Loading...
HomeMy WebLinkAboutRC 20240815000001Instrument Number: 20240815000001 Document:COV Rec: S323.50 Page-1 of 21 Record Date:8/15/2024 8:37 AM Electronically Recorded King County, WA Return Address: City Clerk's Office City of Renton 1055 S Grady Way Renton, WA 98057 DECLARATION OF COVENANT FOR INSPECTION AND MAINTENANCE OF DRAINAGE FACILITIES AND ON -SITE BMPS Grantor: City of Renton Grantee: City of Renton, a Washington municipal corporation Legal Description: POR OF NW 1/4 OF NE 1/4 INC IN FOL DESC-BEG AT NXN OF E LN OF JONES ST & SWLY BDRY OF CEDAR RIVER ...See full legal on Exhibit B. Assessor's Tax Parcel ID#: 2023059059 and 0007200175 IN CONSIDERATION of the approved City of Renton (check one of thefollowing) ❑ Residential Building Permit ❑Commercial Building Permit ❑ Clearing and Grading Permit ✓❑ Civil Construction or Utility Permit for Permit(s) C21006142 (construction/Building/utility Permit#) relating to the real property ("Property") described above, the Grantor(s), the owner(s) in fee of that Property, hereby covenants (covenant) with the City of Renton ("City of Renton" or "City"), a municipal corporation of the state of Washington, that he/she (they) will observe, consent to, and abide by the conditions and obligations set forth and described in Paragraphs 1 through 9 below with regard to the Property, and hereby grants (grant) an easement as described in Paragraphs 2 and 3. Grantor(s) hereby grants (grant), covenants (covenant), and agrees (agree) as follows: 1. The Grantor(s) or his/her (their) successors in interest and assigns ("Owners ") shall at their own cost, operate, maintain, and keep in good repair, the Property's drainage facilities constructed as required in the approved construction plans and specifications R-421101 (Project Plan #) on file with the City of Renton and submitted to the City of Renton for the review and approval of permit(s) C21006142 _ (construction/Building/utility Permit#). The Property's drainage facilities are shown and/or listed on Exhibit A — Site Plan. The Property's drainage facilities shall be maintained in compliance with the operation and maintenance schedule included and attached herein as Exhibit B — Operations and Maintenance. Drainage facilities include pipes, channels, flow control facilities, water quality facilities, on -site best management practices (BMPs) and other engineered structures designed to manage and/or Page 1 of 21 Instrument Number: 20240815000001 Document:COV Rec: S323.50 Page-2 of 21 Record Date:8/15/2024 8:37 AM King County, WA treat stormwater on the Property. On -site BMPs include dispersion and infiltration devices, bioretention, permeable pavements, rainwater harvesting systems, tree retention credit, reduced impervious surface footprint, vegetated roofs and other measures designed to mimic pre -developed hydrology and minimize stormwater runoff on the Property. 2. City of Renton shall have the right to ingress and egress over those portions of the Property necessary to perform inspections of the stormwater facilities and BMPs and conduct maintenance activities specified in this Declaration of Covenant and in accordance with the Renton Municipal Code. City of Renton shall provide at least thirty (30) days' written notice to the Owners that entry on the Property is planned for the inspection of drainage facilities. After the thirty (30) days, the Owners shall allow the City of Renton to enter for the sole purpose of inspecting drainage facilities. In lieu of inspection by the City, the Owners may elect to engage a licensed civil engineer registered in the state of Washington who has expertise in drainage to inspect the drainage facilities and provide a written report describing their condition. If the engineer option is chosen, the Owners shall provide written notice to the City of Renton within fifteen (15) days of receiving the City's notice of inspection. Within thirty (30) days of giving this notice, the Owners, or engineer on behalf of the Owners, shall provide the engineer's report to the City of Renton. If the report is not provided in a timely manner as specified above, the City of Renton may inspect the drainage facilities without further notice. 3. If City of Renton determines from its inspection, or from an engineer's report provided in accordance with Paragraph 2, that maintenance, repair, restoration, and/or mitigation work is required to be done to any of the drainage facilities, City of Renton shall notify the Owners of the specific maintenance, repair, restoration, and/or mitigation work ("Work") required pursuant to the Renton Municipal Code. The City shall also set a reasonable deadline for the Owners to complete the Work, or to provide an engineer's report that verifies completion of the Work. After the deadline has passed, the Owners shall allow the City access to re -inspect the drainage facilities unless an engineer's report has been provided verifying completion of the Work. If the Work is not completed within the time frame set by the City, the City may initiate an enforcement action and/or perform the Work and hereby is given access to the Property for such purposes. Written notice will be sent to the Owners stating the City's intention to perform such Work. This Work will not commence until at least seven (7) days after such notice is mailed. If, within the sole discretion of the City, there exists an imminent or present danger, the seven (7) day notice period will be waived and Work will begin immediately. 4. The Owners shall assume all responsibility for the cost of any Work, or any measures taken by the City to address conditions as described in Paragraph 3. Such responsibility shall include reimbursement to the City within thirty (30) days of the receipt of the invoice for any such Work performed. Overdue payments will require payment of interest at the maximum legal rate allowed by RCW 19.52.020 (currently twelve percent (12%)). If the City initiates legal action to enforce this agreement, the prevailing party in such action is entitled to recover reasonable litigation costs and attorney's fees. 5. The Owners are required to obtain written approval from City of Renton prior to filling, piping, cutting, or removing vegetation (except in routine landscape maintenance) in open vegetated stormwater facilities (such as swales, channels, ditches, ponds, etc.), or performing any alterations or modifications to the drainage facilities referenced in this Declaration of Covenant. Page 2 of 21 Instrument Number: 20240815000001 Document:COV Rec: S323.50 Page-3 of 21 Record Date:8/15/2024 8:37 AM King County, WA 6. Any notice or consent required to be given or otherwise provided for by the provisions of this Agreement shall be effective upon personal delivery, or three (3) days after mailing by Certified Mail, return receipt requested. 7. With regard to the matters addressed herein, this agreement constitutes the entire agreement between the parties, and supersedes all prior discussions, negotiations, and all agreements whatsoever whether oral or written. 8. This Declaration of Covenant is intended to protect the value and desirability and promote efficient and effective management of surface water drainage of the real property described above, and shall inure to the benefit of all the citizens of the City of Renton and its successors and assigns. This Declaration of Covenant shall run with the land and be binding upon Grantor(s), and Grantor's(s') successors in interest, and assigns. 9. This Declaration of Covenant may be terminated by execution of a written agreement by the Owners and the City that is recorded by King County in its real property records. IN WITNESS WHEREOF, this Declaration of Covenant for the Inspection and Maintenance of Drainage Facilities is executed this day of , 20 Armondo Pavone Jason A. Seth Mayor City Clerk STATE OF WASHINGTON ) COUNTY OF KING )ss. On this day personally appeared before me: to me known to be the individual(s) described in and who executed the within and foregoing instrument and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes therein stated. Given under my hand and official seal this day of Printed name Notary Public in and for the State of Washington, residing at My appointment expires Page 3 of 21 20 Instrument Nun Record Date:8/1 fiber: 20240815000001 Document:COV Rec: $323.50 Page-4 of 21 5/2024 8:37 AM King County, WA 'o\ PROPERTY I urn �) UNAU Y VVA Y, NLIN I UN, LINE WA 98057 PROJECT PARCEL NO.: 202305-9059, 000720-0175 PROJECT ADDRESS: 720 JONES AVE. S RENTON WA 98507 SECTION/TOWNSHIP/RANGE: S20, T23N, R5E TOTAL ACREAGE: 10.71 I \\TOTAL IMPERVIOUS AREA: 67,518 DISPERSION TRENCH BASKETBALL \ COURT 4680 SF IN �;\ ~ SOIL a \ AMENDMENT Cn o \ w 1211 Q -4 4 7 4 , i EXISTING / ~v BASEBALL FIELD / III J lC rJ NATIVE GROWTH RETENTION TRACT, TYP. `` m-GAZEBO 1008 SF -� - GAZEBO 576 SF µ INFILTRATION , TRENCH, TYP. NOTE: SOIL AMENDMENT ` 14 CONCRETE PATH BMP IS USED. SEE I,. 34,718 SF APPROVED PLANS R-421101 I \\ \ FOR MORE DETAILS. BIORETENTION j \ 0 20 50 100 150 FT. Page 4 of 21 Instrument Number: 20240815000001 Document:COV Rec: S323.50 Page-5 of 21 Record Date:8/15/2024 8:37 AM King County, WA MAINTENANCE INSTRUCTIONS FOR FULL DISPERSION Your property contains an on -site BMP (best management practice) called ` full dispersion." Full dispersion is a strategy for minimizing the area disturbed by development (i.e., impervious or nonnative pervious surfaces, such as concrete areas, roofs, and lawns) relative to native vegetated areas (e.g., forested surface) together with the application of dispersion techniques that utilize the natural capacity of the native vegetated areas to mitigate the stormwater runoff quantity and quality impacts of the developed surfaces. This on -site BMP has two primary components that must be maintained per Appendix A of the City of Renton's Surface Water Design Manual: (1) the devices that disperse runoff from the developed surfaces, and (2) the native vegetated area and flowpath receiving the dispersed runoff. Dispersion Devices The dispersion devices used on your property include the following as indicated on the site plan (CHECK THE BOX(ES) THAT APPLY): ❑splash blocks, ❑rock pads, ❑gravel filled trenches, ❑sheet flow. MAINTENANCE RESTRICTIONS The size, placement, composition, and downstream flowpaths of these devices as depicted by the site plan and design details must be maintained and may not be changed without written approval from the City of Renton or through a future development permit from the City of Renton. INSPECTION FREQUENCY AND MAINTENANCE GUIDELINES Dispersion Devices • Dispersion devices must be inspected annually and after major storm events to identify and repair any physical defects. • When native soil is exposed or erosion channels are present, the sources of the erosion or concentrated flow need to be identified and mitigated. • Bare spots should be re -vegetated with native vegetation. • Concentrated flow can be mitigated by leveling the edge of the pervious area and/or regrading or replenishing the rock in the dispersion device, such as in rock pads and gravel -filled trenches. Native Growth Retention Area • The native vegetated surface required for full dispersion is delineated as a "native growth retention area" on the on -site BMP site plan. The trees, vegetation, ground cover, and soil conditions in this area may not be disturbed, except as allowed by the following provisions for that portion of the native growth retention area outside of critical areas and critical area buffers: 1. Individual trees that have a structural defect due to disease or other defects, and which threaten to damage a structure, road, parking area, utility, or place of employment or Page 5 of 21 Instrument Number: 20240815000001 Document:COV Rec: S323.50 Page-6 of 21 Record Date:8/15/2024 8:37 AM King County, WA public assembly, or block emergency access, may be topped, pruned, or removed as needed to eliminate the threat. 2. Dead or fallen trees, tree limbs within ten feet of the ground, and branches overhanging a residence may be removed to reduce the danger of wildfire. 3. Noxious weeds (i.e., plant species listed on the State noxious weed list in Chapter 16-750 WAC) and invasive vegetation (i.e., plant species listed as obnoxious weeds on the noxious weed list adopted by King County) may be removed. 4. Passive recreation uses and related facilities, including pedestrian, equestrian community and bicycle trails, nature viewing areas, fishing and camping areas, and other similar uses that do not require permanent structures, are allowed if clearing and soil compaction associated with these uses and facilities does not exceed eight percent of the native growth retention area. RECORDING REQUIREMENT These full dispersion on -site BMP maintenance and operation instructions must be recorded as an attachment to the required declaration of covenant and grant of easement per Requirement 3 of Section C.1.3.4 of the City of Renton Surface Water Design Manual. The intent of these instructions is to explain to future property owners, the purpose of the BMP and how it must be maintained and operated. These instructions are intended to be a minimum; the City of Renton may require additional instructions based on site -specific conditions. See the City of Renton's Surface Water Design Manual website for additional information and updates. Page 6 of 21 Instrument Number: 20240815000001 Document:COV Rec: S323.50 Page-7 of 21 Record Date:8/15/2024 8:37 AM King County, WA TYPICAL FULL DISPERSION°APPLICATIONS HOUSE 000E ==E ROOF DOWNSPOUT =E 0 00E =E MIN. VEGETATED FL FLOWPATH UNDER FULL DISPERSION, SEE SECTION C.2.1.3 000E SPLASH BLOCK FF- DOWNSPOUT EXTENSION ---- SPLASH BLOCK SIDE VIEW NTS Page 7 of 21 Instrument Number: 20240815000001 Document:COV Rec: $323.50 Page-8 of 21 Record Date:8/15/2024 8:37 AM King County, WA Ax 2cr�r SI.aP� .�; 1 400 SO s 2:800 $Q 5, FU �51 FOi f PLAIN TRENCH SECTION I11AIMMr R*0 PERFORATED PIPE, 4" MIN. DIA. fi 0 EDO�cOiFLNNfJiSTu�RE3ED� ,NATIVE VEGETATION a I r' t t $MA9.L CATCATCHBASIN' OR YARD DRAIN +�y FT FOR A WOEI FT NVFS FT FOUR A 200-FT NVFS .-.. CB .. TYPE `t � 000 $U FT' __.... A 100-FT NVFS ,000 O FT R A 200-FT NVFS t e k t m I � r VIEW QF Rt7� m... MIN. 6' DIA. NTS RIGID PIPE Page 8 of 21 SLOPE 10-FOOT-LUNG DISPERSION TRENCH n Y ..<. �- MIN. 104-FT NVFS' ry I 50' SEPARATION BETWEEN F6,OWPATH SEGMENTS TRENCHES FLO VVPATH SEGMENT z.' ' (NVFS) l 100 FEAT [44 IMU, "15 SLOPE 1 I f k t 1 9 I 50-FOOT-LONG DISPERSION TRENCH WTH NOTCH BOARD SEE" FIGURE C.2.1.D Instrument Number: 20240815000001 Document:COV Rec: S323.50 Page-9 of 21 Record Date:8/15/2024 8:37 AM King County, WA EDGE OF UNDISTURBED NATIVE CRUSHED ROCK STRIP VEGETATION 2-FT WIDE � t NATIVE VEGETATEDFLOWPATH SEGMENT (NVFS) WIDTH = 25 [ A 100-FT NV= 5% 100 FT MINIMUMWIDTH SLOPEA ]FOR\ = 50 200-FT NV I � I =15% SLOPE I / I I I i PLAN VIEW NTS Page 9 of 21 Instrument Number: 20240815000001 Document:COV Rec: S323.50 Page-10 of 21 Record Date:8/15/2024 8:37 AM King County, WA MAINTENANCE INSTRUCTIONS FOR FULL INFILTRATION Your property contains an on -site BMP (best management practice) called "full infiltration," which was installed to mitigate the stormwater quantity and quality impacts of some or all of the impervious surfaces on your property. Full infiltration is a method of soaking runoff from impervious area (such as paved areas and roofs) into the ground. If properly installed and maintained per Appendix A of the City of Renton's Surface Water Design Manual, full infiltration can manage runoff so that a majority of precipitation events are absorbed. Infiltration devices, such as gravel filled trenches, drywells, and ground surface depressions, facilitate this process by putting runoff in direct contact with the soil and holding the runoff long enough to soak most of it into the ground. To be successful, the soil condition around the infiltration device must be reliably able to soak water into the ground for a reasonable number of years. Infiltration Devices The infiltration devices used on your property include the following as indicated on the site plan (CHECK THE BOX(ES) THAT APPLY): ❑gravel filled trenches, ❑drywells, ❑ground surface depressions. MAINTENANCE RESTRICTIONS The size, placement, and composition of these devices as depicted by the site plan and design details must be maintained and may not be changed without written approval from the City of Renton or through a future development permit from the City of Renton. INSPECTION FREQUENCY AND MAINTENANCE GUIDELINES • Infiltration devices must be inspected annually and after major storm events to identify and repair any physical defects. • Maintenance and operation of the system should focus on ensuring the system's viability by preventing sediment -laden flows from entering the device. Excessive sedimentation will result in a plugged or non-functioning facility. • If the infiltration device has a catch basin, sediment accumulation must be removed on a yearly basis or more frequently if necessary. • Prolonged ponding around or atop a device may indicate a plugged facility. If the device becomes plugged, it must be replaced. • Keeping the areas that drain to infiltration devices well swept and clean will enhance the longevity of these devices. • For roofs, frequent cleaning of gutters will reduce sediment loads to these devices. Page 10 of 21 Instrument Number: 20240815000001 Document:COV Rec: S323.50 Page-11 of 21 Record Date:8/15/2024 8:37 AM King County, WA RECORDING REQUIREMENT These full infiltration on -site BMP maintenance and operation instructions must be recorded as an attachment to the required declaration of covenant and grant of easement per Requirement 3 of Section C.1.3.4 of the City of Renton Surface Water Design Manual. The intent of these instructions is to explain to future property owners, the purpose of the BMP and how it must be maintained and operated. These instructions are intended to be a minimum; the City of Renton may require additional instructions based on site -specific conditions. See the City of Renton's Surface Water Design Manual website for additional information and updates. Page 11 of 21 Instrument Number: 20240815000001 Document:COV Rec: $323.50 Page-12 of 21 Record Date:8/15/2024 8:37 AM King County, WA 4" RIGID OR 6" CB SUMP w/SOLID LID ROOF DRAIN FLEXIBLE PERFORATED PIPE --------- _____ INFILTRATION TRENCH TRENCH SETBACK FROM BUILDING AS REQUIRED, 15' MIN. OVERFLOW SPLASH BLOCK 4" RIGID OR 6" FLEXIBLE PERFORATED PIPE A 6" 6" LEVEL i I'MIN. 12" ` WASHED ROCK 1 z'-y" �� 1' MIN. 7 A SETBACK VARIES FROM BUILDING FINE MESH 5MIN. SECTION VIEW SCREEN CB SUMP w/SOLID LID NTS r COMPACTED BACKFILL j FFILTER FABRIC 2I., k 12" MIN. V ABOVE SEASONAL HIGH GROUNDWATER TABLE, SEE SECTION C.2.2.2 t ROOF DOWNSPOUT MARK CENTER OF HOLE WITH V CAPPED PVC OR OTHER MEANS OVERFLOW FLUSH WITH SURFACE HOUSE SPLASH BLOCK TOPSOIL I MIN FLOW 5' MIN. SETBACK MIN. 4" DIA. FROM BUILDING PVC PIPE FINE MESH SCREEN 48 INCH DIAMETER VARIES FILLED WITH SIDES OF HOLE HOLE FILLED WITH CATCH BASIN LINED WITH 1 2'-3" WASHED (YARD DRAIN) FILTER FABRIC DRAIN ROCK 15' MIN. AS REQUIRED, SEE SECTION C.2 2 3 SEASONAL HIGH GROUNDWATERTABLE, SECTION SEE SECTION NTS T2 2 2 CT DOWNSPOUT CATCH BASIN (YARD DRAIN) FLow OUT O48 INCH A METER HOLE HLTED WITH PLAN VIEW DRAIN RO.1 NTS 4" RIGID OR 6" FLEXIBLE PERFORATED PIPE 121' -34" WASHED ROCK � 24 DRAIN GRASS FROM ROOF NTS i VERFLOW + �'�/\�\\�/\\\ TO 1-1/2" WASHED DRAIN ��/\\ ROCK11- MIN. 1' ABOVE SEASONAL HIGH GROUNDWATER 2' MIN. 18"MIN. MIN. AS REQUIRED, RE SEE C.2.2.3 TABLE, SEE SECTION C.2.2.2 X-SECTION NTS FILTER STRIP SEE SECTIONS GRASS 6.3.4 & 6.3.5 _ OVERFLOW VVVVV V V V V V 6" MIN. 14� 3" TO 1-1/2" WASHED DRAIN �j/��// ROCK V�j/ \T, DRIVEWAY / Q�QT,�Q�Q�Q�Q�� 18" MIN. NOTE: SEE C.2.2.3 FOR MIN. VABOVE SEASONAL HIGH GROUNDWATER TRENCH LENGTHS, TRENCH SPACING AND SITE LIMITATIONS TABLE,SEE SECTION C.2.2.2 X-SECTION NTS Page 12 of 21 Instrument Number: 20240815000001 Document:COV Rec: S323.50 Page-13 of 21 Record Date:8/15/2024 8:37 AM King County, WA MAINTENANCE INSTRUCTIONS FOR LIMITED INFILTRATION Your property contains an on -site BMP (best management practice) called "limited infiltration," which was installed to mitigate the stormwater quantity and quality impacts of some or all of the impervious surfaces on your property. Limited infiltration is a method of soaking runoff from impervious area (such as paved areas and roofs) into the ground. Infiltration devices, such as gravel filled trenches, drywells, and ground surface depressions, facilitate this process by putting runoff in direct contact with the soil and holding the runoff long enough to soak most of it into the ground. To be successful, the soil condition around the infiltration device must be able to soak water into the ground for a reasonable number of years. This on -site BMP shall be maintained per Appendix A of the City of Renton's Surface Water Design Manual. Infiltration Devices The infiltration devices used on your property include the following as indicated on the site plan (CHECK THE BOX(ES) THAT APPLY): ❑ gravel filled trenches, ❑ drywells MAINTENANCE RESTRICTIONS The size, placement, and composition of these devices as depicted by the site plan and design details must be maintained and may not be changed without written approval from the City of Renton or through a future development permit from the City of Renton. INSPECTION FREQUENCY AND MAINTENANCE GUIDELINES To be successful, the soil condition around the infiltration device must be able to soak water into the ground for a reasonable number of years. • Infiltration devices must be inspected annually and after major storm events to identify and repair any physical defects. • Maintenance and operation of the system should focus on ensuring the system's viability by preventing sediment -laden flows from entering the device. Excessive sedimentation will result in a plugged or non-functioning facility. • If the infiltration device has a catch basin, sediment accumulation must be removed on a yearly basis or more frequently if necessary. • Prolonged ponding around or atop a device may indicate a plugged facility. If the device becomes plugged, it must be replaced. • Keeping the areas that drain to infiltration devices well swept and clean will enhance the longevity of these devices. • For roofs, frequent cleaning of gutters will reduce sediment loads to these devices. Page 13 of 21 Instrument Number: 20240815000001 Document:COV Rec: S323.50 Page-14 of 21 Record Date:8/15/2024 8:37 AM King County, WA RECORDING REQUIREMENT These limited infiltration on -site BMP maintenance and operation instructions must be recorded as an attachment to the required declaration of covenant and grant of easement per Requirement 3 of Section C.1.3.4 of the City of Renton Surface Water Design Manual. The intent of these instructions is to explain to future property owners, the purpose of the BMP and how it must be maintained and operated. These instructions are intended to be a minimum; the City of Renton may require additional instructions based on site -specific conditions. See the City of Renton's Surface Water Design Manual website for additional information and updates. Page 14 of 21 Instrument Number: 20240815000001 Document:COV Rec: $323.50 Page-15 of 21 Record Date:8/15/2024 8:37 AM King County, WA 4" RIGID OR 6" CB SUMP w/SOLID LID ROOF DRAIN FLEXIBLE PERFORATED PIPE ______----- INFILTRATION TRENCH PLAN VIEW NTS TRENCH SETBACK FROM ROOF DRAIN BUILDING AS REQUIRED, 15' MIN. OVERFLOW SPLASH BLOCK 4" RIGID OR 6" FLEXIBLE PERFORATED PIPE A V/w�/.�`!/w/ice �;/i�%T✓i - -- 611 LEVEL 12" WASHED ROCK 1 i"-;' ? I'MIN. 1' MIN. A SETBACK VARIES FROM BUILDING FINE MESH 5' MIN. SECTION VIEW SCREEN CB SUMP w/SOLID LID NTS 2I" 12" MIN. V ABOVE SEASONAL HIGH GROUNDWATER TABLE, SEE SECTION C.2.2.2 MARK CENTER OF HOLE ROOF DOWNSPOUT WITH 1"CAPPED PVC OR OTHER MEANS OVERFLOW FLUSH WITH SURFACE HOUSE SPLASH BLOCK TOPSOIL 1'MIN. FLOW 5' MIN. SETBACK MIN. 4" DIA. FROM BUILDING PVC PIPE FINE MESH SCREEN 481NCH DIAMETER VARIES SIDES OF HOLE HOLE FILLED WITH CATCH BASIN LINED WITH 3"WASHED (VARDDRAI N) FILTER FABRIC DRAIN ROCK 15' MIN. AS REQUIRED, SEE SECTION C 2 2.3 MIN_ 1ABOVE SEASONAL HIGH GROUNDWATER TABLE, SECTION SEE SECTION C 222 NTS DOWNSPOUT CATCH BASIN (YARD DRAIN) RoOF ow DOWNSPOUT PLAN VIEW aIN ROC / NTS IMPACTED BACKFILL FILTER FABRIC 21" RIGID OR 6" FLEXIBLE PERFORATED PIPE FROM ROOF 1z' -a WASHED ROCK 24" SECTION A GRASS NTS i VERFLOW 1 6„MIN. 3/4" TO 1-1/2" WASHED DRAIN 18" MIN. ROCK 15' MIN. AS MIN. 1' ABOVE REQUIRED, SEASONAL HIGH 2' MIN. SEE C.2.2.3 GROUNDWATER TABLE,SEE SECTION C.2.2.2 X-SECTION NTS FILTER STRIP SEE SECTIONS GRASS 6.3.4 & 6.3.5 _ OVERFLOW DRIVEWAY \ \ \ \ \ V A A A A \ \ \ \ \ 6" MIN /// // �4�T \\\\\\\\\\\\\\\\ 3/4' TO 1-1/2" WASHED DRAIN /// 18" MIN. ROCK '�Aj \� NOTE: SEE C.2.2.3 FOR MIN. 1' ABOVE SEASONAL HIGH GROUNDWATER 2' MIN. TRENCH LENGTHS, TRENCH SPACING AND SITE LIMITATIONS TABLE,SEE SECTION C.2.2.2 X-SECTION NTS Page 15 of 21 Instrument Number: 20240815000001 Document:COV Rec: 5323.50 Page-16 of 21 Record Date:8/15/2024 8:37 AM King County, WA MAINTENANCE INSTRUCTIONS FOR NATIVE GROWTH RETENTION CREDIT Your property contains an on -site BMP (best management practice) known as "native growth retention," the practice of preserving a portion of a property in a native vegetated condition (e.g., forest) so as to minimize increases in stormwater runoff from clearing and to offset the stormwater runoff impacts caused by impervious surfaces on your property. This native vegetated area on your property was set aside by covenant as "native growth retention area." This on -site BMP shall be maintained per Appendix A of the City of Renton's Surface Water Design Manual. MAINTENANCE RESTRICTIONS The "native growth retention area" is delineated on the site plan attached to the covenant. The trees, vegetation, ground cover, and soil conditions in this area may not be disturbed, except as allowed by the following provisions: 1. Trees may be harvested in accordance with a King County -approved forest management plan if approved by King County prior to annexation to the City. Individual trees that have a structural defect due to disease or other defects, and which threaten to damage a structure, road, parking area, utility, or place of employment or public assembly, or block emergency access, may be topped, pruned, or removed as needed to eliminate the threat. 3. Dead or fallen trees, tree limbs within ten feet of the ground, and branches overhanging a residence may be removed to reduce the danger of wildfire. 4. Noxious weeds (i.e., plant species listed on the State noxious weed list in Chapter 16-750 WAC) and invasive vegetation (i.e., plant species listed as obnoxious weeds on the noxious weed list adopted by King County) may be removed. 5. Passive recreation uses and related facilities, including pedestrian, equestrian community and bicycle trails, nature viewing areas, fishing and camping areas, and other similar uses that do not require permanent structures, are allowed if clearing and soil compaction associated with these uses and facilities does not exceed eight percent of the native growth retention area. RECORDING REQUIREMENT These native growth retention credit on -site BMP maintenance and operation instructions must be recorded as an attachment to the required declaration of covenant and grant of easement per Requirement 3 of Section C.1.3.4 of the City of Renton Surface Water Design Manual. The intent of these instructions is to explain to future property owners, the purpose of the BMP and how it must be maintained and operated. These instructions are intended to be a minimum; the City of Renton) may require additional instructions based on site -specific conditions. See the City of Renton's Surface Water Design Manual website for additional information and updates. Page 16 of 21 Instrument Number: 20240815000001 Document:COV Rec: 5323.50 Page-17 of 21 Record Date:8/15/2024 8:37 AM King County, WA MAINTENANCE INSTRUCTIONS FOR A BIORETENTION CELL Your property contains an on -site BMP (best management practice) called "bioretention," which was installed to mitigate the stormwater quantity and quality impacts on both the impervious (paved or roof) and pervious surfaces (lawn or landscape) on your property. Bioretention cells, like rain gardens, are vegetated closed depressions or ponds that retain and filter stormwater from an area of impervious surface or nonnative pervious surface. Bioretention cells rely on effective infiltration performance more so than rain gardens. The soil in the bioretention cell has been enhanced to encourage and support vigorous plant growth that serves to filter the water and sustain a minimum infiltration capacity. Depending on soil conditions, bioretention cells may have water in them throughout the wet season and may overflow during major storm events. However, standing water can also be an indicator that periodic maintenance is required to sustain infiltrative performance. This on -site BMP shall be maintained per Appendix A of the City of Renton's Surface Water Design Manual. MAINTENANCE RESTRICTIONS The size, placement, and design of the rain garden as depicted by the site plan and design details must be maintained and may not be changed without written approval from the City of Renton or through a future development permit from the City of Renton. Chemical fertilizers and pesticides must not be used. INSPECTION FREQUENCY AND MAINTENANCE GUIDELINES • Bioretention cells must be inspected annually for physical defects and sediment accumulation. • Bioretention cells have inflow and overflow inlets and outlets. These need to be maintained to ensure that water is moving into and out of the bioretention area. Check inlets/outlets for debris/sediment blockage, bare spots (exposed soil), or other signs of erosion damage (soil movement). Remove debris and obstructions as necessary. • After major storm events, the bioretention cell should be checked to see that the overflow system is working properly and sedimentation is not occurring at the inlet. If erosion damage or bare spots are evident, they should be stabilized with soil, plant material, mulch, or landscape rock. Sediment deposits should be carefully removed and the sediment source eliminated. • Plants must be adapted to wet winter conditions and dry summer conditions. Vegetation is to be watered and pruned as needed. • Frequent watering is required to keep the plants healthy: o Year 1: weekly, o Year 2: bimonthly, o Year 3: bimonthly, o Year 4 and beyond: as needed for established plantings and dry periods. • Chemical fertilizers and pesticides must not be used. • Bioretention soil must be replaced in areas where sediment accumulation is preventing adequate infiltration of water through the soil. Page 17 of 21 Instrument Number: 20240815000001 Document:COV Rec: S323.50 Page-18 of 21 Record Date:8/15/2024 8:37 AM King County, WA • Compacted soil should be decompacted. • Trash and debris must be removed often from the bioretention depression. • Mulch must be applied to bare soil at a minimum of 2 inches to maintain healthy growth. • Compost may be added if soil nutrients are no longer adequate to support plant growth. • Plant materials may be changed to suit tastes. • Vegetation should be maintained as follows: 1) Replace all dead vegetation as soon as possible; 2) Remove fallen leaves and debris as needed; 3) Remove all noxious vegetation when discovered; 4) Manually weed without herbicides or pesticides; 5) To protect infiltration performance, do not compact soils in the bioretention cell with heavy maintenance equipment and/or excessive foot traffic; 6) During drought conditions, use mulch to prevent excess solar damage and water loss. RECORDING REQUIREMENT These bioretention on -site BMP maintenance and operation instructions must be recorded as an attachment to the required declaration of covenant and grant of easement per Requirement 3 of Section C.1.3.4 of the City of Renton Surface Water Design Manual. The intent of these instructions is to explain to future property owners, the purpose of the BMP and how it must be maintained and operated. These instructions are intended to be a minimum; the City of Renton may require additional instructions based on site -specific conditions. See the City of Renton's Surface Water Design Manual website for additional information and updates. Page 18 of 21 Instrument Number: 20240815000001 Document:COV Rec: S323.50 Page-19 of 21 Record Date:8/15/2024 8:37 AM King County, WA ROCKED SPILLWAY, 2'Wx4'L (OR BEYOND BERM IF LONGER), OVERFLOW TO /4 SUITABLE DISCHARGE AREA 4, ,u FREES, SHRUBS BIORETENTION AREA �GROUND COVER " PLAN VIEW A NTS TREES 6" MIN TO 12" MAX WATER DEPTH BIORETENTION SOIL MIX PER REFERENCE 11-C, MIN.18" DEPTH GROUND SHRUBS COVER MAX SLOPE 3H:1V BELOW OVERFLOW WATER SURFACE ELEVATION (TYP.) BIORETENTION AREA VEGETATED COMPACTED EARTH BERM 6" MIN FREEBOARD ABOVE OVERFLOW WS TO TOP OF BERM OR ADJACENT ROADWAY 2' MIN TOP WIDTH SUITABLE SURFACE DISCHARGE AREA COMPACTED EARTH BERM (AS NEEDED) CATCH BASIN A w/GRATE 4' RIGID PIPE OUTLET Ali. TO STORM SYSTEM VEGETATED . . .r .r . W w` COMPACTED a� EARTH BERM, TOP WIDTH TREES, SHRUBS A�, 2' MIN BIORETENTION AREA GROUND COVER A, AvlAll A PLAN VIEW NTS Page 19 of 21 Instrument Number: 20240815000001 Document:COV Rec: S323.50 Page-20 of 21 Record Date:8/15/2024 8:37 AM King County, WA MAINTENANCE INSTRUCTIONS FOR SOIL AMENDMENT Your property contains an on -site BMP (best management practice) called "soil amendment," which was installed to mitigate the stormwater quantity and quality impacts of some or all of the pervious surfaces on your property. Soil amendment is a method of regaining greater stormwater functions in the post development landscape by increasing treatment of pollutants and sediments, and minimizing the need for some landscaping chemicals. To be successful, the soil condition must be able to soak water into the ground for a reasonable number of years. This on -site BMP shall be maintained per Appendix A of the City of Renton's Surface Water Design Manual. MAINTENANCE RESTRICTIONS The size, placement, and composition of these devices as depicted by the site plan and design details must be maintained and may not be changed without written approval from the City of Renton or through a future development permit from the City of Renton. INSPECTION FREQUENCY AND MAINTENANCE GUIDELINES To be successful, the soil must be able to soak water into the ground for a reasonable number of years. • Return leaf fall and shredded woody materials from the landscape to the site when possible in order to replenish soil nutrients and structure. • On turf areas, "grasscycle" (mulch -mow or leave the clippings) to build turf health. • Maintain 2 to 3 inches of mulch over bare areas in landscape beds. • Re -seed bare turf areas until the vegetation fully covers the ground surface. • Avoid using pesticides (bug and weed killers) which damage the soil. • Where fertilization is needed (mainly turf and annual flower beds), a moderate fertilization program should be used which relies on compost, natural fertilizers, or slow -release synthetic balanced fertilizers. RECORDING REQUIREMENT These on -site BMP maintenance and operation instructions must be recorded as an attachment to the required declaration of covenant and grant of easement per Requirement 3 of Section C.1.3.4 of the City of Renton Surface Water Design Manual. The intent of these instructions is to explain to future property owners, the purpose of the BMP and how it must be maintained and operated. These instructions are intended to be a minimum; the City of Renton may require additional instructions based on site -specific conditions. See the City of Renton's Surface Water Design Manual website for additional information and updates. Page 20 of 21 Instrument Number: 20240815000001 Document:COV Rec: S323.50 Page-21 of 21 Record Date:8/15/2024 8:37 AM King County, WA EXHIBIT B - LEGAL DESCRIPTION POR OF NW 1/4 OF NE 1/4 INC IN FOL DESC-BEG AT NXN OF E LN OF JONES ST & SWLY BDRY OF CEDAR RIVER P L ESMT TH S TO S LN OF ELECTRON AVE TH N 70-07-00 E TO SWLY LN OF CEDAR RIVER PIPE LN ESMT TH NWLY TO BEG LESS C/M RGTS and TOBIN H H-D C # 37 POR OF D C LY S OF CEDAR RIVER PIPE LN R/W E OF JONES ST & N OF LN RNNG N 70-07-00 E FR INTRS OF E LN OF JONES ST & S LN OF ELECTRON AVE LESS C/M RGTS Page 21 of 21