Loading...
HomeMy WebLinkAboutCM_Construction Mitigation_240614_v1.pdf ATTACHME NT 9: CONSTRUCTION MITIGATION DESCRIPTION 425-869-2670 ■ 15325 SE 30th Place, Suite 300 ■ Bellevue, Washington 98007 ■ www.dowl.com Proposed Construction Dates Construction is anticipated to start in summer 2024 and may extend into early 2025. Hours and Days of Operation 8:00 AM – 6:00 PM Monday – Friday as included in the project plans (Construction Safety and Phasing Plan). Special Hours Proposed for Construction or Hauling There are no special hours proposed for construction; work will occur during normal daylight hours, between 8:00am and 6:00pm. Proposed Hauling/Transportation Routes West Perimeter Road and East Perimeter Road will be used for haul routes during construction. Haul routes are shown in the project plan set, specifically the construction safety and phasing plans, sheets C4 – C11. Measures to Minimize Impacts A Temporary Erosion and Sediment Control Plan (TESC) and Stormwater Pollution Prevention Plan (SWPPP) were developed for this site to provide temporary sediment control measures while construction is ongoing. Temporary erosion control measures will be in place during construction to minimize impacts. Preliminary Traffic Control Plan A formal traffic control plan has not been established for this project. The Construction Safety and Phasing Plan for this project includes language on how traffic will be redirected during limited interaction with West Perimeter Road. Please refer to shee ts C4 – C11 in the project plan set for further details. DATE: July 22, 2024 SUBJECT: Renton Aprons – Construction Mitigation Description