HomeMy WebLinkAboutP_Civil_Construction_Plans_240614.pdfCITY OF RENTONRENTON MUNICIPAL AIRPORT (RNT)WINDSOCK & 243 BLDG. GA APRON &PARKING LOT REHABILITATIONJUNE 2024SHEET INDEXSHEET NO.SHEET NAMERENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA WWW.DOWL.COM WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION 22PROJECT LOCATIONVICINITY MAPPROJECTSITE243 BLDGWIND SOCKGA APRONC1COVER SHEETLEGENDABBREVIATIONS RAMPPAVEDPAVEDPAVEDPAVED PARKINGPAVEDPAVEDPAVEDWIND SOCKAIRPORTPROPERTYFHPAVEDPAVEDPAVEDMBXTAXIWAY ARAINIER AVE NLOGAN AVE NRUNWAY 16-34W. PERIMETER ROAD600 BLDG500BLDG540BLDGRAINIERFLIGHTE. PERIMETER ROADTAXIWAY BWIND SOCKGA APRONAPRON CAPRON BAIRPORT WAY APRON DCOMPASSROSEAPRON RPRO-FLIGHT AVIATIONA7B7B6A6 B5A5B4 A4 B 3 A3A2 A1TAXIWAY BAIRPORT OFFICE & ATCTAIRPORT BEACONAIRPORT MAINTENANCE BLDG243BLDGWORK AREA #1WORK AREA #2BOEING AIRCRAFT BRIDGEVEHICLE GATE V10VEHICLE GATE V7APRON APED GATE P10CEDAR RIVER COMMERCIAL WATERWAYRENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA WWW.DOWL.COM WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION 22C2CONSTRUCTION SITE PLAN GENERAL NOTES:LEGEND: RAMPPAVEDPAVEDPAVEDPAVED PARKINGPAVEDPAVEDPAVEDWIND SOCK AIRPORTPROPERTYFHPAVEDPAVEDPAVEDMBX TAXIWAY A RAINIER AVE N CEDAR RIVER C O M M E R C I A L W A T E R W A Y LOGAN AV E N RUNWAY 16-34 W. PERIMETER R O A D E. PERIMETER R O A D TAXIWAY B WIND SOCK GA APRON APRON CAPRON B APRON AAIRPORT WAYAPRON D COMPASS ROSE APRON R RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C3SURVEY CONTROL PLANSURVEY NOTES:SURVEY CONTROL: LEGEND: CONTROL POINT TABLE: CEDAR RIV E R C O M M E R C I A L W A T E R W A Y COMPASS ROSE TAXIWAY B BLDG 749B BLDG 749A TWY B4TW Y B 5 E. PERIMETE R R O A D RUNWAY 16-34 PROPERTY L I N E 44.50' 44.50' CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA WORK AREA BIRD CANNON BLOCK OFF PEDESTRIAN ACCESS 21' MIN 100-YEAR FLOOD LINE RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C4CONSTRUCTION SAFETY &PHASING PLANWORK AREA #1 - PHASE 1: WINDSOCK APRON PAVEMENT REHABILITATION ALLOWED DURATION: 28 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:RUNWAY 16/34 OPEN TAXIWAY/TAXILANE STATUS:WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS/TAXILANES OPEN APRON STATUS:WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 1 WORK): 1)CONDUCT PRE-CONSTRUCTION MEETING A MINIMUM OF 1 WEEK PRIOR TO PROJECT COMMENCEMENT. 2)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS HAVE BEEN RELOCATED PRIOR TO THE START OF WORK. 3)ALL DRIVERS EXPECTED TO OPERATE VEHICLES IN ACTIVE AIRCRAFT OPERATIONAL AREAS DURING PHASE 1 MUST VIEW FAA GUIDE TO GROUND VEHICLE OPERATIONS PRIOR TO THE START OF WORK. 4)PLACE LOW PROFILE BARRICADES AS SHOWN. 5)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 3)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 4)INSTALL NEW TIEDOWN ANCHORS 5)COMPLETE INITIAL PAINT MARKINGS PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 1 WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 1. LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C11 1 WORK AREA #1 - PHASE 1 NOTES: CONSTRUCTION NOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C11 1 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3 VEHICLE GATE V10 RELOCATION AND DRIVE AISLE FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS CEDAR RIV E R C O M M E R C I A L W A T E R W A Y COMPASS ROSE TAXIWAY B BLDG 749B BLDG 749A TWY B4TW Y B 5 E. PERIMETE R R O A D RUNWAY 16-34 PROPERTY L I N E 44.50' 44.50' CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA WORK AREA BIRD CANNON BLOCK OFF PEDESTRIAN ACCESS 21' MIN 100-YEAR FLOOD LINE RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C5CONSTRUCTION SAFETY &PHASING PLANWORK AREA #1 - PHASE 2: WINDSOCK APRON FINAL PAVEMENT MARKINGS ALLOWED DURATION: 4 HOURS (WITHIN TIME ALLOTTED FOR WORK AREA 2) ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:RUNWAY 16/34 OPEN TAXIWAY/TAXILANE STATUS:WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS/TAXILANES OPEN APRON STATUS:WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 2 WORK): 1)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS HAVE BEEN RELOCATED PRIOR TO THE START OF WORK. 2)PLACE LOW PROFILE BARRICADES AS SHOWN. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)COMPLETE FINAL PAINT MARKINGS PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 2 WORK): 1)COMPLETE FINAL INSPECTION CHECKLIST AT THE END OF WORK AREA 1 PHASE 2. LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C11 1 WORK AREA #1 - PHASE 2 NOTES: CONSTRUCTION NOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C11 1 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3 VEHICLE GATE V10 RELOCATION AND DRIVE AISLE FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS 62.00'AIRPORT WAYW. PERIMETER ROAD243 BLDG DRIVE L A N E APRON EXISTING HANGAR PARKING LOT TWY A7TAXIWAY A RUNWAY 16-34 W. PERIMETER ROAD CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA VEHICLE GATE V7PROPERTY LINEAPRON B WORK AREA PEDESTRIAN GATE P10 RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C6CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 1: BUILDING 243 APRON PAVEMENT REHABILITATION ALLOWED DURATION: 13 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:RUNWAY 16/34 OPEN TAXIWAY/TAXILANE STATUS:243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS/TAXILANES OPEN APRON STATUS:NORTH HALF OF 243 BUILDING APRON CLOSED, WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 1 WORK): 1)COORDINATE WITH AIRPORT STAFF TO REMOVE AIRCRAFT FROM EXISTING HANGAR PRIOR TO START OF CONSTRUCTION. 2)CONDUCT PRE-CONSTRUCTION MEETING A MINIMUM OF 1 WEEK PRIOR TO PROJECT COMMENCEMENT. 3)ALL DRIVERS EXPECTED TO OPERATE VEHICLES IN ACTIVE AIRCRAFT OPERATIONAL AREAS DURING PHASE 1 MUST VIEW FAA GUIDE TO GROUND VEHICLE OPERATIONS PRIOR TO THE START OF WORK. 4)PLACE LOW PROFILE BARRICADES AS SHOWN. 5)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR. 6)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS. 4)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 5)INSTALL NEW TIEDOWN ANCHORS 6)COMPLETE INITIAL PAINT MARKINGS PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 1 WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF WORK AREA 2, PHASE 1.. LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C11 1 WORK AREA #2 - PHASE 1 NOTES: CONSTRUCTION NOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C11 1 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3 VEHICLE GATE V10 RELOCATION AND DRIVE AISLE FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS 62.00'AIRPORT WAYW. PERIMETER ROAD243 BLDG DRIV E L A N E APRON EXISTING HANGAR PARKING LOT TWY A7TAXIWAY A RUNWAY 16-34 W. PERIMETER ROAD VEHICLE GATE V10PROPERTY LINEAPRON B WORK AREA CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA PEDESTRIAN GATE P10 RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C7CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 2: BUILDING 243 APRON RECONSTRUCTION ALLOWED DURATION: 5 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:RUNWAY 16/34 OPEN TAXIWAY/TAXILANE STATUS:ALL TAXIWAYS/TAXILANES OPEN APRON STATUS:SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 2 WORK): 1)PLACE LOW PROFILE BARRICADES AS SHOWN. 2)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR. 3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS. 4)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 5)COMPLETE INITIAL PAINT MARKINGS. PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 2 WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 2. WORK AREA #2 - PHASE 2 NOTES: LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C11 1 CONSTRUCTION NOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C11 1 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3 VEHICLE GATE V10 RELOCATION AND DRIVE AISLE FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS AIRPORT WAYW. PERIMETER ROAD243 BLDG DRIVE L A N E APRON EXISTING HANGAR PARKING LOT TWY A7TAXIWAY A RUNWAY 16-34 W. PERIMETER ROAD CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA EXISTING VEHICLE GATE V7PROPERTY LINEAPRON B WORK AREA 62.00' PEDESTRIAN GATE P10 RELOCATED VEHICLE GATE V7 RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C8CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 3A: BUILDING 243 DRIVE LANE REHABILITATION (OUTSIDE AOA) ALLOWED DURATION: 8 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:ALL OPEN TAXIWAY/TAXILANE STATUS:ALL OPEN APRON STATUS:ALL OPEN PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 3A WORK): 1)PLACE LOW PROFILE BARRICADES AS SHOWN. 2)PLACE TEMPORARY TRAFFIC CONES OR DRUMS AS SHOWN. 3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)CONFIRM TEMPORARY CONE OR DRUM LOCATIONS WITH THE ENGINEER 3)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 4)RELOCATE EXISTING FENCE, GATE AND ASSOCIATED APPARATUSES. 5)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 6)COMPLETE INITIAL PAINT MARKINGS. PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 3A WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 3A. WORK AREA #2 - PHASE 3 NOTES: LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C11 1 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3 VEHICLE GATE V10 RELOCATION AND DRIVE AISLE FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS CONSTRUCTION NOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C11 1 AIRPORT WAYW. PERIMETER ROAD243 BLDG DRIVE L A N E APRON EXISTING HANGAR PARKING LOT TWY A7TAXIWAY A RUNWAY 16-34 W. PERIMETER ROAD PROPERTY LINEAPRON B CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA 62.00' PEDESTRIAN GATE P10 PROPOSED VEHICLE GATE V7 WORK AREA RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C9CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 4: BUILDING 243 PARKING LOT RECONSTRUCTION ALLOWED DURATION: 8 WORKING DAYS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:ALL OPEN TAXIWAY/TAXILANE STATUS:ALL OPEN APRON STATUS:ALL OPEN PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 4 WORK): 1)PLACE TEMPORARY TRAFFIC CONES OR DRUMS AS SHOWN. 2)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR. 3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE RPR. WORK ELEMENTS: 1)CONFIRM TEMPORARY TRAFFIC CONE OR DRUM LOCATIONS WITH THE ENGINEER. 2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK AREAS. 3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS. 4)COMPLETE EXTRUDED CURB REMOVAL 5)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION. 6)CONSTRUCT LANDSCAPE ISLANDS. 7)COMPLETE INITIAL PAINT MARKINGS. PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 4 WORK): 1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 4. WORK AREA #2 - PHASE 4 NOTES: LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C11 1 CONSTRUCTION NOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C11 1 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3 VEHICLE GATE V10 RELOCATION AND DRIVE AISLE FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS 62.00'AIRPORT WAYW. PERIMETER ROAD243 BLDG DRIVE L A N E APRON EXISTING HANGAR TWY A7TAXIWAY A RUNWAY 16-34 W. PERIMETER ROAD CONTRACTOR'S PRIMARY STOCKPILE AND STAGING AREA VEHICLE GATE V7PROPERTY LINEAPRON B WORK AREA PEDESTRIAN GATE P10 PARKING LOT RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C10CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 5: BUILDING 243 APRON FINAL PAVEMENT MARKINGS ALLOWED DURATION: 4 HOURS ALLOWED WORK HOURS:8:00 AM - 6:00 PM RUNWAY STATUS:RUNWAY 16/34 OPEN TAXIWAY/TAXILANE STATUS:243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS/TAXILANES OPEN APRON STATUS:243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 5 WORK): 1)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS HAVE BEEN RELOCATED PRIOR TO THE START OF WORK. 2)PLACE LOW PROFILE BARRICADES AS SHOWN. 3)PLACE TRAFFIC CONE AND DRUMS AS SHOWN. WORK ELEMENTS: 1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER. 2)CONFIRM TRAFFIC CONE AND DRUM LOCATIONS WITH THE ENGINEER. 3)COMPLETE FINAL PAINT MARKINGS PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 5 WORK): 3) COMPLETE FINAL INSPECTION CHECKLIST AT THE END OF PHASE 5. LEGEND: CONTRACTOR HAUL ROUTE AIRCRAFT TAXI ROUTE WORK AREA CONTRACTOR'S STAGING AREA LOW PROFILE BARRICADE TRAFFIC SAFETY CONES OR DRUMS PROPERTY LINE TAXIWAY OBJECT FREE AREA FLOODWAY C11 1 WORK AREA #2 - PHASE 5 NOTES: CONSTRUCTION NOTES: PLACE LOW PROFILE BARRICADE PER DETAIL SHEET PLACE TEMPORARY TRAFFIC SAFETY CONES OR DRUMS C11 1 PHASING SUMMARY PHASE DESCRIPTION RUNWAY STATUS TAXIWAY & TAXILANE STATUS APRON STATUS ALLOWABLE WORK HOURS DURATION WORK AREA #1 - WINDSOCK APRON 1 WINDSOCK APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 28 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 2 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN WINDSOCK APRON TAXILANES CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN WINDSOCK APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #1 PROJECT DURATION:29 WORKING DAYS WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT 1 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION, TIEDOWN INSTALLATION AND INITIAL MARKING RUNWAY 16-34 OPEN BUILDING 243 APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN NORTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 13 WORKING DAYS 2 BUILDING 243 APRON FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN SOUTH HALF OF 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 5 WORKING DAYS 3 VEHICLE GATE V10 RELOCATION AND DRIVE AISLE FULL DEPTH RECONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING DAYS 4 BUILDING 243 PARKING LOT FULL DEPTH RECONSTRUCTION, LANDSCAPE ISLAND CONSTRUCTION AND INITIAL MARKING RUNWAY 16-34 OPEN ALL TAXIWAYS AND TAXILANES OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING DAYS 30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS 5 FINAL PAINT MARKINGS RUNWAY 16-34 OPEN 243 BUILDING APRON TAXILANE CLOSED, ALL OTHER TAXIWAYS AND TAXILANES OPEN 243 BUILDING APRON CLOSED, ALL OTHER APRONS OPEN 8:00 AM - 6:00 PM 4 HOURS WORK AREA #2 PROJECT DURATION:37 WORKING DAYS RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA WWW.DOWL.COM WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION 22CONSTRUCTION SAFETY & PHASING DETAILS LOW PROFILE BARRICADE DETAILLOW PROFILE BARRICADE NOTES:LOW PROFILE BARRICADEPRE-APPROVED PRODUCTS:C111.AIRCRAFT ALWAYS HAVE THE RIGHT OF WAY. CONTRACTOR SHALL YIELD TO AIRCRAFT AT ALL TIMES.2.THE WORK AREAS AND CONTRACT TIME FOR COMPLETION OF EACH PHASE IS DESCRIBED IN THE CONSTRUCTION PHASING SUMMARYTABLE ON SHEETS C4-C10. LIQUIDATED DAMAGES WILL BE ASSESSED PER THE CONTRACT DOCUMENTS FOR FAILURE TO SUBSTANTIALLYCOMPLETE EACH PHASE WITHIN THE ALLOTTED DURATION.3.ALL WORK WITHIN EACH PHASE SHALL BE SUBSTANTIALLY COMPLETE PRIOR TO BEGINNING WORK IN THE NEXT PHASE, EXCEPT AS NOTEDON THE PHASING SUMMARY TABLE.4.A FOD INSPECTION SHALL BE PERFORMED BY THE CONTRACTOR AT THE END OF EACH PHASE, ON ALL WORK AREAS IN THAT PHASE, PRIORTO RE-OPENING. ALL DEBRIS AND POTENTIAL FOD SHALL BE REMOVED FROM AIRFIELD SURFACES PRIOR TO RE-OPENING THE WORK AREA.5.CONTRACTOR SHALL NOTIFY THE ENGINEER A MINIMUM OF 48-HOURS IN ADVANCE OF ANY CHANGES TO CONSTRUCTION PHASING.6.CONTRACTOR SHALL PLACE AND MAINTAIN ALL BARRICADES, INCLUDING REPLACING LIGHTS ON LOW-PROFILE BARRICADES. GAPSBETWEEN BARRICADES SHALL BE NO MORE THAN 4-FEET.7.WHERE MULTIPLE WORK AREAS ARE PROVIDED, WORK SHALL OCCUR SIMULTANEOUSLY.GENERAL CONSTRUCTION SAFETY AND PHASING NOTES: CEDAR RIV E R C O M M E R C I A L W A T E R W A Y TAXIWAY B BLDG 749B BLDG 749A TWY B4 TW Y B 5 E. PERIMET E R R O A D PROPERTY L I N E 44.50' 44.50' SAWCUT ALONG EXISTING JOINT 21' MIN TRAVEL LANE 100-YEAR FLOOD LINE RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C12SITE PREPARATION & TESC PLANLEGEND: PROPERTY LINE STORM DRAIN INLET PROTECTION SILT FENCE TRIANGULAR SILT DIKE TAXIWAY OBJECT FREE AREA EXISTING WATER EXISTING STORM DRAIN EXISTING ELECTRICAL EXISTING TELECOMMUNICATIONS EXISTING GAS EXISTING PAVEMENT EDGE EXISTING FENCE PROPOSED SAWCUT REMOVE EXISTING EXTRUDED CURB REMOVE EXISTING PAINT MARKING CLEARING AND GRUBBING AND EXCAVATION AS NEEDED ASPHALT REMOVAL CONCRETE REMOVAL FLOODWAY 1.EROSION CONTROL METHODS MUST BE IN PLACE PRIOR TO COMMENCEMENT OF SITE PREPARATION AND REMOVALS. 2.ASPHALT PAVEMENT TO BE HAULED OFFSITE AND SAFELY DISPOSED OF. 3.PROTECT ALL EXISTING UTILITY LINES IN PLACE. EROSION CONTROL NOTES: 1.INSTALL STORM DRAIN INLET PROTECTION PER WSDOT STD PLAN I-40.20-00. 2.INSTALL SILT FENCE PER WSDOT STD PLAN I-30.15-02. 3.INSTALL TRIANGULAR SILT DIKE PER DTL ON SHEET C14. EROSION CONTROL GENERAL NOTES: SITE PREPARATION NOTES: 1.DEMOLISH AND DISPOSE OF EXISTING ASPHALT PAVEMENT. 2.CLEAR AND GRUB AND EXCAVATE TO FINISHED GRADE, AS NEEDED. 3.PROTECT EXISTING UTILITY STRUCTURES IN PLACE. ADJUST RIM AS NEEDED. 4.PROTECT EXISTING FENCE IN PLACE. 5.REMOVE EXISTING EXTRUDED CURB. 6.SAWCUT EXISTING PAVEMENT. 7.REMOVE EXISTING PAINT MARKING. 8.PROTECT EXISTING CATCH BASIN IN PLACE. SEE PLAN FOR PROPOSED RIM ADJUSTMENTS. 62.00'AIRPORT WAY243 BLDG DRIVE LA N E EXISTING HANGAR TWY A7TAXIWA Y A W. PERIMETER ROAD PROPERTY LINEW. PERIMETER ROADRELOCATE EXISTING VEHICLE GATE V7, FENCE AND ALL ASSOCIATED EQUIPMENT, SEE SHEET C19. PEDESTRIAN GATE P10 RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C13SITE PREPARATION & TESC PLANLEGEND: PROPERTY LINE STORM DRAIN INLET PROTECTION SILT FENCE TRIANGULAR SILT DIKE TAXIWAY OBJECT FREE AREA EXISTING WATER EXISTING STORM DRAIN EXISTING ELECTRICAL EXISTING TELECOMMUNICATIONS EXISTING GAS EXISTING PAVEMENT EDGE EXISTING FENCE PROPOSED SAWCUT REMOVE EXISTING EXTRUDED CURB REMOVE EXISTING PAINT MARKING CLEARING AND GRUBBING AND EXCAVATION AS NEEDED ASPHALT REMOVAL CONCRETE REMOVAL FLOODWAY 1.EROSION CONTROL METHODS MUST BE IN PLACE PRIOR TO COMMENCEMENT OF SITE PREPARATION AND REMOVALS. 2.ASPHALT PAVEMENT TO BE HAULED OFFSITE AND SAFELY DISPOSED OF. 3.PROTECT ALL EXISTING UTILITY LINES IN PLACE. EROSION CONTROL NOTES: 1.INSTALL STORM DRAIN INLET PROTECTION PER WSDOT STD PLAN I-40.20-00. 2.INSTALL SILT FENCE PER WSDOT STD PLAN I-30.15-02. 3.INSTALL TRIANGULAR SILT DIKE PER DTL ON SHEET C14. EROSION CONTROL GENERAL NOTES: SITE PREPARATION NOTES: 1.DEMOLISH AND DISPOSE OF EXISTING ASPHALT PAVEMENT. 2.CLEAR AND GRUB AND EXCAVATE TO FINISHED GRADE, AS NEEDED. 3.PROTECT EXISTING UTILITY STRUCTURES IN PLACE. ADJUST RIM AS NEEDED. 4.PROTECT EXISTING FENCE IN PLACE. 5.REMOVE EXISTING EXTRUDED CURB. 6.SAWCUT EXISTING PAVEMENT. 7.REMOVE EXISTING PAINT MARKING. 8.PROTECT EXISTING CATCH BASIN IN PLACE. SEE PLAN FOR PROPOSED RIM ADJUSTMENTS. RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA WWW.DOWL.COM WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION 22SITE PREPARATION & TESC DETAILS TRIANGULAR SILT DIKE DETAILC14 WIND SOCK CEDAR RIVER C O M M E R C I A L W A T E R W A Y TAXIWAY B BLDG 749B BLDG 749A TWY B4 TW Y B 5 E. PERIMETER R O A D 15' TYP.15' TYP.23.332 3 . 3 323.322 3 . 3 3 23.36 23.39 23.42 2 3 . 4 3 23.42 2 3 . 4 8 23.55 2 3 . 6 1 23.262 3 . 2 523.262 3 . 2 823.3123.3323.342 3 . 3 423.342 3 . 4 023.482 3 . 5 5 23.172 3 . 1 823.192 3 . 2 2 23.25 23.28 23.27 2 3 . 2 6 23.25 2 3 . 3 2 23.40 2 3 . 4 9 23.082 3 . 0 923.122 3 . 1 623.1923.2323.212 3 . 1 923.172 3 . 2 423.332 3 . 4 2 23.012 3 . 0 223.052 3 . 0 9 23.13 23.17 23.15 2 3 . 1 2 23.09 2 3 . 1 7 23.27 2 3 . 3 8 22.952 2 . 9 622.982 3 . 0 323.0823.1223.082 3 . 0 523.012 3 . 1 023.232 3 . 3 6 22.902 2 . 9 022.912 2 . 9 6 23.02 23.07 23.02 2 2 . 9 7 22.93 2 3 . 0 3 23.19 2 3 . 3 5 22.882 2 . 8 422.842 2 . 9 022.9623.0122.962 2 . 9 022.852 2 . 9 723.152 3 . 3 4 22.902 2 . 8 122.772 2 . 8 322.9022.9622.892 2 . 8 322.762 2 . 9 023.112 3 . 3 2 22.912 2 . 7 722.702 2 . 7 722.8422.9122.832 2 . 7 622.682 2 . 8 323.062 3 . 2 8 22.942 2 . 7 422.622 2 . 7 022.7822.8522.772 2 . 6 922.602 2 . 7 522.992 3 . 2 4 22.962 2 . 7 322.552 2 . 6 622.7422.8022.742 2 . 6 522.542 2 . 6 822.942 3 . 2 0 22.982 2 . 7 522.602 2 . 6 822.7622.8422.752 2 . 6 622.572 2 . 6 922.932 3 . 1 6 23.022 2 . 8 022.662 2 . 7 322.8122.8822.792 2 . 7 122.622 2 . 7 422.952 3 . 1 7 23.092 2 . 8 722.722 2 . 7 922.862 2 . 9 222.842 2 . 7 622.672 2 . 7 922.982 3 . 1 9 23.162 2 . 9 322.782 2 . 8 422.912 2 . 9 722.892 2 . 8 022.722 2 . 8 123.002 3 . 1 8 23.202 2 . 9 822.842 2 . 8 922.952 3 . 0 122.932 2 . 8 522.782 2 . 8 422.992 3 . 1 5 23.212 3 . 0 222.902 2 . 9 523.002 3 . 0 522.982 2 . 9 022.832 2 . 9 022.972 3 . 0 8 23.272 3 . 0 822.952 3 . 0 023.052 3 . 1 023.032 2 . 9 722.892 2 . 9 723.042 3 . 0 0 23.352 3 . 1 623.012 3 . 0 623.102 3 . 1 423.092 3 . 0 422.992 3 . 0 623.132 3 . 1 7 2 3 . 2 023.072 3 . 1 123.152 3 . 1 823.152 3 . 1 323.102 3 . 1 523.212 3 . 2 5 2 3 . 1 623.122 3 . 1 323.172 3 . 2 223.232 3 . 2 223.202 3 . 2 423.282 3 . 3 1 2 3 . 0 223.062 3 . 1 223.172 3 . 2 723.312 3 . 3 223.322 3 . 3 323.352 3 . 3 7 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 3 ± 2 3 . 3 ± 2 3 . 3 ± 2 3 . 3 ± 2 3 . 3 ± 2 3 . 3 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 6 ± 2 3 . 6 ± 2 3 . 6 ± 2 3 . 7 ± 2 3 . 6 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ±23.5±2 3 . 7 ±23.4±23.3±23.2±23.1±23.0±23.0±22.9±22.9±23.0±23.0±23.1±23.1±23.1±23.1±23.2±23.3±23.3±23.3±23.3±23.4±23.4±23.2±23.1±22.8±22.8±2 2 . 8 ± 2 3 . 0 ± 2 3 . 1 ± 2 3 . 1 ± 2 3 . 3 ± 2 3 . 4 ± 2 3 . 5 ± 2 3 . 5 ± 2 3 . 4 ± 2 3 . 4 ± 2 3 . 4 ±23.4±23.3923.3323.2823.2323.1723.1223.0222.9622.9122.8622.8022.8422.8823.2723.3±START GRID N=182932.69 E=1299021.95 44.50' 44.50' 100-YEAR FLOOD LINE RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C15GRADING PLAN - WINDSOCKAPRONGENERAL NOTES LEGEND: EXISTING GRADE CONDITIONS FINISHED GRADE CONDITIONS ASPHALT PAVEMENT RECONSTRUCTION TAXIWAY OBJECT FREE AREA (TOFA) FG ELEVATION 243 BUILDINGW. PERIMETER ROADDRIVE LANEAIRPORT WAY EXISTING HANGART W Y A 7 W. PERIMETER ROADFC: 30.26FC: 30.39FC: 30.39FC: 30.22FC: 30.22FC: 30.22FC: 30.37FC: 30.62FC: 30.56FC: 30.19FC: 30.20FC: 30.34FC: 30.35FC: 30.4730.5330.4630.43 30.38 30.35 30.31 30.27 30.21 30.16 30.2 0 30 . 3 630.5130.4430.3 9 30. 3 5 3 0 . 2 9 3 0 . 2 3 3 0 . 1 6 3 0 . 0 7 3 0 . 0 2 3 0 . 0 4 3 0 . 1 8 30.413 0 . 3 6 3 0 . 3 1 3 0 . 2 4 3 0 . 1 6 3 0 . 0 5 2 9 . 9 4 2 9 . 8 5 2 9 . 8 2 2 9 . 8 6 2 9 . 2 7 2 9 . 5 8 2 9 . 7 0 2 9 . 8 1 2 9 . 9 5 3 0 . 0 9 3 0 . 2 1 3 0 . 2 8 3 0 . 3 3 30.4±3 0 . 3 2 3 0 . 3 0 FC: 30.46FC: 30.30FC: 30.41FC: 30.36FC: 30.39FC: 30.40FC: 30.55FC: 30.22FC: 30.22FC: 30.54FC: 30.42FC: 30.57FC: 30.42FC: 30.41FC: 30.54FC: 30.54FC: 30.64FC: 30.30FC: 30.38FC: 30.44FC: 30.38FC: 30.1229.9329.7929.6629.5029.3329.2029.1429.0829.012 8 . 9 5 28.9029.0229.8129.6129.4429.2629.0728.9328.8728.8128.7428.6828.6328.712 9 . 6 7 2 9 . 4 2 2 9 . 2 2 2 9 . 0 2 2 8 . 8 1 2 8 . 6 5 2 8 . 6 0 2 8 . 5 4 2 8 . 4 7 2 8 . 4 0 2 8 . 3 5 2 8 . 4 4 2 9 . 5 9 2 9 . 3 4 2 9 . 1 4 2 8 . 9 4 2 8 . 7 3 2 8 . 5 7 2 8 . 5 3 2 8 . 4 7 2 8 . 3 9 2 8 . 3 2 2 8 . 2 8 2 8 . 3 7 2 9 . 5 5 2 9 . 3 3 2 9 . 1 4 2 8 . 9 5 2 8 . 7 6 2 8 . 6 3 2 8 . 5 7 2 8 . 5 1 2 8 . 4 5 2 8 . 3 9 2 8 . 3 6 2 8 . 4 0 2 9 . 4 9 2 9 . 3 0 2 9 . 1 3 2 8 . 9 6 2 8 . 7 8 2 8 . 6 9 2 8 . 6 3 2 8 . 5 8 2 8 . 5 2 2 8 . 4 6 2 8 . 4 2 2 8 . 4 1 2 9 . 3 9 2 9 . 2 0 2 9 . 0 2 2 8 . 8 7 2 8 . 7 5 2 8 . 7 3 2 8 . 7 1 2 8 . 6 7 2 8 . 6 4 2 8 . 5 9 2 8 . 5 4 2 8 . 4 8 2 9 . 2 7 2 9 . 0 5 2 8 . 8 8 2 8 . 8 0 2 8 . 8 0 2 8 . 8 0 2 8 . 7 9 2 8 . 7 7 2 8 . 7 6 2 8 . 7 4 2 8 . 6 9 2 8 . 6 1 2 9 . 1 ± 2 8 . 9 ± 2 8 . 9 ± 2 8 . 9 ± 2 8 . 9 ± 2 8 . 9 ± 2 8 . 9 ± 2 8 . 9 ± 2 8 . 9 ± 2 8 . 9 ± 2 8 . 8 ± 2 8 . 8 ±29.002 8 . 7 3 2 8 . 6 1 2 8 . 5 8 2 8 . 5 7 2 8 . 4 7 2 8 . 5 1 2 8 . 5 6 2 8 . 6 ± 2 9 . 8 7 2 8 . 9 0 2 8 . 8 5 2 8 . 8 6 2 8 . 8 5 2 8 . 8 0 3 0 . 2 1 TAXIWAY A2 8 . 9 ± 2 8 . 9 ± 2 8 . 9 ± 2 8 . 9 ± 2 8 . 8 ± 2 8 . 8 ± 2 8 . 6 ± 2 8 . 7 ± 2 8 . 9 8 2 9 . 1 ± 2 9 . 3 ±28.9±2 8 . 7 9 2 8 . 7 ± 2 8 . 7 ± 2 8 . 8 ±29.3±29.5±29.6±29.8±29.8±29.9±2 8 . 7 ±29.1±29.5±29.5±29.9±30.1±2 9 . 8 ±29.2±29.4629.472 9 . 6 6 2 9 . 7 229.832 9 . 8 1 30.4±30.5±30.5±30.4±30.4±30.4±30.4±30.3±30.3±30.4±30.5±30.5±30.6±30.4±30.3±30.4±30.6±30.3±30.5±30.6±30.7±30.5±30.5±30.2±3 0 . 5 ±30.1330.1130.1530.1930.2330.2530.2930.3130.3830.3430.3330.3430.3630.3730.5±30.5±30.5±30.4±30.4±30.4±30.4±30.5±30.4±FC: 30.3930.0629.9429.8729.9430.0030.0630.1330.4430.35 30.25 30.18 30.20 30.23 30.27 FC: 30.5230.4±30.5±30.5±30.5±30.8±30.1±2 9 . 9 ±29.7730.6±30.2±3 0 . 1 5 30.113 0 . 0 530.152 9 . 8 9 2 9 . 7 3 2 9 . 5 8 29.4029.2330.0±29.2±30.0±30.1±30.3±30.7±30.7±30.7±30.7±30.7±30.6±30.6±2 8 . 8 0 2 8 . 7 8 2 8 . 8 2 2 8 . 8 6 2 8 . 7 4 2 8 . 7 3 2 8 . 6 9 2 8 . 6 4 2 8 . 6 3 2 8 . 5 3 2 8 . 4 7 2 8 . 4 3 2 8 . 3 3 2 8 . 3 130.0830.012 9 . 9 3 3 0 . 0 5 2 8 . 9 8 2 8 . 4 8 2 8 . 3 9 2 8 . 4 9 2 8 . 3 6 2 8 . 2 4 2 8 . 3 0 2 8 . 3 7 2 8 . 4 4 2 8 . 5 1 2 8 . 5 4 2 8 . 7 2 2 8 . 9 3 2 9 . 1 5 2 9 . 3 5 2 9 . 6 2 2 9 . 9 0 14'TYP14' TYP 29.9±2'15'TYP15'TYPSTART GRIDN=180196.38E=1298454.88START GRIDN=180359.59E=1298346.30RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA WWW.DOWL.COM WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION 22C16GRADING PLAN - BUILDING 243 APRON & PARKING LOT GENERAL NOTESLEGEND:EXISTING GRADE CONDITIONSFINISHED GRADE CONDITIONSASPHALT PAVEMENTRECONSTRUCTIONTAXIWAY OBJECT FREE AREA (TOFA)FG ELEVATION 243 BLDGW. PERIMETER ROAD10+0 0 1 1 + 0 0 11+401 SSMH #1 N=180235.13 E=1298418.71 1 SSMH #2 N=180251.91 E=1298400.80 2 24.5LF @ 0.5% 2 78.3LF @ 0.5% 4 20 25 30 35 20 25 30 35 10+00 10+20 10+40 10+60 10+80 11+00 11+20 11+4011+40 6" PVC 3034 SDR35 24.5LF @0.50%6" PVC 3034 SDR35 78.3LF @0.50% SSMH #1 STD PLAN 400.1 RIM = 29.94 INV IN (SW) = 27.37 INV OUT (NW) = 24.52 SSMH #2 STD PLAN 400.1 RIM = 28.97 INV IN (SE) = 24.40 INV OUT (W) = 24.30 EX SSMH RIM = 28.55 INV IN (E) = 23.91 INV OUT (N) = 23.81 STORM CROSSING 1.5' MIN FINISHED GRADE EXISTING GRADE 243 BUILDING EXISTING 6" D.I. SIDE SEWER FOUNDATION 243 BUILDING RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C17SANTIARY SEWER PLAN &PROFILESANITARY SEWER CONSTRUCTION NOTES: 1.INSTALL 48" SANITARY SEWEER MANHOLE. SEE PROFILE ON THIS SHEET FOR STRUCTURE INFORMATION. SEE COR STD DTL 400.1. 2.INSTALL 6" SANITARY SEWER LATERAL. SEE PROFILE VIEW FOR PIPE INFORMATION. 3.CORE DRILL AND CONNECT TO EXISTING SANITARY SEWER MANHOLE. SEE DTL ON SHEET C21. 4.CONNECT EXISTING SANITARY SEWR LATERAL TO PROPOSED MANHOLE. LEGEND: ASPHALT PAVEMENT RECONSTRUCTION TOPSOIL & SEEDING PAVEMENT EDGE PROPOSED TIEDOWN ANCHOR TAXIWAY OBJECT FREE AREA (TOFA) EXISTING SANITARY SEWER LINE EXISTING SANITARY SEWER MANHOLE PROPOSED SANITARY SEWER LINE PROPOSED SANITARY SEWER MANHOLE SANITARY SEWER EXTENSION - PLAN VIEW SANITARY SEWER EXTENSION - PROFILE VIEW 3 # TAXIWAY B BLDG 749B BLDG 749A TWY B4 TW Y B 5 E. PERIMET E R R O A D PROPERTY L I N E 31.60'31.60' 44.50' 44.50' 31.60'31.60'31.60'31.60' TIEDOWN N=182611.31 E=1299207.48 TIEDOWN N=182607.47 E=1299161.64 TIEDOWN N=182603.63 E=1299115.81 TIEDOWN N=182599.79 E=1299069.97 TIEDOWN N=182680.70 E=1299063.18 TIEDOWN N=182684.54 E=1299109.02 TIEDOWN N=182688.38 E=1299154.86 TIEDOWN N=182692.23 E=1299200.70 TIEDOWN N=182723.40 E=1299175.01 TIEDOWN N=182719.56 E=1299129.17 TIEDOWN N=182715.71 E=1299083.33 TIEDOWN N=182794.70 E=1299053.63 TIEDOWN N=182829.71 E=1299073.77 TIEDOWN N=182798.54 E=1299099.47 TIEDOWN N=182833.56 E=1299119.61 TIEDOWN N=182802.38 E=1299145.31 TIEDOWN N=182837.40 E=1299165.45 TIEDOWN N=182806.23 E=1299191.15 TIEDOWN N=182920.23 E=1299181.59 TIEDOWN N=182916.38 E=1299135.75 TIEDOWN N=182912.54 E=1299089.91 TIEDOWN N=182908.70 E=1299044.07 START 6" YELLOW ℄ N=182653.69 E=1299227.01 START 6" YELLOW ℄ N=182767.69 E=1299217.46 START 6" YELLOW ℄ N=182881.69 E=1299207.90 END NON-MOVEMENT AREA MARKING N=182932.47 E=1299022.10 START NON-MOVEMENT AREA MARKING N=182576.20 E=1299052.03 N85°12'31"E 211.70' Δ=84°15'27" R=19.15' L=28.17' Δ=84°15'27" R=19.15' L=28.17' Δ=45°39'49" R=19.00' L=15.14' S39°32'42"W 9.27' N85°12'34"E 206.43' Δ=90°00'00" R=19.00' L=29.85' Δ=90°00'00" R=19.00' L=29.85' Δ=90°00'00" R=19.00' L=29.85' N85°12'34"E 206.52' Δ=90°00'00" R=19.00' L=29.85' S4°47'29"E 357.53' 51.20'51.20' GRADE BREAK N=182585.92 E=1299157.92 GRADE BREAK N=182941.19 E=1299126.20 46.00' TYP 46.00'TYP46.00'TYP46.00'TYPCEDAR RIV E R C O M M E R C I A L W A T E R W A Y RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C18SITE AND STRIPING PLAN -WINDSOCK APRONSITE PLAN AND MARKING NOTES: 1.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2 AND 3 ON SHEET C21. SEE DETAIL 2 ON SHEET C22 FOR TIEDOWN MARKING (TYP). 2.PAINT NON-MOVEMENT AREA MARKING PER DETAIL 1 ON SHEET C22. 3.PAINT 6" YELLOW TAXILANE CENTERLINE MARKING WITH GLASS BEADS. 4.PAINT 4" WHITE MARKING (TYP). 5.CONSTRUCT CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER COR STD PLAN 101. 6.CONSTRUCT LANDSCAPE PLANTER CURB CUT. SEE DETAIL 4 ON SHEET C21. 7.CONSTRUCT STANDARD 45° PARKING STALL. SEE DETAIL 3 ON SHEET C22 8.CONSTRUCT STANDARD PARKING STALL. SEE DETAIL 4 ON SHEET C22 . 9.CONSTRUCT ACCESSIBLE 45° PARKING STALL. SEE DETAIL 5 ON SHEET C22. 10.PLACE TOPSOIL AND SEED LANDSCAPED AREAS. LEGEND: ASPHALT PAVEMENT RECONSTRUCTION TOPSOIL & SEEDING PAVEMENT EDGE PROPOSED TIEDOWN ANCHOR TAXIWAY OBJECT FREE AREA (TOFA) GRADE BRAKE FLOODWAY 100-YEAR FLOOD LINE 62.00'AIRPORT WAY243 BLDG DRIVE LA N E EXISTING HANGAR TWY A7TAXIWA Y A W. PERIMETER ROAD PROPERTY LINEW. PERIMETER ROADTIEDOWN N=180286.16 E=1298517.67 TIEDOWN N=180282.18 E=1298471.85 TIEDOWN N=180278.19 E=1298426.02 TIEDOWN N=180274.21 E=1298380.19 START N=180320.24 E=1298349.72 N85°01'48"E 211.34' Δ=43°52'08" R=19.00' L=14.55' N41°09'40"E 65.39' Δ=85°39'49" R=19.00' L=28.41' 14.25' START 4" WHITE EDGE LINE N=180159.13 E=1298651.03 START 4" WHITE EDGE LINE N=180126.90 E=1298655.14 END 4" WHITE EDGE LINE N=180379.50 E=1298535.00 END 4" WHITE EDGE LINE N=180375.26 E=1298514.85 20.00' TYP 15.00' TYP 25.00' TYP END 4" DASHED WHITE ℄ N=180371.67 E=1298526.24 START 4" DASHED WHITE ℄ N=180175.23 E=1298623.52 46.00' TYP GRADE BREAK N=180151.26 E=1298454.84 GRADE BREAK N=180167.15 E=1298468.92 GRADE BREAK N=180145.12 E=1298595.75 GRADE BREAK N=180162.02 E=1298586.67 GRADE BREAK N=180286.64 E=1298382.88 GRADE BREAK N=180281.18 E=1298356.50 GRADE BREAK N=180247.43 E=1298349.24 GRADE BREAK N=180282.84 E=1298363.34 GRADE BREAK N=180297.16 E=1298540.26 GRADE BREAK N=180373.03 E=1298500.79 10.00' TYP RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C19SITE AND STRIPING PLAN - BUILDNG 243APRON & PARKING LOTSITE PLAN AND MARKING NOTES: 1.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2 AND 3 ON SHEET C21. SEE DETAIL 2 ON SHEET C22 FOR TIEDOWN MARKING (TYP). 2.PAINT NON-MOVEMENT AREA MARKING PER DETAIL 1 ON SHEET C22. 3.PAINT 6" YELLOW TAXILANE CENTERLINE MARKING WITH GLASS BEADS. 4.PAINT 4" WHITE MARKING (TYP). 5.CONSTRUCT CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER COR STD PLAN 101. 6.CONSTRUCT LANDSCAPE PLANTER CURB CUT. SEE DETAIL 4 ON SHEET C21. 7.CONSTRUCT STANDARD 45° PARKING STALL. SEE DETAIL 3 ON SHEET C22 8.CONSTRUCT STANDARD PARKING STALL. SEE DETAIL 4 ON SHEET C22 . 9.CONSTRUCT ACCESSIBLE 45° PARKING STALL. SEE DETAIL 5 ON SHEET C22. 10.PLACE TOPSOIL AND SEED LANDSCAPED AREAS. LEGEND: ASPHALT PAVEMENT RECONSTRUCTION TOPSOIL & SEEDING PAVEMENT EDGE PROPOSED TIEDOWN ANCHOR TAXIWAY OBJECT FREE AREA (TOFA) GRADE BRAKE FLOODWAY R15.00' R2.50' R1.25' R10.00' R4.00' R3.50' R84.75' R20.00' R2.00' R301.10' R1.00' R35.00' R1.00' R1.00' R2.50' RELOCATE AND REUSE EXISTING V7 VEHICLE GATE AND ALL ASSOCIATED APPARATUES PEDESTRIAN GATE P10 PROPOSED SANITARY SEWER EXTENSION SEE SHEET C17 RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA WWW.DOWL.COM WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION 22TYPICAL SECTIONSC20 CONSTRUCTION NOTESKEY NOTES RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA WWW.DOWL.COM WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION 22CIVIL DETAILSC21 CONSTRUCTION NOTES:AIRCRAFT MOORING EYE NOTESPLAN VIEWSECTION A-ASECTION B-B RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA WWW.DOWL.COM WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION 22MARKING DETAILSC22