HomeMy WebLinkAboutPN_Talbot_Narrative_10022024Talbot Hill Reservoir Park Improvements: Project Narrative The proposed renovation project for the park encompasses a comprehensive overhaul designed to enhance both functionality and accessibility. Key elements of the project include: 1. Sports Court Improvements: The project will involve renovating the entire sports court area (six existing courts plus shoulder and practice wall areas) located atop the drinking water reservoir roof, a task that adds a layer of complexity due to the unique structural considerations of the reservoir. The renovation includes: o Removing all sport court surfacing and striping from the top surface of the water reservoir lid and cleaning all drainage joints, while protecting lid concrete from damage. o Repairing cracks, applying filler courses to improve drainage slopes, providing shallow diamond grinding to the shoulders to improvement drainage, and applying acrylic paint surfacing on existing courts (3 tennis and 3 pickleball), walking, and practice wall areas. o Adding dual pickleball stripes to the three tennis courts, effectively creating six additional pickleball courts. o Refurbishing the fencing surrounding the courts through sleeving posts and providing new fabric and frame components. o Rebuilding the plywood section of the practice wall. o Installing new nets (utilizing recoated net posts), as well as moveable nets for the 6 additional pickleball areas, and benches. o Installing two new divider nets between the existing pickleball courts 2. Access and Site Amenity Improvements: o Creation of an ADA-accessible pathway that will connect all new and existing elements, ensuring comprehensive accessibility. o Installation of a new aluminum pedestrian bridge to improve connectivity and ADA-compliance between the on-grade pathway and court structure. o Addition of a new ADA-compliant parking stall. o Repair and resealing of the parking lot, including fixing curbs and addressing cracks. o Installation of a small shade structure and salvaged picnic tables o Installation of a new bike rack and waste receptacle o Installation of a new drinking fountain near the restroom, strategically positioned due to utility constraints. o Placement of landscape boulders Project Timeline: • The project is scheduled to be put out to bid around the end of October with the goal of notice to proceed for the selected contractor in December/January. • Given the weather-dependent nature of the work, we anticipate completing construction by late spring to early summer, contingent upon favorable spring weather conditions.