Loading...
HomeMy WebLinkAboutAddendum - 2 (2) AMENDMENT NO. 2 TO AGREEMENT FOR 116TH AVE SE SIDEWALK PROJECT CAG-23-387 THIS AMENDMENT, dated for reference purposes only as September 19, 2024, is by and between the City of Renton (the “City”), a Washington municipal corporation, and Shea Carr and Jewell, Inc (dba SCJ Alliance) (“Consultant”), a Washington Corporation. The City and the Consultant are referred to collectively in this Amendment as the “Parties.” Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-23-387, dated November 9, 2023, to provide necessary services for the 116 th Ave SE Sidewalk Project (referred to herein as the “Agreement”); Whereas, the Parties wish to amend the Agreement to change the scope of work, and change the compensation in order to complete storm water drainage report, updated construction cost estimate, and collect additional survey. NOW THEREFORE, It is mutually agreed upon that CAG-23-387 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-2, which is attached and incorporated herein. 2. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $49,762.45 from $191,365.90 to $241,128.35, including any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit A-2, which is attached and incorporated herein. 3. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96 PAGE 2 OF 2 IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date last signed by the Parties below. CITY OF RENTON By:_____________________________ CONSULTANT By:____________________________ Martin Pastucha Public Works Administrator Aaron Knight, PE Principal _____________________________ Date _____________________________ Date Approved as to Legal Form By: Cheryl L Beyer 9/25/24 (2852) ________________________ Cheryl Beyer Senior Assistant City Attorney Contract Template Updated 06/17/2021 9/20/2024 Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96 10/9/2024 | 3:52 PM PDT Exhibit A-2 Amendment #2 Scope of Work 116th Avenue SE Sidewalk Project Renton, WA Prepared For: Blake Costa, PE, PTOE City of Renton 1055 South Grady Way, Renton, WA 98057 Prepared By: George Hilen, PE, Project Manager Date Prepared: September 17, 2024 Overview Following the 60% design submittal, it was determined through coordination with the City that the existing waterline in conflict with proposed stormwater along the western side of the road would not be able to be relocated to accommodate the new stormwater system. Amendment #1 included a full draft Drainage Report and an updated construction cost estimate for the change in stormwater system layout. This amendment (Amendment #2) covers the added design efforts through bid documents associated with the following design changes:  Installation of the proposed stormwater system under the southbound lane of 116th Avenue SE from SE 160th Street to SE 162nd Street. The stormwater system will be installed in the southbound lane to avoid conflict with existing watermain.  An overlay of the southbound lane that includes storm line install restoration and regrading of the entire lane to promote water flow to the western gutter/storm system.  Relocation of the existing midblock crosswalk on 116th Avenue SE, north of SE 160th Street (gravel road) to a new location located south of SE 160th Street (gravel road). This will include new curb ramps on both sides of 116th Avenue SE and the installation of an RRFB system.  Spare conduit and junction box system will be added under the proposed sidewalk along the western side of the road. Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96 City of Renton 116th Ave SE Sidewalk Project – Amendment #2 September 17, 2024 Page 2 of 3 2727 Hollycroft Street, Suite 230  Gig Harbor, WA 98335  Office 253.201.0777  Fax 360.352.1509  scjalliance.com Assumptions The following assumptions were made to establish a scope and budget for this project. Changes to these assumptions may require an amendment to this scope of work.  This Amendment will extend the level of effort associated with the following phases for an additional seven (7) months, through May 2025.  All assumptions and work in the original project contract and Amendment #1 still apply, unless otherwise noted in the amendment.  The City applied for construction funding through the Transportation Improvement Board in August 2024. Should the City be awarded that grand funding, any work needed as part of that grant requirements is not included in this amendment and may require an additional amendment.  Any coordination with the Family First Center and any potential work associated with their private stormwater facility is not included in this scope of work. Phase 1 Management/Coordination/Administration (Modified) The level of effort included in the fee estimate covers the additional effort to manage the project due to project duration and scope change. Phase 2 Survey and Right-of-Way Base Mapping No changes. Phase 3 Conceptual Design No changes. Phase 4 Utility Coordination No changes. Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96 City of Renton 116th Ave SE Sidewalk Project – Amendment #2 September 17, 2024 Page 3 of 3 2727 Hollycroft Street, Suite 230  Gig Harbor, WA 98335  Office 253.201.0777  Fax 360.352.1509  scjalliance.com Phase 5 60% Design (Modified) The level of effort included in the fee estimate covers the additional effort required to redesign the project with the design changes mentioned in the introduction. Deliverables  Updated 60% Design Half Size Plans (11x17) submitted via email in PDF format  Updated 60% Specification Outline and Bid Item list submitted via email in PDF format  Updated 60% Design Engineer’s Estimate submitted via email in PDF format  Responses to the City’s previous 60% Design Comments submitted via email in PDF format  Draft Stormwater Technical Memorandum submitted via email in PDF format Task 5 Full Drainage Report (Modified) The level of effort included in the fee estimate covers the additional effort to address the City’s comments from the Draft Drainage Report submittal and to complete the Final Draft. Deliverables  Final Drainage Report including addressing the City’s comments on the draft report  Response to the City’s Draft Drainage Report comments submitted via email in PDF format Assumptions  This task is for one (1) Final Draft of the drainage report. Any City comments on the Final Draft submittal will require an additional amendment. Phase 6 SEPA Checklist No changes. Phase 7 100% Design (Modified) The level of effort included in the fee estimate covers the additional effort for the design changes previously stated in this scope. Phase 8 Bid Documents (Modified) The level of effort included in the fee estimate covers the additional effort for the design changes previously stated in this scope. Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96 Consultant Billing Rate Schedule SCJ Alliance Client:Hourly Rate Table Format: Billing Rate Schedule Project:Allowable Overhead Rate: N/A Job #:Negotiated Fixed Fee: N/A File Name:2024-0916 Renton 116th Ave SE Sidewalks_Fee Estimate - Amendment #2.xlsmLabor Template Version: 8/17/2023 Date: Total Hourly Total Hourly --Billing Rates Billing Rates Minimum NTE - - $185.00 $400.00 - - $165.00 $390.00 - - $185.00 $325.00 - - $165.00 $250.00 - - $145.00 $235.00 - - $130.00 $225.00 - - $155.00 $240.00 - - $145.00 $215.00 - - $125.00 $185.00 - - $105.00 $160.00 - - $100.00 $145.00 - - $130.00 $180.00 - - $120.00 $170.00 - - $115.00 $150.00 - - $105.00 $140.00 - - $100.00 $130.00 - - $155.00 $245.00 - - $125.00 $180.00 - - $115.00 $170.00 - - $105.00 $160.00 - - $90.00 $145.00 - - $115.00 $180.00 - - $110.00 $155.00 - - $100.00 $145.00 - - $90.00 $135.00 - - $80.00 $125.00 - - $0.00 $0.00 - - $185.00 $290.00 - - $170.00 $250.00 - - $145.00 $230.00 - - $140.00 $190.00 - - $145.00 $230.00 - - $170.00 $250.00 - - $145.00 $230.00 - - $120.00 $165.00 - - $100.00 $155.00 - - $100.00 $155.00 - - $125.00 $165.00 - - $115.00 $155.00 - - $100.00 $140.00 - - $100.00 $200.00 Construction Office Engineer CI 3 Construction Inspector CI 4 Construction Inspector Principal Construction Inspector T4 Technician Senior Construction Manager RE 3 Construction Resident Engineer E2 Engineer E1 Engineer L4 Landscape E3 Engineer RE 1 Construction Resident Engineer T1 Technician L3 Landscape T3 Technician T2 Technician L2 Landscape L1 Landscape Senior Planner P3 Planner P2 Planner RE 2 Construction Resident Engineer P4 Planner E4 Engineer Senior Consultant Senior Project Manager PM3 Project Manager PM2 Project Manager PM1 Project Manager Senior Engineer P1 Planner Senior Technician Senior Landscape Architect City of Renton 116th Ave SE Sidewalk Project 23-P00984 Billing Rate Schedule Job Classifications 9/17/24 CI 2 Construction Inspector CI 1 Construction Inspector Graphic Designer PC 3 Project Coordinator - CM Only PC 2 Project Coordinator PC 1 Project Coordinator Project Accountant Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96 Consultant Labor Hour Estimate SCJ Alliance Client:City of Renton Template Version:8/17/2023 Project:116th Ave SE Sidewalk Project Contract Type:Billing Rate Schedule No. of Sheets: N/A Job #:23-P00984 No. of Lots: N/A File Name: 2024-0916 Renton 116th Ave SE Sidewalks_Fee Estimate - Amendment #2.xlsm 259 199 145 113 168 137 Phase & Task No.Principal PM2 Project Manager E3 Engineer E2 Engineer E4 Engineer Project Accountant Total Direct Labor Hours & Cost Total Cost PHASE 1 Task 1 1 32.0 4.0 36.0 6,914.00$ 2 8.0 8.0 1,592.00$ Subtotal Hours: 40.0 4.0 44.0 8,506.00$ Task 2 1 8.0 8.0 1,592.00$ 2 3.0 10.0 12.0 25.0 4,406.05$ Subtotal Hours: 3.0 18.0 12.0 33.0 5,998.05$ Task 3 2 10.0 10.0 1,990.00$ Subtotal Hours: 10.0 10.0 1,990.00$ Total Phase Hours:3.0 68.0 16.0 87.0 87.0 Total Phase Direct Labor: $778.05 $13,532.00 $2,184.00 $16,494.05 16,494.05$ PHASE 5 Task 1 1 1.0 4.0 4.0 9.0 1,231.00$ 2 2.0 4.0 32.0 24.0 4.0 66.0 9,338.70$ 3 10.0 32.0 24.0 4.0 70.0 10,014.00$ Subtotal Hours: 2.0 15.0 68.0 52.0 8.0 145.0 20,583.70$ Task 2 1 1.0 4.0 4.0 9.0 1,635.35$ Subtotal Hours: 1.0 4.0 4.0 9.0 1,635.35$ Task 3 1 1.0 1.0 4.0 8.0 14.0 1,942.35$ Subtotal Hours: 1.0 1.0 4.0 8.0 14.0 1,942.35$ Task 5 1 1.0 20.0 21.0 3,559.00$ Subtotal Hours: 1.0 20.0 21.0 3,559.00$ Total Phase Hours:4.0 21.0 76.0 60.0 28.0 189.0 189.0$ Total Phase Direct Labor: $1,037.40 $4,179.00 $11,020.00 $6,780.00 $4,704.00 $27,720.40 27,720.40$ 60% Design Plans Final Drainage Report Final Drainage Report Progress Meetings (Assume 7) 60% Design Response to Comments 60% Design Cost Estimate 60% Design Cost Estimate Horizontal and Vertical Layout 60% Plans 60% Design Specifications 60% Design Specifications Progress Reports (assume 7) Progress Meetings Management Management Management/Coordination/Administration Schedule and Budget Adiminstration Progress Billings (assume 7) Phase & Task Title 1 of 2 9/17/2024 Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96 Consultant Labor Hour Estimate SCJ Alliance Client:City of Renton Template Version:8/17/2023 Project:116th Ave SE Sidewalk Project Contract Type:Billing Rate Schedule No. of Sheets: N/A Job #:23-P00984 No. of Lots: N/A File Name: 2024-0916 Renton 116th Ave SE Sidewalks_Fee Estimate - Amendment #2.xlsm 259 199 145 113 168 137 Phase & Task No.Principal PM2 Project Manager E3 Engineer E2 Engineer E4 Engineer Project Accountant Total Direct Labor Hours & Cost Total CostPhase & Task Title PHASE 7 Task 1 2 1.0 4.0 4.0 9.0 1,231.00$ 3 1.0 4.0 4.0 9.0 1,231.00$ Subtotal Hours: 2.0 8.0 8.0 18.0 2,462.00$ Task 2 1 1.0 2.0 3.0 489.00$ Subtotal Hours: 1.0 2.0 3.0 489.00$ Task 3 1 1.0 2.0 2.0 5.0 715.00$ Subtotal Hours: 1.0 2.0 2.0 5.0 715.00$ Total Phase Hours:4.0 12.0 10.0 26.0 26.0$ Total Phase Direct Labor: $796.00 $1,740.00 $1,130.00 $3,666.00 3,666.00$ PHASE 8 Task 1 1 2.0 4.0 8.0 14.0 1,882.00$ Subtotal Hours: 2.0 4.0 8.0 14.0 1,882.00$ Total Phase Hours:2.0 4.0 8.0 14.0 14.0$ Total Phase Direct Labor: $398.00 $580.00 $904.00 $1,882.00 1,882.00$ Total Hours All Phases 7.0 95.0 92.0 78.0 28.0 16.0 316.0 316.0 Total Direct Labor Estimate All Phases $1,815.45 $18,905.00 $13,340.00 $8,814.00 $4,704.00 $2,184.00 $49,762.45 49,762.45$ Indirect Costs Subconsultants: Subconsultant Subtotal:-$ Subconsultant Markup:-$ Subconsultant Total:-$ Reimbursable Expenses: Copies, Printing, etc.-$ Mileage -$ Expenses Subtotal:-$ Expenses Markup:-$ Expenses Total:-$ Management Reserve:-$ Total Indirect Costs:-$ Total: 49,762.45$ 100% Design Cost Estimate Bid Document Plans, Specifications & Estimate Bid Document Plans, Specifications & Estimate Bid Documents 100% Design Cost Estimate 100% Design Project Manual 100% Design 100% Design Plans 100% Design Project Manual 100% Design Plans Horizontal and Vertical Layout 2 of 2 9/17/2024 Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96 SCJ Alliance Client: Project: Job #:Template Version: File Name: 2024-0916 Renton 116th Ave SE Sidewalks_Fee Estimate - Amendment #2.xlsm Contract Type: Consultant Fee Determination DIRECT SALARY COST Classification Hours Fully Burdened Rate Amount Principal 7.0 $259 $1,815.45 PM2 Project Manager 95.0 $199 $18,905.00 E3 Engineer 92.0 $145 $13,340.00 E2 Engineer 78.0 $113 $8,814.00 E4 Engineer 28.0 $168 $4,704.00 Project Accountant 16.0 $137 $2,184.00 TOTAL SALARY COST Total Salary Cost $49,762.45 SUBCONSULTANTS No x Subconsultant Fee Subtotal:$0 $0.00 Q Subconsultant Markup:0%$0.00 REIMBURSABLE EXPENSES Copies, Printing, etc. 0.0% of the Total Salary Costs $0.00 Mileage 0 miles at $0.655 per mile $0.00 Expenses Subtotal: $0.00 Expenses Markup:0%$0.00 SUBTOTAL (SALARY, SUBCONSULTANTS AND EXPENSES) Subtotal (Salary, Subconsultants and Expenses)$49,762.45 MANAGEMENT RESERVE FUND (MRF) Management Reserve: $0 $0.00 Total Estimated Budget: $49,762.45 Consultant Fee Determination Summary 116th Ave SE Sidewalk Project 8/17/202323-P00984 Billing Rate Schedule City of Renton 9/17/2024 Page 1 Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96 City of Renton 116th Avenue SE Sidewalk Project - Amendment #2 09/17/2024 Contract Fee Summary Phase #Phase Title Original Contract Amount Contract Amendment #1 6/14/2024 Contract Amendment #2 9/17/2024 Contract Totals SCJ Labor 01 Management/Coordination/Adminstration 15,403.05$ -$ 16,494.05$ 31,897.10$ 02 Survey and Right of Way Base Mapping 15,025.50$ 9,292.50$ -$ 24,318.00$ 03 Conceptual Design 21,558.45$ -$ -$ 21,558.45$ 04 Utility Coordination 7,752.40$ -$ -$ 7,752.40$ 05 60% Design 40,733.75$ 16,416.35$ 27,720.40$ 84,870.50$ 06 SEPA Checklist 5,967.00$ -$ -$ 5,967.00$ 07 100% Design 29,936.55$ -$ 3,666.00$ 33,602.55$ 08 Bid Documents 14,083.85$ -$ 1,882.00$ 15,965.85$ 9 Management Reserve 15,000.00$ -$ -$ 15,000.00$ Subtotal $165,460.55 $25,708.85 $49,762.45 $240,931.85 Reimbursable Expenses 99 Reimbursable Expenses 196.50$ -$ -$ 196.50$ Subtotal $196.50 $0.00 $196.50 Summary Total $165,657.05 $25,708.85 $49,762.45 $241,128.35 Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96