Loading...
HomeMy WebLinkAbout44—�W ad CONTR-kCTOR/SUBCONTR-ACTOR PEPORTING PE1,10D UTILIZATION REPORT Month: YeaT: MONTHLY KANPOWER Goal s and Timetables as committed -o be submitted to t-he city's Project in Contractor's Affirmative Engineer during the ist week of following T % montn while contract is in progress. Prime Action Plan Contrac-tor is responsible for obtaining and or per City's Plan 9.1 submitting all Subcontractor Reports. To: (Neapp and location of compliance Agency Dept.) From: (ma,ae and IoC*tio� Of ont—.t—) This report is required by xecutive Order Ilf-46, Section 203� Failure to report can result in sanctions which include suspension, termination, cancellations or debarment of C tract. 4. 5 6. 3. in T�tal rotal be, W.,k H, of E.pi.y..nt (Sea f--tncte) rit n.m —ber y of of c. /h of m,—r�ty mp3DY- cn:! His- Amer. A.i—/ otal total Employ ft , pa,�,c lndi— Pv�lflc e- ees C..paM,. N"a (I. D.) Trade one r. Ilar d C A Tr AV Tr AD Tr C AD Tr A k A T T, T� company orfioial�& Siz Ture �d TItIe Da Sign�d 9. Telephon� Lumber (include Area Code) 11/77 (*Kale:t&je�ies, **M�norities & Non-minorxties) 7/80 (.ubmi a Requirements r. City-s Coals/Timet&bles) Page o f