HomeMy WebLinkAboutAB-3921VICINITY MAP
CITY OF RENTON
THUNDER HILLS SEWER INTERCEPTOR
REHABILITATION
WWP-27-03921
PROJECT
LOCATION
NTS
1687 114TH Avenue SE, Suite 100
Bellevue WA 98004 phone: (425)869-9448 www.stantec.com
CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON, WASHINGTON 98057
CONTACT PERSONNEL
JOHN HOBSON PROJECT MANAGER (425) 430-7279
JOE STOWELL WASTEWATER UTILITY (425) 430-7212
MANAGER
EMERGENCY 911
ONE CALL 1-800-424-5555
SHEET INDEX
Sheet
Number Sheet Title
1 COVER SHEET
2 GENERAL NOTES & LEGEND
3 EXISTING SITE PLAN & TREE REMOVAL STA. 1+00 - 8+20
4 EXISTING SITE PLAN & TREE REMOVAL STA. 8+20 - 15+20
5 EXISTING SITE PLAN & TREE REMOVAL STA. 15+20 - 22+20
6 EXISTING SITE PLAN & TREE REMOVAL STA. 22+20 - 29+20
7 EXISTING SITE PLAN & TREE REMOVAL STA. 29+20 - 31+00
8 EROSION CONTROL PLAN STA. 1+00 - 8+20
9 EROSION CONTROL PLAN STA. 8+20 - 15+20
10 EROSION CONTROL PLAN STA. 15+20 - 22+20
11 EROSION CONTROL PLAN STA. 22+20 - 29+20
12 EROSION CONTROL PLAN STA. 29+20 - 31+00
13 HORIZONTAL CONTROL STA 1+00 - 4+60
14 HORIZONTAL CONTROL STA. 4+60 - 8+20
15 HORIZONTAL CONTROL STA. 8+20 - 11+80
16 HORIZONTAL CONTROL STA. 11+80 - 15+20
17 HORIZONTAL CONTROL STA. 15+20 - 18+60
18 HORIZONTAL CONTROL STA. 18+60 - 22+20
19 HORIZONTAL CONTROL STA. 22+20 - 25+60
20 HORIZONTAL CONTROL STA. 25+60 - 29+20
21 HORIZONTAL CONTROL STA. 29+20 - 31+00
22 EX. ACCESS IMPROVEMENTS STA. 1+80 - 4+60
23 EX. ACCESS IMPROVEMENTS STA. 4+60 - 8+20
24 EX. ACCESS IMPROVEMENTS STA. 8+20 - 11+80
25 EX. ACCESS IMPROVEMENTS STA. 11+80 - 15+20
26 EX. ACCESS IMPROVEMENTS STA. 15+20 - 18+60
27 EX. ACCESS IMPROVEMENTS STA. 18+60 - 22+20
28 EX. ACCESS IMPROVEMENTS STA. 22+20 - 25+60
29 EX. ACCESS IMPROVEMENTS STA. 25+60 - 29+20
30 EX. ACCESS IMPROVEMENTS STA. 29+20 - 31+00
31 SEWER PLAN AND PROFILE STA 1+00 - 4+60
32 SEWER PLAN AND PROFILESTA. 4+60 - 8+20
33 SEWER PLAN AND PROFILE STA. 8+20 - 11+80
34 SEWER PLAN AND PROFILE STA. 11+80 - 15+20
35 SEWER PLAN AND PROFILE STA. 15+20 - 18+60
36 SEWER PLAN AND PROFILE STA. 18+60 - 22+20
37 SEWER PLAN AND PROFILE STA. 22+20 - 25+60
38 SEWER PLAN AND PROFILE STA. 25+60 - 29+20
39 SEWER PLAN AND PROFILE STA. 29+20 - 31+00
40 GRAVEL PATH CROSS-SECTIONS STA. 1+00 - 4+50
41 GRAVEL PATH CROSS-SECTIONS STA. 5+00 - 7+50
42 GRAVEL PATH CROSS-SECTIONS STA. 8+00 - 11+00
43 GRAVEL PATH CROSS-SECTIONS STA. 11+50 - 13+00
44 GRAVEL PATH CROSS-SECTIONS STA. 13+50 - 16+00
45 GRAVEL PATH CROSS-SECTIONS STA. 16+50 - 20+00
46 GRAVEL PATH CROSS-SECTIONS STA. 20+20 - 24+50
47 GRAVEL PATH CROSS-SECTIONS STA. 25+00 - 28+50
48 GRAVEL PATH CROSS-SECTIONS STA. 29+00 - 30+50
49 TESC DETAILS
50 TESC DETAILS
51 TESC DETAILS
52 CITY STANDARD DETAILS
53 MISCELLANEOUS DETAILS
EXACT SIZE, TYPE, LOCATION OR DEPTH.
BURIED UTILITIES IN AREA
CALL BEFORE YOU DIG
EXISTING UTILITIES SHOWN ARE FROM
THE BEST AVAILABLE INFORMATION AND
NO GUARANTEE IS MADE AS TO THE
1-800-424-5555
54 W1.0 OF 15 - PROJECT OVERVIEW
55 W2.0 OF 15 - PLANTING PLAN & LOG PLACEMENT (1 OF 7)
56 W2.1 OF 15 - PLANTING PLAN & LOG PLACEMENT (2 OF 7)
57 W2.2 OF 15 - PLANTING PLAN & LOG PLACEMENT (3 OF 7)
58 W2.3 OF 15 - PLANTING PLAN & LOG PLACEMENT (4 OF 7)
59 W2.4 OF 15 - PLANTING PLAN & LOG PLACEMENT (5 OF 7)
60 W2.5 OF 15 - PLANTING PLAN & LOG PLACEMENT (6 OF 7)
61 W2.6 OF 15 - PLANTING PLAN & LOG PLACEMENT (7 OF 7)
62 W3.0 OF 15 - PLANT SECHEDULE
63 W3.1 OF 15 - PLANT NOTES & DETAILS
64 W4.0 OF 15 - SITE PREPARATION
65 W5.0 OF 15 - ANCHORED LARGE WOODY DEBRIS PLAN
66 W5.1 - ANCHORED LARGE WOODY DEBRIS NOTES & DETAILS
67 W6.0 - TEMPORARY BYPASS PLAN
68 W7.0 - MITIGATION NOTES
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by information
furnished by the as-built survey on the project. The information
shown on the record drawings that was provided by the City
Utilities Dept. inspector cannot be verified for accuracy or
completeness. The original sealed drawings are on file at the
offices of the City of Renton.
CONSTRUCTION SEQUENCE
1.ATTEND PRE-CONSTRUCTION MEETING AND PERMIT COMPLIANCE MEETING, AS REQUIRED BY PERMIT.
2.OBTAIN NOTICE TO PROCEED FROM CITY AND ALL REQUIRED PERMITS BEYOND THOSE PROVIDED BY CITY (SEE SPECIFICATIONS) PRIOR TO COMMENCING
WORK.
3.COORDINATE WITH CITY / ENGINEER FOR CONSTRUCTION STAKING. STAKING TO BE PROVIDED BY CONTRACTOR.
4.INSTALL PERIMETER PROTECTION, TEMPORARY EROSION AND SEDIMENT CONTROLS, AND BMPS.
5.MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY STANDARDS AND THESE PLANS AND SPECIFICATIONS THROUGHOUT THE PROJECT.
6.CLEAR, ROUGH GRADE, AND INSTALL PROPOSED WALLS ONSITE
7.PROVIDE SEQUENCING PLAN AND SEWAGE BYPASS PUMPING PLAN FOR REVIEW AND ACCEPTANCE BY CITY PRIOR TO PERFORMING INTERCEPTOR
IMPROVEMENTS.
8.PERFORM BYPASS PUMPING, INSTALL OPEN-CUT SEWER AND INSTALL CIPP.
9.INSTALL GRAVEL ROAD.
10.PERFORM LEAKAGE TESTING AND TELEVISION INSPECTION OF NEW SANITARY SEWER MAIN, AND CIPP MAIN.
11.OBTAIN CITY APPROVAL BEFORE TRANSFERRING SEWAGE TO NEW SANITARY SEWER MAIN, AND CIPP MAIN. CONNECT TO EXISTING SANITARY SEWER SYSTEM.
12.ABANDON EXISTING SANITARY SEWER FACILITIES AS SHOWN ON PLANS.
13.PERFORM FINAL GRADING/PAVING AND SURFACE RESTORATION.
14.AFTER ALL DANGER OF EROSION HAS PASSED AND AFTER APPROVAL BY CITY. COORDINATE REMOVAL OR TRANSFER OF TEMPORARY BMPS WITH FOLLOW-UP
CONSTRUCTION PROJECTS.
15.CONTRACTOR TO PROVIDE FIELD MARK-UP OF PLANS AS CONSTRUCTED.
NOTE: THIS IS A POSSIBLE SEQUENCE OF CONSTRUCTION ACTIVITIES. FINAL SEQUENCE SHALL BE DEVELOPED BY CONTRACTOR AND SUBJECT TO REVIEW BY
OWNER.
SURVEY NOTES:
THE SURVEY INFORMATION SHOWN IN THE ATTACHED PLAN HAS BEEN PROVIDED BY STANTEC.
SEE: HORIZONTAL CONTROL SHEETS
HORIZONTAL CONTROL DATUM:
NAD83/91 PER VALUES PUBLISHED FOR CITY OF RENTON CONTROL POINTS 1063 AND 476, CITY OF RENTON SURVEY CONTROL.
BENCHMARKS AND VERTICAL CONTROL DATUM:
1. CITY OF RENTON CONTROL POINT 2193: TOP OF BRASS DISK IN CONCRETE MONUMENT AT THE INTERSECTION OF S 18TH ST. AND GRANT AVE S.
ELEV = 317.58 (NAVD'88)
2. CITY OF RENTON CONTROL POINT 1063: TOP OF PUNCH IN BRASS PIN IN CONCRETE MONUMENT IN CASE AT THE INTERSECTION OF S 18TH ST. AND EAGLE RIDGE DRIVE.
ELEV = 261.22 (NAVD'88)
EXISTING PROPOSED
L E G E N D
T.E.S.C
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
GENERAL NOTES & LEGEND
EXISTING ACCESS IMPROVEMENTS
’
¾”
– ’
– – ”
–
–
– ’
’
–
–
–
–
–
–
– –
–
– ”
SO-DP6SD
SD
SD
SD
SD
SD
I-
4
0
5
SHT.
3SHT.
4SHT.
5SHT. 6SHT. 7S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.MATCHLINE - STA. 4+60 - THIS SHT.MATCHLINE - STA. 4+60 - THIS SHT.MATCHLINE - STA. 8+20 - SHT. 4KEY MAP
NW 20-23-05
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
EXISTING SITE PLAN & TREE REMOVAL
STA. 1+00 - 8+20
SD
///////////////SHT.
3SHT.
4SHT.
5SHT. 6SHT. 7S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 15+20 - SHT. 5MATCHLINE - STA. 11+80 - THIS SHT.MATCHLINE - STA. 8+20 - SHT. 3MATCHLINE - STA. 11+80 - THIS SHT.KEY MAP
NW 20-23-05
EXISTING SITE PLAN & TREE REMOVAL
STA. 8+20 - 15+20
DP2SHT.
3SHT.
4SHT.
5SHT. 6SHT. 7S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 22+20 - SHT. 6MATCHLINE - STA. 18+60 - THIS SHT.MATCHLINE - STA. 15+20 - SHT. 4MATCHLINE - STA. 18+60 - THIS SHT.KEY MAP
NW 20-23-05
EXISTING SITE PLAN & TREE REMOVAL
STA. 15+20 - 22+20
X X X X
SDSDSD===========================================SO-DP1SD/////
/SHT.
3SHT.
4SHT.
5SHT. 6SHT. 7S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
MATC
H
LI
N
E -
S
T
A.
2
9
+
2
0 -
S
H
T.
7
MATCHLINE - STA. 25+60 - THIS SHT.MATCHLINE - STA. 25+60 - THIS SHT.MATCHLINE - STA. 22+20 - SHT. 5KEY MAP
NW 20-23-05/SW 20-23-05
EXISTING SITE PLAN & TREE REMOVAL
STA. 22+20 - 29+20
X==================================================================================================================================================================XXXXXX/////////////////////////////////
//////////////////
///
GRANT AVE S
S 18th STSHT.
3SHT.
4SHT.
5SHT. 6SHT. 7S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 29+20 - SHT. 6KEY MAP
SW 20-23-05
EXISTING SITE PLAN & TREE REMOVAL
STA. 29+20 - 31+00
SO-DP6SD
SD
SD
SD
SD
SD
SHT.
8SHT.
9SHT.
10SHT. 1
1
SHT. 12S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.
T.E.S.C. LEGEND:
T.E.S.C. NOTE:
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
EROSION CONTROL PLAN STA. 1+00 - 8+20MATCHLINE - STA. 4+60 - THIS SHT.MATCHLINE - STA. 4+60 - THIS SHT.MATCHLINE - STA. 8+20 - SHT. 9KEY MAP
NW 20-23-05
SD
///////////////SHT.
8SHT.
9SHT.
10SHT. 1
1
SHT. 12S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.
T.E.S.C. LEGEND:
T.E.S.C. NOTE:
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
EROSION CONTROL PLAN STA. 8+20 - 15+20MATCHLINE - STA. 15+20 - SHT. 10MATCHLINE - STA. 11+80 - THIS SHT.MATCHLINE - STA. 8+20 - SHT. 8MATCHLINE - STA. 11+80 - THIS SHT.KEY MAP
NW 20-23-05
DP2SHT.
8SHT.
9SHT.
10SHT. 1
1
SHT. 12S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.
T.E.S.C. LEGEND:
T.E.S.C. NOTE:
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
EROSION CONTROL PLAN STA. 15+20 - 22+20MATCHLINE - STA. 22+20 - SHT.11MATCHLINE - STA. 18+60 - THIS SHT.MATCHLINE - STA. 15+20 - SHT. 9MATCHLINE - STA. 18+60 - THIS SHT.KEY MAP
NW 20-23-05
X X X X
SDSDSDPWR===========================================SO-DP1SD/////
/SHT.
8SHT.
9SHT.
10SHT. 1
1
SHT. 12S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.
T.E.S.C. LEGEND:
T.E.S.C. NOTE:
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
EROSION CONTROL PLAN STA. 22+20 - 29+20
MATC
H
LI
N
E -
S
T
A.
2
9
+
2
0 -
S
H
T.
12
MATCHLINE - STA. 25+60 - THIS SHT.MATCHLINE - STA. 25+60 - THIS SHT.MATCHLINE - STA. 22+20 - SHT.10KEY MAP
NW 20-23-05/SW 20-23-05
PWRX==================================================================================================================================================================XXXXXX/////////////////////////////////
//////////////////
///SHT.
8SHT.
9SHT.
10SHT. 1
1
SHT. 12S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.
T.E.S.C. LEGEND:
T.E.S.C. NOTE:
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
EROSION CONTROL PLAN STA. 29+20 - 31+00MATCHLINE - STA. 29+20 - SHT. 11KEY MAP
SW 20-23-05
60
65
70
75
80
85
90
95
100
105
110
60
65
70
75
80
85
90
95
100
105
110
SO-DP6I-
4
0
5 SH.
13SH.
15SH.
16SH.
19SH. 21S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
14SH.
17SH.
18SH.
2
0
HORIZONTAL CONTROL STA 1+00 - 4+601687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 4+60 - SHT. 14 KEY MAP
NW 20-23-05
100
105
110
115
120
125
130
135
140
145
100
105
110
115
120
125
130
135
140
145
120
125
130
135
140
145
150
155
160
165
120
125
130
135
140
145
150
155
160
165
SH.
13SH.
15SH.
16SH.
19SH. 21S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
14SH.
17SH.
18SH.
2
0
MATCHLINE - STA. 4+60 - SHT. 13HORIZONTAL CONTROL STA. 4+60 - 8+201687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 8+20 - SHT. 15KEY MAP
NW 20-23-05
135
140
145
150
155
160
165
170
175
180
135
140
145
150
155
160
165
170
175
180
SH.
13SH.
15SH.
16SH.
19SH. 21S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
14SH.
17SH.
18SH.
2
0
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 8+20 - SHT. 14MATCHLINE - STA. 11+80 - SHT. 16KEY MAP
HORIZONTAL CONTROL STA. 8+20 - 11+80
NW 20-23-05
165
170
175
180
185
190
195
200
205
165
170
175
180
185
190
195
200
205
150
155
160
165
170
175
180
185
150
155
160
165
170
175
180
185
SH.
13SH. 15SH.
16SH.
19SH. 21S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
14SH.
17SH.
18SH.
2
0
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 15+20 - SHT. 17MATCHLINE - STA. 11+80 - SHT. 15KEY MAP
HORIZONTAL CONTROL STA. 11+80 - 15+20
NW 20-23-05
180
185
190
195
200
205
210
215
180
185
190
195
200
205
210
215
DP2SH.
13SH. 15SH.
16SH.
19SH. 21S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
14SH.
17SH.
18SH.
2
0
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 15+20 - SHT. 16MATCHLINE - STA. 18+60 - SHT. 18KEY MAP
HORIZONTAL CONTROL STA. 15+20 - 18+60
NW 20-23-05
200
205
210
215
220
225
230
235
200
205
210
215
220
225
230
235
SH.
13SH. 15SH.
16SH.
19SH. 21S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
14SH.
17SH.
18SH.
2
0
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 22+20 - SHT. 19MATCHLINE - STA. 18+60 - SHT. 17KEY MAP
HORIZONTAL CONTROL STA. 18+60 - 22+20
NW 20-23-05
225
230
235
240
245
250
255
260
265
225
230
235
240
245
250
255
260
265
SH.
13SH. 15SH.
16SH.
19SH. 21S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
14SH.
17SH.
18SH.
2
0
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 25+60 - SHT. 20MATCHLINE - STA. 22+20 - SHT. 18KEY MAP
HORIZONTAL CONTROL STA. 22+20 - 25+60
NW 20-23-05/SW 20-23-05
250
255
260
265
270
275
280
285
290
295
300
250
255
260
265
270
275
280
285
290
295
300
SO-DP1 SH.
13SH. 15SH.
16SH.
19SH. 21S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
14SH.
17SH.
18SH.
2
0
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
MATC
H
LI
N
E -
S
T
A.
2
9
+
2
0 -
S
H
T.
21
MATCHLINE - STA. 25+60 - SHT. 19KEY MAP
HORIZONTAL CONTROL STA. 25+60 - 29+20
SW 20-23-05
280
285
290
295
300
305
310
315
320
280
285
290
295
300
305
310
315
320
GRANT AVE S
S 18th STSH.
13SH. 15SH.
16SH.
19SH. 21S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
14SH.
17SH.
18SH.
2
0
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 29+20 - SHT. 20KEY MAP
HORIZONTAL CONTROL STA. 29+20 - 31+00
SW 20-23-05
60
65
70
75
80
85
90
95
100
105
110
60
65
70
75
80
85
90
95
100
105
110
SO-DP6I-
4
0
5 SH.
22SH. 24SH. 25SH. 28SH. 30S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
23SH.
26SH.
27SH.
2
9
EXISTING ACCESS IMPROVEMENTS STA 1+00 - 4+601687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 4+60 - SHT. 23 KEY MAP
NW 20-23-05
100
105
110
115
120
125
130
135
140
145
100
105
110
115
120
125
130
135
140
145
120
125
130
135
140
145
150
155
160
165
120
125
130
135
140
145
150
155
160
165
SH.
22SH. 24SH. 25SH.
28SH. 30S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
23SH.
26SH.
27SH.
2
9
MATCHLINE - STA. 4+60 - SHT. 22EXISTING ACCESS IMPROVEMENTS STA. 4+60 - 8+201687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 8+20 - SHT. 24KEY MAP
NW 20-23-05
135
140
145
150
155
160
165
170
175
180
135
140
145
150
155
160
165
170
175
180
SH.
22SH. 24SH.
25SH.
28SH. 30S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
23SH.
26SH.
27SH.
2
9
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 8+20 - SHT. 23MATCHLINE - STA. 11+80 - SHT. 25KEY MAP
EXISTING ACCESS IMPROVEMENTS STA. 8+20 - 11+80
NW 20-23-05
165
170
175
180
185
190
195
200
205
165
170
175
180
185
190
195
200
205
150
155
160
165
170
175
180
185
150
155
160
165
170
175
180
185
SH.
22SH. 24SH. 25SH.
28SH. 30S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
23SH.
26SH.
27SH.
2
9
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 15+20 - SHT. 26MATCHLINE - STA. 11+80 - SHT. 24KEY MAP
EXISTING ACCESS IMPROVEMENTS
STA. 11+80 - 15+20
NW 20-23-05
180
185
190
195
200
205
210
215
180
185
190
195
200
205
210
215
DP2SH.
22SH. 24SH. 25SH.
28SH. 30S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
23SH.
26SH.
27SH.
2
9
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 15+20 - SHT. 25MATCHLINE - STA. 18+60 - SHT. 27KEY MAP
EXISTING ACCESS IMPROVEMENTS
STA. 15+20 - 18+60
NW 20-23-05
200
205
210
215
220
225
230
235
200
205
210
215
220
225
230
235
SH.
22SH. 24SH. 25SH.
28SH. 30S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
23SH.
26SH.
27SH.
2
9
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 22+20 - SHT. 28MATCHLINE - STA. 18+60 - SHT. 26KEY MAP
EXISTING ACCESS IMPROVEMENTS
STA. 18+60 - 22+20
NW 20-23-05
225
230
235
240
245
250
255
260
265
225
230
235
240
245
250
255
260
265
SH.
22SH.
24SH.
25SH.
28SH. 30S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERIDG
E
D
R.
S.SH.
23SH. 26SH. 27
S
H
.
2
9
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 25+60 - SHT. 29MATCHLINE - STA. 22+20 - SHT. 27KEY MAP
EXISTING ACCESS IMPROVEMENTS
STA. 22+20 - 25+60
NW 20-23-05/SW 20-23-05
250
255
260
265
270
275
280
285
290
295
300
250
255
260
265
270
275
280
285
290
295
300
SO-DP1 SH.
22SH. 24SH.
25SH.
28SH. 30S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
23SH.
26SH.
27SH.
2
9
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
MATC
H
LI
N
E -
S
T
A.
2
9
+
2
0 -
S
H
T.
30
MATCHLINE - STA. 25+60 - SHT. 28KEY MAP
EXISTING ACCESS IMPROVEMENTS
STA. 25+60 - 29+20
SW 20-23-05
280
285
290
295
300
305
310
315
320
280
285
290
295
300
305
310
315
320
GRANT AVE S
S 18th STSH.
22SH. 24SH.
25SH.
28SH. 30S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
23SH.
26SH.
27SH.
2
9
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 29+20 - SHT. 29KEY MAP
EXISTING ACCESS IMPROVEMENTS
STA. 29+20 - 31+00
SW 20-23-05
60
65
70
75
80
85
90
95
100
105
110
60
65
70
75
80
85
90
95
100
105
110
(±324
L
F
C
I
P
P
)
(ABANDON)SO-DP6I-
4
0
5 SH.
31SH. 33SH. 34SH. 37SH. 39S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
32SH.
35SH.
36SH.
3
8
SEWER PLAN AND PROFILE STA 1+00 - 4+601687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 4+60 - SHT. 32KEY MAP
NW 20-23-05
100
105
110
115
120
125
130
135
140
145
100
105
110
115
120
125
130
135
140
145
120
125
130
135
140
145
150
155
160
165
120
125
130
135
140
145
150
155
160
165
(ABAND
O
N
)(ABA
N
D
O
N)
(ABAND
O
N
)SH.
31SH. 33SH. 34SH. 37SH. 39S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
32SH.
35SH.
36SH.
3
8
MATCHLINE - STA. 4+60 - SHT. 31SEWER PLAN AND PROFILE STA. 4+60 - 8+201687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 8+20 - SHT. 33KEY MAP
NW 20-23-05
135
140
145
150
155
160
165
170
175
180
135
140
145
150
155
160
165
170
175
180
(ABANDO
N
)
(ABAND
O
N
)SH.
31SH. 33SH. 34SH. 37SH. 39S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
32SH.
35SH.
36SH.
3
8
140
145
150
155
160
165
170
175
180
140
145
150
155
160
165
170
175
180
SEWER PLAN AND PROFILE STA. 8+20 - 11+801687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 8+20 - SHT. 32MATCHLINE - STA. 11+80 - SHT. 34KEY MAP
8" HDPE SERVICE CONNECTION PROFILE
NW 20-23-05
165
170
175
180
185
190
195
200
165
170
175
180
185
190
195
200
(±70 LF C
I
P
)
(ABAN
D
O
N
)
150
155
160
165
170
175
180
185
150
155
160
165
170
175
180
185
(±197
L
F
CI
P
P
)
(ABANDO
N
)SH.
31SH. 33SH. 34SH.
37SH. 39S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
32SH.
35SH.
36SH.
3
8
SEWER PLAN AND PROFILE STA. 11+80 - 15+201687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 15+20 - SHT. 35MATCHLINE - STA. 11+80 - SHT. 33KEY MAP
NW 20-23-05
180
185
190
195
200
205
210
215
180
185
190
195
200
205
210
215
(ABAND
O
N
)
(CIPP)
(ABANDO
N
)DP2SH.
31SH. 33SH. 34SH.
37SH. 39S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
32SH.
35SH.
36SH.
3
8
SEWER PLAN AND PROFILE STA. 15+20 - 18+601687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 15+20 - SHT. 34MATCHLINE - STA. 18+60 - SHT. 36KEY MAP
NW 20-23-05
200
205
210
215
220
225
230
235
200
205
210
215
220
225
230
235
(CIPP)
(±494 L
F
C
I
P
P
)
(CIPP)SH.
31SH. 33SH. 34SH.
37SH. 39S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
32SH.
35SH.
36SH.
3
8
SEWER PLAN AND PROFILE STA. 18+60 - 22+201687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 22+20 - SHT. 37MATCHLINE - STA. 18+60 - SHT. 35KEY MAP
NW 20-23-05
225
230
235
240
245
250
255
260
265
225
230
235
240
245
250
255
260
265
(±215 LF
C
I
P
P
)
(ABAND
O
N
)
(±79 L
F
C
I
P
P
)SH.
31SH. 33SH. 34SH.
37SH. 39S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
32SH.
35SH.
36SH.
3
8
SEWER PLAN AND PROFILE STA. 22+20 - 25+601687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.MATCHLINE - STA. 25+60 - SHT. 38MATCHLINE - STA. 22+20 - SHT. 36KEY MAP
NW 20-23-05/SW 20-23-05
250
255
260
265
270
275
280
285
290
295
300
250
255
260
265
270
275
280
285
290
295
300
(ABAN
D
O
N
)
REMOVE EXISTING
MH TOP AND FILL
SEE ABANDON MANHOLE
DETAIL: SHEET 52
SO-D
P1 SH.
31SH. 33SH. 34SH.
37SH. 39S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
32SH.
35SH.
36SH.
3
8
SEWER PLAN AND PROFILE STA. 25+60 - 29+201687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
MATC
H
LI
N
E -
S
T
A.
2
9
+
2
0 -
S
H
T.
39
MATCHLINE - STA. 25+60 - SHT. 37KEY MAP
SW 20-23-05
280
285
290
295
300
305
310
315
320
280
285
290
295
300
305
310
315
320
GRANT AVE S
S 18th STSH.
31SH. 33SH. 34SH.
37SH. 39S.
1
8
T
H
S
T
.I-405GRANT AVE. S.EAGLERID
G
E
D
R.
S.SH.
32SH.
35SH.
36SH.
3
8
1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
SEWER PLAN AND PROFILE STA. 29+20 - 31+00MATCHLINE - STA. 29+20 - SHT. 38KEY MAP
SW 20-23-05
GRAVEL PATH CROSS-SECTIONS STA. 1+00 - 4+501687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
GRAVEL PATH CROSS-SECTIONS STA. 5+00 - 7+501687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
GRAVEL PATH CROSS-SECTIONS STA. 8+00 - 11+001687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
GRAVEL PATH CROSS-SECTIONS STA. 11+50 - 13+001687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
GRAVEL PATH CROSS-SECTIONS STA. 13+50 - 16+001687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
GRAVEL PATH CROSS-SECTIONS STA. 16+50 - 20+001687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
GRAVEL PATH CROSS-SECTIONS STA. 20+20 - 24+501687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
GRAVEL PATH CROSS-SECTIONS STA. 25+00 - 28+501687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
GRAVEL PATH CROSS-SECTIONS STA. 29+00 - 30+501687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
1
49
HIGH VISIBILITY FENCE 2
49
HIGH VISIBILITY SILT FENCE
3
49
EROSION CONTROL AT CULVERT ENDS
4
49
CATCH BASIN FILTER
1.THIS TEMPORARY EROSION/SEDIMENTATION CONTROL (TESC) PLAN DOES NOT
CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G.
SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION
FACILITIES, UTILITIES, ETC.)
2.CONTRACTOR REQUIRED TO SUBMIT TESC AND DEWATERING PLAN TO OWNER
AND ENGINEER FOR REVIEW PRIOR TO CONSTRUCTION.
3.CONTRACTOR AND AN ON-SITE REPRESENTATIVE OF OWNER WILL REVIEW THE
INSTALLATION, MAINTENANCE AND PERFORMANCE OF THE TESC MEASURES
SHOWN ON THE APPROVED PLANS. THE TESC OBSERVER OR PERMITTING
AGENCY MAY RECOMMEND ADDITIONAL MEASURES OR CHANGES TO THE
TESC PLAN THAT ARE WARRANTED DURING CONSTRUCTION. THE
CONTRACTOR AND OBSERVER WILL EXAMINE ALL TESC MEASURES
PERIODICALLY DURING THE CONSTRUCTION PERIOD, AND AFTER STORMS
HAVING 0.5 INCHES OR MORE OF RAINFALL IN A 24-HOUR PERIOD. THE
OBSERVER AND THE PERMITTING AGENCY HAVE THE AUTHORITY TO REQUIRE
CORRECTIVE ACTION IN ORDER TO ACHIEVE EROSION CONTROL OBJECTIVES.
4.THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSTRUCTION,
MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE TESC FACILITIES IS
THE RESPONSIBILITY OF THE CONTRACTOR. TESC MEASURES SHALL REMAIN
FUNCTIONING AND IN PLACE UNTIL THE SITE HAS BEEN STABILIZED AND THE
PERMITTING AGENCY, OWNER OR ENGINEER HAS APPROVED THE REMOVAL OF
THE TESC MEASURES.
5.AS CONSTRUCTION PROGRESSES AND UNEXPECTED SEASONAL CONDITIONS
DICTATE, ADDITIONAL TESC MEASURES MAY BECOME NECESSARY TO
PROTECT ADJACENT PROPERTIES AND TO ENSURE WATER QUALITY FOR SITE
RUNOFF. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ADDRESS
DEFICIENT TESC CONDITIONS, AND TO PROVIDE ADDITIONAL FACILITIES, OVER
AND ABOVE THE MINIMUM REQUIREMENTS OUTLINED ON THE APPROVED
PLANS AS NEEDED.
6.THE TESC FACILITIES SHOWN ON THESE PLANS MUST BE CONSTRUCTED IN
CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A
MANNER AS TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE
DRAINAGE SYSTEM OR VIOLATE APPLICABLE WATER QUALITY STANDARDS.
7.THE TESC FACILITIES SHOWN ON THESE PLANS ARE THE MINIMUM
REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE
CONSTRUCTION PERIOD, THESE TESC FACILITIES SHALL BE UPGRADED (E.G.
ADDITIONAL SUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.) AS
NEEDED.
8.THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND
MAINTAINED AS NECESSARY TO ENSURE THEY CONTINUE TO FUNCTION.
9.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT
WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON OR SEVEN
DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH
APPROVED ESC METHODS (E.G. SEEDING, MULCHING, PLASTIC COVERING,
ETC.)
10.ANY AREA NEEDING TESC MEASURE, NOT REQUIRING IMMEDIATE ATTENTION,
SHALL BE STABILIZED WITHIN SEVEN (7) DAYS.
11.AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO
ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE
LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL
NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM.
12.WHERE MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL
BE APPLIED AT A MINIMUM THICKNESS OF 2 TO 3 INCHES.
13.PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED
AREAS SHALL BE REVIEWED TO IDENTIFY WHICH AREAS CAN BE STABILIZED IN
PREPARATION FOR THE WINTER RAINS. IDENTIFIED AREAS SHOULD BE
STABILIZED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.
14.TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) MEASURES SHALL BE
IMPLEMENTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE NPDES
CONSTRUCTION STORMWATER GENERAL PERMIT, THE CONSTRUCTION
STORMWATER POLLUTION PREVENTION PLAN, ALL OTHER APPLICABLE PERMIT
CONDITIONS, AND ALL OTHER APPLICABLE FEDERAL AND STATE LAWS.
15.NOT ALL CONSTRUCTION STORMWATER BMPS ARE SHOWN ON THE TESC
DRAWINGS. SEE SWPPP FOR DESCRIPTIONS OF THE BMPS IDENTIFIED IN THE
PLAN SHEETS AS WELL AS FOR OTHER APPLICABLE CONSTRUCTION
STORMWATER BMPS.
16.TESC MEASURES AND SELECTED BMPS IDENTIFIED ON THE TESC PLAN AND IN
THE SWPPP ARE BASED ON INFORMATION AVAILABLE AT THE TIME OF THE
DRAWING AND SWPPP DEVELOPMENT. CONTRACTOR'S CERTIFIED EROSION
AND SEDIMENT CONTROL LEAD (CESCL) SHALL MODIFY TESC PLAN AND SWPPP
AS REQUIRED TO ENSURE THE REQUIREMENTS DESCRIBED IN ITEM 15 ARE
MET AT ALL TIMES.
TEMPORARY EROSION/SEDIMENTATION
CONTROL NOTES:
TESC DETAILS1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
TESC DETAILS1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
4
50
SLOPE INSTALLATIONS
1
50
SURFACE ROUGHING 2
50
WATERWAY INSTALLATIONS 3
50
STRAW WATTLES
1
51
WHEEL WASH
TESC DETAILS1687 114TH Avenue SE, Suite 100 Bellevue WA98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
2
51
CONSTRUCTION ENTRANCE 3
51
CURB AND GUTTER PROTECTION
STD.
400.1
STANDARD SANITARY MANHOLE
INSIDE DROP CONNECTION
FOR SANITARY MANHOLESTD.
402.2
AIR TEST TABLE (LOW PRESSURE)
FOR SANITARY SEWERSSTD.
410
MANHOLE FRAME AND COVERSTD.
401
ABANDON MANHOLESTD.
400.5
PIPE BEDDING FOR
SANITARY SEWERSSTD.
405
WASTEWATER UTILITY
STANDARD NOTESSTD.
413
CITY STANDARD DETAILS1687 114TH Avenue SE, Suite 100 Bellevue WA
98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
TRENCH DETAIL FOR GRAVITY MAIN
(OPEN CUT/UNPAVED SECTIONS)1
53
TRENCH DETAIL FOR GRAVITY MAIN
(OPEN CUT/PAVED SECTIONS)3
53
TYPICAL GRADING PLAN4
53
2
53
NOT USED
MISC. DETAILS1687 114TH Avenue SE, Suite 100 Bellevue WA
98004 phone: (425) 869-9448 www.stantec.com
THUNDER HILLS SEWER
INTERCEPTOR REHABILITATION
WWP-27-03921
Stantec was not present on site during construction. These
record drawings are a compilation of a copy of the sealed
engineering drawings for this project, as modified by
information furnished by the as-built survey on the project.
The information shown on the record drawings that was
provided by the City Utilities Dept. inspector cannot be
verified for accuracy or completeness. The original sealed
drawings are on file at the offices of the City of Renton.
TYPICAL ROCK WALL DETAIL5
53
TYPICAL SD AT BACK OF WALL DETAIL6
53
TYPICAL PAVED
MAINTENANCE PATH8
53