Loading...
HomeMy WebLinkAboutP_Traffic Control SR515_240723_v1.pdfFILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 13:48:52 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR515.dgn 10 Plot 13 N. MENZEL A. MANGAHAS A. EMERSON B. NIELSENpw:\\projectstore.wsdot.wa.gov:WSDOT\Documents\Northwest\_Projects\000\XL6747_NWRSouthStrategicPvmtPres\Design\_CAD\_Sheets\XL6747_PS_TC_SR515.dgnA. MANGAHAS TRAFFIC CONTROL PLAN PAVEMENT REPAIR NOT TO SCALE SR 515 FULL CLOSURE SECTION 12 SEE SHEET TC98MATCH LINETC91S 16TH STSR 515 SR 515S 21ST ST TATATATATALBOT RD SA B C W20-1 ROAD WORK AHEAD 48" 48" 48" 48" LEFT LANE CLOSED AHEAD W20-5L D 48" 48" ROAD CLOSED AHEAD W20-3 A B D 36" 36" R3-2 (R/B/W)XXXE XX A C XC G100'H 2.0 SEC 2.0 SEC mPCMS 1 2 ROUTE ALT USE AHEAD CLOSED SR 515 PER STD. SPEC. 1-10.3(3)C. PRIOR TO CLOSURE TAPER 100' 100' XX SEE THIS SHEETMATCH LINE ASEE THIS SHEETMATCH LINE ASEE THIS SHEETMATCH LINE BSEE THIS SHEETMATCH LINE BD C X 30" 36" R3-5R (B/W) E F 48" 48" RIGHT LANE CLOSED AHEAD W20-5R F G 48" 60" R11-1501 (B/W) WILL BE CLOSED /DD MM- MM/DD ROAD TO ROAD CLOSURE INSTALL FIVE DAYS PRIOR XAM - XPM H ROAD CLOSED 48"x30" BLACK/WHITE W/ TYPE C LIGHTS W/ R11-201 SIGN TYPE III BARRICADE (ONE PER LANE) X A H H $TOT 111 2. SEE SHEET DU30 and DU31 FOR DETOUR. DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER :NOTES I-5 ET AL. NWR SOUTH 23-25 ONLYmP CMS FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 13:48:54 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR515.dgn 10 Plot 14 N. MENZEL A. MANGAHAS A. EMERSON B. NIELSENpw:\\projectstore.wsdot.wa.gov:WSDOT\Documents\Northwest\_Projects\000\XL6747_NWRSouthStrategicPvmtPres\Design\_CAD\_Sheets\XL6747_PS_TC_SR515.dgnA. MANGAHAS TRAFFIC CONTROL PLAN PAVEMENT REPAIR NOT TO SCALE SR 515 FULL CLOSURE SECTION 12SEE SHEET TC97MATCH LINETC92 S P UGET DR S 15TH STSR 515 I-405 NB ON-RAMPTATAXXXXAB W20-1 ROAD WORK AHEAD 48" 48" 48" 48" ROAD CLOSED AHEAD W20-3 B A A B D C D D 60" 30" R11-3 (B/W) ROAD CLOSED LOCAL TRAFFIC ONLY ##MILES AHEAD D ROAD CLOSED 48"x30" BLACK/WHITE W/ TYPE C LIGHTS W/ R11-201 SIGN TYPE III BARRICADE (ONE PER LANE) C X$TOT 111 S E E S HE E T T C 1 00 2. SEE SHEET DU30 and DU31 FOR DETOUR. DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER :NOTES I-5 ET AL. NWR SOUTH 23-25SEE SHEET TC99MATCH LINEc:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR515.dgn ONLYEXITEXITONLY FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 13:48:56 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR515.dgn 10 Plot 15 N. MENZEL A. MANGAHAS A. EMERSON B. NIELSENpw:\\projectstore.wsdot.wa.gov:WSDOT\Documents\Northwest\_Projects\000\XL6747_NWRSouthStrategicPvmtPres\Design\_CAD\_Sheets\XL6747_PS_TC_SR515.dgnA. MANGAHAS TRAFFIC CONTROL PLAN PAVEMENT REPAIR NOT TO SCALE SR 515 FULL CLOSURE SECTION 12 SEE THIS SHEETMATCH LINESEE THI S SHEETMATCH LI NESEE SHEET TC98MATCH LINE X X X X SR 515S RENTON VILLAGE PLI-405 SB OFF-R A MP I-405 SB A B D W20-1 ROAD WORK AHEAD 48" 48" E 48" 48" ROAD CLOSED AHEAD W20-3 D B A 48" 48" CLOSED AHEAD 2 LANES LEFT W20-501L 7D 7D 7D 7C H 48" 60" R11-1501 (B/W) W ILL BE CLOSED /DD MM- MM/DD ROAD TO ROAD CLOSURE INSTALL FIVE DAYS PRIOR XAM - XPM 36" 36" R3-1 (R/B/W)XXX100'D C X 100' X X X A B D G 30" 36" R3-5R (B/W) E G A XC 48" 48" LEFT LANE CLOSED AHEAD W20-5L H I I 2.0 SEC 2.0 SEC mPCMS 1 2 ROUTE ALT USE AHEAD CLOSED SR 515 PER STD. SPEC. 1-10.3(3)C. PRIOR TO CLOSURE TAPER X F 36" 36" R3-2 (R/B/W) F XFTATA $TOT 111 TC93A 2. SEE SHEET DU30 and DU31 FOR DETOUR. DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER :NOTES I-5 ET AL. NWR SOUTH 23-25 ONLY mPCMS Plot 17 N. MENZEL A. MANGAHAS A. EMERSON B. NIELSEN A. MANGAHAS TRAFFIC CONTROL PLAN PAVEMENT REPAIR NOT TO SCALE SR 515 FULL CLOSURE SECTION 12 SEE SHEET TC98 B A A 60" 30" R11-3 (B/W) ROAD CLOSED LOCAL TRAFFIC ONLY ##MILES AHEAD B ROAD CLOSED 48"x30" BLACK/WHITE W/ TYPE C LIGHTS W/ R11-201 SIGN TYPE III BARRICADE (ONE PER LANE) FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 13:48:58 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR515.dgn 10 $TOT 111 S P UGET DRBENSON RD S BENSON RD S S PUGET DRpw:\\projectstore.wsdot.wa.gov:WSDOT\Documents\Northwest\_Projects\000\XL6747_NWRSouthStrategicPvmtPres\Design\_CAD\_Sheets\XL6747_PS_TC_SR515.dgnTC93B 2. SEE SHEET DU30 and DU31 FOR DETOUR. DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER :NOTES I-5 ET AL. NWR SOUTH 23-25