A. ADMINISTRATIVE REPORT & DECISION
Decision:APPROVED APPROVED SUBJECT TO CONDITIONS DENIED
Report Date:October 10, 2024
Project File Number:PR24-000034
Project Name:PSE South Seattle Gate Station Fencing Maintenance
Land Use File Number:LUA24-000242, V-A
Project Manager:Brianna Burroughs, Associate Planner
Owner(s):Puget Sound Energy, 6500 Ursula Pl S, Seattle, WA 98108 & Northwest Pipeline LLC,
22909 NE Red Fall City RD, Redmond, WA 98053
Applicant/Contact:Kerry Kriner, Puget Sound Energy, PO Box 97034 M/S EST-04W, Bellevue, WA 98009
Project Location:730 S 21st St, Renton, WA 98055 (APNs 7222000071 and 7222000070)
Project Summary:The applicant, Puget Sound Energy (PSE), is requesting approval of an administrative
variance from the provisions of the Renton Municipal Code (RMC) regulating
maximum fence height located within the Residential-8 (R-8) zoning district (RMC 4-
4-040.D). The subject property is approximately 3.45 acres in size and is located at
730 & 800 S 21st St (APNs 7222000071 and 7222000070) on the corner of S 21st St
and Benson Drive S, in the Talbot Community Planning Area. The South Seattle Gate
Station houses infrastructure for underground gas pipelines that intersect at the site.
The purpose of the variance is to allow the applicant to replace the existing security
fence, of varying height up to eight feet (8’) tall, around the gate station with a taller
fence, of varying height of up to fifteen feet (15’) tall, as part of a security upgrade
project. The maximum fence height allowed in any residential zone is seventy-two
inches (72”). To meet national physical security standards, the proposed replacement
perimeter fence would include a new eight foot (8’) tall fence, in place of the existing
fence, installed along the perimeter of the gate station area (approximately 26,320
square feet of the site). The length of the fence is approximately six hundred eleven
feet (611’) in length including the gate structure. The fence may reach up to 15 feet
(15’) in height due to the existing grade of the site which includes an existing retaining
wall that is included as part of the height of the fence. Access to the substation is
provided via a driveway from S 21st St. There would be no tree removal associated
with the fence replacement. According to City of Renton (COR) Maps, the eastern
portion of the site contains moderate coalmine hazards and regulated slopes.
Site Area:3.45 acres
City of Renton Department of Community & Economic Development
PSE South Seattle Gate Station Fencing Maintenance
Administrative Report & Decision
LUA24-000242, V-A
Report of October 10, 2024 Page 2 of 11
D_Admin_Report_PSE_Fence_Variance_FINAL
B. EXHIBITS:
Exhibit 1: Administrative Decision
Exhibit 2: Vicinity Map
Exhibit 3: Project Narrative and Site Photos
Exhibit 4: Existing Fence and New Fence Reference photos
Exhibit 5: Fencing Site Plan and Details
Exhibit 6: Fence Replacement Colors Renderings
Exhibit 7: Geotechnical Engineering Services Report, prepared by GeoEngineers, Inc., dated
February 16, 2024
Exhibit 8: Variance Request Justification
C. GENERAL INFORMATION:
1. Owner(s) of Record: 1. Puget Sound Energy, 6500 Ursula Pl S, Seattle, WA
98108
2. Northwest Pipeline LLC 22909 NE Red Fall City Rd,
Redmond, WA 98053
2. Zoning Classification: Residential-8 (R-8)
3. Comprehensive Plan Land Use Designation: Residential Medium Density (MD)
4. Existing Site Use: Utility
5. Critical Areas: Moderate coalmine hazards and regulated slopes.
6. Neighborhood Characteristics:
a. North: Talbot Hill Reservoir Park, Residential Medium Density (MD) Comprehensive Plan Land
Use Designation; Residential-8 DU/AC (R-8) zone
b. East: Benson Dr S, Residential Medium Density (MD) Comprehensive Plan Land Use
Designation; Residential-8 DU/AC (R-8) zone
c. South: S 21st St, Residential Medium Density (MD) Comprehensive Plan Land Use Designation;
Residential-8 DU/AC (R-8) zone
d. West: Talbot Reservoir Park, Smithers Ave S, Residential Medium Density (MD) Comprehensive
Plan Land Use Designation; Residential-8 DU/AC (R-8) zone
7. Site Area: 3.45 acres
D. HISTORICAL/BACKGROUND:
Action Land Use File No. Ordinance No. Date
Comprehensive Plan N/A 5758 06/22/2015
Zoning N/A 5758 06/22/2015
Annexation (Talbot Hill) N/A 3316 5/23/1979
City of Renton Department of Community & Economic Development
PSE South Seattle Gate Station Fencing Maintenance
Administrative Report & Decision
LUA24-000242, V-A
Report of October 10, 2024 Page 3 of 11
D_Admin_Report_PSE_Fence_Variance_FINAL
E. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE:
1. Chapter 2 Land Use Districts
a. Section 4-2-020: Purpose and Intent of Zoning Districts
b. Section 4-2-110: Residential Development Standards
2. Chapter 3 Environmental Regulations and Overlay Districts
a. Section 4-3-050: Critical Area Regulations
3. Chapter 4 City-Wide Property Development Standards
a. Section 4-4-040: Fences, Hedges, and Retaining Walls
4. Chapter 9 Permits – Specific
a. Section 4-9-250: Variances, Waivers, Modifications, and Alternates
5. Chapter 11 Definitions
F. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN:
1. Land Use Element
2. Utilities Element
G. FINDINGS OF FACT (FOF):
1. The Planning Division of the City of Renton accepted the above master application for review on June 27,
2024 and determined the application complete on August 7, 2024. The project complies with the 120-day
review period.
2. The applicant’s submittal materials comply with the requirements necessary to process the administrative
variance request (Exhibits 2-8).
3. The project site is located at 730 and 800 S 21st St, Renton, WA 98055 (APNs 7222000071 and
7222000070).
4. The project site is currently developed as the Puget Sound Energy South Seattle Gate Station.
5. Access to the site is provided via S 21st St.
6. The property is located within the Residential Medium Density (MD) Comprehensive Plan land use
designation. The project complies with the goals and policies of this Comprehensive Plan land use
designation:
Compliance Comprehensive Plan Analysis
99
Policy L-28: Minimize erosion and sedimentation in and near sensitive areas by
requiring appropriate construction techniques and resource practices, such as low
impact development.
9
Policy L-36: Land uses in areas subject to flooding, seismic, geologic, and coal mine
hazards should be designed to prevent property damage and environmental
degradation before, during, and after construction.
City of Renton Department of Community & Economic Development
PSE South Seattle Gate Station Fencing Maintenance
Administrative Report & Decision
LUA24-000242, V-A
Report of October 10, 2024 Page 4 of 11
D_Admin_Report_PSE_Fence_Variance_FINAL
99 Policy L-48: Address privacy and quality of life for existing residents by considering
scale and context in infill project design.
9
Policy L-55: Preserve natural landforms, vegetation, distinctive stands of trees, natural
slopes, and scenic areas that contribute to the City’s identity, preserve property values,
and visually define the community and neighborhoods.
9
Goal U-O: Promote the availability of safe, adequate, and efficient electrical service
within the City and its planning area, consistent with the regulatory obligation of the
utility to serve customers.
9
Policy U-67: Coordinate with local and regional electricity providers to ensure the siting
and location of transmission and distribution facilities is accomplished in a manner that
minimizes adverse impacts on the environment and adjacent land uses.
9 Policy U-68: Encourage electricity purveyors to make facility improvements and
additions within existing utility corridors wherever possible.
7. The site is located within the Residential-8 (R-8) zoning classification.
8. The applicant is proposing to retain all existing trees onsite.
9. The site is mapped with moderate coalmine hazards and regulated slopes.
10. New fencing would be constructed in the same location as the existing fence.
11. It is anticipated that the construction work would begin at the end of 2024 or beginning of 2025.
12. The following variance to exceed the fence height restrictions of the Residential-8 (R-8) zone has been
requested by the applicant:
RMC Code Citation Required Standard Requested Variance
RMC 4-4-040
Fences, Hedges,
and Retaining Walls
D1 Maximum Height: In any
residential zone, the maximum
height of any fence, hedge or
retaining wall shall be seventy-two
inches (72"), subject to further height
limitations as specified in subsection
D2 of this Section.
D2 Height Limitations within
Setbacks:
Fences shall not exceed forty-eight
inches (48") in height within any part
of the front yard or secondary front
yard setback.
Fences shall not exceed seventy-two
inches (72") in height within any part
of the interior side yard setback to
the point where they intersect the
front yard setback or a secondary
front yard setback, in which case they
shall be governed by the applicable
To meet the security standards of The
Transportation Security Administration
(TSA), PSE is proposing to replace the
existing 8-foot (8’) tall perimeter fence
around the substation with up to a 15-
foot (15’) tall fence around the
perimeter of the substation (Exhibits 3-
6). As a result, the applicant would
exceed maximum fence height
restrictions allowed in residential zones.
City of Renton Department of Community & Economic Development
PSE South Seattle Gate Station Fencing Maintenance
Administrative Report & Decision
LUA24-000242, V-A
Report of October 10, 2024 Page 5 of 11
D_Admin_Report_PSE_Fence_Variance_FINAL
limitations of the front yard or
secondary front yard setbacks.
Fences shall not exceed seventy-two
inches (72") in height within the rear
yard setback except the fence,
hedge, or retaining wall shall not
exceed forty-eight inches (48") in
height where the rear yard abuts a
public or private street.
13. No public or agency comment letter(s) were received.
14. Representatives from various city departments have reviewed the application materials to identify and
address issues raised by the proposed development. These comments are contained in the official file,
and the essence of the comments has been incorporated into the appropriate sections of this report and
the Departmental Recommendation at the end of this report.
15. Pursuant to WAC 197-11-800(6)(e), land use decisions are categorically exempt from the State
Environmental Policy Act (SEPA) for the granting of a variance based on special circumstances, not
including economic hardship, applicable to the subject property, such as size, shape, topography, location
or surroundings and not resulting in any change in land use or density.
16. Critical Areas: Project sites which contain critical areas are required to comply with the Critical Areas
Regulations (RMC 4-3-050). The proposal is consistent with the Critical Areas Regulations.
Compliance Critical Areas Analysis
99
Geologically Hazardous Areas: Based upon the results of a geotechnical report and/or
independent review, conditions of approval for developments may include buffers
and/or setbacks from buffers. A standard 15-foot building setback is required for all
structures from Protected Slope areas.
A 50-foot buffer and 15-foot building setback are required from Very High Landslide
Hazard Areas.
Staff Comment: A Geotechnical Engineering Services Revised Report (Exhibit 7), dated
February 16, 2024, completed by GeoEngineers, Inc. was submitted with the
application. The project site contains moderate coalmine hazards and regulated slopes
(15 to 25 percent). Temporary erosion protection and control measures would need to
be in place prior to starting soil disturbance activities on the site to help reduce the
potential for erosion and reduce transport of sediment to adjacent areas and receiving
waters. Geotechnical recommendations presented would need to be addressed within
the project specific plans and construction/building permit submittal, including but not
limited to repair of any disturbance area after fence is installed.
According to the report, the soils mapped in the project vicinity are predominantly
glacial till (Qvt). However, smaller scale mapping indicate that the glacial till is in turn
predominately underlain by continental sedimentary rocks of the Puget Sound Group
(Tr) consisting of sandstone, siltstone, shale, carbonaceous shale, claystone, and coal.
The extent of disturbance for the proposal would be approximately 611 linear feet
(611’) around the perimeter of the substation.
The geotechnical engineer’s evaluation of the slope and site conditions concludes that
there is a low risk of the proposed fence installation adversely affecting the regulated
City of Renton Department of Community & Economic Development
PSE South Seattle Gate Station Fencing Maintenance
Administrative Report & Decision
LUA24-000242, V-A
Report of October 10, 2024 Page 6 of 11
D_Admin_Report_PSE_Fence_Variance_FINAL
17.
Variance Analysis: The proposal is compliant with the following variance criteria, pursuant to RMC 4-9-
250.B.5. Therefore, staff recommends approval of the requested variance.
slope adjacent to the east and south sides of the project site. The next nearest regulated
slope is more than 50 feet (50’) away from the project and is not considered an adjacent
regulated steep slope and would not result in soil erosion and sedimentation, land
sliding, or excess surface water runoff.
The geotechnical engineer found that the moderate coal mine hazard on a
georeferenced detailed map is not directly over known mine shafts related to the Old
Talbot Mine. The site is more than 50 feet (50’) from the mapped mine depth of
historical coal mining activity and the relatively shallow depth of the proposed
improvements would result in a low coal mine hazard at the site.
Maintenance, operation, and repair of existing facilities and utilities are exempt
activities or permitted within critical areas and associated buffers under RMC 4-3-
050C.3.e.ii to meet established safety standards. In every case, critical area and
required buffer impacts shall be minimized and disturbed areas shall be restored during
and immediately after the use of construction equipment. Therefore, the proposed
development is consistent with the following findings pursuant to RMC section 4-3-
050C.2.d:
i. The activity is not prohibited by this or any other provision of the Renton Municipal
Code or State or Federal law or regulation;
ii. The activity will be conducted using best management practices as specified by
industry standards or applicable Federal agencies or scientific principles;
iii. Impacts are minimized and, where applicable, disturbed areas are immediately
restored;
iv. Where water body or buffer disturbance has occurred in accordance with an
exemption during construction or other activities, revegetation with native
vegetation shall be required;
v. If a hazardous material, activity, and/or facility that is exempt pursuant to this
Section has a significant or substantial potential to degrade groundwater quality,
then the Administrator may require compliance with the Wellhead Protection Area
requirements of this Section otherwise relevant to that hazardous material, activity,
and/or facility. Such determinations will be based upon site and/or chemical-specific
data.
Compliance Variance Criteria and Analysis
99
a. That the applicant suffers practical difficulties and unnecessary hardship and the
variance is necessary because of special circumstances applicable to subject
property, including size, shape, topography, location or surroundings of the
subject property, and the strict application of the Zoning Code is found to deprive
subject property owner of rights and privileges enjoyed by other property owners
in the vicinity and under identical zone classification.
Staff Comment: PSE South Seattle Gate Station is located within the Residential-8 (R-
8) zoning district, which limits fence heights to a maximum of forty-eight inches (48")
to seventy-two inches (72") in height. The applicant, Puget Sound Energy (PSE),
contends that the strict application of the zoning code, which imposes a fence height
City of Renton Department of Community & Economic Development
PSE South Seattle Gate Station Fencing Maintenance
Administrative Report & Decision
LUA24-000242, V-A
Report of October 10, 2024 Page 7 of 11
D_Admin_Report_PSE_Fence_Variance_FINAL
applicable to the residential development, is not practical, safe, or compliant with
national physical security standards for a substation use. The existing substation
facility on the site is currently surrounded by up to an eight-foot (8’) tall chain link
fence, which no longer meets PSE safety and security standards. PSE has determined
that a fence taller than the existing 8 feet (8’) is needed to meet the security standards
of The Transportation Security Administration (TSA). TSA is an international regulatory
authority whose mission is to protect the country's transportation systems while
ensuring the freedom of movement for people and commerce. To meet the TSA
security standards, PSE plans to replace the existing perimeter fence with a new green
Clearvu shutter mesh panel perimeter fence of varying height up to a maximum of
fifteen feet (15’) (Exhibits 3-6). The additional fence height would assist in blocking
lines of sight into the substation deterring potential delinquent or unlawful threats to
the substation. The proposed additional fence height is anticipated to deter visual and
physical access into the substation, thereby preventing potential damage to substation
equipment.
The fence material itself, which is made of high-quality coated mesh wiring, would be
eight feet (8’) in height with an additional four-inch (4”) anti-climbing ribbon (also
known as a dental strip) that is field attached to the top of the mesh and gate. Due to
the existing elevations of the site, which includes an existing retaining wall along the
southwest of the property approximately ninety-five feet (95’), some areas of fence
replacement would be considered taller than eight feet (8’) (RMC 4-4-040.C.2.a Fences
on Retaining Walls); the fence and the retaining wall height in this area is calculated
as one combined measurement. This area, along approximately forty-five feet (45’) of
the west perimeter, twenty-five feet (25’) of the southwest perimeter, and twenty-
three feet (23’) of the south perimeter, would in some sections of the wall, reach a
combined maximum height of approximately fifteen feet (15’). However, public view
of the site along this retaining wall area is from Benson Dr S and S 21st St, which are at
a higher elevation than the site. The applicant contends that in these areas the
perceived fence height along this section of fencing would be anywhere from three feet
(3’) to eight feet (8’) in height (Exhibit 8). Along the remaining section, approximately
one hundred two feet (102’) of the western perimeter fencing, the maximum height of
the fence would be eight feet (8’) in height with an additional four-inch (4”) anti-
climbing ribbon. Along the north side of the substation, the side that faces dense
vegetation, approximately one hundred fifty-six feet (156’) of perimeter fencing would
be installed at eight feet (8’) in height with an additional four-inch (4”) anti-climbing
ribbon. Along the east side of the substation, which also faces dense vegetation,
approximately one hundred fifty-five feet (155’) of perimeter fencing would be
installed at eight feet (8’) in height with an additional four-inch (4”) anti-climbing
ribbon. The remaining southern perimeter fencing, approximately one hundred
twenty-three feet (123’) of fencing, which includes the main access gate to the site,
would be eight feet (8’) in height with an additional four-inch (4”) anti-climbing ribbon
(Exhibits 3-6 and 8).
The applicant further contends that to not allow the fence replacement as it has been
proposed would deprive PSE from the ability to safely and securely operate critical
utility infrastructure. Due to the unique nature of the substation use within the R-8
zone and as a critical infrastructure facility, it is not practical or safe for the substation
to be subject to the same use standards as single-family residential uses in the same
zoning district.
City of Renton Department of Community & Economic Development
PSE South Seattle Gate Station Fencing Maintenance
Administrative Report & Decision
LUA24-000242, V-A
Report of October 10, 2024 Page 8 of 11
D_Admin_Report_PSE_Fence_Variance_FINAL
Staff has reviewed the proposed variance request and concurs that strict adherence to
the residential zone height limitations may cause unnecessary hardship by depriving
the applicant the ability to comply with all PSE and TSA safety and security standards
necessary for the substation. The site’s topography is such that traditional adherence
to code standards would be impractical. The variance is necessary for the substation
property due to the topographical challenges of the site and special circumstances
needed to meet mandatory physical security standards that apply to facilities that are
part of the US electric power grid and subject to the Federal Energy Regulatory
Commission. Therefore, staff agrees that the proposed perimeter fence configuration
is reasonable to block the line of sight into the substation, meet the security standards
of TSA and deter potential unlawful threats to the substation.
Compliant if
condition of
approval is
met
b. That the granting of the variance will not be materially detrimental to the public
welfare or injurious to the property or improvements in the vicinity and zone in
which subject property is situated.
Staff Comment: The applicant contends that the granting of the variance would not be
materially detrimental to the public welfare or injurious to the property or
improvements in the vicinity or zone.
The applicant further contends that the purpose of installing taller fencing around the
substation is to secure the site from potential nefarious activities, which is anticipated
to prevent large scale outages and is in the best interest of the public welfare.
Staff has reviewed the applicant’s justifications and concurs with their analysis and
finds that the proposed fence replacement would not be detrimental to the public
welfare or injurious to the property or improvements in the vicinity and zone in which
the subject property is situated based on the site and neighborhood characteristics.
The granting of the variance would not have a negative visual impact on the
surrounding property owners. Much of the site is heavily covered in dense vegetation
to the north and west of the site, which serves as a visual buffer between the site and
the surrounding neighboring residences. The south and east portions of the site abut
major roadways (Benson Dr S & S 21st St) which further serve as a separation of the
site from other adjacent residences within the R-8 zone.
The variance request is not an expansion of the fence location, rather an expansion of
the height of the fence that already exists. A taller fence would further shield the public
from the facility. Additionally, the fence would be replaced with a higher quality
galvanized mesh material that would provide a 35% screening element because the
new wire mesh is a tighter weave, while maintaining 65% visibility which is needed for
security of the site, which overall creates a better visual screen than the weathered,
standard chain link fence that currently exists. Furthermore, staff recommends as a
condition of approval, that the applicant be required to powder coat the fence grass
green (or equivalent) at a minimum thickness of two (2) mm (Exhibit 6) which would
match the color of many of the onsite structures and equipment. This would further
mitigate the visual impact of the fence and the existing uses on site.
City of Renton Department of Community & Economic Development
PSE South Seattle Gate Station Fencing Maintenance
Administrative Report & Decision
LUA24-000242, V-A
Report of October 10, 2024 Page 9 of 11
D_Admin_Report_PSE_Fence_Variance_FINAL
H. CONCLUSIONS:
1. The subject site is located in the Residential Medium Density (MD) Comprehensive Plan designation and
complies with the goals and policies established with this designation, see FOF 6.
2. The subject site is located in the Residential-8 (R-8) zoning designation and complies with the zoning and
development standards established with this designation provided the applicant complies with City Code,
see FOF 7 and FOF 12.
3. The proposed variance complies with the Critical Areas Regulations provided the applicant complies with
City Code, see FOF 16.
4. Key features which are integral to this project include removing the existing eight-foot (8’) tall perimeter
chain-link fence. The new fencing to be installed, is in most cases, eight feet (8’) tall with a four-inch (4”)
anti climbing ribbon. In a portion of the site the fence will reach up to fifteen feet (15’) in a limited area
due to an existing retaining wall. The proposed replacement fence heights coincide with the topography
of the site to block line of sight into the substation, comply with physical security standards of TSA and
deter potential unlawful threats to the regional substation.
99
c. That approval shall not constitute a grant of special privilege inconsistent with the
limitation upon uses of other properties in the vicinity and zone in which the
subject property is situated.
Staff Comment: The applicant contends that the approval would not constitute a grant
of special privilege inconsistent with the limitation upon uses of other properties in the
vicinity and zone. The applicant expands on their explanation by observing that the
residential properties along Benson Dr S have fences for the purposes of privacy
screening. PSE’s fence, due to site elevation, would appear lower than the fences built
by residents in the area.
Staff has reviewed the applicant’s justifications and concurs that the granting of the
variance would not constitute a grant of special privilege inconsistent with other
properties in the vicinity and under the same zoning designation. The granting of this
variance would allow the applicant to increase the safety of the substation by installing
a perimeter security fence that would meet TSA Security standards.
9
d. That the approval is a minimum variance that will accomplish the desired purpose.
Staff Comment: The applicant contends that the approval is a minimum variance that
would accomplish the needed purpose by meeting TSA security standards.
Staff reviewed the variance request and concludes that the proposed fence heights
would be the minimum required in order to meet the project goals. The applicant’s
desired purpose is to correct security deficiencies and assure the station is compliant
with national physical security standards, which includes replacing the existing
perimeter security fence around the substation. Therefore, the proposed security
fencing is found to be the minimum size necessary to achieve the desired purpose of
the project.
City of Renton Department of Community & Economic Development
PSE South Seattle Gate Station Fencing Maintenance
Administrative Report & Decision
LUA24-000242, V-A
Report of October 10, 2024 Page 10 of 11
D_Admin_Report_PSE_Fence_Variance_FINAL
I. DECISION:
The PSE South Seattle Gate Station Fencing Maintenance Variance, File No. LUA24-000242, V-A, as depicted
in Exhibits 3-6, is approved subject to the following condition:
1.The applicant shall construct a powder coated fence in the green color shown in the Fence Replacement
Color Renderings document (Exhibit 6). Alternatively, if that color is not available, the applicant will
provide new a color to staff for approval. Demonstration and analysis that the new proposed color is of
equal value and performance as the original color referred to as RAL-6010 in the exhibit document will
be required.
DATE OF DECISION ON LAND USE ACTION:
SIGNATURE:
Matthew Herrera Planning Director Date
TRANSMITTED on October 10, 2024 to the Owner/Applicant/Contact:
Owner:Owner:Applicant/Contact:
Puget Sound Energy
6500 Ursula PL S
Seattle WA 98108
Northwest Pipeline LLC
22909 NE Red Fall City RD
Redmond WA 98053
Kerri Kriner
Puget Sound Energy
PO Box 97034 M/S EST-04W,
Bellevue, WA 98009
TRANSMITTED on October 10, 2024 to the Parties of Record:
N/A
TRANSMITTED on October 10, 2024 to the following:
Gina Estep, CED Administrator
Brianne Bannwarth, Development Engineering Manager
Amanda Free, Economic Development Acting Director
Clark Close, Current Planning Manager
Anjela Barton, Fire Marshal
J.LAND USE ACTION APPEALS, REQUEST FOR RECONSIDERATION, & EXPIRATION:
The administrative land use decision will become final if the decision is not appealed within 14 days of the decision
date.
APPEAL: This administrative land use decision will become final if not appealed in writing to the Hearing
Examiner on or before 5:00 PM on October 24, 2024. An appeal of the decision must be filed within the 14-day
appeal period (RCW 43.21.C.075(3); WAC 197-11-680). Appeals must be submitted electronically to the City Clerk
at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee,
normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted
electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals
to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process
may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
City of Renton Department of Community & Economic Development
PSE South Seattle Gate Station Fencing Maintenance
Administrative Report & Decision
LUA24-000242, V-A
Report of October 10, 2024 Page 11 of 11
D_Admin_Report_PSE_Fence_Variance_FINAL
EXPIRATION: The Variance decision will expire two (2) years from the date of decision. A single one (1) year
extension may be requested pursuant to RMC 4-9-250.
RECONSIDERATION: Within 14 days of the decision date, any party may request that the decision be reopened by
the approval body. The approval body may modify his decision if material evidence not readily discoverable prior
to the original decision is found or if he finds there was misrepresentation of fact. After review of the
reconsideration request, if the approval body finds sufficient evidence to amend the original decision, there will
be no further extension of the appeal period. Any person wishing to take further action must file a formal appeal
within the 14-day appeal time frame.
THE APPEARANCE OF FAIRNESS DOCTRINE: provides that no ex parte (private one-on-one) communications may
occur concerning the land use decision. The Doctrine applies not only to the initial decision, but to Appeals to the
Hearing Examiner as well. All communications after the decision/approval date must be made in writing through
the Hearing Examiner. All communications are public record and this permits all interested parties to know the
contents of the communication and would allow them to openly rebut the evidence in writing. Any violation of
this doctrine could result in the invalidation of the appeal by the Court.
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
ADMINISTRATIVE REPORT & DECISION
EXHIBITS
Project Name:
PSE South Seattle Gate Station Fencing
Maintenance
Land Use File Number:
LUA24-000242, V-A
Date of Report
October 10, 2024
Staff Contact
Brianna Burroughs
Associate Planner
Project Applicant/Contact
Kerry Kriner
Puget Sound Energy
PO Box 97034 M/S EST-04W,
Bellevue, WA 98009
Project Location
730 S 21st St, Renton,
WA 98055 (APNs
7222000071 and
7222000070)
The following exhibits are included with the Administrative Report:
Exhibit 1:Administrative Decision
Exhibit 2:Vicinity Map
Exhibit 3:Narrative and Site Photos
Exhibit 4:Existing Fence and New Fence Reference photos
Exhibit 5:Fencing Site Plan and Details
Exhibit 6:Fence Replacement Colors Renderings
Exhibit 7:Geotechnical Engineering Services Report, prepared by GeoEngineers, Inc., dated
February 16, 2024
Exhibit 8:Variance Request Justification