Loading...
HomeMy WebLinkAboutPN_Project Narrative_240723_v1.pdf1. Project name:  NWR South 23 – 25 Pavement Repair Project XL6747    2. The nature, source, intensity and locaƟon of the sound/project limits:  Nature: Pavement PreservaƟon along specific highways within the City of Renton  Source: Temporary  ConstrucƟon Equipment  Intensity: range between 61 – 97 dBA at 50 feet and 41 – 77 dBA at 500 Ō  LocaƟons:  SR 167 Milepost (MP) MP 26.18 to MP 27.18  SR 515 MP 6.70 to MP 6.93  3. DescripƟon of work:  This project will provide crack sealing and asphalt patching on highways in Maintenance Areas 4 and 5  covering SR 515, SR 167, SR 161, SR 18, SR 523, SR 520, I‐405, SR 202, I‐90, and I‐5 ramps. NWR Materials  has determined that numerous routes require strategic preservaƟon before a paving project can be  programmed to address deterioraƟng roadway condiƟons. Specifically for the City of Renton, this project  will occur along SR 167 MP 26.18 to MP 27.18 and SR 515 MP 6.70 to MP 6.93.  4. The equipment and vehicles used for the work:  Item    #  Equipment Sound  level  (dBA)  at 50Ō  Sound  level  (dBA)  at  100Ō  Sound  level  (dBA)  at  300Ō  Sound  level  (dBA)  at  500Ō  Type  of ConstrucƟon work  1 Backhoe /  Excavator  76 70 60 56 Digging and scooping materials  2 Backup and  Movement  alarm  79 73 64 59 Pouring concrete, warning for work site  3 Ground  Compactor  75 69 59 55    CompacƟng and flaƩening surfaces  4 Air  Compressor  66 60 50 46 GeneraƟng power  5 Diamond  Concrete  Grinder  97 91 81 77 Pavement preservaƟon technique to  correct surface imperfecƟons  6 Concrete Mixer  Truck   81 75 66 61 Pouring concrete  7 Concrete Saw 85 79 70 65 Cuƫng concrete and pavement  8 Flatbed Truck  74 71 66 64 Transpor Ɵng people and materials    9 Generator 67 61 52 47 GeneraƟng power / Generator    10 Jackhammer 91 85 75 71 Breaking, Breaking asphalt, Breaking  concrete    11 Joint Sealer 74 71 66 64 Seals joints  12 Light Tower  61 55 45 41 Generates light  13 Asphalt Paver 83 80 75 73 Paving asphalt  14 Dump Truck  82 76 66 62 Transpor Ɵng materials (idle)  15 Material  transfer  Vehicle   73 70 65 63 Transpor Ɵng materials (moving)  16 Concrete  paving ‐ Texturing  and  Curing  Machine  73 67 58 53 Sealing concrete  17 Power Tool –  Air Hose  93 87 77 73 Clearing debris  18 Power Tool –  Grinder  68 62 52 48 Grinding metal and concrete  19 Roller 82 79 75 72 CompacƟng materials  20 Vacuum Street  Sweeper  81 78 74 71 Sweeping up and vacuuming materials  21 Tra ffic Control  Equipment  74 68 62 54 Support traffic control – truck mounted  aƩenuators and portable changeable  message signs.      5. Proposed Noise MiƟgaƟng Measures the applicant will implement to minimize the sound level violaƟons:   All trucks performing export haul shall have well maintained bed liners as inspected and accepted by  the Engineer.   Truck  tailgate banging is prohibited. All truck tailgates shall be secured to prevent excessive noise from  banging.   A copy of the noise exempƟon shall be kept  on the project site at all Ɵmes.   Wri Ʃen noƟficaƟons detailing the anƟcipated work schedule, project duraƟon, and a 24‐hour noise  complaint number will be sent to all residents and businesses located within 500 feet of the project  boundary, at least 14 calendar days prior to any anƟcipated nighƫme construcƟon work.   Contractor and WSDOT personnel must refrain from parking and idling vehicles near residenƟal areas.    6. Any addiƟonal informaƟon or studies regarding any aspect of the requested variance that is deemed  necessary to complete the review of the variance request:  This project is exempt from WAC  197‐11‐800(26) state transportaƟon projects. This project is a repair  project that occurs within the exisƟng right of way and in a manner that substanƟally conforms to the  preexisƟng design, funcƟon, and locaƟon as the original except to meet current engineering standard  and the acƟon does not result in addiƟon lanes, changing of capacity, or the funcƟonal use of the  highway.  7. The hours during the day and/or night the noise will occur:  Monday to Thursday, from 9 PM to 5 AM    8. The number of days and/or nights the noise will occur:  15 cumulaƟve nights    9. The ambient sound level during the Ɵme of day or night for which the variance is being sought:   Level of highway traffic noise depends on volume, speed, and mix of trucks. Based off WSDOT’s Biological  Assessment Chapter 7 Table 7‐3 Typical noise levels for traffic volumes at a given speed and Washington  State Pavement Management System.  SR 167 daily noise range levels: 66 to 80 dBA  SR 515 daily noise range levels: 63 to 72 dBA    10. The Ɵme period (include start date and end date) for which the variance is requested:   April 1, 2025 to December 31, 2025    11. The reason for which the noise violaƟon cannot be avoided, i.e. why work cannot be performed within  allowed Ɵmes:  WSDOT traffic recommends that lane closures be done at night when traffic volumes are low enough to  handle closures.  ConstrucƟon related lane closures during the dayƟme could cause delays to the  traveling public, impact bus routes and business access, jeopardize workers’ and public safety.   Performing work at night will minimize the danger to workers and the traveling public from road  closures, detours and traffic delays. In addiƟon, dayƟme lane closures could backup and adversely  impact traffic and city arterials.  Therefore, lane closures during the nighƫme are necessary for this  project.    12. MiƟgaƟng condiƟons the applicant will implement to minimize the sound level violaƟons:  See #5