AMENDMENT NO. 2 TO AGREEMENT FOR 116TH AVE SE
SIDEWALK PROJECT CAG-23-387
THIS AMENDMENT, dated for reference purposes only as September 19, 2024, is by and
between the City of Renton (the “City”), a Washington municipal corporation, and Shea Carr and
Jewell, Inc (dba SCJ Alliance) (“Consultant”), a Washington Corporation. The City and the
Consultant are referred to collectively in this Amendment as the “Parties.” Once fully executed
by the Parties, this Amendment is effective as of the last date signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-23-387, dated
November 9, 2023, to provide necessary services for the 116 th Ave SE Sidewalk Project (referred
to herein as the “Agreement”);
Whereas, the Parties wish to amend the Agreement to change the scope of work, and change the
compensation in order to complete storm water drainage report, updated construction cost
estimate, and collect additional survey.
NOW THEREFORE, It is mutually agreed upon that CAG-23-387 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit
A-2, which is attached and incorporated herein.
2. Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased by $49,762.45 from $191,365.90 to
$241,128.35, including any applicable state and local sales taxes. The additional
compensation shall be paid based upon Work actually performed according to the rate(s)
or amounts specified in Exhibit A-2, which is attached and incorporated herein.
3. All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96
PAGE 2 OF 2
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date
last signed by the Parties below.
CITY OF RENTON
By:_____________________________
CONSULTANT
By:____________________________
Martin Pastucha
Public Works Administrator
Aaron Knight, PE
Principal
_____________________________
Date
_____________________________
Date
Approved as to Legal Form
By: Cheryl L Beyer 9/25/24 (2852)
________________________
Cheryl Beyer
Senior Assistant City Attorney
Contract Template Updated 06/17/2021
9/20/2024
Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96
10/9/2024 | 3:52 PM PDT
Exhibit A-2
Amendment #2
Scope of Work
116th Avenue SE Sidewalk Project
Renton, WA
Prepared For: Blake Costa, PE, PTOE
City of Renton
1055 South Grady Way, Renton, WA 98057
Prepared By: George Hilen, PE, Project Manager
Date Prepared: September 17, 2024
Overview
Following the 60% design submittal, it was determined through coordination with the City that the existing
waterline in conflict with proposed stormwater along the western side of the road would not be able to be
relocated to accommodate the new stormwater system. Amendment #1 included a full draft Drainage Report
and an updated construction cost estimate for the change in stormwater system layout.
This amendment (Amendment #2) covers the added design efforts through bid documents associated with the
following design changes:
Installation of the proposed stormwater system under the southbound lane of 116th Avenue SE from SE
160th Street to SE 162nd Street. The stormwater system will be installed in the southbound lane to avoid
conflict with existing watermain.
An overlay of the southbound lane that includes storm line install restoration and regrading of the entire
lane to promote water flow to the western gutter/storm system.
Relocation of the existing midblock crosswalk on 116th Avenue SE, north of SE 160th Street (gravel road)
to a new location located south of SE 160th Street (gravel road). This will include new curb ramps on
both sides of 116th Avenue SE and the installation of an RRFB system.
Spare conduit and junction box system will be added under the proposed sidewalk along the western
side of the road.
Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96
City of Renton
116th Ave SE Sidewalk Project – Amendment #2
September 17, 2024
Page 2 of 3
2727 Hollycroft Street, Suite 230 Gig Harbor, WA 98335 Office 253.201.0777 Fax 360.352.1509 scjalliance.com
Assumptions
The following assumptions were made to establish a scope and budget for this project. Changes to these
assumptions may require an amendment to this scope of work.
This Amendment will extend the level of effort associated with the following phases for an additional
seven (7) months, through May 2025.
All assumptions and work in the original project contract and Amendment #1 still apply, unless otherwise
noted in the amendment.
The City applied for construction funding through the Transportation Improvement Board in August
2024. Should the City be awarded that grand funding, any work needed as part of that grant
requirements is not included in this amendment and may require an additional amendment.
Any coordination with the Family First Center and any potential work associated with their private
stormwater facility is not included in this scope of work.
Phase 1 Management/Coordination/Administration (Modified)
The level of effort included in the fee estimate covers the additional effort to manage the project due to project
duration and scope change.
Phase 2 Survey and Right-of-Way Base Mapping
No changes.
Phase 3 Conceptual Design
No changes.
Phase 4 Utility Coordination
No changes.
Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96
City of Renton
116th Ave SE Sidewalk Project – Amendment #2
September 17, 2024
Page 3 of 3
2727 Hollycroft Street, Suite 230 Gig Harbor, WA 98335 Office 253.201.0777 Fax 360.352.1509 scjalliance.com
Phase 5 60% Design (Modified)
The level of effort included in the fee estimate covers the additional effort required to redesign the project with
the design changes mentioned in the introduction.
Deliverables
Updated 60% Design Half Size Plans (11x17) submitted via email in PDF format
Updated 60% Specification Outline and Bid Item list submitted via email in PDF format
Updated 60% Design Engineer’s Estimate submitted via email in PDF format
Responses to the City’s previous 60% Design Comments submitted via email in PDF format
Draft Stormwater Technical Memorandum submitted via email in PDF format
Task 5 Full Drainage Report (Modified)
The level of effort included in the fee estimate covers the additional effort to address the City’s comments from
the Draft Drainage Report submittal and to complete the Final Draft.
Deliverables
Final Drainage Report including addressing the City’s comments on the draft report
Response to the City’s Draft Drainage Report comments submitted via email in PDF format
Assumptions
This task is for one (1) Final Draft of the drainage report. Any City comments on the Final Draft
submittal will require an additional amendment.
Phase 6 SEPA Checklist
No changes.
Phase 7 100% Design (Modified)
The level of effort included in the fee estimate covers the additional effort for the design changes previously
stated in this scope.
Phase 8 Bid Documents (Modified)
The level of effort included in the fee estimate covers the additional effort for the design changes previously
stated in this scope.
Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96
Consultant Billing Rate Schedule
SCJ Alliance
Client:Hourly Rate Table Format: Billing Rate Schedule
Project:Allowable Overhead Rate: N/A
Job #:Negotiated Fixed Fee: N/A
File Name:2024-0916 Renton 116th Ave SE Sidewalks_Fee Estimate - Amendment #2.xlsmLabor Template Version: 8/17/2023
Date:
Total Hourly Total Hourly
--Billing Rates Billing Rates
Minimum NTE
- - $185.00 $400.00
- - $165.00 $390.00
- - $185.00 $325.00
- - $165.00 $250.00
- - $145.00 $235.00
- - $130.00 $225.00
- - $155.00 $240.00
- - $145.00 $215.00
- - $125.00 $185.00
- - $105.00 $160.00
- - $100.00 $145.00
- - $130.00 $180.00
- - $120.00 $170.00
- - $115.00 $150.00
- - $105.00 $140.00
- - $100.00 $130.00
- - $155.00 $245.00
- - $125.00 $180.00
- - $115.00 $170.00
- - $105.00 $160.00
- - $90.00 $145.00
- - $115.00 $180.00
- - $110.00 $155.00
- - $100.00 $145.00
- - $90.00 $135.00
- - $80.00 $125.00
- - $0.00 $0.00
- - $185.00 $290.00
- - $170.00 $250.00
- - $145.00 $230.00
- - $140.00 $190.00
- - $145.00 $230.00
- - $170.00 $250.00
- - $145.00 $230.00
- - $120.00 $165.00
- - $100.00 $155.00
- - $100.00 $155.00
- - $125.00 $165.00
- - $115.00 $155.00
- - $100.00 $140.00
- - $100.00 $200.00
Construction Office Engineer
CI 3 Construction Inspector
CI 4 Construction Inspector
Principal
Construction Inspector
T4 Technician
Senior Construction Manager
RE 3 Construction Resident Engineer
E2 Engineer
E1 Engineer
L4 Landscape
E3 Engineer
RE 1 Construction Resident Engineer
T1 Technician
L3 Landscape
T3 Technician
T2 Technician
L2 Landscape
L1 Landscape
Senior Planner
P3 Planner
P2 Planner
RE 2 Construction Resident Engineer
P4 Planner
E4 Engineer
Senior Consultant
Senior Project Manager
PM3 Project Manager
PM2 Project Manager
PM1 Project Manager
Senior Engineer
P1 Planner
Senior Technician
Senior Landscape Architect
City of Renton
116th Ave SE Sidewalk Project
23-P00984
Billing Rate Schedule
Job Classifications
9/17/24
CI 2 Construction Inspector
CI 1 Construction Inspector
Graphic Designer
PC 3 Project Coordinator - CM Only
PC 2 Project Coordinator
PC 1 Project Coordinator
Project Accountant
Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96
Consultant Labor Hour Estimate
SCJ Alliance
Client:City of Renton Template Version:8/17/2023
Project:116th Ave SE Sidewalk Project Contract Type:Billing Rate Schedule No. of Sheets: N/A
Job #:23-P00984 No. of Lots: N/A
File Name: 2024-0916 Renton 116th Ave SE Sidewalks_Fee Estimate - Amendment #2.xlsm 259 199 145 113 168 137
Phase &
Task No.Principal PM2 Project
Manager E3 Engineer E2 Engineer E4 Engineer
Project
Accountant
Total Direct Labor
Hours & Cost Total Cost
PHASE 1
Task 1
1 32.0 4.0
36.0 6,914.00$
2 8.0 8.0 1,592.00$
Subtotal Hours: 40.0 4.0 44.0
8,506.00$
Task 2
1 8.0 8.0 1,592.00$
2 3.0 10.0 12.0 25.0 4,406.05$
Subtotal Hours: 3.0 18.0 12.0 33.0
5,998.05$
Task 3
2 10.0 10.0 1,990.00$
Subtotal Hours: 10.0 10.0
1,990.00$
Total Phase Hours:3.0 68.0 16.0 87.0 87.0
Total Phase Direct Labor: $778.05 $13,532.00 $2,184.00 $16,494.05 16,494.05$
PHASE 5
Task 1
1 1.0 4.0 4.0 9.0 1,231.00$
2 2.0 4.0 32.0 24.0 4.0 66.0 9,338.70$
3 10.0 32.0 24.0 4.0 70.0 10,014.00$
Subtotal Hours: 2.0 15.0 68.0 52.0 8.0 145.0
20,583.70$
Task 2
1 1.0 4.0 4.0 9.0 1,635.35$
Subtotal Hours: 1.0 4.0 4.0 9.0
1,635.35$
Task 3
1 1.0 1.0 4.0 8.0 14.0 1,942.35$
Subtotal Hours: 1.0 1.0 4.0 8.0 14.0
1,942.35$
Task 5
1 1.0 20.0 21.0 3,559.00$
Subtotal Hours: 1.0 20.0 21.0 3,559.00$
Total Phase Hours:4.0 21.0 76.0 60.0 28.0 189.0 189.0$
Total Phase Direct Labor: $1,037.40 $4,179.00 $11,020.00 $6,780.00 $4,704.00 $27,720.40 27,720.40$
60% Design Plans
Final Drainage Report
Final Drainage Report
Progress Meetings (Assume 7)
60% Design
Response to Comments
60% Design Cost Estimate
60% Design Cost Estimate
Horizontal and Vertical Layout
60% Plans
60% Design Specifications
60% Design Specifications
Progress Reports (assume 7)
Progress Meetings
Management
Management
Management/Coordination/Administration
Schedule and Budget
Adiminstration
Progress Billings (assume 7)
Phase & Task Title
1 of 2 9/17/2024
Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96
Consultant Labor Hour Estimate
SCJ Alliance
Client:City of Renton Template Version:8/17/2023
Project:116th Ave SE Sidewalk Project Contract Type:Billing Rate Schedule No. of Sheets: N/A
Job #:23-P00984 No. of Lots: N/A
File Name: 2024-0916 Renton 116th Ave SE Sidewalks_Fee Estimate - Amendment #2.xlsm 259 199 145 113 168 137
Phase &
Task No.Principal PM2 Project
Manager E3 Engineer E2 Engineer E4 Engineer
Project
Accountant
Total Direct Labor
Hours & Cost Total CostPhase & Task Title
PHASE 7
Task 1
2 1.0 4.0 4.0
9.0 1,231.00$
3 1.0 4.0 4.0
9.0 1,231.00$
Subtotal Hours: 2.0 8.0 8.0 18.0
2,462.00$
Task 2
1 1.0 2.0 3.0 489.00$
Subtotal Hours: 1.0 2.0 3.0
489.00$
Task 3
1 1.0 2.0 2.0 5.0 715.00$
Subtotal Hours: 1.0 2.0 2.0 5.0
715.00$
Total Phase Hours:4.0 12.0 10.0 26.0 26.0$
Total Phase Direct Labor: $796.00 $1,740.00 $1,130.00 $3,666.00 3,666.00$
PHASE 8
Task 1
1 2.0 4.0 8.0 14.0 1,882.00$
Subtotal Hours: 2.0 4.0 8.0 14.0
1,882.00$
Total Phase Hours:2.0 4.0 8.0 14.0 14.0$
Total Phase Direct Labor: $398.00 $580.00 $904.00 $1,882.00 1,882.00$
Total Hours All Phases 7.0 95.0 92.0 78.0 28.0 16.0 316.0
316.0
Total Direct Labor Estimate All Phases $1,815.45 $18,905.00 $13,340.00 $8,814.00 $4,704.00 $2,184.00 $49,762.45
49,762.45$
Indirect Costs
Subconsultants:
Subconsultant Subtotal:-$
Subconsultant Markup:-$
Subconsultant Total:-$
Reimbursable Expenses:
Copies, Printing, etc.-$
Mileage -$
Expenses Subtotal:-$
Expenses Markup:-$
Expenses Total:-$
Management Reserve:-$
Total Indirect Costs:-$
Total: 49,762.45$
100% Design Cost Estimate
Bid Document Plans, Specifications & Estimate
Bid Document Plans, Specifications & Estimate
Bid Documents
100% Design Cost Estimate
100% Design Project Manual
100% Design
100% Design Plans
100% Design Project Manual
100% Design Plans
Horizontal and Vertical Layout
2 of 2 9/17/2024
Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96
SCJ Alliance
Client:
Project:
Job #:Template Version:
File Name: 2024-0916 Renton 116th Ave SE Sidewalks_Fee Estimate - Amendment #2.xlsm Contract Type:
Consultant Fee Determination
DIRECT SALARY COST
Classification Hours Fully Burdened Rate Amount
Principal 7.0 $259 $1,815.45
PM2 Project Manager 95.0 $199 $18,905.00
E3 Engineer 92.0 $145 $13,340.00
E2 Engineer 78.0 $113 $8,814.00
E4 Engineer 28.0 $168 $4,704.00
Project Accountant 16.0 $137 $2,184.00
TOTAL SALARY COST Total Salary Cost $49,762.45
SUBCONSULTANTS No
x
Subconsultant Fee Subtotal:$0 $0.00
Q Subconsultant Markup:0%$0.00
REIMBURSABLE EXPENSES
Copies, Printing, etc. 0.0% of the Total Salary Costs $0.00
Mileage 0 miles at $0.655 per mile $0.00
Expenses Subtotal: $0.00
Expenses Markup:0%$0.00
SUBTOTAL (SALARY, SUBCONSULTANTS AND EXPENSES)
Subtotal (Salary, Subconsultants and Expenses)$49,762.45
MANAGEMENT RESERVE FUND (MRF)
Management Reserve: $0 $0.00
Total Estimated Budget: $49,762.45
Consultant Fee Determination Summary
116th Ave SE Sidewalk Project
8/17/202323-P00984
Billing Rate Schedule
City of Renton
9/17/2024 Page 1
Docusign Envelope ID: 3920FFEB-C72C-4220-B042-2A7B94C8FA96
City of Renton
116th Avenue SE Sidewalk Project - Amendment #2
09/17/2024
Contract Fee Summary
Phase #Phase Title
Original Contract
Amount
Contract
Amendment #1
6/14/2024
Contract
Amendment #2
9/17/2024 Contract Totals
SCJ Labor
01 Management/Coordination/Adminstration 15,403.05$ -$ 16,494.05$ 31,897.10$
02 Survey and Right of Way Base Mapping 15,025.50$ 9,292.50$ -$ 24,318.00$
03 Conceptual Design 21,558.45$ -$ -$ 21,558.45$
04 Utility Coordination 7,752.40$ -$ -$ 7,752.40$
05 60% Design 40,733.75$ 16,416.35$ 27,720.40$ 84,870.50$
06 SEPA Checklist 5,967.00$ -$ -$ 5,967.00$
07 100% Design 29,936.55$ -$ 3,666.00$ 33,602.55$
08 Bid Documents 14,083.85$ -$ 1,882.00$ 15,965.85$
9 Management Reserve 15,000.00$ -$ -$ 15,000.00$
Subtotal $165,460.55 $25,708.85 $49,762.45 $240,931.85
Reimbursable Expenses
99 Reimbursable Expenses 196.50$ -$ -$ 196.50$
Subtotal $196.50 $0.00 $196.50
Summary
Total $165,657.05 $25,708.85 $49,762.45 $241,128.35