. No responsibility is assumed for matters legal in character. Any and all property is appraised or evaluated as though free and clear, under responsible ov,mership and competent management. 2) It is assumed that any property is not in violation of any applicable codes, ordinances, statutes, or other governmental regulations, unless otherwise stated. 3) Care has been taken to obtain all information from reliable sources. All data has been verified insofar as possible; however, Washington Forestry Consultants, Inc. can neither guarantee nor be responsible for the accuracy of information. 4) w·ashington Forestry Consultants, Inc. shall not be required to give testimony or to attend court by reason of this report unless subsequent contractual arrangements are made, including payment of an additional fee for such services as described in the fee schedule and contract of engagement. 5) Loss or alteration of any part of this report invalidated the entire report. 6) Possession of this report or a copy thereof does not imply right of publication or use for any purpose by any other than the person to whom it is addressed, without the prior expressed mitten or verbal consent of \Vashington Forestry Consultants, Inc. 7) Neither all or any part of the contents of this report, nor copy thereof, shall be conveyed by anyone, including the client, to the public through advertising, public relations, news, sales or other media, ,:vithout the prior expressed written or verbal consent of Washington Forestry Consultants, Inc. --particularly as to value conclusions, identity of Washington Forestry Consultants, Inc., or any reference to any professional society or to any initialed designation conferred upon Washington Forestry Consultants, Inc. as stated in its qualifications. 8) This report and any values expressed herein represent the opinion of Washington Forestry Consultants, Inc., and the fee is in no way contingent upon the reporting of a specified value, a stipulated result, the occurrence neither of a subsequent event, nor upon any finding in to reported. 9) Sketches, diagrams, graphs, and photographs in this report, being intended as visual aids, arc not necessarily to scale and should not be construed as engineering or architectural reports or surveys. I 0) Unless expressed otherwise: 1) information contained in this report covers only those items that were examined and reflects the condition of those items at the time of inspection; and 2) the inspection is limited to visual examination of accessible items without dissection, excavation, probing, or coring. There is no warranty or guarantee, expressed or implied, that problems or deficiencies of the tree or other plant or property in question may not arise in the future. ]',late: Even healthy trees can/ail under normal or storm conditions. The only way to eliminate all risk is to remove all trees within reach of all targets. Annual monitoring by an ISA Certified Arborist or Certified Forester will reduce the potential of tree failures. It is impossible to predict with certainty that a tree will stand or JQil, or the timing of the failure. It is considered an 'Act of God' when a tree fails, unless it is directlyfelled or pushed over by man 's actions. Washington Forestry Consultants, Inc. 16 GEOTECHNICAL ENGINEERING REPORT Firestone Retail Store 17808108th Ave SE Renton, WA 98055 PSI PROJECT N0.07121375 June 1, 2016 Prepared for: Bridgestone Retail Operations, LLC 333 E. Lake Street Bloomingdale, IL 60108 Prepared by: Professional Service Industries, Inc. 20508 -55th Ave W, Suite A Lynnwood, WA 98036 J •J lnfon1ulfion • ToBuildOn Engineering • Consulting • Testing l •J lnfonnation • ToBuildOn Engineering • Consulting • 71,sti'ng June 1. 2016 Bridgestone Retail Operations, LLC 333 E Lake Street Bloomingdale, IL 60108 ATTENTION: Subject: Dear Mr. Ansay, Dennis Ansay Email: AnsayDennis@bfusa.com Geotechnical Investigation Firestone Retail Store 17808108th Ave SE, Renton, Washington PSI Report No. 07121375 Professional Service Industries, Inc. (PSI) is pleased to submit a report of our geotechnical investigation for the proposed FrrestoneRetail Store to be located at 17808 108"' Ave SE in Renton, Washington. This report summarizes the work accomplished and provides our recommendations for design and construction of the proposed project. PSI performed the requested geotechnical investigation services in general accordance with the consultant agreement dated May 2, 2016. Based on the results of our field investigation, laboratory testing and engineering analysis, the proposed site is suitable for the construction of the proposed improvements from a geotechnical standpoint, provided the recommendations of this report are followed. Recommendations regarding the geotechnical aspects of project design and construction are presented in the attached report. PSI appreciates the opportunity to contribute our services and looks forward to working with you during design and construction of this project. Please contact the undersigned directly if you have questions pertaining to this project. Respectfully Submitted, PROFESSIONAL SERVICE INDUSTRIES, INC. /I ,-/ -" .-- j(JJ/~(2/ s~- Richard C Fredricksen, L.G., L.E.G. Project Geologist rich a rd .fred ricksen@psiusa.com (,,-/-/(p Professional Service Industries, Inc. 205DB-561h Ave W Suite A Lynnwood. WA 98036. Phone (425) 409-2504 Fax (425) 582-8193 Firestone Retail Store I 7808 J08'h Ave SE, Renton, fYashin5 PSI Project No 07121375 1. PROJECT DESCRIPTION Profe.vsional Service Industries, Inc. Engineering• Consulting• Testing June 1, 2016 Page 1 o/7 PSI understands the site improvements will consist of a new single story retail facility and expanded parking. Based on preliminary structural information provided and previous experience with similar projects, we anticipate column and wall loads be on the order of 30 kips and 3 kips per foot, respectively. We also anticipate design floor loads of about 125 psi with a maximum concentrated load of 8 kips. 2. SITE DESCRIPTION 2.1. General The proposed site is located at 17808 108th Ave SE in Renton, Washington. Based on readily available aerial images the site presently has a single story building, which we understand will be razed prior to construction. The remainder of the site has sporadic landscaped shrubbery and paved parking. The site is bordered to the west by 108'" Ave SE (State Route 515), to the east by 109'" Ave SE, and to the north and south by existing developments. 2.2. Topography Our review of available topographic information indicates that the proposed site is relatively flat with elevations ranging from approximately EL400 to EL410 from east to west over a distance of approximately 300 feet, based on available aerial imagery on Google Earth. 2.3. Geology Based on a review of the geology of the region utilizing the Washington Department of Natural Recourses Interactive Geologic Map (WDNRIGM), PSI observed that this area is mapped as Quaternary glacial till. Glacial till is typically silts sand and gravels that have been overridden by a glacier and are thereby heavily over-consolidated. 2.4. Seismic Design Values The nearest mapped fault zone to the site is the Seattle Fault Zone approximately 5 miles northwest of the site. The Seattle Fault Zone is mapped as a Holocene age thrust faults that trend east to west with a reported slip rate of 0.2 to 1 mm per year (Reference 2). The contribution of potential earthquake-induced ground motion from known sources is included in the probabilistic ground motion maps published by the USGS. Design data regarding seismic site characterization and design recommendations based on USGS mapping and analysis are implemented in the 2012 International Building Code. Based on the SPT data collected during our drilling, the site conforms to the characteristics of Site Class C. The published design ground motion values, based on the USGS Seismic Design Maps (Reference 3), corresponding to a risk-targeted 2 percent probability of exceedance in 50 years at the project site. Seismic design values for the project site are provided in Table 1 below. Firestone Retail S1ore 17808108'h Ave SE Renton, Washin0 , PSI Project .!\'o 07121375 Table 1: Ground Motion Values* Mapped MCE Adjusted MCE Period Spectral Site Spectral (sec) Response Coefficients Response Acceleration Acceleration (g) (g) 0.2 S, 1.395 Fa 1.000 SMs 1.392 1.0 S, 0.519 Fv 1.300 SM1 0.674 Professional Service Industries, Inc. Engineering• Consulting• Testing June l, 2016 Pu,-:e 2 of? Design Spectral Response Acceleration (g) Sos 0.928 S01 0.450 . Risk Targeted 2% Probability of Exceedance m 50 years for Latitude 47.44309 and Longitude -122.19636 2.5. Subsurface conditions Subsurface materials and conditions were investigated with nine hollow-stem auger borings performed on May 16"', 2016. The nine borings were drilled to a depth of approximately 11 to 21 feet below the ground surface. The approximate locations of the soil borings are shown on Figure 2. In general, the soils under the proposed building areas generally consist of loose to medium dense silty sands fill soils over medium dense to very dense glacial till soils. A description of our field investigation, and our boring logs, are available in Appendix A. A description of the laboratory testing program along with sample test results are available in Appendix B. The terms used to describe material encountered in the boring are defined in the General Notes. A description of the soils as they were encountered from the ground surface is provided below. 1. FILL: The fill generally consisted of silty sands. The fill was observed in all borings. N-Values in the silty sand fill soils ranged from 3 to 25 blows per foot to indicate relative densities of loose to medium dense. Moisture contents of the fill soils range from 15 percent to 20 percent. 2. WEATHERED TILL: The weathered till deposits consisted of light brown to dark brown with orange mottling, silty sand and silt with sand soils. Weathered till was observed in all borings. N-Values ranged from 22 to 72 blows per foot in the silty sand soils to indicate relative densities of medium dense to very dense. Moisture contents in the silty sand soils range from 13 percent to 18 percent. 3. TILL: The till deposits consisted of gray silty sand soils and were observed in all borings except B-1 and B-2. N-Values ranged from 50 blows for 2 inches to 50 blows for 6 inches to indicate a relative density of very dense. Moisture contents of the till range from 9 percent to 20 percent. 2.6. Groundwater Static groundwater was not encountered at the boring locations at the time of our field investigation; however, PSI believes that small amounts of perched water was observed in borings B-3 and B-4. This perched water was observed within sand lenses within the till soils and may be present in other portions of the site seasonally or after significant precipitation events. 3. CONCLUSIONS AND RECOMMENDATIONS 3.1. General Subsurface explorations for this investigation indicate the presence of as much as 3Y, to 5Y, feet of fill overlying glacially consolidated soils across the entire site. It is PSl's opinion that the onsite soils are suitable to support conventional spread footings provided the recommendations stated below are followed. Firestone Retail Store 17808 1081h Ave SE, Renton, Washinu . PSI Project l\'o 07121375 3.2. Site Preparation Professional Service Industries, Inc. Engineering • Consulting• Testing .June I, 2016 Page 3 ofl We anticipate that the removal of existing structures, foundations and utilities will likely disturb the upper 3y, to SY, feet of soils in the northern portion of the site. Any large debris encountered below proposed new buildings should be removed. 3.3. Structural Fill All fill placed beneath foundation elements, sidewalk, and pavement areas should be placed as compacted structural fill. We recommend that structural fill extends at least 2 feet beyond building and pavement limits where nearby structures do not restrict fill placement. On-site soils, in lieu of organic matters or other deleterious materials can be reused for backfill purposes, provided the material can obtain moisture contents that will allow it to meet compaction requirements. Imported material, if required, should be approved by the geotechnical engineer. Compacted fill should be placed in 12-inch-thick lifts (loose) by heavy compactors such as large vibratory rollers and hoe-packs and in 6 inch loose lists for smaller compactors such as small plate compactors and jumping jacks. These soil should be moisture-conditioned to wi1hin 2 percent of the optimum moisture content, and compacted to a density of 95% of the maximum dry density as determined by ASTM D 1557. The condition of the subgrade should be evaluated by a PSI representative before fill placement or construction begins. Fill compaction should be evaluated by in-place density tests performed during fill placement so that adequacy of soil compaction efforts may be evaluated as earthwork progresses. When fill material is inconsistent or when more than 30% of the fill material is retained on a 'Y. inch sieve, fill placement should be observed and compaction evaluated by observation of a proof-roll using a loaded tandem axle dump truck. If Imported fill materials area required PSI recommends they consist of granular material such as pit-run or quarry-run rock, crushed rock, crushed gravel, or sand. They should be fairly well-graded between coarse and fine material with a maximum particle size of 2 inches and should have less than 5 percent by weight passing the U.S. Standard No. 200 Sieve. 3.4. Utility Trench Excavations and Backfill Excavations should be made in accordance with applicable Federal and State Occupational Safety and Health Administration regulations. Utility trenches in the near surface sand soils at the site will need to be sloped, or shored from the ground surface due to the potential for caving. Actual inclinations will ultimately depend on the soil conditions encountered during earthwork. While we may provide certain approaches for trench excavations, the contractor should be responsible for selecting the excavation technique, monitoring the trench excavations for safety, and providing shoring, as required, to protect personnel and adjacent improvements. The information provided below is for use by the owner and engineer and should not be interpreted to mean that PSI is assuming responsibility for the contractor's actions or site safety. The fill and soft silty soils PSI encountered onsite should be considered Type C soils. Dense or hard native soils can be classified as Type B soil according to the most recent OSHA regulations. In our opinion, excavations should be safely sloped or shored. The contractor should be aware that excavation and shoring should conform to the requirements specified in the applicable local, state, and federal safety regulations, such as OSHA Health and Safety Standards for Excavations, 29 CFR Part 1926, or successor regulations. We understand that such regulations are being strictly enforced, and if not followed, the contractor may be liable for substantial penalties. FireMone Retail Store J 7808 108'h Ave SE, Renton. Washin,., _ 1 PSI Project No 07121375 Professional Service Industries, Inc. t:ngineering • Consulting • Testing June I, 2016 Page 4 of7 Excavation and construction operations may expose the on-site soils to inclement weather conditions. The stability of exposed soils may deteriorate due to a change in moisture content or the action of heavy or repeated construction traffic. Accordingly, foundation and pavement area excavations should be protected from the elements and from the action of repetitive or heavy construction loadings. Utilities trenches within the building, pavement, and sidewalk areas should be backfilled with structural fill and compacted in accordance with the recommendation in section 3.3 of this report with the exception of fill soils placed immediately around and above the first foot vertically around utility lines which should be compacted to at least 90% of the maximum dry density as determined by ASTM D 1557. Compaction by jetting or flooding should not be permitted. 3.5. Foundations PSI has provided two options for the potential foundation subgrade preparation which are listed below. Option 1: Footing subgrades should be over-excavated a minimum of two feet and have the soil in the base of the trenches compacted to a firm and unyielding state as determined by the geotechnical engineer, then the removed soil should either be recompacted as structural fill back into the over-excavated area or should replaced with imported structural fill, place in accordance with the recommendations in Section 3.3 of this report. The over-excavation and backfill areas should extend at least 2 feet beyond the edge of the footings or a distance equivalent to the dlepth of the over-excavation, whichever is greater. Provided these foundation subgrades are prepared in this way the building may be supported by shallow spread footings with an allowable bearing pressure of up to 3,000 pounds per square foot (psi). This value applies to the total of dead load and/or frequently applied live load and can be increased by one-third for the total of all loads; dead, live and wind or seismic. Option 2: Footing may be excavated extending to dense native glacial till soils that were observed from 3Y:z to 5Y:z feet below existing site grades. Footings extending down to these dense native soils may be designed with an allowable bearing capacity of 5,000 psf. This value applies to the total of dead load and/or frequently applied live load and can be increased by one-third for the total of all loads; dead, live and wind or seismic. Regardless of the option selected All footings should have a minimum 18 inches of embedment below the lowest adjacent final grade for frost protection and all footing subgrades should be prepared in the same manner across the site. Perimeter and spread footing should be at least 18 inches and 24 inches wide respectively. Horizontal forces can be resisted partially or completely by frictional forces developed between the base of the spread footings. The total shearing resistance between the foundation footprint and the soil should be taken as the normal force, i.e., the sum of all vertical forces (dead load plus real live load) times the coefficient of friction between the soil and the base of the footing. We recommend assuming an ultimate coefficient of friction value of 0.30 for design. If additional lateral resistance is required, passive earth pressures against embedded footings or walls can be computed using a pressure based on an equivalent fluid with a unit weight of 250 pounds per cubic foot. This value assumes that backfill around footings will be placed as granular structural fill. Firestone Retail Store 17808 1081h Ave SE, Renton, Washin" PSI Project So 0712 I 375 3.6. Settlement Professional Service Industries, Inc. Engineering • Consulting • Testing June I, 2016 Page 5 of7 The building foundation loads, and floor live loads will all cause settlement due to consolidation, or compression, of the underlying soils. The subsurface information and laboratory test data developed for this study was used to estimate settlement beneath these loads. We have assumed that the maximum wall and column loads will be 3 kips per foot and 30 kips for the purpose of this analyses on both foundation options. We estimate that the settlement of a typically loaded, isolated column footing designed in a=rdance with our previously recommended allowable bearing pressure of 5,000 psf on dense native soil will be less than 1 inch, additionally we estimate that settlement for 3,000 psf footings, founded on 2 feet of structural fill, will be less than 1 inch. These estimates assume that the load on the footings are real dead load and sustained or long- term live load. Lesser actual bearing pressures will produce less settlement. Some differential settlement between footings should be expected due to differences in their size and loading conditions and the variability in subsurface conditions across the building footprint. Differential settlements are difficult to quantify; however, we anticipate they will likely be limited to less than about one half of the total settlement or less than Y, inch for both foundation options along a 40-foot span. Settlement of the footings is also expected to occur rapidly, essentially as the new structural loads are placed and shortly thereafter. Footing settlements will be in addition to areal settlements due to floor live, or storage loads. For this reason. we recommend that floors, walls and columns be designed to move independently of each other. 3.7. Floor Support PSI recommends that soil subgrades below the slab be compacted to a firm and unyielding state. Compaction of in these areas should be confirmed with a proof rolled with a loaded tandem axe! dump truck, or be observed by the geotechnical engineer or their representative to be firm and unyielding. We further recommend the installation of a 6-inch thick granular base course beneath the floor slab to provide uniform support and a capillary break between the slab and the subgrade soil. The base course should consist of crushed rock with particles no larger than 1-inch size and having less than about 2% passing the No. 200 sieve (washed analysis). Crushed rock o/.i to Y. inch gradation is often used for this purpose. The base course material should be installed in a single lift and compacted to at least 95% of the maximum density as determined by ASTM D 1557 or to a firm and unyielding state. In our opinion, it is appropriate to assume a coefficient of subgrade reaction, k, of 250 pound per cubic inch for the design of floor slabs constructed as recommended above. It may also be appropriate to install a vapor-retarding membrane beneath slabs that will receive floor coverings or will be used to store moisture-sensitive materials. The membrane should be installed in accordance with manufacturer's recommendations. 3.8. Drainage We recommend footing drains be placed around the exterior of the building foundation to reduce the potential for lateral migration of moisture into the building envelope. We recommend that all roof drains be connected to a tight-line pipe leading to storm drain facilities. Pavement surfaces and open space areas should be sloped such that surface water runoff is collected and routed to suitable discharge points. We also recommend that ground surfaces adjacent to buildings be sloped to facilitate positive drainage away from the buildings. 3.9. Pavement For automobile parking areas founded on silty sand fill soil, we recommend a pavement section consisting of 2Y, inches of asphaltic concrete (AC) over 4 inches of crushed rock base (CRB) or 4 inches of Portland Cement Concrete (PCC) over 4 inches of crushed rock base. If semi-trucks, or other heavy equipment is Firestone Retail Store 17808 JOS'h Ave SE. Renton. Washin,r.1 PSI Project .\'o 0712 l 3 75 Profe:,;sional Service Industries, Inc. Engineering• Consulting• Testing June 1, 2016 Page 6 of7 expected on paved areas, the pavement section should consist of 4 inches of AC over 6 inches of CRB or 5 inches of PCC over 6 inches of CRB. These preliminary pavement sections are based on a pavement design using the site sand subgrade, a desired pavement life of 20 years, and a terminal serviceability index of 2.0. These estimates should be revised once design traffic information is developed. These recommended pavement sections are also based on the assumption that the subgrade consists of firm, undisturbed soil or structural fill and that the pavement will be constructed during the dry summer months. Proofrolling should be used to evaluate pavement subgrade. Any soft areas disclosed by proofrolling will likely require over-excavation and replacement with structural fill. Some contingency should be provided for the repair of any soft areas. Permanent, properly installed drainage is also an essential aspect of pavement design and construction. All paved areas should have positive drainage to prevent ponding of surface water and saturation of the base course. This is particularly important in cut sections or at low points within the paved areas, such as in sunken loading dock areas or around stormwater catch basins. Effective means to prevent saturation of the base course induding installing subdrain systems below sunken loading docks and weep holes in the sidewalls to catch basins. 3.10. Stormwater Based on previous experience on glacial till sites PSI does not believe that infiltration of site stormwater will be practical. Glacial till soil in this region typically provide infiltration rates of less than one inch per hour and very often less than % inch per hour. 4. DESIGN REVIEW AND CONSTRUCTION MONITORING We welcome the opportunity to review and discuss construction plans and specifications as they are being developed. We are of the opinion that to observe compliance with the design concepts, specifications, and recommendations, construction operations dealing with earthwork and foundations should be observed by a qualified geotechnical engineer. We would be pleased to provide these services to you. 5. REPORT LIMITATIONS The recommendations submitted in this report are based on the subsurface information obtained by PSI and design details furnished by representatives of the client, Bridgestone Retail Operations LLC., for the proposed improvements at 17808 1 OB"' Avenue SE in Renton, Washington. If there are any revisions to the plans for this project, or if deviations from the subsurface conditions noted in this report are encountered during construction, PSI should be notified immediately to determine if changes in the foundation and/or pavement recommendations are required. If PSI is not retained to review these changes, PSI will not be responsible for the impact of those conditions on the project. After the plans and specifications are more complete, PSI should be retained and provided the opportunity to review the final design plans and specifications to verify that our engineering recommendations have been properly incorporated into the design. Firestone Retail Store 17808 108'h Ave SE. Renton, Washin" _ 1 PSI Project .Yo 0712/J75 REFERENCES Professional Service Industries, Inc. En!{ineering • Consulting• Testing June I, 20/6 Page 7 ufl Reference 1: Washington Department of Natural Recourses Interactive Geologic Map, http: //www. d n r. wa. gov /research science/topics/geosciencesdata/ p ages/g eol og y po rt al. aspx Reference 2: U.S. Geological Survey, 2010, Quaternary fault and fold database for the United States, accessed November 10, 2010, from USGS web site: http://earthguake.usgs.gov/hazards/qfaults/. Reference 3: USGS Seismic Design Maps. http://earthguake.usgs.gov/designmaps/us/application.php Firestone Retail Stare I 7808 J08'h Ave SE, Renton, Washington PSI Project Nu 07121375 FIGURES VICINITY MAP SITE EXPLORATION LOCATION MAP Professionul Service Industries, Inc. Engineering• Consulting• Testing June I, 2016 LEGEND: -= Site Location 1---~ ;, Information &1::t:.~• !To Build On En gineering· Consulting · Testing 20508 56th Ave W Suite A Lynwood , WA 98036 (425)409-2504 NOTES Site und e rl ay provided by Google Earth PROJECT NAME: Firestone Retail Store 17808 108th Avenu e S E Re nton, Washington DESCRIPTION: V icinity Map DRAWN BY : MSP APPROVED BY: MSP s DATE: FIGURE: June,201 6 PSI PROJECT NUMBER: 07121375 LEGEND: ~ Boring Location JIFFY LU BE J ..-. ~;,Information I,~.,,,..,.• !To Build On Engineering • Consulting • Testing 20508 56th Ave W Suite A Lynwood, WA 98036 (425) 409-2504 ·:.: 7.700SF NOTES Site underlay provided by GEi Engineering Associates PROJECT NAME: Firestone Retail Store 17808 108th Avenue S E Renton, Washington DESCR IPTION: S ite Exploration Map DRAWN BY: MSP APPROVED BY: MSP DATE: June,2016 s FIGURE: 2 PSI PROJECT NU MBER: 07121375 e Firestone Retail Store I 7808 108'h Ave SE, Renton, Wushington PSI Project No 07 I 21375 APPENDIX A FIELD EXPLORATION PROGRAM GENERAL NOTES SOIL CLASSIFICATION CHART BORING LOGS Profes.,·ional Service lnduslrie.,;, Inc. Engineering• Consulting• Testing June l, 2016 Firestone Retail Store 17808 108'h Ave SE, Renton, Washington PSI Project No 07121375 Profes.'iional Service Industries, Inc. Engineering• Consulting• Testing June/, 2016 FIELD EXPLORATION PROGRAM General We explored the site by drilling nine soil borings (B-1 to B-9) to depths that ranged from approximately 11 feet to 21 feet below existing ground surface on May 16, 2016, using a trailer- mounted mobile drill rig. The locations of the borings are shown on Figure 2. A representative of PSl's geotechnical staff was present during the explorations to record soil and groundwater conditions encountered in the exploration and to obtain soil and rock samples for laboratory testing. Sampling Procedures Throughout the drilling operation, soil samples were obtained from the borings using a 2-inch OD Split Spoon in general conformance with guidelines presented in ASTM 01586, Standard Test Method for Penetration Test and Split Barrel Sampling of Soils. The samplers were driven into the soil a distance of 18 inches or to refusal with a 140-pound hammer free falling a distance of 30 inches. The sum of the blows required to drive the sampler in three 6-inch increments is provided in the boring logs. If the sampler met refusal, the number of inches driven and the number of blows is recorded. The borings were drilled to observe the stratigraphy, density, and variability of subsurface soil conditions. Soil samples recovered from the explorations were sealed in airtight plastic bags to retain moisture and carefully transported to PSl's laboratory for additional examination and testing. Field Classification Soil samples were initially classified visually in the field. Consistency, color, relative moisture, degree of plasticity, peculiar odors and other distinguishing characteristics of the soil samples were noted. The terminology used in the soil and rock classifications and other modifiers are defined in the General Notes in this appendix. Exploration Logs Summary boring logs follows in this appendix. The left-hand portion of the boring log gives our interpretation of the soil encountered in the soil boring, sample locations and depths, and groundwater information. The right-hand portion of the log shows the results of the sample water contents, and other laboratory information. The soil profile shown on the boring logs represent the conditions only at actual exploration location. Variations may occur and should be expected. The stratifications represent the approximate boundary between subsurface materials; the actual transition may be gradual. ~., ,~ GENERAL NOTES SAMPLE IDENTIFICATION The Unified Soil Classification System (USCS), AASHTO 1988 and ASTM designations 02487 and D-2488 are used to identify the encountered materials unless otherwise noted. Coarse-grained soils are defined as having more than 50% of their dry weight retained on a #200 sieve (0.075mm); they are described as: boulders, cobbles, gravel or sand. Fine-grained soils have less than 50% of their dry weight retained on a #200 sieve; they are defined as silts or clay depending on their Atterberg Limit attributes. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. DRILLING AND SAMPLING SYMBOLS SFA: Solid Flight Auger -typically 4" diameter flights, SS: Split-Spoon -1 3/8" 1.0., 2" 0.0., except where noted. except where noted. HSA: Hollow Stem Auger -typically 3'!." or 4'!. I.D. ST: Shelby Tube -3" 0.0., except where noted. Bulk Sample openings, except where noted. BS: M.R.: Mud Rotary -Uses a rotary head with Bentonite PM: Pressuremeter or Polymer Slunry CPT-U: Cone Penetrometer Testing with Pore-Pressure Readings R.C.: Diamond Bit Core Sampler H.A.: Hand Auger P.A.: Power Auger-Handheld motorized auger SOIL PROPERTY SYMBOLS N: Standard "N" penetration: Blows per foot of a 140 pound hammer falling 30 inches on a 2-inch 0.0. Split-Spoon. N . 60- Qu: a,: A "N" penetration value corrected to an equivalent 60% hammer energy transfer efficiency (ETR) Unconfined compressive strength, TSF w%: Pocket penetrometer value, unconfined compressive strength, TSF Moisture/water content, % LL: PL: Pl: DD: Liquid Limit, % Plastic Limit, % Plasticity Index= (LL-PL),% Dry unit weight, pcf Apparent groundwater level at time noted RELATIVE DENSITY OF COARSE-GRAINED SOILS ANGULARITY OF COARSE-GRAINED PARTICLES Relative Density Very Loose Loose Medium Dense Dense Very Dense Extremely Dense N -Blows/foot 0-4 4 -10 10 -30 30 -50 50 -80 80+ GRAIN-SIZE TERMINOLOGY Component Boulders: Cobbles: Coarse-Grained Gravel: Fine-Grained Gravel: Coarse-Grained Sand: Medium-Grained Sand: Size Range Over 300 mm (>12 in.) 75 mm to 300 mm (3 in. to 12 in.) 19 mm to 75 mm(% in. to 3 in.) 4.75 mm to 19 mm (No.4 to% in.) 2 mm to 4.75 mm (No.10 to No.4) 0.42 mm to 2 mm (No.40 to No.10) Description Criteria Angulac Particles have sharp edges and relatively plane sides with unpolished surfaces Subangular: Particles are similar to angular description, but have rounded edges Subrounded: Particles have nearly plane sides, but have well-rounded comers and edges Rounded: Particles have smoothly curved sides and no edges PARTICLE SHAPE Description _____ _,c,.,r,,it,eerc,ia._ ____ _ Flat: Particles with width/thickness ratio> 3 Elongated: Flat & Elongated: Particles with length/width ratio > 3 Particles meet criteria for both flat and elongated RELATIVE PROPORTIONS OF FINES Fine-Grained Sand: Silt: 0.075 mm to 0.42 mm (No. 200 to No.40) 0.005 mm to 0.075 mm Descriptive Term% Dry Weight Trace: < 5% Clay: <0.005 mm With: 5% to 12% Modifier: >12% Page 1 of2 ~-· ,~ GENERAL NOTES (Continued) CONSISTENCY OF FINE-GRAINED SOILS MOISTURE CONDITION DESCRIPTION 0 0 -TSF N -Blows/foot Consistency_ Description Criteria 0 -0.25 0-2 0.25 -0.50 2-4 Very Soft Soft Dry: Absence of moisture, dusty, dry to the touch Moist: Damp but no visible water 0.50 -1.00 4-8 Medium Stiff Wet: Visible free water, usually soil is below water table 1.00 -2.00 8 -15 2.00 -4.00 15 -30 4.00 -8.00 30 -50 8.00+ 50+ Stiff Very Stiff Hard Very Hard RELATIVE PROPORTIONS OF SAND AND GRAVEL Descriptive Term --'~Y,~D=ryLW=e~iq~h~t~ Trace: < 15% With: 15% to 30% Modifier. >30% STRUCTURE DESCRIPTION Description ______ ...;C,,,,,ri.,,tee.cn.,,·a,______ Description Criteria Stratified: Alternating layers of varying material or color with Blocky: Cohesive soil that can be broken down into small layers at least X-inch (6 mm) thick angular lumps which resist further breakdown Laminated: Alternating layers of varying material or color with Lensed: Inclusion of small pockets of different soils layers less than Y.-inch (6 mm) thick Layer. Inclusion greater than 3 inches thick (75 mm) Fissured: Breaks along definite planes of fracture with little Seam: Inclusion 1/8-inch to 3 inches (3 to 75 mm) thick resistance to fracturing extending through the sample Slickensided: Fracture planes appear polished or glossy, Parting: Inclusion less than 1/8-inch (3 mm) thick sometimes striated SCALE OF RELATIVE ROCK HARDNESS ROCK BEDDING THICKNESSES Q0 -TSF 2.5 -10 10 -50 50 -250 250 -525 525 -1,050 1,050 -2,600 >2,600 Consistency Extremely Soft Very Soft Soft Medium Hard Moderately Hard Hard Very Hard ROCK VOIDS Voids ___ V,::o,,_ieed!JDec·,,,,ae,me,ee,t,ae,_r __ Pit <6 mm (<0.25 in) Vug 6 mm to 50 mm (0.25 in to 2 in) Cavity 50 mm to 600 mm (2 in to 24 in) Cave >600 mm (>24 in) ROCK QUALITY DESCRIPTION Rock Mass Description RQD Value Excellent 90 -100 Good Fair Poor Very Poor 75 -90 50 -75 25-50 Less than 25 Description ______ ...;C=ri,,tee.cr.,,ia,_ ____ _ Very Thick Bedded Greater than 3-foot (>1.0 m) Thick Bedded 1-foot to 3-foot (0.3 m to 1.0 m) Medium Bedded 4-inch to 1-foot (0.1 m to 0.3 m) Thin Bedded 1 Y.-inch to 4-inch (30 mm to 100 mm) Very Thin Bedded Y~inch to 1Y.-inch (10 mm to 30 mm) Thickly Laminated 1/8-inch to %-inch (3 mm to 10 mm) Thinly Laminated 1/8-inch or less "paper thin" (<3 mm) GRAIN-SIZED TERMINOLOGY (Typically Sedimentary Rock) Component Size Range Very Coarse Grained >4. 76 mm Coarse Grained 2.0 mm -4. 76 mm Medium Grained 0.42 mm -2.0 mm Fine Grained 0.075 mm -0.42 mm Very Fine Grained <0.075 mm DEGREE OF WEATHERING Slightly Weathered: Rock generally fresh, joints stained and discoloration extends into rock up to 25 mm (1 in), open joints may contain clay, core rings under hammer impact. Weathered: Rock mass is decomposed 50% or less, significant portions of the rock show discoloration and weathering effects, cores cannot be broken by hand or scraped by knife. Highly Weathered: Rock mass is more than 50% decomposed, complete discoloration of rock fabric, core may be extremely broken and gives clunk sound when struck by hammer, may be shaved with a knife. Page 2 of 2 ~vll CLASSIFICATION l. .. ART NOTE: DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS MAJOR DIVISIONS COARSE GRAINED SOILS MORE THAN 50% OF MATERIAL IS LARGER THAN NO. 200 SIEVE SIZE FINE GRAINED SOILS MORE THAN 50% OF MATERIAL IS SMALLER THAN NO. 200 SIEVE SIZE GRAVEL AND GRAVELLY SOILS CLEAN GRAVELS (LITILE OR NO FINES) GRAVELS WITH MORE THAN 50% FINES OF COARSE FRACTION RETAINED ON NO 4 SIEVE (APPRECIABLE SAND AND SANDY SOILS AMOUNT OF FINES) CLEAN SANOS SANDS WITH MORE THAN 50% FINES OF COARSE FRACTION PASSING ON NO. 4 SIEVE (APPRECIABLE SILTS AND CLAYS SILTS AND CLAYS AMOUNT OF FINES) LIQUID LIMIT LESS THAN 50 LIQUID LIMIT GREATER THAN 50 HIGHLY ORGANIC SOILS SYMBOLS GRAPH LETTER ....... . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....... ....... ....... ....... ....... . . . . . . . ....... ......... GW GP GM GC SW SP SM SC ML CL OL MH CH OH PT TYPICAL DESCRIPTIONS WELL-GRADED GRAVELS. GRAVEL - SAND MIXTURES. LITILE OR NO FINES POORLY-GRADED GRAVELS, GRAVEL -SAND MIXTURES. LITILE OR NO FINES SIL TY GRAVELS, GRAVEL -SAND - SILT MIXTURES CLAYEY GRAVELS. GRAVEL -SAND - CLAY MIXTURES WELL-GRADED SANDS, GRAVELLY SANDS. LITTLE OR NO FINES POORLY-GRADED SANDS. GRAVELLY SAND, LITTLE OR NO FINES SIL TY SANDS. SAND -SILT MIXTURES CLAYEY SANDS, SAND -CLAY MIXTURES INORGANIC SILTS AND VERY FINE SANDS. ROCK FLOUR, SIL TY OR CLAYEY FINE SANDS OR CLAYEY SILTS WITH SLIGHT PLASTICITY INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY, GRAVELLY CLAYS, SANDY CLAYS, SILTY CLAYS, LEAN CLAYS ORGANIC SILTS ANO ORGANIC SILTY CLAYS OF LOW PLASTICITY INORGANIC SIL TS, MICACEOUS OR DIATOMACEOUS FINE SAND OR SILTY SOILS INORGANIC CLAYS OF HIGH PLASTICITY ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY, ORGANIC SILTS PEAT. HUMUS. SWAMP SOILS WITH HIGH ORGANIC CONTENTS DATE STARTED: 5116116 -DRILL COMPANY: Geologic Drill BORING B-1 DATE COMPLETED: 5116116 DRILLER: LOGGED BY: S.Malo!o COMPLETION DEPTH 11.5 ft DRILL RIG: Trailer Mounted ~ ¥ ., -y BENCHMARK: NIA DRILLING METHOD: Hollow Stem Auger "' ELEVATION: NIA SAMPLING METHOD: ss ~ :l- LATITUDE: 47.44312' HAMMER TYPE: Manual Pullet BORING LOCATION: LONGITUDE: -122.19671' EFFICIENCY NIA STATION: NIA OFFSET: NIA REVIEWED BY: MSP REMARKS: iii STANDARD PENETRATION "' C '!,. TEST DATA .Q .c ,; a, w w " C N in bloY.s/ft @ ,; a. 0 .c C ~ 0 u ,g ~ ;f, ~ -' >-z .~ X wl PL f-·~ " Moisture C u w -MATERIAL DESCRIPTION • Additional 0 E w a. c ro 0. .3 • LL ~ .c 0. a. E u " 0 ,s s Remarks Q w C rn E > ·5 I I > w co rn rn 0 "' • " w 0 (f) u 0 w (f) u "' <D w STRENGTH, tsf Q'. ::, >-a. "' a, * Qp <I) 0 0 ,.o ,., h.ASPHALT Silty SAND wtth Gravel Dark Brown • . nonplastic, moist, loose, fine to medium sand with concrete fragment & gravel. FILL . X " I SM o XI 1 12 2-2-4 ®-.,, 1 N=6 "" " "5 <ffl " e 2 3 Silty SANO with Gravel Light to Dark Brown, 6-2G-21 'l§l low placticity to nonplastic, moist, medium N=41 dense to dense, fine to medium sand with I gravel with some mottling. WEATHERED ~ GLACIAL TILL 13 3 18 SM 4-12-14 . ·-1: . N=26 . .. ·:1-. "10 ... ·.·.~ 14 , ; .. ' ... : d .. 4 18 11-11-11 N=22 Bottom of boring at approximately 11 reet 6 inches. No ground water observed (if§i} Professional Service Industries, Inc. PROJECT NO.: 07121375 20508 56th Avenue W, Suite A PROJECT: Bridgestone Renton • Lynnwood, WA 98036 LOCATION: 17808 108th Ave SE Telephone: (425) 409-2504 Renton, WA The strat1ficat1on lines represent approximate boundanes. The trans1t1on may be gradual. Sheet 1 of 1 DATE STARTED: 5/16/16 -DRILL COMPANY: Geologic Drill . BORING B-2 DATE COMPLETED: 5/16/16 DRILLER: LOGGED BY: S.Matolo COMPLETION DEPTH 11.5 ft DRILL RIG: Trailer Mounted ... ¥ "' -_y BENCHMARK: N/A DRILLING METHOD: Hollow Stem Auger "' ELEVATION: N/A SAMPLING METHOD: ss ::: ::L LATITUDE: 47.44324° HAMMER TYPE: Manual Pullet BORING LOCATION: LONGITUDE: -122. 19663° EFFICIENCY N/A STATION: N/A OFFSET: N/A REVIEWED BY: MSP REMARKS: in STANDARD PENETRATION "' C ~ TEST DATA .Q .c m a, w w 1i u N in bJa.Ns/ft @ m ~ ci .c = ~ 0 ~ u _g J ;f'. ~ -' >-z C a s X i.t PL 0 w -MATERIAL DESCRIPTION Moisture C © • :s • LL Additional .Q .c :c 0. i'.' ro 0 " ~ 0. 0 • 0 " ,, Remarks ;;; 0. E © • > © ~ E ro > "' • ·5 I I I © 0 ('.) ro U) 0 u 0 " w U) u "' "' © STRENGTH, tsf a:: :::, >-a. ... "' Qo * Qp 0 0 ,.o ,.o g --.ASPHALT Silty SAND: dark brown, moist, low plasticity, very loose. FILL -. 22 X ,A SM II 1 18 2-2-1 \ -~ N=3 - 5 16 ,A \i_ ···.·~ 2 5 Silty SANO: brownish gray to brown, moist, 3-7-14 ' low plasticity, medium dense to very dense, N=21 ~ fine to medium sand with gravel & trace -:· mottling. WEATHERED GLACIAL TILL ····~ 13 < "" ·. 3 18 SM 18-21-31 »I .. N=52 I 10 -:. ~4 15 / ... 18 18-21-16 I N=37 Bottom of boring at approximately 11 feet 6 inches. No ground water observed. li!§jJ Professional Service Industries, Inc. PROJECT NO.: 07121375 20508 56th Avenue W, Suite A PROJECT: Bridgestone Renton • Lynnwood, WA 98036 LOCATION: 17808 108th Ave SE Telephone: (425) 409-2504 Renton, WA The strat1ficat1on Imes represent approXJmate boundanes. The trans1t1on may be gradual. Sheet 1 of 1 DATE STARTED: DATE COMPLETED: COMPLETION DEPTH BENCHMARK; ELEVATION; LATITUDE: LONGITUDE: STATION: NIA REMARKS: ;; a, m ci ~ ;; 0 a. ~ ~ ~ z u f- C m ID 0 ~ :c a. a. -~ a. E C. ~ E > ID ro ro m 0 CJ "' "' w 0 5 2 3 10 4 15 5 20 6 5116116 DRILL COMPANY: Geologic Drill 5116116 DRILLER: LOGGED BY: S.Malolo 20.4 ft DRILL RIG: Trailer Mounted NIA DRILLING METHOD; NIA SAMPLING METHOD; 47.44299° HAMMER TYPE; -122. 19643° EFFICIENCY OFFSET; NIA REVIEWED BY: "' ru ~ u C '=-c ID > 0 u ID 0: 18 18 18 12 5 5 MATERIAL DESCRIPTION ASPHALT Silty SAND: brown, moist, non~astic, medium dense. FILL Sitty SANl'f: brown, wet to molSt (possible perched water witt,in sand Jens). medium dense, predominantly fine sand with trace of subround gravel. WEATHERED GLACIAL TILL Silty SAND: brown to gray, moist, low plasticity, very dense, predominantly fine sand and sift, 8 inch band of poor1y graded SAND with silt observed from approximatley 15 feet. GLACIAL TILL Bottom o boring at approximately 20 feet 5 inches. Possible Perach groundwater at 6 feet. but no static groundwater observed. Hollow Stem Auger ss Manual Pullet NIA MSP ;;; C ;'!. .Q ~ " 0 C 0 ~ ~ w • ro a. u • "' • 0 u 1a "' :, f- [L "' SM 3-5-9 N=14 7-10-16 N=26 SM 6-11-11 N=22 31-50/6" SM 5015" 5015" BORING B-3 ~ 'Sl-a, -:J_ "' 3:: 'l- BORING LOCATION; ST AN OARD PENETRATION TEST DATA N in blows/ft @ * ~ PL t X Moisture • LL Additional ti " 0 Remarks ·5 " STRENGTH, tsf ~ o, * Qp '" ,, 17 X 18 18 X 0 12 13 Professional Service Industries, Inc. 20508 56th Avenue W, Suite A Lynnwood, WA 98036 PROJECT NO.: 07121375 PROJECT: ___ _.B,,.n..,·d.,,g""e"-st,,,o"-'n"e-'-Ro,ee,nc,to,,.n,____ __ LOCATION: 17808 108th Ave SE Telephone: (425) 409-2504 Renton, WA The stratification lines represent approximate boundaries. The transition may be gradual. Sheet 1 of 1 DATE ST ART ED: 5116116 -DRILL COMPANY: Geologic Drill BORING 8-4 DATE COMPLETED: 5116116 DRILLER: LOGGED BY: S.Malolo COMPLETION DEPTH 20.2 ft DRILL RIG: Trailer Mounted ... 'SJ "' --'-BENCHMARK: NIA DRJWNG METHOD: Hollow Stem Auger "' ELEVATION: NIA SAMPLING METHOD: ss s: "5l LATITUDE: 47.44309° HAMMER TYPE: Manual Pullet BORING LOCATION: LONGITUDE: -122.19642° EFFICIENCY NIA STATION: NIA OFFSET: NIA REVIEWED BY: MSP REMARKS: "' STANDARD PENETRATION -;;;-C ~ TEST DATA 0 ~ 1, "' w m ~ u N in blows/ft @ 1, 0 ~ C ,1!, 0 a. u ,g ;I; " ,1!, ~ >, z C X .. PL C u f-w cc-MATERIAL DESCRIPTION ·~ a ~ Moisture 0 £ i' m Q. iC' 0 0. ii • LL Additional ~ a. Q. [j " ,, 0 Remarks a. E E w w 5 I I I > w ~ 0 > "' • " w 0 0 0 en 0 0 0 w en u "' as m STRENGTH, tsf 0: :, f-a. ... Ou * Qp "' 0 0 " " -ASPHALT Silty SAND. brown. moist, nonplastic, medium dense. FILL SM . A 18 X 1 18 2-3-7 @ lj N=10 ~ -Silty SAN(). brown with orange mottling, wet -'---- -5 -.·. to moist (possib~ perched water within sand 16 ~ lenses), dense to very dense, predominantly , I"-2 18 fine sand and silt with trace subround gravel. 11-15-17 0 . r. : WEATHERED GLACIAL TILL N=32 -1· -. r-: -- ·_•i~ 16 X ·:·. :-. 3 18 SM 8-15-17 " C -N=32 "" 10 ···-~ 16 ' , . ·.· C -:· ·. :-. 4 18 Hl-19-38 »• N=57 . L -. 1 &tty S'"AND. brown to gray, moist, low plastiC-'---- ' to nonplastic, very dense, predominantly fine sand with silt. GLACIAL TILL L ' 15 5 5 5015" 11 » L SM ' L ' L 20 6 2 Bottom of boring at approximaUey 20 feet 2 5012" inches. Possible Perach groundwater at 6 feet, but no static groundwater observed. lii§il Professional Service Industries, Inc. PROJECT NO.: 07121375 20508 56th Avenue W, Suite A PROJECT: Bridgestone Renton Y-• Lynnwood, WA 98036 LOCATION: 17808 108th Ave SE Telephone: (425) 409-2504 Renton, WA The stratification hnes represent approximate boundaries. The transition may be gradual. Sheet 1 of 1 DATE ST ART ED: 5/16116 -DRILL COMPANY: Geologic Drill BORING 8-5 DATE COMPLETED: 5/16/16 DRILLER: LOGGED BY: S.Malolo COMPLETION DEPTH 10.9 ft DRILL RIG: Trailer Mounted ... 'l-"' -.'.f BENCHMARK: NIA DRILLING METHOD: Hollow Stem Auger " ELEVATION: NIA SAMPLING METHOD: ss s:: "!. LATITUDE: 47.44325° HAMMER TYPE: Manual Pulley BORING LOCATION: LONGITUDE: -122.19633° EFFICIENCY NIA STATION: NIA OFFSET: NIA REVIEWED BY: MSP REMARKS: u, STANDARD PENETRATION "' C e?. TEST DATA Q ~ ID 0, w w ] u N in blows/ft @ ID ~ ci ~ C ,g,_ 0 u ~ " ,g,_ _, ~ z 2. ,I PL u .... ID MATERIAL DESCRIPTION ·a • t X Moisture C w • • LL Additional .Q .c i' D. ~ ro ~ ~ " D. ~ D. E w 0 • 0 ,s e Remarks ~ E > 5 I I I > w ro u, • ::, w 0 C) ro U) 0 0 0 U) u uJ w "' io STRENGTH, tsf Cl'. :, .... n. u, .. Ou * Qp 0 0 20 ,.o m ,ASPHALT Silty SAND: brown, moist, nonplastic, medium dense. FILL -- SM 15 X ,A ! 1 18 3-6-11 ~ -1 N=16 -Silty ~ri: brown" 'Mth ci""ange" inottlii,g-:----~--'\. 5 ·.··~ 14 . .. moisl dense. predominantly fine sand with \a .. · 2 18 trace of subround gravel. WEATHERED 13-16-21 -GLACIAL TILL SM N=36 ~ ~ 12 ' 3 12 Silty SAND: brown to gray, moist, low 16-5016° >>~~ 101 plasticity, very dense, predominantly fine sand and slit. GLACIAL TILL SM 10 4 10 36-5015° >>( >) Bottom of boring at approximately 10 teet 11 inches. No ground water observed. [ejJ Professional Service Industries, Inc. PROJECT NO.: 07121375 20508 56th Avenue W, Suite A PROJECT: Bridgestone Renton • Lynnwood, WA 98036 LOCATION: 17808 108th Ave SE Telephone• (425) 409-2504 Renton. WA The strat1ficat1on lines represent approximate boundanes. The trans1t1on may be gradual. Sheet 1 of 1 DATE STARTED: DATE COMPLETED: COMPLETION DEPTH BENCHMARK: ELEVATION: LATITUDE: LONGITUDE: STATION: N/A REMARKS: ;; 0, w w ~ 0 0. ~ ~ >-f- C 0 0 :c ID ~ ~ 0. a. D. ro E > w w 0 i5 ro lf) uJ 0 5 10 15 20 5/16/16 DRILL COMPANY: Geologic Drill 5/16/16 DRILLER: LOGGED BY: S.Malolo ---- 20.9 tt DRILL RIG: Trailer Mounted N/A DRILLING METHOD: Hollow Stem Auger N/A SAMPLING METHOD: ss 47.44308" HAMMER TYPE: Manual Pullel -122.19615" EFFICIENCY N/A OFFSET: N/A REVIEWED BY: MSP iii "' C ~ Q r w ] u ci r C 0 ·, z .E w a w MATERIAL DESCRIPTION • • a. c • 0. u E w • ro > "' • lf) 0 u a 0 ai ID "' a:'. ;::, f-a. "' ASPHALT Silty SAND: brown, moist, nonplastic, medium dense. FILL SM 18 6-11-15 sTtty SAND: brown with orange mottling N=26 moist, very dense, predominantly fine sand and silt with trace of subround gravel. WEATHERED GLACIAL TILL 2 18 12-25-30 N=55 SM 3 18 17-31-41 N=72 4 12 Silty SAND: brown to gray, moTst. 29-50/6" nonplastic, very dense, predominantly fine sand with silt, trace of gravel. GLACIAL TILL 5 9 SM 26-50/4" 6 11 35-5015" Bottom of boring at approximately 20 feet 11 inches. No ground water observed. BORING B-6 ~ 'l-"' -.Y "' ;:: 'l BORING LOCATION: ST AND ARD PENETRA TJON TEST DATA Nin~@ " X wl PL ~ Moisture Additional 3 • LL • 0 25 Remarks ·5 " STRENGTH, tsf " Qu * Qp ' ,., '' 15 X 13 » 16 X » 12 » 9 » » ~-· ,~ Professional Service Industries, Inc. 20508 56th Avenue W, Suite A Lynnwood, WA 98036 PROJECT NO.: 07121375 PROJECT: LOCATION: Telephone: (425) 409-2504 The stratification lines represent approximate boundaries. The transition may be gradual. Bridgestone Renton 17808 108th Ave SE Renton, WA Sheet 1 of 1 DATE STARTED: DATE COMPLETED: COMPLETION DEPTH BENCHMARK: ELEVATION: LATITUDE: LONGITUDE: STATION: NIA REMARKS: ;; m ;; "' Q. ,g,_ 0 ,g,_ ~ A = u ,- g :c m ~ a. ;; 0. Q. E > m ro m 0 i5 ro (fJ w 0 5 10 15 -20 5/16116 DRILL COMPANY: Geologic Drill 5116116 DRILLER: LOGGED BY: S.Malolo 21.0ft DRILL RIG: Trailer Mounted NIA DRILLING METHOD: Hollow Stem Auger NIA SAMPLING METHOD: ss 47.44308° HAMMER TYPE: Manual Pulley -122.19596° EFFICIENCY N/A OFFSET: NIA REVIEWED BY: MSP iii "' = ,,,_ m .Q n 0 ~ " = u g ~ z 2-m MATERIAL DESCRIPTION -~ :,; a. c ro Q. [j E m a ro > "' < (fJ 0 " 0 u m "' ro 0: :, >-- Q_ "' ASPHALT Silty SAND: brown, moist, nonplastic, medium dense. FILL SM 18 13-7-13 N=15 SIity SANlJ: brown with oranage mottling, moist. medium dense, predominantly fine 2 18 sand and silt with trace of subround gravel. 8-8-11 WEATHERED GLACIAL TILL SM N=19 3 12 Silty SAND: brown to gray, moist, 27-50/6" nonplastic, very dense, predominantly fine sand and silt with trace gravel. GLACIAL TILL 4 12 18-50/6" SM 5 6 50/6" 6 11 3().50/6" Bottom of boring at approximately 21 feet. No ground water observed. BORING B-7 .. 'Sl-., -.!-" ~ '51- BORING LOCATION: ST AND ARD PENETRATION TEST DATA N in blO'Ns/ft @ ,fl wl PL t X Moisture = • LL Additional " 0 " Remarks " " STRENGTH. tsf ... Ou " Op ,.o '° 15 X a 12 16 X 12 » 11 1~---,t-~-t-~--t--:c,,::a 10 X » ~-· ,~ Professional Service Industries, Inc. 20508 56th Avenue W, Suite A Lynnwood, WA 98036 PROJECT NO.: 07121375 PROJECT: Bridgestone Renton LOCATION: 17808 108th Ave SE Telephone: (425) 409-2504 Renton. WA The stratification lines represent approximate boundaries. The transition may be gradual. Sheet 1 of 1 DATE STARTED: 5/16/16 -DRILL COMPANY: Geologic Drill BORING 8-8 DATE COMPLETED: 5/16/16 DRILLER; LOGGED BY: S.Malolo COMPLETION DEPTH 20.8 ft DRILL RIG; Trailer Mounted ~ 'Sl-Q) -?: BENCHMARK: N/A DRILLING METHOD: Hollow Stem Auger " ELEVATION: N/A SAMPLING METHOD: ss 3:: :l. LATITUDE: 47.44316" HAMMER TYPE: Manual Pulle}'. BORING LOCATION: LONGITUDE; -122.19597" EFFICIENCY N/A STATION: NIA OFFSET: NIA REVIEWED BY: MSP REMARKS: Cf) ST Af.JDARD PENETRATION " C ~ TEST DATA .Q £ w 0, Q w • u N in blows/ft @ © a. 0 £ s ,!!_ 0 u u ;, ,!!_ _, ~ z §. ~ "' ~ PL C f-w MATERIAL DESCRIPTION ·a " ~ X Moisture s w w • LL Additional 0 £ £ 0. ~ ro a. " ~ 0. 0 " 0 " q Remarks a. a. E w w > ~ E ro > Cf) • ·a I I I w ro 0 " w 0 CJ Cf) 0 0 Cf) u <D w w Cf) STRENGTH, tsf Cl'. " >- (L " U) Ou * Qp 0 0 ,., '·' "'ASPHALT q A >--'' ~ 1 8 Poorty Graded GRAVEL with Silt and Sand; i,P-G~ 7-15-10 ~ )0 dark brown, moist, nonplastic, medium dense, predominantly subgrounded fine gravel with N=25 f--x:Kil h silt and sand matrix. FILL _______ _J-f---L ' Silty $ANb; brown. moist, nonp!astic, >-X X 2 medium dense. FILL SM 1 8-9-11 f-j ._S.tty SAND: brown with orange mottling. --f---N=20 ~ moist, very dense, predominantly fine sand I'.. >-5 .. ·· ···~ and silt with trace subround gravel. 13 3 9 WEATHERED GLACIAL TILL 15-26-32 >>~!} f-. .. N=58 ·.~ ·.· ····~ SM 14 K < :. 4 14 18-28-47 »@ N=75 10 ····~ 12 -:_)_.· 5 10 5-28-5013 » I) .. -Silty ~D: brown to gray, moist, · -~--N=78 nonplastic. very dense, predominantly fine sand with silt. trace of gravel. GLACIAL TILL 15 9 ' " 6 9 41-50/3" »ii SM - 20 10 7 10 4515014" >>~~ Bottom of boring at approximately 20 feet 1 O inches. No ground water observed. eiJ Professional Service Industries, Inc. PROJECT NO.: 07121375 20508 56th Avenue W, Suite A PROJECT: Bridgestone Renton ~ . Lynnwood.WA 98036 LOCATION: 17808 108th Ave SE Telephone: ( 425) 409-2504 Renton, WA The strat1ficat1on lines represent approximate boundaries. The transition may be gradual. Sheet 1 of 1 DATE STARTED: 5116116 DRILL COMPANY: Geologic Drill BORING 8-9 - DATE COMPLETED: 5/16/16 DRILLER: LOGGED BY: S.Malolo COMPLETION DEPTH 11.0 ft DRILL RIG: Trailer Mounted ~ '¥ Q) -!: BENCHMARK: NIA DRILLING METHOD: Hollow Stem Auger "' ELEVATION: NIA SAMPLING METHOD: ss ~ 'l LATITUDE: 47.44322° HAMMER TYPE: Manual Pullet BORING LOCATION: LONGITUDE: -122.19599° EFFICIENCY NIA STATION: NIA OFFSET: NIA REVIEWED BY: MSP REMARKS: iii ST AN OARD PENETRATION " C ~ TEST DATA a ~ w "' ID ID ~ 0 N in blow;lft @ w ci ~ C ,!g, 0 Q u 0 J "' ,!g, ~ " z C ~ X 1,/1 PL u f-'=-MATERIAL DESCRIPTION -~ • t Moisture C ID ID , • LL Additional 0 £ :c 0. c • Q -~ 0. 0 ;;; 0 ,, " Remarks 15. Q E E ID " ·o ~ > • > ID m m 0 "' 0 " ID 0 CJ U) u uj U) u "' a; ID STRENGTH, tsf Cl'. ::, f- [L " a, * Op "' 0 -0 ,.o " ~ hASPHALT Silty SAND: brown. moist., nonplaslic. loose. FILL ' SM 15 X X 1 12 2-4-5 @1 I N=9 L_ Silty SAR0-6ruish Q@yio-t>rcvm:--moist.---- ,_ __ \_ 5 ·······~ medium dense to very dense, predominantly 18 ., \ --:·· 2 18 fine sand and silt with trace of subround 6-12-14 ~ gravel. WEATHERED GLACIAL TILL N=26 ···.?~ SM 14 X ~ C -.. 3 18 12-21-38 >>{• N=59 L... 10 -.::-· ·•.·:117 12 , 4 11 L_ Silty SANO: brown, moist, non plastic, very · -~--30-5015" >>{~ " SM \ dense, predominantly fine sand and silt, trace / of gravel. GLACIAL TILL Bottom of boring at approximately 1 Oleet 11 inches. No ground water observed. fiI§j} Professional Service Industries, Inc. PROJECT NO.: 07121375 20508 56th Avenue W, Suite A PROJECT: Bridgestone Renton • Lynnwood.WA 98036 LOCATION: 17808 108!h Ave SE Telephone: (425) 409-2504 Renton, WA The strat1ficat1on Jines represent approximate boundaries. The transition may be gradual. Sheet 1 of 1 Firestone Retail Store I 7808 108'1' Ave SE, Renton, Washinf:lun PSI Project ,Vo 07121375 APPENDIX B LABORATORY TESTING PROGRAM LABORATORY TESTING RESULTS Professional Service Industries, Inc. Engineering • Consulting• Testing June l, 2016 Firestone Retail Store 17808 1081h Ave SE. Renton, Washmglon PSI Project No 07121 375 Professional Service Industries, Inc. Engineering• Consulting • Testing June I, 2016 Laboratory Testing Program and Procedures General Soil samples obtained during the field explorations were examined in our laboratory. The physical characteristics of the samples were noted and the field classifications were modified where necessary in accordance with terminology presented the General Notes included in this appendix. Representative samples were selected during the course of the examination for further testing. The testing procedures and results of the tests are summarized below. The phrase "In general accordance with guidelines presented in .. ." means that certain local and common descriptive practices and methodologies have been followed. Visual-Manual Classification The soil samples were classified in general accordance with guidelines presented in ASTM 02488, Standard Practice for Description and Identification of Soils (Visual-Manual Procedure). Certain terminology incorporating current local engineering practice, as provided in the Soil Classification Chart included with or in lieu of ASTM terminology. The term which best described the major portion of the sample was used in determining the soil type (that is, gravel, sand, silt or clay). Moisture Content Natural moisture content determinations were made on all samples. The natural moisture content is defined as the ratio of the weight of water to dry weight of soil, expressed as a percentage. The results of the moisture content determinations are presented on the boring logs in this appendix. Grain-Size Distribution Select samples from the borings were analyzed for grain size in general conformance with ASTM C 136 and ASTM C117. In general, samples were oven dried, weighed then washed over a #200 sieve to remove silt and clay sized particles and then dried again. The samples were separated through a series of sieves of progressively smaller openings for determination of particle size distribution. The material passing and/or retained on each sieve was recorded as a percent of the total sample weight. The results of the sieve analysis are depicted in this appendix. PARTICLE SIZE ANALYSIS -ASTM Cl36/Cll7 SIZE OF OPSNIKG IN lt1CHES ;J.S. STANDARD SIEV; SIZF. !-':YDROM;TSR 100 .,;,.i~" ~..!,.i'~· __J'~ ... r~r .... 1 ,. 1 Q_,_"("_,_1·~· __J~~---1-"~'..!.1°_,.,!,i'~'~·..,_1''~~1.__.Jic._' 00 ---1- 02 ~ 00 ------~ 95 .1.1-1-LI wl ..1..I ...L.__ _ ___1j_ui !-L-! i'--'-'~~---1-W-1l ]W-i' -1.-I L I I I I ! 11 I I I 11 ! : i I J I '1 I!! I I: 11 I I I I I 9 0 J.li.Ll_1 -'--',___J____l~.l..i-; i i ,__I f I T \-. ! -l+c--+-----~ ---+!++-+-+------+-----+ic..;.I ++I I --+-~---'-1 l++i I i ffi 8 3 5 0 . i ! I I '. I Ii i i , -~---, '-'++++~-+--I H 1: 1 1111 I I~_ -ii I , I II! ~ 15 111 I I lli 1 il I I I I rT'i ~--l-l-i-1-1 W-IL-L---'1~'1~'11~1-L'-L·~il~II-'--': -"-1---'------' ~ 70 I I T u ]Ti-~ ' ! 111 ! I • 11 .L .. 6 c I .. EL[ ! U __ J_-lJ_il.C.J_Lj__J_ _ _)J_lllA,:_J_-'---__j_l '_j_l_!_IJ_l_ ii _ __J__ ! ! i ! i '._ ~6:~ui_L1 11:1,111 11 1 11 1,1 1111: 1··11111--• I I rr-, "-1 :~,'------~, ~, ----'--'--1 -'-1--ll1,-W4-L-1 1C"I~'--,_ -----'1~1 ; n 1 r-r , 1 1 , ~ 55 ill___j__j_. I i\ ----• --• i;: so ll I LI -,'_'_ci __ ' _'_' ~' ___ ' '-'-'11'---1..J.._C'~I _J_I_! -+!-LI _:_\\ ". ~' ·_· ------;---' __ ' -+-I -I 8 :1 I: .' I i I i I': I \ -,,: : : 'i ! Z 4 5 =LL-,'--'-1, -L--,'----.-'---'-, __ ---1.J-'.C--L--',-. l. •-• _;._1-.._;_..-'\c----,=-, -'------'.---'---.'-'-----.J_---j rz1 : i . : ! i I I I : i I! I ,· ' ' ' ! ; I ~ 4 0 .l.UJ...L.....!..._L_-'---'------'--'----'----'-' ,1-'-' 1 : · re 35 =.,_1 _1 .....!...1 _!.1___c_~i_ ____ ___ , , ! i 1·;· 1 -1 : . 11 , ~ 1 ":: , -1 , -------+1---l 1~: 1 , I : 111 11 : r 1: 11 I 1 ::~ , -.... :: --i : 30 =11"-1-: "-1 _j_,,-'--:---~~ ~~, -'--':----'-1 !l.'-1....LI 11---i --',--'1,-,, ILil---!i_J_! --'-, --',-'-i le:.;_;__;_·, ----·--i _ _, 2 5 -l--"--=·---'---'----'.:I i_;_i _;l_;,_'c.....:__;_ _ _;_U_J___J_--l--, • ·-~------·---~---l - ' i ·, " I I 1, ,1 I i j ! II ' j i -l----+li '=' -+-e-+-+--+J.l-l'-+ ·, -J.i--1-.....!...----' ! 1 · 1 I I ::_.:, 1-I-1-1--1--1----'--_J'-l++.J...!..1 -l-'-1----1-=1 lLI-+-1---1----1.LI ' 10+1-1-1-~-1---'--~i-'-l---l--'--+-i--'------IJ.J.UI ~l~J-1,~-1--~1---+1_1 '.+e--'~l~--"l~l~l~I L--'-----1 I : i : I i 1111 ! I ! I i J : ! ;; I ' i --• .I : ml -'-1-1--1 : -1---'-I --""i I l~I 1 _J_I I _;_I --i---j-[ . -~1 ---++++'I 1-1--'---+I 1---'I---+-!-+! ~i I --'--I-.--,-I'-'-I j I I [ i ;- 20 1000. ooo 100.000 10.000 :.ooo 0.100 0. 0 10 0.001 PARTICLE SIZE IN MILLIMETERS Coarse I fine Coarse! Mediw:'. I F.:r.e Silt I c:ay BOULDERS COBBL:SS ::;?.AV£L SAND FI~F. G:l.AI:-JED % Gravel % Sand ?o Fines PL= - 21.9% 45.1% 33.0% LL= - Soi1 Cl.assification Silty SAND with Gravel Pl= - Exploration Sample Depth(feet} Moisture Reviewed uses Symbol 8-2 2.5 feet 21.9 MSP SM l •J Infomwtion PROJECT NO: PR.0,...TECT NAME: • ToBuildOn 07121375 Bridgestone Renton Engineering • Consulting • Testing PARTICLE SIZE ANALYSIS -ASTM Cl36/Cll7 SIZE OF O?SKING IN INCHF.S U.S. STA..~~ARJ SIEVE SIZE #200 r J2" r r 2" , ,12f t,~· ~-#4 #r ro io T 1100 1D O ,\-,-,-,-,--,-',--,-L-.,... ...... r+-.._ .......... ,±---.----'---,,'.,--,--,--',-,--'--,---'---,-,--',-_,.-,----,----.,.,-,--.,.-,---,---,---, 99: ::~I I ::~:::::::::11:,:+_+_~-+ __ J-__ -___ +"'i: :-1-1 __ +~-'--' +j_""';_'-c-_"':_::-W:I _j_!_+_-li-·----+l-4-' I +-+I ,=-,:-=--=--=--:1:1 ::i 1:i :I :1::::: I II I I I I h' I I I I . E-< 8 5 I LL_l_, -----1!il.W--Ll-i-_l_-----11Li W-1 L'._i-J______JUW,W-J__j_l ----lW-1-1-WI_Ji::::::::::::::-~---'-l---ll----' __ 13 80 fil_J_LL_J__J_l_-'JI il)_J__J__j__j_ _ _JJ_UJ__LJ__J__J__J.U_J_L... ~ I H ' 1 I, I , ! I ! ! I --1· I ~ 7 s =I -'-'-1-L--'-1--'---"-'-'-'-'-'-'--'----'-'--'----'---'---'---"-'-'-W-L.ll-'---'-. -"----'--=-'--'-1-L--'---'----' : ,0 ! I, I ! , I i 1 ! 1 I i I 11 \ _ 1 _ ! i: I ! I I Ill ! I i i I ! I ,j ! 1 1 i I i I I ~ :: .l-;-! LiC-.L._!_i _ __uL·..,_i__ ' ! ! i i I_J_ __ -·L1'L'--..J1__[___;:_-_µl._-_-_-+!-+!+-+--'-----+L!_· ;-! _! _l__c!_-J gi 55 1 • I I •. _ I I I I! j I i I I I I ! I I 111 : ! i ~ ! I 1 T I --, -11 I I i I I I I ! I I '. ! 11 _J I ! ~ so -1-iL!-ILLLL;' __j_l_J_ _ _J_1 --4.L..J1-LI _ _[_,I _ __;: :_'_;_i __:_ __ :[___l~-~-1 j ___ G,_~!~i l_,_l _ _,_i ---'--~---'' !_~i __ _, lzl 45 1'1 I I j, I I ' ,I ··-I I '' I Ii' ' U I I I , . , -if,! I. I iii.· i re :: -1-4--W-'--+-1 _ _,__,_ u , 1 , . : : , , '-"1 '-"1-:'--'-1_ -"1 f-_J_11 ~11-"--.-;-l--l----'-, ---',----l 30 I I I I 11 _jJ '_L_!~i j ~!_! _1 --'--ii ----'l-'-1---ll _' -'--: -'-I ~I ,_l.wl i_,__l-1-l--'-I _J__ __ !cc• -'--' ''-'' _ 1 __ _ Ii 1 ! . I ' .•• ', 1 !! II I I 1, 111!1 I ' ' :: ··1'--'-l--f~:-:~::_-.-+-'--+--: ~::_:_-,:,_:_-:~l-,--l--'---_-4"-'1 :::1-=--=-1~:~\:1::, :'-'---I T:T: i :~- " -1-4-L-, I..L..L-L-----1.w.w-, --'i -l-+---'-+'-'--'---'-1 "--'---l--W-'-'--L-"j---1 J++-1-+-+----+++++l l-+---+-----J 10 -l-W-LLLL.L.-l--l.i.LI'--'--1-'---'-----+--++L'--'--'---~W-l-;J, '---J---fC~f-+-c-!---'----+.L"--'---J---'----J : I i ! 11 I I i I : I 11 I II!; i s il-L'-l-1 I "-11 I -'--1 __[___-'-LLLLLi I J-L-<---Ji T 1 ·l----c-+-1 -'-'----++11 ++-+-'1'-- 1 -"1---+-+! I ++I I --+I l~--;+.l 1. i 1~1 1 -'--1 -,-+--- 0 il.!.LLLL.L.-l--..l.W-'-'--l-.!-.!---+--'-+L~'-----'-'-'-'-LL'----'--'-+l.J-l---'-----'-'-'----'--'----' 1000.0DO 100.000 10.000 1. 000 0.100 C.010 O.OJl PARTICLE SIZE IN MILLIMETERS Coa::se I Fine Coarsel Medium I Fine Silt I ::lay BOG:..DF.RS COBBLES GRAVEL SAND FINE ::;~INS;) % Gravel % Sand % Fines PL= - 1.3% 87.6% 11.1% LL= - Soil. Cl.assification Poorly Graded SAND with Silt Pl= - Exploration Sample Depth (feet) Moisture Reviewed uses Symbol B-3 15 feet 19.5 MSP SP-SM l iJ Infomwtion PROJECT NO: PROJECT NP._ME: • ToBuildOn 07121375 Bridgestone Renton Engineering • Consulting • Testing PARTICLE SIZE ANALYSIS -ASTM Cl36/Cll7 s~zs CF' O?EN:NG lN lNCHES U.S. STANDARD SIEVE SIZE HYDROMETER 100 r i' r r r l mr ,,. r #4 T r r T i'°0 "'° 95 I c'.-tti' Ill, ' -I! -,I_ lf--Ji-+-----f11 +tH,-._-+I ~~~ .... :I+ ,I ft-''+I +-: -J--++t+Hl-+-+--+11 +++--11', ,-+---,· f 1 1 • ~,-! '· I I 90 T -i [ ! ~ 8805 t+++-HI -+-!---+--H-+-H---+-+' -+---+H-+++-+-1 ~ I I\.· -+I __ ---+-++-: t+-' -+-+-1 _' ft-+--1 H-il---+---1 ;:; l,11 ' I 11-11 I~ 'I 111 ~ 75-H++-H-'-~~-+H' ---H++++-+--'--++-H--"--t-~h----++'l:+c----t;---,---ft+--i-+-+--'f------j ~ 70 f ; j' ii I I I I i ; I I 1111 i I \ I i 11 ! I I I J !' -j :: t,-1 :'-cl+:~, -+-! -~.H+~ ,i i+!-"-!--+1-H+I l-+:111 +-!' :-+--' ----W-! !uc..:; :.1= 1\/:----;iil~:f l;-·-·-+-j---+I c'--1 ! -:__,_:~:-----< ::: ! I I I I i I ' : : ! ! I ~\~ I ' ! ! ! I I 8 so r--'--'1-i-c-+l-c'-I--+,++++-, -+-+-j+---+'l,-i1 ++~,-+,~,--Tn i ' , 'I\! , , , i ~ 45 _,___,_,_,_ ___ ctl t-t-Ti_ ----____ 11 i ! ! I ! I I i I i: I ' I ~ 40 i I ! I I 11 I j : ' I ii I , , I; I i ~ 3 , ~Tel I~,-,-~: -I 11+-+-I +-t-+-.,ch--1 ~I~~,~,~,~! ~l--+-1'+1 ,~, -!~~,I-+: l __ ,_I , --,-.-,-1,, 1 --. --1--++t-,-,! +I+---+--+-, -++-i--+-1 ~--,---,--~!I~! ~i . ·1-Fi I I i ::::1:1:1::==:1==::11=:1:,=:1 =::==:1:,::1~•--+I-___ +_-_-,-. ,,--:-· !!' I I !1 j ' j I , ' I i --;·-,-. +-, !-,~-,--:-+-,'--il-i ~--;I+, .-, -ii ~-I ---I 2 0 -H++-+-+, +----;-+-~+,,++--+-~- 1 I 11 I ! I 1 :: :::1 ::1:::::1 ;:: '::1::-j_ _____ I • ·+-i-+-+I li++--+1-+-+---+t-f-,--+-i 1-H-+-+;-I i+I ++-i!--,----1 5 ++++-; :~: +-1 ---. it·-1+1++-1 +--+++I t+-1 i-+--1 -+---+ii *1 ---+, 1-+i-+----+++-HI I 1+1 f-+I I ill j 11 ! i 0 ~~~--'--~~-'----'--'-'-UC..--'--~--''-"---'--'--'---"'-'-.W...'-'---'---'-'-'-'--'-'--'----'-..J 1000.000 100.000 10.000 1. 000 O. 100 0.010 O. :JOl PARTICLE SIZE IN MILLIMETERS Coarse I Fine Co2rsej Medium I Fine Silt I Cl,1y BO:JLDERS COBBLES GRAVEL SANJ FINE GRAINED % Gravel % Sand ?o Fines PL= - 2.0% 51.5% 46.5% LL= - Soil Classification Silty SAND Pl= - Exploration Sample Depth (feet) Moisture Reviewed uses Symbol B-3 16 feet 12.6 MSP SM l •J lnfomuttion PROJECT NO: PROJECT N.'\ME: • ToBuildOn 07121375 Bridgestone Renton Engineering • Consulting • Testing 8 :,: {') H ~ >< IQ {') z H Ul Ul f 8 z Jz1 u i,: Jz1 "' PARTICLE SIZE ANALYSIS -ASTM Cl36/Cll7 SIZE Of OPENING IN INCHES U.S. STANDARD SIEVE SIZE HYDROM?.'::'E':<. 100 r 12" r r r ra-rr 3,S" " #10 #20 rr #100 ~00 I I I I I 95 11 II 90 85 80 Ii I I I I I , I I I 75 p-j-r--- 70 ! Ii Ii r-n r cs 60 .:s ' , ! I 11 I ' I '. I 11; ' I I! ! so ' ' ,s 1: '. ·-·; ,o I;; 35 ': ! ' I!' . ' 30 : : 25 ii 20 15 10 5 111 I! 0 1000.000 ' I i I -- 3CJJLDERS - ' I I i I ' I I: I I I . I I 11 I I +-Hti-, I ' 1 Ii I I ' ' I I ' I I ' 11 ' ' I 1: 11 I I I I ! ( I l 1 _[_ 111 I' I I ' ' ! I I : I ! I I 11 I I I !I! I ' I i I I ' i 11 i I', ; ' I I 11 I ' ' ' i I ' I I I I I ' Ii I ' I I 100.000 Coarse I C0Sl:!Li::S GRAVEL % Gravel 6.3% Soi1 C1assification 111 I I Ill 11 I 11 I I I I I ~~ I I : i '1· I I I I I i,I I I --..1 I I 11111 11 I ' I -.. --l 1'J , I Ii\ I I I I I I ---! I ' I I I I I Ii I ! I i I I " i I ! . I \ I I II I : I I ' I I i I I ! I I \ I! i : I i I I ! _j_ __ I 111 I i I I I I ii! ' ' 1111 11 ____ 111 J I rr-j j i Ii i ii Ii ,. 11 I .. ----1-r11-I ii : . 1! I '· I ' I 111 i I i\: I , I I I I " . I I I " I 111 I I! I 11~ .ii I . I "I 11 I I: !ii' Ii I ' i 1;: ! ! II' I I I i ! i 'I ! I iii --·-,-•--I I I _;_ l .L_._. : , . ! ,,, I . , , I ' I I I I i • I : I i --- I I : ··1· .. : • ! l Ii I I I I I i I I r I I 111 I I 1111 I I I' 111 I i I 11 I I I 11 I I 10.000 1. 000 0.100 0.010 PARTICLE SIZE IN MILLIMETERS Fine Coar:sel !'lediurr. I Fine Silt JcL:iy SAND FlNE GRAINED % Sand % Fines PL= - 54.6% 39.1% LL= - Silty SAND Pl= - 0.001 Exploration Sample Depth(feet) Moisture Reviewed uses Symbol B-6 5 feet 13.0 MSP SM l •J Infomwtion PROJECT NO: PROJECT NAME : • ToBuildOn 07121375 Bridgestone Renton Engineering • Consulting • Testing PARTICLE SIZE ANALYSIS -ASTM Cl36/Cll7 SIZE OF OPE~lING IN INCHES U.S. STANDARD SEVE SIZE HY:)ROMETER r lOC r r r r ,,o:,T· r .. T r r r r, #200 li,,1,, I 1,111 I q4J1···· l.i I! I !I' II I I ,' I ' ' I I I': I ', ', 11 I I I ! 11 I' I I I ' I : 9 0 -.~, j -1 ------+------++++---+1 -+-+--·. -1 1 ; : r r 1 1 , , 1 1 1 1 1 1 . ~ 85 ~tLJ i I \ ! • I I I I I i 'Ii '+i H 80 : 11 I I i I\ I I' I I,· 1, I I I ' I I 'I -pi! I I ! I : I I I I I ;,: 75 b,-,, ,H,+-,---+--++,-r, ,-++,-+I-+, --+-, ---1\c--+,+++-+lc-~1--+-+r+-+--+--+--++++---+l-+-+-+---H,-------c,+i +I------~ 70 ii I! I I i I I ! [ I I I i I I i j I I ~""',"''!I J ''I 1,n,1·1,,-1]:j ! ! : ' I ! i iii I I I I \ I : : J_ ; ! I fg 6 5 I ' I ! ! i : i ! I : ~ ( ! -1--~I+ +-++--+-+---+----+-!-!-+-I ;-,-i i-+-l +---'1--;---1, i -i '-+I I ~I -,I-------< H 60 ··-•·· +--~ {/} ' i i ' i i ! I I I ! ! I I I i I I 11 I I ! I I I ~ s; '' I I ! I I I 1 ! : 111 I ! 11 I ! I i' ' ' ,-i t ; : +-.---. --'---,----,-'--! +!'+-+! ------'-+:1 1+1 1-+-"-\JI ----+--++-+J~ l _ __JJ : rr r -n i T : • : 1 ~ ,o ',' ' i I i I,!' 1111 ii N, II'\.--+, !i i I 111 111 ! ' • • • • i I -1 1 1 I I I '1 I 11 I 1 . ": : 1 I re 35 , . I 1 , . I , 11 , . I -+ 1 . , , I ! . 1 30 +- 1 -1-.• _._! ___ i '~I~:_,_,,: ljjl_J_,I i,:·T !, !, ·~"SH-,t-+---++1-, -+-1--+IH! -, ++-I'! ""'!---~,!~I~! !c-c---+!---j ' ' ; i I i ' ' ,' I ~ I 11· 11 I I '" ' I 1 " i , : I I , ! I , , · 25 ~~--------"c----·-------,--+-c-c-+----1++-h--rrf--i--+--+--i++--+-------'--,----·-- ! I I i I I ' i I ' '. 2 0 1+1 ++--~.: ---++! 1+ 1 1 H'+----+---t++++I ++-, +----''--H++++--1-'<+--'+------+-'-.+++---'--.. 1 1 1 -i- 15 s~-+1 ---H-++-t--'--+--++++-+--c--+----++t++-,-+-+'--'d--. . -+--f-i' --++++--t-+--+--+----l II I : I I I I ' '.. I I i I lO 1-,~!--i-t ~. +I --+,--+:1 l+I :-+-I +-I -+---+HI i I-HI l+--+-1 ~!-++++-+++-+-... -.it+~l--1--1--i-i+--i-l -----rl-! 1+-+-1-+1 +I +I +-----l s , I I i I! I I I I 1:1111 I f T I ! I II I I I 1111 I 11 I 0 -'-'---'--'----'-'-'-'--'-'-'---'-'-"-'----'-"--"-'-'-'-"-'-'---'---'l..Ll-'--'~~-....CJ..J..J.._.W.._J.__J.___J 95 1000.000 100.000 10.000 1. 000 0.100 0.010 0.001 PARTICLE SIZE IN MILLIMETERS Coa:::-se I Fice Coarse I Medi·Jm I Fi:ic Silt icley BOULC:SRS COBBLES GRAVEL SAND F:NE GRAINED % Gravel % Sand % Fines PL= - 52.8% 39.7% 7.5% LL= - Soi1 C1assification Poorly Graded GRAVEL with Silt and Sand Pl= - Exploration Sample Depth(feet) Moisture Reviewed uses Symbol B-8 O feet 4.3 MSP GP-GM l •J lnfomuztion PROJECT NO: PROJECT NAME:; • ToBuildOn 07121375 Bridgestone Renton Engineering • Consulting • Testing Zipper Geo Associates. LLC Geotechnical and Environmental Consulting Project No. 1688.01 29 August 2016 PACLAND 1505 Westlake Ave. N, Suite 305 Seattle, WA 98109 Attention: Subject: Mr. Bill Fortunato Summary of Field Infiltration Testing Renton Retail 17808 108th Avenue SE Renton, Washington King County Parcel No. 322305-9104 Dear Mr. Fortunato: This report summarizes the field infiltration testing services provided by Zipper Geo Associates, LLC (ZGA) for the proposed retail development at the above-referenced address. Our services have been provided in general accordance with our Proposal P16269 dated 9 August 2016. Written authorization to proceed with our evaluation was provided by PACLAND on 15 August 2016. This letter is an instrument of service and the conclusions presented herein are in respect to the subject property and have been prepared in accordance with generally accepted geotechnical engineering consulting practice. This letter has been prepared for the exclusive use of PACLAND, and its agents, for specific application to the subject property and stated purpose. SITE LOCATION AND DESCRIPTION The project site is a rectilinear parcel comprising approximately 1 acre of land with its long axis oriented east to west between 109'h Avenue SE and 108th Avenue SE in Renton, King County, Washington. The western approximately 4/5'h of the property is developed with a 2,200 square foot single-story building, occupied by a Skipper's Seafood, with a surrounding parking lot. The eastern portion of the property is at a slightly higher elevation and consists of a tended grass lot with scattered trees and a fence on its western edge dividing the developed portion of the parcel from the green space. The site is bordered to the north and south by developed commercial properties; to the east by 109th Avenue SE and developed residential properties beyond; and to the west by 108'h Avenue SE and developed commercial properties beyond. Topographically, the ground surface on the site generally slopes gently downward to the west with a total vertical relief from the east property boundary to the west of about 10 feet. 19023 36'" Avenue West, Suite D Lynnwood, Washington 98036 ( 425) 582-9928 Zipper Geo Associates, LLC Summary of Field Infiltration Testing Project No. 1688.01 29 August 2016 PROJECT DESCRIPTION A plan provided for our review indicates that proposed development will include one building with paved parking and vehicle access areas. ZGA was not provided with plans for the infiltration facility. You have indicated that the infiltration facility may be approximately 8 feet below existing grade and located north of the proposed building location below parking areas. A proposed location for infiltration testing was outlined on Geotech RFP Exhibit 1.0, issued on 26 July 2016. The test location was moved to the eastern portion of the parcel when it was determined that the Skipper's facility was still in operation and that the initial test location would impede parking and require resurfacing. The project site is illustrated on Figure 1. SCOPE OF SERVICES The purpose of the limited geotechnical engineering services described in this letter was to determine a field-measured stromwater infiltration rate at the site by completing one field infiltration test. Our scope of services included the following: reviewing the King County 2009 Surface Water Design Manual (Manual) regarding stormwater infiltration testing requirements, arranging for marking of underground utilities, completion of one infiltration test, and preparation of this report. Our scope of services did not include addressing other geotechnical engineering aspects of the proposed site improvements. SUBSURFACE CONDITIONS Soil Conditions Published geologic maps indicate that the property is underlain by glacial till. A geotechnical report was previously completed at the site by PSI (Geotechnical Engineering Report, Firestone Retail Store, 17808 108"' Ave. SE, Renton, WA) dated June 1, 2016. Borings completed at the site as part of the PSI report indicate the site is generally underlain by a thin layer of asphalt concrete pavement underlain by about 3.5 to 5 feet of fill consisting of very loose to medium dense, silty sand. Below the silty sand fill, the boring logs disclosed medium dense grading to very dense silty sand with variable gravel content (weathered glacial till grading to unweathered glacial till). Our infiltration test was completed in a test pit located in the eastern, undeveloped portion of the site at the location shown on the attached Figure 1, Site and Exploration Plan. A descriptive Jog of the subsurface conditions observed at the infiltration test location is presented in Appendix A as test pit TP-1. Please note that per the Manual requirements, the soil descriptions are provided in accordance with US Department of Agriculture nomenclature. Soils observed at the infiltration test location included approximately 4 feet of weathered glacial till material consisting of medium dense, light brown to tan with some oxidation, sandy loam with gravel and some organics in the form of tree roots. The weathered till was underlain by unweathered glacial till consisting of dense, tan to light brown, sandy loam with gravel. The test pit was terminated at a depth of approximately 8 feet in dense, tan, unweathered glacial till. 19023 36th Avenue West, Suite D Lynnwood, Washington 98036 Page 2 (425) 582-9928 Zipper Geo Associates. LLC Summary of Field Infiltration Testing Project No. 1688.01 29 August 2016 Groundwater Conditions No groundwater was observed during our exploration, which extended to a depth of approximately 8 feet below existing site grade at the infiltration test location. We did not observe soil coloration mottling suggesting that seasonal groundwater may be higher than the observed condition. PSI did not report observing groundwater in their explorations, which were advanced to a depth of up to 21 feet below the current grade of the paved portion of the property. However, PSI notes that " ... PSI believes that small amounts of perched water was observed in borings B-3 and B-4. This perched water was observed within sand lenses within the till soils and may be present in other portions of the site seasonally or after significant precipitation events." Groundwater conditions should be expected to fluctuate due to seasonal precipitation variation, irrigation, site utilization, and other factors. INFILTRATION TESTING RESULTS A single small-scale Pilot Infiltration Test (PIT) was completed at a depth of approximately 8 feet below existing site grade in general accordance with the procedures described in the Manual. The approximate test location is illustrated on Figure 1. Based on the results of our testing, the field-measured infiltration rate was determined to be approximately 0.21 inches per hour. For design, corrections (or reductions) to the measured infiltration rate should be made for testing, geometry, and plugging per the Manual to arrive at a design infiltration rate. CLOSURE We trust that this letter meets your current needs. Please do not hesitate to contact us should you have any questions. Respectfully submitted, Zipper Geo Associates, LLC Robert A. Ross, P.E. Principal Enclosures: Figure 1-Site and Exploration Plan Appendix A-Field Testing Procedures and Log 19023 36"' Avenue West, Suite D Lynnwood, Washington 98036 Page 3 (425) 582-9928 ' ' 1111 i ,,II : r: I ,"Ji-1 i I '\J, ~ l' l I " ~~' \. ~ -------'@ I Li , ~ce--~ I t ,,,,,,,, -\ ' ,_ ' 1,f I ~1~1-\ --' -e-__-----,c:::.:;-;, II ' y I / / , ~ -~-'='-c::-P.,-c::-cc~:_--i--,00-,1' <.. N88"58'1o·w 288.35',*--~.--...._ lo..>.~--I ·' I --\ --_, Ill'\ I 'II ,,,___ '-, -, n , \o->L1 ,, ' '' \ \ ·~, •1 ' ''•'Y\ I I • ' 'I , -• , ', . , ' ' ' -• ' I TFF.· -,_ "'~ i ----,, . . ·t: k, .• ,,~ I ll -~--' ' ' ' ' '" , , -" '"-'Cc_-e__ ',,--·' '•, ' I ' / © ' , ' ' ' ',~ ~~ ---' l I I I IO / / " •011 '-,o, __ "C-_c~ I I 1 ( \ 1¥'. I /I ~ 11 I /--' ! : I ' ; ' I 1:1 ' I ; ~ ~ I " I I ~ •,/' ' :;1: 6 !' ·~ -~ I 1: /[fl II' I I II ~ Ii II / / ,' / / /~[ O /l!'iiilJTP-1 1 1 I I I, I I b ; I II / -•,, • '.'· .. '· / I' / / -I I II / /\ I /1. I b -, . .. , ' , '" ,c , ' I ____ -I. , / I I I J 1 I J o---i,,\ / / \ - ' ' ' ' ' ,, ~/?;:!,,;,;-,,,;;;;-~ 7;,7.4////~1· J' / / / I ---'" :,c' ( I 1--1,,, I I I IS ',I ii j_,, 1- 1 ~ I I, i I l~I; I/ I I I 1 I I " I I I I I , 11 r ! I 41.10' I i I I ___!-----I I ,,1401 I'/ 'I I I \ I I I I\ I ,1 l ' I ;;, ii ~,, // 1 / / \ 11"1~'.Y< 0 >'1. / , 1,:; ;; \1 I I \.. /! r'J ·"~ :['11 / / ''/ '1 1 ~-!'1 *' ( i~· " , /I ,,,., fr' ii',_, ,• ,1 / ' I ' k I / ',i, I ,5 > ' o ' ' I/)'\ "( ., / I / '___'-- 1 _;, 1 ,, z,'///h, I_,-----=--,---.0 • W//////////k ----------= _,,_,_ -. -c -r \ r~I. l s S'5B'10'E 290.'4------cc.cc----- ' --·~,---,-"/! --:-• I 11' i •-·, I I, / I \ r1 I REFERENCE· UNDATED CAD FILE PROVIDED BY PACLAND LEGEN(? l!'iiil ITP-1 INFILTRATION TEST AND PIT LOCATION N ~ 15 ----· SCALE I~ fEfl ,0 _, RENTON RETAIL INFILTRATION TESTING I 1808 10dlh A~e. SE Ren100, Wash.ngt.:rn SITE AND EXPLORATION PLAN DATE AUGUST2015 -·~--jQbNQ 166801 nppu G.o Asse>c./11Jes, LLC I FIGURE---1- \9023 361h A~e w .. su,te o Lynnwood, WA 98036 SHT 1 of1 APPENDIX A FIELD EXPLORATION PROCEDURES AND LOGS APPENDIX A FIELD EXPLORATION PROCEDURES AND LOGS 1688.01 Our field exploration for this project included one test pit completed on August 19, 2016. Approximate exploration locations are shown on the Site and Exploration Plan, Figure 1. Exploration locations were determined by measuring distances from existing site features with a fiberglass tape relative to an ALTA survey CAD file of the site provided PACLAND. As such, the exploration locations should be considered accurate to the degree implied by the measurement method. The approximate ground surface elevation at each exploration location was determined by interpolating the information provided on the ALTA survey. The following sections describe our procedures associated with the exploration. Descriptive logs of the explorations are enclosed in this appendix. Test Pit Explorations An independent contractor working under subcontract to our firm excavated the test pits through the use of a rubber-tired backhoe. An engineering geologist form our firm continuously observed the test pit excavations and logged the subsurface conditions. After we logged each test pit, the operator backfilled each with excavated soils tamped into place. Some settlement of the backfill should be expected over time. The enclosed test pit logs indicate the vertical sequence of soils and materials encountered in each test pit, based primarily on our field classifications and supported by our subsequent laboratory testing. Where a soil contact was observed to be gradational or undulating, our logs indicate the average contact depth. We estimated the relative density and consistency of in situ soils by means of the excavation characteristics and by the sidewall stability. Our logs also indicate the approximate depths of any sidewall caving or groundwater seepage observed in the test pits, as well as all sample numbers and sampling locations. Test Pit TP-1 Project: Renton Firestone location: See Site and Exploration Plan, Figure 1 Project No: 1688.01 Approx. Ground Surface Elevation: 409 feet Date Excavated: 19 August 2016 Depth Material Description Sample Ne %M Testing (ft) 1/2 foot or less of sod . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Medium dense to dense, light brown to tan with some oxidation, sandy loam with some gravel, some organics above 2 feet consisting of roots less than 1/2 inch in 2 diameter. [Weathered Till] 3 4 .............................................................. Dense, tan to light brown, sandy loam with some gravel. 5 [Unweathered Till] 6 7 8 9 TP-1 completed at approximately 8 feet. No groundwater seepage observed at time of excavation. 10 Form WA-5 (6/76) Commitment Face Page COMMITMENT FOR TITLE INSURANCE Issued by File No.: NCS-795710-WAI FIRST AMERICAN TITLE INSURANCE COMPANY First American Title Insurance Company, herein called the Company, for valuable consideration, hereby commits to issue its policy or policies of title insurance, as identified in Schedule A, in favor of the proposed Insured named in Schedule A, as owner or mortgagor of the estate or interest covered hereby in the land described or referred to in Schedule A, upon payment of the premiums and charges therefor; all subject to the provisions of Schedules A and B and to the Conditions and Stipulations hereof. This Commitment shall be effective only when the identity of the proposed Insured and the amount of the policy or policies committed for have been inserted in Schedule A hereof by the Company, either at the time of the issuance of the Commitment or by subsequent endorsement. This Commitment if preliminary to the issuance of such policy or policies of title insurance and all liability and obligations hereunder shall cease and terminate six (6) months after the effective date hereof or when the policy or policies committed for shall issue, whichever first occurs, provided that the failure to issue such policy or policies is not the fault of the Company. This Commitment shall not be valid or binding until countersigned by an authorized officer or agent. IN WITNESS WHEREOF, the Company has caused this commitment to be signed, to become valid when countersigned by an authorized officer or agent of the Company, all in accordance with its By- laws. This Commitment is effective as of the date shown in Schedule A as "Effective Date." First American Title Insurance Company flr//lL D'Jnni'.:> J G1!tno1e- Pres1de-nt Jeffrey $ Robmson Secre:on, First American Title Insurance Company Form WA-5 (6/76) Commitment File No.: NCS-795710-WAl Page No. 1 To: --4-Lf" ~ First American Title Insurance Company National Commercial Services 818 Stewart Street, Suite 800, Seattle, WA 98101 (206)728-0400 -(800)526-7544 FAX (206)448-6348 Laura Lau (206)615-3017 llau@firstam.com Lavonne Bowman (206)615-3269 lavbowman@firstam.com M&T Bank 10510 NE Northup Way, Suite 350 Kirkland, WA 89033 Attn: Lea Hanada SCHEDULE A Soupy Klea (206)615-3054 sklea@firstam.com File No.: NCS-795710-WAl Your Ref No.: RPI Renton Skippers 1. Commitment Date: May 25, 2016 at 7:30 A.M. 2. Policy or Policies to be issued: AMOUNT PREMIUM TAX Reorganization Rate Standard Mortgagee's Coverage $ 520,000.00 $ To Be Determined $ To Be Determined Proposed Insured: To Be Determined 3. The estate or interest in the land described on Page 2 herein is Fee Simple, and title thereto is at the effective date hereof vested in: RPI Skippers LLC, a Washington limited liability company 4. The land referred to in this Commitment is described as follows: The land referred to in this report is described in Exhibit "A" attached hereto. First American Title Insurance Company Form WA-5 (6/76) Commitment LEGAL DESCRIPTION: EXHIBIT 'A' File No.: NCS-795710-WAl Page No. 2 THE SOUTH 132 FEET OF THE NORTH SIX-TENTHS OF THAT PORTION OF THE WEST HALF OF THE WEST HALF OF THE NORTHWEST QUARTER OF THE NORTHEAST QUARTER OF SECTION 32, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., IN KING COUNTY, WASHINGTON, LYING SOUTH OF THE NORTH 30 FEET THEREOF; EXCEPT THAT PORTION LYING WESTERLY OF A LINE BEGINNING OPPOSITE HIGHWAY ENGINEER'S STATION 315 + 81 AND 40 FEET EASTERLY OF THE CENTERLINE OF HIGHWAY SR 515, RENTON VICINITY; (SOUTHEAST 196TH STREET TO CARR ROAD); THENCE NORTHERLY IN A STRAIGHT LINE TO A POINT OPPOSITE HIGHWAY ENGINEER'S STATION 318 + 41 AND 45 FEET EASTERLY OF SAID CENTERLINE, AND END OF SAID LINE AS CONVEYED TO THE STATE OF WASHINGTON BY DEEDS RECORDED AUGUST 02, 1972 AND JULY 11, 1972, UNDER RECORDING NOS. 7208020358 AND 7207110553, IN KING COUNTY, WASHINGTON. First American Title Insurance Company Form WA-5 (6/76) Commitment SCHEDULE B -SECTION 1 REQUIREMENTS The following are the Requirements to be complied with: File No.: NCS-795710-WAl Page No. 3 Item (A) Payment to or for the account of the Grantors or Mortgagors of the full consideration for the estate or interest to be insured. Item (B) Proper instrument(s) creating the estate or interest to be insured must be executed and duly filed for record. Item (C) Pay us the premiums, fees and charges for the policy. Item (D) You must tell us in writing the name of anyone not referred to in this Commitment who will get an interest in the land or who will make a loan on the land. We may then make additional requirements or exceptions SCHEDULE B -SECTION 2 GENERAL EXCEPTIONS The Policy or Policies to be issued will contain Exceptions to the following unless the same are disposed of to the satisfaction of the Company. A. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records. B. Any facts, rights, interest, or claims which are not shown by the public records but which could be ascertained by an inspection of said land or by making inquiry of person in possession thereof. C. Easements, claims of easement or encumbrances which are not shown by the public records. D. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any other facts which a correct survey would disclose, and which are not shown by public records. E. (1) Unpatented mining claims; (2) reservations or exceptions in patents or in acts authorizing the issuance thereof; (3) Water rights, claims or title to water; whether or not the matters excepted under (1), (2) or (3) are shown by the public records; (4) Indian Tribal Codes or Regulations, Indian Treaty or Aboriginal Rights, including easements or equitable servitudes. F. Any lien, or right to a lien, for services, labor, materials or medical assistance heretofore or hereafter furnished, imposed by law and not shown by the public records. G. Any service, installation, connection, maintenance, construction, tap or reimbursement charges/costs for sewer, water, garbage or electricity. H. Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in the public records or attaching subsequent to the effective date hereof but prior to the date the proposed insured acquires of record for value the estate or interest or mortgages thereon covered by this Commitment. First American Title Insurance Company Form WA-5 (6/76) Commitment SCHEDULE B -SECTION 2 (continued) SPECIAL EXCEPTIONS 1. General Taxes for the year 2016. Tax Account No.: Amount Billed: Amount Paid: Amount Due: Assessed Land Value: Assessed Improvement Value: $ $ $ $ $ 322305-9104-06 9,225.59 4,612.80 4,612.79 673,100.00 1,000.00 File No.: NCS-795710-WAl Page No. 4 2. Potential charges, for the King County Sewage Treatment Capacity Charge, as authorized under RCW 35.58 and King County Code 28.84.050. Said charges could apply for any property that connected to the King County Sewer Service area on or after February 1, 1990. Note: Properties located in Snohomish County and Pierce County may be subject to the King County Sewage Treatment Capacity Charges. To verify charges contact: (206) 296-1450 or CapChargeEscrow@kingcounty.gov. 3. Easement, including terms and provisions contained therein: Recording Information: February 15, 1972 under Recording No. 7202150287 In Favor of: Cascade Sewer District For: Sewer mains Affects: as described therein. 4. Easement, including terms and provisions contained therein: Recording Information: June 20, 1975 under Recording No. 7506200772 In Favor of: King County Water District No. 58, a municipal corporation For: Water mains Affects: as described therein. 5. The terms and provisions contained in the document entitled "Agreement" recorded October 21, 1959 as Recording No. 5094081 of Official Records. 6. Reservations and exceptions, including the terms and conditions thereof: Reserving: Minerals Reserved By: John Winston and Lulu Benson Recorded: April 07, 1914 Recording Information: 924587 7. Conditions, notes, easements, provisions and/or encroachments contained and/or delineated on the face of the Survey recorded April 08, 1982 under Recording No. 8204089004 of surveys, in King County, Washington. 8. Evidence of the authority of the individual(s) to execute the forthcoming document for RPI Skippers LLC, a Washington limited liability company, copies of the current operating agreement should be submitted prior to closing. First American Title Insurance Company Form WA-5 (6/76) Commltment File No.: NCS-795710-WAl Page No. 5 9. Any claim that the Title is subject to a trust or lien created under The Perishable Agricultural Commodities Act, 1930 (7 U.S.C. §§499a, et seq.) or the Packers and Stockyards Act (7 U.S.C. §§181 et seq.) or under similar state laws. 10. Unrecorded leaseholds, if any, rights of vendors and security agreement on personal property and rights of tenants, and secured parties to remove trade fixtures at the expiration of the term. 11. Prior to issuance of an extended coverage policy, the Company will require an Owner's Affidavit be completed and submitted to the Company for approval prior to closing. The Company reserves the right to make any additional requirement as warranted. First American Title Insurance Company Form WA-5 (6/76) Commitment .,, ··-- INFORMATIONAL NOTES File No.: NCS-795710-WA! Page No. 6 A. Effective January 1, 1997, and pursuant to amendment of Washington State Statutes relating to standardization of recorded documents, the following format and content requirements must be met. Failure to comply may result in rejection of the document by the recorder. B. Any sketch attached hereto is done so as a courtesy only and is not part of any title commitment or policy. It is furnished solely for the purpose of assisting in locating the premises and First American expressly disclaims any liability which may result from reliance made upon it. C. The description can be abbreviated as suggested below if necessary to meet standardization requirements. The full text of the description must appear in the document(s) to be insured. ptn Sec 32 Twp 23N Rge SE, NW Qtr NE Qtr APN: 322305-9104-06 D. A fee will be charged upon the cancellation of this Commitment pursuant to the Washington State Insurance Code and the filed Rate Schedule of the Company. END OF SCHEDULE B First American Title Insurance Company Form WA-5 (6/76) Commitment First American Title Insurance Company National Commercial Services COMMITMENT Conditions and Stipulations File No.: NCS-795710-WAl Page No. 7 1. The term "mortgage" when used herein shall include deed of trust, trust deed, or other security instrument. 2. If the proposed Insured has or acquires actual knowledge of a defect, lien, encumbrance, adverse claim or other matter affecting the estate or interest or mortgage thereon covered by this Commitment, other than those shown in Schedule B hereof, and shall fail to disclose such knowledge to the Company in writing, the Company shall be relieved from liability for any loss or damage resulting from any act or reliance hereon to the extent the Company is prejudiced by failure to so disclose such knowledge. If the proposed Insured shall disclosure such knowledge to the Company, or if the Company otherwise acquires actual knowledge of any such defect, lien, encumbrance, adverse claim or other matter, the Company at its option, may amend Schedule B of this Commitment accordingly, but such amendment shall not relieve the Company from liability previously incurred pursuant to paragraph 3 of these Conditions and Stipulations. 3. Liability of the Company under this Commitment shall be only to the named proposed Insured and such parties included under the definition of Insured in the form of Policy or Policies committed for, and only for actual loss incurred in reliance hereon in undertaking in good faith (a) to comply with the requirements hereof, or (b) to eliminate exceptions shown in Schedule B, or (c) to acquire or create the estate or interest or mortgage thereon covered by this Commitment. In no event shall such liability exceed the amount stated in Schedule A for the Policy or Policies committed for and such liability is subject to the Insuring provisions, exclusion from coverage, and the Conditions and Stipulations of the form of Policy or Policies committed for in favor of the proposed Insured which are hereby incorporated by references, and are made a part of this Commitment except as expressly modified herein. 4. Any claim of loss or damage, whether or not based on negligence, and which arises out of the status of the title to the estate or interest or the lien of the Insured mortgage covered hereby or any action asserting such claim, shall be restricted to the provisions and Conditions and Stipulations of this Commitment. First American Title Insurance Company Form WA-5 (6/76) Commitment The First American Corporation First American Title Insurance Company National Commercial Services PRIVACY POLICY We Are Committed to Safeguarding Customer Information File No.: NCS-795710-WA! Page No. 8 In order to better serve your needs now and in the future, we may ask you to provide us with certain information. We understand that you may be concerned about what we will do with such information particularly any personal or financial information. We agree that you have a right to know how we will utilize the personal information you provide to us. Therefore, together with our parent company, The First American Corporation, we have adopted this Privacy Policy to govern the use and handling of your personal information. Applicability This Privacy Policy governs our use of the information which you provide to us. It does not govern the manner in which we may use information we have obtained from any other source, such as Information obtained from a public record or from another person or entity. First American has also adopted broader guidelines that govern our use of personal information regardless of its source. First American calls these guidelines its Fair Information Values, a copy of which can be found on our website at www.firstam.com. Types of Information Depending upon which of our services you are utilizing, the types of nonpublic personal information that we may collect include: • Information we receive from you on applications, forms and in other communications to us, whether in writing, in person, by telephone or any other means; • Information about your transactions with us, our affiliated companies, or others; and· • Information we receive from a consumer reporting agency. Use of Information We request information from you for our own legitimate business purposes and not for the benefit of any nonaffiliated party. Therefore, we will not release your information to nonaffiliated parties except: (1) as necessary for us to provide the product or service you have requested of us; or {2) as permitted by law. We may, however, store such information indefinitely, including the period alter which any customer relationship has ceased. Such information may be used for any internal purpose, such as quality control efforts or customer analysis. We may also provide all of the types of nonpublic personal information listed above to one or more of our affiliated companies. Such affiliated companies include financial service providers, such as title insurers, property and casualty Insurers, and trust and investment advisory companies, or companies involved in rea! estate services, such as appraisal companies, home warranty companies, and escrow companies. Furthermore, we may also provide all the information we col!ect, as described above, to companies that perform marketing services on our behalf, on behalf of our affiliated companies, or to other financial institutions with whom we or our affiliated companies have joint marketing agreements. Former Customers Even if you are no longer our customer, our Privacy Policy wil! continue to apply to you. Confidentiality and Security We will use our best efforts to ensure that no unauthorized parties have access to any of your information. We restrict access to nonpublic personal information about you to those individuals and entities who need to know that information to provide products or services to you. We will use our best efforts to train and oversee our employees and agents to ensure that your information will be handled responsibly and in accordance with thls Privacy Policy and First American's Fair Information Values. We currently maintain physical, electronic, and procedural safeguards that comply with federal regulations to guard your nonpublic personal information. c 2001 The First American Corporation -AH Rights Reserved First American Title Insurance Company 1,J ,., <-- 0 0 1:nis COUNTY HATER DJSf:l:ICT ::o. 58 10S2G S:. E. 17GTH r.:-.1:rn~:. 11;:;.sr..1 r-:,:;ro~; 98055 I' .'.,JJ :~C:1" l vr1.1 L. ~'.e..:hit.:h I'. O. R"..I~: Ill Rt·n:._on, Ii.\. 9BO:>,-, La~rence s. Muhich 3?·::'.3-~-:R Contrr:ct ~::-: .- REcc;:J3 & E'-== 1<.lh.G c,:;;1;~ i. 1,: "":vl bei::'-'"'"ri ttc> KU:G c;o:.;:;·n 1:.:,.TEP-DISTP.IC"i'. 1:0. ss. a 1':'.mic:ipa!. corpo:-.atioa of l:ic,; 'lh'. ',o!"th c, 1'?.rtcr of th~ S:.i:.ith 4/lOth~ (Jf r.hc 1-:e:.t h::11£ of th;:; 11est h;:,.L: of th,:; t.:on.J.i-.-c:si:. qt1<:rtcr-o:" tht: }:o-::-thc!ast q'.lcrtcr of Scctic,:n. 3?, "fo· .. n~t,.l.p z::; ;-:'Jrth, P...::11::e 5 cast, J';_;.J. _ lying South of the '.\arth 30 feet thereof; LESS 10Bth A\·cnue S.f:. ·1·1.:il v:.i·tiun 0f th'.! a~ovc <.:~~,crJbc<l :r,:irc.cl \;hic.h lies 10 f~ct ·E::.stcrly ;•n.i ·,t ri;:!•t nu~;lc::; to the followiil;'. o:lescrihd line. 1:c;;i.,,;t~r:z O??Ositc Hi.th·,,esy Enginc~r's Stativn 314-1-00 ;:i.ml .:o f..:,e-t F.:1::te:rlr of the ccnterlin-:: of SR 515, T:cntar: Vicinit)'; S..E. 19(,th St. to (:..rr Ro;:i.J; thcn::c ;:o,rths:rlr p;,rallel to s:ti<l centerline ta High1;ay L1:.:_,i;,2er's St;.tion 3E, .. 81; thence \"ortherly in a straight li.n~ to p:.int op;"J'.dte: 1ligh1;.1y !::r::::incer's Station 318+41 ~ni 45 feet f..a5terly (,! ,;aJJ ccr.tcr.lii:t: 2;-:'.l the-cr.d o[ this line tlc:;criptio11. i'ht:-,;:,ic! t;r:-1.-•ni:!e e;J:,:111 l,i<'.'<! th~ ri:;.nt •·ith:.u pr'.::,r ;nSLitutio:. o! aay o~ r::-,.,c.:,:,H:1z at la·.,, at s,1~h t!n.:1;; "" ::;iy he c:(..:,·.~~atry, to <"::ter upon t ',t "'"~"':.?r~ for ti' • ., P'l!,'c':." o: ~o:i.,;1:n,s:tlns, repa'.rin~, alti:ring or ceco.o- ',tr-,ct!!l.; ,;:dd .rat"r main, or :::l'.:l.ng any i:conri.:1cti"ns ther.,\.alth, 1.ithout in- ("~rr lng a11y lrg.al ob1iga::1on or l!ab1lity tho?rcfor, pro·.•ido2,d that ~uch con- ,.:ruc:ing., r";iair1Di!, alterl~ or recons!::ucti~ of said .. a~e! ~ain shall be ::~ ~::;ilishi:!:! in S"-Ch a :::anaet ti:at the p::l\'ate i'=tpr.:ivic:::ent:,: ,:,dsil.n;: in this ~.iso?:::ant sh:i.11 not be disturbed a: destroyoC, ,:>r tu t':lE' ever.t th,?t they are <::is:crC>ed or Ce!'-trt,::ed, they -.:ill be rei}laced in as :;;o:>! a ..:ouditio:i as they •.-e!"~ l~dL:itrly bef.,,r~-the pro,><'!"t)" 1,;as entered upo:i t,y the sa1d G:aatee. The. Cr.:,..,tor shall rt'tain t~,:, right to us~ the S'-'rtace of the e.ase::iiea:; i!: ,;ucb us" d=s no:; in:erfere '-'it;h iostallo.~io::i r,f t~e :.iacer ~ain. liWt!ver, ::i,,. Granter shall not erect bui1Cin&s or structures o::i the eas,c:r,em during th.:, existence of sa!d ea,,.t'!l'enr. The e.as<"::ie-:it, dud;,;; its eY.!.~tem:.::, sh~1l be a ~ovenant r;;::ntr.g 'liith the L:,::d. a:id shall be bi;:,.diag t>-, t:?.:. succe;,;s,:,rs, ~ei:--s, a:-:d assigns of both of r:. l."IT!:f.:3S, kll:ri(WF, 'I.I! hav.i S-.!t rh«c oe1r han::!s 19 a---- ,,,,e, and SE,a!s this_e> ___ day of , S"i,\T£ OF 1.IA51lISC:IO~) ) " cou:;r; OF tm;c ) This h to ce.rr Hy that o <o oe kn~ <o b, <h, todMdual demib,d in ~o m,m, ,>, ~schin ,wl _/. foregc.ing inst'Ollllent, and ackno.,l,:,dged that s1gi'!ed th"! same as~,,(_ free and vole1nta,:y act and dee'J, for the uses .ind purpos.e~ therein cer,;tioned. GiveQ undet my hand aod offidal nt is approved and n,co=ended. Da<ed,_-'<&-,/:._,_:/U"'Jl--/__:_7-;s.\'--- 1 / ,Attorn1c;;. Oate<i /z /,c:,/ 7' J / I ,En;lneer. t.OUD Of CO!-NlSS!O:-.'"?.RS OP' K[;.;G Cot'hTi o!'A'i:~ DISTRICT NO, S,8_ EasEl!lent No. 32-l3-S-4 R MUHICll SPECI.,1. 5TlP1JL..\TlONS 1. ln the construction work area, ~here there is an established lawn, restoration shall be made by replacing ~ith either oriqinal grGSs sod or imported grass sod, placed over a 4" deptb of sandy top soil. 2. The gravel dr~veway is to be restored in as good or better condition as it was imrlediately before the property Wlt3 entered upon by th@ contractor. 3. The root systema of the two j2) "Crimson King Red Maple Trees", "King Apple Treem~ and the "Sutters Gold Rose Bush", located on or near tbe easmaent shall not be desturbed, but sbUl be-turmeled or otherwise protected by the contractor to insure that no damage is done. 1n the event these subject: trees and bush do not survive, compenaotion in the following amounts wi 11 be made : Crl.m60n King Red Maple Tree Crir.l!!on King Red Ka.ple Tree King Apple Tree Sutters Gold Rose 9ush $250.1'}0 $250.00 $300.00 $ 35.0f) . BR!STO\-\ --· 10 . P[RM ESM'T f .... 11::,1 · ... ~~OP . , I ' ! . ,r fL!::., ,:.·l 'l • "" r ,, --........... ,..,., ... ,...""-'- E A S E X E N T this~ day of ll. L ilr is tow l7S08 108th Ave. ~.E. Renton, Wa. 98055 .l:".~ bc~,.,,ell:-. ::S.c CASCADE SEWER OIS'IRICT, a mur;.iCipal corporat~cr. of K!r.q .:..;;...:.:-.:.y p i;.'as:'" . .;.r.~t.Or41 hereinofter ter:r~d the UGrantee·· • &r.d ~ /lie F. /? Bns~{(), /u-£,ia-"·I i< "-!1/e ..... _ ~ -•• ,a. ... sa. id :::;:ant:or tr.e Grantee. 7 =o= aDd in consideration of the s ..... "Ti of $ and other valwable conside~at~on does ~y ~~ese ~=€se~~s gra~~ ~~~o tr~ Grantee a perpetual easement for sewer ~a~~s o~d a~?~=~e~a~ces ~trc~gh, over and across the following described ?roperty s:.. t.;,;ated in i<ir6g Co1..onty. Washington, more particularly described as :'oJ. -ows; The tast 10 feet of the West 40 feet of the following descrioed par,:el: ,co Sout~ 132 feet of the North 6/lJ of the West 1/2 0£ the \\est ., _ of the ~orthwest l/4 of the Northeast 1/4 of Section 32, To~n~hi? 23 Xorth. Range 5 East, W.M., King County, Washington. Together ~ith a temporary construction easement described as the East 15 feet of the West 4S feet of said parcel. Sa;.d t.erntorary :.onstruction easement shall remc.1.i.n 1:i force c.-.... r~n& construct.ion and until the sewers and appurtenances are acc~pted £or ,:iaintenance and operation by the Cascade Sewer Dist:rict. Easeaont No. 32-23-5-9 ::;,a1j :-·.creto!:o.re mentioned ,;,;an."tee, 1t.a successor• or 1.ts asslgr,St s:.s;.i:. :·.:,v.: tl,e :1:,:.t, war.out prior institutl.on of any suit or i:::oceedir.g <it law, at ss"h t.:r."s as r.,ay be necessary to ent"r upon said above deacrih<',d property ::~~r t~.e pu.rpcsl;'s ot construction, repairing, altering or reconstructing said s€'-...cts. er .-.~;dt!ng any connections therewith, without incurring ijr,; leJ.;a.l .::::l!St.it~ur;s er lidbllity therefor. provided that such constructl.or., repa.:.r1ng, altcr1r,,J vr recor.struction of such sewers shall be accomplished in such a. :-:-.. 1::ner t'··,..l.t. tt-,e pr1vate improvements existing in the easesnen.t shall not :Ce d~st~~~c~ or ~escroyed, or in the event they are disturbed or destroyed, th~y ~,:" be replaced in as good a condition as they were ~m.~ediat,ly before tr.e property was entered upon b)' the Grantee,.,,.,., ~~e,,,p;"':j' w~ #ok! /re~ r-!Sh.V/ #cr,!,e ~.HiJ',fe4 '1.-Qrtf!.r/n,yeef v/7';41"' o~r/,,v.a/ Cd#,Pe,v.s~~ '1) 7he ::irantor shall retain the r1ght to use the surface of said easerner.t ~ 2:5 ~= a.:ch '1&e doea not interfere with inatallation of the aewar rr.ain, However, '::c' Lt') t:-.e :;rar.tor snall not erect any bu1 ldings or str..ictures on the easement. :s; r~1s easeme~t shall be a covenant running with the land and shall be =:..::.d.i.:9 v:-~ bot!". parties. their &fwcc&ssors, heira a.nd assigns. IN WITNESS W~'EREOF, we &.dYua.-1 . 19 zv. have set our hands and seals this J.4aay of Granters• S?kTE OF WAS~INGTON SB COUNTY OF KIN::i .. -~ <. .. f I' On fr,is day personally appeared before me iJ/deJ='e~5,.../4r;;s;14/ to me knowr, to be the individua~ described in and who execcited the foregoing ir.stru~ent, and acknowledged to me that~ signed and sealed the said ir.str~ment as ~/:.: -48 and voluntary act and deed for the uses and purposes • t.hereir. rr.entioned. WITNESS my hand and official 0/iYU-drY. 19 7~ r . seal hereto affixed this Uday of ;,,cc?:?'l'ED by CASCAl:lE Sa!ER.J>I~ICT at ~eqular -eting of the CO."':" .. ":,issic:-,ers thereof on the ~ day of ~Yf1 t x;.r:• 19 7,......-; ~T]~~ ~.~ ,/~ r Seci-etary ? Page 2 Board of • N 0 /"\J r-- / ;._-·=-' ~~·, / JZ. · ~ 3 ·S) \ 8 . COVA:,..: I-,- ~ :,: :,: </) "' u.J uJ 4 c.. a; ::;: uJ uJ a.. ,- I-,- u.. u.. 0 Lf\ ..... ..... (i-04) -"2 ·~ <3~·~3-5) 32. -2.3: · .;\ ' 0 B?.JSTO\./ ..... ,. , ,,... ' • ,_.r""'. . .__.., ,7808 J .., 4 '' . 4 .i..1.n,00 ---·---. ..... ·~~ ·-x-, ... ·, , .. fir ..-v..,...,.,. .o~,,,:;r t :,c.;;o:-i::i~. :.: •.... ·• -~-. ... -··· ·~---- '/QI 3972 l'ACt288 50940R1. ~ ;~s AomM!>rr, -~e~,..E~6~'~r~P-«=---~---~--Jl'la:,hin.p,t.on ! m t.l"tt ft _d;;.y or s e PT t M ,., E 8 ,19_.r:t_., by Ml.I b_~Pft.~n ~ ~6,")1,,,·~tB8iJtew ~ b ~ e. y .G (I (-"~~-o'""'"'w __ _ ::: <r. / HU= AND =· ~ CALtl'D T~ l'!RIIT r~ns, .,,. icrno COU!II",, • IIUHIOIFAL WH!R&.\S 1 fl.rot Jarl1o:, ropro&ent .and 'lfarrAnt that they Aro the O'lmB:"'I! {t.onont"' mort8"g,,•) ot that oerla1n paroel or land da!IOl'ibod •• foll<Ma1 1 ·-' f/-t /... ' '., s .s1:c 3:1..Twf'. :l3-rio-s. 7,._y. J..oT ,0·1. G r:. w z t, F w 4 "F tV w 1 fJ F NP Y1 ,. Co. , .. It ts WTUAll,"t AOOEED AS FOU.Cffl'S1 that t~e ,9JJ.d F1.Ntt P=lrt1eo hereby conr3cnt to t~ natural flOl'f of 3urt.aOG watBr from 541d plat to bo i::&ni.ed tn its n;;.tural ch.:im.0:1 :r.crosu the lJ:.-op:ir ·"¥ o1" the P1.z-.st Pe.rtie3 13f1.d t.o hold king CC11.U1.ty bl&mole:1::i ror any d=.nge u • .-tt m.'l.Y be o;:;.ul50d by a.a.id dra.inage n°"• Di W!THESS 1'IHEllEOF tho portiu h!?I"8to "'\'V'O hereunto :,1:1t thaU' m.nd arid itt•,,li, nt t.hc <lAr ...n.d yao.:: i'il"':1t e.bove wr1.t.t.on. hi, B5ikil 01 COON'rt eciii!S!lffiW !I\RTT OF 'l!l!i SllCDN!l PART, ·.;,&v·: --~~~1~ .-~~=' DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT --------Renton 8 AFFIDAVIT OF INSTALLATION OF PUBLIC INFORMATION SIGN STATE OF WASHINGTON COUNTY OF KING Planning Division 1055 South Grady Way, Renton, WA 98057 Phone: 425-430-7200 I www.rentonwa.gov ss -~\-==-'----·,:..._1:..._'.:.."--.::."_\_,__----'\'-J\.-'"j"----"('--;,.,n--'"''-----------------' being first duly sworn on oath, deposes and s~s: 1. On the day of _.,_()"-'-'-· -~-"'-".'o-'-'r-·' __ , 20_:_s_, I installed sign(s) on the property located _,_\ ~~~-'·.~"-'·"-· !-'' '.:..' _..:c\_c(_f.:..;_. ·l_._ .. -'-A"'·"'' ::c' ~c-' \°'-----for the fo I lowing project: information Project Name Owner Name public at 2. I have attached a copy of the neighborhood detail map marked with an "X" to indicate the location of the installed sign. 3. This/these public information sign(s) was/were constructed and installed in locations in conformance with the requirements of Chapter 8 Title 4 of Renton Municipal Code and the City's "Public Information Signs Installation" handout package . ............... k . ...__...._.._......,...,....,~··,o(j,"~·· / NOTARY PUBLICln an or th~ S~te of 1Nashington, 'iotc11y '',:t::,._ residing at f: ,) D\<,) NJ,""., Wt\ 3L::1rf' ,-;f Wc-i:sr, 1nr_;tor I l.AURll: J\ \HA!~P (\ [ \ My ,~ppo1ntrnr~nt lxp1rns on Sept 2d. 2018 My commission expires on_··-'--' t\.:.~.L.;·=,.\--'l>"'------ 7 H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Pub Info Sign Handout.docx Rev.04/2016