HomeMy WebLinkAbout291986 S14ALL BRIDGE REPAIR a GUARD RAILS
SCHEDULE OF PRICES
s all extentions and total amount of bid
(NOTE: Unit prices for all item , figures and where
in both word,' and
must
be shown. Show unit prices
typed words shall prevoil.)
conflict occurs the written or
ITEM
APPROX.
ITEM WITH UNIT PRICED BID UNIT PRICE AMOUNT
�rices be Writ— ;_ Wfs) DOLLARS CTS_ DOLLARS T
NO.
QUANTITY
(Unit to
Install City -furnished Pipe Gate
r)o 0. 2-1
11.
Lump Sum
at Devil's Elbow-
$ SeVE_ k�,7—ort
Per LJMP zulll 09
/0.
S�_
3301
12.
33 SY
Remove existing walks and pavement.
-1 0 a �,�n rt.
Per uare Vo
A 0
3
13.
10 EA.
Bridge connections - Beam Guard Rail.
T-VIIZFE pjU�Oafio
_r
e ia-ch
.j 14.
485 EA.
Cement concrete curb and gutter . tl
,,q
Type "A".
1.4
"I-F
Iq
Per Linear Foot
�—,
-3 r) S-0
.j 15.
EA.
Remove existing rail and post.
__15
SITE
Two Hu-ojeev FF
�Each
Per Site
r)
SUBTOTAL SCHEDULE "G'" - ADDITIVE BI
BASE BIDS:
?fro S-0
Subtotal Schedule "A"
Subtotal Schedule "B"
4
SUBTOTAL BASE BIDS
3
ADDITIVE BIDS:
"C"
)00.
Subtotal Schedule
0 of-0
Subtotal Schedule "D"
a o.t_-
J
Subtotal Schedule "E"
/4, so C�
Subtotal Schedule "F"
130
Subtotal Schedule "G"
S14 a4
SUBTOTAL ADDITIVE BIDS
GRANu TOTAL