Loading...
HomeMy WebLinkAboutAB-3921VICINITY MAP CITY OF RENTON THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 PROJECT LOCATION NTS 1687 114TH Avenue SE, Suite 100 Bellevue WA 98004 phone: (425)869-9448 www.stantec.com CITY OF RENTON 1055 SOUTH GRADY WAY RENTON, WASHINGTON 98057 CONTACT PERSONNEL JOHN HOBSON PROJECT MANAGER (425) 430-7279 JOE STOWELL WASTEWATER UTILITY (425) 430-7212 MANAGER EMERGENCY 911 ONE CALL 1-800-424-5555 SHEET INDEX Sheet Number Sheet Title 1 COVER SHEET 2 GENERAL NOTES & LEGEND 3 EXISTING SITE PLAN & TREE REMOVAL STA. 1+00 - 8+20 4 EXISTING SITE PLAN & TREE REMOVAL STA. 8+20 - 15+20 5 EXISTING SITE PLAN & TREE REMOVAL STA. 15+20 - 22+20 6 EXISTING SITE PLAN & TREE REMOVAL STA. 22+20 - 29+20 7 EXISTING SITE PLAN & TREE REMOVAL STA. 29+20 - 31+00 8 EROSION CONTROL PLAN STA. 1+00 - 8+20 9 EROSION CONTROL PLAN STA. 8+20 - 15+20 10 EROSION CONTROL PLAN STA. 15+20 - 22+20 11 EROSION CONTROL PLAN STA. 22+20 - 29+20 12 EROSION CONTROL PLAN STA. 29+20 - 31+00 13 HORIZONTAL CONTROL STA 1+00 - 4+60 14 HORIZONTAL CONTROL STA. 4+60 - 8+20 15 HORIZONTAL CONTROL STA. 8+20 - 11+80 16 HORIZONTAL CONTROL STA. 11+80 - 15+20 17 HORIZONTAL CONTROL STA. 15+20 - 18+60 18 HORIZONTAL CONTROL STA. 18+60 - 22+20 19 HORIZONTAL CONTROL STA. 22+20 - 25+60 20 HORIZONTAL CONTROL STA. 25+60 - 29+20 21 HORIZONTAL CONTROL STA. 29+20 - 31+00 22 EX. ACCESS IMPROVEMENTS STA. 1+80 - 4+60 23 EX. ACCESS IMPROVEMENTS STA. 4+60 - 8+20 24 EX. ACCESS IMPROVEMENTS STA. 8+20 - 11+80 25 EX. ACCESS IMPROVEMENTS STA. 11+80 - 15+20 26 EX. ACCESS IMPROVEMENTS STA. 15+20 - 18+60 27 EX. ACCESS IMPROVEMENTS STA. 18+60 - 22+20 28 EX. ACCESS IMPROVEMENTS STA. 22+20 - 25+60 29 EX. ACCESS IMPROVEMENTS STA. 25+60 - 29+20 30 EX. ACCESS IMPROVEMENTS STA. 29+20 - 31+00 31 SEWER PLAN AND PROFILE STA 1+00 - 4+60 32 SEWER PLAN AND PROFILESTA. 4+60 - 8+20 33 SEWER PLAN AND PROFILE STA. 8+20 - 11+80 34 SEWER PLAN AND PROFILE STA. 11+80 - 15+20 35 SEWER PLAN AND PROFILE STA. 15+20 - 18+60 36 SEWER PLAN AND PROFILE STA. 18+60 - 22+20 37 SEWER PLAN AND PROFILE STA. 22+20 - 25+60 38 SEWER PLAN AND PROFILE STA. 25+60 - 29+20 39 SEWER PLAN AND PROFILE STA. 29+20 - 31+00 40 GRAVEL PATH CROSS-SECTIONS STA. 1+00 - 4+50 41 GRAVEL PATH CROSS-SECTIONS STA. 5+00 - 7+50 42 GRAVEL PATH CROSS-SECTIONS STA. 8+00 - 11+00 43 GRAVEL PATH CROSS-SECTIONS STA. 11+50 - 13+00 44 GRAVEL PATH CROSS-SECTIONS STA. 13+50 - 16+00 45 GRAVEL PATH CROSS-SECTIONS STA. 16+50 - 20+00 46 GRAVEL PATH CROSS-SECTIONS STA. 20+20 - 24+50 47 GRAVEL PATH CROSS-SECTIONS STA. 25+00 - 28+50 48 GRAVEL PATH CROSS-SECTIONS STA. 29+00 - 30+50 49 TESC DETAILS 50 TESC DETAILS 51 TESC DETAILS 52 CITY STANDARD DETAILS 53 MISCELLANEOUS DETAILS EXACT SIZE, TYPE, LOCATION OR DEPTH. BURIED UTILITIES IN AREA CALL BEFORE YOU DIG EXISTING UTILITIES SHOWN ARE FROM THE BEST AVAILABLE INFORMATION AND NO GUARANTEE IS MADE AS TO THE 1-800-424-5555 54 W1.0 OF 15 - PROJECT OVERVIEW 55 W2.0 OF 15 - PLANTING PLAN & LOG PLACEMENT (1 OF 7) 56 W2.1 OF 15 - PLANTING PLAN & LOG PLACEMENT (2 OF 7) 57 W2.2 OF 15 - PLANTING PLAN & LOG PLACEMENT (3 OF 7) 58 W2.3 OF 15 - PLANTING PLAN & LOG PLACEMENT (4 OF 7) 59 W2.4 OF 15 - PLANTING PLAN & LOG PLACEMENT (5 OF 7) 60 W2.5 OF 15 - PLANTING PLAN & LOG PLACEMENT (6 OF 7) 61 W2.6 OF 15 - PLANTING PLAN & LOG PLACEMENT (7 OF 7) 62 W3.0 OF 15 - PLANT SECHEDULE 63 W3.1 OF 15 - PLANT NOTES & DETAILS 64 W4.0 OF 15 - SITE PREPARATION 65 W5.0 OF 15 - ANCHORED LARGE WOODY DEBRIS PLAN 66 W5.1 - ANCHORED LARGE WOODY DEBRIS NOTES & DETAILS 67 W6.0 - TEMPORARY BYPASS PLAN 68 W7.0 - MITIGATION NOTES Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. CONSTRUCTION SEQUENCE 1.ATTEND PRE-CONSTRUCTION MEETING AND PERMIT COMPLIANCE MEETING, AS REQUIRED BY PERMIT. 2.OBTAIN NOTICE TO PROCEED FROM CITY AND ALL REQUIRED PERMITS BEYOND THOSE PROVIDED BY CITY (SEE SPECIFICATIONS) PRIOR TO COMMENCING WORK. 3.COORDINATE WITH CITY / ENGINEER FOR CONSTRUCTION STAKING. STAKING TO BE PROVIDED BY CONTRACTOR. 4.INSTALL PERIMETER PROTECTION, TEMPORARY EROSION AND SEDIMENT CONTROLS, AND BMPS. 5.MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY STANDARDS AND THESE PLANS AND SPECIFICATIONS THROUGHOUT THE PROJECT. 6.CLEAR, ROUGH GRADE, AND INSTALL PROPOSED WALLS ONSITE 7.PROVIDE SEQUENCING PLAN AND SEWAGE BYPASS PUMPING PLAN FOR REVIEW AND ACCEPTANCE BY CITY PRIOR TO PERFORMING INTERCEPTOR IMPROVEMENTS. 8.PERFORM BYPASS PUMPING, INSTALL OPEN-CUT SEWER AND INSTALL CIPP. 9.INSTALL GRAVEL ROAD. 10.PERFORM LEAKAGE TESTING AND TELEVISION INSPECTION OF NEW SANITARY SEWER MAIN, AND CIPP MAIN. 11.OBTAIN CITY APPROVAL BEFORE TRANSFERRING SEWAGE TO NEW SANITARY SEWER MAIN, AND CIPP MAIN. CONNECT TO EXISTING SANITARY SEWER SYSTEM. 12.ABANDON EXISTING SANITARY SEWER FACILITIES AS SHOWN ON PLANS. 13.PERFORM FINAL GRADING/PAVING AND SURFACE RESTORATION. 14.AFTER ALL DANGER OF EROSION HAS PASSED AND AFTER APPROVAL BY CITY. COORDINATE REMOVAL OR TRANSFER OF TEMPORARY BMPS WITH FOLLOW-UP CONSTRUCTION PROJECTS. 15.CONTRACTOR TO PROVIDE FIELD MARK-UP OF PLANS AS CONSTRUCTED. NOTE: THIS IS A POSSIBLE SEQUENCE OF CONSTRUCTION ACTIVITIES. FINAL SEQUENCE SHALL BE DEVELOPED BY CONTRACTOR AND SUBJECT TO REVIEW BY OWNER. SURVEY NOTES: THE SURVEY INFORMATION SHOWN IN THE ATTACHED PLAN HAS BEEN PROVIDED BY STANTEC. SEE: HORIZONTAL CONTROL SHEETS HORIZONTAL CONTROL DATUM: NAD83/91 PER VALUES PUBLISHED FOR CITY OF RENTON CONTROL POINTS 1063 AND 476, CITY OF RENTON SURVEY CONTROL. BENCHMARKS AND VERTICAL CONTROL DATUM: 1. CITY OF RENTON CONTROL POINT 2193: TOP OF BRASS DISK IN CONCRETE MONUMENT AT THE INTERSECTION OF S 18TH ST. AND GRANT AVE S. ELEV = 317.58 (NAVD'88) 2. CITY OF RENTON CONTROL POINT 1063: TOP OF PUNCH IN BRASS PIN IN CONCRETE MONUMENT IN CASE AT THE INTERSECTION OF S 18TH ST. AND EAGLE RIDGE DRIVE. ELEV = 261.22 (NAVD'88) EXISTING PROPOSED L E G E N D T.E.S.C 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. GENERAL NOTES & LEGEND EXISTING ACCESS IMPROVEMENTS ’ ¾” – ’ – – ” – – – ’ ’ – – – – – – – – – – ” SO-DP6SD SD SD SD SD SD I- 4 0 5 SHT. 3SHT. 4SHT. 5SHT. 6SHT. 7S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.MATCHLINE - STA. 4+60 - THIS SHT.MATCHLINE - STA. 4+60 - THIS SHT.MATCHLINE - STA. 8+20 - SHT. 4KEY MAP NW 20-23-05 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. EXISTING SITE PLAN & TREE REMOVAL STA. 1+00 - 8+20 SD ///////////////SHT. 3SHT. 4SHT. 5SHT. 6SHT. 7S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S. 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 15+20 - SHT. 5MATCHLINE - STA. 11+80 - THIS SHT.MATCHLINE - STA. 8+20 - SHT. 3MATCHLINE - STA. 11+80 - THIS SHT.KEY MAP NW 20-23-05 EXISTING SITE PLAN & TREE REMOVAL STA. 8+20 - 15+20 DP2SHT. 3SHT. 4SHT. 5SHT. 6SHT. 7S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S. 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 22+20 - SHT. 6MATCHLINE - STA. 18+60 - THIS SHT.MATCHLINE - STA. 15+20 - SHT. 4MATCHLINE - STA. 18+60 - THIS SHT.KEY MAP NW 20-23-05 EXISTING SITE PLAN & TREE REMOVAL STA. 15+20 - 22+20 X X X X SDSDSD===========================================SO-DP1SD///// /SHT. 3SHT. 4SHT. 5SHT. 6SHT. 7S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S. 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. MATC H LI N E - S T A. 2 9 + 2 0 - S H T. 7 MATCHLINE - STA. 25+60 - THIS SHT.MATCHLINE - STA. 25+60 - THIS SHT.MATCHLINE - STA. 22+20 - SHT. 5KEY MAP NW 20-23-05/SW 20-23-05 EXISTING SITE PLAN & TREE REMOVAL STA. 22+20 - 29+20 X==================================================================================================================================================================XXXXXX///////////////////////////////// ////////////////// /// GRANT AVE S S 18th STSHT. 3SHT. 4SHT. 5SHT. 6SHT. 7S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S. 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 29+20 - SHT. 6KEY MAP SW 20-23-05 EXISTING SITE PLAN & TREE REMOVAL STA. 29+20 - 31+00 SO-DP6SD SD SD SD SD SD SHT. 8SHT. 9SHT. 10SHT. 1 1 SHT. 12S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S. T.E.S.C. LEGEND: T.E.S.C. NOTE: 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. EROSION CONTROL PLAN STA. 1+00 - 8+20MATCHLINE - STA. 4+60 - THIS SHT.MATCHLINE - STA. 4+60 - THIS SHT.MATCHLINE - STA. 8+20 - SHT. 9KEY MAP NW 20-23-05 SD ///////////////SHT. 8SHT. 9SHT. 10SHT. 1 1 SHT. 12S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S. T.E.S.C. LEGEND: T.E.S.C. NOTE: 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. EROSION CONTROL PLAN STA. 8+20 - 15+20MATCHLINE - STA. 15+20 - SHT. 10MATCHLINE - STA. 11+80 - THIS SHT.MATCHLINE - STA. 8+20 - SHT. 8MATCHLINE - STA. 11+80 - THIS SHT.KEY MAP NW 20-23-05 DP2SHT. 8SHT. 9SHT. 10SHT. 1 1 SHT. 12S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S. T.E.S.C. LEGEND: T.E.S.C. NOTE: 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. EROSION CONTROL PLAN STA. 15+20 - 22+20MATCHLINE - STA. 22+20 - SHT.11MATCHLINE - STA. 18+60 - THIS SHT.MATCHLINE - STA. 15+20 - SHT. 9MATCHLINE - STA. 18+60 - THIS SHT.KEY MAP NW 20-23-05 X X X X SDSDSDPWR===========================================SO-DP1SD///// /SHT. 8SHT. 9SHT. 10SHT. 1 1 SHT. 12S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S. T.E.S.C. LEGEND: T.E.S.C. NOTE: 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. EROSION CONTROL PLAN STA. 22+20 - 29+20 MATC H LI N E - S T A. 2 9 + 2 0 - S H T. 12 MATCHLINE - STA. 25+60 - THIS SHT.MATCHLINE - STA. 25+60 - THIS SHT.MATCHLINE - STA. 22+20 - SHT.10KEY MAP NW 20-23-05/SW 20-23-05 PWRX==================================================================================================================================================================XXXXXX///////////////////////////////// ////////////////// ///SHT. 8SHT. 9SHT. 10SHT. 1 1 SHT. 12S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S. T.E.S.C. LEGEND: T.E.S.C. NOTE: 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. EROSION CONTROL PLAN STA. 29+20 - 31+00MATCHLINE - STA. 29+20 - SHT. 11KEY MAP SW 20-23-05 60 65 70 75 80 85 90 95 100 105 110 60 65 70 75 80 85 90 95 100 105 110 SO-DP6I- 4 0 5 SH. 13SH. 15SH. 16SH. 19SH. 21S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 14SH. 17SH. 18SH. 2 0 HORIZONTAL CONTROL STA 1+00 - 4+601687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 4+60 - SHT. 14 KEY MAP NW 20-23-05 100 105 110 115 120 125 130 135 140 145 100 105 110 115 120 125 130 135 140 145 120 125 130 135 140 145 150 155 160 165 120 125 130 135 140 145 150 155 160 165 SH. 13SH. 15SH. 16SH. 19SH. 21S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 14SH. 17SH. 18SH. 2 0 MATCHLINE - STA. 4+60 - SHT. 13HORIZONTAL CONTROL STA. 4+60 - 8+201687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 8+20 - SHT. 15KEY MAP NW 20-23-05 135 140 145 150 155 160 165 170 175 180 135 140 145 150 155 160 165 170 175 180 SH. 13SH. 15SH. 16SH. 19SH. 21S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 14SH. 17SH. 18SH. 2 0 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 8+20 - SHT. 14MATCHLINE - STA. 11+80 - SHT. 16KEY MAP HORIZONTAL CONTROL STA. 8+20 - 11+80 NW 20-23-05 165 170 175 180 185 190 195 200 205 165 170 175 180 185 190 195 200 205 150 155 160 165 170 175 180 185 150 155 160 165 170 175 180 185 SH. 13SH. 15SH. 16SH. 19SH. 21S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 14SH. 17SH. 18SH. 2 0 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 15+20 - SHT. 17MATCHLINE - STA. 11+80 - SHT. 15KEY MAP HORIZONTAL CONTROL STA. 11+80 - 15+20 NW 20-23-05 180 185 190 195 200 205 210 215 180 185 190 195 200 205 210 215 DP2SH. 13SH. 15SH. 16SH. 19SH. 21S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 14SH. 17SH. 18SH. 2 0 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 15+20 - SHT. 16MATCHLINE - STA. 18+60 - SHT. 18KEY MAP HORIZONTAL CONTROL STA. 15+20 - 18+60 NW 20-23-05 200 205 210 215 220 225 230 235 200 205 210 215 220 225 230 235 SH. 13SH. 15SH. 16SH. 19SH. 21S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 14SH. 17SH. 18SH. 2 0 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 22+20 - SHT. 19MATCHLINE - STA. 18+60 - SHT. 17KEY MAP HORIZONTAL CONTROL STA. 18+60 - 22+20 NW 20-23-05 225 230 235 240 245 250 255 260 265 225 230 235 240 245 250 255 260 265 SH. 13SH. 15SH. 16SH. 19SH. 21S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 14SH. 17SH. 18SH. 2 0 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 25+60 - SHT. 20MATCHLINE - STA. 22+20 - SHT. 18KEY MAP HORIZONTAL CONTROL STA. 22+20 - 25+60 NW 20-23-05/SW 20-23-05 250 255 260 265 270 275 280 285 290 295 300 250 255 260 265 270 275 280 285 290 295 300 SO-DP1 SH. 13SH. 15SH. 16SH. 19SH. 21S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 14SH. 17SH. 18SH. 2 0 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. MATC H LI N E - S T A. 2 9 + 2 0 - S H T. 21 MATCHLINE - STA. 25+60 - SHT. 19KEY MAP HORIZONTAL CONTROL STA. 25+60 - 29+20 SW 20-23-05 280 285 290 295 300 305 310 315 320 280 285 290 295 300 305 310 315 320 GRANT AVE S S 18th STSH. 13SH. 15SH. 16SH. 19SH. 21S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 14SH. 17SH. 18SH. 2 0 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 29+20 - SHT. 20KEY MAP HORIZONTAL CONTROL STA. 29+20 - 31+00 SW 20-23-05 60 65 70 75 80 85 90 95 100 105 110 60 65 70 75 80 85 90 95 100 105 110 SO-DP6I- 4 0 5 SH. 22SH. 24SH. 25SH. 28SH. 30S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 23SH. 26SH. 27SH. 2 9 EXISTING ACCESS IMPROVEMENTS STA 1+00 - 4+601687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 4+60 - SHT. 23 KEY MAP NW 20-23-05 100 105 110 115 120 125 130 135 140 145 100 105 110 115 120 125 130 135 140 145 120 125 130 135 140 145 150 155 160 165 120 125 130 135 140 145 150 155 160 165 SH. 22SH. 24SH. 25SH. 28SH. 30S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 23SH. 26SH. 27SH. 2 9 MATCHLINE - STA. 4+60 - SHT. 22EXISTING ACCESS IMPROVEMENTS STA. 4+60 - 8+201687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 8+20 - SHT. 24KEY MAP NW 20-23-05 135 140 145 150 155 160 165 170 175 180 135 140 145 150 155 160 165 170 175 180 SH. 22SH. 24SH. 25SH. 28SH. 30S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 23SH. 26SH. 27SH. 2 9 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 8+20 - SHT. 23MATCHLINE - STA. 11+80 - SHT. 25KEY MAP EXISTING ACCESS IMPROVEMENTS STA. 8+20 - 11+80 NW 20-23-05 165 170 175 180 185 190 195 200 205 165 170 175 180 185 190 195 200 205 150 155 160 165 170 175 180 185 150 155 160 165 170 175 180 185 SH. 22SH. 24SH. 25SH. 28SH. 30S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 23SH. 26SH. 27SH. 2 9 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 15+20 - SHT. 26MATCHLINE - STA. 11+80 - SHT. 24KEY MAP EXISTING ACCESS IMPROVEMENTS STA. 11+80 - 15+20 NW 20-23-05 180 185 190 195 200 205 210 215 180 185 190 195 200 205 210 215 DP2SH. 22SH. 24SH. 25SH. 28SH. 30S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 23SH. 26SH. 27SH. 2 9 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 15+20 - SHT. 25MATCHLINE - STA. 18+60 - SHT. 27KEY MAP EXISTING ACCESS IMPROVEMENTS STA. 15+20 - 18+60 NW 20-23-05 200 205 210 215 220 225 230 235 200 205 210 215 220 225 230 235 SH. 22SH. 24SH. 25SH. 28SH. 30S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 23SH. 26SH. 27SH. 2 9 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 22+20 - SHT. 28MATCHLINE - STA. 18+60 - SHT. 26KEY MAP EXISTING ACCESS IMPROVEMENTS STA. 18+60 - 22+20 NW 20-23-05 225 230 235 240 245 250 255 260 265 225 230 235 240 245 250 255 260 265 SH. 22SH. 24SH. 25SH. 28SH. 30S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERIDG E D R. S.SH. 23SH. 26SH. 27 S H . 2 9 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 25+60 - SHT. 29MATCHLINE - STA. 22+20 - SHT. 27KEY MAP EXISTING ACCESS IMPROVEMENTS STA. 22+20 - 25+60 NW 20-23-05/SW 20-23-05 250 255 260 265 270 275 280 285 290 295 300 250 255 260 265 270 275 280 285 290 295 300 SO-DP1 SH. 22SH. 24SH. 25SH. 28SH. 30S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 23SH. 26SH. 27SH. 2 9 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. MATC H LI N E - S T A. 2 9 + 2 0 - S H T. 30 MATCHLINE - STA. 25+60 - SHT. 28KEY MAP EXISTING ACCESS IMPROVEMENTS STA. 25+60 - 29+20 SW 20-23-05 280 285 290 295 300 305 310 315 320 280 285 290 295 300 305 310 315 320 GRANT AVE S S 18th STSH. 22SH. 24SH. 25SH. 28SH. 30S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 23SH. 26SH. 27SH. 2 9 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 29+20 - SHT. 29KEY MAP EXISTING ACCESS IMPROVEMENTS STA. 29+20 - 31+00 SW 20-23-05 60 65 70 75 80 85 90 95 100 105 110 60 65 70 75 80 85 90 95 100 105 110 (±324 L F C I P P ) (ABANDON)SO-DP6I- 4 0 5 SH. 31SH. 33SH. 34SH. 37SH. 39S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 32SH. 35SH. 36SH. 3 8 SEWER PLAN AND PROFILE STA 1+00 - 4+601687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 4+60 - SHT. 32KEY MAP NW 20-23-05 100 105 110 115 120 125 130 135 140 145 100 105 110 115 120 125 130 135 140 145 120 125 130 135 140 145 150 155 160 165 120 125 130 135 140 145 150 155 160 165 (ABAND O N )(ABA N D O N) (ABAND O N )SH. 31SH. 33SH. 34SH. 37SH. 39S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 32SH. 35SH. 36SH. 3 8 MATCHLINE - STA. 4+60 - SHT. 31SEWER PLAN AND PROFILE STA. 4+60 - 8+201687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 8+20 - SHT. 33KEY MAP NW 20-23-05 135 140 145 150 155 160 165 170 175 180 135 140 145 150 155 160 165 170 175 180 (ABANDO N ) (ABAND O N )SH. 31SH. 33SH. 34SH. 37SH. 39S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 32SH. 35SH. 36SH. 3 8 140 145 150 155 160 165 170 175 180 140 145 150 155 160 165 170 175 180 SEWER PLAN AND PROFILE STA. 8+20 - 11+801687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 8+20 - SHT. 32MATCHLINE - STA. 11+80 - SHT. 34KEY MAP 8" HDPE SERVICE CONNECTION PROFILE NW 20-23-05 165 170 175 180 185 190 195 200 165 170 175 180 185 190 195 200 (±70 LF C I P ) (ABAN D O N ) 150 155 160 165 170 175 180 185 150 155 160 165 170 175 180 185 (±197 L F CI P P ) (ABANDO N )SH. 31SH. 33SH. 34SH. 37SH. 39S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 32SH. 35SH. 36SH. 3 8 SEWER PLAN AND PROFILE STA. 11+80 - 15+201687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 15+20 - SHT. 35MATCHLINE - STA. 11+80 - SHT. 33KEY MAP NW 20-23-05 180 185 190 195 200 205 210 215 180 185 190 195 200 205 210 215 (ABAND O N ) (CIPP) (ABANDO N )DP2SH. 31SH. 33SH. 34SH. 37SH. 39S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 32SH. 35SH. 36SH. 3 8 SEWER PLAN AND PROFILE STA. 15+20 - 18+601687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 15+20 - SHT. 34MATCHLINE - STA. 18+60 - SHT. 36KEY MAP NW 20-23-05 200 205 210 215 220 225 230 235 200 205 210 215 220 225 230 235 (CIPP) (±494 L F C I P P ) (CIPP)SH. 31SH. 33SH. 34SH. 37SH. 39S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 32SH. 35SH. 36SH. 3 8 SEWER PLAN AND PROFILE STA. 18+60 - 22+201687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 22+20 - SHT. 37MATCHLINE - STA. 18+60 - SHT. 35KEY MAP NW 20-23-05 225 230 235 240 245 250 255 260 265 225 230 235 240 245 250 255 260 265 (±215 LF C I P P ) (ABAND O N ) (±79 L F C I P P )SH. 31SH. 33SH. 34SH. 37SH. 39S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 32SH. 35SH. 36SH. 3 8 SEWER PLAN AND PROFILE STA. 22+20 - 25+601687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 25+60 - SHT. 38MATCHLINE - STA. 22+20 - SHT. 36KEY MAP NW 20-23-05/SW 20-23-05 250 255 260 265 270 275 280 285 290 295 300 250 255 260 265 270 275 280 285 290 295 300 (ABAN D O N ) REMOVE EXISTING MH TOP AND FILL SEE ABANDON MANHOLE DETAIL: SHEET 52 SO-D P1 SH. 31SH. 33SH. 34SH. 37SH. 39S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 32SH. 35SH. 36SH. 3 8 SEWER PLAN AND PROFILE STA. 25+60 - 29+201687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. MATC H LI N E - S T A. 2 9 + 2 0 - S H T. 39 MATCHLINE - STA. 25+60 - SHT. 37KEY MAP SW 20-23-05 280 285 290 295 300 305 310 315 320 280 285 290 295 300 305 310 315 320 GRANT AVE S S 18th STSH. 31SH. 33SH. 34SH. 37SH. 39S. 1 8 T H S T .I-405GRANT AVE. S.EAGLERID G E D R. S.SH. 32SH. 35SH. 36SH. 3 8 1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. SEWER PLAN AND PROFILE STA. 29+20 - 31+00MATCHLINE - STA. 29+20 - SHT. 38KEY MAP SW 20-23-05 GRAVEL PATH CROSS-SECTIONS STA. 1+00 - 4+501687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. GRAVEL PATH CROSS-SECTIONS STA. 5+00 - 7+501687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. GRAVEL PATH CROSS-SECTIONS STA. 8+00 - 11+001687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. GRAVEL PATH CROSS-SECTIONS STA. 11+50 - 13+001687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. GRAVEL PATH CROSS-SECTIONS STA. 13+50 - 16+001687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. GRAVEL PATH CROSS-SECTIONS STA. 16+50 - 20+001687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. GRAVEL PATH CROSS-SECTIONS STA. 20+20 - 24+501687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. GRAVEL PATH CROSS-SECTIONS STA. 25+00 - 28+501687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. GRAVEL PATH CROSS-SECTIONS STA. 29+00 - 30+501687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. 1 49 HIGH VISIBILITY FENCE 2 49 HIGH VISIBILITY SILT FENCE 3 49 EROSION CONTROL AT CULVERT ENDS 4 49 CATCH BASIN FILTER 1.THIS TEMPORARY EROSION/SEDIMENTATION CONTROL (TESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.) 2.CONTRACTOR REQUIRED TO SUBMIT TESC AND DEWATERING PLAN TO OWNER AND ENGINEER FOR REVIEW PRIOR TO CONSTRUCTION. 3.CONTRACTOR AND AN ON-SITE REPRESENTATIVE OF OWNER WILL REVIEW THE INSTALLATION, MAINTENANCE AND PERFORMANCE OF THE TESC MEASURES SHOWN ON THE APPROVED PLANS. THE TESC OBSERVER OR PERMITTING AGENCY MAY RECOMMEND ADDITIONAL MEASURES OR CHANGES TO THE TESC PLAN THAT ARE WARRANTED DURING CONSTRUCTION. THE CONTRACTOR AND OBSERVER WILL EXAMINE ALL TESC MEASURES PERIODICALLY DURING THE CONSTRUCTION PERIOD, AND AFTER STORMS HAVING 0.5 INCHES OR MORE OF RAINFALL IN A 24-HOUR PERIOD. THE OBSERVER AND THE PERMITTING AGENCY HAVE THE AUTHORITY TO REQUIRE CORRECTIVE ACTION IN ORDER TO ACHIEVE EROSION CONTROL OBJECTIVES. 4.THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE TESC FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR. TESC MEASURES SHALL REMAIN FUNCTIONING AND IN PLACE UNTIL THE SITE HAS BEEN STABILIZED AND THE PERMITTING AGENCY, OWNER OR ENGINEER HAS APPROVED THE REMOVAL OF THE TESC MEASURES. 5.AS CONSTRUCTION PROGRESSES AND UNEXPECTED SEASONAL CONDITIONS DICTATE, ADDITIONAL TESC MEASURES MAY BECOME NECESSARY TO PROTECT ADJACENT PROPERTIES AND TO ENSURE WATER QUALITY FOR SITE RUNOFF. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ADDRESS DEFICIENT TESC CONDITIONS, AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE THE MINIMUM REQUIREMENTS OUTLINED ON THE APPROVED PLANS AS NEEDED. 6.THE TESC FACILITIES SHOWN ON THESE PLANS MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE DRAINAGE SYSTEM OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. 7.THE TESC FACILITIES SHOWN ON THESE PLANS ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE TESC FACILITIES SHALL BE UPGRADED (E.G. ADDITIONAL SUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.) AS NEEDED. 8.THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE THEY CONTINUE TO FUNCTION. 9.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH APPROVED ESC METHODS (E.G. SEEDING, MULCHING, PLASTIC COVERING, ETC.) 10.ANY AREA NEEDING TESC MEASURE, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE STABILIZED WITHIN SEVEN (7) DAYS. 11.AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. 12.WHERE MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF 2 TO 3 INCHES. 13.PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH AREAS CAN BE STABILIZED IN PREPARATION FOR THE WINTER RAINS. IDENTIFIED AREAS SHOULD BE STABILIZED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. 14.TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) MEASURES SHALL BE IMPLEMENTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE NPDES CONSTRUCTION STORMWATER GENERAL PERMIT, THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN, ALL OTHER APPLICABLE PERMIT CONDITIONS, AND ALL OTHER APPLICABLE FEDERAL AND STATE LAWS. 15.NOT ALL CONSTRUCTION STORMWATER BMPS ARE SHOWN ON THE TESC DRAWINGS. SEE SWPPP FOR DESCRIPTIONS OF THE BMPS IDENTIFIED IN THE PLAN SHEETS AS WELL AS FOR OTHER APPLICABLE CONSTRUCTION STORMWATER BMPS. 16.TESC MEASURES AND SELECTED BMPS IDENTIFIED ON THE TESC PLAN AND IN THE SWPPP ARE BASED ON INFORMATION AVAILABLE AT THE TIME OF THE DRAWING AND SWPPP DEVELOPMENT. CONTRACTOR'S CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL) SHALL MODIFY TESC PLAN AND SWPPP AS REQUIRED TO ENSURE THE REQUIREMENTS DESCRIBED IN ITEM 15 ARE MET AT ALL TIMES. TEMPORARY EROSION/SEDIMENTATION CONTROL NOTES: TESC DETAILS1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. TESC DETAILS1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. 4 50 SLOPE INSTALLATIONS 1 50 SURFACE ROUGHING 2 50 WATERWAY INSTALLATIONS 3 50 STRAW WATTLES 1 51 WHEEL WASH TESC DETAILS1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. 2 51 CONSTRUCTION ENTRANCE 3 51 CURB AND GUTTER PROTECTION STD. 400.1 STANDARD SANITARY MANHOLE INSIDE DROP CONNECTION FOR SANITARY MANHOLESTD. 402.2 AIR TEST TABLE (LOW PRESSURE) FOR SANITARY SEWERSSTD. 410 MANHOLE FRAME AND COVERSTD. 401 ABANDON MANHOLESTD. 400.5 PIPE BEDDING FOR SANITARY SEWERSSTD. 405 WASTEWATER UTILITY STANDARD NOTESSTD. 413 CITY STANDARD DETAILS1687 114TH Avenue SE, Suite 100 Bellevue WA 98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. TRENCH DETAIL FOR GRAVITY MAIN (OPEN CUT/UNPAVED SECTIONS)1 53 TRENCH DETAIL FOR GRAVITY MAIN (OPEN CUT/PAVED SECTIONS)3 53 TYPICAL GRADING PLAN4 53 2 53 NOT USED MISC. DETAILS1687 114TH Avenue SE, Suite 100 Bellevue WA 98004 phone: (425) 869-9448 www.stantec.com THUNDER HILLS SEWER INTERCEPTOR REHABILITATION WWP-27-03921 Stantec was not present on site during construction. These record drawings are a compilation of a copy of the sealed engineering drawings for this project, as modified by information furnished by the as-built survey on the project. The information shown on the record drawings that was provided by the City Utilities Dept. inspector cannot be verified for accuracy or completeness. The original sealed drawings are on file at the offices of the City of Renton. TYPICAL ROCK WALL DETAIL5 53 TYPICAL SD AT BACK OF WALL DETAIL6 53 TYPICAL PAVED MAINTENANCE PATH8 53