HomeMy WebLinkAboutP_Civil_Construction_Plans_240614.pdfCITY OF RENTONRENTON MUNICIPAL AIRPORT (RNT)WINDSOCK & 243 BLDG. GA APRON &PARKING LOT REHABILITATIONJUNE 2024SHEET INDEXSHEET NO.SHEET NAMERENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA
WWW.DOWL.COM
WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION
22PROJECT LOCATIONVICINITY MAPPROJECTSITE243 BLDGWIND SOCKGA APRONC1COVER SHEETLEGENDABBREVIATIONS
RAMPPAVEDPAVEDPAVEDPAVED PARKINGPAVEDPAVEDPAVEDWIND SOCKAIRPORTPROPERTYFHPAVEDPAVEDPAVEDMBXTAXIWAY ARAINIER AVE NLOGAN AVE NRUNWAY 16-34W. PERIMETER ROAD600 BLDG500BLDG540BLDGRAINIERFLIGHTE. PERIMETER ROADTAXIWAY BWIND SOCKGA APRONAPRON CAPRON BAIRPORT WAY
APRON DCOMPASSROSEAPRON RPRO-FLIGHT AVIATIONA7B7B6A6
B5A5B4
A4
B
3 A3A2
A1TAXIWAY BAIRPORT OFFICE & ATCTAIRPORT BEACONAIRPORT MAINTENANCE BLDG243BLDGWORK AREA #1WORK AREA #2BOEING AIRCRAFT BRIDGEVEHICLE GATE V10VEHICLE GATE V7APRON APED GATE P10CEDAR RIVER COMMERCIAL WATERWAYRENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA
WWW.DOWL.COM
WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION
22C2CONSTRUCTION SITE PLAN GENERAL NOTES:LEGEND:
RAMPPAVEDPAVEDPAVEDPAVED PARKINGPAVEDPAVEDPAVEDWIND SOCK AIRPORTPROPERTYFHPAVEDPAVEDPAVEDMBX
TAXIWAY A
RAINIER AVE
N
CEDAR RIVER
C
O
M
M
E
R
C
I
A
L
W
A
T
E
R
W
A
Y
LOGAN AV
E
N
RUNWAY 16-34
W. PERIMETER
R
O
A
D
E. PERIMETER R
O
A
D
TAXIWAY B
WIND SOCK
GA APRON
APRON CAPRON B
APRON AAIRPORT WAYAPRON D
COMPASS
ROSE
APRON R
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C3SURVEY CONTROL PLANSURVEY NOTES:SURVEY CONTROL:
LEGEND:
CONTROL POINT TABLE:
CEDAR RIV
E
R
C
O
M
M
E
R
C
I
A
L
W
A
T
E
R
W
A
Y
COMPASS
ROSE
TAXIWAY B
BLDG 749B
BLDG 749A TWY B4TW
Y
B
5
E. PERIMETE
R
R
O
A
D
RUNWAY 16-34
PROPERTY L
I
N
E
44.50'
44.50'
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
WORK AREA
BIRD CANNON
BLOCK OFF PEDESTRIAN ACCESS
21' MIN
100-YEAR FLOOD LINE
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C4CONSTRUCTION SAFETY &PHASING PLANWORK AREA #1 - PHASE 1: WINDSOCK APRON PAVEMENT REHABILITATION
ALLOWED DURATION: 28 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:RUNWAY 16/34 OPEN
TAXIWAY/TAXILANE STATUS:WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER
TAXIWAYS/TAXILANES OPEN
APRON STATUS:WINDSOCK APRON CLOSED, ALL
OTHER APRONS OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 1 WORK):
1)CONDUCT PRE-CONSTRUCTION MEETING A MINIMUM OF 1
WEEK PRIOR TO PROJECT COMMENCEMENT.
2)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS
HAVE BEEN RELOCATED PRIOR TO THE START OF WORK.
3)ALL DRIVERS EXPECTED TO OPERATE VEHICLES IN ACTIVE
AIRCRAFT OPERATIONAL AREAS DURING PHASE 1 MUST VIEW
FAA GUIDE TO GROUND VEHICLE OPERATIONS PRIOR TO THE
START OF WORK.
4)PLACE LOW PROFILE BARRICADES AS SHOWN.
5)CONFIRM LIMITS OF FULL DEPTH PAVEMENT
RECONSTRUCTION WITH THE RPR.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE
ENGINEER.
2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES
AROUND WORK AREAS.
3)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
4)INSTALL NEW TIEDOWN ANCHORS
5)COMPLETE INITIAL PAINT MARKINGS
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 1 WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF
PHASE 1.
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C11
1
WORK AREA #1 - PHASE 1 NOTES:
CONSTRUCTION NOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C11
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3
VEHICLE GATE V10
RELOCATION AND DRIVE
AISLE FULL DEPTH
RECONSTRUCTION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING
DAYS
4
BUILDING 243 PARKING LOT
FULL DEPTH
RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
CEDAR RIV
E
R
C
O
M
M
E
R
C
I
A
L
W
A
T
E
R
W
A
Y
COMPASS
ROSE
TAXIWAY B
BLDG 749B
BLDG 749A TWY B4TW
Y
B
5
E. PERIMETE
R
R
O
A
D
RUNWAY 16-34
PROPERTY L
I
N
E
44.50'
44.50'
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
WORK AREA
BIRD CANNON
BLOCK OFF PEDESTRIAN ACCESS
21' MIN
100-YEAR FLOOD LINE
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C5CONSTRUCTION SAFETY &PHASING PLANWORK AREA #1 - PHASE 2: WINDSOCK APRON FINAL PAVEMENT MARKINGS
ALLOWED DURATION: 4 HOURS (WITHIN TIME ALLOTTED
FOR WORK AREA 2)
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:RUNWAY 16/34 OPEN
TAXIWAY/TAXILANE STATUS:WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER
TAXIWAYS/TAXILANES OPEN
APRON STATUS:WINDSOCK APRON CLOSED, ALL
OTHER APRONS OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 2 WORK):
1)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS
HAVE BEEN RELOCATED PRIOR TO THE START OF WORK.
2)PLACE LOW PROFILE BARRICADES AS SHOWN.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE
ENGINEER.
2)COMPLETE FINAL PAINT MARKINGS
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 2 WORK):
1)COMPLETE FINAL INSPECTION CHECKLIST AT THE END OF
WORK AREA 1 PHASE 2.
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C11
1
WORK AREA #1 - PHASE 2 NOTES:
CONSTRUCTION NOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C11
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3
VEHICLE GATE V10
RELOCATION AND DRIVE
AISLE FULL DEPTH
RECONSTRUCTION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING
DAYS
4
BUILDING 243 PARKING LOT
FULL DEPTH
RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
62.00'AIRPORT WAYW. PERIMETER ROAD243
BLDG
DRIVE L
A
N
E
APRON
EXISTING
HANGAR
PARKING
LOT
TWY A7TAXIWAY A
RUNWAY 16-34
W. PERIMETER ROAD
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
VEHICLE GATE V7PROPERTY LINEAPRON B
WORK AREA
PEDESTRIAN
GATE P10
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C6CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 1: BUILDING 243 APRON PAVEMENT REHABILITATION
ALLOWED DURATION: 13 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:RUNWAY 16/34 OPEN
TAXIWAY/TAXILANE STATUS:243 BUILDING APRON TAXILANE CLOSED, ALL
OTHER TAXIWAYS/TAXILANES OPEN
APRON STATUS:NORTH HALF OF 243 BUILDING APRON
CLOSED, WINDSOCK APRON CLOSED, ALL
OTHER APRONS OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 1 WORK):
1)COORDINATE WITH AIRPORT STAFF TO REMOVE AIRCRAFT FROM
EXISTING HANGAR PRIOR TO START OF CONSTRUCTION.
2)CONDUCT PRE-CONSTRUCTION MEETING A MINIMUM OF 1 WEEK PRIOR
TO PROJECT COMMENCEMENT.
3)ALL DRIVERS EXPECTED TO OPERATE VEHICLES IN ACTIVE AIRCRAFT
OPERATIONAL AREAS DURING PHASE 1 MUST VIEW FAA GUIDE TO
GROUND VEHICLE OPERATIONS PRIOR TO THE START OF WORK.
4)PLACE LOW PROFILE BARRICADES AS SHOWN.
5)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR.
6)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH
THE RPR.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER.
2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK
AREAS.
3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS.
4)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
5)INSTALL NEW TIEDOWN ANCHORS
6)COMPLETE INITIAL PAINT MARKINGS
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 1 WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF WORK
AREA 2, PHASE 1..
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C11
1
WORK AREA #2 - PHASE 1 NOTES:
CONSTRUCTION NOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C11
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3
VEHICLE GATE V10
RELOCATION AND DRIVE
AISLE FULL DEPTH
RECONSTRUCTION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING
DAYS
4
BUILDING 243 PARKING LOT
FULL DEPTH
RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
62.00'AIRPORT WAYW. PERIMETER ROAD243
BLDG
DRIV
E
L
A
N
E
APRON EXISTING
HANGAR
PARKING
LOT
TWY A7TAXIWAY A
RUNWAY 16-34
W. PERIMETER ROAD
VEHICLE GATE V10PROPERTY LINEAPRON B
WORK AREA
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
PEDESTRIAN
GATE P10
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C7CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 2: BUILDING 243 APRON RECONSTRUCTION
ALLOWED DURATION: 5 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:RUNWAY 16/34 OPEN
TAXIWAY/TAXILANE STATUS:ALL TAXIWAYS/TAXILANES OPEN
APRON STATUS:SOUTH HALF OF 243 BUILDING APRON CLOSED,
ALL OTHER APRONS OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 2 WORK):
1)PLACE LOW PROFILE BARRICADES AS SHOWN.
2)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR.
3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE
RPR.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER.
2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK
AREAS.
3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS.
4)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
5)COMPLETE INITIAL PAINT MARKINGS.
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 2 WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 2.
WORK AREA #2 - PHASE 2 NOTES:
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C11
1
CONSTRUCTION NOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C11
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3
VEHICLE GATE V10
RELOCATION AND DRIVE
AISLE FULL DEPTH
RECONSTRUCTION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING
DAYS
4
BUILDING 243 PARKING LOT
FULL DEPTH
RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
AIRPORT WAYW. PERIMETER ROAD243
BLDG
DRIVE L
A
N
E
APRON EXISTING
HANGAR
PARKING
LOT
TWY A7TAXIWAY A
RUNWAY 16-34
W. PERIMETER ROAD
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
EXISTING VEHICLE
GATE V7PROPERTY LINEAPRON B
WORK AREA
62.00'
PEDESTRIAN
GATE P10
RELOCATED VEHICLE
GATE V7
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C8CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 3A: BUILDING 243 DRIVE LANE REHABILITATION (OUTSIDE AOA)
ALLOWED DURATION: 8 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:ALL OPEN
TAXIWAY/TAXILANE STATUS:ALL OPEN
APRON STATUS:ALL OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 3A WORK):
1)PLACE LOW PROFILE BARRICADES AS SHOWN.
2)PLACE TEMPORARY TRAFFIC CONES OR DRUMS AS SHOWN.
3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE
RPR.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER.
2)CONFIRM TEMPORARY CONE OR DRUM LOCATIONS WITH THE ENGINEER
3)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK
AREAS.
4)RELOCATE EXISTING FENCE, GATE AND ASSOCIATED APPARATUSES.
5)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
6)COMPLETE INITIAL PAINT MARKINGS.
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 3A WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 3A.
WORK AREA #2 - PHASE 3 NOTES:
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C11
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3
VEHICLE GATE V10
RELOCATION AND DRIVE
AISLE FULL DEPTH
RECONSTRUCTION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING
DAYS
4
BUILDING 243 PARKING LOT
FULL DEPTH
RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
CONSTRUCTION NOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C11
1
AIRPORT WAYW. PERIMETER ROAD243
BLDG
DRIVE L
A
N
E
APRON EXISTING
HANGAR
PARKING
LOT
TWY A7TAXIWAY A
RUNWAY 16-34
W. PERIMETER ROAD
PROPERTY LINEAPRON B
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
62.00'
PEDESTRIAN
GATE P10
PROPOSED VEHICLE
GATE V7
WORK AREA
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C9CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 4: BUILDING 243 PARKING LOT RECONSTRUCTION
ALLOWED DURATION: 8 WORKING DAYS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:ALL OPEN
TAXIWAY/TAXILANE STATUS:ALL OPEN
APRON STATUS:ALL OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 4 WORK):
1)PLACE TEMPORARY TRAFFIC CONES OR DRUMS AS SHOWN.
2)CONFIRM CLEARING AND GRUBBING LIMITS WITH THE RPR.
3)CONFIRM LIMITS OF FULL DEPTH PAVEMENT RECONSTRUCTION WITH THE
RPR.
WORK ELEMENTS:
1)CONFIRM TEMPORARY TRAFFIC CONE OR DRUM LOCATIONS WITH THE
ENGINEER.
2)INSTALL CONSTRUCTION FENCING AND TESC MEASURES AROUND WORK
AREAS.
3)COMPLETE CLEARING AND GRUBBING IN WORK AREAS.
4)COMPLETE EXTRUDED CURB REMOVAL
5)COMPLETE FULL DEPTH PAVEMENT RECONSTRUCTION.
6)CONSTRUCT LANDSCAPE ISLANDS.
7)COMPLETE INITIAL PAINT MARKINGS.
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 4 WORK):
1)COMPLETE INTERIM INSPECTION CHECKLIST AT THE END OF PHASE 4.
WORK AREA #2 - PHASE 4 NOTES:
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C11
1
CONSTRUCTION NOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C11
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3
VEHICLE GATE V10
RELOCATION AND DRIVE
AISLE FULL DEPTH
RECONSTRUCTION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING
DAYS
4
BUILDING 243 PARKING LOT
FULL DEPTH
RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
62.00'AIRPORT WAYW. PERIMETER ROAD243
BLDG
DRIVE L
A
N
E
APRON
EXISTING
HANGAR
TWY A7TAXIWAY A
RUNWAY 16-34
W. PERIMETER ROAD
CONTRACTOR'S PRIMARY
STOCKPILE AND STAGING AREA
VEHICLE GATE V7PROPERTY LINEAPRON B
WORK AREA
PEDESTRIAN
GATE P10
PARKING
LOT
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C10CONSTRUCTION SAFETY &PHASING PLANWORK AREA #2 - PHASE 5: BUILDING 243 APRON FINAL PAVEMENT MARKINGS
ALLOWED DURATION: 4 HOURS
ALLOWED WORK HOURS:8:00 AM - 6:00 PM
RUNWAY STATUS:RUNWAY 16/34 OPEN
TAXIWAY/TAXILANE STATUS:243 BUILDING APRON TAXILANE CLOSED, ALL
OTHER TAXIWAYS/TAXILANES OPEN
APRON STATUS:243 BUILDING APRON CLOSED, ALL OTHER
APRONS OPEN
PHASING ELEMENTS (PRIOR TO BEGINNING PHASE 5 WORK):
1)COORDINATE WITH AIRPORT STAFF TO ENSURE AIRCRAFTS HAVE BEEN
RELOCATED PRIOR TO THE START OF WORK.
2)PLACE LOW PROFILE BARRICADES AS SHOWN.
3)PLACE TRAFFIC CONE AND DRUMS AS SHOWN.
WORK ELEMENTS:
1)CONFIRM LOW PROFILE BARRICADE LOCATIONS WITH THE ENGINEER.
2)CONFIRM TRAFFIC CONE AND DRUM LOCATIONS WITH THE ENGINEER.
3)COMPLETE FINAL PAINT MARKINGS
PHASING ELEMENTS (FOLLOWING COMPLETION OF PHASE 5 WORK):
3) COMPLETE FINAL INSPECTION CHECKLIST AT THE END OF PHASE 5.
LEGEND:
CONTRACTOR HAUL ROUTE
AIRCRAFT TAXI ROUTE
WORK AREA
CONTRACTOR'S STAGING AREA
LOW PROFILE BARRICADE
TRAFFIC SAFETY CONES OR DRUMS
PROPERTY LINE
TAXIWAY OBJECT FREE AREA
FLOODWAY
C11
1
WORK AREA #2 - PHASE 5 NOTES:
CONSTRUCTION NOTES:
PLACE LOW PROFILE BARRICADE PER
DETAIL SHEET
PLACE TEMPORARY TRAFFIC SAFETY
CONES OR DRUMS
C11
1
PHASING SUMMARY
PHASE DESCRIPTION RUNWAY
STATUS
TAXIWAY &
TAXILANE STATUS APRON STATUS ALLOWABLE
WORK HOURS DURATION
WORK AREA #1 - WINDSOCK APRON
1
WINDSOCK APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 28 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
2 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
WINDSOCK APRON TAXILANES
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
WINDSOCK APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #1 PROJECT DURATION:29 WORKING
DAYS
WORK AREA #2 - BUILDING 243 APRON AND PARKING LOT
1
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION,
TIEDOWN INSTALLATION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
BUILDING 243 APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
NORTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 13 WORKING
DAYS
2
BUILDING 243 APRON FULL
DEPTH RECONSTRUCTION
AND INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN
SOUTH HALF OF 243
BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 5 WORKING
DAYS
3
VEHICLE GATE V10
RELOCATION AND DRIVE
AISLE FULL DEPTH
RECONSTRUCTION AND
INITIAL MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 10 WORKING
DAYS
4
BUILDING 243 PARKING LOT
FULL DEPTH
RECONSTRUCTION,
LANDSCAPE ISLAND
CONSTRUCTION AND INITIAL
MARKING
RUNWAY
16-34 OPEN
ALL TAXIWAYS AND TAXILANES
OPEN ALL APRONS OPEN 8:00 AM - 6:00 PM 8 WORKING
DAYS
30 CALENDAR DAYS BETWEEN COMPLETION OF FINAL PAVING AND STRIPING OF FINAL PAVEMENT MARKINGS
5 FINAL PAINT MARKINGS RUNWAY
16-34 OPEN
243 BUILDING APRON TAXILANE
CLOSED, ALL OTHER TAXIWAYS
AND TAXILANES OPEN
243 BUILDING APRON
CLOSED, ALL OTHER
APRONS OPEN
8:00 AM - 6:00 PM 4 HOURS
WORK AREA #2 PROJECT DURATION:37 WORKING
DAYS
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA
WWW.DOWL.COM
WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION
22CONSTRUCTION SAFETY &
PHASING DETAILS LOW PROFILE BARRICADE DETAILLOW PROFILE BARRICADE NOTES:LOW PROFILE BARRICADEPRE-APPROVED PRODUCTS:C111.AIRCRAFT ALWAYS HAVE THE RIGHT OF WAY. CONTRACTOR SHALL YIELD TO AIRCRAFT AT ALL TIMES.2.THE WORK AREAS AND CONTRACT TIME FOR COMPLETION OF EACH PHASE IS DESCRIBED IN THE CONSTRUCTION PHASING SUMMARYTABLE ON SHEETS C4-C10. LIQUIDATED DAMAGES WILL BE ASSESSED PER THE CONTRACT DOCUMENTS FOR FAILURE TO SUBSTANTIALLYCOMPLETE EACH PHASE WITHIN THE ALLOTTED DURATION.3.ALL WORK WITHIN EACH PHASE SHALL BE SUBSTANTIALLY COMPLETE PRIOR TO BEGINNING WORK IN THE NEXT PHASE, EXCEPT AS NOTEDON THE PHASING SUMMARY TABLE.4.A FOD INSPECTION SHALL BE PERFORMED BY THE CONTRACTOR AT THE END OF EACH PHASE, ON ALL WORK AREAS IN THAT PHASE, PRIORTO RE-OPENING. ALL DEBRIS AND POTENTIAL FOD SHALL BE REMOVED FROM AIRFIELD SURFACES PRIOR TO RE-OPENING THE WORK AREA.5.CONTRACTOR SHALL NOTIFY THE ENGINEER A MINIMUM OF 48-HOURS IN ADVANCE OF ANY CHANGES TO CONSTRUCTION PHASING.6.CONTRACTOR SHALL PLACE AND MAINTAIN ALL BARRICADES, INCLUDING REPLACING LIGHTS ON LOW-PROFILE BARRICADES. GAPSBETWEEN BARRICADES SHALL BE NO MORE THAN 4-FEET.7.WHERE MULTIPLE WORK AREAS ARE PROVIDED, WORK SHALL OCCUR SIMULTANEOUSLY.GENERAL CONSTRUCTION SAFETY AND PHASING NOTES:
CEDAR RIV
E
R
C
O
M
M
E
R
C
I
A
L
W
A
T
E
R
W
A
Y
TAXIWAY B
BLDG 749B
BLDG 749A TWY
B4
TW
Y
B
5
E. PERIMET
E
R
R
O
A
D
PROPERTY
L
I
N
E
44.50'
44.50'
SAWCUT ALONG EXISTING JOINT
21' MIN
TRAVEL LANE
100-YEAR FLOOD LINE
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C12SITE PREPARATION & TESC PLANLEGEND:
PROPERTY LINE
STORM DRAIN INLET PROTECTION
SILT FENCE
TRIANGULAR SILT DIKE
TAXIWAY OBJECT FREE AREA
EXISTING WATER
EXISTING STORM DRAIN
EXISTING ELECTRICAL
EXISTING TELECOMMUNICATIONS
EXISTING GAS
EXISTING PAVEMENT EDGE
EXISTING FENCE
PROPOSED SAWCUT
REMOVE EXISTING EXTRUDED CURB
REMOVE EXISTING PAINT MARKING
CLEARING AND GRUBBING AND
EXCAVATION AS NEEDED
ASPHALT REMOVAL
CONCRETE REMOVAL
FLOODWAY
1.EROSION CONTROL METHODS MUST BE IN PLACE
PRIOR TO COMMENCEMENT OF SITE PREPARATION
AND REMOVALS.
2.ASPHALT PAVEMENT TO BE HAULED OFFSITE AND
SAFELY DISPOSED OF.
3.PROTECT ALL EXISTING UTILITY LINES IN PLACE.
EROSION CONTROL NOTES:
1.INSTALL STORM DRAIN INLET PROTECTION PER
WSDOT STD PLAN I-40.20-00.
2.INSTALL SILT FENCE PER WSDOT STD PLAN
I-30.15-02.
3.INSTALL TRIANGULAR SILT DIKE PER DTL ON SHEET
C14.
EROSION CONTROL GENERAL NOTES:
SITE PREPARATION NOTES:
1.DEMOLISH AND DISPOSE OF EXISTING ASPHALT
PAVEMENT.
2.CLEAR AND GRUB AND EXCAVATE TO FINISHED
GRADE, AS NEEDED.
3.PROTECT EXISTING UTILITY STRUCTURES IN PLACE.
ADJUST RIM AS NEEDED.
4.PROTECT EXISTING FENCE IN PLACE.
5.REMOVE EXISTING EXTRUDED CURB.
6.SAWCUT EXISTING PAVEMENT.
7.REMOVE EXISTING PAINT MARKING.
8.PROTECT EXISTING CATCH BASIN IN PLACE. SEE
PLAN FOR PROPOSED RIM ADJUSTMENTS.
62.00'AIRPORT WAY243
BLDG
DRIVE LA
N
E
EXISTING
HANGAR
TWY A7TAXIWA
Y
A
W. PERIMETER ROAD
PROPERTY LINEW. PERIMETER ROADRELOCATE EXISTING
VEHICLE GATE V7, FENCE AND
ALL ASSOCIATED EQUIPMENT,
SEE SHEET C19.
PEDESTRIAN
GATE P10
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C13SITE PREPARATION & TESC PLANLEGEND:
PROPERTY LINE
STORM DRAIN INLET PROTECTION
SILT FENCE
TRIANGULAR SILT DIKE
TAXIWAY OBJECT FREE AREA
EXISTING WATER
EXISTING STORM DRAIN
EXISTING ELECTRICAL
EXISTING TELECOMMUNICATIONS
EXISTING GAS
EXISTING PAVEMENT EDGE
EXISTING FENCE
PROPOSED SAWCUT
REMOVE EXISTING EXTRUDED CURB
REMOVE EXISTING PAINT MARKING
CLEARING AND GRUBBING AND
EXCAVATION AS NEEDED
ASPHALT REMOVAL
CONCRETE REMOVAL
FLOODWAY
1.EROSION CONTROL METHODS MUST BE IN PLACE
PRIOR TO COMMENCEMENT OF SITE PREPARATION
AND REMOVALS.
2.ASPHALT PAVEMENT TO BE HAULED OFFSITE AND
SAFELY DISPOSED OF.
3.PROTECT ALL EXISTING UTILITY LINES IN PLACE.
EROSION CONTROL NOTES:
1.INSTALL STORM DRAIN INLET PROTECTION PER
WSDOT STD PLAN I-40.20-00.
2.INSTALL SILT FENCE PER WSDOT STD PLAN
I-30.15-02.
3.INSTALL TRIANGULAR SILT DIKE PER DTL ON SHEET
C14.
EROSION CONTROL GENERAL NOTES:
SITE PREPARATION NOTES:
1.DEMOLISH AND DISPOSE OF EXISTING ASPHALT
PAVEMENT.
2.CLEAR AND GRUB AND EXCAVATE TO FINISHED
GRADE, AS NEEDED.
3.PROTECT EXISTING UTILITY STRUCTURES IN PLACE.
ADJUST RIM AS NEEDED.
4.PROTECT EXISTING FENCE IN PLACE.
5.REMOVE EXISTING EXTRUDED CURB.
6.SAWCUT EXISTING PAVEMENT.
7.REMOVE EXISTING PAINT MARKING.
8.PROTECT EXISTING CATCH BASIN IN PLACE. SEE
PLAN FOR PROPOSED RIM ADJUSTMENTS.
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA
WWW.DOWL.COM
WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION
22SITE PREPARATION &
TESC DETAILS TRIANGULAR SILT DIKE DETAILC14
WIND SOCK
CEDAR RIVER
C
O
M
M
E
R
C
I
A
L
W
A
T
E
R
W
A
Y
TAXIWAY B
BLDG 749B
BLDG 749A TWY B4
TW
Y
B
5
E. PERIMETER
R
O
A
D
15'
TYP.15'
TYP.23.332
3
.
3
323.322
3
.
3
3
23.36
23.39
23.42
2
3
.
4
3
23.42
2
3
.
4
8
23.55
2
3
.
6
1
23.262
3
.
2
523.262
3
.
2
823.3123.3323.342
3
.
3
423.342
3
.
4
023.482
3
.
5
5
23.172
3
.
1
823.192
3
.
2
2
23.25
23.28
23.27
2
3
.
2
6
23.25
2
3
.
3
2
23.40
2
3
.
4
9
23.082
3
.
0
923.122
3
.
1
623.1923.2323.212
3
.
1
923.172
3
.
2
423.332
3
.
4
2
23.012
3
.
0
223.052
3
.
0
9
23.13
23.17
23.15
2
3
.
1
2
23.09
2
3
.
1
7
23.27
2
3
.
3
8
22.952
2
.
9
622.982
3
.
0
323.0823.1223.082
3
.
0
523.012
3
.
1
023.232
3
.
3
6
22.902
2
.
9
022.912
2
.
9
6
23.02
23.07
23.02
2
2
.
9
7
22.93
2
3
.
0
3
23.19
2
3
.
3
5
22.882
2
.
8
422.842
2
.
9
022.9623.0122.962
2
.
9
022.852
2
.
9
723.152
3
.
3
4
22.902
2
.
8
122.772
2
.
8
322.9022.9622.892
2
.
8
322.762
2
.
9
023.112
3
.
3
2
22.912
2
.
7
722.702
2
.
7
722.8422.9122.832
2
.
7
622.682
2
.
8
323.062
3
.
2
8
22.942
2
.
7
422.622
2
.
7
022.7822.8522.772
2
.
6
922.602
2
.
7
522.992
3
.
2
4
22.962
2
.
7
322.552
2
.
6
622.7422.8022.742
2
.
6
522.542
2
.
6
822.942
3
.
2
0
22.982
2
.
7
522.602
2
.
6
822.7622.8422.752
2
.
6
622.572
2
.
6
922.932
3
.
1
6
23.022
2
.
8
022.662
2
.
7
322.8122.8822.792
2
.
7
122.622
2
.
7
422.952
3
.
1
7
23.092
2
.
8
722.722
2
.
7
922.862
2
.
9
222.842
2
.
7
622.672
2
.
7
922.982
3
.
1
9
23.162
2
.
9
322.782
2
.
8
422.912
2
.
9
722.892
2
.
8
022.722
2
.
8
123.002
3
.
1
8
23.202
2
.
9
822.842
2
.
8
922.952
3
.
0
122.932
2
.
8
522.782
2
.
8
422.992
3
.
1
5
23.212
3
.
0
222.902
2
.
9
523.002
3
.
0
522.982
2
.
9
022.832
2
.
9
022.972
3
.
0
8
23.272
3
.
0
822.952
3
.
0
023.052
3
.
1
023.032
2
.
9
722.892
2
.
9
723.042
3
.
0
0
23.352
3
.
1
623.012
3
.
0
623.102
3
.
1
423.092
3
.
0
422.992
3
.
0
623.132
3
.
1
7
2
3
.
2
023.072
3
.
1
123.152
3
.
1
823.152
3
.
1
323.102
3
.
1
523.212
3
.
2
5
2
3
.
1
623.122
3
.
1
323.172
3
.
2
223.232
3
.
2
223.202
3
.
2
423.282
3
.
3
1
2
3
.
0
223.062
3
.
1
223.172
3
.
2
723.312
3
.
3
223.322
3
.
3
323.352
3
.
3
7
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
2
3
.
3
±
2
3
.
3
±
2
3
.
3
±
2
3
.
3
±
2
3
.
3
±
2
3
.
3
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
6
±
2
3
.
6
±
2
3
.
6
±
2
3
.
7
±
2
3
.
6
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
5
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±23.5±2
3
.
7
±23.4±23.3±23.2±23.1±23.0±23.0±22.9±22.9±23.0±23.0±23.1±23.1±23.1±23.1±23.2±23.3±23.3±23.3±23.3±23.4±23.4±23.2±23.1±22.8±22.8±2
2
.
8
±
2
3
.
0
±
2
3
.
1
±
2
3
.
1
±
2
3
.
3
±
2
3
.
4
±
2
3
.
5
±
2
3
.
5
±
2
3
.
4
±
2
3
.
4
±
2
3
.
4
±23.4±23.3923.3323.2823.2323.1723.1223.0222.9622.9122.8622.8022.8422.8823.2723.3±START GRID
N=182932.69
E=1299021.95
44.50'
44.50'
100-YEAR FLOOD LINE
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C15GRADING PLAN - WINDSOCKAPRONGENERAL NOTES
LEGEND:
EXISTING GRADE CONDITIONS
FINISHED GRADE CONDITIONS
ASPHALT PAVEMENT
RECONSTRUCTION
TAXIWAY OBJECT FREE AREA (TOFA)
FG ELEVATION
243 BUILDINGW. PERIMETER ROADDRIVE LANEAIRPORT WAY
EXISTING HANGART
W
Y
A
7 W. PERIMETER ROADFC: 30.26FC: 30.39FC: 30.39FC: 30.22FC: 30.22FC: 30.22FC: 30.37FC: 30.62FC: 30.56FC: 30.19FC: 30.20FC: 30.34FC: 30.35FC: 30.4730.5330.4630.43 30.38 30.35 30.31 30.27 30.21 30.16 30.2
0
30
.
3
630.5130.4430.3
9
30.
3
5
3
0
.
2
9
3
0
.
2
3
3
0
.
1
6
3
0
.
0
7
3
0
.
0
2
3
0
.
0
4
3
0
.
1
8
30.413
0
.
3
6
3
0
.
3
1
3
0
.
2
4
3
0
.
1
6
3
0
.
0
5
2
9
.
9
4
2
9
.
8
5
2
9
.
8
2
2
9
.
8
6
2
9
.
2
7
2
9
.
5
8
2
9
.
7
0
2
9
.
8
1
2
9
.
9
5
3
0
.
0
9
3
0
.
2
1
3
0
.
2
8
3
0
.
3
3
30.4±3
0
.
3
2
3
0
.
3
0 FC: 30.46FC: 30.30FC: 30.41FC: 30.36FC: 30.39FC: 30.40FC: 30.55FC: 30.22FC: 30.22FC: 30.54FC: 30.42FC: 30.57FC: 30.42FC: 30.41FC: 30.54FC: 30.54FC: 30.64FC: 30.30FC: 30.38FC: 30.44FC: 30.38FC: 30.1229.9329.7929.6629.5029.3329.2029.1429.0829.012
8
.
9
5 28.9029.0229.8129.6129.4429.2629.0728.9328.8728.8128.7428.6828.6328.712
9
.
6
7
2
9
.
4
2
2
9
.
2
2
2
9
.
0
2
2
8
.
8
1
2
8
.
6
5
2
8
.
6
0
2
8
.
5
4
2
8
.
4
7
2
8
.
4
0
2
8
.
3
5
2
8
.
4
4
2
9
.
5
9
2
9
.
3
4
2
9
.
1
4
2
8
.
9
4
2
8
.
7
3
2
8
.
5
7
2
8
.
5
3
2
8
.
4
7
2
8
.
3
9
2
8
.
3
2
2
8
.
2
8
2
8
.
3
7
2
9
.
5
5
2
9
.
3
3
2
9
.
1
4
2
8
.
9
5
2
8
.
7
6
2
8
.
6
3
2
8
.
5
7
2
8
.
5
1
2
8
.
4
5
2
8
.
3
9
2
8
.
3
6
2
8
.
4
0
2
9
.
4
9
2
9
.
3
0
2
9
.
1
3
2
8
.
9
6
2
8
.
7
8
2
8
.
6
9
2
8
.
6
3
2
8
.
5
8
2
8
.
5
2
2
8
.
4
6
2
8
.
4
2
2
8
.
4
1
2
9
.
3
9
2
9
.
2
0
2
9
.
0
2
2
8
.
8
7
2
8
.
7
5
2
8
.
7
3
2
8
.
7
1
2
8
.
6
7
2
8
.
6
4
2
8
.
5
9
2
8
.
5
4
2
8
.
4
8
2
9
.
2
7
2
9
.
0
5
2
8
.
8
8
2
8
.
8
0
2
8
.
8
0
2
8
.
8
0
2
8
.
7
9
2
8
.
7
7
2
8
.
7
6
2
8
.
7
4
2
8
.
6
9
2
8
.
6
1
2
9
.
1
±
2
8
.
9
±
2
8
.
9
±
2
8
.
9
±
2
8
.
9
±
2
8
.
9
±
2
8
.
9
±
2
8
.
9
±
2
8
.
9
±
2
8
.
9
±
2
8
.
8
±
2
8
.
8
±29.002
8
.
7
3
2
8
.
6
1
2
8
.
5
8
2
8
.
5
7
2
8
.
4
7
2
8
.
5
1
2
8
.
5
6
2
8
.
6
±
2
9
.
8
7
2
8
.
9
0
2
8
.
8
5
2
8
.
8
6
2
8
.
8
5
2
8
.
8
0
3
0
.
2
1
TAXIWAY A2
8
.
9
±
2
8
.
9
±
2
8
.
9
±
2
8
.
9
±
2
8
.
8
±
2
8
.
8
±
2
8
.
6
±
2
8
.
7
±
2
8
.
9
8
2
9
.
1
±
2
9
.
3
±28.9±2
8
.
7
9
2
8
.
7
±
2
8
.
7
±
2
8
.
8
±29.3±29.5±29.6±29.8±29.8±29.9±2
8
.
7
±29.1±29.5±29.5±29.9±30.1±2
9
.
8
±29.2±29.4629.472
9
.
6
6
2
9
.
7
229.832
9
.
8
1
30.4±30.5±30.5±30.4±30.4±30.4±30.4±30.3±30.3±30.4±30.5±30.5±30.6±30.4±30.3±30.4±30.6±30.3±30.5±30.6±30.7±30.5±30.5±30.2±3
0
.
5
±30.1330.1130.1530.1930.2330.2530.2930.3130.3830.3430.3330.3430.3630.3730.5±30.5±30.5±30.4±30.4±30.4±30.4±30.5±30.4±FC: 30.3930.0629.9429.8729.9430.0030.0630.1330.4430.35 30.25 30.18 30.20 30.23 30.27 FC: 30.5230.4±30.5±30.5±30.5±30.8±30.1±2
9
.
9
±29.7730.6±30.2±3
0
.
1
5
30.113
0
.
0
530.152
9
.
8
9
2
9
.
7
3
2
9
.
5
8
29.4029.2330.0±29.2±30.0±30.1±30.3±30.7±30.7±30.7±30.7±30.7±30.6±30.6±2
8
.
8
0
2
8
.
7
8
2
8
.
8
2
2
8
.
8
6
2
8
.
7
4
2
8
.
7
3
2
8
.
6
9
2
8
.
6
4
2
8
.
6
3
2
8
.
5
3
2
8
.
4
7
2
8
.
4
3
2
8
.
3
3
2
8
.
3
130.0830.012
9
.
9
3
3
0
.
0
5
2
8
.
9
8
2
8
.
4
8
2
8
.
3
9
2
8
.
4
9
2
8
.
3
6
2
8
.
2
4
2
8
.
3
0
2
8
.
3
7
2
8
.
4
4
2
8
.
5
1
2
8
.
5
4
2
8
.
7
2
2
8
.
9
3
2
9
.
1
5
2
9
.
3
5
2
9
.
6
2
2
9
.
9
0
14'TYP14'
TYP 29.9±2'15'TYP15'TYPSTART GRIDN=180196.38E=1298454.88START GRIDN=180359.59E=1298346.30RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA
WWW.DOWL.COM
WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION
22C16GRADING PLAN - BUILDING 243 APRON &
PARKING LOT GENERAL NOTESLEGEND:EXISTING GRADE CONDITIONSFINISHED GRADE CONDITIONSASPHALT PAVEMENTRECONSTRUCTIONTAXIWAY OBJECT FREE AREA (TOFA)FG ELEVATION
243
BLDGW. PERIMETER ROAD10+0
0
1
1
+
0
0
11+401 SSMH #1
N=180235.13
E=1298418.71
1 SSMH #2
N=180251.91
E=1298400.80
2 24.5LF
@ 0.5%
2 78.3LF
@ 0.5%
4
20
25
30
35
20
25
30
35
10+00 10+20 10+40 10+60 10+80 11+00 11+20 11+4011+40
6" PVC 3034 SDR35
24.5LF @0.50%6" PVC 3034 SDR35 78.3LF @0.50%
SSMH #1
STD PLAN 400.1
RIM = 29.94
INV IN (SW) = 27.37
INV OUT (NW) = 24.52
SSMH #2
STD PLAN 400.1
RIM = 28.97
INV IN (SE) = 24.40
INV OUT (W) = 24.30
EX SSMH
RIM = 28.55
INV IN (E) = 23.91
INV OUT (N) = 23.81
STORM CROSSING
1.5' MIN
FINISHED GRADE
EXISTING GRADE
243
BUILDING
EXISTING 6" D.I. SIDE SEWER
FOUNDATION
243
BUILDING
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C17SANTIARY SEWER PLAN &PROFILESANITARY SEWER CONSTRUCTION NOTES:
1.INSTALL 48" SANITARY SEWEER MANHOLE. SEE
PROFILE ON THIS SHEET FOR STRUCTURE
INFORMATION. SEE COR STD DTL 400.1.
2.INSTALL 6" SANITARY SEWER LATERAL. SEE
PROFILE VIEW FOR PIPE INFORMATION.
3.CORE DRILL AND CONNECT TO EXISTING SANITARY
SEWER MANHOLE. SEE DTL ON SHEET C21.
4.CONNECT EXISTING SANITARY SEWR LATERAL TO
PROPOSED MANHOLE.
LEGEND:
ASPHALT PAVEMENT RECONSTRUCTION
TOPSOIL & SEEDING
PAVEMENT EDGE
PROPOSED TIEDOWN ANCHOR
TAXIWAY OBJECT FREE AREA (TOFA)
EXISTING SANITARY SEWER LINE
EXISTING SANITARY SEWER MANHOLE
PROPOSED SANITARY SEWER LINE
PROPOSED SANITARY SEWER MANHOLE
SANITARY SEWER EXTENSION - PLAN VIEW
SANITARY SEWER EXTENSION - PROFILE VIEW
3
#
TAXIWAY B
BLDG 749B
BLDG 749A TWY
B4
TW
Y
B
5
E. PERIMET
E
R
R
O
A
D
PROPERTY
L
I
N
E
31.60'31.60'
44.50'
44.50'
31.60'31.60'31.60'31.60'
TIEDOWN
N=182611.31
E=1299207.48
TIEDOWN
N=182607.47
E=1299161.64
TIEDOWN
N=182603.63
E=1299115.81
TIEDOWN
N=182599.79
E=1299069.97
TIEDOWN
N=182680.70
E=1299063.18
TIEDOWN
N=182684.54
E=1299109.02
TIEDOWN
N=182688.38
E=1299154.86
TIEDOWN
N=182692.23
E=1299200.70
TIEDOWN
N=182723.40
E=1299175.01
TIEDOWN
N=182719.56
E=1299129.17
TIEDOWN
N=182715.71
E=1299083.33
TIEDOWN
N=182794.70
E=1299053.63
TIEDOWN
N=182829.71
E=1299073.77
TIEDOWN
N=182798.54
E=1299099.47
TIEDOWN
N=182833.56
E=1299119.61
TIEDOWN
N=182802.38
E=1299145.31
TIEDOWN
N=182837.40
E=1299165.45
TIEDOWN
N=182806.23
E=1299191.15
TIEDOWN
N=182920.23
E=1299181.59
TIEDOWN
N=182916.38
E=1299135.75
TIEDOWN
N=182912.54
E=1299089.91
TIEDOWN
N=182908.70
E=1299044.07
START 6" YELLOW ℄
N=182653.69
E=1299227.01
START 6" YELLOW ℄
N=182767.69
E=1299217.46
START 6" YELLOW ℄
N=182881.69
E=1299207.90
END NON-MOVEMENT AREA MARKING
N=182932.47
E=1299022.10
START NON-MOVEMENT AREA MARKING
N=182576.20
E=1299052.03
N85°12'31"E
211.70'
Δ=84°15'27"
R=19.15'
L=28.17'
Δ=84°15'27"
R=19.15'
L=28.17'
Δ=45°39'49"
R=19.00'
L=15.14'
S39°32'42"W
9.27'
N85°12'34"E
206.43'
Δ=90°00'00"
R=19.00'
L=29.85'
Δ=90°00'00"
R=19.00'
L=29.85'
Δ=90°00'00"
R=19.00'
L=29.85'
N85°12'34"E
206.52'
Δ=90°00'00"
R=19.00'
L=29.85'
S4°47'29"E
357.53'
51.20'51.20'
GRADE BREAK
N=182585.92
E=1299157.92
GRADE BREAK
N=182941.19
E=1299126.20
46.00'
TYP 46.00'TYP46.00'TYP46.00'TYPCEDAR RIV
E
R
C
O
M
M
E
R
C
I
A
L
W
A
T
E
R
W
A
Y
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C18SITE AND STRIPING PLAN -WINDSOCK APRONSITE PLAN AND MARKING NOTES:
1.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2 AND
3 ON SHEET C21. SEE DETAIL 2 ON SHEET C22 FOR
TIEDOWN MARKING (TYP).
2.PAINT NON-MOVEMENT AREA MARKING PER DETAIL
1 ON SHEET C22.
3.PAINT 6" YELLOW TAXILANE CENTERLINE MARKING
WITH GLASS BEADS.
4.PAINT 4" WHITE MARKING (TYP).
5.CONSTRUCT CEMENT CONCRETE TRAFFIC CURB
AND GUTTER PER COR STD PLAN 101.
6.CONSTRUCT LANDSCAPE PLANTER CURB CUT. SEE
DETAIL 4 ON SHEET C21.
7.CONSTRUCT STANDARD 45° PARKING STALL. SEE
DETAIL 3 ON SHEET C22
8.CONSTRUCT STANDARD PARKING STALL. SEE
DETAIL 4 ON SHEET C22 .
9.CONSTRUCT ACCESSIBLE 45° PARKING STALL. SEE
DETAIL 5 ON SHEET C22.
10.PLACE TOPSOIL AND SEED LANDSCAPED AREAS.
LEGEND:
ASPHALT PAVEMENT RECONSTRUCTION
TOPSOIL & SEEDING
PAVEMENT EDGE
PROPOSED TIEDOWN ANCHOR
TAXIWAY OBJECT FREE AREA (TOFA)
GRADE BRAKE
FLOODWAY
100-YEAR FLOOD LINE
62.00'AIRPORT WAY243
BLDG
DRIVE LA
N
E
EXISTING
HANGAR
TWY A7TAXIWA
Y
A
W. PERIMETER ROAD
PROPERTY LINEW. PERIMETER ROADTIEDOWN
N=180286.16
E=1298517.67
TIEDOWN
N=180282.18
E=1298471.85
TIEDOWN
N=180278.19
E=1298426.02
TIEDOWN
N=180274.21
E=1298380.19
START
N=180320.24
E=1298349.72
N85°01'48"E
211.34'
Δ=43°52'08"
R=19.00'
L=14.55'
N41°09'40"E
65.39'
Δ=85°39'49"
R=19.00'
L=28.41'
14.25'
START 4" WHITE EDGE LINE
N=180159.13
E=1298651.03
START 4" WHITE EDGE LINE
N=180126.90
E=1298655.14
END 4" WHITE EDGE LINE
N=180379.50
E=1298535.00
END 4" WHITE EDGE LINE
N=180375.26
E=1298514.85
20.00'
TYP
15.00'
TYP
25.00'
TYP
END 4" DASHED WHITE ℄
N=180371.67
E=1298526.24
START 4" DASHED WHITE ℄
N=180175.23
E=1298623.52
46.00'
TYP
GRADE BREAK
N=180151.26
E=1298454.84
GRADE BREAK
N=180167.15
E=1298468.92
GRADE BREAK
N=180145.12
E=1298595.75
GRADE BREAK
N=180162.02
E=1298586.67
GRADE BREAK
N=180286.64
E=1298382.88
GRADE BREAK
N=180281.18
E=1298356.50
GRADE BREAK
N=180247.43
E=1298349.24
GRADE BREAK
N=180282.84
E=1298363.34
GRADE BREAK
N=180297.16
E=1298540.26
GRADE BREAK
N=180373.03
E=1298500.79
10.00'
TYP
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WAWWW.DOWL.COMWINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION22C19SITE AND STRIPING PLAN - BUILDNG 243APRON & PARKING LOTSITE PLAN AND MARKING NOTES:
1.INSTALL TIEDOWN ANCHORS PER DETAILS 1, 2 AND
3 ON SHEET C21. SEE DETAIL 2 ON SHEET C22 FOR
TIEDOWN MARKING (TYP).
2.PAINT NON-MOVEMENT AREA MARKING PER DETAIL
1 ON SHEET C22.
3.PAINT 6" YELLOW TAXILANE CENTERLINE MARKING
WITH GLASS BEADS.
4.PAINT 4" WHITE MARKING (TYP).
5.CONSTRUCT CEMENT CONCRETE TRAFFIC CURB
AND GUTTER PER COR STD PLAN 101.
6.CONSTRUCT LANDSCAPE PLANTER CURB CUT. SEE
DETAIL 4 ON SHEET C21.
7.CONSTRUCT STANDARD 45° PARKING STALL. SEE
DETAIL 3 ON SHEET C22
8.CONSTRUCT STANDARD PARKING STALL. SEE
DETAIL 4 ON SHEET C22 .
9.CONSTRUCT ACCESSIBLE 45° PARKING STALL. SEE
DETAIL 5 ON SHEET C22.
10.PLACE TOPSOIL AND SEED LANDSCAPED AREAS.
LEGEND:
ASPHALT PAVEMENT RECONSTRUCTION
TOPSOIL & SEEDING
PAVEMENT EDGE
PROPOSED TIEDOWN ANCHOR
TAXIWAY OBJECT FREE AREA (TOFA)
GRADE BRAKE
FLOODWAY
R15.00'
R2.50'
R1.25'
R10.00'
R4.00'
R3.50'
R84.75'
R20.00'
R2.00'
R301.10'
R1.00'
R35.00'
R1.00'
R1.00'
R2.50'
RELOCATE AND REUSE
EXISTING V7 VEHICLE GATE AND
ALL ASSOCIATED APPARATUES
PEDESTRIAN
GATE P10
PROPOSED SANITARY
SEWER EXTENSION
SEE SHEET C17
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA
WWW.DOWL.COM
WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION
22TYPICAL SECTIONSC20 CONSTRUCTION NOTESKEY NOTES
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA
WWW.DOWL.COM
WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION
22CIVIL DETAILSC21 CONSTRUCTION NOTES:AIRCRAFT MOORING EYE NOTESPLAN VIEWSECTION A-ASECTION B-B
RENTON MUNICIPAL AIRPORT (RNT) - RENTON, WA
WWW.DOWL.COM
WINDSOCK & 243 BLDG. GA APRON & PARKING LOT REHABILITATION
22MARKING DETAILSC22