Loading...
HomeMy WebLinkAboutMFP24004737.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24004737 IVR Number: 24004737 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:09/17/2024Application Date:8645511040Parcel Number: 3209 SE 18TH ST Permit Type:10/02/2024Issue Date:Franchise Permit Work Class:10/02/2025Expiration Date:Minor Utility Job Number: 109156794Franchise Type:Natural Gas Description: PSE Gas EMERGENCY AFTER THE FACT CREW REPLACED 3' OF MAIN. ALSO REPLACED LEAKING BOLT ON TEE. 2 CONCRETE CUTS Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering INFRASOURCE, INC 6905 S 228TH ST KENT, WA 98032 PLEASE SEE ATTACHED 109156794 3209 SE 18TH ST COURTNEY ISBELL 253-293-0216 MFP24004737 Monday Friday 8:00am 3:00pm Scott Warlick CED 10/2/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURESE 18TH STW20-1ROAD WORK AHE AD W20-4ONE LANEROAD AHEAD X' ≥ X' ≥ X' ≥W2 0 - 7 AW20-1ROADWORKAHEADW20-4ONE LANEROADAHEADX'≥X'≥X'≥W20-7AW20-1ROAD WORK AHEAD W20-4ONE LANE ROADAHEADX'≥X'≥X'≥W20-7AFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FR O M TO T O W AW A Y A R E APHONE 888-9999 INFR A S O U R C E L L C 0 0 0 0 0 0 0 0 0 0NO P A R K I N G NO-PARK STOP FLAGGER STO P FLAGGER STO P FLAGGER 1212 1515 1 5 1 5 1515M O N R O E A V E S ETHE CREW SHALL CEASEWORK FOR A FLAGGER/SPOTTERTO ESCORT PEDESTRIANSAROUND THE WORK AREA0'60'30'NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVjose.rodriguez@pse.com425-424-6658JOSE RODRIGUEZ1 OF 1 3209 SE 18TH ST, RENTON, WA 980580 10915679408/15/2024Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 20' WCL of Monroe Ave SE & 20'SCL of SE 18th ST.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPWORK PITMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425MFP24004737 Service Address: City Zip: Customer: Phone: Customer Email: Est. Start Date: Site Contact Email: & & No Job Description New Construction: Construction Method Building Foundation Type Septic System  1 Day No Basement Trench Renton YesROW Permit: Jurisdiction: Emergency Leak Repair: Replaced 3' of 2" PE Main from 19'‐22' W c/l of Monroe  Ave SE & 20' S c/l of SE 18 St & Replaced Leaking Bolt on Tee too. Est. Duration: Fuse PLAT Map: N EFV:N/A Police #:0 TCP:YES Tie‐In Fitting Meter: Speed Limit:20 No Parks #:YES Job Type Diameter: Flaggers #:2 Arterial: Del Press:N/A Traffic Signal:N/A Bus Stop:NO Bollards: 2.5" #4" #ADA Ramps #:N/A Route #'s:N/A Meter Loc: Trolley Lines:N/A Mtr Hoods #:N/AN/A NO Emergency Leak Repair Service Information Street Information N/A Work Location 20' West Surface Type C C Size of Cut of CL Monroe Ave SE 20' South of CL SE 18 St 3 X 5 X 3 PM / Inspector: Courtney Isbell 98058 Phone:253‐293‐0216 Puget Sound Energy Gas Pre‐Inspect Form 7/24/24Date: 109156794Job #: Renton 3209 SE 18 St PSE 888‐225‐5773 N/A Phone:206‐498‐0053Ken Elvsaas 3 X 5 X 3of CL of CL 211.084 CONC S/WALK Grass Parking Strip CONCRETE SIDEWALK Grass Area Drivaway 1000 SF Work Area 3209 Grass Parking Strip Grass Area P/L P/L C/L ROW 60 FTSE 18 St 2" PE IP Main @ 20' S of C/L Monroe Ave SECONCRETE SIDEWALK MFP24004737 RESTORATION PER CITY OF RENTON STANDARDS 8203208073115170617241728173217191723172731123106171031193113320332093215320231163227322117071711171531383121322632203214310817201716170817121742333330233083314332033033326333233333327332133153309SE 18TH ST2" PE-A IP 20'S 76E0342" PE-A IP 20'S76E0342" PE-A IP 20'S 7831192" PE-A IP 20'W76E0344" PE-B IP 20'E 76E2102" MPE IP 28'S 107053564-2018 JT2" MPE IP 28'S 107053564-2018 JT205'E49'N168'E174'N354 5 5 'S195'S66'E30 9 'S291'W70'E105'E155'E45'N238'N 547'S254'S157'W39'E94'W18'W127'E363'W365'W311'W303'W273'W207'W162'W197'W106'W98'W60'N1 1/8" MPEI2019-E1 1/8" MPE-72021-E1 1/8" MPEI2019-E1 1/8" MPE-72021-E1 1/8" MPEI2019-E1 1/8" MP2016-E1 201 1/2021 1/8" MPE-72021-E1 1/8" MPEI-72020-E1 1/8" MPE-72021-E1 1/8" MPEI2018-E1 1/8" MPE-72021-E1 1/8" MPEI-92021-E1 1/8" MPE-72021-E1 1/8" MPE2014E1 1/8" MPE2014-E1 1/8" MPE2014-E1 1/8" MPE2014-E1 1/8" MPE2014-E1 1/8" MPE2014-E1 1/8" MPE2014-E5/8" PE19765/8" PE19945/8"130'E 5/8" PE19765/8" PE19765/8" PE19945 /8" 76 'E 5/8"183'E 5/8"236'E5/8" PE19775/8" PE19765/8" PE19775/8" PE19795/8"5/8"5/8" PE19765/8" PE19795/8"5/8" PE19775/8" PE19765/8" PE19765/8" PE19775/8" PE19765/8"5/8" MPE20015/8" PE19765/8" PE19775/8" PE19775/8" PE19775/8"317'S5/8" PE19775/8" PE19765/8" PE19775/8" PE19765/8" PE197746'E139'E20'S,200'E20'S,200'EROPE28'S,260'E3332 No electric grid information availableS208080, Q211084The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“08-08-2024Scale 1:900Lat\Long=47.4642, -122.1752MONROE AVE SEMFP24004737