AMENDMENT NO. 6 TO AGREEMENT FOR PROFESSIONAL
DESIGN SERVICES -PAVILION
THIS AMENDMENT, dated for reference purposes only as October 10, 2024, is by and between
the City of Renton (the "City"), a Washington municipal corporation, and Graham Baba Architects
("Consultant"). The City and the Consultant are referred to collectively in this Amendment as the
"Parties." Once fully executed by the Parties, this Amendment is effective as of the last date
signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-22-376, dated
12/06/2022, to provide necessary services for the Renton Pavilion-Redevelopment and
Conceptual Design project (referred to herein as the "Agreement");
Whereas, the Parties wish to amend the Agreement to provide additional design and consultation
services as-needed and increase fee for the additional services.
NOW THEREFORE, It is mutually agreed upon that CAG-22-376 is amended as follows:
1.
2.
3.
Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit
A-6, which is attached and incorporated herein.
Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased by $5,250.00 from $1,245,877.00 to
$1,251,127.00, plus any applicable state and local sales taxes. The additional
compensation shall be paid based upon Work actually performed according to the rate(s)
or amounts specified in Exhibit A-6 which is attached and incorporated herein
All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date
last signed by the Parties below.
CAG-22-376, Adden #6-24
Docusign Envelope ID: 0825D847-76E5-46CE-861 O-BE904BB46607
CITY OF RENTON G ,� .. •·" . .,
By: �s7,�!�a�:st ucha
Martin Pastucha, Administrator
Public Works
10/10/2024 I 2:06 PM PDT
Date
Approved as to Legal Form
By: _________ _ Shane Moloney
City Attorney
Contract Template Updated 06/17/2021
PAGE 2 OF 2
CONSULTANT
Date
Approved by Cheryl Beyer via email 10/9/2024
Docusign Envelope ID: 0825D847-76E5-46CE-861 0-BE904BB46607 EXHIBIT A-6
GRAHAM BABA ARCHITECTS
ADDITONAL SERVICES REQUEST 05
Date
Between the uclient"
July 25, 2024
Deborah Boodell
City of Renton
And "Architect"
For the "Project"
1055 S. Grady Way, 6th Floor
Renton, WA 98057
Graham Baba Architects
1507 Belmont Avenue, Suite 200
Seattle, WA 98122
Renton Market -Additional Structural Scope
Under the "Agreement" Agreement for Conceptual Redevelopment Study and Design
Dated December 6, 2022
Additional Services Description:
A.The Client authorizes Graham Baba Architects to perform the following Additional Services:
o Structural design services scopes recently identified as needed for the project:•DD level of design for wood framed trash enclosure building with roof and concrete foundations. This
work has already been completed, but the scope is no longer included in the project.•Back-up framing to support new fall protection anchors.
Fall protection anchor layout design and attachments of the anchor to structure are assumed to be
provided by the manufacturer and are not included in this scope.•Calculations for the fall protection anchor back-up framing will be provided with the permit submittal
as required.
o Architectural coordination and administration of additional structural work
o GBA 10% Markup on Consultants
Assumptions
A minimum of (4) weeks will be permitted to complete the design for permit submittal from notice to proceed. The
design of mechanical equipment attachments or any associated modifications are not included in this proposal.
B.Our proposal is that services be performed on a lump sum basis in the amount of $5250. Although a sizable portion
of the work was already performed and completed during the DD phase (structural design of the trash enclosure
building), since that phase has been completed we propose adding this sum onto the CD phase, which is currently
contracted at $276,937.00 and would therefore be increased to $282,187.00. Total contract is $1,251,127.00 that
includes ASR #5.
Brian Jonas, Principal/Owner
GRAHAM BABA ARCHITECTS
+it!ea Oat�====