HomeMy WebLinkAboutChange Order - 1Docusign Envelope ID: 5586C7DE-3D49-4DBC-951 E-50CC46FE309B CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: Lift Sta and Force Main Improve Phase 3 CAG-23-288 CONTRACTOR: Equity Builders LLC SUMMARY OF PROPOSED CHANGE: C.O.# 1 Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM A31 A32 A33 A34 Additional Quantities Under This Change Order New Item: Cottonwood Lift Station Mounting Plates: Additional work to fabricate and install stainless steel mounting plates for new pumps New Item: Cottonwood Lift Station Landing Removal: Additional work to remove existing landing in wetwell for pump clearance, remove and remount floats and stilling well New Item: Cottonwood Lift Station Pressure Gage: Additional work to furnish and install pressure gauge assembly in valve vault New Item: Cottonwood Lift Station Electrical Changes: Additional materials and work to modify HOA switch, reverse engineering & trouble shooting existing MCC to integrate new telemetry panels, and field install mini-cas relavs. Sub Total Sales Tax (10.3%) Total Unit DCR FA COP#? DCR FA COP#? DCR FA COP#? DCR FA COP#? H:\File Sys\WWP -WasteWater\WWP-27-04223 Lift Sta Imp Ph 3\110 -Construction\110.1 2 -Change Orders\CO#l\CO#l-CAG-23-288.xlsx Qty. 1 1 1 1 Unit Price Total Price $6,497.05 $1,199.80 $2,372.69 $7,598.07 $6,497.05 $1,199.80 $2,372.69 $7,598.07 $17,667.61 $1,819.76 $19,487.37 1 of 2 CAG-23-288, CO #1-24 Docusign Envelope ID: 5586C7DE-3D49-4DBC-951 E-50CC46FE309B ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET ESTIMATED CONTRACT TOTAL AFTER CHANGE THIS ORDER CHANGE $1,229,376.60 $1,229,376.60 $19,487.37 $1,248,863.97 SIGNATURES: Contractor: Date: 9/25/2024 I 8:17 AM PDT Project EngineeGOocuSigned by: Michael Benoit ...,,F""'d""9s"'9""BS""3d"'ST'Cb4"'S,..f.-.. ------------------- Date: 9/25/2024 I 8:21 AM PDT Approved By: Date: 9/25/2024 I 8:24 AM PDT Ronald Straka, Utility Systems Director Approved By: �"""'""'"" Martin Pastucha Date: 9/27/2024 I 12: 56 PM PDT afffl!lMJ!-RMK��1\!,\w Administrator Approved By: Date: Shane Moloney, Renton City Attorney H:\File Sys\WWP -WasteWater\WWP-27-04223 Lift Sta Imp Ph 3\110 -Construction\110.12 -Change Orders\CO#l\CO#l -CAG-23-288.xlsx 2 of 2 Approved by Cheryl Beyer via email 9/20/2024