Loading...
HomeMy WebLinkAboutR-431004SW 1/4 SECTION 32, TOWNSHIP 24 N, RANGE 5 E, W.M. KENN YDA L E LOTS 0 w U) O J W J Z Z W V DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 2"x2' 14 GAUGE WIRE, OR EQUIVALENT, IF STANDARD STRENGTH FABRIC USED FILTER FABRIC �6'MAX.I POST SPACING MAY BE INCREASED I I 4"x4" MIN. TRENCH TO 8' IF WIRE BACKING IS USED 'ul BACKFILL TRENCH WITH NATIVE SOIL OR 3/4" TO 1-1/2" WASHED GRAVEL 2"x4- WOOD POSTS, STEEL FENCE POSTS, OR EQUIVALENT (TYP.) 2' MIN. NOTES. 1. CONDITIONS OF USE 1.1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS. 1.2. SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS IT INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW. ANY CONCENTRATED FLOW MUST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. THE GEOTEXTILE USED MUST MEET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MUST BE AVAILABLE ON SITE. AOS (ASTM D4751) 30-100 SIEVE SIZE (0.60-0.15mm) FOR SILT FILM 50-100 SIEVE SIZE (0.30-0.15mm) FOR OTHER FABRICS WATER PERMITTIVITY (ASTM D4491) 0.02 SEC' MINIMUM GRAB TENSILE STRENGTH (ASTM D4632) 180 LBS. MIN. FOR EXTRA STRENGTH FABRIC 100 LBS. MIN. FOR STANDARD STRENGTH FABRIC GRAB TENSILE ELONGATION (ASTM D4632) 30% MAX. (WOVEN) ULTRAVIOLET RESISTANCE (ASTM D4355) 70% MIN. 2.2. STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST SPACING MAY BE REQUIRED FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE. 2.3. WHERE THE FENCE IS INSTALLED, THE SLOPE SHALL NOT BE STEEPER THAN 2HAV 2.4. IF A TYPICAL SILT FENCE IS USED, THE STANDARD 4"X4" TRENCH MAY BE REDUCED AS LONG AS THE BOTTOM 8 INCHES OF THE SILT FENCE FABRIC IS WELL BURIED AND SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE. 2.5. FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CONTOURS WHENEVER POSSIBLE. 3. MAINTENANCE STANDARDS 3.1. ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY. 3.2. IF CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND. 3.3. IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS REPLACE THE FENCE OR REMOVE THE TRAPPED SEDIMENT. 3.4. SEDIMENT MUST BE REMOVED WHEN SEDIMENT IS 61NCHES HIGH. 3.5. IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED. UNLESS OTHERWISE NOTED, DRAWING IS NOTTO SCALE (NTS) STD. PLAN - 214.00 c PUBLIC WORKS P"O "' DEPARTMENT SILT FENCE GAZ 9/28/2018 I urwork.nam 7,.., DATE Call 2 Working Days Before You Dig 811 Utilities Underground Location Center (ID,MT,ND,OR,WA) L. PIED \O of WAS R 5 232�� �SS/ONAL G 2� :45 A DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 5" MAX. DRAINAGE GRATE TRIM GRATE FRAME _ C— OVERFLOW BYPASS d• BELOW INLET GRATE DEVICE SEDIMENT AND DEBRIS - FILTERED WATER SECTION VIEW DRAINAGE GRATE (RECTANGULAR GRATE SHOWN) RETRIEVAL SYSTEM (TYP.) OVERFLOW BYPASS (TYP.) BELOW INLET GRATE DEVICE ISOMETRIC VIEW NOTES: 1. PROTECTION SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE CATCH BASIN WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. 2. INLET PROTECTION SHALL BE USED TO PROTECT THE DRAINAGE SYSTEM. 3. THE CONTRIBUTING DRAINAGE AREA MUST NOT BE LARGER THAN ONE ACRE. 4. SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE STORMWATER STRUCTURE IT WILL SERVICE. 5. THE BIGD SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF SYSTEM OVERFLOW BYPASS). 6. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF THE BIGD WITHOUT SPILLING THE COLLECTED MATERIAL. 7. PERFORM MAINTENANCE IN ACCORDANCE WITH STANDARD SPECIFICATION 8-01.3(15). 8. ANY SEDIMENT IN THE CATCH BASIN INSERT SHALL BE REMOVED WHEN THE SEDIMENT HAS FILLED ONE-THIRD OF THE AVAILABLE STORAGE. THE FILTER MEDIA FOR THE INSERT SHALL BE CLEANED OR REPLACED AT LEAST MONTHLY. UNLESS OTHERWISE NOTED, DRAWING IS NOTTO SCALE (NTS) STD. PLAN - 216.30 PUBLIC WORKS CATCH BASIN INSERT APPR 9/28/2018 1 DEPARTMENT GAZ %,�#workz aammisv.mr DATE D.R. STRONG 1 CITY COMMENTS (DATED 07.19.24) CONSUL TING ENGINEERS 2 CITY COMMENTS (DATED 09.06.24) ENGINEERS PLANNERS SURVEYORS 620 - 7th AVENUE KIRKLAND, WA 98033 0 425827.3063 F 425.827.2423 N0. REVISION DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 CONSTRUCTION ENTRANCE NOTES: 1gS1NC',0 PO 1 . DRIVEWAYS SHALL BE PAVED TO THE EDGE OF HE RIGHT-OF-WAY PRIOR TO INSTALLATION OF THE R = 25' MIN. CONSTRUCTION ENTRANCE TO AVOID DAMAGING OF THE ROADWAY. 2. IT IS RECOMMENDED THAT THE ENTRANCE BE CROWNED SO THAT • RUNOFF DRAINS OFF THE PAD 100' MIN. INSTALL DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT, AS PER CITY ROAD STANDARDS 4"-8" QUARRY SPALLS GEOTEXTILE IFMIN. PROVIDE FULL WIDTH OF INGRESS/EGRESS AREA 12" MIN. THICKNESS NOTES: 1. CONDITION OF USE 1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE. 1.2. FOR RESIDENTIAL CONSTRUCTION PROVIDE STABILIZED CONSTRUCTION ENTRANCES FOR EACH RESIDENCE IN ADDITION TO THE MAIN SUBDIVISION ENTRANCE. STABILIZED SURFACES SHALL BE OF SUFFICIENT LENGTHMIDTH TO PROVIDE VEHICLE ACCESS/PARKING, BASED ON LOT SIZE/CONFIGURATION. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. A SEPARATION GEOTEXTILE SHALL BE PLACED UNDER THE SPALLS TO PREVENT FINE SEDIMENT FROM PUMPING UP INTO THE ROCK PAD. THE GEOTEXTILE SHALL MEET THE FOLLOWING STANDARDS: 2.2. DO NOT USE CRUSHED CONCRETE, CEMENT, OR CALCIUM CHLORIDE FOR CONSTRUCTION ENTRANCE STABILIZATION BECAUSE THESE PRODUCTS RAISE pH LEVELS IN STORMWATER AND CONCRETE DISCHARGE TO SURFACE WATERS OF THE STATE IS PROHIBITED. 2.3. HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN AREAS THAT WILL NOT BE USED FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. HE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT. 2.4. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE. 2.5. WHENEVER POSSIBLE THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE. 3. MAINTENANCE STANDARDS 3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. 3.2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE OR THE INSTALLATION OF A WHEEL WASH. IF WASHING IS USED IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK AND WASH WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND. 3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREAT TO PUBLIC SAFETY. IF IT IS NECESSARY TO WASH THE STREETS A SMALL SUMP MUST BE CONSTRUCTED. THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND DISCHARGED APPROPRIATELY. WASH WATER MUST BE PUMPED BACK ONTO THE SITE AND CANNOT DISCHARGE TO SYSTEMS TRIBUTARY TO SURFACE WATERS. 3.4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. 3.5. IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL TRAFFIC. UNLESS OTHERWISE NOTED, DRAWING IS NOTTO SCALE (NTS) STD. PLAN - 215.10 • PUBLIC WORKS PvaoVED DEPARTMENT STABILIZED CONSTRUCTION ENTRANCE GAZ 9/28/2018 1 DATE GRAB TENSILE STRENGTH (ASTM D4832) 200 LBS. MIN. GRAB TENSILE ELONGATION (ASTM D4632) 30%MAX. (WOVEN) CBR PUNCTURE STRENGTH (ASTM D6241) 495 LBS. MIN. ADS (ASTM D4751) 20�5 (U.S. STANDARD SIEVE SIZE) :45 Al DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 UNDISTURBED NATIVE VEGETATION UNDISTURBED NATIVE SOIL 3"4" ARBORIST WOOD CHIP MULCH, SEE STD. PLAN 262.60 3" OF COMPOST INCORPORATED INTO 5" OF SITE SOIL (TOTAL AMENDED DEPTH OF 9.5", FOR A SETTLED DEPTH OF 8") SUBSOIL SCARIFIED 4" BELOW COMPOST AMENDED LAYER (12" BELOW SOIL SURFACE) PLANTING BEDS/UNDISTURBED UNDISTURBED TURF (LAWN) AREAS, VEGETATION, SEE NOTE 1 SEE NOTE 1 0" OPTION 1 - NO DISTURBANCE PLANTING BEDS SRASS: SEED OR SOD UNDISTURBED NATIVE SOIL TURF (LAWN) AREAS '1II�IIIA�A! � ��A�I�RASS: SEED OR SOD n" 8" 1.75" OF COMPOST INCORPORATED INTO 6.25" OF SITE SOIL (TOTAL AMENDED DEPTH OF 9.5", FOR A SETTLED DEPTH OF 8") SUBSOIL SCARIFIED 4" BELOW COMPOST AMENDED LAYER (12" BELOW SOIL SURFACE) OPTIONS 2, 3, AND 4 - AMEND IN PLACE OR STOCKPILE AND AMEND PLANTING BEDS TURF (LAWN) AREAS 3"-0ARBORIST WOOD CHIP MULCH, SEE STD. PLAN 262.60 1=1T_I=1 11=1 11=1 11= 111—I 11—I 11—I 11—I 1-111-111=1 1=1 j - 1I I=1 I I=1 I I—JJ 1=j 6" IMPORTED _I —I —I - _I III-1 I I=1 I I=ITI— TOPSOIL MIX (COMPACTED DEPTH) 1=1I1-1=1I1=111= 1=I�1--11=111—III_ I�IIr r1�, 1= SUBSOIL IS I� SCARIFIED 6" BELOW IMPORTED i / TOPSOIL MIX . � PUBLIC WORKS :45 A �'® DEPARTMENT OPTION 5 - IMPORTED TOPSOIL 3RASS: SEED OR SOD NOTES: 1. AREAS OF NO DISTURBANCE TO BE FENCED AND EXISTING VEGETATION AND SOIL TO BE PROTECTED FROM CONSTRUCTION IMPACTS. 3" IMPORTED TOPSOIL MIX COMPACTED GENERAL NOTES: )EPTH) 1. TO MEASURE SETTLED DEPTH, WATER SOIL SUFFICIENTLY TO FULLY SATURATE WITHOUT CAUSING EROSION SUBSOIL IS 2. COMPOST TO MEET STD. PLAN 262.60. SCARIFIED 6" BELOW IMPORTED 3. COMPACTION OF TOPSOIL WHERE REQUIRED 1 ) TOPSOIL MIX TO BE TO BS% OF STANDARD PROCTOR. 4, SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS. UNLESS OTHERWISE NOTED, DRAWING IS NOTTO SCALE (NTS) STD. PLAN - 264.00 APPH I D SOIL AMENDMENT SECTIONS GAZ 9/28/2018 1 I.w.nzna-611 a, DATE :45 AI CD N co N O O N W, u t-J O O O ��N■■ LnL R-431004 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING HHuynh 09/27/2024 0 O J W J BD 08.13.24 YLP SURVEYED: TERRANE SCALE: AS NOTED VERTICAL: NAVD ,3/1 HORIZONTAL: NAD 1983/1991 DATUMV4397 w'„ v C T Y OF U'R RENTON N T O N Planning/Building/Public Works Dept. KENNYDALE LOTS NOTE AND DETAILS 1116 N 34T H ST RENTON, WASHINGTON 98056 DATE: 2/13/2024 o 7 z W Y BD 09.17.24 YLP DESIGNED: BDTESC FIELDBOOK: PAGE: DRAWN: ECM ONE IN DRAWING N0: C 4 CHECKED: YLP AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY BY DATE APPR APPROVED: YLP SHEET: 4 OF: 9 DRS PROJECT NO. 24010