Loading...
HomeMy WebLinkAbout34L� Contracts Other Than Federal -Aid FHWA 3 of 7 subcontractors should violate any of the provisions of this Contract, the City may then serve written notice upon him and his surety of its intention to terminate the Contract, and unless within ten (10) days after the serving of such notice, such violation or non-compliance of any provision of the Contract shall cease and satisfactory arrangement for the correction thereof be made, this Contract. shall, upon the expiration of said ten (10) day per4,)d, cease and terminate in every respect. In the event of any such termination, the City shall immediately serve written notice thereof upon the surety and ithe Contractor and the surety shall have the right to take over and perform the Contract, provided, �owever, that if the surety within fifteen (15) days after the serving upon it of such notice of termination does not perform the Contract or does not commence performance thereof within thirty (30) days from the date of serving such notice, the City itself may take over the work under the Contract and prosecute the sarne to completion by Contract or by any other method it may deem advisable. for the account and at the expense of the Contractor, and his surety shall be liable to the City for any excess cost or other damages occasioned the City thereby. In such event, the City, if it so elects. may, without liability for so doing, take possession of and utilize in completing said Contract such materials. machinery, appliances. equipment, plants and other properties belonging to the Contractor as Yrzy be on site of the project and useful therein. 4) The foregoing provisions are in addition to and not in limitation of any other rights or remedies available to the City.