CITY OF RENTON
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: Lift Sta and Force Main Improve Phase 3 CAG-23-288
CONTRACTOR: Equity Builders LLC
SUMMARY OF PROPOSED CHANGE:
C.O.# 1
Provide all labor, equipment, subcontracting, bonding, insurance for the complete work
required for the extra work as outlined below:
ITEM
A31
A32
A33
A34
Additional Quantities Under This Change Order
New Item:
Cottonwood Lift Station Mounting Plates: Additional
work to fabricate and install stainless steel mounting
plates for new pumps
New Item:
Cottonwood Lift Station Landing Removal: Additional
work to remove existing landing in wetwell for pump
clearance, remove and remount floats and stilling well
New Item:
Cottonwood Lift Station Pressure Gage: Additional
work to furnish and install pressure gauge assembly in
valve vault
New Item:
Cottonwood Lift Station Electrical Changes:
Additional materials and work to modify HOA switch,
reverse engineering & trouble shooting existing MCC to
integrate new telemetry panels, and field install mini-cas
relavs.
Sub Total
Sales Tax (10.3%)
Total
Unit
DCR FA
COP#?
DCR FA
COP#?
DCR FA
COP#?
DCR FA
COP#?
H:\File Sys\WWP -WasteWater\WWP-27-04223 Lift Sta Imp Ph 3\110 -Construction\110.1 2 -Change Orders\CO#l\CO#l-CAG-23-288.xlsx
Qty.
1
1
1
1
Unit Price Total Price
$6,497.05
$1,199.80
$2,372.69
$7,598.07
$6,497.05
$1,199.80
$2,372.69
$7,598.07
$17,667.61
$1,819.76
$19,487.37
1 of 2
CAG-23-288, CO #1-24
Docusign Envelope ID: 5586C7DE-3D49-4DBC-951 E-50CC46FE309B
ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET ESTIMATED CONTRACT TOTAL AFTER
CHANGE THIS ORDER CHANGE
$1,229,376.60 $1,229,376.60 $19,487.37 $1,248,863.97
SIGNATURES:
Contractor: Date: 9/25/2024 I 8:17 AM PDT
Project EngineeGOocuSigned by:
Michael Benoit
...,,F""'d""9s"'9""BS""3d"'ST'Cb4"'S,..f.-.. -------------------
Date: 9/25/2024 I 8:21 AM PDT
Approved By: Date: 9/25/2024 I 8:24 AM PDT
Ronald Straka, Utility Systems Director
Approved By:
�"""'""'"" Martin Pastucha Date: 9/27/2024 I 12: 56 PM PDT
afffl!lMJ!-RMK��1\!,\w Administrator
Approved By: Date:
Shane Moloney, Renton City Attorney
H:\File Sys\WWP -WasteWater\WWP-27-04223 Lift Sta Imp Ph 3\110 -Construction\110.12 -Change Orders\CO#l\CO#l -CAG-23-288.xlsx 2 of 2
Approved by Cheryl Beyer via email 9/20/2024