Loading...
HomeMy WebLinkAbout48I K PERMITS REQUIRED FOR THE PROJECT ARE AS FOLLOWS: KING COUNTY BUILDING AND LAND DEVELOPMENT DI%rISION NK YfE on No. 25789 requires an unclassified use gigtoyg; mMiluarrying (including borrow pits and associ- ated activities such as asphalt plants, rock crushers) and refuse disposal sites and provides for land reclamation subse- quent to these activities. A copy is available at the Department of Public Works or Building and Land Development Division. Shoreline M IMT 11 Act 1971 requires a permit for construction o-n-3—tate sTWr Ms. Permit acquired by Public Works and reviewed by Building and Land Development Divisio;.. ;j,nf.qoM%X Ordl!!:?c; No. 1488 requires permit for grading, land , gr veT t umping, quarrying and mining operations except on County right-of-way. Review by Building and -Land Develop- ment Division. WASHINGTON STATE DEPARTMENT OF FISHERIES AND GMIL Chg5j!1.112 f Requires hydraulics permit on certain �f . tK�i%sdGnIty"DLpartment of Public Works will obtain.) WASHINGTON STATE DEPARTMENT OF ECOLOGY W.A.C. 173-220: Requires a National Pollutant Discharge Elimination System (NPUE'ST permit before discharge of pollutants from a point source into the navigable waters of the State of Washington. W.A.C. 372-24: Permit to discharge commercial or industrial. waste waters int tate surface or ground water (such as gravel washing, pit operations, or any operation which results in a discharge which contains turbidity.) W.A.C. 508-12-100: Requires permit to use surface water. W.A.C. 508-12-190: Requires that changes to permits for water use 7 be reviewed by the Department of Ecology whenever it is desired to change the purpose of use, the place of use, the point of withdrawal and/or the diversion of water. W.A.C. 508-12-220: Requires permit to use ground wat-!r. W�A.C. 508-12-260: Requires permit to construct reservoir for water storage. W.A.C. 508-12-280: Requires permit to construct storage dam. ..j W.A.C. 508-60: Requires permit to construct in State flood Z —on -tr-o-r z —on e . King County Public Works secures one for design. -i Contractor secures one for his operation (false work design, etc.). _j -3-